Scheduling information generation method and device, electronic equipment, medium and program product

Through the circular iterative optimization of the air transport and land transport scheduling models, the problem of insufficient resource allocation in air-land transport scheduling is solved, the optimal matching of resources and the shortening of transportation time are achieved, and the accuracy and user experience of scheduling are improved.

CN118941178APending Publication Date: 2024-11-12BEIJING JINGDONG YUANSHENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410981784.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the existing air-to-land intermodal transport scheduling methods, air transport scheduling information cannot be effectively fed back to land transportation after it is generated, resulting in incomplete resource allocation, resulting in waste of resources and extended transportation time.

Method used

By obtaining item order information, air transportation resource information, land transportation resource information and scheduling models, the cycle iterative optimization of the air transportation scheduling model and land transportation scheduling model is adopted to achieve the optimal matching and allocation of air transportation and land transportation resources, and generate accurate generation air-land transport dispatch information.

Benefits of technology

It reduces the waste of air and land transportation resources, shortens transportation time, and improves the accuracy and user experience of transportation scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941178A_ABST
    Figure CN118941178A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses a scheduling information generation method and device, electronic equipment, a medium and a program product. A specific embodiment of the method comprises the steps of obtaining an article order information set, an air transportation resource information set, a land transportation resource information set, an air transportation scheduling model and a land transportation scheduling model; inputting the article order information set and the air transportation resource information set into an air transportation scheduling model to obtain air transportation scheduling information and air transportation value consumption information; inputting the air transportation scheduling information and the land transportation resource information set into a land transportation scheduling model to obtain land transportation scheduling information and land transportation value consumption information; inputting the land transportation scheduling information into an air transportation scheduling model to obtain target air transportation scheduling information and target air transportation value consumption information; and air-land combined transportation scheduling information is generated. The implementation mode is related to intelligent logistics, the transportation cost can be reduced, the transportation time can be shortened, and waste of transportation resources is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present disclosure relate to the field of computer technology, and in particular to a method, device, electronic device, medium, and program product for generating scheduling information. Background Art

[0002] Air-land transport scheduling refers to the service scheduling of transporting goods from one location to another quickly and efficiently by combining air transport and land transport. Since air-land transport scheduling involves the comprehensive scheduling of multiple scheduling links, the transportation scheduling cost is relatively high. How to achieve the joint scheduling of multiple scheduling links has become a key issue of concern. For the generation of scheduling information, the usual method is to determine the air transport scheduling information of air transport based on various evaluation indicators empirically discovered by experts. Then, the land transport scheduling information of land transport is generated through the air transport scheduling information of air transport to complete the scheduling of the item set corresponding to the item order information set.

[0003] However, the inventors have found that when the above method is used to generate scheduling information, the following technical problems often occur:

[0004] Since the air transport scheduling information is determined first and the land transport scheduling information is generated based on the air transport scheduling information, the land transport scheduling information cannot be fed back to the air transport information, and the air transport resources and land transport resources cannot be systematically allocated as a whole. The accuracy of the generated air-land intermodal transport scheduling information is low, resulting in a waste of air transport resources and land transport resources and an increase in transportation time.

[0005] The above information disclosed in this Background section is only for enhancement of understanding of the background of the inventive concept and therefore it may contain information that does not form the prior art that is already known in this country to a person of ordinary skill in the art. Summary of the invention

[0006] The content of this disclosure is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this disclosure is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.

[0007] Some embodiments of the present disclosure propose scheduling information generation methods, devices, electronic devices, media, and program products to solve one or more of the technical problems mentioned in the above background technology section.

[0008] In a first aspect, some embodiments of the present disclosure provide a scheduling information generation method, including: obtaining an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model, and a land transport scheduling model; inputting the above-mentioned item order information set and the above-mentioned air transport resource information set into the above-mentioned air transport scheduling model to obtain air transport scheduling information and air transport value consumption information; based on the air transport scheduling information, performing the following generation steps: inputting the air transport scheduling information and the above-mentioned land transport resource information set into the above-mentioned land transport scheduling model to obtain land transport scheduling information and land transport value consumption information; inputting the land transport scheduling information into the above-mentioned air transport scheduling model to obtain target air transport scheduling information and target air transport value consumption information; in response to determining that the air transport value consumption information, the target air transport value consumption information, and the land transport value consumption information meet preset conditions, generating air-land combined transport scheduling information according to the target air transport scheduling information and the land transport scheduling information.

[0009] Optionally, the above method also includes: in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information do not meet the preset conditions, determining the target air transport scheduling information as the air transport scheduling information to perform the above generation step again.

[0010] Optionally, the above-mentioned air transport scheduling model includes: an air transport value consumption objective function, order flight matching constraints, flight order capacity constraints and flight order time constraints; and the above-mentioned item order information set and the above-mentioned air transport resource information set are input into the above-mentioned air transport scheduling model to obtain air transport scheduling information and air transport value consumption information, including: screening out at least one item order information corresponding to the above-mentioned air transport resource information set from the above-mentioned item order information set to obtain a target item order information set; inputting the above-mentioned target item order information set and the above-mentioned air transport resource information set into the above-mentioned air transport value consumption objective function to generate the above-mentioned air transport value consumption information and the above-mentioned air transport scheduling information under the above-mentioned order flight matching constraints, the above-mentioned flight order capacity constraints and the above-mentioned flight order time constraints.

[0011] Optionally, the above-mentioned land transportation scheduling model includes: a land cargo collection transportation scheduling model and a land bulk cargo transportation scheduling model; and the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set are input into the above-mentioned land transportation scheduling model to obtain land transportation scheduling information and land transportation value consumption information, including: inputting the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set into the above-mentioned land cargo collection transportation scheduling model to obtain cargo collection transportation value consumption information and cargo collection transportation scheduling information; inputting the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set into the above-mentioned land bulk cargo transportation scheduling model to obtain bulk cargo transportation value consumption information and bulk cargo transportation scheduling information; determining the above-mentioned cargo collection transportation value consumption information and the above-mentioned bulk cargo transportation value consumption information as land transportation value consumption information; determining the above-mentioned cargo collection transportation scheduling information and the above-mentioned bulk cargo transportation scheduling information as land transportation scheduling information.

[0012] Optionally, the above-mentioned land cargo collection and transportation scheduling model includes: cargo collection and transportation value consumption objective function, cargo collection path constraints and cargo collection and transportation equipment constraints; the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set are input into the above-mentioned land cargo collection and transportation scheduling model to obtain cargo collection and transportation value consumption information and cargo collection and transportation scheduling information, including: inputting the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set into the above-mentioned cargo collection and transportation value consumption objective function to generate cargo collection and transportation value consumption information and cargo collection and transportation scheduling information under the above-mentioned cargo collection path constraints and the above-mentioned cargo collection and transportation equipment constraints.

[0013] Optionally, the above-mentioned land bulk cargo transportation scheduling model includes: a bulk cargo transportation value consumption objective function, bulk cargo path constraints and bulk cargo transportation equipment constraints; and the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set are input into the above-mentioned land bulk cargo transportation scheduling model to obtain bulk cargo transportation value consumption information and bulk cargo transportation scheduling information, including: inputting the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set into the above-mentioned bulk cargo transportation value consumption objective function to generate bulk cargo transportation value consumption information and bulk cargo transportation scheduling information under the above-mentioned bulk cargo path constraints and the above-mentioned bulk cargo transportation equipment constraints.

[0014] Optionally, the method further includes: controlling land transport equipment and transport aircraft devices according to the air-land transport scheduling information to schedule items for the item set corresponding to the item order information set.

[0015] In a second aspect, some embodiments of the present disclosure provide a scheduling information generating device, including: an acquisition unit, configured to acquire an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model, and a land transport scheduling model; an input unit, configured to input the above-mentioned item order information set and the above-mentioned air transport resource information set into the above-mentioned air transport scheduling model to obtain air transport scheduling information and air transport value consumption information; an execution unit, configured to execute the following generation steps based on the air transport scheduling information: input the air transport scheduling information and the above-mentioned land transport resource information set into the above-mentioned land transport scheduling model to obtain land transport scheduling information and land transport value consumption information; input the land transport scheduling information into the above-mentioned air transport scheduling model to obtain target air transport scheduling information and target air transport value consumption information; in response to determining that the air transport value consumption information, the target air transport value consumption information, and the land transport value consumption information meet preset conditions, generate air-land combined transport scheduling information according to the target air transport scheduling information and the land transport scheduling information.

[0016] Optionally, the device also includes: in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information do not meet the preset conditions, determining the target air transport scheduling information as the air transport scheduling information to perform the above-mentioned generation step again.

[0017] Optionally, the input unit can be further configured as follows: the above-mentioned air transport scheduling model includes: an air transport value consumption objective function, order flight matching constraints, flight order capacity constraints and flight order time constraints; and screening out at least one item order information corresponding to the above-mentioned air transport resource information set from the above-mentioned item order information set to obtain a target item order information set; inputting the above-mentioned target item order information set and the above-mentioned air transport resource information set into the above-mentioned air transport value consumption objective function to generate the above-mentioned air transport value consumption information and the above-mentioned air transport scheduling information under the above-mentioned order flight matching constraints, the above-mentioned flight order capacity constraints and the above-mentioned flight order time constraints.

[0018] Optionally, the execution unit can be further configured as follows: the above-mentioned land transportation scheduling model includes: a land cargo collection transportation scheduling model and a land bulk cargo transportation scheduling model; and the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set are input into the above-mentioned land cargo collection transportation scheduling model to obtain cargo collection transportation value consumption information and cargo collection transportation scheduling information; the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set are input into the above-mentioned land bulk cargo transportation scheduling model to obtain bulk cargo transportation value consumption information and bulk cargo transportation scheduling information; the above-mentioned cargo collection transportation value consumption information and the above-mentioned bulk cargo transportation value consumption information are determined as land transportation value consumption information; the above-mentioned cargo collection transportation scheduling information and the above-mentioned bulk cargo transportation scheduling information are determined as land transportation scheduling information.

[0019] Optionally, the execution unit can be further configured to: the above-mentioned land cargo collection and transportation scheduling model includes: cargo collection and transportation value consumption objective function, cargo collection path constraints and cargo collection and transportation equipment constraints; and the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set are input into the above-mentioned cargo collection and transportation value consumption objective function to generate cargo collection and transportation value consumption information and cargo collection and transportation scheduling information under the above-mentioned cargo collection path constraints and the above-mentioned cargo collection and transportation equipment constraints.

[0020] Optionally, the execution unit can be further configured to: the above-mentioned land bulk cargo transportation scheduling model includes: bulk cargo transportation value consumption objective function, bulk cargo path constraints and bulk cargo transportation equipment constraints; and the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set are input into the above-mentioned bulk cargo transportation value consumption objective function to generate bulk cargo transportation value consumption information and bulk cargo transportation scheduling information under the above-mentioned bulk cargo path constraints and the above-mentioned bulk cargo transportation equipment constraints.

[0021] Optionally, the device further includes: controlling land transport equipment and transport aircraft devices according to the above-mentioned air-land transport scheduling information to schedule items for the item set corresponding to the above-mentioned item order information set.

[0022] In a third aspect, some embodiments of the present disclosure provide an electronic device comprising: one or more processors; a storage device on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation manner in the above-mentioned first aspect.

[0023] In a fourth aspect, some embodiments of the present disclosure provide a computer-readable medium having a computer program stored thereon, wherein when the program is executed by a processor, the method described in any one of the implementation modes in the first aspect above is implemented.

[0024] In a fifth aspect, some embodiments of the present disclosure provide a computer program product, including a computer program, which implements the method described in any implementation manner in the above-mentioned first aspect when executed by a processor.

[0025] The above-mentioned embodiments of the present disclosure have the following beneficial effects: the scheduling information generation method of some embodiments of the present disclosure can reduce the order transportation cost and shorten the order transportation time, and reduce the waste of air transportation resources and land transportation resources. Specifically, the waste of relevant air transportation resources and land transportation resources and the increase of transportation time are caused by: since the air transportation scheduling information is determined first, and the land transportation scheduling information is generated based on the air transportation scheduling information, the land transportation scheduling information cannot be fed back to the air transportation information, and the air transportation resources and land transportation resources cannot be systematically allocated as a whole. The accuracy of the generated air-land transport scheduling information is low, resulting in the waste of air transportation resources and land transportation resources and the increase of transportation time. Based on this, the scheduling information generation method of some embodiments of the present disclosure first obtains the item order information set, the air transportation resource information set, the land transportation resource information set, the air transportation scheduling model and the land transportation scheduling model. Here, the item order information set, the air transportation resource information set, the land transportation resource information set, the air transportation scheduling model and the land transportation scheduling model are used for the subsequent generation of air scheduling information and air transportation value consumption information. Then, the above-mentioned item order information set and the above-mentioned air transport resource information set are input into the above-mentioned air transport scheduling model to obtain air transport scheduling information and air transport value consumption information. Here, the air transport scheduling model can be a mixed integer programming model, which can achieve the optimal matching of the item order information set and the air transport resource information, minimize the air transport cost and air transport timeliness, and reduce the waste of air resources. Finally, based on the air transport scheduling information, the following generation steps are performed: the first step is to input the air transport scheduling information and the above-mentioned land transport resource information set into the above-mentioned land transport scheduling model to obtain land transport scheduling information and land transport value consumption information. Here, the land transport scheduling model can be a mixed integer programming model, which can achieve the optimal matching of the item order information set and the land transport resource information, minimize the land transport cost, and reduce the waste of land transport resources. The second step is to input the land transport scheduling information into the above-mentioned air transport scheduling model to obtain the target air transport scheduling information and the target air transport value consumption information. Here, the cyclic iterative optimization of the air transport scheduling model and the land transport scheduling model can be realized, the feedback mechanism of the air transport stage and the land transport stage can be realized, and the optimal utilization of air transport resources and land transport resources can be realized. In the third step, in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet the preset conditions, the air-land transport scheduling information is generated according to the target air transport scheduling information and the land transport scheduling information. Here, the air-land transport scheduling information with high accuracy can be generated to achieve fast and timely transport scheduling of item orders, reduce transport scheduling time, and improve user experience.In summary, through the cyclic iteration of the air transport scheduling model and the land transport scheduling model, the circular feedback of the land transport stage and the air transport stage can be realized, the matching degree between the item order information set and the air transport resource information set and the land transport resource information set can be improved, the air transport cost and the land transport cost can be reduced, the air transport and the land transport time can be shortened, the waste of air transport resources and the land transport resources can be reduced, and the user experience can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that components and elements are not necessarily drawn to scale.

[0027] Figure 1 is a schematic diagram of an application scenario of a scheduling information generation method according to some embodiments of the present disclosure;

[0028] Figure 2 is a flow chart of some embodiments of the scheduling information generation method according to the present disclosure;

[0029] Figure 3 is a flow chart of some other embodiments of the scheduling information generation method according to the present disclosure;

[0030] Figure 4 is a schematic diagram of an application scenario of other embodiments of the scheduling information generation method according to the present disclosure;

[0031] Figure 5 is a schematic diagram of the structure of some embodiments of the scheduling information generating device according to the present disclosure;

[0032] Figure 6 It is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present disclosure. DETAILED DESCRIPTION

[0033] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.

[0034] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.

[0035] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0036] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0037] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0038] With regard to the collection, storage, and use of user personal information (such as user portraits, user historical behavior, and item order purchase information) involved in this disclosure, relevant organizations or individuals must fulfill obligations such as conducting personal information security impact assessments, fulfilling the obligation to inform the personal information subject, and obtaining the prior authorization and consent of the personal information subject before performing the corresponding operations.

[0039] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0040] Figure 1 It is a schematic diagram of an application scenario of the scheduling information generation method according to some embodiments of the present disclosure.

[0041] exist Figure 1In the application scenario, the electronic device 101 can first obtain the item order information set 102, the air transport resource information set 103, the land transport resource information set 104, the air transport scheduling model 105 and the land transport scheduling model 106. Then, the above-mentioned item order information set 102 and the above-mentioned air transport resource information set 103 are input into the above-mentioned air transport scheduling model 105 to obtain the air transport scheduling information 107 and the air transport value consumption information 108. Finally, based on the air transport scheduling information 107, the following generation steps are performed: First, the air transport scheduling information 107 and the above-mentioned land transport resource information set 104 are input into the above-mentioned land transport scheduling model 106 to obtain the land transport scheduling information 109 and the land transport value consumption information 110. Second, the land transport scheduling information 109 is input into the above-mentioned air transport scheduling model 105 to obtain the target air transport scheduling information 111 and the target air transport value consumption information 112. In the third step, in response to determining that the air transport value consumption information 108, the target air transport value consumption information 112 and the land transport value consumption information 110 meet the preset conditions, the air-land transport scheduling information 113 is generated according to the target air transport scheduling information 111 and the land transport scheduling information 109.

[0042] It should be noted that the electronic device 101 can be hardware or software. When the electronic device is hardware, it can be implemented as a distributed cluster consisting of multiple servers or terminal devices, or it can be implemented as a single server or a single terminal device. When the electronic device is embodied as software, it can be installed in the hardware devices listed above. It can be implemented as multiple software or software modules for providing distributed services, for example, or it can be implemented as a single software or software module. No specific limitation is made here.

[0043] It should be understood that Figure 1 The number of electronic devices in the embodiment is only for illustration. Any number of electronic devices may be provided according to implementation requirements.

[0044] Continue to refer Figure 2 , shows a process 200 of some embodiments of the scheduling information generation method according to the present disclosure. The scheduling information generation method comprises the following steps:

[0045] Step 201, obtaining an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model and a land transport scheduling model.

[0046] In some embodiments, the execution subject of the above scheduling information generation method (for example Figure 1The electronic device 101 shown can obtain an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model and a land transport scheduling model through a wired connection or a wireless connection. Among them, the item order information in the above-mentioned item order information set can be order information waiting for delivery. The item order information in the above-mentioned item order information set can include but is not limited to at least one of the following: order starting position, order destination position, item weight, order transportation time. The air transport resource information in the above-mentioned air transport resource information set can be transportation resource information related to airports and flights. The above-mentioned air transport resource information set can include but is not limited to at least one of the following: flight departure time, flight arrival time, flight cargo capacity, airport location. The land transport resource information in the above-mentioned land transport resource information set can be transportation resource information of different types of land transport equipment. The above-mentioned land transport resource information set can include but is not limited to at least one of the following: land transport equipment type information, land transport equipment cargo capacity, land transport equipment starting position, land transport equipment identification information. The above-mentioned land transport equipment type information can be one of the following: road transport equipment and railway transport equipment. The air transport scheduling model may be a model that matches item order information and air transport resources to plan the air transport scheduling information of the item order. For example, the air transport scheduling model may be a linear programming model. The land transport scheduling model may be a model that matches item order information and land transport resources to plan the land transport scheduling information of the item order. For example, the land transport scheduling model may be a linear programming model.

[0047] Step 202: Input the item order information set and the air transport resource information set into the air transport scheduling model to obtain air transport scheduling information and air transport value consumption information.

[0048] In some embodiments, the execution entity may input the item order information set and the air transport resource information set into the air transport scheduling model to obtain air transport scheduling information and air transport value consumption information. The air transport scheduling information may be flight information for loading each item order. For example, the air transport scheduling information may be the take-off and landing time, flight loading capacity, and flight type information of the aircraft flight that matches each item order information. The air value consumption information may be information on the air transport cost and air transport time consumed by the order item set corresponding to the air transport item order information set.

[0049] As an example, the execution subject may use a heuristic algorithm to input the item order information set and the air transport resource information set into the air transport scheduling model and then solve the linear programming model to generate air transport scheduling information and air transport value consumption information. The heuristic algorithm may be a simulated annealing algorithm or a particle swarm optimization algorithm.

[0050] In some optional implementations of some embodiments, the air transport scheduling model includes: an air transport value consumption objective function, an order flight matching constraint condition, a flight order capacity constraint condition, and a flight order time constraint condition. Among them, the air transport value consumption objective function can be an objective function that minimizes air transport costs and air transport time. The air transport value consumption objective function can be obtained by the following steps: the first step is to determine the flight carrying item cost, flight transportation fuel cost, flight departure time, flight arrival time, and flight transportation time efficiency cost included in each air transport resource information in the air transport resource information set, and obtain the flight carrying item cost set, flight transportation fuel cost set, flight departure time set, flight arrival time set, and flight transportation time efficiency cost. The second step is to determine the cumulative sum of the product of the order flight variable parameter, item weight, and flight carrying item cost within the value range of the item order information set and the air transport resource information set as the air transport carrying cost. Among them, the order flight variable parameter can represent whether the item order information uses the flight set corresponding to the air transport resource information set for transportation. If it is used, the order flight variable parameter takes a value of 1, otherwise the order flight variable parameter takes a value of 0. The above-mentioned item weight may be the weight of the item order included in the item order information. The third step is to determine the flight time difference between each flight arrival time in the above-mentioned flight arrival time set and the corresponding flight departure time in the above-mentioned flight departure time set as a flight time difference set. The fourth step is to determine the cumulative sum of the products of the above-mentioned order flight variable parameters, flight time difference, and flight transportation fuel cost within the value range of the above-mentioned item order information set and the air transportation resource information set as the air transportation fuel cost. The fifth step is to determine the product of the above-mentioned air transportation fuel cost and the above-mentioned flight transportation time efficiency cost as the air transportation time efficiency cost. The sixth step is to minimize the sum of the above-mentioned air transportation carrying cost and the above-mentioned air transportation time efficiency cost to obtain the air transportation value consumption objective function.

[0051] The order flight matching constraint condition may be a condition that indicates that the item order information cannot be split into multiple item order information, and the same item order information can only be transported by the same airport and the same flight at the same time. The order flight matching constraint condition may be expressed as: the cumulative sum of the order flight parameters within the value range of the item order information set and the available flight information set is equal to the first preset threshold. The first preset threshold may be a preset value. For example, the first preset threshold may be 1. The available flight information set may be a transport information set of available aircraft flights of the transport item order set selected from the air transport resource information set.

[0052] The flight order capacity constraint condition may be a constraint condition that the sum of the weights of the items in the multiple item order information loaded on the flight is less than or equal to the maximum loading capacity of the flight. The flight order capacity constraint condition may be expressed as: the cumulative sum of the product of the order flight parameter variable and the item weight within the value range of the item order information set and the air transport resource information set is less than or equal to the maximum loading capacity of the flight. The maximum loading capacity of the flight may be the maximum capacity of the weight of items that can be loaded on the flight included in each air transport resource information in the air transport resource information set.

[0053] The flight order time constraint condition may be a constraint condition between the order transportation time, flight departure time, flight arrival time and the time for transporting the item order information to the order destination location by air transportation. The flight order time constraint condition may include: order start time constraint condition, equipment order time constraint condition, order termination time constraint condition, order bulk start time constraint condition and order bulk termination time constraint condition. The order start time constraint condition may be a constraint condition that represents that the item order information set loaded by the flight needs to arrive at the airport and be loaded before the flight departure time. The order start time constraint condition may be expressed as: the cumulative sum of the product of the flight departure time and the order flight parameter variable within the value range of the item order information set and the available flight information set is greater than or equal to the sum of the item arrival time at the starting airport and the item loading time. Among them, the item arrival time at the starting airport may be the time of arrival at the starting airport included in each item order information in the item order information set. The item loading time may be the time when the item order included in the item order information set is loaded to the aircraft flight for transportation.

[0054] The equipment order time constraint condition may be a constraint condition that indicates that the item order information set that needs to be loaded and transported by the flight has been transported to the airport by land transportation equipment before the flight departure time. The equipment order time constraint condition may be expressed as follows: the first step is to determine the sum of the time when the equipment arrives at the starting position, the service time when the equipment stays at the starting position, and the item start travel time as the order start time. The equipment arrival time at the starting position may be the time required for the land transportation equipment to arrive at the order start position. The service time when the equipment stays at the starting position may be the service time when the item order information stays at the order start position. The item start travel time may be the product of the order flight parameter variable and the item start travel time. The item start travel time may be the time required for the land transportation equipment to reach the order start airport position from the order start position. The order start airport position may be the airport position assigned to the order start position. The second step is that the order start time is less than or equal to the item start airport time. The item start airport time may be the time required for the item order included in the item order information to arrive at the order start airport position.

[0055] The order termination time constraint condition may be a constraint condition that the landing time of the flight representing the transport item order information is less than or equal to the arrival airport time specified in the item order information. The order termination time constraint condition may be expressed as: the product of the order flight parameter variable and the flight arrival time, the cumulative sum within the value range of the order starting airport position set and the item order information set, is less than or equal to the item landing airport time. The item landing airport time may be the time when the item order arrives at the landing airport included in the item order information.

[0056] The above-mentioned order bulk cargo start time constraint condition may be a constraint condition that indicates that the flight landing time needs to be less than or equal to the time when the land transportation equipment arrives at the airport to transport the item order information. The above-mentioned order bulk cargo start time constraint condition may be expressed as follows: Step 1, determine the sum of the item landing airport time and the item order unloading time as the item landing time. Step 2, the item landing airport departure time is greater than or equal to the item landing time. Among them, the above-mentioned item landing airport departure time may be the time when the item order information departs from the landing airport during the item order receiving stage.

[0057] The above-mentioned order bulk cargo termination time constraint condition may be a constraint condition that characterizes that the time for the item order to depart from the airport and arrive at the destination of the item order information needs to be less than or equal to the latest arrival time specified in the item order information. The above-mentioned order bulk cargo termination time constraint condition may be expressed as: the first step is to determine the sum of the departure time of the item landing airport, the service time of the landing location, and the item landing travel time as the order landing time. Among them, the above-mentioned item landing airport departure time may be the time when the item order departs from the landing airport. The above-mentioned landing location stay service time may be the service time that the item order information stays at the order destination location. The above-mentioned item landing travel time may be the product of the above-mentioned order flight parameter variable and the item landing travel time. The above-mentioned item landing travel time may be the travel time required for the land transportation equipment to arrive at the order destination location from the order landing airport location. The above-mentioned order landing airport location may be the airport location assigned to the order destination location. The second step is that the time for the equipment to arrive at the destination location is greater than or equal to the above-mentioned order landing time. Among them, the above-mentioned time for the equipment to arrive at the destination location may be the time required for the item order to reach the order destination location.

[0058] Optionally, the step of inputting the item order information set and the air transport resource information set into the air transport scheduling model to obtain the air transport scheduling information and the air transport value consumption information may include the following steps:

[0059] The first step is to select at least one item order information corresponding to the air transport resource information set from the item order information set to obtain a target item order information set. The target item order information in the target item order information set may be information on item orders that need to be dispatched by air transport.

[0060] The second step is to input the above-mentioned target item order information set and the above-mentioned air transport resource information set into the above-mentioned air transport value consumption objective function to generate the above-mentioned air transport value consumption information and the above-mentioned air transport scheduling information under the above-mentioned order flight matching constraints, the above-mentioned flight order capacity constraints and the above-mentioned flight order time constraints.

[0061] Step 203, based on the air transport scheduling information, execute the following generation steps:

[0062] Step 2031, inputting the air transport scheduling information and the land transport resource information set into the land transport scheduling model to obtain the land transport scheduling information and the land transport value consumption information.

[0063] In some embodiments, the execution subject may input the air transport scheduling information and the land transport resource information set into the land transport scheduling model to obtain the land transport scheduling information and the land transport value consumption information. The land transport scheduling information may be the transport resource information of the land transport equipment for transporting the item order. The land transport scheduling information may include: the transport equipment type information, the land transport equipment path information, the item order receiving time and the item order delivery time of the land transport equipment for transporting the item order. For example, the land transport scheduling information may be the information that the first type of land transport equipment receives the item order at the first location within the first time period, transports the item order to the second location through the planned transport path and unloads the item, and the second type of land transport equipment delivers the item order at the second location within the second time period, and transports the item order to the order destination of the item order through the planned transport path. The first location and the second location may be the locations through which the item order is transported. For example, the first location may be the location of the airport. The second location may be the order starting location or the order destination location for receiving or unloading the item order. The land transport value consumption information may be the information of the land transport equipment cost and path cost consumed by the transport item order information set.

[0064] As an example, the execution subject may use a heuristic algorithm to input the air transport scheduling information and the land transport resource information set into the land transport scheduling model and then solve the linear programming model to generate air transport scheduling information and air transport value consumption information. The heuristic algorithm may be a simulated annealing algorithm or a particle swarm optimization algorithm.

[0065] Step 2032, input the land transportation scheduling information into the air transportation scheduling model to obtain the target air transportation scheduling information and the target air transportation value consumption information.

[0066] In some embodiments, the execution entity may input the land transport scheduling information into the air transport scheduling model to obtain the target air transport scheduling information and the target air transport value consumption information. The target air transport scheduling information may be the transport resource information that modifies the air transport scheduling information through the land transport scheduling information. The modification may be a modification of the flight type, flight take-off and landing time, and airport location. The target value consumption information may represent the information of the flight transport cost and air transport time consumed by the modified transport flight information.

[0067] Step 2033, in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet the preset conditions, generate air-land transport scheduling information according to the target air transport scheduling information and the land transport scheduling information.

[0068] In some embodiments, the execution subject may generate air-land transport scheduling information according to the target air transport scheduling information and the land transport scheduling information in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet the preset conditions. Wherein, when the generation step is the first cycle, the preset condition may be that the air transport cost and transportation time corresponding to the air transport value consumption information are less than or equal to the air transport cost and transportation time corresponding to the target air transport value consumption information, and the number of times the generation step has been executed is not 1. When the generation step is not the first cycle, the preset condition may be that the air transport cost and transportation time are greater than or equal to the air transport cost and transportation time corresponding to the target air transport value consumption information, and the land transport cost corresponding to the land transport value consumption information obtained in the previous cycle is less than or equal to the land transport cost corresponding to the land transport value consumption information obtained in this cycle. The air-land transport scheduling information may be the flight information, land transport equipment information required for the item order corresponding to the transport item order information set, and the coordination and matching information of the flight information and the land transport equipment information. The above coordination and matching information may be information that the time when the land transportation equipment arrives at the airport is less than or equal to the flight departure time, and the time when the land transportation equipment leaves the airport with the item order is greater than or equal to the flight arrival time.

[0069] As an example, in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet the preset conditions, the above-mentioned execution entity may, in the first step, perform the following extraction steps for each item order information in the above-mentioned item order information set: First, extract the airport flight information of each item order information from the above-mentioned target air transport scheduling information. Among them, the above-mentioned airport flight information may include: flight landing time and airport location. Then, extract the land transportation equipment information matching the above-mentioned airport flight information from the above-mentioned land transportation scheduling information. Among them, the above-mentioned land transportation equipment information may include: land transportation equipment type information, land transportation equipment loading capacity and land transportation equipment transportation path information. In the second step, the obtained airport flight information set and land transportation equipment information set are determined as air-land intermodal transport scheduling information.

[0070] In some optional implementations of some embodiments, after step 203, the steps further include:

[0071] In response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information do not meet the preset conditions, the target air transport scheduling information is determined as the air transport scheduling information to perform the above generation step again.

[0072] In some optional implementations of some embodiments, after step 203, the steps further include:

[0073] According to the above-mentioned air-land transport scheduling information, the land transport equipment and the transport aircraft device are controlled to schedule the items set corresponding to the above-mentioned item order information set.

[0074] The above-mentioned embodiments of the present disclosure have the following beneficial effects: the scheduling information generation method of some embodiments of the present disclosure can reduce the order transportation cost and shorten the order transportation time, and reduce the waste of air transportation resources and land transportation resources. Specifically, the waste of relevant air transportation resources and land transportation resources and the increase of transportation time are caused by: since the air transportation scheduling information is determined first, and the land transportation scheduling information is generated based on the air transportation scheduling information, the land transportation scheduling information cannot be fed back to the air transportation information, and the air transportation resources and land transportation resources cannot be systematically allocated as a whole. The accuracy of the generated air-land transport scheduling information is low, resulting in the waste of air transportation resources and land transportation resources and the increase of transportation time. Based on this, the scheduling information generation method of some embodiments of the present disclosure first obtains the item order information set, the air transportation resource information set, the land transportation resource information set, the air transportation scheduling model and the land transportation scheduling model. Here, the item order information set, the air transportation resource information set, the land transportation resource information set, the air transportation scheduling model and the land transportation scheduling model are used for the subsequent generation of air scheduling information and air transportation value consumption information. Then, the above-mentioned item order information set and the above-mentioned air transport resource information set are input into the above-mentioned air transport scheduling model to obtain air transport scheduling information and air transport value consumption information. Here, the air transport scheduling model can be a mixed integer programming model, which can achieve the optimal matching of the item order information set and the air transport resource information, minimize the air transport cost and air transport timeliness, and reduce the waste of air resources. Finally, based on the air transport scheduling information, the following generation steps are performed: the first step is to input the air transport scheduling information and the above-mentioned land transport resource information set into the above-mentioned land transport scheduling model to obtain land transport scheduling information and land transport value consumption information. Here, the land transport scheduling model can be a mixed integer programming model, which can achieve the optimal matching of the item order information set and the land transport resource information, minimize the land transport cost, and reduce the waste of land transport resources. The second step is to input the land transport scheduling information into the above-mentioned air transport scheduling model to obtain the target air transport scheduling information and the target air transport value consumption information. Here, the cyclic iterative optimization of the air transport scheduling model and the land transport scheduling model can be realized, the feedback mechanism of the air transport stage and the land transport stage can be realized, and the optimal utilization of air transport resources and land transport resources can be realized. In the third step, in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet the preset conditions, the air-land transport scheduling information is generated according to the target air transport scheduling information and the land transport scheduling information. Here, the air-land transport scheduling information with high accuracy can be generated to achieve fast and timely transport scheduling of item orders, reduce transport scheduling time, and improve user experience.In summary, through the cyclic iteration of the air transport scheduling model and the land transport scheduling model, the circular feedback of the land transport stage and the air transport stage can be realized, the matching degree between the item order information set and the air transport resource information set and the land transport resource information set can be improved, the air transport cost and the land transport cost can be reduced, the air transport and the land transport time can be shortened, the waste of air transport resources and the land transport resources can be reduced, and the user experience can be improved.

[0075] Further references Figure 3 , shows a process 300 of another embodiment of the scheduling information generation method according to the present disclosure. The scheduling information generation method comprises the following steps:

[0076] Step 301, obtaining an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model and a land transport scheduling model.

[0077] Step 302: Input the item order information set and the air transport resource information set into the air transport scheduling model to obtain air transport scheduling information and air transport value consumption information.

[0078] In some embodiments, the specific implementation of steps 301-302 and the technical effects thereof can be referred to in Figure 2 The steps 201-202 in the corresponding embodiment will not be described in detail here.

[0079] Step 303, based on the air transport scheduling information, execute the following generation steps:

[0080] Step 3031, inputting the air transport scheduling information and the land transport resource information set into the land cargo collection transport scheduling model to obtain the cargo collection transport value consumption information and the cargo collection transport scheduling information.

[0081] In some embodiments, an execution entity (e.g. Figure 1The electronic device shown in the figure can input the above-mentioned air transport scheduling information and the above-mentioned land transport resource information set into the above-mentioned land cargo collection transportation scheduling model to obtain the cargo collection transportation value consumption information and the cargo collection transportation scheduling information. Among them, the above-mentioned cargo collection transportation scheduling model can be a model that matches the item order information and the land transport resources in the item order receiving stage to plan the land scheduling information of the item order. The above-mentioned cargo collection transportation scheduling information can be the transportation scheduling information of the land transportation equipment of the item order set corresponding to the item order information set obtained in the item order receiving stage. For example, the above-mentioned cargo collection transportation scheduling information can be different types of land transportation equipment driving to each item order starting position of the item order information set according to the planned transportation path to obtain the transportation scheduling information of the item order set. The above-mentioned transportation path can be a path obtained by a path planning algorithm. The above-mentioned path planning algorithm can be but not limited to one of the following: Freud algorithm, Dijkstra algorithm and rapidly expanding random tree algorithm. The above-mentioned cargo collection transportation value consumption information can be the cost information of the land transportation equipment cost consumed in the item order receiving stage and the land transportation equipment transportation path cost.

[0082] In some optional implementations of some embodiments, the above-mentioned land cargo collection and transportation scheduling model includes: cargo collection and transportation value consumption objective function, cargo collection path constraint conditions and cargo collection and transportation equipment constraint conditions. Among them, the above-mentioned cargo collection and transportation value consumption objective function can be an objective function that minimizes the transportation cost and path cost of land transportation equipment in the item order receiving stage. The above-mentioned cargo collection and transportation value consumption objective function can be obtained by the following steps: the first step is to determine the land transportation equipment cost, land transportation path cost, cargo collection equipment driving time and land transportation equipment included in each land transportation resource information in the above-mentioned land transportation resource information set. Among them, the above-mentioned cargo collection equipment driving time can be the driving time required for each land transportation equipment in the land transportation equipment set to reach the second cargo collection location from the first cargo collection location. The above-mentioned first cargo collection location can be a location in the transportation starting location set and the order starting location set of the land transportation equipment. The above-mentioned second cargo collection location can be a location in the order starting location set and the order starting airport location set. The second step is to determine the cumulative sum of the product of the cargo collection and transportation path parameter variable and the land transportation equipment cost within the value range of the first cargo collection location set, the second cargo collection location set and the land transportation equipment set as the cargo collection land transportation equipment cost. The above-mentioned cargo collection and transportation path parameter variable can characterize whether the land transportation equipment passes through the path from the starting cargo collection location to the ending cargo collection location during the item order receiving stage. If it passes, the cargo collection and transportation path parameter variable is 1, otherwise it is 0. The land transportation equipment set can be different types of land transportation equipment. The third step is to determine the cumulative sum of the product of the land transportation path cost, the cargo collection equipment driving time and the cargo collection and transportation path parameter variable within the value range of the first cargo collection location set, the second cargo collection location set and the land transportation equipment set as the cargo collection land transportation path cost. The fourth step is to minimize the sum of the above-mentioned cargo collection land transportation equipment cost and the above-mentioned cargo collection land transportation path cost to obtain the cargo collection transportation value consumption objective function.

[0083] The above-mentioned cargo collection path constraint condition may be a constraint condition that characterizes the path information of the land transportation equipment at the stage of receiving the item order. The above-mentioned cargo collection path constraint condition may include: cargo collection equipment order matching constraint condition, cargo collection equipment path matching constraint condition, cargo collection equipment path constraint condition, and cargo collection path node constraint condition. The above-mentioned cargo collection equipment order matching constraint condition may be a constraint condition that characterizes that only one land transportation equipment is responsible for receiving the item order information at each order node. The above-mentioned cargo collection equipment order matching constraint condition may be expressed as: the cumulative sum of the cargo collection transportation path parameter variable, within the value range of the order starting position set, the second cargo collection position set, and the land transportation equipment set, is equal to the above-mentioned first preset threshold.

[0084] The above-mentioned cargo collection equipment path matching constraint condition may be constraint information that characterizes that each land transportation equipment only receives the item order according to one receiving path during the item order receiving stage. The above-mentioned cargo collection equipment path matching constraint condition may be expressed as: the cumulative sum of the cargo collection transportation path parameter variable within the value range of the transportation starting position set, the order starting position set and the land transportation equipment set is less than or equal to the above-mentioned first preset threshold.

[0085] The above-mentioned cargo collection equipment path constraint condition may be a constraint condition that characterizes that each land transportation equipment needs to completely run from the starting point of the receiving path to the end point of the receiving path in the stage of receiving the item order. The above-mentioned cargo collection equipment path constraint condition may be expressed as: the cargo collection transportation path parameter variable within the value range of the order starting position set, the order starting airport position set and the land transportation equipment set is greater than or equal to the cargo collection transportation path parameter variable within the value range of the order starting position set, the order starting position set and the land transportation equipment set.

[0086] The above-mentioned cargo collection path node constraint condition may be a constraint condition that represents that the receiving path remains unchanged when the starting point and the end point of the receiving path are replaced, that is, the land transportation flow balance in the item order receiving stage. The above-mentioned cargo collection path node constraint condition may be expressed as: the difference between the cumulative sum of the cargo collection transportation path parameter variables within the value range of the order starting position set and the land transportation equipment set and the cumulative sum of the cargo collection transportation reverse path parameter variables within the value range of the order starting position set and the land transportation equipment set is equal to the second preset threshold. The above-mentioned second preset threshold may be a preset value. For example, the above-mentioned second preset threshold may be 0. The above-mentioned cargo collection transportation reverse path parameter variable may be a parameter variable that is opposite to the starting cargo collection position and the ending cargo collection position of the above-mentioned cargo collection transportation path parameter variable.

[0087] The above-mentioned cargo collection and transportation equipment constraint condition may be a constraint condition that characterizes the drivable area range and quantity requirements of land transportation equipment during the item order receiving stage. The above-mentioned cargo collection and transportation equipment constraint condition may include: cargo collection equipment capacity constraint condition, cargo collection order node time constraint condition, cargo collection and transportation area constraint condition, cargo collection equipment quantity constraint condition and cargo collection flight time constraint condition. The above-mentioned cargo collection equipment capacity constraint condition may be a constraint condition that characterizes the item order receiving stage, and the order capacity cannot exceed the loading capacity of the land transportation equipment. The above-mentioned cargo collection equipment capacity constraint condition may be expressed as: the product of the cargo collection and transportation path parameter variable and the required capacity of the cargo collection location, the cumulative sum within the value range of the above-mentioned order starting location set, the second cargo collection location set and the land transportation equipment set, and less than or equal to the maximum loading capacity of land transportation. Among them, the required capacity of the above-mentioned cargo collection location may be the capacity of the item order that each third cargo collection location in the above-mentioned third cargo collection location set needs to load during the item order distribution stage. The above-mentioned maximum loading capacity of land transportation may be the maximum capacity of the item order weight that can be loaded by the land transportation equipment.

[0088] The above-mentioned time constraint condition of the cargo collection order node may be a constraint condition that characterizes the time window for receiving the item order during the item order receiving stage. The above-mentioned time constraint condition of the cargo collection order node may be expressed as follows: the first step is to determine the sum of the arrival time of the first cargo collection equipment, the cargo collection stop service time and the cargo collection equipment travel time as the first cargo collection transportation time. Among them, the arrival time of the first cargo collection equipment may be the time when the land transportation equipment arrives at the first cargo collection location. The above-mentioned cargo collection stop service time may be the stop service time of the item order at the first cargo collection location. The second step is to determine the difference between the first preset threshold and the cargo collection transportation path parameter variable within the value range of the first cargo collection location set, the second cargo collection location set and the land transportation equipment set as the cargo collection difference. The third step is to determine the product of the third preset threshold and the cargo collection difference as the second cargo collection transportation time. Among them, the above-mentioned third preset threshold may be an artificial variable in the big M method. The above-mentioned third preset threshold may be a predetermined constant that is arbitrarily large but not infinite. The fourth step is to determine the difference between the above-mentioned first cargo collection transportation time and the above-mentioned second cargo collection transportation time as the cargo collection transportation time difference. Step 5: The difference in the collection and transportation time is less than or equal to the arrival time of the second collection equipment, and the arrival time of the third collection equipment is within the collection service time window. The arrival time of the second collection equipment may be the time when the land transportation equipment arrives at the second collection location. The arrival time of the third collection equipment may be the time when the land transportation equipment arrives at the order start location. The collection service time window may be the time window between the earliest item receiving time and the latest item receiving time of the land transportation equipment at any order start location.

[0089] The above-mentioned cargo collection and transportation area constraint condition may be a constraint condition that characterizes the stage of receiving item orders and narrows the search space of the feasible domain of land transportation equipment. The above-mentioned cargo collection and transportation area constraint condition may be expressed as: the cumulative sum of the cargo collection and transportation path parameter variables within the value range of the first cargo collection location set, the second cargo collection location set and the land transportation equipment set, less than or equal to the difference between the number of cargo collection locations and the above-mentioned first preset threshold. Among them, the above-mentioned number of cargo collection locations may be the number of locations included in the transportation starting location set, the order starting location set and the order starting airport location set. The values ​​of the above-mentioned starting cargo collection location and the ending cargo collection location are different.

[0090] The above-mentioned cargo collection equipment quantity constraint condition may be a constraint condition that characterizes that the number of land transportation equipment arriving at the airport during the item order receiving stage cannot exceed the number of available land transportation equipment. The above-mentioned cargo collection equipment quantity constraint condition may be expressed as: the cumulative sum of the cargo collection transportation path parameter variables within the value range of the order starting position set and the order starting airport position set is less than or equal to the number of cargo collection equipment. The above-mentioned cargo collection equipment quantity constraint condition may be the number of land transportation equipment included in the land transportation equipment set that travels from each order starting position to each order starting airport position during the item order receiving stage.

[0091] The above cargo collection flight time constraint condition can be a constraint condition that represents the item order receiving stage, and the departure time of the flight assigned to the item order is the departure time of the flight corresponding to the item order information. The above cargo collection flight time constraint condition can be expressed as: the arrival time of the first cargo collection device is equal to the item starting airport time is equal to the cumulative sum of the product of the order flight variable parameter and the order departure time within the value range of the flight set corresponding to the order starting airport location set.

[0092] Optionally, the step of inputting the air transport scheduling information and the land transport resource information set into the land cargo collection transport scheduling model to obtain the cargo collection transport scheduling information and the cargo collection transport value consumption information may include the following steps:

[0093] The above-mentioned air transport scheduling information and the above-mentioned land transport resource information set are input into the above-mentioned cargo collection transport value consumption objective function to generate cargo collection transport value consumption information and cargo collection transport scheduling information under the above-mentioned cargo collection path constraint conditions and the above-mentioned cargo collection transport equipment constraint conditions.

[0094] Step 3032, inputting the air transport scheduling information and the land transport resource information set into the land bulk cargo transport scheduling model to obtain the bulk cargo transport value consumption information and the bulk cargo transport scheduling information.

[0095] In some embodiments, the execution entity may input the air transport scheduling information and the land transport resource information set into the land bulk cargo transportation scheduling model to obtain bulk cargo transportation value consumption information and bulk cargo transportation scheduling information. The land bulk cargo transportation scheduling model may be a model that matches the item order information and land transport resources in the item order matching stage to plan the land scheduling information of the item order. The bulk cargo transportation scheduling information may be the transportation scheduling information of the land transportation equipment that transports the item order information set to the order destination location. For example, the bulk cargo transportation scheduling information may be the scheduling information of different types of land transportation equipment that transports the item set to the order destination location according to the planned transportation path in different time periods. The bulk cargo transportation value consumption information may be the information of the land transportation equipment cost and the transportation path cost consumed in transporting the item order information set to the order destination location set in the item order matching stage.

[0096] In some optional implementations of some embodiments, the land bulk cargo transportation scheduling model includes: a bulk cargo transportation value consumption objective function, a bulk cargo path constraint condition, and a bulk cargo transportation equipment constraint condition. Among them, the bulk cargo transportation value consumption objective function can be an objective function that minimizes the land transportation equipment cost and the transportation path cost in the item order distribution stage. The bulk cargo transportation value consumption objective function can be obtained by the following steps: the first step is to determine the bulk cargo equipment travel time included in each land transportation resource information in the land transportation resource information set. Among them, the bulk cargo equipment travel time can be the travel time required for each land transportation equipment in the land transportation equipment set to reach the order destination location from the first bulk cargo location. The first bulk cargo location can be a location in the order destination location set and the order landing airport location set. The order landing airport location in the order landing airport location set can be the location of the airport assigned to the order destination. The second step is to determine the cumulative sum of the product of the bulk cargo transportation path parameter variable and the land transportation equipment cost within the value range of the first bulk cargo location set, the order destination location set, and the land transportation equipment set as the bulk cargo land transportation equipment cost. The above bulk cargo transportation path parameter variable can represent whether the land transportation equipment passes through the path from the starting bulk cargo location to the ending bulk cargo location during the item order distribution stage. If it passes, the bulk cargo transportation path parameter variable is 1, otherwise it is 0. The third step is to determine the cumulative sum of the product of the land transportation path cost, the bulk cargo equipment travel time and the bulk cargo transportation path parameter variable within the value range of the first bulk cargo location set, the order destination location set and the land transportation equipment set as the bulk cargo land transportation path cost. The fourth step is to minimize the sum of the above bulk cargo land transportation equipment cost and the above bulk cargo land transportation path cost to obtain the bulk cargo transportation value consumption objective function.

[0097] The above-mentioned bulk cargo path constraint condition may be a constraint condition that characterizes the path information of land transportation equipment during the item order distribution stage. The above-mentioned bulk cargo path constraint condition may include: a bulk cargo equipment order matching constraint condition, a bulk cargo equipment path matching constraint condition, a bulk cargo equipment path constraint condition and a bulk cargo path node constraint condition. The above-mentioned bulk cargo equipment order matching constraint condition may be a constraint condition that characterizes that during the item order distribution stage, each order node has only one land transportation equipment responsible for the distribution of the item order information. The above-mentioned bulk cargo equipment order matching constraint condition may be expressed as: the cumulative sum of the bulk cargo transportation path parameter variables within the value range of the order destination location set, the first bulk cargo location set and the land transportation equipment set is equal to the above-mentioned first preset threshold.

[0098] The bulk cargo equipment path matching constraint condition may be constraint information that characterizes that during the item order delivery phase, each land transportation equipment only delivers the item order along one delivery path. The bulk cargo equipment path matching constraint condition may be expressed as follows: the cumulative sum of the bulk cargo transportation path parameter variables within the value range of the first bulk cargo location set, the order destination location set, and the land transportation equipment set is less than or equal to the first preset threshold.

[0099] The above-mentioned bulk cargo equipment path constraint condition may be a constraint condition that characterizes the stage of item order delivery, and each land transportation equipment needs to run completely from the starting point of the delivery path to the end point of the delivery path according to the delivery path. The above-mentioned bulk cargo equipment path constraint condition may be expressed as: a bulk cargo transportation path parameter variable within the value range of the order landing airport location set, the order starting airport location set, and the land transportation equipment set, and a bulk cargo transportation path parameter variable greater than or equal to the value range of the order landing airport location set, the order destination location set, and the land transportation equipment set.

[0100] The above-mentioned bulk cargo path node constraint condition may be a constraint condition that indicates that the path remains unchanged when the starting point and the end point of the distribution path are replaced during the item order distribution stage, that is, the land transportation flow balance during the item order distribution stage. The above-mentioned bulk cargo path node constraint condition may be expressed as: the difference between the bulk cargo transportation path parameter variable within the value range of the order destination location set and the land transportation equipment set and the bulk cargo transportation opposite path parameter variable within the value range of the order destination location set and the land transportation equipment set is equal to the above-mentioned second preset threshold. The above-mentioned bulk cargo transportation opposite path parameter variable may be a parameter variable opposite to the starting bulk cargo position and the ending bulk cargo position of the above-mentioned bulk cargo transportation path parameter variable.

[0101] The above-mentioned bulk cargo transportation equipment constraint condition may be a constraint condition that characterizes the drivable area range and quantity requirements of land transportation equipment during the item order delivery stage. The above-mentioned bulk cargo transportation equipment constraint condition may include: bulk cargo equipment capacity constraint condition, bulk cargo order node time constraint condition, bulk cargo transportation area constraint condition, bulk cargo equipment quantity constraint condition and bulk cargo flight time constraint condition. The above-mentioned bulk cargo equipment capacity constraint condition may be a constraint condition that characterizes the item order delivery stage, and the order capacity cannot exceed the loading capacity of the land transportation equipment. The above-mentioned bulk cargo equipment capacity constraint condition may be expressed as: the cumulative sum of the product of the bulk cargo transportation path parameter variable and the required capacity of the bulk cargo location within the value range of the above-mentioned order destination location set, the second cargo collection location set and the land transportation equipment set is less than or equal to the maximum loading capacity of the land transportation. Among them, the required capacity of the above-mentioned bulk cargo location may be the capacity of the item order that each second bulk cargo location in the above-mentioned second bulk cargo location set needs to load during the item order delivery stage. The above-mentioned second bulk cargo location may be a location in the order destination location set and the order starting airport location set.

[0102] The above-mentioned bulk cargo order node time constraint condition may be a constraint condition that characterizes the time window for delivering the item order during the item order delivery phase. The above-mentioned bulk cargo order node time constraint condition may be expressed as: the first step is to determine the sum of the arrival time of the first bulk cargo equipment, the bulk cargo stop service time and the bulk cargo equipment travel time as the first bulk cargo transportation time. Among them, the arrival time of the first bulk cargo equipment may be the time when the land transportation equipment arrives at the first bulk cargo location. The above-mentioned bulk cargo stop service time may be the stop service time of the item order at the first bulk cargo location. The second step is to determine the difference between the above-mentioned first preset threshold and the bulk cargo transportation path parameter variable within the value range of the first bulk cargo location set, the second bulk cargo location set and the land transportation equipment set as the bulk cargo difference. The third step is to determine the product of the above-mentioned third preset threshold and the above-mentioned bulk cargo difference as the second bulk cargo transportation time. The fourth step is to determine the difference between the above-mentioned first bulk cargo transportation time and the above-mentioned second bulk cargo transportation time as the bulk cargo transportation time difference. The fifth step is that the above-mentioned bulk cargo transportation time difference is less than or equal to the second bulk cargo equipment arrival time, and the second bulk cargo equipment arrival time is within the bulk cargo service time window. The second bulk cargo equipment arrival time may be the time when the land transport equipment arrives at the order destination location. The bulk cargo service time window may be the time window between the earliest item delivery time and the latest item delivery time of the land transport equipment at any order starting location.

[0103] The above-mentioned bulk cargo transportation area constraint condition may be a constraint condition that characterizes the item order distribution stage and narrows the search space of the feasible domain of land transportation equipment. The above-mentioned bulk cargo transportation area constraint condition may be expressed as: the cumulative sum of the bulk cargo transportation path parameter variables within the value range of the first bulk cargo location set, the order destination location set and the land transportation equipment set, and the difference that is less than or equal to the number of bulk cargo locations and the above-mentioned first preset threshold. The above-mentioned number of bulk cargo locations may be the number of locations included in the first bulk cargo location set and the order destination location set.

[0104] The above-mentioned bulk cargo equipment quantity constraint condition may be a constraint condition that characterizes that the number of land transportation equipment arriving at the airport cannot exceed the number of available land transportation equipment during the item order delivery stage. The above-mentioned bulk cargo equipment quantity constraint condition may be expressed as: the cumulative sum of the bulk cargo transportation path parameter variables within the value range of the order destination location set, the order landing airport location set and the land transportation equipment set is less than or equal to the number of bulk cargo equipment. Among them, the above-mentioned bulk cargo equipment quantity may be the number of land transportation equipment included in the land transportation equipment set that passes from each order destination location to each order landing airport location during the item order delivery stage.

[0105] The above-mentioned bulk cargo flight time constraint condition may be a constraint condition that characterizes that the landing time of the flight assigned to the item order in the item order delivery stage is the landing time of the flight corresponding to the item order information. The above-mentioned bulk cargo flight time constraint condition may be expressed as: the arrival time of the second bulk cargo equipment is equal to the item landing airport time, and the product of the order flight variable parameter and the order landing time is equal to the cumulative sum within the value range of the flight set corresponding to the order landing airport position set.

[0106] Optionally, the above-mentioned air transport scheduling information and the above-mentioned land transport resource information set are input into the above-mentioned land bulk cargo transportation scheduling model to obtain the bulk cargo transportation value consumption information and the bulk cargo transportation scheduling information, including:

[0107] The above-mentioned air transport scheduling information and the above-mentioned land transport resource information set are input into the above-mentioned bulk cargo transportation value consumption objective function to generate bulk cargo transportation value consumption information and bulk cargo transportation scheduling information under the above-mentioned bulk cargo path constraint conditions and the above-mentioned bulk cargo transportation equipment constraint conditions.

[0108] Step 3033, determine the value consumption information of the consolidated cargo transportation and the value consumption information of the bulk cargo transportation as the value consumption information of the land transportation.

[0109] In some embodiments, the execution entity may determine the cargo collection transport value consumption information and the bulk cargo transport value consumption information as land transport value consumption information.

[0110] Step 3034, determining the cargo transport scheduling information and bulk cargo transport scheduling information as land transport scheduling information.

[0111] In some embodiments, the execution entity may determine the cargo collection transport scheduling information and the bulk cargo transport scheduling information as land transport scheduling information.

[0112] Step 3035, input the land transportation scheduling information into the air transportation scheduling model to obtain the target air transportation scheduling information and the target air transportation value consumption information.

[0113] Step 3036, in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet the preset conditions, generate air-land transport scheduling information according to the target air transport scheduling information and the land transport scheduling information.

[0114] In some embodiments, the specific implementation of step 3036 and the technical effects thereof can be referred to in Figure 2 The corresponding step 2033 in the embodiment will not be described in detail here.

[0115] from Figure 3 It can be seen that Figure 2 Compared with the description of some corresponding embodiments, Figure 3 The process 300 of the scheduling information generation method in some corresponding embodiments further highlights the specific steps of the item order information set transportation scheduling in the item order receiving stage and the item order delivery stage of the land transportation scheduling. Therefore, the schemes described in these embodiments can be more targeted by dividing the land transportation scheduling into two stages: item order receiving and item order delivery, so as to obtain more accurate land transportation scheduling information, reduce the waste of land transportation resources and shorten the land transportation time.

[0116] Figure 4 It is a schematic diagram of an application scenario of other embodiments of the scheduling information generation method according to some embodiments of the present disclosure.

[0117] exist Figure 4In the application scenario in, the electronic device 401 can first obtain the item order information set 402, the air transport resource information set 403, the land transport resource information set 404, the air transport scheduling model 405 and the land transport scheduling model 406. In this application scenario, the land transport scheduling model 406 can include: a land cargo collection transportation scheduling model 4061 and a land bulk cargo transportation scheduling model 4062. Then, the above-mentioned item order information set 402 and the above-mentioned air transport resource information set 403 are input into the above-mentioned air transport scheduling model 405 to obtain air transport scheduling information 407 and air transport value consumption information 408. Finally, based on the air transport scheduling information 407, the following generation steps are performed: First, the air transport scheduling information 407 and the land transport resource information set 404 are input into the land cargo collection transportation scheduling model 4061 to obtain cargo collection transportation scheduling information 4091 and cargo collection transportation value consumption information 4101. In the second step, the air transport scheduling information 407 and the land transport resource information set 404 are input into the land bulk cargo transport scheduling model 4062 to obtain the bulk cargo transport scheduling information 4092 and the bulk cargo transport value consumption information 4102. In the third step, the cargo collection transport value consumption information 4101 and the bulk cargo transport scheduling information 4102 are determined as the land transport value consumption information 410. In the fourth step, the cargo collection transport scheduling information 4091 and the bulk cargo transport scheduling information 4092 are determined as the land transport scheduling information 409. In the fifth step, the land transport scheduling information 409 is input into the above-mentioned air transport scheduling model 405 to obtain the target air transport scheduling information 411 and the target air transport value consumption information 412. In the sixth step, in response to determining that the air transport value consumption information 408, the target air transport value consumption information 412 and the land transport value consumption information 410 meet the preset conditions, the air-land combined transport scheduling information 413 is generated according to the target air transport scheduling information 412 and the land transport scheduling information 409.

[0118] It should be noted that the electronic device 401 can be hardware or software. When the electronic device is hardware, it can be implemented as a distributed cluster consisting of multiple servers or terminal devices, or it can be implemented as a single server or a single terminal device. When the electronic device is embodied as software, it can be installed in the hardware devices listed above. It can be implemented as multiple software or software modules for providing distributed services, for example, or it can be implemented as a single software or software module. No specific limitation is made here.

[0119] It should be understood that Figure 4 The number of electronic devices in the embodiment is only for illustration. Any number of electronic devices may be provided according to implementation requirements.

[0120] Further references Figure 5As an implementation of the methods shown in the above figures, the present disclosure provides some embodiments of a scheduling information generating device, and these device embodiments are Figure 2 Corresponding to the method embodiments shown, the device can be specifically applied to various electronic devices.

[0121] like Figure 5 As shown, a scheduling information generating device 500 includes: an acquisition unit 501, an input unit 502 and an execution unit 503. The acquisition unit 501 is configured to: acquire an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model and a land transport scheduling model. The input unit 502 is configured to: input the above-mentioned item order information set and the above-mentioned air transport resource information set into the above-mentioned air transport scheduling model to obtain air transport scheduling information and air transport value consumption information. The execution unit 503 is configured to: based on the air transport scheduling information, perform the following generation steps: input the air transport scheduling information and the above-mentioned land transport resource information set into the above-mentioned land transport scheduling model to obtain land transport scheduling information and land transport value consumption information; input the land transport scheduling information into the above-mentioned air transport scheduling model to obtain target air transport scheduling information and target air transport value consumption information; in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet the preset conditions, generate air-land transport scheduling information according to the target air transport scheduling information and the land transport scheduling information.

[0122] In some optional implementations of some embodiments, the device 500 further includes: a determination unit (not shown in the figure). The determination unit may be configured to: in response to determining that the air transport value consumption information, the target air transport value consumption information, and the land transport value consumption information do not meet the preset conditions, determine the target air transport scheduling information as the air transport scheduling information, so as to perform the above generation step again.

[0123] In some optional implementations of some embodiments, the above-mentioned air transport scheduling model includes: an air transport value consumption objective function, order flight matching constraints, flight order capacity constraints and flight order time constraints; and the input unit can be further configured to: filter out at least one item order information corresponding to the above-mentioned air transport resource information set from the above-mentioned item order information set to obtain a target item order information set; input the above-mentioned target item order information set and the above-mentioned air transport resource information set into the above-mentioned air transport value consumption objective function to generate the above-mentioned air transport value consumption information and the above-mentioned air transport scheduling information under the above-mentioned order flight matching constraints, the above-mentioned flight order capacity constraints and the above-mentioned flight order time constraints.

[0124] In some optional implementations of some embodiments, the above-mentioned land transportation scheduling model includes: a land cargo collection transportation scheduling model and a land bulk cargo transportation scheduling model; and the above-mentioned execution unit can be further configured to: input the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set into the above-mentioned land cargo collection transportation scheduling model to obtain cargo collection transportation value consumption information and cargo collection transportation scheduling information; input the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set into the above-mentioned land bulk cargo transportation scheduling model to obtain bulk cargo transportation value consumption information and bulk cargo transportation scheduling information; determine the above-mentioned cargo collection transportation value consumption information and the above-mentioned bulk cargo transportation value consumption information as land transportation value consumption information; determine the above-mentioned cargo collection transportation scheduling information and the above-mentioned bulk cargo transportation scheduling information as land transportation scheduling information.

[0125] In some optional implementations of some embodiments, the above-mentioned land cargo collection and transportation scheduling model includes: a cargo collection and transportation value consumption objective function, cargo collection path constraints and cargo collection and transportation equipment constraints; and the above-mentioned execution unit can be further configured to: input the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set into the above-mentioned cargo collection and transportation value consumption objective function to generate cargo collection and transportation value consumption information and cargo collection and transportation scheduling information under the above-mentioned cargo collection path constraints and the above-mentioned cargo collection and transportation equipment constraints.

[0126] In some optional implementations of some embodiments, the above-mentioned land bulk cargo transportation scheduling model includes: a bulk cargo transportation value consumption objective function, bulk cargo path constraints and bulk cargo transportation equipment constraints; and the above-mentioned execution unit is further configured to: input the above-mentioned air transportation scheduling information and the above-mentioned land transportation resource information set into the above-mentioned bulk cargo transportation value consumption objective function to generate bulk cargo transportation value consumption information and bulk cargo transportation scheduling information under the above-mentioned bulk cargo path constraints and the above-mentioned bulk cargo transportation equipment constraints.

[0127] In some optional implementations of some embodiments, the scheduling information generating device 500 further includes: a control unit (not shown in the figure). The control unit may be configured to: control the land transportation equipment and the transport aircraft device according to the air-land transport scheduling information to perform item scheduling on the item set corresponding to the item order information set.

[0128] It is understood that the units described in the device 500 are similar to those described in the reference Figure 2 Therefore, the operations, features and beneficial effects described above for the method are also applicable to the device 500 and the units included therein, and will not be described in detail here.

[0129] Reference below Figure 6, which shows an electronic device (eg, Figure 1 Schematic diagram of the structure of the electronic device 101)600. Figure 6 The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.

[0130] like Figure 6 As shown, the electronic device 600 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 601, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 602 or a program loaded from a storage device 608 into a random access memory (RAM) 603. In the RAM 603, various programs and data required for the operation of the electronic device 600 are also stored. The processing device 601, the ROM 602, and the RAM 603 are connected to each other via a bus 604. An input / output (I / O) interface 605 is also connected to the bus 604.

[0131] Typically, the following devices may be connected to the I / O interface 605: an input device 606 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 607 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 608 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 609. The communication device 609 may allow the electronic device 600 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 6 The electronic device 600 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 6 Each block shown in the figure may represent one device, or may represent multiple devices as required.

[0132] In particular, according to some embodiments of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present disclosure include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In some such embodiments, the computer program can be downloaded and installed from the network through the communication device 609, or installed from the storage device 608, or installed from the ROM 602. When the computer program is executed by the processing device 601, the above-mentioned functions defined in the method of some embodiments of the present disclosure are executed.

[0133] It should be noted that the computer-readable medium in some embodiments of the present disclosure may be a computer-readable signal medium or a computer-readable storage medium or any combination of the two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present disclosure, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In some embodiments of the present disclosure, the computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, in which a computer-readable program code is carried. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0134] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0135] The computer-readable medium may be included in the electronic device; or it may exist independently without being assembled into the electronic device. The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device: obtains an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model, and a land transport scheduling model; inputs the item order information set and the air transport resource information set into the air transport scheduling model to obtain air transport scheduling information and air transport value consumption information; based on the air transport scheduling information, performs the following generation steps: inputs the air transport scheduling information and the land transport resource information set into the land transport scheduling model to obtain land transport scheduling information and land transport value consumption information; inputs the land transport scheduling information into the air transport scheduling model to obtain target air transport scheduling information and target air transport value consumption information; in response to determining that the air transport value consumption information, the target air transport value consumption information, and the land transport value consumption information meet the preset conditions, generates air-land transport scheduling information according to the target air transport scheduling information and the land transport scheduling information.

[0136] Computer program code for performing the operations of some embodiments of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0137] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0138] The units described in some embodiments of the present disclosure may be implemented by software or by hardware. The described units may also be set in a processor, for example, it may be described as: a processor includes an acquisition unit, an input unit, and an execution unit. The names of these units do not constitute a limitation on the units themselves in some cases. For example, the acquisition unit may also be described as "a unit for acquiring an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model, and a land transport scheduling model."

[0139] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0140] Some embodiments of the present disclosure further provide a computer program product, including a computer program, which implements any of the above-mentioned scheduling information generation methods when executed by a processor.

[0141] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present disclosure (but not limited to) and the technical solutions formed.

Claims

1. A method for generating scheduling information, comprising: Obtaining an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model, and a land transport scheduling model; Inputting the item order information set and the air transport resource information set into the air transport scheduling model to obtain air transport scheduling information and air transport value consumption information; Based on the air transport scheduling information, the following generation steps are performed: Inputting the air transport scheduling information and the land transport resource information set into the land transport scheduling model to obtain land transport scheduling information and land transport value consumption information; Inputting the land transport scheduling information into the air transport scheduling model to obtain target air transport scheduling information and target air transport value consumption information; In response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet preset conditions, air-land transport scheduling information is generated according to the target air transport scheduling information and the land transport scheduling information.

2. The method according to claim 1, wherein: The method further comprises: In response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information do not meet the preset conditions, the target air transport scheduling information is determined as the air transport scheduling information to perform the generating step again.

3. The method according to claim 1, wherein: The air transport scheduling model includes: an air transport value consumption objective function, an order flight matching constraint condition, a flight order capacity constraint condition, and a flight order time constraint condition; and The step of inputting the item order information set and the air transport resource information set into the air transport scheduling model to obtain air transport scheduling information and air transport value consumption information includes: Filtering at least one item order information corresponding to the air transport resource information set from the item order information set to obtain a target item order information set; The target item order information set and the air transport resource information set are input into the air transport value consumption objective function to generate the air transport value consumption information and the air transport scheduling information under the order flight matching constraints, the flight order capacity constraints and the flight order time constraints.

4. The method according to claim 1, wherein: The land transport scheduling model includes: a land cargo collection transport scheduling model and a land bulk cargo transport scheduling model; and The step of inputting the air transport scheduling information and the land transport resource information set into the land transport scheduling model to obtain the land transport scheduling information and the land transport value consumption information includes: Inputting the air transport scheduling information and the land transport resource information set into the land cargo collection transport scheduling model to obtain cargo collection transport value consumption information and cargo collection transport scheduling information; Inputting the air transport scheduling information and the land transport resource information set into the land bulk cargo transport scheduling model to obtain bulk cargo transport value consumption information and bulk cargo transport scheduling information; Determine the cargo transport value consumption information and the bulk cargo transport value consumption information as land transport value consumption information; The cargo collection transport scheduling information and the bulk cargo transport scheduling information are determined as land transport scheduling information.

5. The method according to claim 4, wherein: The land cargo collection and transportation scheduling model includes: cargo collection and transportation value consumption objective function, cargo collection path constraint conditions and cargo collection and transportation equipment constraint conditions; and The step of inputting the air transport scheduling information and the land transport resource information set into the land cargo collection transport scheduling model to obtain cargo collection transport value consumption information and cargo collection transport scheduling information includes: The air transport scheduling information and the land transport resource information set are input into the cargo collection transport value consumption objective function to generate cargo collection transport value consumption information and cargo collection transport scheduling information under the cargo collection path constraint conditions and the cargo collection transport equipment constraint conditions.

6. The method according to claim 4, wherein: The land bulk cargo transportation scheduling model includes: a bulk cargo transportation value consumption objective function, a bulk cargo path constraint condition and a bulk cargo transportation equipment constraint condition; and The step of inputting the air transport scheduling information and the land transport resource information set into the land bulk cargo transport scheduling model to obtain bulk cargo transport value consumption information and bulk cargo transport scheduling information includes: The air transport scheduling information and the land transport resource information set are input into the bulk cargo transportation value consumption objective function to generate bulk cargo transportation value consumption information and bulk cargo transportation scheduling information under the bulk cargo path constraint condition and the bulk cargo transportation equipment constraint condition.

7. The method according to claim 1, wherein: The method further comprises: According to the air-land transport scheduling information, the land transport equipment and the transport aircraft device are controlled to schedule the items set corresponding to the item order information set.

8. A scheduling information generating device, comprising: An acquisition unit configured to acquire an item order information set, an air transport resource information set, a land transport resource information set, an air transport scheduling model, and a land transport scheduling model; An input unit, configured to input the item order information set and the air transport resource information set into the air transport scheduling model to obtain air transport scheduling information and air transport value consumption information; The execution unit is configured to perform the following generation steps based on the air transport scheduling information: input the air transport scheduling information and the land transport resource information set into the land transport scheduling model to obtain the land transport scheduling information and the land transport value consumption information; input the land transport scheduling information into the air transport scheduling model to obtain the target air transport scheduling information and the target air transport value consumption information; in response to determining that the air transport value consumption information, the target air transport value consumption information and the land transport value consumption information meet the preset conditions, generate the air-land transport scheduling information according to the target air transport scheduling information and the land transport scheduling information.

9. An electronic device, comprising: one or more processors; a storage device having one or more programs stored thereon, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 7.

10. A computer readable medium having a computer program stored thereon, wherein: When the program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.

11. A computer program product, comprising a computer program, which, when executed by a processor, implements the method according to any one of claims 1 to 7.