Cooling capacity distribution device and liquid cooling system

By designing an integrated adjustment tank, integrating pressure adjustment and working fluid supplement functions, the problem of large space occupancy of the cold distribution device is solved, the rational use of space and the cost reduction is achieved, and the risk of pollution of rust substances is reduced.

CN118946087APending Publication Date: 2024-11-12HUAWEI DIGITAL POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410946314.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing cold distribution device occupies a large installation space due to the separate arrangement of multiple components, resulting in unreasonable utilization of the installation space.

Method used

An integrated adjustment tank is designed to integrate pressure adjustment and working fluid supplement functions. The volume of the liquid storage chamber and the liquid replenishment chamber is adjusted under the action of pressure, so as to stabilize the secondary circuit pressure and replenish the working fluid. , reduce the configuration of valve body, sensor and other components.

Benefits of technology

The volume of the cold distribution device is reduced, installation space is saved, costs are reduced, and the risk of rust substances entering the secondary side circuit is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118946087A_ABST
    Figure CN118946087A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a cooling capacity distribution device and a liquid cooling system comprising the cooling capacity distribution device, and relates to the technical field of heat dissipation. The cooling capacity distribution device comprises a heat exchanger, an adjusting tank and a first pump body, the heat exchanger comprises a first heat exchange channel and a second heat exchange channel, the first heat exchange channel is used for being communicated with a cold source, and an inlet and an outlet of the second heat exchange channel are both used for being communicated with a cold plate; the adjusting tank comprises a tank body and a partition part, the partition part is arranged in the tank body, the tank body comprises a liquid supplementing cavity and a liquid storage cavity, the partition part is used for adjusting the volume of the liquid supplementing cavity and the volume of the liquid storage cavity under the action of pressure, and the liquid storage cavity communicates with the second heat exchange channel; in the liquid supplementing state, the first pump body communicates with the liquid supplementing cavity and the liquid storage cavity. According to the technical scheme, the size of the cooling capacity distribution device can be reduced, and the installation space of the cooling capacity distribution device is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of heat dissipation technology, and in particular to a cooling capacity distribution device and a liquid cooling system. Background Art

[0002] In a liquid cooling system, a cold water distribution device is usually used, such as a cold water distribution unit (CDU). The primary side pipeline of the cold water distribution device is connected to an external cold source (e.g., a cold tower) for heat dissipation, and the secondary side pipeline extends to the equipment that needs heat dissipation (e.g., a server) for heat dissipation.

[0003] In the related art, the cold distribution device includes components such as a pressure regulating tank, a liquid replenishing tank, and a liquid replenishing pump in addition to a heat exchanger and related connecting pipes. The pressure regulating tank can stabilize the pressure of the system pipes, and the liquid replenishing tank and the liquid replenishing pump can replenish the liquid when the liquid inside the pipes is insufficient. However, many components in the cold distribution device will take up a large installation space during installation, occupying the installation positions of other core components, which is not conducive to the rational use of the installation space. Summary of the invention

[0004] The present application provides a cooling distribution device and a liquid cooling system including the cooling distribution device, which can reduce the volume of the cooling distribution device and save the installation space of the cooling distribution device.

[0005] In order to achieve the above objectives, this application adopts the following technical solutions:

[0006] In a first aspect of the present application, a cold capacity distribution device is provided, which includes a heat exchanger, an adjusting tank and a first pump body; the heat exchanger includes a first heat exchange channel and a second heat exchange channel, the first heat exchange channel is used to communicate with a cold source, and the inlet and outlet of the second heat exchange channel are both used to communicate with a cold plate; the adjusting tank includes a tank body and a partition, the partition is arranged in the tank body, the tank body includes a liquid replenishing chamber and a liquid storage chamber, the liquid storage chamber and the liquid replenishing chamber are separated by the partition, the partition is used to adjust the volume of the liquid replenishing chamber and the liquid storage chamber under the action of pressure, and the liquid storage chamber is connected to the second heat exchange channel; the cold capacity distribution device has a liquid replenishing state, in which the first pump body connects the liquid replenishing chamber and the liquid storage chamber, and the first pump body is used to replenish the working fluid in the liquid replenishing chamber into the liquid storage chamber.

[0007] When the working fluid of the cold source flows into the first heat exchange channel of the heat exchanger, it will exchange heat with the working fluid in the second heat exchange channel of the heat exchanger, so that the working fluid in the second heat exchange channel is cooled. After the heat exchange, the working fluid in the first heat exchange channel will flow back to the cold source, forming at least part of the primary side loop of the liquid cooling system. The working fluid cooled in the second heat exchange channel flows from the outlet of the second heat exchange channel to the cold plate, dissipates heat for the equipment to be cooled, and then flows back to the heat exchanger from the inlet of the second heat exchange channel, and circulates continuously, forming at least part of the secondary side loop of the liquid cooling system, thereby continuously dissipating heat for the equipment to be cooled.

[0008] The cold distribution device of the present application is also provided with a regulating tank, and the partition can adjust or change the volume of the liquid storage chamber and the liquid replenishing chamber in the regulating tank under the action of pressure. The second heat exchange channel is connected with the liquid storage chamber of the regulating tank. When the pressure of the secondary side circuit is relatively large, the working fluid in the secondary side circuit will be pressed into the liquid storage chamber. Under the action of pressure, the partition increases the volume of the liquid storage chamber. When the pressure of the circulation circuit is relatively small, the working fluid in the liquid storage chamber will be squeezed into the secondary side circuit, and the partition reduces the volume of the liquid storage chamber. In the above manner, the pressure of the secondary side circuit is regulated, and the pressure stabilization effect is achieved.

[0009] In addition, when the working fluid needs to be supplemented in the secondary circuit, the cooling capacity distribution device is in a liquid replenishing state, in which the first pump body connects the liquid replenishing chamber and the liquid storage chamber, drives the first pump body, and replenishes the working fluid in the liquid replenishing chamber into the liquid storage chamber. After the working fluid enters the liquid storage chamber, the internal pressure of the liquid storage chamber increases. Under the pressure of the internal pressure, the working fluid in the liquid replenishing chamber will enter the secondary circuit, thereby replenishing the working fluid in the secondary circuit.

[0010] By setting up an "integrated" regulating tank, multiple components are integrated, so that the two functions of pressure regulation and working fluid replenishment are combined in one component, so that the valve body, sensor and other components that were originally required when the liquid replenishment component and the pressure stabilization component were set separately are shared by the integrated regulating tank, eliminating the configuration of multiple components, reducing costs, reducing the volume of the cold distribution device, saving the installation space of the cold distribution device, and facilitating the rational use of space.

[0011] In an optional embodiment, the separator is in the form of a membrane and is elastic, and an edge portion of the separator is fixedly connected to the tank body; or, the separator is a piston, and the separator moves along the distribution direction of the liquid replenishing chamber and the liquid storage chamber.

[0012] In the case where the separator is an elastic membrane structure, the separator adjusts the volume of the liquid storage chamber and the liquid replenishment chamber by deformation, that is, when the pressure inside the liquid storage chamber or the liquid replenishment chamber increases, the separator will deform. Since the edge of the separator is fixed to the tank body, the deformation area of ​​the separator is mostly in the middle of the separator, which reduces the possibility of the separator contacting the periphery of the tank body during elastic activity, reduces the possibility of rusty materials inside the tank body being scratched and dropped by the separator, and reduces the risk of rusty materials entering the secondary circuit and contaminating the working fluid.

[0013] When the partition is a piston, the partition can adjust the volume of the liquid storage chamber and the liquid infusion chamber in a movable manner. For example, when the internal pressure of the liquid storage chamber increases, the partition will move toward the liquid infusion chamber. Conversely, when the internal pressure of the liquid infusion chamber increases, the partition will move toward the liquid storage chamber.

[0014] In an optional embodiment, the regulating tank also includes a pressure relief channel and a pressure relief valve. One end of the pressure relief channel is connected to the fluid replenishment chamber, and the other end is connected to the fluid storage chamber. The pressure relief channel is provided with a pressure relief valve, which is used to block or open the pressure relief channel.

[0015] When the pressure inside the liquid storage chamber is too high, for example, when more liquid in the secondary circuit is pressed into the liquid storage chamber, in order to adjust the internal pressure of the liquid storage chamber, the pressure relief valve can be opened to allow the liquid in the liquid storage chamber to enter the liquid replenishment chamber through the pressure relief channel, thereby completing the pressure relief of the liquid storage chamber. This reduces the possibility of the separator being damaged due to excessive pressure, and also reduces the possibility of the regulating tank being damaged due to excessive imbalance in the internal pressure of the regulating tank.

[0016] In an optional embodiment, the regulating tank further includes a liquid level meter, which is connected to the liquid replenishing chamber or at least partially extends into the liquid replenishing chamber, and the liquid level meter is used to detect the liquid level of the working medium inside the liquid replenishing chamber.

[0017] The liquid level meter can detect the liquid level of the working fluid in the liquid replenishment chamber. When the working fluid in the liquid replenishment chamber needs to be replenished into the liquid storage chamber, the liquid level meter can be used to first determine whether there is enough working fluid in the liquid replenishment chamber. For example, if the working fluid in the liquid replenishment chamber is sufficient, the working fluid in the liquid replenishment chamber is replenished into the liquid storage chamber through the first pump body; if the working fluid in the liquid replenishment chamber is less, the working fluid is added to the liquid replenishment chamber, and then the working fluid in the liquid replenishment chamber is replenished into the liquid storage chamber through the first pump body.

[0018] In an optional embodiment, the regulating tank further includes a fluid infusion port and a sealing cover. The fluid infusion port is arranged at the top of the tank body and is connected to the fluid infusion cavity. The sealing cover is arranged at the fluid infusion port and is used to open or seal the fluid infusion port.

[0019] When the working fluid in the liquid replenishment chamber is replenished into the liquid storage chamber through the first pump body, the working fluid in the liquid replenishment chamber will be reduced, and the liquid replenishment port can be exposed by opening the plugging cover, and then the working fluid is replenished into the liquid replenishment chamber from the liquid replenishment port. After the liquid replenishment is completed, the liquid replenishment port is blocked by the plugging cover to close the liquid replenishment chamber, thereby realizing the maintenance of the regulating tank.

[0020] In an optional embodiment, the regulating tank further includes an air valve, which is connected to the tank body and is used to connect or block the space between the liquid replenishing cavity and the outside of the tank body.

[0021] Opening the air valve can connect the liquid filling chamber to the external space of the tank body, and closing the air valve can disconnect the liquid filling chamber from the external space of the tank body (disconnection). When the pressure in the liquid filling chamber is too high, the pressure in the liquid filling chamber can be released by opening the air valve; when the pressure in the liquid filling chamber is too low, gas can be injected into the liquid filling chamber by opening the air valve to increase the internal pressure of the liquid filling chamber.

[0022] In an optional embodiment, the regulating tank further includes a first pressure detector, which is located outside the tank body and connected to the air valve. The first pressure detector is used to detect the pressure in the fluid infusion chamber through the air valve.

[0023] A first pressure detector is externally connected to the air valve to detect the pressure in the fluid infusion chamber, which can assist in determining whether to adjust the pressure in the fluid infusion chamber, that is, to assist in determining whether to release the pressure in the fluid infusion chamber or to inject gas into the fluid infusion chamber to add additional pressure.

[0024] In an optional embodiment, the cold capacity distribution device also includes a second pump body, and the first pump body and the second pump body are connected in parallel; the cold capacity distribution device also has an operating state, in which the liquid replenishment chamber and the liquid storage chamber are both disconnected from the first pump body, and at least one of the first pump body and the second pump body is used to drive the working fluid in the second heat exchange channel to flow between the second heat exchange channel and the cold plate; in the liquid replenishment state, the heat exchanger and the cold plate are both disconnected from the first pump body, and the first pump body is connected to the liquid replenishment chamber and the liquid storage chamber.

[0025] The first pump body and the second pump body are connected in parallel. When the cold distribution device is in operation, the liquid replenishment chamber and the liquid storage chamber are not connected to the first pump body. At least one of the first pump body and the second pump body drives the working fluid to flow along the secondary side circuit to complete the flow of the working fluid between the cold plate and the heat exchanger. When the secondary side circuit needs to be replenished, the cold distribution device is in a liquid replenishment state, the first pump body is not connected to the heat exchanger and the cold plate, and the first pump body is connected to the liquid replenishment chamber and the liquid storage chamber. When the first pump body is started, the working fluid in the liquid replenishment chamber can be replenished into the liquid storage chamber. In this way, the cold distribution device can be operated stably (the first pump body and the second pump body can be used one by one and spared by the other), and the pump body and related configurations specifically for liquid replenishment can be omitted (the first pump body also takes care of liquid replenishment), saving space and cost.

[0026] In an optional embodiment, the cooling capacity distribution device further includes a first flow channel and a second flow channel, one of the inlet and the outlet of the second heat exchange channel is connected to the first flow channel, and the other is connected to the second flow channel, the first flow channel includes an input main flow channel, an output main flow channel and a plurality of branch flow channels, one of the input main flow channel and the output main flow channel is connected to the second heat exchange channel, and the other is used to communicate with the cold plate, each of the plurality of branch flow channels is connected to the input main flow channel at one end and to the output main flow channel at the other end, and the first pump body and the second pump body are respectively connected to Two different branch channels among the multiple branch channels, one of the input main channel, the output main channel and the second channel is connected to the liquid storage chamber; in the operating state, the liquid replenishment chamber and the liquid storage chamber are both disconnected from the branch channel provided with the first pump body, and the input main channel is connected to the branch channel provided with the first pump body or the branch channel provided with the second pump body; in the liquid replenishment state, the input main channel is disconnected from the branch channel provided with the first pump body, the liquid replenishment chamber and the liquid storage chamber are both connected to the branch channel provided with the first pump body, and the input main channel is connected to the branch channel provided with the second pump body.

[0027] When the working fluid in the secondary side circuit flows into the input main channel, in the running state, the input main channel will be connected to the first pump body or the second pump body through the corresponding branch channel. Under the action of the first pump body or the second pump body, the working fluid in the input main channel will flow into the output main channel through the corresponding branch channel, and the first pump body or the second pump body realizes the driving of the working fluid. In the replenishing state, the input main channel is disconnected from the branch channel provided with the first pump body, so that the first pump body can replenish fluid independently. In addition, the input main channel is connected to the branch channel provided with the second pump body, and the second pump body drives the working fluid to flow between the heat exchanger and the cold plate, so that the working fluid circulates normally in the secondary side circuit.

[0028] In an optional embodiment, in the fluid infusion state, the fluid infusion chamber is connected to the branch channel provided with the first pump body and the connection position is located upstream of the first pump body, and the fluid storage chamber is connected to the branch channel provided with the first pump body and the connection position is located downstream of the first pump body.

[0029] In the fluid replenishment state, the main input channel is disconnected from the branch channel provided with the first pump body. When the first pump body is running, the working fluid in the fluid replenishment chamber will enter the branch channel provided with the first pump body, flow through the first pump body, and then flow into the liquid storage chamber from the connecting position between the liquid storage chamber and the branch channel, thereby completing the fluid replenishment of the liquid storage chamber.

[0030] In an optional embodiment, the first flow channel also includes a first multi-way valve and a second multi-way valve, both of which are connected to a branch channel in which the first pump body is provided, the first multi-way valve is used to control the connection or disconnection between the first pump body and the fluid infusion chamber, and the second multi-way valve is used to control the connection or disconnection between the first pump body and the fluid storage chamber.

[0031] In the liquid replenishing state, the first multi-way valve can conduct the connection between the branch channel provided with the first pump body and the liquid replenishing chamber, and the second multi-way valve can conduct the connection between the branch channel provided with the first pump body and the liquid storage chamber. In the running state, the first multi-way valve can block the connection between the branch channel provided with the first pump body and the liquid replenishing chamber, and the second multi-way valve can block the connection between the branch channel provided with the first pump body and the liquid storage chamber. By arranging the first multi-way valve and the second multi-way valve on the branch channel, it is conducive to realizing the control of on and off.

[0032] In an optional embodiment, the first flow channel further includes a third multi-way valve for controlling on-off, and the input main flow channel is connected to the plurality of branch flow channels through the third multi-way valve.

[0033] The third multi-way valve can be used to control which branch channel or which branch channels the main channel is connected to, which is beneficial to controlling the on-off of the first channel.

[0034] In an optional embodiment, the cooling capacity distribution device further includes a second pump body, and the second pump body is used to drive the working medium in the second heat exchange channel to flow between the second heat exchange channel and the cold plate.

[0035] Through the above design, only the second pump body is connected to the first flow channel, and the first pump body and the second pump body operate independently. During normal cooling, the second pump body drives the working fluid to flow along the secondary side circuit to complete the circulation of the working fluid between the cold plate and the heat exchanger. When it is necessary to replenish the secondary side circuit, the cold capacity distribution device is in the replenishment state, and the first pump body connects the replenishment chamber and the liquid storage chamber. When the first pump body is started, it can replenish the working fluid in the replenishment chamber into the liquid storage chamber.

[0036] In an optional embodiment, the cooling capacity distribution device further includes a first flow channel and a plurality of second pressure detectors, the inlet or outlet of the second heat exchange channel is connected to the first flow channel, and the first flow channel is provided with at least some of the plurality of second pressure detectors.

[0037] The second pressure detector can detect the pressure of the secondary circuit, and the cooling distribution device can be determined to enter the liquid replenishment state for liquid replenishment according to the detection result of the second pressure detector. The pressure at different positions of the secondary circuit can also be detected in real time by multiple second pressure detectors, which is convenient for the staff, cooling distribution device and liquid cooling system to quickly respond to emergencies.

[0038] In an optional embodiment, the fluid infusion chamber and the fluid storage chamber are distributed in a vertical direction, and the fluid infusion chamber is located above the fluid storage chamber; or, the fluid infusion chamber and the fluid storage chamber are distributed in a horizontal direction.

[0039] When the infusion chamber and the liquid storage chamber are arranged in the vertical direction, the infusion chamber is located above the liquid storage chamber, which is convenient for replenishing gas and liquid into the infusion chamber. When the infusion chamber and the liquid storage chamber are arranged in the horizontal direction, the possibility of the partition moving toward the infusion chamber or the liquid storage chamber under the action of gravity can be reduced.

[0040] In a second aspect of the present application, a liquid cooling system is provided, which includes a cold source, a cold plate and the above-mentioned cold distribution device, wherein a first heat exchange channel is connected to the cold source, one of the inlet and the outlet of the second heat exchange channel is connected to the cold plate through a first flow channel, and the other is connected to the cold plate through a second flow channel.

[0041] When the working fluid of the cold source flows into the first heat exchange channel of the heat exchanger, it will exchange heat with the working fluid in the second heat exchange channel of the heat exchanger, so that the working fluid in the second heat exchange channel is cooled. The working fluid in the first heat exchange channel will flow back to the cold source after the heat exchange. The cooled working fluid in the second heat exchange channel flows along the first flow channel or the second flow channel to the cold plate to dissipate heat for the equipment to be cooled, and then flows back to the heat exchanger from the first flow channel or the second flow channel, for example, flows from the first flow channel to the cold plate and then flows back to the heat exchanger from the second flow channel, and continues to circulate to dissipate heat for the equipment to be cooled. In addition, the liquid cooling system provided in the present application includes the above-mentioned cold distribution device, so the liquid cooling system provided in the present application and the cold distribution device of the above-mentioned technical solution can solve the same technical problems and have the same technical effects, which will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a structural schematic diagram of a liquid cooling system in the related art;

[0043] Figure 2 A schematic diagram of the structure of a liquid cooling system provided in an embodiment of the present application;

[0044] Figure 3 A schematic diagram of the structure of a cooling distribution device provided in an embodiment of the present application;

[0045] Figure 4 A schematic diagram of the structure of a first flow channel provided in an embodiment of the present application;

[0046] Figure 5 A schematic diagram of the structure of another first flow channel provided in an embodiment of the present application;

[0047] Figure 6 A schematic diagram of the structure of a regulating tank provided in an embodiment of the present application;

[0048] Figure 7 for Figure 6 A schematic diagram of the structure of the regulating tank after the separator is deformed;

[0049] Figure 8 A schematic diagram of the structure of another regulating tank provided in an embodiment of the present application;

[0050] Fig. 9 for Figure 8 A schematic diagram of the structure after the partition of the regulating tank in FIG. 1 is moved;

[0051] Fig.10 A flow diagram of a working medium in a cooling distribution device in a liquid replenishing state provided in an embodiment of the present application;

[0052] Fig.11 A flow diagram of a working medium in a cooling capacity distribution device in operation provided by an embodiment of the present application;

[0053] Fig.12 A schematic diagram of the structure of another regulating tank provided in an embodiment of the present application;

[0054] Fig.13 A schematic diagram of the structure of another cooling capacity distribution device provided in an embodiment of the present application;

[0055] Fig.14 A schematic diagram of the structure of another cooling capacity distribution device provided in an embodiment of the present application;

[0056] Fig.15 A schematic diagram of the structure of a cabinet server provided in an embodiment of the present application.

[0057] Reference numerals:

[0058] 100-liquid cooling system; 10-cold source; 20-cold plate; 30-cold distribution device;

[0059] 1-heat exchanger; 11-first heat exchange channel; 12-second heat exchange channel;

[0060] 21-first flow channel; 211-input main flow channel; 212-output main flow channel; 213-branch flow channel; 214-first multi-way valve; 215-second multi-way valve; 216-third multi-way valve; 217-fourth multi-way valve; 22-second flow channel; 23-third flow channel; 231-liquid replenishing valve; 24-fourth flow channel; 25-fifth flow channel;

[0061] 3-regulating tank; 31-tank body; 311-liquid filling chamber; 312-liquid storage chamber; 32-separator; 33-pressure relief channel; 34-pressure relief valve; 35-liquid level meter; 36-liquid filling port; 37-blocking cover; 38-air valve; 39-first pressure detector;

[0062] 4-first pump body;

[0063] 5- second pump body;

[0064] 6- second pressure detector;

[0065] 7-cabinet; 71-interface;

[0066] 200-heat exchange component; 300-liquid replenishment tank; 400-liquid replenishment pump; 500-pressure stabilizing component; 600-driving component;

[0067] 700-cabinet server; 800-cabinet; 900-server. DETAILED DESCRIPTION

[0068] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0069] In the present application, unless otherwise clearly specified and limited, the directions or positional relationships indicated by the terms "upper" and "lower" may be defined, including but not limited to, the directions relative to the schematic placement of the components in the drawings, wherein these directional terms may be relative concepts, which are used for relative description and clarification, and may change accordingly according to the changes in the placement of the components in the drawings, and shall not be understood as limitations on the present application.

[0070] In this application, the terms "first", "second", etc. are used only for descriptive purposes to distinguish one element from another element, and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features.

[0071] In the present application, unless otherwise clearly specified or limited, "plurality" means two or more.

[0072] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be internal communication between two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances. In addition, when describing pipelines or channels, the "connected" and "connected" used in this application have the meaning of conduction, and the specific meaning needs to be understood in conjunction with the context.

[0073] In addition, in this application, the words "exemplary" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "exemplary" or "for example" in this application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.

[0074] The appendix of the embodiment of this application Figure 6 To Attachment Fig. 9 , Attachment Fig.12 , Attachment Fig.14 and attached Fig.15 In the drawings, components, assemblies and other solid structures are indicated by guide lines; openings, holes, spaces, cavities and other hollow structures are indicated by guide lines with arrows. Figure 1 To Attachment Figure 5 , Attachment Fig.10 , Attachment Fig.11 and attached Fig.13 ), in order to avoid confusion on the lines, numbers are marked on the side, above, below or inside the structure to indicate the corresponding structure.

[0075] Figure 1 The liquid cooling system in the related art is shown as an example, and the liquid cooling system in the related art includes a heat exchange component 200, a fluid replenishment tank 300, a fluid replenishment pump 400, a pressure stabilizing component 500 (for example, a pressure regulating tank, an expansion tank), a plurality of driving components 600, and the like. The pressure stabilizing component 500 can stabilize the pressure of the system pipeline, and the fluid replenishment tank 300 and the fluid replenishment pump 400 can replenish the liquid when the liquid inside the pipeline is insufficient. However, in this way, more components will occupy a larger installation space during installation, occupying the installation position of other core components, which is not conducive to the rational use of the installation space.

[0076] The embodiment of the present application provides a liquid cooling system 100. Figure 2A liquid cooling system 100 is exemplarily shown, wherein the liquid cooling system 100 includes a cold source 10 (eg, a cold tower), a cold plate 20 (which may be a liquid cold plate), and a cold distribution device 30 . Figure 2 The portion within the dashed box 10 exemplarily shows the cold source 10. Figure 2 The portion within the dashed box 30 exemplarily shows a cooling capacity distribution device 30, wherein: Figure 2 The specific details of the cooling capacity distribution device 30 can be found in Figure 3 , Figure 3 Shows Figure 2 In the cooling capacity distribution device 30. In addition, Figure 2 The box below the reference numeral “ 20 ” denotes a cold plate 20 .

[0077] The present application also provides a cooling capacity distribution device 30, referring to Figure 2 and Figure 3 The cooling capacity distribution device 30 includes a heat exchanger 1, a first flow channel 21 and a second flow channel 22, wherein the box above the label "1" refers to the heat exchanger 1, the line above the label "21" refers to the first flow channel 21 (a part), and the line below the label "22" refers to the second flow channel 22. The heat exchanger 1 includes a first heat exchange channel 11 and a second heat exchange channel 12 capable of heat exchange, wherein the broken line on the right side of the label "11" refers to the first heat exchange channel 11, and the broken line on the left side of the label "12" refers to the second heat exchange channel 12.

[0078] The first heat exchange channel 11 is used to communicate with the cold source 10. For example, the inlet of the first flow channel 21 is communicated with the outlet of the cold source 10, and the outlet of the first flow channel 21 is communicated with the inlet of the cold source 10. One of the inlet and the outlet of the second heat exchange channel 12 is communicated with the first flow channel 21, and the other is communicated with the second flow channel 22. For example, Figure 2 and Figure 3 In the example shown, the first flow channel 21 is connected to the outlet of the second heat exchange channel 12, and the second flow channel 22 is connected to the inlet of the second heat exchange channel 12. In other examples, the first flow channel 21 may be connected to the inlet of the second heat exchange channel 12, and the second flow channel 22 may be connected to the outlet of the second heat exchange channel 12. In addition, both the first flow channel 21 and the second flow channel 22 are used to communicate with the cold plate 20.

[0079] When the working fluid of the cold source 10 flows into the first heat exchange channel 11 of the heat exchanger 1, it will exchange heat with the working fluid in the second heat exchange channel 12 of the heat exchanger 1, so that the working fluid in the second heat exchange channel 12 is cooled. After the heat exchange, the working fluid in the first heat exchange channel 11 will flow back to the cold source 10, forming at least part of the primary side loop of the liquid cooling system 100. The cooled working fluid in the second heat exchange channel 12 flows along one of the first flow channel 21 and the second flow channel 22 to the cold plate 20, dissipates heat for the device to be cooled, and then flows back to the heat exchanger 1 from the other of the first flow channel 21 and the second flow channel 22, for example, flows from the first flow channel 21 to the cold plate 20, and then flows back to the heat exchanger 1 from the second flow channel 22, and circulates continuously, forming at least part of the secondary side loop of the liquid cooling system 100, and continuously dissipates heat for the device to be cooled (for example, a server, a battery pack, etc.).

[0080] The cooling capacity distribution device 30 further includes a first pump body 4 and a second pump body 5. Figure 3 The box below the number "4" refers to the first pump body 4, and the box above the number "5" refers to the second pump body 5. The first pump body 4 and the second pump body 5 are both connected to the first flow channel 21, and the first pump body 4 and the second pump body 5 are connected in parallel.

[0081] Figure 4 The structure of a first flow channel 21 is shown as an example, wherein: Figure 4 for Figure 3 The remaining part after removing some structures. Figure 3 and Figure 4 The first flow channel 21 includes an input main flow channel 211, an output main flow channel 212 and a plurality of branch flow channels 213. Figure 4 The line above the number "211" indicates the input main channel 211, the line above the number "212" indicates the output main channel 212, and the channel parts in the two dotted boxes are branch channels 213. One of the input main channel 211 and the output main channel 212 is connected to the second heat exchange channel 12, and the other is used to communicate with the cold plate 20 (the cold plate 20 can refer to Figure 2 ), for example, in Figure 3 and Figure 4 In the example, the input main channel 211 is connected to the second heat exchange channel 12 , and the output main channel 212 is used to connect to the cold plate 20 .

[0082] Figure 5 Another structure of the first flow channel 21 is shown as an example. Figure 5 In the illustrated example, the output main channel 212 is in communication with the second heat exchange channel 12 , and the input main channel 211 is used to communicate with the cold plate 20 .

[0083] Reference Figure 4 and Figure 5, the input main channel 211 is located upstream of the plurality of branch channels 213 and connected to the plurality of branch channels 213, and the output main channel 212 is located downstream of the plurality of branch channels 213 and connected to the plurality of branch channels 213, that is, each of the plurality of branch channels 213 is connected to the input main channel 211 at one end and to the output main channel 212 at the other end. The upstream and downstream are determined by referring to the flow of the working medium, for example, when the working medium flows through the first main channel, passes through the plurality of branch channels 213 and then enters the second main channel, then the first main channel is located upstream of the plurality of branch channels 213, and the plurality of branch channels 213 are located upstream of the second main channel, and the first main channel is also located upstream of the second main channel, that is, the first main channel is the input main channel 211, and the second main channel is the output main channel 212. Figure 4 and Figure 5 The arrows in the figure indicate the flow direction of the working fluid in the two examples, which can assist in determining the upstream and downstream. In addition, the upstream and downstream can also be determined based on common sense, and this application will not go into details.

[0084] exist Figure 4 and Figure 5 In the example shown, the plurality of branch flow channels 213 are two branch flow channels 213. In other examples, the plurality of branch flow channels 213 may be three, four branch flow channels 213, and so on.

[0085] Reference Figure 3 and Figure 4 The first pump body 4 and the second pump body 5 are respectively connected to two different branch channels 213 among the plurality of branch channels 213, that is, among the plurality of branch channels 213, there are two branch channels 213, one of which is provided with the first pump body 4 and the other is provided with the second pump body 5. The cooling capacity distribution device 30 has an operating state, in which at least one of the first pump body 4 and the second pump body 5 drives the working medium in the first flow channel 21 to flow between the second heat exchange channel 12 and the cold plate 20 (the cold plate 20 can refer to Figure 2 ), that is, it flows in the secondary circuit.

[0086] For example, refer to Figure 3 and Figure 4 In the running state, the first pump body 4 drives the working medium in the first flow channel 21 to flow between the second heat exchange channel 12 and the cold plate 20. In this state, the first pump body 4 is running, and the second pump body 5 is on standby. The working medium flows in the branch flow channel 213 of the first pump body 4. The flow direction can be referred to Figure 4 The dashed arrow in Figure 4 The solid arrows in the figure indicate the direction in which the working fluid flows in the input main flow channel 211, the output main flow channel 212 and the second flow channel 22).

[0087] For example, refer to Figure 3 and Figure 4In the running state, the second pump body 5 drives the working medium in the first flow channel 21 to flow between the second heat exchange channel 12 and the cold plate 20. In this state, the second pump body 5 is running, and the first pump body 4 is on standby. The working medium flows in the branch flow channel 213 set in the second pump body 5. The flow direction can be referred to Figure 4 Double-dotted long dash arrow in .

[0088] For example, refer to Figure 3 and Figure 4 In the running state, the first pump body 4 and the second pump body 5 jointly drive the working medium in the first flow channel 21 to flow between the second heat exchange channel 12 and the cold plate 20. In this state, the first pump body 4 and the second pump body 5 operate simultaneously, and the working medium flows in the two branch flow channels 213. The flow direction can be referred to Figure 4 The dashed arrow and the double-dotted long dash arrow in .

[0089] Which pump is needed to drive the working medium to flow between the second heat exchange channel 12 and the cold plate 20 can be achieved by changing the way the input main flow channel 211 is connected to the corresponding branch flow channel 213 .

[0090] In an example provided in this application, refer to Figure 3 and Figure 4 , the first flow channel 21 also includes a third multi-way valve 216 (for example, a three-way valve) for controlling on-off, the T-shaped frame above the label "216" refers to the third multi-way valve 216, and the input main flow channel 211 is connected to the plurality of branch flow channels 213 through the third multi-way valve 216. For example, when it is necessary to drive the working medium to flow between the second heat exchange channel 12 and the cold plate 20 through the first pump body 4, the third multi-way valve 216 can disconnect the connection between the input main flow channel 211 and the branch flow channel 213 provided with the second pump body 5, and the third multi-way valve 216 conducts the connection between the input main flow channel 211 and the branch flow channel 213 provided with the first pump body 4. For another example, when it is necessary to drive the working medium to flow between the second heat exchange channel 12 and the cold plate 20 through the second pump body 5, the third multi-way valve 216 can disconnect the connection between the input main channel 211 and the branch channel 213 provided with the first pump body 4, and the third multi-way valve 216 connects the input main channel 211 with the branch channel 213 provided with the second pump body 5. For another example, when it is necessary to drive the working medium to flow between the second heat exchange channel 12 and the cold plate 20 through the first pump body 4 and the second pump body 5 at the same time, the third multi-way valve 216 can connect the input main channel 211 with the above two branch channels 213 at the same time.

[0091] In some examples, reference Figure 3 and Figure 4, the first flow channel 21 also includes a fourth multi-way valve 217 (for example, a three-way valve) for controlling the on-off, and the T-shaped frame above the label "217" refers to the fourth multi-way valve 217, and the output main channel 212 is connected to multiple branch channels 213 through the fourth multi-way valve 217. The fourth multi-way valve 217 can also connect the corresponding branch channels 213 with the output main channel 212 as needed. For example, when it is necessary to drive the working medium to flow between the second heat exchange channel 12 and the cold plate 20 through the first pump body 4, the fourth multi-way valve 217 connects the output main channel 212 with the branch channel 213 provided with the first pump body 4. For another example, when it is necessary to drive the working medium to flow between the second heat exchange channel 12 and the cold plate 20 through the second pump body 5, the fourth multi-way valve 217 connects the output main channel 212 with the branch channel 213 provided with the second pump body 5. For another example, when the working medium needs to be driven to flow between the second heat exchange channel 12 and the cold plate 20 by the first pump body 4 and the second pump body 5 at the same time, the fourth multi-way valve 217 can simultaneously open the connection between the output main channel 212 and the two branch channels 213 .

[0092] In some other examples, the fourth multi-way valve 217 may not be provided, and the output main flow channel 212 is directly connected to the multiple branch flow channels 213 and communicated with each other, and the on-off is only controlled by the third multi-way valve 216 .

[0093] In addition, return to reference Figure 3 and Figure 4 , the cold distribution device 30 may also include a plurality of second pressure detectors 6, and the first flow channel 21 is provided with at least part of the plurality of second pressure detectors 6. For example, each branch flow channel 213 is provided with a second pressure detector 6 (one or more), wherein in the branch flow channel 213 provided with the first pump body 4, the upstream and downstream of the first pump body 4 are provided with a second pressure detector 6, and in the branch flow channel 213 provided with the second pump body 5, the upstream and downstream of the second pump body 5 are provided with a second pressure detector 6. The pressure at different positions of the secondary side circuit is detected in real time by a plurality of second pressure detectors 6, so that the staff, the cold distribution device 30 and the liquid cooling system 100 can quickly respond to emergencies.

[0094] Reference Figure 3 , the cold distribution device 30 also includes a regulating tank 3 and a third flow channel 23. The device above the label "3" refers to the regulating tank 3, and the line on the left of the label "23" refers to the third flow channel 23. The regulating tank 3 includes a variable-volume liquid replenishment chamber 311 and a variable-volume liquid storage chamber 312. The label "311" is marked in the liquid replenishment chamber 311, and the label "312" is marked in the liquid storage chamber 312. One of the first flow channel 21 and the second flow channel 22 is connected to the liquid storage chamber 312 through the third flow channel 23. Figure 3In the example shown, the first flow channel 21 (eg, the input main flow channel 211 or the output main flow channel 212) communicates with the liquid storage chamber 312 through the third flow channel 23. In other examples, the second flow channel 22 communicates with the liquid storage chamber 312 through the third flow channel 23.

[0095] When the pressure of the secondary circuit is high, refer to Figure 3 , the working fluid in the first flow channel 21 will be pressed into the liquid storage chamber 312 (through the third flow channel 23), and the volume of the liquid storage chamber 312 will increase. When the pressure of the secondary side circuit is low, the working fluid in the liquid storage chamber 312 will be squeezed into the first flow channel 21 (through the third flow channel 23), so that the volume of the liquid storage chamber 312 will decrease. In the above manner, the pressure of the secondary side circuit is regulated, which plays a role in stabilizing the pressure.

[0096] Figure 6 The structure of a regulating tank 3 is exemplarily shown, wherein the regulating tank 3 includes a tank body 31 and a partition 32. A cavity is formed inside the tank body 31, and the partition 32 is arranged in the cavity inside the tank body 31. The cavity inside the tank body 31 includes a variable-volume fluid infusion chamber 311 and a variable-volume fluid storage chamber 312. The fluid storage chamber 312 and the fluid infusion chamber 311 are separated by the partition 32. The partition 32 is used to adjust the volumes of the fluid infusion chamber 311 and the fluid storage chamber 312 under the action of pressure.

[0097] Figure 7 The example shows Figure 6 Another state of the middle regulating tank 3, refer to Figure 6 and Figure 7 The separator 32 is in the form of a membrane and has elasticity. For example, the separator 32 is an elastic membrane (rubber membrane, plastic film, etc.), and the edge of the separator 32 is fixedly connected to the inner wall surface of the tank body 31. Elasticity refers to the property of an object that can restore its original size and shape after deformation, that is, the separator 32 can be deformed repeatedly.

[0098] In the case where the partition 32 is an elastic membrane structure, the partition 32 adjusts the volume of the liquid storage chamber 312 and the liquid replenishment chamber 311 by deformation. That is, when the pressure inside the liquid storage chamber 312 or the liquid replenishment chamber 311 increases, the partition 32 will deform under the action of the pressure, and the volume of the liquid replenishment chamber 311 and the liquid storage chamber 312 will change during the deformation of the partition 32. For example, when the pressure of the secondary side circuit is relatively high, the working fluid in the first flow channel 21 will be pressed into the liquid storage chamber 312, and the partition 32 will increase the volume of the liquid storage chamber 312 and reduce the volume of the liquid replenishment chamber 311. For details, please refer to Figure 6 to Figure 7 When the pressure of the circulation loop is low, the working fluid in the liquid storage chamber 312 will be squeezed into the first flow channel 21, the partition 32 reduces the volume of the liquid storage chamber 312, and increases the volume of the liquid replenishment chamber 311. For details, please refer to Figure 7 to Figure 6In other examples, the partition 32 may also protrude toward one side of the liquid storage chamber 312 .

[0099] In the example where the partition 32 is an elastic membrane, since the edge of the partition 32 is fixed to the tank body 31, most of the deformation area of ​​the partition 32 is in the middle of the partition 32. In this way, the possibility of the partition 32 contacting the periphery of the tank body 31 during the elastic activity is reduced, and the possibility of rusted materials inside the tank body 31 being scratched and dropped by the partition 32 is reduced, thereby reducing the risk of rusted materials entering the liquid cooling system 100 and contaminating the working fluid (the pressure stabilizing component 500 in the related technology is in the form of an airbag, which is easy to scratch the inner wall of the expansion tank when inflated, causing the rusted materials to fall off).

[0100] Figure 8 and Fig. 9 Another structure of the regulating tank 3 is shown as an example. Figure 8 and Fig. 9 It is intended to indicate two different states of the regulating tank 3. Figure 8 and Fig. 9 The partition 32 is a piston, and the partition 32 moves along the distribution direction of the liquid replenishing chamber 311 and the liquid storage chamber 312.

[0101] When the partition 32 is a piston, the partition 32 can adjust the volume of the liquid storage chamber 312 and the liquid replenishing chamber 311 in a movable manner. For example, when the pressure of the secondary circuit is low, the partition 32 will move toward the liquid storage chamber 312. For details, please refer to Figures 8 to 9 conversely, when the pressure of the secondary circuit is high, the internal pressure of the liquid storage chamber 312 increases, and the separator 32 moves toward the liquid replenishment chamber 311. For details, please refer to Figure 9 to Figure 8 process.

[0102] It should be noted that Figure 6 and Figure 7 Changes in the middle separator 32, and Figure 8 and Fig. 9 The change of the middle separator 32 is only an example and is not a limitation on the deformation degree and movement position of the separator 32 of the present application.

[0103] In addition, in some examples, reference Figures 6 to 9As shown in any of the accompanying drawings in the figure, the regulating tank 3 also includes a pressure relief channel 33 and a pressure relief valve 34 (for example, a solenoid valve), one end of the pressure relief channel 33 is connected to the liquid replenishing chamber 311, and the other end is connected to the liquid storage chamber 312, wherein the pressure relief channel 33 can be located inside the pressure relief pipe, and the pressure relief pipe can be arranged outside the tank body 31, and the pressure relief channel 33 is provided with a pressure relief valve 34, and the pressure relief valve 34 is used to block or conduct the pressure relief channel 33. When the internal pressure of the liquid storage chamber 312 is too large, for example, after a large amount of liquid in the secondary side circuit is pressed into the liquid storage chamber 312, in order to adjust the internal pressure of the liquid storage chamber 312, the pressure relief valve 34 can be opened, so that the liquid in the liquid storage chamber 312 enters the liquid replenishing chamber 311 through the pressure relief channel 33, and the pressure relief of the liquid storage chamber 312 is completed, thereby reducing the possibility of damage to the partition 32, and also reducing the possibility of damage to the regulating tank 3 due to excessive imbalance of the internal pressure of the regulating tank 3.

[0104] In some other examples, when the partition 32 is a piston, the pressure relief channel 33 can be formed on the partition 32, and the pressure relief channel 33 extends along the distribution direction of the fluid replenishment chamber 311 and the fluid storage chamber 312, and the pressure relief valve 34 located in the pressure relief channel 33 can also be set on the partition 32.

[0105] The regulating tank 3 of the present application can not only regulate the pressure, but also supplement the working medium. The cooling capacity distribution device 30 also has a liquid replenishing state. Fig.10 The flow of the working medium in the cooling capacity distribution device 30 in the liquid replenishment state is exemplarily shown. In the liquid replenishment state, the first pump body 4 is connected to the liquid replenishment chamber 311 and the liquid storage chamber 312. The first pump body 4 is used to replenish the working medium in the liquid replenishment chamber 311 into the liquid storage chamber 312. Fig.10 The dotted arrow in the figure shows the path of the working medium during the replenishment. When the working medium needs to be supplemented in the secondary circuit, the cooling capacity distribution device 30 enters the replenishment state. In this state, the first pump body 4 connects the replenishment chamber 311 and the liquid storage chamber 312, and drives the first pump body 4 to replenish the working medium in the replenishment chamber 311 into the liquid storage chamber 312. After the working medium enters the liquid storage chamber 312, the internal pressure of the liquid storage chamber 312 increases. Under the pressure of the internal pressure of the liquid storage chamber 312, the working medium in the replenishment chamber 311 will enter the first flow channel 21 or the second flow channel 22, so as to replenish the working medium in the secondary circuit.

[0106] The two chambers of the regulating tank 3 can be connected to the first pump body 4 in any suitable manner. Fig.10The cold capacity distribution device 30 further includes a fourth flow channel 24 and a fifth flow channel 25. The line below the label "24" refers to the fourth flow channel 24, and the line below the label "25" refers to the fifth flow channel 25. The liquid replenishing chamber 311 is connected to the branch flow channel 213 provided with the first pump body 4 through the fourth flow channel 24, and the connection position is located upstream of the first pump body 4. The liquid storage chamber 312 is connected to the branch flow channel 213 provided with the first pump body 4 through the fifth flow channel 25, and the communication position is located downstream of the first pump body 4.

[0107] In the liquid replenishing state, the heat exchanger 1 and the cold plate 20 (the cold plate 20 can refer to Figure 2 ) are disconnected from the first pump body 4 (disconnected, that is, not connected), or in other words, the heat exchanger 1 and the cold plate 20 are not connected to the first pump body 4, and the first pump body 4 is connected to the liquid replenishment chamber 311 and the liquid storage chamber 312. For example, the input main channel 211 is disconnected from the branch channel 213 provided with the first pump body 4 (the input main channel 211 is not connected to the branch channel 213 provided with the first pump body 4), and the input main channel 211 is connected to the branch channel 213 provided with the second pump body 5. At this time, the first pump body 4 can independently replenish the fluid, and the second pump body 5 drives the working fluid to flow between the heat exchanger 1 and the cold plate 20, so that the working fluid circulates normally in the secondary side circuit, Fig.10 The solid arrows in the figure show the circulation path of the working medium in the secondary circuit. In the replenishing state, the replenishing chamber 311 is connected to the branch channel 213 provided with the first pump body 4 through the fourth channel 24, and the connecting position is located upstream of the first pump body 4, and the liquid storage chamber 312 is connected to the branch channel 213 provided with the first pump body 4 through the fifth channel 25, and the connecting position is located downstream of the first pump body 4. When the first pump body 4 is running, the working medium in the replenishing chamber 311 will enter the corresponding branch channel 213 through the fourth channel 24, flow through the first pump body 4, and then flow into the liquid storage chamber 312 from the connecting position between the fifth channel 25 and the branch channel 213, completing the replenishment of the liquid storage chamber 312.

[0108] Fig.11 The flow condition of the cold distribution device 30 in the running state is shown by way of example. In the running state, the liquid replenishment chamber 311 and the liquid storage chamber 312 are disconnected from the first pump body 4, and at least one of the first pump body 4 and the second pump body 5 drives the working medium in the first flow channel 21 to flow between the second heat exchange channel 12 and the cold plate 20. For example, the liquid replenishment chamber 311 and the liquid storage chamber 312 are disconnected from the branch flow channel 213 provided with the first pump body 4, and the input main flow channel 211 is connected to the branch flow channel 213 provided with the first pump body 4 (the flow path of the working medium in the branch flow channel 213 can be referred to Fig.11 The dotted arrow in the figure), or the input main channel 211 is connected to the branch channel 213 provided with the second pump body 5 (the flow path of the working medium in the branch channel 213 can be referred to Fig.11The double-dot long dashed line arrow in the figure), or the input main flow channel 211 is connected to the above two branch flow channels 213 (the flow path of the working medium in the two branch flow channels 213 can be referred to Fig.11 The dashed arrow and the double-dotted long dashed arrow in the figure). Fig.11 The solid arrows in 20 indicate the paths of the working fluid flowing in the input main flow channel 211 , the output main flow channel 212 and the second flow channel 22 .

[0109] In addition, the connection and disconnection between the regulating tank 3 and the corresponding branch channel 213 can be achieved by any suitable method. In an example provided in this application, refer to Fig.10 and Fig.11 , the first flow channel 21 also includes a first multi-way valve 214 (for example, a three-way valve) and a second multi-way valve 215 (for example, a three-way valve), the T-shaped frame below the label "214" refers to the first multi-way valve 214, and the T-shaped frame on the left side of the label "215" refers to the second multi-way valve 215. The first multi-way valve 214 and the second multi-way valve 215 are both connected to the branch channel 213 provided with the first pump body 4, the first multi-way valve 214 is arranged upstream of the first pump body 4, and the first multi-way valve 214 is used to control the connection or disconnection between the first pump body 4 and the liquid replenishing chamber 311, and the second multi-way valve 215 is arranged downstream of the first pump body 4, and the second multi-way valve 215 is used to control the connection or disconnection between the first pump body 4 and the liquid storage chamber 312. By arranging the first multi-way valve 214 and the second multi-way valve 215 on the branch channel 213, it is conducive to realizing the control of the on-off.

[0110] In the example of setting the first multi-way valve 214 and the second multi-way valve 215, in the liquid replenishing state, refer to Fig.10 The first multi-way valve 214 can conduct the communication between the branch channel 213 provided with the first pump body 4 and the liquid replenishing chamber 311, and the second multi-way valve 215 can conduct the communication between the branch channel 213 provided with the first pump body 4 and the liquid storage chamber 312. In the running state, refer to Fig.11 The first multi-way valve 214 can block the connection between the branch channel 213 provided with the first pump body 4 and the liquid replenishing chamber 311, and the second multi-way valve 215 can block the connection between the branch channel 213 provided with the first pump body 4 and the liquid storage chamber 312.

[0111] The present application integrates multiple components by setting an "integrated" regulating tank 3, so that the two functions of pressure regulation and working fluid replenishment are combined in one component, so that the valve body, sensor and other components that were originally required when the liquid replenishment component and the pressure stabilizing component 500 were set separately are shared by the integrated regulating tank 3, eliminating the configuration of multiple components, reducing costs, reducing the volume of the cold distribution device 30, and saving the installation space of the cold distribution device 30.

[0112] In addition, the first pump body 4 can use variable frequency regulation to adjust the flow rate and head so that the first pump body 4 can adapt to the fluid replenishment state and the operating state. For example, in the fluid replenishment state, the rotation speed of the first pump body 4 during fluid replenishment is relatively low. In the operating state, the rotation speed of the first pump body 4 driving the working fluid to flow in the secondary side circuit is relatively high.

[0113] In some examples, the reference is returned Figures 6 to 9 In any of the accompanying drawings, the regulating tank 3 also includes a liquid level meter 35, which is used to detect the liquid level of the working medium inside the liquid replenishment chamber 311. Among them, the liquid level meter 35 can be a liquid level tube, the liquid level meter 35 extends in the vertical direction, and the two ends of the liquid level meter 35 have a height difference. Both ends of the liquid level meter 35 are connected to the liquid replenishment chamber 311. By observing the height of the working medium inside the liquid level meter 35, the height of the working medium in the liquid replenishment chamber 311 can be judged. The liquid level meter 35 can also be a liquid level sensor, and the liquid level meter 35 partially or completely extends into the liquid replenishment chamber 311. By transmitting electrical signals, auxiliary equipment or personnel can judge the liquid level of the working medium inside the liquid replenishment chamber 311.

[0114] A liquid level meter 35 is provided to detect the liquid level of the working medium in the liquid replenishment chamber 311. When the working medium in the liquid replenishment chamber 311 needs to be replenished into the liquid storage chamber 312, the liquid level meter 35 can be used to first determine whether there is enough working medium in the liquid replenishment chamber 311. For example, if the working medium in the liquid replenishment chamber 311 is sufficient, the working medium in the liquid replenishment chamber 311 is replenished into the liquid storage chamber 312 through the first pump body 4; if the working medium in the liquid replenishment chamber 311 is less, the working medium is added to the liquid replenishment chamber 311, and then the working medium in the liquid replenishment chamber 311 is replenished into the liquid storage chamber 312 through the first pump body 4.

[0115] Among them, the start signal of the cold distribution device 30 to start the liquid replenishment state can be determined by the liquid level meter 35 and any second pressure detector 6 that can detect the pressure of the secondary side circuit, that is, when the pressure of the secondary side circuit is too low and needs liquid replenishment, and there is enough working fluid in the liquid replenishment chamber 311, the cold distribution device 30 can enter the liquid replenishment state. The closing signal of the cold distribution device 30 to end the liquid replenishment state can be determined by the second pressure detector 6 (inlet pressure detector) upstream of the second pump body 5 or the second pressure detector 6 (outlet pressure detector) downstream of the second pump body 5. That is, when the pressure of the secondary side circuit reaches normal, the cold distribution device 30 ends the liquid replenishment state.

[0116] In some examples, the regulating tank 3 may further include a liquid replenishing port 36 and a blocking cover 37, see Figures 6 to 9In any of the accompanying drawings, the refill port 36 is arranged at the top of the tank body 31, the refill port 36 is connected to the refill chamber 311, and the blocking cover 37 is arranged at the refill port 36 and is used to open or block the refill port 36. Among them, the blocking cover 37 can be detachably connected to the refill port 36, or movably connected. When the working fluid in the refill chamber 311 is replenished into the liquid storage chamber 312 through the first pump body 4, the working fluid in the refill chamber 311 will be reduced, and the refill port 36 can be exposed by opening the blocking cover 37, and then the working fluid is replenished into the refill chamber 311 through the refill port 36. After the refill is completed, the refill port 36 is blocked by the blocking cover 37 to close the refill chamber 311, thereby realizing the maintenance of the regulating tank 3.

[0117] Reference Figures 6 to 9 As shown in any of the accompanying drawings, the regulating tank 3 may further include an air valve 38, which is connected to the tank body 31, and is used to conduct or block the liquid replenishment chamber 311 and the space outside the tank body 31. The air valve 38 may be an electromagnetic valve or a manual valve, and the air valve 38 may be arranged at the top of the tank body 31, or at other suitable positions of the tank body 31 (for example, on the peripheral wall of the tank body 31). Opening the air valve 38 can make the liquid replenishment chamber 311 communicate with the space outside the tank body 31, and closing the air valve 38 can disconnect the liquid replenishment chamber 311 from the space outside the tank body 31. For example, when the pressure in the liquid replenishment chamber 311 is too high, the pressure in the liquid replenishment chamber 311 can be released by opening the air valve 38; when the pressure in the liquid replenishment chamber 311 is too low, the gas can be injected into the liquid replenishment chamber 311 by opening the air valve 38 to increase the internal pressure of the liquid replenishment chamber 311.

[0118] The regulating tank 3 may also include a first pressure detector 39, see Figure 8 or Fig. 9 The first pressure detector 39 is located outside the tank body 31, and the first pressure detector 39 is connected to the gas valve 38. The first pressure detector 39 is used to detect the pressure in the liquid infusion chamber 311 through the gas valve 38. The first pressure detector 39 is externally connected to the gas valve 38 to detect the pressure in the liquid infusion chamber 311, which can assist in determining whether the pressure in the liquid infusion chamber 311 needs to be adjusted. For example, when the first pressure detector 39 detects that the pressure in the liquid infusion chamber 311 is too high, the pressure in the liquid infusion chamber 311 can be released; for another example, when the first pressure detector 39 detects that the pressure in the liquid infusion chamber 311 is too low, gas can be injected into the liquid infusion chamber 311 to add additional pressure.

[0119] In some examples, reference Figure 6 or Figure 7 , the first pressure detector 39 may not be externally connected to the gas valve 38.

[0120] The liquid replenishment chamber 311 and the liquid storage chamber 312 may be arranged in any suitable manner, for example, Figures 6 to 9 In any of the figures in FIG. 3 , the liquid infusion chamber 311 and the liquid storage chamber 312 are distributed in the vertical direction, and the liquid infusion chamber 311 is located above the liquid storage chamber 312, which is conducive to the arrangement of the gas valve 38 and the liquid infusion port 36, and is convenient for replenishing gas and liquid into the liquid infusion chamber 311. For another example, the liquid infusion chamber 311 and the liquid storage chamber 312 are distributed in the horizontal direction. Fig.12 This example is shown exemplarily, where the fluid infusion port 36 and the air valve 38 are arranged at the top of the fluid infusion chamber 311, wherein the fluid infusion chamber 311 and the fluid storage chamber 312 are distributed in a horizontal direction, which can reduce the possibility of the partition 32 moving toward the fluid infusion chamber 311 or the fluid storage chamber 312 under the action of gravity.

[0121] In one example, referring to Fig.12 A liquid replenishing valve 231 (manual valve or solenoid valve) can be provided on the third flow channel 23. During the operation of the cold distribution device 30 (whether in the operation state or the liquid replenishing state), the liquid replenishing valve 231 is opened. When the cold distribution device 30 needs to be repaired or maintained, the liquid replenishing valve 231 can be closed, thereby reducing the possibility of leakage of the working fluid during the repair and maintenance process.

[0122] Fig.13 Another structure of the cooling capacity distribution device 30 is shown as an example. Fig.13 , the first pump body 4 and the second pump body 5 are not arranged in parallel. In the replenishing state, the first pump body 4 connects the replenishing chamber 311 and the liquid storage chamber 312, and is used to replenish the working medium in the replenishing chamber 311 into the liquid storage chamber 312. The second pump body 5 is connected to the first flow channel 21, and the second pump body 5 is used to drive the working medium in the first flow channel 21 to flow between the second heat exchange channel 12 and the cold plate 20. That is, only the second pump body 5 is connected to the first flow channel 21, and the first pump body 4 and the second pump body 5 operate independently. During normal cooling, the second pump body 5 drives the working medium to flow along the secondary side circuit to complete the circulation of the working medium between the cold plate 20 and the heat exchanger 1. When it is necessary to replenish the secondary side circuit, the cold capacity distribution device 30 is in the replenishing state, the first pump body 4 connects the replenishing chamber 311 and the liquid storage chamber 312, and the first pump body 4 can replenish the working medium in the replenishing chamber 311 into the liquid storage chamber 312 when it is started.

[0123] Fig.14 The structure of another cold capacity distribution device 30 is shown by way of example, wherein the cold capacity distribution device 30 may further include a cabinet 7, and structures such as the heat exchanger 1, the regulating tank 3, the first pump body 4, the second pump body 5, the first flow channel 21, and the second flow channel 22 are all arranged in the cabinet 7, and a plurality of interfaces 71 for external pipes are provided on the cabinet 7, wherein the inlet and the outlet of the first heat exchange channel 11 are respectively connected to an interface 71, and the first flow channel 21 and the second flow channel 22 are respectively connected to an interface 71.

[0124] In addition, the cooling capacity distribution device 30 of the present application can also be applied in any suitable scenario. For example, the cooling capacity distribution device 30 can be applied in a cabinet server 700. Fig.15 The structure of a cabinet server 700 is shown as an example. Fig.15 The cabinet server 700 includes a cabinet 800, a plurality of servers 900, a plurality of cold plates 20 and a cold distribution device 30 ( Fig.15 In the example, one of the cooling distribution devices 30 provided in the present application is taken as an example). Among them, multiple servers 900, multiple cold plates 20 and the cooling distribution device 30 are all arranged in the cabinet 800, and each server 900 corresponds to one (or more) cold plates 20, and the cold plates 20 are used to dissipate heat for the corresponding servers 900. The first flow channel 21 and the second flow channel 22 connect the multiple cold plates 20 to form at least part of the secondary side circulation loop.

[0125] The flow channels of the present application, for example, the first flow channel 21, the second flow channel 22, the third flow channel 23, the fourth flow channel 24, the fifth flow channel 25, etc. can be realized by any suitable structure. For example, the first flow channel 21, the second flow channel 22, the third flow channel 23, the fourth flow channel 24, the fifth flow channel 25, etc. are respectively formed by different pipes.

[0126] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A cooling capacity distribution device, characterized in that: It includes a heat exchanger, a regulating tank and a first pump body; The heat exchanger comprises a first heat exchange channel and a second heat exchange channel, the first heat exchange channel is used to communicate with a cold source, and the inlet and outlet of the second heat exchange channel are both used to communicate with a cold plate; The regulating tank comprises a tank body and a partition, wherein the partition is arranged in the tank body, the tank body comprises a liquid replenishing chamber and a liquid storage chamber, the liquid storage chamber and the liquid replenishing chamber are separated by the partition, the partition is used to adjust the volumes of the liquid replenishing chamber and the liquid storage chamber under the action of pressure, and the liquid storage chamber is communicated with the second heat exchange channel; The cold capacity distribution device has a liquid replenishing state. In the liquid replenishing state, the first pump body is connected to the liquid replenishing chamber and the liquid storage chamber, and the first pump body is used to replenish the working medium in the liquid replenishing chamber into the liquid storage chamber.

2. The cooling capacity distribution device according to claim 1, characterized in that: The separator is in the shape of a membrane and has elasticity, and the edge portion of the separator is fixedly connected to the tank body; Alternatively, the partition is a piston, and the partition moves along the distribution direction of the liquid replenishing chamber and the liquid storage chamber.

3. The cooling capacity distribution device according to claim 1 or 2, characterized in that: The regulating tank also includes a pressure relief channel and a pressure relief valve. One end of the pressure relief channel is connected to the fluid replenishing chamber, and the other end is connected to the fluid storage chamber. The pressure relief channel is provided with the pressure relief valve, and the pressure relief valve is used to block or open the pressure relief channel.

4. The cooling capacity distribution device according to any one of claims 1 to 3, characterized in that: The regulating tank further comprises a liquid level meter, which is communicated with the liquid replenishing cavity or at least partially extends into the liquid replenishing cavity, and is used to detect the liquid level of the working medium inside the liquid replenishing cavity.

5. The cooling capacity distribution device according to any one of claims 1 to 4, characterized in that: The regulating tank also includes a liquid infusion port and a sealing cover. The liquid infusion port is arranged on the top of the tank body and is connected to the liquid infusion cavity. The sealing cover is arranged at the liquid infusion port and is used to open or seal the liquid infusion port.

6. The cooling capacity distribution device according to any one of claims 1 to 5, characterized in that: The regulating tank further comprises an air valve, which is connected to the tank body and is used for conducting or blocking the fluid infusion cavity and the space outside the tank body.

7. The cooling capacity distribution device according to claim 6, characterized in that: The regulating tank also includes a first pressure detector, which is located outside the tank body and connected to the air valve. The first pressure detector is used to detect the pressure in the fluid infusion chamber through the air valve.

8. The cooling capacity distribution device according to any one of claims 1 to 7, characterized in that: The cold distribution device further comprises a second pump body, wherein the first pump body and the second pump body are connected in parallel; The cold distribution device also has an operating state, in which the liquid replenishing chamber and the liquid storage chamber are both disconnected from the first pump body, and at least one of the first pump body and the second pump body is used to drive the working medium in the second heat exchange channel to flow between the second heat exchange channel and the cold plate; In the fluid replenishing state, the heat exchanger and the cold plate are disconnected from the first pump body, and the first pump body is connected to the fluid replenishing chamber and the fluid storage chamber.

9. The cooling capacity distribution device according to claim 8, characterized in that: The cooling capacity distribution device further includes a first flow channel and a second flow channel, one of the inlet and the outlet of the second heat exchange channel is communicated with the first flow channel, and the other is communicated with the second flow channel, the first flow channel includes an input main flow channel, an output main flow channel and a plurality of branch flow channels, one of the input main flow channel and the output main flow channel is communicated with the second heat exchange channel, and the other is used to communicate with the cold plate, each of the plurality of branch flow channels is connected to the input main flow channel at one end, and connected to the output main flow channel at the other end, the first pump body and the second pump body are respectively connected to two different branch flow channels of the plurality of branch flow channels, and one of the input main flow channel, the output main flow channel and the second flow channel is communicated with the liquid storage chamber; In the operating state, the liquid infusion chamber and the liquid storage chamber are both disconnected from the branch channel provided with the first pump body, and the main input channel is connected to the branch channel provided with the first pump body or the branch channel provided with the second pump body; In the fluid replenishment state, the main input channel is disconnected from the branch channel provided with the first pump body, the fluid replenishment chamber and the fluid storage chamber are both connected to the branch channel provided with the first pump body, and the main input channel is connected to the branch channel provided with the second pump body.

10. The cooling capacity distribution device according to claim 9, characterized in that: The first flow channel also includes a first multi-way valve and a second multi-way valve, both of which are connected to the branch flow channel where the first pump body is provided, the first multi-way valve is used to control the connection or disconnection between the first pump body and the fluid infusion chamber, and the second multi-way valve is used to control the connection or disconnection between the first pump body and the fluid storage chamber.

11. The cooling capacity distribution device according to claim 9 or 10, characterized in that: The first flow channel further includes a third multi-way valve for controlling on-off, and the input main flow channel is connected to the plurality of branch flow channels via the third multi-way valve.

12. The cooling capacity distribution device according to any one of claims 1 to 7, characterized in that: The cooling capacity distribution device further includes a second pump body, and the second pump body is used to drive the working medium in the second heat exchange channel to flow between the second heat exchange channel and the cold plate.

13. The cooling capacity distribution device according to any one of claims 1 to 12, characterized in that: The cooling capacity distribution device further includes a first flow channel and a plurality of second pressure detectors. The inlet or outlet of the second heat exchange channel is in communication with the first flow channel. The first flow channel is provided with at least some of the plurality of second pressure detectors.

14. The cooling capacity distribution device according to any one of claims 1 to 13, characterized in that: The liquid replenishing chamber and the liquid storage chamber are distributed in a vertical direction, and the liquid replenishing chamber is located above the liquid storage chamber; Alternatively, the liquid replenishing chamber and the liquid storage chamber are distributed in a horizontal direction.

15. A liquid cooling system, characterized in that: It comprises a cold source, a cold plate and a cold distribution device according to any one of claims 1 to 14, wherein the first heat exchange channel is connected to the cold source, one of the inlet and the outlet of the second heat exchange channel is connected to the cold plate through a first flow channel, and the other is connected to the cold plate through a second flow channel.