Power distribution network planning method suitable for new energy access

Through density clustering method and mathematical optimization algorithm, a distribution network planning model adapted to new energy access was constructed, which solved the problem of unconsidered in the analysis of influencing factors after new energy access and the adjustable load characteristics, and realized the distribution network The optimized configuration and minimized cost have improved the adaptability and efficiency of the distribution network.

CN118944188APending Publication Date: 2024-11-12NAT NUCLEAR POWER PLANNING & DESIGN INST CHONGQING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410918037.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing distribution network planning method fails to effectively consider the influencing factors and adjustable load characteristics after new energy access, and does not optimize the configuration plan under cost constraints, resulting in deviations in the distribution network planning model.

Method used

The density clustering method is used to cluster the output data of new energy, construct the output curve of regional power supply and load capacity curve in uncertain scenarios, formulate the objective function with the smallest total cost, and solve the optimized distribution network through mathematical optimization algorithm. Planning the model, considering the minimization of power supply and grid costs.

Benefits of technology

An optimized distribution network planning model is formed to adapt to new energy access, which improves the adaptability and efficiency of the distribution network, reduces operation and maintenance and construction costs, and ensures the matching of load and demand.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944188A_ABST
    Figure CN118944188A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of power distribution network planning, and particularly relates to a power distribution network planning method suitable for new energy access, which comprises the following steps: S1, constructing a regional power supply output curve; s2, constructing a load capacity curve in an uncertain scene; s3, formulating a target function; s4, determining constraint conditions; a power supply curve of conventional power supply output of a new energy typical output scene superposition area is formed by using a data-driven density clustering optimization method, and power supply cost and power grid cost are respectively analyzed one by one by formulating a total cost minimum objective function. The number of turns of newly-built lines or expanded lines among nodes of a current network frame is taken as a decision variable, an objective function is established with reference to the lowest comprehensive cost, a power distribution network planning model capable of adjusting source load hyperbola adaptability under load driving is introduced, and an optimized power distribution network planning model is obtained based on a power distribution network facility LCC method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of distribution network planning, and specifically relates to a distribution network planning method suitable for access of new energy sources. Background Art

[0002] In the power system, the traditional distribution network plays the role of distributing the electric energy of the transmission network or regional power plant to various users locally or through distribution facilities. It is the last link of power transmission. With the large-scale access of new energy to the distribution network, the function of the distribution network has changed from a single power supply and distribution service entity to an efficient allocation platform for source, grid, load and storage resources. It has transformed from simply accepting and distributing electric energy to users to a power grid that integrates source, grid, load and storage and is flexibly coupled with the superior power grid. Its functions in promoting the local consumption of new energy and carrying new loads are becoming increasingly prominent.

[0003] The existing distribution network planning method is mainly based on the existing regional distribution network load combined with the regional economic development plan to predict the expected load. The spatial saturation load prediction method is adopted according to the planning attributes of the plot, and the adaptability of the network structure of the existing distribution network planning is further analyzed. On the premise of ensuring that the load is adapted to the actual demand and meeting the power supply reliability of regional users, the cost investment in the operation and maintenance of the distribution network system and the construction of the distribution network structure is reduced.

[0004] The current existing technology still has the following deficiencies:

[0005] It mainly focuses on the problem of traditional power load forecasting. For loads with adjustable capacity, it does not further adopt the optimization configuration of adjustable load characteristics, electricity price factors, user capacity cost constraints, and comprehensively consider the optimal configuration plan under the constraints of load growth construction investment and electricity cost;

[0006] Regarding the analysis of the influencing factors after the access of new energy to the distribution network, the functional attributes of the traditional distribution network do not take into account the impact of the aggregation effect of the access of new energy under the current new energy supply;

[0007] The traditional distribution network planning method is only based on the total cost of each distribution network area in the short-term, medium-term and long-term, without calculating the LCC of the main equipment in the distribution network area, which may lead to deviations in determining the optimal planning model of the distribution network.

[0008] To this end, the present invention provides a distribution network planning method that is adaptable to the access of new energy sources. Summary of the invention

[0009] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0010] The technical solution adopted by the present invention to solve the technical problem is: a distribution network planning method adapted to the access of new energy sources described in the present invention comprises the following steps:

[0011] S1: The density clustering method is used to cluster the regional renewable energy output data and construct the regional power output curve;

[0012] S2: Construct load capacity curve under uncertainty scenario;

[0013] S3: Formulate an objective function, taking the number of new lines or expanded lines between nodes of the current grid as the decision variable, and establishing the objective function with reference to the minimum comprehensive cost;

[0014] S4: Determine the constraints, use mathematical optimization algorithms to solve them, and obtain the optimized distribution network planning model.

[0015] Preferably, constructing the regional power output curve in S1 includes constructing the operating characteristic curves of each conventional unit and new energy output within the current distribution network area, using the density clustering method to perform cluster analysis on the new energy output data in the area and superimposing the conventional unit output curve; selecting access points based on the operation of each conventional unit and new energy output within the distribution network area, and determining the distance of each candidate access point, which is used as the basis for calculating the line investment cost.

[0016] Preferably, in S2, a load capacity curve is constructed under an uncertainty scenario, a high-dimensional ellipsoid set based on existing load data in the distribution network is constructed, the convex hull of the high-dimensional ellipsoid set is scaled, and an uncertain set of adjustable load models is introduced under extreme scenarios of the distribution network system, and a load capacity curve model under uncertainty scenarios is combined.

[0017] Preferably, formulating the objective function in S3 includes formulating a total cost minimum objective function, analyzing the power source costs one by one, and analyzing the grid costs one by one.

[0018] Preferably, the total cost (C) includes two parts: power cost (P) and grid cost (W), and the total cost minimum objective function is: C min =P min +W min .

[0019] Preferably, the power cost mainly includes the power construction cost (P pc ), power supply maintenance cost (P pm ), power outage cost (P ps ), residual cost after retirement (P pr ), P=P pc +P pm +P ps +P pr , and solve the minimum value of the sub-items to obtain P min .

[0020] Preferably, the power grid cost mainly includes: supporting power grid construction cost (W pc ), power grid maintenance cost (W pm ), power grid outage cost (W ps ), residual cost after retirement (W pr ), W=W pc +W pm +W ps +W pr , and solve the minimum value of the sub-items to get W min .

[0021] Preferably, the constraints determined in S4 include: satisfying the power planning capacity space under the total constraints of load capacity and system backup capacity; satisfying the minimum power investment cost and grid construction cost; satisfying the planning requirements and the minimum LCC constraints based on the source side and the grid side in different ways, solving the established distribution network planning model using the optimization method driven by source and load data, and obtaining the optimized distribution network planning model.

[0022] The beneficial effects of the present invention are as follows:

[0023] 1. The distribution network planning method adapted to the access of new energy described in the present invention forms a power curve of the output of conventional power sources in the superimposed area by a typical output scenario of new energy by utilizing a data-driven density clustering optimization method, and introduces a distribution network planning model with source-load hyperbola adaptability under adjustable load drive, and obtains an optimized distribution network planning model based on the LCC method of distribution network facilities.

[0024] 2. The distribution network planning method adapted to the access of new energy sources described in the present invention introduces a conventional distribution network planning model that meets planning requirements and load requirements, formulates a total cost minimum objective function, analyzes the power source cost one by one, and analyzes the grid cost one by one, takes the number of new lines or expanded lines between the nodes of the current grid as the decision variable, establishes the objective function with reference to the lowest comprehensive cost, and utilizes the total cost minimum constraint to optimize the distribution network planning model. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The present invention will be further described below in conjunction with the accompanying drawings.

[0026] Figure 1 is a flow chart of a distribution network planning method in one embodiment of the present invention;

[0027] Figure 2 is a block diagram of formulating an objective function in one embodiment of the present invention;

[0028] Figure 3 is a block diagram of determining constraint conditions in one embodiment of the present invention; DETAILED DESCRIPTION

[0029] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0030] like Figure 1 As shown, a distribution network planning method adapted to the access of new energy sources according to an embodiment of the present invention comprises the following steps:

[0031] S1: The density clustering method is used to cluster the regional renewable energy output data and construct the regional power output curve;

[0032] S2: Construct load capacity curve under uncertainty scenario;

[0033] S3: Formulate an objective function, taking the number of new lines or expanded lines between nodes of the current grid as the decision variable, and establishing the objective function with reference to the minimum comprehensive cost;

[0034] S4: Determine the constraints, use mathematical optimization algorithms to solve them, and obtain the optimized distribution network planning model.

[0035] When the planning method provided by the present invention is used, the initial value of the decision variable is determined, wherein the initial value is 1, indicating that the new energy power station has at least one line that needs to be connected to the access point to be selected, and the other bits of the initial value are recorded as 0;

[0036] Then, the output characteristic curves of conventional units and new energy sources within the current distribution network area are constructed, and the density clustering method is used to cluster the new energy output data in the area and superimpose the output curves of conventional units; the access points are selected based on the output operation of conventional units and new energy sources within the distribution network area, and the distance of each candidate access point is determined, which is used as the basis for calculating the line investment cost;

[0037] Then, a high-dimensional ellipsoid set based on the existing load data in the distribution network is constructed, and the convex hull of the high-dimensional ellipsoid set is scaled to obtain an uncertain set of adjustable load models introduced under extreme scenarios of the distribution network system, and a load capacity curve model under uncertain scenarios is combined;

[0038] Then formulate the objective function, by formulating the minimum total cost objective function, analyzing the power source cost one by one and the grid cost one by one, taking the number of new lines or expanded lines between the nodes of the current grid as the decision variable, and referring to the minimum comprehensive cost to establish the objective function;

[0039] Finally, the constraints are determined: the power planning capacity space under the total constraints of load capacity and system backup capacity; the minimum power investment cost and grid construction cost are met; in different ways, the planning requirements and the minimum LCC constraints based on the source side and the grid side are met respectively, and the established distribution network planning model is solved using the optimization method driven by source and load data to obtain the optimized distribution network planning model.

[0040] like Figure 1 As shown, the regional power output curve is constructed in S1, including constructing the operating characteristic curves of each conventional unit and new energy output within the current distribution network area, using the density clustering method to perform cluster analysis on the new energy output data in the area and superimpose the conventional unit output curve; the access point is selected based on the operation of each conventional unit and new energy output within the distribution network area, and the distance of each candidate access point is determined, and this is used as the basis for calculating the line investment cost.

[0041] When the power output curve provided by the present invention is used, the density clustering algorithm is a density-based clustering analysis algorithm, which is used to automatically find and distinguish different clusters in an unknown number of clusters. These clusters can be large or small, dense or sparse, and have any shape; the density clustering method is used to cluster the new energy output data in the region and superimpose the conventional unit output curve, and the data of each conventional unit in the distribution network area is divided into different groups, so that the difference in data of each conventional unit in the distribution network area in the same group is as small as possible, and the difference in data of each conventional unit in the distribution network area in different groups is as large as possible, thereby improving the authenticity and accuracy of the operation, analyzing the influencing factors after the new energy is connected to the distribution network, and solving the problem that the functional attributes of the traditional distribution network do not take into account the aggregation effect of new energy access under the current new energy supply.

[0042] like Figure 1 As shown, in S2, a load capacity curve is constructed under an uncertain scenario, a high-dimensional ellipsoid set based on the existing load data in the distribution network is constructed, and the convex hull of the high-dimensional ellipsoid set is scaled to obtain an uncertain set of adjustable load models introduced under the extreme scenario of the distribution network system, and a load capacity curve model under the uncertain scenario is combined.

[0043] The load capacity curve under uncertainty scenario provided by the present invention can be used in the following three ways:

[0044] (1) Capacity calculation method based on the day-ahead load curve: Based on historical load data, determine the load curve for a period of time, and then calculate the energy storage capacity based on the parameters such as the energy storage device's charging and discharging efficiency, charging speed, and discharging speed, combined with the load curve;

[0045] (2) Energy storage capacity calculation method based on maximum load peak: According to historical load data, the maximum load peak is determined, and then the energy storage capacity is calculated based on the charging and discharging efficiency, charging speed, discharging speed and other parameters of the energy storage device, as well as the peak-shaving and valley-filling effect of the load curve, combined with the maximum load peak;

[0046] (3) Energy storage capacity calculation method based on minimum load valley value: According to historical load data, the minimum load valley value is determined, and then the energy storage capacity is calculated based on the charging and discharging efficiency, charging speed, discharging speed and other parameters of the energy storage device, as well as the valley filling effect of the load curve, combined with the minimum load valley value.

[0047] Different methods are suitable for different scenarios. It is necessary to select the appropriate method according to the actual situation to solve the traditional electricity load forecasting problem. For loads with adjustable capacity, we further adopt the optimization configuration of adjustable load characteristics and electricity price factors and user capacity cost constraints, and comprehensively consider the optimal configuration plan under the constraints of load growth construction investment and electricity cost.

[0048] like Figure 2 As shown, the formulation of the objective function in S3 includes formulating a total cost minimum objective function, analyzing the power source costs one by one, and analyzing the grid costs one by one.

[0049] like Figure 2 As shown, the total cost (C) includes two parts: power cost (P) and grid cost (W). The total cost minimum objective function is: C min =P min +W min .

[0050] like Figure 2 As shown, the power cost mainly includes the power construction cost (P pc ), power supply maintenance cost (P pm ), power outage cost (P ps ), residual cost after retirement (P pr ), P=P pc +P pm +P ps +P pr , and solve the minimum value of the sub-items to obtain P min .

[0051] like Figure 2 As shown in the figure, the power grid cost mainly includes: supporting power grid construction cost (W pc ), power grid maintenance cost (W pm ), power grid outage cost (W ps ), residual cost after retirement (W pr ), W=W pc +Wpm +W ps +W pr , and solve the minimum value of the sub-items to get W min .

[0052] When the objective function provided by the present invention is used, a total cost minimum objective function is formulated, power supply costs are analyzed one by one, and grid costs are analyzed one by one respectively, and the number of new lines or expanded lines between nodes of the current grid is used as a decision variable. The objective function is established with reference to the minimum comprehensive cost, so as to solve the problem that the traditional distribution network planning method is only based on the total cost of each distribution network area in the short term and the medium and long term, and the LCC of the main equipment in the distribution network area is not calculated, and there may be a deviation in determining the optimal planning model of the distribution network.

[0053] like Figure 3 As shown, the constraints determined in S4 include: satisfying the power planning capacity space under the total constraints of load capacity and system backup capacity; satisfying the minimum power investment cost and grid construction cost; satisfying the planning requirements and the minimum LCC constraints based on the source side and the grid side in different ways, and solving the established distribution network planning model using the optimization method driven by source and load data to obtain the optimized distribution network planning model.

[0054] When the determined constraint conditions provided by the present invention are used, the power supply planning capacity space, the minimum power supply investment cost and the power grid construction cost are respectively solved by using the optimization method driven by source and load data to solve the established distribution network planning model in different ways to meet the planning requirements and the minimum LCC constraints based on the source side and the grid side, so as to obtain the optimized distribution network planning model.

[0055] Working principle: First, determine the initial value of the decision variable. If the initial value is 1, it means that the new energy power station has at least one line that needs to be connected to the access point to be selected, and the other bits of the initial value are recorded as 0;

[0056] Then, the output characteristic curves of conventional units and new energy sources within the current distribution network area are constructed, and the density clustering method is used to cluster the new energy output data in the area and superimpose the output curves of conventional units; the access points are selected based on the output operation of conventional units and new energy sources within the distribution network area, and the distance of each candidate access point is determined, which is used as the basis for calculating the line investment cost;

[0057] Then, a high-dimensional ellipsoid set based on the existing load data in the distribution network is constructed, and the convex hull of the high-dimensional ellipsoid set is scaled to obtain an uncertain set of adjustable load models introduced under extreme scenarios of the distribution network system, and a load capacity curve model under uncertain scenarios is combined;

[0058] Then formulate the objective function, by formulating the minimum total cost objective function, analyzing the power source cost one by one and the grid cost one by one, taking the number of new lines or expanded lines between the nodes of the current grid as the decision variable, and referring to the minimum comprehensive cost to establish the objective function;

[0059] Finally, the constraints are determined: the power planning capacity space under the total constraints of load capacity and system backup capacity; the minimum power investment cost and grid construction cost are met; in different ways, the planning requirements and the minimum LCC constraints based on the source side and the grid side are met respectively, and the established distribution network planning model is solved using the optimization method driven by source and load data to obtain the optimized distribution network planning model.

[0060] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A distribution network planning method adapted to the access of new energy sources, characterized in that: The planning approach includes the following steps: S1: The density clustering method is used to cluster the regional renewable energy output data and construct the regional power output curve; S2: Construct load capacity curve under uncertainty scenario; S3: Formulate an objective function, taking the number of new lines or expanded lines between nodes of the current grid as the decision variable, and establishing the objective function with reference to the minimum comprehensive cost; S4: Determine the constraints, use mathematical optimization algorithms to solve them, and obtain the optimized distribution network planning model.

2. A distribution network planning method adapted to the access of new energy sources according to claim 1, characterized in that: The regional power output curve is constructed in S1, including constructing the operating characteristic curves of each conventional unit and new energy output within the current distribution network area, using the density clustering method to perform cluster analysis on the new energy output data in the area and superimpose the conventional unit output curve; the access point is selected based on the operation of each conventional unit and new energy output within the distribution network area, and the distance of each candidate access point is determined, and this is used as the basis for calculating the line investment cost.

3. A distribution network planning method adapted to the access of new energy sources according to claim 2, characterized in that: In S2, a load capacity curve is constructed under an uncertainty scenario, a high-dimensional ellipsoid set based on the existing load data in the distribution network is constructed, the convex hull of the high-dimensional ellipsoid set is scaled, and an uncertain set of adjustable load models is introduced under the extreme scenario of the distribution network system, and a load capacity curve model under the uncertainty scenario is combined.

4. A distribution network planning method adapted to the access of new energy sources according to claim 3, characterized in that: Formulating the objective function in S3 includes formulating the total cost minimum objective function, analyzing the power source costs one by one, and analyzing the grid costs one by one.

5. A distribution network planning method adapted to the access of new energy sources according to claim 4, characterized in that: The total cost (C) includes two parts: power cost (P) and grid cost (W). The total cost minimum objective function is: C min =P min +W min .

6. A distribution network planning method adapted to the access of new energy sources according to claim 5, characterized in that: The power cost mainly includes the power construction cost (P pc ), power supply maintenance cost (P pm ), power outage cost (P ps ), residual cost after retirement (P pr ), P=P pc +P pm +P ps +P pr , and solve the minimum value of the sub-items to obtain P min .

7. A distribution network planning method adapted to the access of new energy sources according to claim 6, characterized in that: The power grid cost mainly includes: supporting power grid construction cost (W pc ), power grid maintenance cost (W pm ), power grid outage cost (W ps ), residual cost after retirement (W pr ), W=W pc +W pm +W ps +W pr , and solve the minimum value of the sub-items to get W min .

8. A distribution network planning method adapted to the access of new energy sources according to claim 7, characterized in that: The constraints determined in S4 include: satisfying the power planning capacity space under the total constraints of load capacity and system backup capacity; satisfying the minimum power investment cost and grid construction cost; satisfying the planning requirements and the minimum LCC constraints based on the source side and the grid side in different ways, and solving the established distribution network planning model using the optimization method driven by source and load data to obtain the optimized distribution network planning model.

Citation Information