Capacity mutual aid control method and device between interconnected regional power grids

By obtaining data from regional power grids and connection lines, DPFC controllers and evaluation models calculate the current transfer value, and adjusting the trend of connection lines, the problem of mutual capacity between interconnected regional power grids is solved, and the stability and economics of the power grid are improved.

CN118944097APending Publication Date: 2024-11-12GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410955710.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing technology cannot achieve stable capacity mutual assistance between power grids in interconnected areas, resulting in insufficient backup capacity when the power system exchanges power between cross-domain power grids, affecting the unit regulation capability and coordination capability of the connection line.

Method used

By obtaining the information of the power grids in the two regions and the trend data of the connection lines, the DPFC controller and the mutual assistance capacity evaluation model are used to calculate the DPFC trend transfer value, adjust the trend of the connection lines, and realize the optimal capacity allocation between the power grids.

Benefits of technology

It improves the stability and economicality of power grid operation, realizes effective capacity mutual assistance between power grids in interconnected areas, and ensures the reasonable allocation of power grid resources and the reliability of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944097A_ABST
    Figure CN118944097A_ABST
Patent Text Reader

Abstract

The invention discloses a capacity mutual aid control method and device between interconnected regional power grids. Firstly, detailed information of two regional power grids and power flow data of a connection line between the two regional power grids are collected; and when the data do not meet the preset condition, determining the required power flow transfer amount by using an evaluation model integrated with the DPFC controller. The DPFC controller is composed of a plurality of sub-modules, and the output voltage which should be provided by each sub-module is determined through calculation. Then, the power flow of the connection line is adjusted according to the output voltages so as to realize mutual complementation of capacities between the power grids in the interconnection region and improve the operation economy of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of capacity mutual assistance, and in particular to a capacity mutual assistance control method and device between interconnected regional power grids. Background Art

[0002] With the continuous development of my country's new power system with renewable energy as the main body, the installed capacity of clean energy generators represented by wind power and photovoltaic power is steadily increasing. However, new energy power generation is random and uncertain. Wind power generation and photovoltaic power generation are not only unevenly distributed in the region, but also fluctuate in the time distribution of their output. The load distribution of the regional power grid often does not match the total installed capacity of new energy units, resulting in insufficient new energy consumption capacity. To solve this problem, cross-regional coordination and optimization is the ultimate way to promote the consumption of new energy in my country. The regional power grids are interconnected through interconnection lines to achieve power space-time complementarity, peak load regulation, and improve the economy of the power system. However, power transmission is limited by the transmission capacity of the line. In order to smoothly send out the mutual assistance flow, flexible AC power flow control equipment is required. At present, distributed power flow controllers are widely used in transmission networks due to their high flexibility, high reliability, and high economy. They improve the overall transmission level of transmission lines and realize flexible mutual assistance in regional power grids.

[0003] However, when interconnection lines exist, there is power exchange between regional power grids. When the power level of the interconnection lines is determined by power trading, the determination of the unit operation level and reserve capacity will be carried out step by step with the interconnection line operation plan. At this time, the impact of power exchange between cross-domain power grids on the original regional reserve capacity plan cannot be determined. If the interconnection line operation plan requires the upper region with insufficient reserve capacity to supply power to the outside, the regulating ability of the unit will be further deteriorated, and the interconnection line will not be able to exert its coordination ability. The same is true for the region with insufficient reserve capacity. Therefore, existing technologies cannot achieve capacity mutual assistance between interconnected regional power grids. Summary of the invention

[0004] The present invention provides a capacity mutual assistance control method and device between interconnected regional power grids, so as to solve the problem that the capacity mutual assistance between interconnected regions cannot be stably realized in the prior art.

[0005] In a first aspect, the present application provides a capacity mutual assistance control method between interconnected regional power grids, comprising:

[0006] Respectively obtaining power grid information of the first regional power grid and the second regional power grid;

[0007] Acquiring power flow level data of a connection line; wherein the connection line is used to connect the first regional power grid and the second regional power grid;

[0008] If the power grid information and the power flow level data of the interconnection line do not meet the preset conditions, the DPFC power flow transfer value under the capacity mutual aid scenario is output through the interconnected regional power grid mutual aid capacity assessment model containing the DPFC controller; wherein the DPFC controller includes a plurality of DPFC submodules;

[0009] According to the DPFC power flow transfer value, an output voltage satisfying a single DPFC submodule is calculated;

[0010] According to the output voltage of the single DPFC submodule, the power flow value of the interconnection line is adjusted to achieve capacity mutual assistance of the interconnected regional power grid.

[0011] The present application achieves the beneficial effect of capacity mutual assistance by accurately controlling the power flow between interconnected regional power grids. First, the present application provides decision support for mutual assistance between power grids by collecting the load and power supply information of the two regional power grids and the flow data of the interconnection lines. When the existing data does not meet the preset conditions, indicating that there is a capacity imbalance or there is room for optimization, the DPFC controller and the mutual assistance capacity evaluation model are used to calculate the required DPFC flow transfer value, and then the voltage that each DPFC submodule should output is determined based on the DPFC flow transfer value, and then the flow on the interconnection line is adjusted to achieve optimal capacity allocation between power grids. Compared with the existing technology that cannot achieve capacity mutual assistance between interconnected regional power grids, the present application improves the stability and economy of power grid operation and achieves effective capacity mutual assistance between interconnected regional power grids.

[0012] As a preferred embodiment of the first aspect, the interconnected regional power grid mutual aid capacity assessment model including the DPFC controller outputs the DPFC power flow transfer value in the capacity mutual aid scenario, specifically:

[0013] According to the preset constraints and objective functions, a mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is constructed;

[0014] The mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is solved based on the particle swarm algorithm to obtain the DPFC power flow transfer value under the capacity mutual aid scenario.

[0015] As a preferred embodiment of the first aspect, the interconnected regional power grid mutual aid capacity assessment model containing a DPFC controller is constructed according to preset constraints and objective functions, specifically:

[0016] The constraints include power balance constraints of the interconnected regional power grid, upper and lower output limits of conventional thermal power units, upper and lower output limits of new energy power plants, lower reserve constraints of the interconnected regional power grid in transmitting power to the outside through DPFC or receiving power in the region, and power transmission constraints of interconnection lines;

[0017] The objective function formula is: min(C f +C b +C a +C l +C se +C e ′);

[0018] Where: C f represents the power generation cost, C b represents the standby cost, C a Indicates the penalty for abandoning new energy, C l represents the load loss penalty, C se represents the loss cost of the distributed power flow controller submodule, C e ′ represents the cross-regional reserve mutual assistance cost based on distributed power flow controller;

[0019] According to the constraints and objective function, a mutual aid capacity assessment model of interconnected regional power grids containing a DPFC controller is constructed.

[0020] In this preferred embodiment, the present application constructs an interconnected regional power grid mutual assistance capacity assessment model containing a DPFC controller, which accurately evaluates and quantifies the mutual assistance capacity requirements between power grids based on preset constraints and objective functions. Using the particle swarm algorithm as an optimization tool, the model can be efficiently solved to obtain the flow transfer value of the DPFC in a specific capacity mutual assistance scenario. This process not only improves the optimization accuracy of power flow between power grids, but also ensures the feasibility and economy of power grid mutual assistance operations through the iterative search capability of the algorithm, thereby achieving a reasonable allocation of power grid resources and enhanced stability of power grid operation.

[0021] As a preferred embodiment of the first aspect, the output voltage satisfying a single DPFC submodule is calculated based on the DPFC power flow transfer value, specifically:

[0022] According to the preset formula and the DPFC power flow transfer value, the total compensation voltage required to be output by the DPFC submodule group is calculated; wherein the DPFC submodule group includes all DPFC submodules;

[0023] According to the total compensation voltage and output average distribution method, the output voltage that satisfies a single DPFC submodule is calculated.

[0024] As a preferred embodiment of the first aspect, the total compensation voltage required to be output by the DPFC submodule group is calculated according to the preset formula and the DPFC power flow transfer value, specifically:

[0025] The preset formula is:

[0026] Where τ is the ratio of transmission capacity to mutual assistance capacity, which is the degree of mutual assistance, that is, is the DPFC power flow transfer value in period t, is the transmission power of the interconnection line DPFC after it is put into operation at time period t, is the original transmission power of the interconnection line at time period t, R is the interconnection line resistance, X is the interconnection line reactance, V r is the voltage of the first section of the interconnection line, V se is the total compensation voltage that the DPFC submodule group should output, δ r is the voltage phase angle of the first section of the interconnection line;

[0027] The total compensation voltage that the DPFC submodule group should output is calculated based on the calculated DPFC power flow transfer value and a preset formula.

[0028] In this preferred embodiment, the present application determines the output voltage required for a single DPFC submodule by precise calculation to achieve optimal power flow control and power compensation. First, the scheme obtains the DPFC power flow transfer value, which is a key parameter obtained based on the grid mutual aid capacity assessment model and particle swarm algorithm optimization. Then, using a preset formula, the power flow transfer value is converted into the total compensation voltage that the DPFC submodule group should output. This step ensures the coordinated operation of the entire submodule group and the satisfaction of the overall power demand. Finally, the output average distribution method is adopted to reasonably distribute the total compensation voltage to each DPFC submodule, ensuring that each submodule can participate in the grid power flow control with a balanced output. This coherent process not only improves the flexibility and accuracy of grid power regulation, but also enhances the stability and reliability of grid operation by balancing the output of each submodule.

[0029] As a preferred embodiment of the first aspect, respectively acquiring the grid information of the first regional grid and the second regional grid; and acquiring the flow level data of the interconnection line are specifically:

[0030] The grid information of the first regional grid and the second regional grid includes the upper and lower reserve capacities, power load, actual power generation of new energy and predicted power generation of new energy of the first regional grid and the second regional grid;

[0031] The power flow level data of the interconnection line include the active power transmission limit of the interconnection line between the first regional power grid and the second regional power grid, the voltage and current at both ends of the DPFC controller, and the impedance of the interconnection line.

[0032] In this preferred embodiment, the present application achieves an in-depth understanding and precise control of the state of the power grid by comprehensively collecting and analyzing the key operating data of the power grid. First, the scheme obtains detailed load and power supply information of the two regional power grids, including upper and lower spare capacity, power load, and actual and predicted power generation of new energy. These data provide the basis for the supply and demand balance and scheduling strategy of the power grid. Then, by collecting the flow level data of the interconnection line, such as transmission limit, voltage and current at both ends, and line impedance, the scheme can evaluate the transmission capacity and efficiency of the power grid. This process enhances the real-time monitoring capability of the power grid operation status, provides decision-making support for capacity mutual assistance and optimized scheduling between power grids, and thus improves the stability and economy of the power grid.

[0033] In a second aspect, the present application provides a capacity mutual assistance control device between interconnected regional power grids, including an acquisition module, an evaluation module, a calculation module and an adjustment module;

[0034] The acquisition module is used to respectively acquire the grid information of the first regional grid and the second regional grid; and acquire the flow level data of the interconnection line; wherein the interconnection line is used to connect the first regional grid and the second regional grid;

[0035] The evaluation module is used to evaluate whether the grid information of the first regional grid and the second regional grid and the power flow level data of the interconnection line meet the preset conditions. If not, the DPFC power flow transfer value under the mutual aid scenario is output through the interconnected regional grid mutual aid capacity evaluation model containing the DPFC controller; wherein the DPFC controller includes a plurality of DPFC submodules;

[0036] The calculation module is used to calculate the output voltage that satisfies a single DPFC submodule according to the DPFC power flow transfer value;

[0037] The regulating module is used to adjust the power flow value of the interconnection line according to the output voltage of the single DPFC submodule, so as to achieve capacity mutual assistance of the interconnected regional power grid.

[0038] This device uses four modules to divide the work and coordinate the work to better realize the capacity mutual assistance between interconnected regional power grids. First, this application provides decision support for the mutual assistance between power grids by collecting the load and power supply information of the two regional power grids and the flow data of the interconnection lines. When the existing data does not meet the preset conditions, indicating that there is a capacity imbalance or there is room for optimization, the DPFC controller and the mutual assistance capacity evaluation model are used to calculate the required DPFC flow transfer value, and then the voltage that each DPFC sub-module should output is determined based on the DPFC flow transfer value, and then the flow on the interconnection line is adjusted to achieve optimal capacity allocation between power grids. Compared with the existing technology that cannot achieve capacity mutual assistance between interconnected regional power grids, this application improves the stability and economy of power grid operation and realizes effective capacity mutual assistance between interconnected regional power grids.

[0039] As a preferred embodiment of the second aspect, the interconnected regional power grid mutual aid capacity assessment model including the DPFC controller outputs the DPFC power flow transfer value in the capacity mutual aid scenario, specifically:

[0040] According to the preset constraints and objective functions, a mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is constructed;

[0041] The mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is solved based on the particle swarm algorithm to obtain the DPFC power flow transfer value under the capacity mutual aid scenario.

[0042] As a preferred embodiment of the second aspect, the interconnected regional power grid mutual aid capacity assessment model containing a DPFC controller is constructed according to preset constraints and objective functions, specifically:

[0043] The constraints include power balance constraints of the interconnected regional power grid, upper and lower output limits of conventional thermal power units, upper and lower output limits of new energy power plants, lower reserve constraints of the interconnected regional power grid in transmitting power to the outside through DPFC or receiving power in the region, and power transmission constraints of interconnection lines;

[0044] The objective function formula is: min(C f +C b +C a +C l +C se +C e ′);

[0045] Where: C f represents the power generation cost, C b represents the standby cost, C a Indicates the penalty for abandoning new energy, C l represents the load loss penalty, C se represents the loss cost of the distributed power flow controller submodule, Ce ′ represents the cross-regional reserve mutual assistance cost based on distributed power flow controller;

[0046] According to the constraints and objective function, a mutual aid capacity assessment model of interconnected regional power grids containing a DPFC controller is constructed.

[0047] In this preferred embodiment, the present application constructs an interconnected regional power grid mutual assistance capacity assessment model containing a DPFC controller, which accurately evaluates and quantifies the mutual assistance capacity requirements between power grids based on preset constraints and objective functions. Using the particle swarm algorithm as an optimization tool, the model can be efficiently solved to obtain the flow transfer value of the DPFC in a specific capacity mutual assistance scenario. This process not only improves the optimization accuracy of power flow between power grids, but also ensures the feasibility and economy of power grid mutual assistance operations through the iterative search capability of the algorithm, thereby achieving a reasonable allocation of power grid resources and enhanced stability of power grid operation.

[0048] As a preferred embodiment of the second aspect, the output voltage satisfying a single DPFC submodule is calculated based on the DPFC power flow transfer value, specifically:

[0049] According to the preset formula and the DPFC power flow transfer value, the total compensation voltage required to be output by the DPFC submodule group is calculated; wherein the DPFC submodule group includes all DPFC submodules;

[0050] According to the total compensation voltage and output average distribution method, the output voltage that satisfies a single DPFC submodule is calculated.

[0051] As a preferred embodiment of the second aspect, the total compensation voltage required to be output by the DPFC submodule group is calculated according to the preset formula and the DPFC power flow transfer value, specifically:

[0052] The preset formula is:

[0053] Where τ is the ratio of transmission capacity to mutual assistance capacity, which is the degree of mutual assistance, that is, is the DPFC power flow transfer value in period t, is the transmission power of the interconnection line DPFC after it is put into operation at time period t, is the original transmission power of the interconnection line at time period t, R is the interconnection line resistance, X is the interconnection line reactance, V r is the voltage of the first section of the interconnection line, V se is the total compensation voltage that the DPFC submodule group should output, δ r is the voltage phase angle of the first section of the interconnection line;

[0054] The total compensation voltage that the DPFC submodule group should output is calculated based on the calculated DPFC power flow transfer value and a preset formula.

[0055] In this preferred embodiment, the present application determines the output voltage required for a single DPFC submodule by precise calculation to achieve optimal power flow control and power compensation. First, the scheme obtains the DPFC power flow transfer value, which is a key parameter obtained based on the grid mutual aid capacity assessment model and particle swarm algorithm optimization. Then, using a preset formula, the power flow transfer value is converted into the total compensation voltage that the DPFC submodule group should output. This step ensures the coordinated operation of the entire submodule group and the satisfaction of the overall power demand. Finally, the output average distribution method is adopted to reasonably distribute the total compensation voltage to each DPFC submodule, ensuring that each submodule can participate in the grid power flow control with a balanced output. This coherent process not only improves the flexibility and accuracy of grid power regulation, but also enhances the stability and reliability of grid operation by balancing the output of each submodule.

[0056] As a preferred embodiment of the second aspect, respectively acquiring the grid information of the first regional grid and the second regional grid; and acquiring the flow level data of the interconnection line are specifically:

[0057] The grid information of the first regional grid and the second regional grid includes the upper and lower reserve capacities, power load, actual power generation of new energy and predicted power generation of new energy of the first regional grid and the second regional grid;

[0058] The power flow level data of the interconnection line include the active power transmission limit of the interconnection line between the first regional power grid and the second regional power grid, the voltage and current at both ends of the DPFC controller, and the impedance of the interconnection line.

[0059] In this preferred embodiment, the present application achieves an in-depth understanding and precise control of the state of the power grid by comprehensively collecting and analyzing the key operating data of the power grid. First, the scheme obtains detailed load and power supply information of the two regional power grids, including upper and lower spare capacity, power load, and actual and predicted power generation of new energy. These data provide the basis for the supply and demand balance and scheduling strategy of the power grid. Then, by collecting the flow level data of the interconnection line, such as transmission limit, voltage and current at both ends, and line impedance, the scheme can evaluate the transmission capacity and efficiency of the power grid. This process enhances the real-time monitoring capability of the power grid operation status, provides decision-making support for capacity mutual assistance and optimized scheduling between power grids, and thus improves the stability and economy of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] Figure 1 : A flow chart of an embodiment of a capacity mutual assistance control method between interconnected regional power grids provided in the present application;

[0061] Figure 2 : A schematic diagram of the interconnected regional power grid structure based on the mutual assistance of distributed power flow controllers provided in this application;

[0062] Figure 3 : A schematic diagram of the structure of an embodiment of a capacity mutual assistance control device between interconnected regional power grids provided by the present application; DETAILED DESCRIPTION

[0063] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0064] Embodiment 1

[0065] Please refer to Figure 1 , which is a power mutual assistance control method between interconnected regional power grids provided in an embodiment of the present invention.

[0066] In this embodiment, the process of the power mutual assistance control method in this application is described in detail through steps S01-S04.

[0067] S01: respectively obtaining grid information of a first regional grid and a second regional grid;

[0068] Acquire the flow level data of the interconnection line; wherein the interconnection line is used to connect the first regional power grid and the second regional power grid; Figure 2 As shown, there is a connection line between the first regional power grid and the second regional power grid, and the connection line also includes a DPFC control module.

[0069] Furthermore, the obtaining of grid information of the first regional grid and the second regional grid respectively; and obtaining the flow level data of the interconnection line are specifically:

[0070] The grid information of the first regional grid and the second regional grid includes the upper and lower reserve capacities, power load, actual power generation of new energy and predicted power generation of new energy of the first regional grid and the second regional grid;

[0071] The power flow level data of the interconnection line include the active power transmission limit of the interconnection line between the first regional power grid and the second regional power grid, the voltage and current at both ends of the DPFC controller, and the impedance of the interconnection line.

[0072] S02: If the power grid information and the power flow level data of the interconnection line do not meet the preset conditions, the DPFC power flow transfer value under the capacity mutual aid scenario is output through the interconnected regional power grid mutual aid capacity assessment model containing the DPFC controller; wherein the DPFC controller includes a plurality of DPFC submodules;

[0073] Furthermore, the preset condition is: if or If the reserve level of the interconnected regional power grid A meets the reserve demand, the DPFC will not be put into operation. Otherwise, if the reserve level of the interconnected regional power grid cannot meet the reserve demand, the DPFC on the interconnection line will be used to achieve capacity mutual assistance.

[0074] Where N GA represents the total number of thermal power units in regional power grid A; represents the output of the i-th thermal power unit in the regional power grid A at time t; Indicates the actual output of the new energy units after dispatch; Represents the total number of renewable energy units in region A; is the transmission power of the tie line connected to the regional power grid A at time t, where inflow is positive and outflow is negative; N TA is the total number of interconnection lines connected to the regional power grid A; L A,t is the power load in regional power grid A at time t; N TA is the total load of regional power grid A.

[0075] Furthermore, the interconnected regional power grid mutual aid capacity assessment model containing the DPFC controller outputs the DPFC power flow transfer value in the capacity mutual aid scenario, specifically:

[0076] According to the preset constraints and objective functions, a mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is constructed;

[0077] The mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is solved based on the particle swarm algorithm to obtain the DPFC power flow transfer value under the capacity mutual aid scenario.

[0078] Furthermore, the interconnected regional power grid mutual aid capacity assessment model containing a DPFC controller is constructed according to the preset constraints and objective function, specifically:

[0079] The constraints include power balance constraints of the interconnected regional power grid, upper and lower output limits of conventional thermal power units, upper and lower output limits of new energy power plants, lower reserve constraints of the interconnected regional power grid in transmitting power to the outside through DPFC or receiving power in the region, and power transmission constraints of interconnection lines;

[0080] Among them, the power balance constraint of the interconnected regional power grid is

[0081]

[0082] Where N GA represents the total number of thermal power units in regional power grid A; represents the output of the i-th thermal power unit in the regional power grid A at time t; Indicates the actual output of the new energy units after dispatch; Represents the total number of renewable energy units in region A; is the transmission power of the tie line connected to the regional power grid A at time t, where inflow is positive and outflow is negative; N TA is the total number of interconnection lines connected to the regional power grid A; L A,t is the power load in regional power grid A at time t; N TA is the total load of regional power grid A.

[0083] The upper and lower limits of conventional thermal power generation units are:

[0084]

[0085] Where P gimin , P gimax are the maximum and minimum outputs of thermal power units, is the real-time output of thermal power units, are the upper and lower spare capacities of unit i at time t respectively.

[0086] The upper and lower limits of the output of new energy power plants are:

[0087]

[0088] Where P imax , P imin They are the maximum and minimum outputs of the new energy units respectively.

[0089] The lower reserve constraint of the interconnected regional power grid when transmitting power to the outside or receiving power from the region through DPFC is:

[0090]

[0091] In the formula and are the upper and lower reserve capacities set for conventional unit i in region A during time period t, N TA is the total number of interconnection lines connected to the regional power grid A, B u , B d They are the overall upper and lower reserve capacities of the interconnected regional power grid system, They are respectively the upper and lower reserve capacities for cross-regional mutual assistance.

[0092] Interconnection line power transmission constraints:

[0093]

[0094] Where P Lmin , P Lmax are the upper and lower limits of transmission power of the interconnection line, is the original transmission power of the tie line at time period t, is the mutual assistance capacity between interconnected regional power grids in time period t, τ is the ratio of transmission capacity to mutual assistance capacity, and is the degree of mutual assistance.

[0095] The objective function formula is: min(C f +C b +C a +C l +C se +C e ′);

[0096] Where: C f represents the power generation cost, C b represents the standby cost, C a Indicates the penalty for abandoning new energy, C l represents the load loss penalty, C se represents the loss cost of the distributed power flow controller submodule, C e ′ represents the cross-regional reserve mutual assistance cost based on distributed power flow controller;

[0097] The power generation cost is:

[0098] After the completion, the new energy generating set has no primary energy cost requirement. The present invention mainly considers the coal cost required for thermal power generation, which is expressed as:

[0099]

[0100] In the formula, T represents the number of time periods in the dispatch cycle, t represents a certain time period from the start of dispatch, A and B represent the two interconnected regional power grids under consideration, and N GA represents the total number of thermal power units in regional power grid A, N GB represents the total number of thermal power units in regional power grid B, represents the output of the i-th thermal power unit in the regional power grid A at time t, represents the output of the i-th thermal power unit in the regional power grid B at time t, and f(x) represents the functional relationship between the power generation cost of the thermal power unit and its output, which is usually considered to be The quadratic function of is expressed as follows,

[0101]

[0102] In the formula, a i 、b i 、c i is the power generation cost coefficient of thermal power unit i in regional power grid Z, Represents the output of the i-th thermal power unit in the regional power grid Z at time t.

[0103] The standby cost is:

[0104] Due to its inherent uncertainty, the current control level of new energy power cannot allow it to provide support as a backup. The system's backup level is still provided by conventional thermal power units, and its backup cost is:

[0105]

[0106] In the formula, c Aui 、c Adi Refers to the upper and lower reserve cost coefficients of conventional unit i in region A, Refers to the upper and lower reserve capacities set by conventional unit i in region A during time period t; c Bui 、c Bdi Refers to the upper and lower reserve cost coefficients of conventional unit i in region B, Refers to the upper and lower reserve capacities set for conventional unit i in area B during time period t.

[0107] The penalties for abandoning new energy generation are:

[0108] When the regional power grid load demand is insufficient to absorb the power supply of renewable energy sources, and the system has insufficient spare capacity, some renewable energy units will be forced to shut down, and the penalty for abandoning renewable energy generation is:

[0109]

[0110] In the formula, c Aa 、c Ba They represent the penalty coefficients for abandonment of renewable energy in regional power grids A and B respectively. represents the predicted maximum output value of new energy unit i, It indicates the actual output of the new energy units after dispatch. Represents the total number of new energy units in area A, Represents the total number of renewable energy units in region A.

[0111] The penalty for load loss is:

[0112] When the level of renewable energy generation is lower than expected, resulting in the overall power generation of the regional power grid being unable to meet the load demand, and the system's upper reserve capacity is insufficient, part of the load in the region will be forced to be removed. In order to ensure the reliability of power supply in the regional power grid and reduce the economic losses caused by load loss, it is necessary to introduce a load loss penalty.

[0113] C l =c Al L Aab +c Bl L Bab (9)

[0114] In the formula, c Al 、c Bl are the load loss penalty coefficients of regional power grids A and B, L Aab , L Bab are the total amount of load loss in regional power grids A and B respectively.

[0115] The loss cost of the distributed power flow controller submodule is:

[0116] The operating loss of the DPFC submodule mainly comes from the on-off loss of power electronics, the loss of the filter circuit and the loss generated on the equivalent impedance. The active loss of the DPFC submodule is:

[0117] P s =V se I L cos∠(90-θ I +δ r )=V se I L sin(θ I -δ r )

[0118] In the formula, I L is the interconnection line current, θ I is the phase angle of the interconnection line current, δ r is the voltage phase angle at the head end of the interconnection line.

[0119] Then the loss cost function of the submodule is:

[0120] C se =c DPFC_L P s

[0121] In the formula, c DPFC_L is the DPFC submodule operating loss cost coefficient.

[0122] The cross-regional reserve mutual assistance cost based on the distributed power flow controller is:

[0123]

[0124] where c ue 、c de are the cost coefficients of cross-regional upper and lower reserve mutual assistance, They are the upper and lower reserve capacities for cross-regional mutual assistance, is the transmission power of the interconnection line DPFC after it is put into operation at time period t, It is the original transmission power of the interconnection line during time period t.

[0125] According to the constraints and objective function, a mutual aid capacity assessment model of interconnected regional power grids containing a DPFC controller is constructed.

[0126] S03: calculating, according to the DPFC power flow transfer value, an output voltage satisfying a single DPFC submodule;

[0127] Furthermore, the output voltage satisfying a single DPFC submodule is calculated based on the DPFC power flow transfer value, specifically:

[0128] According to the preset formula and the DPFC power flow transfer value, the total compensation voltage required to be output by the DPFC submodule group is calculated; wherein the DPFC submodule group includes all DPFC submodules;

[0129] According to the total compensation voltage and output average distribution method, the output voltage that satisfies a single DPFC submodule is calculated.

[0130] Furthermore, the total compensation voltage required to be output by the DPFC submodule group is calculated according to the preset formula and the DPFC power flow transfer value, specifically:

[0131] The preset formula is:

[0132] Where τ is the ratio of transmission capacity to mutual assistance capacity, which is the degree of mutual assistance, that is, is the DPFC power flow transfer value in period t, is the transmission power of the interconnection line DPFC after it is put into operation at time period t, is the original transmission power of the interconnection line at time period t, R is the interconnection line resistance, X is the interconnection line reactance, V r is the voltage of the first section of the interconnection line, V se is the total compensation voltage that the DPFC submodule group should output, δ r is the voltage phase angle of the first section of the interconnection line;

[0133] The total compensation voltage that the DPFC submodule group should output is calculated based on the calculated DPFC power flow transfer value and a preset formula.

[0134] S04: According to the output voltage of the single DPFC submodule, the power flow value of the interconnection line is adjusted to achieve capacity mutual assistance of the interconnected regional power grid.

[0135] The present application achieves the beneficial effect of capacity mutual assistance by accurately controlling the power flow between interconnected regional power grids. First, the present application provides decision support for mutual assistance between power grids by collecting the load and power supply information of the two regional power grids and the flow data of the interconnection lines. When the existing data does not meet the preset conditions, indicating that there is a capacity imbalance or there is room for optimization, the DPFC controller and the mutual assistance capacity evaluation model are used to calculate the required DPFC flow transfer value, and then the voltage that each DPFC submodule should output is determined based on the DPFC flow transfer value, and then the flow on the interconnection line is adjusted to achieve optimal capacity allocation between power grids. Compared with the existing technology that cannot achieve capacity mutual assistance between interconnected regional power grids, the present application improves the stability and economy of power grid operation and achieves effective capacity mutual assistance between interconnected regional power grids.

[0136] Embodiment 2

[0137] Please refer to Figure 2 , which is a capacity mutual assistance control device between interconnected regional power grids provided in an embodiment of the present application.

[0138] In this embodiment, the capacity mutual assistance control device between interconnected regional power grids includes an acquisition module 10, an evaluation module 20, a calculation output module 30 and a regulation module 40.

[0139] The acquisition module 10 is used to respectively acquire the grid information of the first regional grid and the second regional grid; acquire the flow level data of the interconnection line; wherein the interconnection line is used to connect the first regional grid and the second regional grid; Figure 2 As shown, there is a connection line between the first regional power grid and the second regional power grid, and the connection line also includes a DPFC control module.

[0140] Furthermore, the obtaining of grid information of the first regional grid and the second regional grid respectively; and obtaining the flow level data of the interconnection line are specifically:

[0141] The grid information of the first regional grid and the second regional grid includes the upper and lower reserve capacities, power load, actual power generation of new energy and predicted power generation of new energy of the first regional grid and the second regional grid;

[0142] The power flow level data of the interconnection line include the active power transmission limit of the interconnection line between the first regional power grid and the second regional power grid, the voltage and current at both ends of the DPFC controller, and the impedance of the interconnection line.

[0143] The evaluation module 20 is used to evaluate whether the grid information of the first regional grid and the second regional grid and the power flow level data of the interconnection line meet the preset conditions. If not, the DPFC power flow transfer value under the mutual aid scenario is output through the interconnected regional grid mutual aid capacity evaluation model containing the DPFC controller; wherein the DPFC controller includes a plurality of DPFC submodules;

[0144] Furthermore, the preset condition is: if or If the reserve level of the interconnected regional power grid A meets the reserve demand, the DPFC will not be put into operation. Otherwise, if the reserve level of the interconnected regional power grid cannot meet the reserve demand, the DPFC on the interconnection line will be used to achieve capacity mutual assistance.

[0145] Where N GA represents the total number of thermal power units in regional power grid A; represents the output of the i-th thermal power unit in the regional power grid A at time t; Indicates the actual output of the new energy units after dispatch; Represents the total number of renewable energy units in region A; is the transmission power of the tie line connected to the regional power grid A at time t, where inflow is positive and outflow is negative; N TA is the total number of interconnection lines connected to the regional power grid A; L A,t is the power load in regional power grid A at time t; N TA is the total load of regional power grid A.

[0146] Furthermore, the interconnected regional power grid mutual aid capacity assessment model containing the DPFC controller outputs the DPFC power flow transfer value in the capacity mutual aid scenario, specifically:

[0147] According to the preset constraints and objective functions, a mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is constructed;

[0148] The mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is solved based on the particle swarm algorithm to obtain the DPFC power flow transfer value under the capacity mutual aid scenario.

[0149] Furthermore, the interconnected regional power grid mutual aid capacity assessment model containing a DPFC controller is constructed according to the preset constraints and objective function, specifically:

[0150] The constraints include power balance constraints of the interconnected regional power grid, upper and lower output limits of conventional thermal power units, upper and lower output limits of new energy power plants, lower reserve constraints of the interconnected regional power grid in transmitting power to the outside through DPFC or receiving power in the region, and power transmission constraints of interconnection lines;

[0151] Among them, the power balance constraint of the interconnected regional power grid is

[0152]

[0153] Where N GA represents the total number of thermal power units in regional power grid A; represents the output of the i-th thermal power unit in the regional power grid A at time t; Indicates the actual output of the new energy units after dispatch; Represents the total number of renewable energy units in region A; is the transmission power of the tie line connected to the regional power grid A at time t, where inflow is positive and outflow is negative; N TA is the total number of interconnection lines connected to the regional power grid A; L A,t is the power load in regional power grid A at time t; N TA is the total load of regional power grid A.

[0154] The upper and lower limits of conventional thermal power generation units are:

[0155]

[0156] Where P gimin , P gimax are the maximum and minimum outputs of thermal power units, is the real-time output of thermal power units, are the upper and lower spare capacities of unit i at time t respectively.

[0157] The upper and lower limits of the output of new energy power plants are:

[0158]

[0159] Where P imax , P imin They are the maximum and minimum outputs of the new energy units respectively.

[0160] The lower reserve constraint of the interconnected regional power grid when transmitting power to the outside or receiving power from the region through DPFC is:

[0161]

[0162] In the formula and are the upper and lower reserve capacities set for conventional unit i in region A during time period t, N TA is the total number of interconnection lines connected to the regional power grid A, B u , B d They are the overall upper and lower reserve capacities of the interconnected regional power grid system, They are respectively the upper and lower reserve capacities for cross-regional mutual assistance.

[0163] Interconnection line power transmission constraints:

[0164]

[0165] Where P Lmin , P Lmax are the upper and lower limits of transmission power of the interconnection line, is the original transmission power of the tie line at time period t, is the mutual assistance capacity between interconnected regional power grids in time period t, τ is the ratio of transmission capacity to mutual assistance capacity, and is the degree of mutual assistance.

[0166] The objective function formula is: min(C f +C b +C a +C l +C se +C e ′);

[0167] Where: C f represents the power generation cost, C b represents the standby cost, C a Indicates the penalty for abandoning new energy, C l represents the load loss penalty, C se represents the loss cost of the distributed power flow controller submodule, C e ′ represents the cross-regional reserve mutual assistance cost based on distributed power flow controller;

[0168] The power generation cost is:

[0169] After the completion, the new energy generating set has no primary energy cost requirement. The present invention mainly considers the coal cost required for thermal power generation, which is expressed as:

[0170]

[0171] In the formula, T represents the number of time periods in the dispatch cycle, t represents a certain time period from the start of dispatch, A and B represent the two interconnected regional power grids under consideration, and N GA represents the total number of thermal power units in regional power grid A, N GB represents the total number of thermal power units in regional power grid B, represents the output of the i-th thermal power unit in the regional power grid A at time t, represents the output of the i-th thermal power unit in the regional power grid B at time t, and f(x) represents the functional relationship between the power generation cost of the thermal power unit and its output, which is usually considered to be The quadratic function of is expressed as follows,

[0172]

[0173] In the formula, a i 、b i 、c i is the power generation cost coefficient of thermal power unit i in regional power grid Z, Represents the output of the i-th thermal power unit in the regional power grid Z at time t.

[0174] The standby cost is:

[0175] Due to its inherent uncertainty, the current control level of new energy power cannot allow it to provide support as a backup. The system's backup level is still provided by conventional thermal power units, and its backup cost is:

[0176]

[0177] In the formula, c Aui 、c Adi Refers to the upper and lower reserve cost coefficients of conventional unit i in region A, Refers to the upper and lower reserve capacities set by conventional unit i in region A during time period t; c Bui 、c Bdi Refers to the upper and lower reserve cost coefficients of conventional unit i in region B, Refers to the upper and lower reserve capacities set for conventional unit i in area B during time period t.

[0178] The penalties for abandoning new energy generation are:

[0179] When the regional power grid load demand is insufficient to absorb the power supply of renewable energy sources, and the system has insufficient spare capacity, some renewable energy units will be forced to shut down, and the penalty for abandoning renewable energy generation is:

[0180]

[0181] In the formula, c Aa 、c Ba They represent the penalty coefficients for abandonment of renewable energy in regional power grids A and B respectively. represents the predicted maximum output value of new energy unit i, It indicates the actual output of the new energy units after dispatch. Represents the total number of new energy units in area A, Represents the total number of renewable energy units in region A.

[0182] The penalty for load loss is:

[0183] When the level of renewable energy generation is lower than expected, resulting in the overall power generation of the regional power grid being unable to meet the load demand, and the system's upper reserve capacity is insufficient, part of the load in the region will be forced to be removed. In order to ensure the reliability of power supply in the regional power grid and reduce the economic losses caused by load loss, it is necessary to introduce a load loss penalty.

[0184] C l =c Al L Aab +c Bl L Bab (9)

[0185] In the formula, c Al 、c Bl are the load loss penalty coefficients of regional power grids A and B, L Aab , L Bab are the total amount of load loss in regional power grids A and B respectively.

[0186] The loss cost of the distributed power flow controller submodule is:

[0187] The operating loss of the DPFC submodule mainly comes from the on-off loss of power electronics, the loss of the filter circuit and the loss generated on the equivalent impedance. The active loss of the DPFC submodule is:

[0188] P s =V se I L cos∠(90°-θ I +δ r )=V se I L sin(θ I -δ r )

[0189] In the formula, I L is the interconnection line current, θ I is the phase angle of the interconnection line current, δ r is the voltage phase angle at the head end of the interconnection line.

[0190] Then the loss cost function of the submodule is:

[0191] C se =c DPFC_L P s

[0192] In the formula, c DPFC_L is the DPFC submodule operating loss cost coefficient.

[0193] The cross-regional reserve mutual assistance cost based on the distributed power flow controller is:

[0194]

[0195] where c ue 、c de are the cost coefficients of cross-regional upper and lower reserve mutual assistance, They are the upper and lower reserve capacities for cross-regional mutual assistance, is the transmission power of the interconnection line DPFC after it is put into operation at time period t, It is the original transmission power of the interconnection line during time period t.

[0196] According to the constraints and objective function, a mutual aid capacity assessment model of interconnected regional power grids containing a DPFC controller is constructed.

[0197] The calculation module 30 is used to calculate the output voltage of a single DPFC submodule according to the DPFC power flow transfer value;

[0198] Furthermore, the output voltage satisfying a single DPFC submodule is calculated based on the DPFC power flow transfer value, specifically:

[0199] According to the preset formula and the DPFC power flow transfer value, the total compensation voltage required to be output by the DPFC submodule group is calculated; wherein the DPFC submodule group includes all DPFC submodules;

[0200] According to the total compensation voltage and output average distribution method, the output voltage that satisfies a single DPFC submodule is calculated.

[0201] Furthermore, the total compensation voltage required to be output by the DPFC submodule group is calculated according to the preset formula and the DPFC power flow transfer value, specifically:

[0202] The preset formula is:

[0203] Where τ is the ratio of transmission capacity to mutual assistance capacity, which is the degree of mutual assistance, that is, is the DPFC power flow transfer value in period t, is the transmission power of the interconnection line DPFC after it is put into operation at time period t, is the original transmission power of the interconnection line at time period t, R is the interconnection line resistance, X is the interconnection line reactance, V r is the voltage of the first section of the interconnection line, V se is the total compensation voltage that the DPFC submodule group should output, δ r is the voltage phase angle of the first section of the interconnection line;

[0204] The total compensation voltage that the DPFC submodule group should output is calculated based on the calculated DPFC power flow transfer value and a preset formula.

[0205] The regulating module 40 is used to adjust the power flow value of the interconnection line according to the output voltage of the single DPFC submodule, so as to achieve capacity mutual assistance of the interconnected regional power grid.

[0206] This device uses four modules to divide the work and coordinate the work to better realize the capacity mutual assistance between interconnected regional power grids. First, this application provides decision support for the mutual assistance between power grids by collecting the load and power supply information of the two regional power grids and the flow data of the interconnection lines. When the existing data does not meet the preset conditions, indicating that there is a capacity imbalance or there is room for optimization, the DPFC controller and the mutual assistance capacity evaluation model are used to calculate the required DPFC flow transfer value, and then the voltage that each DPFC sub-module should output is determined based on the DPFC flow transfer value, and then the flow on the interconnection line is adjusted to achieve optimal capacity allocation between power grids. Compared with the existing technology that cannot achieve capacity mutual assistance between interconnected regional power grids, this application improves the stability and economy of power grid operation and realizes effective capacity mutual assistance between interconnected regional power grids.

[0207] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.

Claims

1. A capacity mutual assistance control method between interconnected regional power grids, characterized in that: include: Respectively obtaining power grid information of the first regional power grid and the second regional power grid; Acquiring power flow level data of a connection line; wherein the connection line is used to connect the first regional power grid and the second regional power grid; If the power grid information and the power flow level data of the interconnection line do not meet the preset conditions, the DPFC power flow transfer value under the capacity mutual aid scenario is output through the interconnected regional power grid mutual aid capacity assessment model containing the DPFC controller; wherein the DPFC controller includes a plurality of DPFC submodules; According to the DPFC power flow transfer value, an output voltage satisfying a single DPFC submodule is calculated; According to the output voltage of the single DPFC submodule, the power flow value of the interconnection line is adjusted to achieve capacity mutual assistance of the interconnected regional power grid.

2. A capacity mutual assistance control method between interconnected regional power grids according to claim 1, characterized in that: The interconnected regional power grid mutual aid capacity assessment model including the DPFC controller outputs the DPFC power flow transfer value in the capacity mutual aid scenario, specifically: According to the preset constraints and objective functions, a mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is constructed; The mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is solved based on the particle swarm algorithm to obtain the DPFC power flow transfer value under the capacity mutual aid scenario.

3. The capacity mutual assistance control method between interconnected regional power grids according to claim 2 is characterized in that: The interconnected regional power grid mutual aid capacity assessment model containing a DPFC controller is constructed according to the preset constraints and objective function, specifically: The constraints include power balance constraints of the interconnected regional power grid, upper and lower output limits of conventional thermal power units, upper and lower output limits of new energy power plants, lower reserve constraints of the interconnected regional power grid in transmitting power to the outside through DPFC or receiving power in the region, and power transmission constraints of interconnection lines; The objective function formula is: min(C f +C b +C a +C l +C se +C e ′); Where: C f represents the power generation cost, C b represents the standby cost, C a Indicates the penalty for abandoning new energy, C l represents the load loss penalty, C se represents the loss cost of the distributed power flow controller submodule, C e ′ represents the cross-regional reserve mutual assistance cost based on distributed power flow controller; According to the constraints and objective function, a mutual aid capacity assessment model of interconnected regional power grids containing a DPFC controller is constructed.

4. The capacity mutual assistance control method between interconnected regional power grids according to claim 1 is characterized in that: The output voltage that satisfies a single DPFC submodule is calculated based on the DPFC power flow transfer value, specifically: According to the preset formula and the DPFC power flow transfer value, the total compensation voltage required to be output by the DPFC submodule group is calculated; wherein the DPFC submodule group includes all DPFC submodules; According to the total compensation voltage and output average distribution method, the output voltage that satisfies a single DPFC submodule is calculated.

5. The capacity mutual assistance control method between interconnected regional power grids according to claim 4 is characterized in that: The total compensation voltage required to be output by the DPFC submodule group is calculated according to the preset formula and the DPFC power flow transfer value, specifically: The preset formula is: Where τ is the ratio of transmission capacity to mutual assistance capacity, which is the degree of mutual assistance, that is, is the DPFC power flow transfer value in period t, is the transmission power of the interconnection line DPFC after it is put into operation at time period t, is the original transmission power of the interconnection line at time period t, R is the interconnection line resistance, X is the interconnection line reactance, V r is the voltage of the first section of the interconnection line, V se is the total compensation voltage that the DPFC submodule group should output, δ r is the voltage phase angle of the first section of the interconnection line; The total compensation voltage that the DPFC submodule group should output is calculated based on the calculated DPFC power flow transfer value and a preset formula.

6. The capacity mutual assistance control method between interconnected regional power grids according to claim 1 is characterized in that: The obtaining of grid information of the first regional grid and the second regional grid respectively; and obtaining the flow level data of the interconnection line are specifically: The grid information of the first regional grid and the second regional grid includes the upper and lower reserve capacities, power load, actual power generation of new energy and predicted power generation of new energy of the first regional grid and the second regional grid; The power flow level data of the interconnection line include the active power transmission limit of the interconnection line between the first regional power grid and the second regional power grid, the voltage and current at both ends of the DPFC controller, and the impedance of the interconnection line.

7. A capacity mutual assistance control device between interconnected regional power grids, characterized in that: It includes an acquisition module, an evaluation module, a calculation module and an adjustment module; The acquisition module is used to respectively acquire the grid information of the first regional grid and the second regional grid; and acquire the flow level data of the interconnection line; wherein the interconnection line is used to connect the first regional grid and the second regional grid; The evaluation module is used to evaluate whether the grid information of the first regional grid and the second regional grid and the power flow level data of the interconnection line meet the preset conditions. If not, the DPFC power flow transfer value under the mutual aid scenario is output through the interconnected regional grid mutual aid capacity evaluation model containing the DPFC controller; wherein the DPFC controller includes a plurality of DPFC submodules; The calculation module is used to calculate the output voltage that satisfies a single DPFC submodule according to the DPFC power flow transfer value; The regulating module is used to adjust the power flow value of the interconnection line according to the output voltage of the single DPFC submodule, so as to achieve capacity mutual assistance of the interconnected regional power grid.

8. The capacity mutual assistance control device between interconnected regional power grids according to claim 7, characterized in that: The interconnected regional power grid mutual aid capacity assessment model including the DPFC controller outputs the DPFC power flow transfer value in the mutual aid scenario, specifically: According to the preset constraints and objective functions, a mutual aid capacity assessment model of interconnected regional power grids containing DPFC controllers is constructed; The mutual aid capacity assessment model of the interconnected regional power grid containing DPFC controller is solved according to the particle swarm algorithm to obtain the DPFC power flow transfer value in the mutual aid scenario.

9. The capacity mutual assistance control device between interconnected regional power grids according to claim 8, characterized in that: The interconnected regional power grid mutual aid capacity assessment model containing a DPFC controller is constructed according to the preset constraints and objective function, specifically: The constraints include power balance constraints of the interconnected regional power grid, upper and lower output limits of conventional thermal power units, upper and lower output limits of new energy power plants, lower reserve constraints of the interconnected regional power grid in transmitting power to the outside through DPFC or receiving power in the region, and power transmission constraints of interconnection lines; The objective function formula is: min(C f +C b +C a +C l +C se +C′ e ); Where: C f represents the power generation cost, C b represents the standby cost, C a Indicates the penalty for abandoning new energy, C l represents the load loss penalty, C se represents the loss cost of the distributed power flow controller submodule, C e ′ represents the cross-regional reserve mutual assistance cost based on distributed power flow controller; According to the constraints and objective function, a mutual aid capacity assessment model of interconnected regional power grids containing a DPFC controller is constructed.

10. The capacity mutual assistance control device between interconnected regional power grids according to claim 7, characterized in that: The output voltage that satisfies a single DPFC submodule is calculated based on the DPFC power flow transfer value, specifically: According to the preset formula and the DPFC power flow transfer value, the total compensation voltage required to be output by the DPFC submodule group is calculated; wherein the DPFC submodule group includes all DPFC submodules; According to the total compensation voltage and output average distribution method, the output voltage that satisfies a single DPFC submodule is calculated.

11. The capacity mutual assistance control device between interconnected regional power grids according to claim 10, characterized in that: The total compensation voltage that the DPFC submodule group should output is calculated according to the preset formula and the DPFC power flow transfer value, specifically: The preset formula is: Where τ is the ratio of transmission capacity to mutual assistance capacity, which is the degree of mutual assistance, that is, is the DPFC power flow transfer value in period t, is the transmission power of the interconnection line DPFC after it is put into operation at time period t, is the original transmission power of the interconnection line at time period t, R is the interconnection line resistance, X is the interconnection line reactance, V r is the voltage of the first section of the interconnection line, V se is the total compensation voltage that the DPFC submodule group should output, δ r is the voltage phase angle of the first section of the interconnection line; The total compensation voltage that the DPFC submodule group should output is calculated based on the calculated DPFC power flow transfer value and a preset formula.

12. The capacity mutual assistance control device between interconnected regional power grids according to claim 7, characterized in that: The obtaining of grid information of the first regional grid and the second regional grid respectively; and obtaining the flow level data of the interconnection line are specifically: The grid information of the first regional grid and the second regional grid includes the upper and lower reserve capacities, power load, actual power generation of new energy and predicted power generation of new energy of the first regional grid and the second regional grid; The power flow level data of the interconnection line include the active power transmission limit of the interconnection line between the first regional power grid and the second regional power grid, the voltage and current at both ends of the DPFC controller, and the impedance of the interconnection line.

Citation Information

Cited By

  • Day-ahead scheduling method and device based on distributed power flow control, equipment and medium

    CN119765293A

  • Day-ahead scheduling method and device based on distributed power flow control, equipment and medium

    CN119765293B