Project development progress data acquisition method and device, computer equipment, readable storage medium and program product

By matching resource processing information and project function category and object category information in spatial variables, the resource processing volume and processing degree are evaluated, and the problem of low efficiency in project development progress data acquisition in the existing technology is solved, and efficient development progress evaluation and Data acquisition.

CN118941230APending Publication Date: 2024-11-12CHINA CONSTRUCTION BANK +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410959082.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The acquisition method of project development progress data in the existing technology is not efficient enough, which leads to managers needing to manually analyze the developer's registration form, affecting the efficiency of development progress evaluation.

Method used

By obtaining the resource processing information of the target project, matching the project function category information and object category information in the spatial variable, evaluating the resource processing information of each function category and object category, calculating the function development progress and object development progress, and then obtaining the project's Overall development progress data.

Benefits of technology

It realizes efficient acquisition of project development progress data without manual analysis, improves the efficiency of development progress evaluation, and simplifies the data acquisition and analysis process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941230A_ABST
    Figure CN118941230A_ABST
Patent Text Reader

Abstract

The invention relates to a project development progress data acquisition method and device, computer equipment, a computer readable storage medium and a computer program product in the technical field of big data. The method comprises the steps of obtaining resource processing information and spatial variables of a target project; obtaining function resource processing information associated with each item function category information in the space variable and object resource processing information associated with each object category information; evaluating the project function development progress of each function category in the target project to obtain function development progress data; evaluating the object development project progress of each project associated object corresponding to the target project to obtain object development progress data; and according to the function development progress data and the object development progress data, performing evaluation processing on the development progress of the target project to obtain project development progress data of the target project. By adopting the method, the project development progress data can be efficiently obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of big data technology, and in particular to a method, apparatus, computer equipment, computer-readable storage medium, and computer program product for acquiring project development progress data. Background Art

[0002] With the development of big data technology, the technology of acquiring and processing data has gradually become a hot topic of research. By acquiring and processing data, the information conveyed by the data can be accurately obtained.

[0003] In traditional technology, for example, in the process of project development, developers need to obtain project development progress data. Generally, developers report the project development progress to managers through registration forms, so that managers can analyze the data registered by developers from the upward feedback of developers and further clarify the project development progress of developers. However, the current method of obtaining project development progress data is not efficient enough. Summary of the invention

[0004] Based on this, it is necessary to provide an efficient project development progress data acquisition method, device, computer equipment, computer readable storage medium and computer program product to address the above technical problems.

[0005] In a first aspect, the present application provides a method for acquiring project development progress data, comprising:

[0006] Obtain resource processing information and spatial variables of the target project; the spatial variables carry project function category information corresponding to the resource processing information and object category information of the project-related objects;

[0007] Matching the spatial variables with the resource processing information to obtain the functional resource processing information associated with each item functional category information in the spatial variables and the object resource processing information associated with each object category information;

[0008] According to the functional resource processing information associated with each project functional category information, the project functional development progress of each functional category in the target project is evaluated to obtain functional development progress data;

[0009] According to the object resource processing information associated with each object category information, the object development project progress of each project-associated object corresponding to the target project is evaluated to obtain object development progress data;

[0010] The development progress of the target project is evaluated based on the function development progress data and the object development progress data to obtain the project development progress data of the target project.

[0011] In one embodiment, according to the functional resource processing information associated with each project functional category information, the project function development progress of each functional category in the target project is evaluated to obtain functional development progress data, including:

[0012] Obtain resource processing volume in the function resource processing information associated with each project function category information;

[0013] Based on the resource processing capacity and the required processing capacity of the preset resources, the project function development progress of each functional category in the target project is evaluated to obtain the resource processing degree;

[0014] Based on the resource processing degree and resource processing volume, determine the functional development progress data corresponding to the project functions of each functional category.

[0015] In one embodiment, based on the resource processing degree and the resource processing amount, determining the function development progress data corresponding to the project function of each function category includes:

[0016] Determine the highest resource processing degree among the resource processing degrees of each project function category information;

[0017] Based on the highest resource processing degree and the resource processing degree of each project function category information, the development efficiency corresponding to the project function of each functional category is evaluated to obtain the development efficiency corresponding to the project function of each functional category;

[0018] Based on the resource processing degree, resource processing volume, and development efficiency, the function development progress data corresponding to the project functions of each function category is determined.

[0019] In one embodiment, the development progress of the target project is evaluated based on the function development progress data and the object development progress data to obtain the project development progress data and object development progress data of the target project, and further includes:

[0020] Determine the project group information to which each object category information belongs;

[0021] Aggregate the object resource processing information associated with each object category information corresponding to the same project group information to obtain the group resource processing information associated with the project group information;

[0022] According to the group resource processing information associated with each project group information, the progress of each group development project is evaluated to obtain the group development progress data of each project group information;

[0023] The development progress of the target project is evaluated based on the function development progress data, the object development progress data, and the group development progress data to obtain the project development progress data of the target project.

[0024] In one embodiment, the method further comprises:

[0025] Obtain a first acquisition timestamp of function resource processing information associated with each project function category information and a second acquisition timestamp of object resource processing information associated with each object category information within a preset time period;

[0026] According to the function resource processing information associated with each project function category information corresponding to the first acquisition timestamp, the project function development progress of each function category within the preset time period is evaluated to obtain the first development progress data within the preset time period;

[0027] According to the object resource processing information associated with each object category information corresponding to the second acquisition timestamp, the object development project progress of each project-associated object within the preset time period is evaluated to obtain the second development progress data within the preset time period;

[0028] Based on the first development progress data and the second development progress data, the development progress of the target project is evaluated and processed to obtain the project development progress data of the target project within a preset time period.

[0029] In one embodiment, the function resource processing information includes a resource code and a resource processing status; based on the function resource processing information associated with each project function category information, the project function development progress of each function category in the target project is evaluated to obtain function development progress data, including:

[0030] For the functional resource processing information associated with each project functional category information, based on the occurrence frequency of resource codes whose resource processing status is successfully processed in the functional resource processing information, the debugging progress of each functional category in the target project is evaluated to obtain the project functional debugging result of the project functional category information;

[0031] When the project function debugging result is normal, the project function development progress of each function category in the target project is evaluated according to the function resource processing information to obtain the function development progress data of each function category.

[0032] In one embodiment, after evaluating the development progress of the target project according to the function development progress data and the object development progress data to obtain the project development progress data of the target project, the method further includes:

[0033] Aggregate the project development progress data, function development progress data, and object development progress data of the target project to obtain aggregated data;

[0034] The aggregated data, project development progress data, function development progress data, and object development progress data are visualized separately.

[0035] In a second aspect, the present application also provides a device for acquiring project development progress data, the device comprising:

[0036] The acquisition module is used to acquire the resource processing information and space variables of the target project; the space variables carry the project function category information corresponding to the resource processing information and the object category information of the project-related objects;

[0037] A matching module is used to match the spatial variable with the resource processing information to obtain the functional resource processing information associated with each item functional category information in the spatial variable and the object resource processing information associated with each object category information;

[0038] A function evaluation module is used to evaluate the project function development progress of each function category in the target project according to the function resource processing information associated with each project function category information, and obtain function development progress data;

[0039] An object evaluation module is used to evaluate the object development project progress of each project-related object corresponding to the target project according to the object resource processing information associated with each object category information, and obtain object development progress data;

[0040] The progress acquisition module is used to evaluate the development progress of the target project according to the function development progress data and the object development progress data, and obtain the project development progress data of the target project.

[0041] In one of the embodiments, the function evaluation module is also used to obtain the resource processing capacity in the function resource processing information associated with each project function category information; based on the resource processing capacity and the processing capacity required by the preset resources, the project function development progress of each function category in the target project is evaluated to obtain the resource processing degree; based on the resource processing degree and the resource processing capacity, the function development progress data corresponding to the project function of each function category is determined.

[0042] In one of the embodiments, the function evaluation module is also used to determine the highest resource processing degree among the resource processing degrees of each project function category information; based on the highest resource processing degree and the resource processing degree of each project function category information, the development efficiency corresponding to the project function of each function category is evaluated to obtain the development efficiency corresponding to the project function of each function category; based on the resource processing degree, resource processing volume, and development efficiency, the function development progress data corresponding to the project function of each function category is determined.

[0043] In one of the embodiments, the progress acquisition module is also used to determine the project group information to which each object category information belongs; aggregate the object resource processing information associated with each object category information corresponding to the same project group information to obtain the group resource processing information associated with the project group information; evaluate the progress of each group development project based on the group resource processing information associated with each project group information to obtain the group development progress data of each project group information; evaluate and process the development progress of the target project based on the function development progress data, the object development progress data, and the group development progress data to obtain the project development progress data of the target project.

[0044] In one of the embodiments, the project development progress data acquisition device also includes a time evaluation module, which is used to obtain a first acquisition timestamp of function resource processing information associated with each project function category information and a second acquisition timestamp of object resource processing information associated with each object category information within a preset time period; based on the function resource processing information associated with each project function category information corresponding to the first acquisition timestamp, the project function development progress of each function category within the preset time period is evaluated to obtain the first development progress data within the preset time period; based on the object resource processing information associated with each object category information corresponding to the second acquisition timestamp, the object development project progress of each project-associated object within the preset time period is evaluated to obtain the second development progress data within the preset time period; based on the first development progress data and the second development progress data, the development progress of the target project is evaluated and processed to obtain the project development progress data of the target project within the preset time period.

[0045] In one of the embodiments, the functional resource processing information includes resource coding and resource processing status; the functional evaluation module is also used to evaluate the debugging progress of each functional category in the target project based on the frequency of occurrence of resource coding with a resource processing status of successful processing in the functional resource processing information associated with each project functional category information, and obtain the project function debugging result of the project functional category information; when the project function debugging result is normal, the project function development progress of each functional category in the target project is evaluated according to the functional resource processing information, and the functional development progress data of each functional category is obtained.

[0046] In one of the embodiments, the project development progress data acquisition device also includes a visualization module, which is used to aggregate the project development progress data, function development progress data, and object development progress data of the target project to obtain aggregated data; and visualize the aggregated data, project development progress data, function development progress data, and object development progress data, respectively.

[0047] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:

[0048] Obtain resource processing information and spatial variables of the target project; the spatial variables carry project function category information corresponding to the resource processing information and object category information of the project-related objects;

[0049] Matching the spatial variables with the resource processing information to obtain the functional resource processing information associated with each item functional category information in the spatial variables and the object resource processing information associated with each object category information;

[0050] According to the functional resource processing information associated with each project functional category information, the project functional development progress of each functional category in the target project is evaluated to obtain functional development progress data;

[0051] According to the object resource processing information associated with each object category information, the object development project progress of each project-associated object corresponding to the target project is evaluated to obtain object development progress data;

[0052] The development progress of the target project is evaluated based on the function development progress data and the object development progress data to obtain the project development progress data of the target project.

[0053] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the following steps are implemented:

[0054] Obtain resource processing information and spatial variables of the target project; the spatial variables carry project function category information corresponding to the resource processing information and object category information of the project-related objects;

[0055] Matching the spatial variables with the resource processing information to obtain the functional resource processing information associated with each item functional category information in the spatial variables and the object resource processing information associated with each object category information;

[0056] According to the functional resource processing information associated with each project functional category information, the project functional development progress of each functional category in the target project is evaluated to obtain functional development progress data;

[0057] According to the object resource processing information associated with each object category information, the object development project progress of each project-associated object corresponding to the target project is evaluated to obtain object development progress data;

[0058] The development progress of the target project is evaluated based on the function development progress data and the object development progress data to obtain the project development progress data of the target project.

[0059] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:

[0060] Obtain resource processing information and spatial variables of the target project; the spatial variables carry project function category information corresponding to the resource processing information and object category information of the project-related objects;

[0061] Matching the spatial variables with the resource processing information to obtain the functional resource processing information associated with each item functional category information in the spatial variables and the object resource processing information associated with each object category information;

[0062] According to the functional resource processing information associated with each project functional category information, the project functional development progress of each functional category in the target project is evaluated to obtain functional development progress data;

[0063] According to the object resource processing information associated with each object category information, the object development project progress of each project-associated object corresponding to the target project is evaluated to obtain object development progress data;

[0064] The development progress of the target project is evaluated based on the function development progress data and the object development progress data to obtain the project development progress data of the target project.

[0065] The above-mentioned project development progress data acquisition method, device, computer equipment, computer-readable storage medium and computer program product, in the present application, by matching the spatial variables with the resource processing information of the target project, the functional resource processing information associated with each project functional category information and the object resource processing information associated with each object category information are obtained, thereby efficiently obtaining the functional development progress data and the object development progress data. Starting from the two aspects of the object development progress data and the functional development progress data, the project development progress data of the target project is efficiently obtained. Through this method, there is no need to manually analyze the project development progress data, which improves the efficiency of evaluating and processing the project development progress of the target project. BRIEF DESCRIPTION OF THE DRAWINGS

[0066] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0067] Figure 1 An application environment diagram of a method for acquiring project development progress data in one embodiment;

[0068] Figure 2 A schematic diagram of a process of obtaining project development progress data in one embodiment;

[0069] Figure 3 A schematic diagram of a flow chart of a method for acquiring project development progress data in another embodiment;

[0070] Figure 4 It is a structural block diagram of a device for acquiring project development progress data in one embodiment;

[0071] Figure 5 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0072] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application. It should be noted that in the embodiments of the present application, certain software, groups, models and other existing solutions in the industry may be mentioned, which should be considered as exemplary, and their purpose is only to illustrate the feasibility of the implementation of the technical solution of the present application, but it does not mean that the applicant has or will necessarily use the solution.

[0073] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations. The acquisition, storage, use, and processing of data in the technical solution of this application are in compliance with relevant provisions of national laws and regulations.

[0074] The project development progress data acquisition method provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown, the terminal 102 communicates with the server 104 through a network. The data storage system can store data that the server 104 needs to process. The data storage system can be integrated on the server 104, or placed on the cloud or other network servers.

[0075] The user performs a resource processing action on the target project on the terminal 102. The terminal 102 responds to the resource processing action of the target project, obtains the project function category information corresponding to the resource processing information of the target project and the object category information of the project-associated objects, and uses spatial variables to wrap the project function category information corresponding to the resource processing information and the object category information of the project-associated objects.

[0076] The terminal 102 generates a data processing request based on the resource processing information and space variables of the target project, and forwards the data processing request to the server 104. The log of the server 104 may store the resource processing information and space variables of the target project extracted from the data processing request.

[0077] Furthermore, when performing data processing, the server 104 can pull the resource processing information and spatial variables of the stored target project from the log, and match the spatial variables with the resource processing information to obtain the functional resource processing information associated with each project functional category information in the spatial variables, and the object resource processing information associated with each object category information; according to the functional resource processing information associated with each project functional category information, the project functional development progress of each functional category in the target project is evaluated to obtain functional development progress data; according to the object resource processing information associated with each object category information, the object development project progress of each project-related object corresponding to the target project is evaluated to obtain object development progress data; according to the functional development progress data and the object development progress data, the development progress of the target project is evaluated and processed to obtain the project development progress data of the target project. Further, the server 104 can visualize the project development progress data of the target project, and push the visualized results to the terminal 102 to display to the user.

[0078] The terminal 102 may be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, IoT devices, and portable wearable devices. The IoT devices may be smart speakers, smart TVs, smart air conditioners, smart car devices, projection devices, etc. Portable wearable devices may be smart watches, smart bracelets, head-mounted devices, etc. Head-mounted devices may be virtual reality (VR) devices, augmented reality (AR) devices, smart glasses, etc. The server 104 may be an independent physical server, a server cluster or distributed system consisting of multiple physical servers, or a cloud server that provides cloud computing services.

[0079] In an exemplary embodiment, Figure 2 As shown, a method for obtaining project development progress data is provided, and the method is applied to Figure 1 The server 104 in FIG. 1 is used as an example for explanation. Among them:

[0080] S100, obtaining resource processing information and space variables of a target project.

[0081] Among them, the spatial variable carries the project function category information corresponding to the resource processing information and the object category information of the project-related object. Resource processing information refers to information related to the resources processed by the target project, and the target project includes but is not limited to: game projects, research projects, deposit and withdrawal projects, etc. For example, when the target project is a game project, the resource processing information can be the game play time, etc., and when the target project is a deposit and withdrawal project, the resource processing information can be the transaction amount of deposits and withdrawals, etc.

[0082] The space variable is a variable used to store the project function category information corresponding to the resource processing information and the object category information of the project-related object. The project function category information is the category to which the function of the target project belongs, and different project functions correspond to different project function category information.

[0083] The project-related object refers to the developer who develops the target project. The object category information refers to the specific category of the developer, and each developer corresponds to an object category information.

[0084] Specifically, the user performs a resource processing action on the target project on the terminal 102. The terminal 102 responds to the resource processing action of the target project, obtains the project function category information corresponding to the resource processing information of the target project and the object category information of the project-associated objects, and uses spatial variables to wrap the project function category information corresponding to the resource processing information and the object category information of the project-associated objects.

[0085] The terminal generates a data processing request based on the resource processing information and space variables of the target project, and forwards the data processing request to the server. The server log can store the resource processing information and space variables of the target project extracted from the data processing request.

[0086] Furthermore, when performing data processing, the server can pull the resource processing information and space variables of the stored target project from the log.

[0087] Furthermore, the project function category information and the object category information of the project-associated objects corresponding to the resource processing information of the target project are the information attached when the developer performs template-based development of the template project. For example, the developer's name, the developer's group information, the project function category information, the page name, the object category information of the project-associated objects, etc. Template-based development means that no matter which developer is doing the development, or no matter which function in the target project is being developed, the above information will be attached. When the same developer develops different function categories, the project function category information is different, and the object category information of the project-associated objects is the same; when different developers develop the same function category, the project function category information is the same, and the object category information of the project-associated objects is different. When a user uploads resource processing information, the spatial variables can be sent to the server along with the resource processing information for processing.

[0088] In one embodiment, the resource processing information and spatial variables of the target project can be pulled out from the log and stored in the database of the server. Subsequently, the resource processing information and spatial variables of the target project can be obtained from the database of the server to analyze the resource processing information and spatial variables of the target project. Obtaining the resource processing information and spatial variables of the target project from the database can improve the data acquisition efficiency of the resource processing information and spatial variables of the target project.

[0089] Furthermore, the resource processing information and the space variables of the target project are stored in the database of the server by creating a new resource information table in the database or expanding the original information table.

[0090] S200, matching the space variable with the resource processing information to obtain the function resource processing information associated with each item function category information in the space variable and the object resource processing information associated with each object category information.

[0091] Among them, function resource processing information refers to resource processing information associated with each function, and object resource processing information refers to resource processing information associated with each developer.

[0092] Specifically, the spatial variables are matched with the resource processing information, that is, the project function category information and the object category information of the project-associated objects in the spatial variables are matched with the resource processing information respectively, to obtain the function resource processing information associated with each project function category information in the spatial variables and the object resource processing information associated with each object category information.

[0093] For example, the project function category information in the spatial variable includes: project function category A and project function category B; the object category information of the project-associated object includes: object category information 1 and object category information 2. The spatial variable is matched with the resource processing information to obtain the function resource processing information corresponding to the project function category A, the function resource processing information corresponding to the project function category B, the object resource processing information corresponding to the object category information 1, and the object resource processing information corresponding to the object category information 2. Among them, if the project function development corresponding to the project function category A is processed by the project-associated object corresponding to the object category information 1 and the project-associated object corresponding to the object category information 2, then the function resource processing information corresponding to the project function category A includes the object resource processing information under the function corresponding to the object category information 1, and the object resource processing information under the function corresponding to the object category information 2; if the project-associated object corresponding to the object category information 1 performs the project function development of the project function category A and the project function category B, then the object resource processing information corresponding to the object category information 1 includes the object resource processing information corresponding to the object category information 1 in the project function category A, and the object resource processing information corresponding to the object category information 1 in the project function category B.

[0094] S300, evaluating the project function development progress of each functional category in the target project according to the functional resource processing information associated with each project function category information, and obtaining function development progress data.

[0095] The function development progress data refers to the development progress corresponding to each function category, such as the development volume of the functions corresponding to the function category.

[0096] Specifically, since the function resource processing information associated with each project function category information is the resource processing information specifically for the function and does not include the resource processing information corresponding to other functions, the project function development progress of the corresponding function category in the target project can be evaluated based on the function resource processing information associated with each project function category information to obtain the function development progress data of the corresponding function category. For example, when the project function category information includes the development application M, the function resource processing information related to the development application M is obtained, and based on the function resource processing information related to the development application M, the development progress of the application M is evaluated to obtain the function development progress data corresponding to the application M.

[0097] S400, evaluating the object development project progress of each project-related object corresponding to the target project according to the object resource processing information associated with each object category information, and obtaining object development progress data.

[0098] The object development progress data refers to the project-related objects, that is, the development progress of the developer in the target project, such as all development data of the project-related objects.

[0099] Specifically, since the object resource processing information associated with each object category information is the resource processing information specifically for the project-associated object and does not include the resource processing information corresponding to other project-associated objects, the object development project progress of the project-associated object corresponding to the target project can be evaluated based on the object resource processing information associated with each object category information, and the object development progress data corresponding to the object category information can be obtained. For example, when the object development category information includes object A, different applications developed by object A, such as application L and application C, are obtained, and the resource processing information corresponding to all project function category information corresponding to object A is obtained to obtain the object resource processing information of object A. Based on the object resource processing information of object A, the object development project progress of object A is evaluated to obtain the object development progress data corresponding to object A.

[0100] S500, evaluating the development progress of the target project according to the function development progress data and the object development progress data, and obtaining the project development progress data of the target project.

[0101] Among them, the project development progress data refers to the overall development progress of the target project. The project development progress is related to factors such as the function development progress data and the object development progress data.

[0102] Specifically, based on the function development progress data and the object development progress data, an overall evaluation and processing of the development progress of the target project is performed. For example, the function development progress data and the object development progress data can be aggregated, and the aggregated result can be determined as the project development progress data of the target project. The function development progress data can also be used as the first project development progress data of the target project, and the object development progress data can be used as the second project development progress data of the target project. The final project development progress data of the target project includes the first project development progress data and the second project development progress data.

[0103] In the above-mentioned project development progress data acquisition method, by matching the spatial variables with the resource processing information of the target project, the functional resource processing information associated with each project functional category information and the object resource processing information associated with each object category information are obtained, thereby efficiently obtaining the functional development progress data and the object development progress data. Starting from the object development progress data and the functional development progress data, the project development progress data of the target project is efficiently obtained. Through this method, there is no need for manual analysis of the project development progress data, which improves the efficiency of evaluating and processing the project development progress of the target project.

[0104] In an exemplary embodiment, Figure 3 As shown, S300 includes:

[0105] S320, obtaining the resource processing amount in the function resource processing information associated with each item function category information.

[0106] The resource processing volume refers to the amount of resources required for resource processing. For example, when the resource processing information is transaction information, the transaction information corresponding to function A is obtained, and the transaction information corresponding to function A includes the transaction volume corresponding to function A, and the transaction volume can be a transaction amount, etc.

[0107] Specifically, the functional resource processing information associated with each project functional category information includes a number of resource-related information generated when resource processing is performed on the project functional category information, such as resource processing volume, etc. Therefore, the resource processing volume corresponding to the project functional category information is obtained from the functional resource processing information associated with each project functional category information. Further, based on the resource processing volume of each project functional category information, the functional development progress data corresponding to the project function of each functional category can be obtained, that is, the resource processing volume is determined as the development completion volume in the functional development progress data corresponding to the project function of each functional category.

[0108] S340, based on the resource processing capacity and the required processing capacity of the preset resources, the project function development progress of each functional category in the target project is evaluated to obtain the resource processing degree.

[0109] The preset resource required processing capacity is the resource processing capacity required to be achieved by the initial custom setting corresponding to each project function category information, that is, the required processing capacity when the resource processing degree is 100%. The resource processing degree refers to the progress of the resource processing capacity reaching the preset resource required processing capacity. The resource processing degree is essentially equivalent to the development completion degree in the project function development progress of each function category.

[0110] Specifically, the resource processing degree is obtained based on the ratio of the resource processing amount of each project function category information to the required processing amount of the preset resources of each project function category information, and the resource processing degree can be used to evaluate the project function development progress of the function category in the target project. Further, based on the resource processing degree of each project function category information, the function development progress data corresponding to the project function of each function category can be obtained, that is, the resource processing degree is determined as the development completion degree in the function development progress data corresponding to the project function of each function category.

[0111] S360: Determine function development progress data corresponding to the project functions of each function category based on the resource processing degree and the resource processing amount.

[0112] Specifically, based on the resource processing amount of each project function category information, the development completion amount in the function development progress data corresponding to the project function of each function category is obtained. Based on the resource processing degree of each project function category information, the development completion degree in the function development progress data corresponding to the project function of each function category is obtained.

[0113] Based on the development completion amount and development completion degree of the project functions of each functional category, the functional development progress data corresponding to the project functions of each functional category are obtained.

[0114] In the above embodiment, by obtaining the resource processing amount and resource processing degree in the functional resource processing information associated with each project function category information, and then starting from the resource processing amount and resource processing degree, the development completion amount and development completion degree in the functional development progress data corresponding to the project function of each functional category are accurately determined, thereby obtaining accurate functional development progress data corresponding to the project function of each functional category.

[0115] In an exemplary embodiment, based on the resource processing degree and the resource processing amount, determining the function development progress data corresponding to the project function of each function category includes:

[0116] Determine the highest resource processing degree among the resource processing degrees of each project function category information; evaluate the development efficiency corresponding to the project function of each function category based on the highest resource processing degree and the resource processing degree of each project function category information, and obtain the development efficiency corresponding to the project function of each function category; determine the function development progress data corresponding to the project function of each function category based on the resource processing degree, resource processing volume, and development efficiency.

[0117] Specifically, since there are several types of project function category information, the resource processing degrees of different project function category information are obtained, and the highest resource processing degree is determined from the resource processing degrees of several project function category information. Based on the highest resource processing degree, the resource processing degrees corresponding to other project function category information are evaluated, that is, based on the highest resource processing degree and the resource processing degree of each project function category information, the development efficiency corresponding to the project function of each functional category is evaluated.

[0118] The specific evaluation method includes: evaluating the development efficiency corresponding to the project function of each functional category through the ratio of the resource processing degree of each project function category information to the highest resource processing degree, so as to determine the development efficiency corresponding to the project function of each functional category. The development efficiency corresponding to the project function of each functional category in this application is the development efficiency contrasted with different functional categories. For example, the project function category information includes function A, function B, and function C. The resource processing degrees corresponding to function A, function B, and function C are 20%, 30%, and 50%, respectively. It can be seen that the highest resource processing degree is the resource processing degree of function C. The ratio of the resource processing degree of function A to the resource processing degree of function C, the ratio of the resource processing degree of function B to the resource processing degree of function C, and the ratio of the resource processing degree of function C to the resource processing degree of function C are calculated respectively, and the corresponding ratios are 2 / 5, 3 / 5, and 1. Therefore, it can be determined that the development efficiency of function A is 2 / 5, the development efficiency of function B is 3 / 5, and the development efficiency of function C is 1.

[0119] Furthermore, based on the development efficiency corresponding to the project functions of each functional category, the functional development progress data corresponding to the project functions of each functional category are determined. That is to say, the development efficiency corresponding to the project functions of each functional category is determined as the functional development progress data corresponding to the project functions of each functional category.

[0120] Furthermore, based on the resource processing degree corresponding to the project function of each functional category, the resource processing amount corresponding to the project function of each functional category, and the development efficiency corresponding to the project function of each functional category, the function development progress data corresponding to the project function of each functional category is determined. The function development progress data corresponding to the project function of each functional category includes: the resource processing degree corresponding to the project function of each functional category, the resource processing amount corresponding to the project function of each functional category, and the development efficiency corresponding to the project function of each functional category.

[0121] In the above embodiment, by determining the highest resource processing degree among the resource processing degrees of each project function category information and obtaining its ratio to the highest resource processing degree, the resource processing degree of each project function category information can be evaluated, and then the development efficiency corresponding to the project function of each function category can be accurately evaluated, making the function development progress data more comprehensive.

[0122] In an exemplary embodiment, the object development project progress of each project-associated object corresponding to the target project is evaluated based on the object resource processing information associated with each object category information to obtain object development progress data, including: obtaining the object resource processing amount in the object resource processing information associated with each object category information; based on the object resource processing amount and the processing amount required by the preset object resources, evaluating the object development project progress of each project-associated object in the target project to obtain the object resource processing degree; based on the object resource processing degree and the object resource processing amount, determining the function development progress data corresponding to each project-associated object.

[0123] Specifically, the object resource processing amount of the corresponding object category information is obtained from the object resource processing information associated with each object category information. Further, based on the object resource processing amount of each object category information, the object development progress data corresponding to each project-related object can be obtained, that is, the object resource processing amount is determined as the object development completion amount in the object development progress data of each project-related object.

[0124] The object resource processing degree is obtained based on the ratio of the object resource processing amount of each object category information to the preset object resource required processing amount of each object category information. Further, the object development completion degree in the object development progress data corresponding to each object category is determined based on the object resource processing degree of each object category information.

[0125] Based on the object development completion degree and the object development completion amount of each object category, object development progress data corresponding to the object category information of each project-related object is obtained.

[0126] In the above embodiment, starting from the functional resource processing amount and the functional resource processing degree, the functional development completion amount and the functional development completion degree corresponding to each functional category are accurately determined, thereby obtaining accurate functional development progress data corresponding to each functional category.

[0127] In an exemplary embodiment, based on the object resource processing degree and the object resource processing volume, the functional development progress data corresponding to each project-associated object is determined, including: determining the highest object resource processing degree among the object resource processing degrees of each object category information; evaluating the object development efficiency corresponding to the object category of each project management object based on the ratio of the highest object resource processing degree to the object resource processing degree of each object category information to obtain the object development efficiency corresponding to each object category; determining the object development progress data of each object category based on the object resource processing degree, the object resource processing volume, and the object development efficiency.

[0128] In the above embodiment, by determining the object development efficiency of each object category, it is possible to facilitate competition between project-related objects, that is, developers, and thus improve the efficiency of project development.

[0129] In an exemplary embodiment, the development progress of the target project is evaluated based on the function development progress data and the object development progress data to obtain the project development progress data and object development progress data of the target project, and further includes:

[0130] Determine the project group information to which each object category information belongs; aggregate the object resource processing information associated with each object category information corresponding to the same project group information to obtain the group resource processing information associated with the project group information; evaluate the progress of each group development project based on the group resource processing information associated with each project group information to obtain the group development progress data of each project group information; evaluate and process the development progress of the target project based on the function development progress data, the object development progress data, and the group development progress data to obtain the project development progress data of the target project.

[0131] The project group information refers to the groups participating in the target project, and each object category information corresponds to a project group information.

[0132] Specifically, the project group information to which each object category information belongs is identified, and the object resource processing information corresponding to all object category information in the group corresponding to each project group information is regarded as the resource processing information managed by the project group information, and the object resource processing information corresponding to all object category information in the group corresponding to each project group information is determined as the group resource processing information managed by the project group information. For example, each object category information includes object 1, object 2, and object 3, where object 1 belongs to group a, object 2 belongs to group a, and object 3 belongs to group b, then the group resource processing information of group a includes the sum of the object resource processing information of object 1 and the object resource processing information of object 2, and the group resource processing information of group b includes the object resource processing information of object 3.

[0133] Furthermore, according to the group resource processing information associated with each project group information, the progress of each group development project is evaluated to obtain the group development progress data of each project group information.

[0134] In one embodiment, the group resource processing amount associated with each project group information is obtained from the group resource processing information associated with each project group information, and the group resource processing degree associated with each project group information is determined based on the group resource processing amount. Furthermore, the group development progress data of each project group information is determined based on the group resource processing amount and the group resource processing degree.

[0135] In another embodiment, the highest group resource processing degree is obtained, and based on the ratio of the group resource processing degree associated with each project group information to the highest group resource processing degree, the group development efficiency of each project group information is obtained, and then based on the group development efficiency of each project group information, the group development progress data of each project group information is determined. By determining the group development efficiency, it can be beneficial to the competition between groups, thereby improving the efficiency of project development.

[0136] In the above embodiment, by acquiring the group development progress data of each project group information, the group development progress of each project group information participating in the target project development process can be evaluated, thereby realizing the evaluation of the overall development progress of the target project.

[0137] In an exemplary embodiment, the method further comprises:

[0138] Obtain a first acquisition timestamp of function resource processing information associated with each project function category information and a second acquisition timestamp of object resource processing information associated with each object category information within a preset time period; evaluate the project function development progress of each function category within the preset time period according to the function resource processing information associated with each project function category information corresponding to the first acquisition timestamp, and obtain first development progress data within the preset time period; evaluate the object development project progress of each project-associated object within the preset time period according to the object resource processing information associated with each object category information corresponding to the second acquisition timestamp, and obtain second development progress data within the preset time period; evaluate and process the development progress of the target project based on the first development progress data and the second development progress data, and obtain project development progress data of the target project within the preset time period.

[0139] The acquisition timestamp refers to the time when the server acquires the resource processing information. The timestamp corresponding to the functional resource processing information is defined as the first acquisition timestamp, and the timestamp corresponding to the object resource processing information is defined as the second acquisition timestamp.

[0140] Specifically, when the resource processing information is obtained, the acquisition timestamp of the resource processing information will be attached. In practical applications, the resource processing information is generally obtained from the log at a preset time interval, that is, based on the preset time interval and the initial acquisition timestamp, the acquisition timestamp of each resource processing information can be determined.

[0141] After matching the spatial variables with the resource processing information to obtain the functional resource processing information associated with each project functional category information in the spatial variables and the object resource processing information associated with each object category information, the acquisition timestamp of the functional resource processing information is defined as the first acquisition timestamp, and the timestamp corresponding to the object resource processing information is defined as the second acquisition timestamp.

[0142] The function resource processing information associated with each item function category information corresponding to all first acquisition timestamps within a preset time period and the object resource processing information associated with each object category information corresponding to all second acquisition timestamps within a preset time period are acquired.

[0143] According to the function resource processing information associated with each project function category information corresponding to the first acquisition timestamp, the project function development progress of each function category in the preset time period is evaluated to obtain the first development progress data in the preset time period. According to the object resource processing information associated with each object category information corresponding to the second acquisition timestamp, the object development project progress of each project-related object in the preset time period is evaluated to obtain the second development progress data.

[0144] Based on the first development progress data and the second development progress data, the development progress of the target project is evaluated from a time dimension to determine the project development progress data of the target project within a preset time period.

[0145] In the above embodiment, by analyzing the first acquisition timestamp of the function resource processing information associated with each project function category information and the second acquisition timestamp of the object resource processing information associated with each object category information within a preset time period, the development progress of the target project can be evaluated and processed from the time dimension, thereby achieving more comprehensive acquisition of the project development progress data of the target project.

[0146] In an exemplary embodiment, the function resource processing information includes a resource code and a resource processing state; based on the function resource processing information associated with each project function category information, the project function development progress of each function category in the target project is evaluated to obtain function development progress data, including:

[0147] For the functional resource processing information associated with each project functional category information, based on the frequency of occurrence of resource codes with a resource processing status of successful processing in the functional resource processing information, the debugging progress of each functional category in the target project is evaluated to obtain the project function debugging result of the project functional category information; when the project function debugging result is normal, the project function development progress of each functional category in the target project is evaluated according to the functional resource processing information to obtain the function development progress data of each functional category.

[0148] The resource code is an identifier that uniquely identifies the functional resource processing information. The resource processing status refers to the resource processing result during resource processing, and the resource processing status includes processing success and processing failure.

[0149] Specifically, the functional resource processing information associated with each project functional category information includes resource codes and resource processing status, and several pieces of functional resource processing information associated with the project functional category information are obtained, and the functional resource processing information with a resource processing status of successfully processed is screened from the several pieces of functional resource processing information associated with each project functional category information, and the occurrence frequency of the resource codes of the functional resource processing information with a resource processing status of successfully processed is obtained, and based on the occurrence frequency, the debugging progress of each functional category in the target project is evaluated to obtain the project function debugging result of the project functional category information. When the occurrence frequency is within the preset normal range, the project function debugging result of the project functional category information is normal; when the occurrence frequency is not within the preset normal range, the project function debugging result of the project functional category information is abnormal.

[0150] That is, when the first resource code appears, it is considered that the project function debugging starts, when the resource processing status in a certain functional resource processing information is successfully processed, it is considered that the project function debugging result corresponding to the functional resource processing information is successful, and when the frequency of resource codes with a resource processing status of successfully processed appears normally, that is, when the frequency of functional resource processing information with a resource processing status of successfully processed appears normally, the project function debugging result of the project function category information is normal. In one embodiment, the accuracy of the project development process can also be measured by the project function debugging result.

[0151] When the project function debugging result is normal, the project function development progress of each function category in the target project is evaluated according to the function resource processing information to obtain the function development progress data of each function category.

[0152] In the above embodiment, the accuracy of obtaining the function development progress data can be improved by evaluating the project function development progress of each function category in the target project only when the project function debugging result is normal.

[0153] In an exemplary embodiment, after evaluating the development progress of the target project according to the function development progress data and the object development progress data to obtain the project development progress data of the target project, the method further includes:

[0154] Aggregate the project development progress data, function development progress data, and object development progress data of the target project to obtain aggregated data; and visualize the aggregated data, project development progress data, function development progress data, and object development progress data, respectively.

[0155] Among them, visualization aims to study the visual presentation of large-scale non-numerical information resources, and help people understand and analyze data by utilizing graphic and image technologies and methods.

[0156] Specifically, the project development progress data, function development progress data, and object development progress data of the target project are aggregated to obtain aggregated data, which includes the project development progress data, function development progress data, and object development progress data of the target project. Not only can the function development progress data of each project function category information and the object development progress data of each object category information be displayed separately; the project development progress data, function development progress data, and object development progress data of the target project can also be displayed comprehensively.

[0157] Aggregated data, project development progress data of the target project, function development progress data, and object development progress data can all be visualized in the form of charts. For example, a bar chart is used to display the function development progress data corresponding to the project functions of each function category, a line chart is used to display the object development progress data of the object category of each project-associated object, and a table is used to display the project development progress data of the target project and the aggregated data, etc.

[0158] In this application, a progress management page can be developed to display the visualized data. In the visualized data, for example, in the visualization of aggregated data, it can be achieved that: by selecting the time dimension, the corresponding first-time development progress data and second-time development progress data can be counted by week, day, or a certain time period, for example, the resource processing volume from the start of the project to date can be counted; by selecting the project group dimension, the group resource processing volume and group resource processing degree in the development progress data of each group can be displayed according to the project group information; by selecting the function category dimension, according to the project function category information, the resource processing volume, resource processing degree, and development efficiency of a certain project function category information can be displayed; by selecting the object category dimension, according to the object category information, the object resource processing volume, object resource processing degree, and accuracy of a certain object category information can be displayed.

[0159] Furthermore, the progress management page can also provide functions such as data summation, accuracy calculation, data export, progress comparison, etc. to provide detailed records of progress for users to perform data analysis.

[0160] In the above embodiment, by visualizing the aggregated data, project development progress data, function development progress data, and object development progress data respectively, it is possible to display the visualized project development progress data from multiple dimensions, thereby intuitively and efficiently understanding the progress. By publicly displaying the results of the data presentation, it is also possible to reduce misunderstandings caused by information asymmetry.

[0161] In one embodiment, the entire process of acquiring project development progress data can be traced back to the source, so that problems can be quickly located after they occur.

[0162] In a specific application example, several functions to be developed in the target project are function A and function B, and the developers involved in the target project are developer A, developer B, and developer C. The project development progress data acquisition method includes:

[0163] 1. Developer A, Developer B, and Developer C develop the target project through a unified template page. Each template page contains developer information, project function category information, project group information, etc. Set space variables to wrap developer information, project function category information, project group information, etc.

[0164] 2. When the terminal initiates a resource processing request for the target project, the server obtains the resource processing information of the target project, and the space variables in the terminal are also sent to the server along with the resource processing information. First, the resource processing information is stored in the server's log, which is used to monitor whether the terminal initiates the resource processing service normally. Secondly, the space variables are also printed in a specific format along with the resource processing information.

[0165] 3. When acquiring project development progress data, set a specific time interval, for example, by day, and filter out spatial variables and resource processing information from the log in a specific format, and send it to the data processing center inside the server with a timestamp.

[0166] 4. The data processing center obtains the resource processing information and spatial variables of the target project, extracts the project function category information and the object category information of the project-related objects in the spatial variables, and determines the function resource processing information associated with each project function category information, and the object resource processing information associated with each object category information. For example, determine the function resource processing information associated with function A in the resource processing information, the function resource processing information associated with function B in the resource processing information, the object resource processing information associated with developer A, the object resource processing information associated with developer B, and the object resource processing information associated with developer C.

[0167] 5. The function resource processing information includes the resource processing capacity. Based on the function resource processing information associated with function A and the function resource processing information associated with function B, the resource processing capacity of function A and the resource processing capacity of function B are obtained. Then, based on the ratio of the resource processing capacity of function A to the processing capacity required by the preset resources, the resource processing degree of function A is determined, and based on the ratio of the resource processing capacity of function B to the processing capacity required by the preset resources, the resource processing degree of function B is determined.

[0168] Furthermore, the higher resource processing degree between the resource processing degree of function A and the resource processing degree of function B can also be determined. For example, if the resource processing degree of function A is 40% and the resource processing degree of function B is 80%, then the higher resource processing degree is determined to be 80%. Based on the higher resource processing degree, let the development efficiency of function B be 1, then the development efficiency of function A is 1 / 2. The development efficiency here refers to the comparative efficiency of the development efficiencies of different functions.

[0169] Furthermore, based on the resource processing volume, resource processing degree, and development efficiency of function A, the function development progress data of function A is determined; based on the resource processing volume, resource processing degree, and development efficiency of function B, the function development progress data of function B is determined.

[0170] Similarly, the resource processing capacity, resource processing degree, and development efficiency of each developer are calculated to determine the development progress data of each developer; based on the resource processing capacity, resource processing degree, and development efficiency of each developer, the development progress data of each developer is determined. In addition, based on the development efficiency of each developer, the competition between developers can also be intuitively understood.

[0171] 6. Each developer belongs to a group. Developers A and C belong to group one, and developer B belongs to group two. The object resource processing information of developer A and the object resource processing information of developer C are determined as group resource processing information of group one, and the object resource processing information of developer B is determined as group resource processing information of group two.

[0172] Based on the group resource processing information of one group, the progress of the development project of one group is evaluated to obtain the group development progress data of one group; based on the group resource processing information of the second group, the progress of the development project of the second group is evaluated to obtain the group development progress data of the second group.

[0173] 7. Based on the function development progress data of each project function, the development progress data of each developer, and the group development progress data of each group, the development progress of the target project is evaluated and processed to obtain the project development progress data of the target project.

[0174] Furthermore, the project development progress data, the function development progress data of each project function, the development progress data of each developer, and the group development progress data of each group may be aggregated, and the aggregated results may be visualized.

[0175] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0176] Based on the same inventive concept, the embodiment of the present application also provides a project development progress data acquisition device for implementing the project development progress data acquisition method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations of one or more project development progress data acquisition device embodiments provided below can refer to the limitations of the project development progress data acquisition method above, and will not be repeated here.

[0177] In an exemplary embodiment, Figure 4 As shown, a device for acquiring project development progress data is provided, comprising: an acquisition module 100, a matching module 200, a function evaluation module 300, an object evaluation module 400 and a progress acquisition module 500, wherein:

[0178] The acquisition module 100 is used to acquire resource processing information and space variables of the target project; the space variables carry project function category information corresponding to the resource processing information and object category information of the project-related objects;

[0179] A matching module 200 is used to match the spatial variable with the resource processing information to obtain the function resource processing information associated with each item function category information in the spatial variable and the object resource processing information associated with each object category information;

[0180] Function evaluation module 300, for evaluating the project function development progress of each function category in the target project according to the function resource processing information associated with each project function category information, and obtaining function development progress data;

[0181] The object evaluation module 400 is used to evaluate the object development project progress of each project-related object corresponding to the target project according to the object resource processing information associated with each object category information, and obtain object development progress data;

[0182] The progress acquisition module 500 is used to evaluate the development progress of the target project according to the function development progress data and the object development progress data, and obtain the project development progress data of the target project.

[0183] In one embodiment, the function evaluation module 300 is also used to obtain the resource processing capacity in the function resource processing information associated with each project function category information; based on the resource processing capacity and the processing capacity required by the preset resources, the project function development progress of each function category in the target project is evaluated to obtain the resource processing degree; based on the resource processing degree and the resource processing capacity, the function development progress data corresponding to the project function of each function category is determined.

[0184] In one embodiment, the function evaluation module 300 is also used to determine the highest resource processing degree among the resource processing degrees of each project function category information; based on the highest resource processing degree and the resource processing degree of each project function category information, the development efficiency corresponding to the project function of each function category is evaluated to obtain the development efficiency corresponding to the project function of each function category; based on the resource processing degree, resource processing volume, and development efficiency, the function development progress data corresponding to the project function of each function category is determined.

[0185] In one of the embodiments, the progress acquisition module 500 is also used to determine the project group information to which each object category information belongs; aggregate the object resource processing information associated with each object category information corresponding to the same project group information to obtain the group resource processing information associated with the project group information; evaluate the progress of each group development project based on the group resource processing information associated with each project group information to obtain the group development progress data of each project group information; evaluate and process the development progress of the target project based on the function development progress data, the object development progress data, and the group development progress data to obtain the project development progress data of the target project.

[0186] In one of the embodiments, the project development progress data acquisition device also includes a time evaluation module, which is used to obtain a first acquisition timestamp of function resource processing information associated with each project function category information and a second acquisition timestamp of object resource processing information associated with each object category information within a preset time period; based on the function resource processing information associated with each project function category information corresponding to the first acquisition timestamp, the project function development progress of each function category within the preset time period is evaluated to obtain the first development progress data within the preset time period; based on the object resource processing information associated with each object category information corresponding to the second acquisition timestamp, the object development project progress of each project-associated object within the preset time period is evaluated to obtain the second development progress data within the preset time period; based on the first development progress data and the second development progress data, the development progress of the target project is evaluated and processed to obtain the project development progress data of the target project within the preset time period.

[0187] In one of the embodiments, the functional resource processing information includes resource coding and resource processing status; the functional evaluation module 300 is also used to evaluate the debugging progress of each functional category in the target project based on the frequency of occurrence of resource coding with a resource processing status of successful processing in the functional resource processing information for each project functional category information, and obtain the project function debugging result of the project functional category information; when the project function debugging result is normal, the project function development progress of each functional category in the target project is evaluated according to the functional resource processing information, and the function development progress data of each functional category is obtained.

[0188] In one of the embodiments, the project development progress data acquisition device also includes a visualization module, which is used to aggregate the project development progress data, function development progress data, and object development progress data of the target project to obtain aggregated data; and visualize the aggregated data, project development progress data, function development progress data, and object development progress data, respectively.

[0189] Each module in the above-mentioned project development progress data acquisition device can be implemented in whole or in part by software, hardware and their combination. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.

[0190] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Figure 5As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as resource processing information and space variables of the target project. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for acquiring project development progress data is implemented.

[0191] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0192] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.

[0193] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0194] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0195] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.

[0196] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0197] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for obtaining project development progress data, It is characterized in that The method comprises: Obtain resource processing information and space variables of a target project; the space variables carry project function category information corresponding to the resource processing information and object category information of project-related objects; Matching the space variable with the resource processing information to obtain the function resource processing information associated with each item function category information in the space variable and the object resource processing information associated with each object category information; According to the functional resource processing information associated with each of the project functional category information, the project function development progress of each functional category of the target project is evaluated to obtain functional development progress data; According to the object resource processing information associated with each of the object category information, the object development project progress of each project-associated object corresponding to the target project is evaluated to obtain object development progress data; The development progress of the target project is evaluated according to the function development progress data and the object development progress data to obtain the project development progress data of the target project.

2. The method according to claim 1, It is characterized in that The function resource processing information associated with each project function category information is used to evaluate the project function development progress of each function category in the target project to obtain function development progress data, including: Obtaining resource processing capacity in the function resource processing information associated with each of the project function category information; Based on the resource processing capacity and the required processing capacity of the preset resources, the project function development progress of each functional category in the target project is evaluated to obtain the resource processing degree; Based on the resource processing degree and the resource processing amount, function development progress data corresponding to the project function of each function category is determined.

3. The method according to claim 2, It is characterized in that The determining, based on the resource processing degree and the resource processing amount, function development progress data corresponding to the project function of each function category includes: Determine the highest resource processing level among the resource processing levels of each of the project function category information; Based on the highest resource processing degree and the resource processing degree of each of the project function category information, the development efficiency corresponding to the project function of each functional category is evaluated to obtain the development efficiency corresponding to the project function of each functional category; Function development progress data corresponding to the project functions of each function category is determined based on the resource processing degree, the resource processing volume, and the development efficiency.

4. The method according to claim 1, It is characterized in that The evaluating the development progress of the target project according to the function development progress data and the object development progress data to obtain the project development progress data of the target project also includes: Determine the project group information to which each object category information belongs; Aggregating the object resource processing information associated with each of the object category information corresponding to the same project group information to obtain the group resource processing information associated with the project group information; According to the group resource processing information associated with each of the project group information, the progress of each group development project is evaluated to obtain the group development progress data of each of the project group information; The development progress of the target project is evaluated based on the function development progress data, the object development progress data, and the group development progress data to obtain the project development progress data of the target project.

5. The method according to claim 1, It is characterized in that The method further comprises: Acquire a first acquisition timestamp of the function resource processing information associated with each item function category information and a second acquisition timestamp of the object resource processing information associated with each object category information within a preset time period; According to the functional resource processing information associated with each of the project function category information corresponding to the first acquisition timestamp, the project function development progress of each functional category within a preset time period is evaluated to obtain first development progress data within the preset time period; According to the object resource processing information associated with each of the object category information corresponding to the second acquisition timestamp, the object development project progress of each project-associated object within a preset time period is evaluated to obtain second development progress data within the preset time period; Based on the first development progress data and the second development progress data, the development progress of the target project is evaluated to obtain the project development progress data of the target project within a preset time period.

6. The method according to claim 1, It is characterized in that The functional resource processing information includes resource coding and resource processing status; the functional resource processing information associated with each project functional category information is used to evaluate the project functional development progress of each functional category in the target project to obtain functional development progress data, including: For each functional resource processing information associated with the project functional category information, based on the occurrence frequency of the resource code whose resource processing status in the functional resource processing information is successfully processed, the debugging progress of each functional category in the target project is evaluated to obtain the project function debugging result of the project functional category information; When the project function debugging result is normal, the project function development progress of each functional category in the target project is evaluated according to the functional resource processing information to obtain functional development progress data of each functional category.

7. The method according to claim 1, It is characterized in that After evaluating the development progress of the target project according to the function development progress data and the object development progress data to obtain the project development progress data of the target project, the method further includes: Aggregating the project development progress data of the target project, the function development progress data, and the object development progress data to obtain aggregated data; The aggregated data, the project development progress data, the function development progress data, and the object development progress data are visualized respectively.

8. A device for acquiring project development progress data, It is characterized in that The device comprises: An acquisition module, used to acquire resource processing information and space variables of a target project; the space variables carry project function category information corresponding to the resource processing information and object category information of project-related objects; A matching module, used for matching the space variable with the resource processing information, and obtaining the function resource processing information associated with each item function category information in the space variable, and the object resource processing information associated with each object category information; A function evaluation module, for evaluating the project function development progress of each function category in the target project according to the function resource processing information associated with each project function category information, to obtain function development progress data; An object evaluation module, configured to evaluate the object development project progress of each project-related object corresponding to the target project according to the object resource processing information associated with each object category information, and obtain object development progress data; The progress acquisition module is used to evaluate the development progress of the target project according to the function development progress data and the object development progress data, and obtain the project development progress data of the target project.

9. The device according to claim 8, It is characterized in that The function evaluation module is also used to obtain the resource processing capacity in the function resource processing information associated with each of the project function category information; based on the resource processing capacity and the processing capacity required by the preset resources, evaluate the project function development progress of each function category in the target project to obtain the resource processing degree; based on the resource processing degree and the resource processing capacity, determine the function development progress data corresponding to the project function of each function category.

10. The device according to claim 9, It is characterized in that The function evaluation module is also used to determine the highest resource processing degree among the resource processing degrees of each of the project function category information; based on the highest resource processing degree and the resource processing degree of each of the project function category information, evaluate the development efficiency corresponding to the project function of each function category to obtain the development efficiency corresponding to the project function of each function category; based on the resource processing degree, the resource processing volume, and the development efficiency, determine the function development progress data corresponding to the project function of each function category.

11. The device according to claim 8, It is characterized in that The progress acquisition module is also used to determine the project group information to which each object category information belongs; aggregate the object resource processing information associated with each object category information corresponding to the same project group information to obtain the group resource processing information associated with the project group information; evaluate the progress of each group development project according to the group resource processing information associated with each project group information to obtain the group development progress data of each project group information; evaluate and process the development progress of the target project according to the function development progress data, the object development progress data, and the group development progress data to obtain the project development progress data of the target project.

12. The device according to claim 8, It is characterized in that The project development progress data acquisition device also includes a time evaluation module, which is used to obtain a first acquisition timestamp of the function resource processing information associated with each project function category information and a second acquisition timestamp of the object resource processing information associated with each object category information within a preset time period; According to the functional resource processing information associated with each of the project function category information corresponding to the first acquisition timestamp, the project function development progress of each functional category within a preset time period is evaluated to obtain first development progress data within the preset time period; According to the object resource processing information associated with each of the object category information corresponding to the second acquisition timestamp, the object development project progress of each project-associated object within a preset time period is evaluated to obtain second development progress data within the preset time period; Based on the first development progress data and the second development progress data, the development progress of the target project is evaluated to obtain the project development progress data of the target project within a preset time period.

13. The device according to claim 8, It is characterized in that The functional resource processing information includes resource coding and resource processing status; the functional evaluation module is also used to evaluate the debugging progress of each functional category in the target project based on the frequency of occurrence of the resource coding with the resource processing status of successful processing in the functional resource processing information for each functional resource processing information associated with the project functional category information, and obtain the project function debugging result of the project functional category information; when the project function debugging result is normal, the project function development progress of each functional category in the target project is evaluated according to the functional resource processing information, and the functional development progress data of each functional category is obtained.

14. The device according to claim 8, It is characterized in that The project development progress data acquisition device further includes a visualization module, which is used to aggregate the project development progress data of the target project, the function development progress data, and the object development progress data to obtain aggregated data; The aggregated data, the project development progress data, the function development progress data, and the object development progress data are visualized respectively.

15. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

16. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

17. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.