By setting up an electronic sensing display and a combined structure of the ring main bridge and the upper and lower bridge passage on the new roundabout, the problem of slow traffic at the intersection of traditional overpasses is solved, and the rapid passage of vehicles and pedestrians is achieved.
Patent Information
- Application Number
- CN202411275030.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-18
- Publication Date
- 2024-11-15
AI Technical Summary
The problem of slow traffic at intersections of traditional overpasses, vehicles and pedestrians need to wait for multiple traffic light signals, resulting in congestion under the bridge and congestion on the main road.
A new round overpass was designed, adopting a combined structure of the ring main bridge and eight upper and lower bridge channels. An electronic induction display is set at the upper and lower bridge entrances. By inducing the vehicle density and driving speed, the vehicle passes are monitored and guided in real time. Reduced dependence on traditional traffic lights.
It achieves smooth traffic between vehicles and pedestrians, reduces waiting time at intersections, improves traffic speed, and avoids congestion under and on the bridge.
Smart Images

Figure SMS_1 
Figure SMS_2 
Figure SMS_3
Abstract
Description
Technical Field
[0002] The technical design field of a new type of circular flyover, the technical design field of the new type of circular flyover is the circular main body design of the circular flyover, the main body design includes a combination of a circular main bridge (1) and eight upper bridge channels and lower bridge channels (2)(3)(4)(5) connected to the circular main bridge, and an electronic information sensing display set at the upper bridge intersection and the lower bridge intersection of the circular main bridge, the electronic sensing display can sense the temperature and driving speed of vehicles, the electronic information sensing transmission display, the electronic information sensor can sense the vehicle density number and the vehicle driving speed on the bridge surface at the upper bridge entrance and the lower bridge entrance, and then transmit the sensed information to the electronic display at a clear visual position on the bridge, so that all surrounding vehicles can quickly see all the road conditions on the bridge surface, the electronic sensing display will use color and text to display the safe driving road conditions on the bridge surface, the display uses color to display the vehicle driving density and safety warnings on the bridge surface, the display is divided into three colors, namely green, yellow and red, to prompt and warn the safe driving conditions on the bridge, green means smooth passage without obstacles, yellow means that there are many vehicles on the bridge surface and the vehicles are driving slowly, and red means that there is a traffic failure on the bridge surface and warns the following vehicles to detour. The text on the display shows the road conditions on the bridge deck, and the corresponding intersection shows the exit name ahead, weather conditions, temperature and other service information. Vehicles traveling on the bridge can clearly feel all the information on the bridge deck. The electronic sensor can also be linked to the electronic navigation to guide vehicles to drive safely through the navigator, so the electronic sensor display can effectively control the vehicle density and vehicle speed on the circular bridge. The combination of this technical effect and the scientific method of natural guidance of vehicle operation on the circular bridge perfectly solves the technical problem of complex traffic needs at road intersections, allowing vehicles and pedestrians at road intersections to move freely and orderly, and clearing the technical problem of poor traffic at intersections. This technical effect can solve the technical problem of slow traffic at road intersections. 1. The design technology of the circular overpass is that the circular main bridge can guide all vehicles and pedestrians passing through the intersection. What can support this demand is the high-tech electronic sensing display and overall bridge design technology set on the upper bridge channel and the lower bridge channel of (2)(3)(4)(5) connecting the circular main bridge. All vehicles passing through the intersection can pass or turn on the circular bridge. Technology 2 of the circular overpass is that the circular overpass is designed with eight upper and lower circular main bridge channels of the auxiliary circular overpass. Vehicles passing through the intersection can pass through the upper bridge channel or the lower bridge channel. The technical design of the new circular overpass improves the speed of vehicles passing through the road intersection. This is the technical effect of the circular overpass of the present invention. The overall traffic combination effect technology is designed to solve the technical problem of poor traffic at the road intersection, which solves the technical problem of poor traffic at the road intersection.Because the design technology of the new type of circular overpass makes full use of natural science to guide vehicles and pedestrians who need to pass through various aspects of the road intersection, the innovation is that it eliminates the control of traffic lights around the overpass, and vehicles and pedestrians who need to pass through the intersection can pass quickly and orderly, saving the time for vehicles and pedestrians to pass through the intersection. The overall technical design of the circular overpass can solve the technical problem of poor traffic at road intersections.
[0003] 1. The technical design of the circular overpass is natural and simple. The main bridge deck (1) of the new circular overpass is designed as an integral high-strength steel frame to make the bridge deck more solid. A waterproof groove is designed on the upper edge of the bridge deck to prevent the bridge deck from being slippery in rainy and snowy weather. The left and right sides of the circular bridge deck are provided with cross-section prefabricated beams with the same width as the main road to connect the two-way driving lanes (2) on the main road. After the connection, it is convenient to guide the vehicles on the main road (2) to pass or turn on the circular bridge (1). Since the bridge deck of the new circular overpass is a hollow ring design, it can more effectively guide the vehicles on the bridge deck to pass quickly on the bridge. 2. The 36 bridge columns (7) supporting the main bridge deck are circular bridge columns with a height of 3.5 meters and a radius of one meter. The bridge columns (7) are made of reinforced concrete, and high-tech means are also used to make the bridge columns more solid and durable. The bridge columns (7) are arranged to avoid the road surface under the bridge and are arranged on the edge of the paved road or on the isolation belt of the road, so as not to affect the passage of vehicles on the paved road. The bridge columns are spaced about 10 meters apart and are evenly supported at various support points of the circular bridge deck and effectively connected with the main bridge deck and the steel frame, thereby fixing the entire circular overpass deck. 3. Six circular bridge columns are arranged under the upper bridge passage (4) and the lower bridge passage (5) which are about 30 meters long and 5 meters wide and lead to the circular bridge deck on the paving (3) as support. The passage is also connected to the prefabricated crossbeams with the same width as the paving (3) passage reserved before and after the circular bridge deck (1). The passage is designed as a sloped passage with a 20-degree angle at the end. Waterproof grooves are also designed on both sides of the passage to prevent slippery roads due to rain and snow. The edge of the passage is a 1-meter high guardrail (8) to ensure the safety of vehicle traffic. Several energy-saving lighting street lamps will be arranged on the edge of the guardrail to facilitate vehicle driving at night. The bridge columns designed under the passage are because the passage is built on the edge of the paving (3) to lead to the circular bridge deck. Therefore, the bridge columns (7) are minimized under the passage, and only six circular bridge columns (7) are arranged as support to avoid affecting the traffic of vehicles on the paving (3). In actual construction, the passage will be negotiated with the engineering and technology department to use high-tech construction measures to implement an integrated crossbeam structure to solve the support problem under the passage. 4. The 1-meter-high guardrail (8) at the edge of the circular bridge deck is designed as a hollow guardrail to facilitate the wide observation field of view of vehicles passing on the bridge. In addition, due to the design of the hollow guardrail and the wide density bridge column setting, the bridge has more waterproof and windproof functions. 5. The pedestrian bridge (6) is set beside the circular bridge. The bridge is 30 meters long, 3 meters wide and 3.5 meters high. There are 6 bridge columns and guardrails (8) under the bridge, which are 1 meter high. In addition, in actual construction, it can also be set according to the local terrain. If it is set at a crossroad with a subway station, the pedestrian bridge setting will be reduced, and the subway passage will be directly used for pedestrians to pass. 6. The pedestrian zebra crossing is set for the convenience of pedestrians who need to pass through the main road. It is set on both sides of the paved road under the bridge and does not affect the road traffic.
[0004] The technical design of the new type of circular overpass can simultaneously solve the two needs of vehicles and pedestrians. One is that vehicles and pedestrians need to go straight, and the other is that vehicles and pedestrians need to turn. Vehicles can go on and off the circular bridge (1) through the upper and lower bridge passages (4) (5) and quickly pass through the intersection of the road. In addition, the technical design of the circular overpass also solves the traffic needs of pedestrians who need to go straight and turn. Pedestrians can pass on the pedestrian overpasses set before and after the circular bridge or on the pedestrian zebra crossings on both sides of the paved road under the bridge, and can also quickly pass through the intersection of the road. In addition, all vehicles and pedestrians who need to pass through the circular overpass also need to pass in order when passing through the circular overpass. The circular overpass will regulate vehicle traffic according to the order of vehicles as traffic rules. The bridge deck of the circular overpass is 20 meters wide and 50 meters long, and the hollow circle in the middle is 30 meters long. A solid line of about 5 meters long will be set at the upper and lower bridge passages on the circular bridge deck. There are 4 upper bridge passages and 4 lower bridge passages on the circular bridge deck. After the vehicle goes on the bridge, it will pass along the solid line to the dotted line and then merge to the crossing where it needs to go down the bridge. No vehicle can cross the solid line. Dotted lines are used outside the 5-meter solid line to regulate vehicles. Three lanes controlled by dotted lines will be set on the bridge deck, 12 meters in the middle and 4 meters wide on both sides to serve the traffic of vehicles. In addition, the speed limit of the bridge is 30 to 50 miles per hour, so that vehicles will not run sideways after going on the bridge, and will travel slowly and orderly to ensure the safety of vehicle traffic. In addition, the bridge uses a circular natural diversion vehicle traffic design, so there is no need to set up traffic lights at the four corners of the bridge to control pedestrian traffic and vehicle driving, so it can greatly save the travel time of vehicles and pedestrians. This technical design is a new type of circular overpass technology that diverts vehicles and pedestrians through road intersections quickly, so that vehicles and pedestrians do not have to wait for traffic lights at intersections, so that vehicles and pedestrians can come and go as they please, avoiding vehicles and pedestrians from being stranded at intersections.
[0005] Innovative content
[0006] The innovative parts of this new type of circular overpass are 1. The designed circular main bridge can smoothly guide the passage of vehicles; 2. Eight auxiliary circular main bridges are designed for the passage of vehicles; 3. Electronic induction conduction displays are set at the upper and lower bridge entrances of the circular overpass to sense and control the vehicle density and vehicle speed on the circular bridge; 4. The circular overpass does not need to be equipped with traffic lights at the four corners of the intersection, so the circular overpass can meet the needs of vehicles that need to go straight or turn on the bridge deck to pass and turn at any time. Vehicles can drive along the circular road to the intersection where they need to get on or off the bridge, and solid lines and dotted lines are used on the circular bridge deck to facilitate vehicle traffic trajectory and driving speed. "Because vehicles on the main road of a traditional overpass need to go straight on the bridge, while vehicles that need to turn have to go down the side road next to the main road and turn under the bridge, resulting in a large number of vehicles crossing the road and waiting for multiple traffic lights, which causes congestion under the bridge. The congestion under the bridge will be transmitted to the congestion under the bridge and even the main road. (2) Vehicles that need to pass on the paved road under the circular overpass can pass directly under the bridge, while vehicles that need to turn on the paved road can turn left or right on the bridge in the passage leading to the main bridge. Pedestrians who need to pass under the bridge can pass on the pedestrian zebra crossings on both sides of the bridge in the direction of the paved road. Pedestrians can pass directly and separate from vehicles. "Because vehicles that need to go straight or turn under the bridge of a traditional overpass have to wait for multiple traffic lights to pass under the bridge, and pedestrians who need to cross the road will further increase the traffic burden under the bridge, thus causing congestion under the bridge. "(3) The overpass has diverted all vehicles that need to pass or turn on the auxiliary road next to the main road to the circular overpass for straight or turning. Therefore, vehicles on the auxiliary road next to the main road under the bridge cannot pass directly. There is no traffic flow on the paved road under the bridge to block vehicles and pedestrians who need to pass on the paved road. Therefore, vehicles and pedestrians on the paved road can pass directly without waiting for the traffic lights at the four corners under the bridge. Therefore, vehicles traveling in both directions on the main road can pass or turn left or right at any time on the circular overpass. Pedestrians who need to pass the paved road in the direction of the main road can pass on the pedestrian bridges on both sides of the circular bridge.
[0007] [Specific traffic rules for the roundabout] Traffic rules. The specific traffic rules for the roundabout do not conflict with the original national road traffic rules. That is to say, the roundabout is applicable to the original national road traffic rules. There are also some specific traffic rules applicable to the roundabout. First, the characteristic of the new roundabout is that vehicles and pedestrians can pass naturally as they come and go. The specific rules stipulate that vehicles on and off the bridge should slow down in an orderly manner and follow the order of vehicles passing in order to adapt to the original traffic rules. Second, the width of the roundabout bridge is 20 meters. Three circular lanes with inner and outer widths of 4 meters and a middle width of 12 meters are set on the bridge with solid and dotted lines. The inner 4-meter-wide lane is an emergency lane, the outer 4-meter-wide lane is an upper and lower bridge buffer lane, and the middle 12-meter-wide lane is a normal driving lane. Third, it is stipulated that vehicles on and off the bridge should drive on the required roads and not overtake or change lanes at will. Fourth, it is stipulated that when there are multiple vehicles on the bridge, the vehicles need to slow down and drive slowly, and the speed is stipulated to be 30 to 50 miles per hour. Fifth, it is stipulated that when there are multiple vehicles driving on the bridge deck, vehicles driving in parallel should pay attention to avoid vehicles getting off the bridge. High-definition cameras will be installed at the intersections above and below the roundabout bridge to monitor the driving conditions of vehicles. If traffic accidents such as scratches occur, they will be handled in accordance with the original national traffic rules. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will implement a turn. There is no longitudinal driving channel under the bridge on the auxiliary road, and there is no traffic crossing the paved road under the bridge, which will not cause obstruction to pedestrians and vehicles passing on the paved road. Therefore, pedestrians who need to pass the main road on the left and right sides of the intersection can pass through the pedestrian zebra crossings on both sides under the circular bridge, and pedestrians who need to pass the paved road on the front and back sides can pass through the two pedestrian bridges under the bridge in the direction of the main road. The traffic lights at the four corners of the intersection can be omitted and do not need to be set.
[0009] The specific implementation method is
[0010] The new type of circular overpass design technology is a circular overpass main bridge. The electronic information sensing displays installed at the upper and lower bridge entrances of the circular overpass use text and color to monitor and guide the traffic order and safety of vehicles and pedestrians on the circular overpass. The invention is specifically embodied in the actual needs of vehicles and pedestrians who need to pass through the intersection. When vehicles and pedestrians pass through the road intersection, they have actual needs to go straight through, turn left or turn right. The new overpass can meet these needs of vehicles and pedestrians at the same time. 1. When a vehicle needs to go straight through the intersection from north to south, it can directly pass through the auxiliary road (3) below the circular overpass without obstacles. 2. When pedestrians need to go straight from north to south at the intersection, they can directly pass through the (9) pedestrian zebra crossings on both sides of the auxiliary road below the circular overpass. 3. When a vehicle needs to go straight from east to west at the intersection, it can directly pass along the circular bridge deck (1) on the circular overpass. 4. When pedestrians need to go straight from east to west, they can directly pass through the (6) pedestrian bridges on both sides of the circular bridge. 5. Vehicles that need to turn right can make a right turn on the (1) roundabout bridge through the (4) upper bridge channel or the (5) lower bridge channel of the roundabout bridge. 6. Vehicles that need to turn left can also make a left turn through the (4) upper bridge channel or the (5) lower bridge channel of the roundabout bridge.
[0011] For example, the roundabout in Fangzhuang, Beijing, is a circular bridge deck, but the difference is that this invention is an overpass circular bridge. Fangzhuang is a flat roundabout. The same thing is that vehicles and pedestrians can come and go as they please.
[0012] In summary, the technical design of the new type of circular overpass can solve the technical problem of congested traffic at road intersections. The circular main bridge of the new type of circular overpass technical design can effectively guide the passage of vehicles. The electronic induction displays installed at the upper and lower bridge entrances of the eight auxiliary circular main bridges use text and color to control the passage of vehicles on the bridge, effectively guiding vehicles to pass quickly on the bridge deck. The technical design of the circular overpass can solve the technical problem of slow traffic at road intersections. Improve the problem of slow traffic at the intersection of traditional overpasses, remove the red lights at the four corners of the intersection, save the time vehicles have to wait for red lights at the intersection, and change the disadvantage of turning under the bridge. The vehicles that need to turn under the bridge are diverted to the roundabout bridge to turn. The main road and paved vehicles of the traditional overpass turn at the intersection under the bridge, which will cause traffic pressure at the intersection under the bridge. In addition, pedestrians need to pass or turn at the intersection, and need to wait for multiple traffic lights, which will aggravate the congestion time at the intersection under the bridge. Because the intersection under the bridge is blocked for a long time, the main road above the bridge will also be congested. This is the technical problem of road intersection congestion. The traffic mode of the new type of circular overpass has changed the structure of vehicles turning under the bridge, and the vehicles that need to turn at the intersection and some vehicles that need to go straight are all diverted to the circular bridge to turn or go straight. Due to the circular bridge design of the circular overpass, vehicles can come and go as they please without stopping at the intersection. The traffic technology problem of the circular overpass is the electronic sensor display installed at the upper and lower bridge passages of the new type of circular overpass. This technology uses induction conduction technology to monitor the driving conditions of vehicles on the bridge deck, so that vehicles on the bridge can pass safely and orderly. This technology has greatly improved the intersection.
[0013] 4. Ensuring a lean and stable construction team and sufficient and high-quality mechanical equipment is the basic condition for ensuring the construction period. If necessary, increase the investment in personnel and equipment to ensure the supply of various raw materials.
[0014] 5. Implement the sub-project contracting system for each team at the same time to fully mobilize the enthusiasm of each team and effectively ensure the quality of the project and construction safety.
[0015] 6. When purchasing raw materials, fully consider various possible situations and adopt flexible and maneuverable purchasing methods to ensure both the timely supply of materials and the quality of the materials to ensure the smooth progress of the project.
[0016] 11. Civilized construction:
[0017] 1. This project will be designated as a standardized construction site, and the project-based construction experience that our company has acquired will be promoted. Civilized construction management will be strengthened so that the entire project will be strictly arranged in accordance with the general layout in the construction organization design, with unified planning and management.
[0018] 2. Adhere to civilized construction and provide excellent services to the owner. During the construction process, obey the owner's on-site dispatch and execute the instructions of the engineer representative in a timely and accurate manner.
[0019] 3. Educate employees to form a style of unity, civilization and courtesy, cooperate and coordinate with the owners, assist the owners and other relevant departments in handling the relationship with the local people and local government, and obey and meet the needs of highway construction.
[0020] 4. Eliminate barbaric construction. Personnel entering the construction site must strictly implement the civilized management rules and regulations of the construction site, keep the area around the construction site clean, and pay attention to and do a good job of cleaning and maintenance of the roads. Materials entering the site must be stacked at designated locations, and random stacking and unloading are strictly prohibited. Barbaric construction must be resolutely eliminated.
[0021] 5. Maintain good relations with the local government and local residents, strictly prohibit fighting and making trouble, continue to carry forward the fine traditions and style of our company in the infrastructure engineering corps, and strive to create a good production, living environment and atmosphere for engineering construction.
[0022] 12. Environmental Protection:
[0023] 1. Before starting work, all employees will be educated on environmental protection knowledge, environmental protection technical measures, and technical explanations to enhance environmental awareness and clarify the significance of environmental protection work. Actively participate in environmental protection work and consciously abide by national and local environmental protection rules and regulations.
[0024] 2. The project management department shall establish an environmental protection management work organization, formulate environmental protection work plans and measures, and consciously accept the supervision and inspection of the environmental protection work on the construction site by the environmental protection department and local government.
[0025] 3. The key points of environmental protection for this sub-project are: utilization and discharge of water resources, use of temporary land, site cleaning, material leakage, waste disposal, noise protection, and sewage control.
[0026] 4. The layout of temporary facilities must comply with the requirements of local environmental protection departments. Production and living areas should be set up while occupying less arable land, and attention should be paid to the protection of water resources. Sewage discharge must be treated, and production and production waste must be centrally processed.
[0027] 5. During construction, the village roads and lead lines along the route must be cleaned, and transport vehicles must follow the prescribed driving routes. When passing through residential areas, they should drive slowly to avoid vibration and noise as much as possible. During the transportation of materials, protective measures should be taken to avoid throwing, spilling, dripping, and leaking. Covering measures should be adopted when necessary. When the humidity is low in the dry season, water should be sprinkled along the roads to prevent dust from polluting the surrounding environment.
[0028] 6. When constructing in areas close to residential areas, avoid nighttime construction as much as possible, properly handle conflicts with local authorities and residents, establish friendly neighborly relations, and prevent noise nuisance.
[0029] 7. After the completion of the project, the temporary land should be dealt with. The temporary land that occupies farmland must be reclaimed and returned to farmland, and the remaining mountains and slopes should be greened to maintain the original natural landscape.
[0030] 8. Carry out civilized construction. Handle and remove garbage and waste generated during the construction process at any time, and clean up the site after the work is completed without leaving any dead corners.
[0031] The electronic sensor design on the new type of circular overpass can better control the order of vehicle operation on the bridge deck, avoid vehicle congestion and scratches on the bridge deck and various safety hazards and accidents. The electronic sensor can solve the technical problems of traffic order and traffic safety of the circular overpass.
[0032] How the sensor works
[0033] Sensors, also called sensors, are ubiquitous. Just a small smartphone contains more than a dozen sensors such as acceleration sensors, gravity sensors, and distance sensors. So what is the working principle of the sensor?
[0034] The traffic speed at the intersection has solved the technical problem of traffic congestion at the road intersection. In addition, the technical design of the circular overpass allows vehicles and pedestrians to go their separate ways directly, without waiting for traffic lights at the intersection or traveling in the same direction as vehicles, which reduces the hidden dangers of pedestrian traffic. When pedestrians need to pass through the paved road under the circular overpass, they can pass through the pedestrian bridges on the front and back sides of the circular overpass. Pedestrians can pass through the pedestrian bridges at any time without waiting for red lights. Pedestrians who need to pass through the main road longitudinally can pass directly at the pedestrian zebra crossings on both sides of the circular bridge without waiting. Vehicles and pedestrians do not interfere with each other, and they come and go as they please without being stranded at the intersection. Therefore, the overall design technology of the new circular overpass can effectively alleviate the technical problem of congestion at road intersections.
[0035] 1. Working principle of sensor
[0036] Inductor, also known as sensor or transducer, is a detection device that can measure signals and convert signal forms on demand. It is usually composed of sensitive elements and conversion elements. It is the first link of automatic detection and automatic control. It is now widely used in various types of automatic control, security equipment, etc.
[0037] 2. Working Principle of Sensors - Classification
[0038] Sensors have different classification standards. According to the use technology, they can be classified into pressure sensors, image sensors, acceleration sensors, displacement sensors, temperature sensors, etc. According to the application needs of our bridge traffic technology, they can be divided into displacement sensors, image sensors, displacement sensors, weighing sensors, and they are used together at the upper and lower bridge intersections of our circular overpasses to fully detect the running speed, vehicle density and vehicle load of vehicles on and off the bridge. In this way, the driving conditions of vehicles on the circular overpass are monitored, and the electronic display screen of the circular overpass is input with text and color to remind motor vehicles on the bridge deck to pay attention to the road conditions on the bridge deck.
[0039] 3. Working principle of sensor - structure
[0040] The basic torque sensor is actually a special torque measuring piece pasted on a special elastic shaft. The secondary coil of the energy toroidal transformer, the primary coil of the signal toroidal transformer, the printed circuit board containing the rectifier stable power supply, the instrument amplifier circuit, the V / F conversion circuit, and the signal output circuit are fixed on the elastic shaft; the excitation circuit, the primary coil of the energy toroidal transformer, the secondary coil of the signal toroidal transformer and the signal processing circuit are fixed on the shell of the sensor.
[0041] 4. Working Principle of Sensor
[0042] When the elastic shaft of the sensor is twisted, first, the strain signal is detected by the strain bridge and amplified to a certain extent by the instrument amplifier circuit; secondly, the amplified strain signal is converted into a frequency signal by the V / F converter and transmitted from the primary coil of the signal toroidal transformer to the secondary coil; finally, the frequency signal that is proportional to the torque of the elastic shaft is obtained by filtering and shaping by the signal processing circuit. This signal is the sensed signal, which can be used in instruments and can also be transmitted to a computer for corresponding processing.
[0043] 5. Working Principle of Sensor--Application
[0044] 1. In the field of industrial automation, sensors have been widely used in various devices for measuring process variables and electronic characteristics;
[0045] 2. In the automotive industry, sensors have been widely used in the automatic control of automobiles. A car contains at least thirty and up to two hundred types of sensors.
[0046] (6) Electronic sensing system is also known as intelligent electronic sensing navigation system. The functions of intelligent navigation system are:
[0047] The intelligent navigation system is a navigation software based on the central brain chip set in the intelligent electronic sensor system, Beidou GPS positioning technology and artificial intelligence algorithm. It can provide users with the best travel route and navigation services based on the user's location, route, traffic conditions and other information. The intelligent navigation system has the following main functions:
[0048] 1. Real-time navigation: The system can receive Beidou and GPS signals in real time, providing users with the best route planning and navigation, avoiding the risks of traffic jams and bad road conditions.
[0049] 2. Voice navigation: The system supports voice navigation function. Users can input the destination by voice. The system will automatically plan the route and broadcast driving information, making it more convenient for users to travel.
[0050] 3. Route planning: The system can automatically plan the best driving route according to the user's needs, and can also provide a variety of alternative routes for users to choose from.
[0051] 4. Real-time traffic conditions: The system can monitor traffic conditions in real time and adjust the driving route according to changes in traffic conditions to provide users with the most suitable driving plan.
[0052] In the application scenario of the intelligent navigation system, the system will automatically plan the best route.
[0053] 1. Receive navigation information: The system will provide users with the best driving route and navigation information based on real-time road and traffic conditions.
[0054] 2. Follow the prompts: Just follow the navigation prompts. If there is a change in route, the software will remind the user in time.
[0055] In short, the intelligent navigation system has brought great convenience to people's travel. It can provide users with the best driving routes and navigation services based on real-time road and traffic conditions, making travel smoother and more convenient. In the future, with the continuous advancement of technology, the intelligent navigation system will be more intelligent and humanized, bringing more convenience and fun to people's travel.
[0056] The main technical parameters of the sensor are
[0057] The main technical parameters of the sensor:
[0058] (1) Rated load: The rated load of a sensor refers to the maximum axial load that can be measured within the specified technical range when the sensor is designed. However, in actual use, generally only 2 / 3 to 1 / 3 of the rated range is used.
[0059] (2) Allowable load (or safe overload): The maximum axial load allowed to be applied to the sensor. Overload operation is allowed within a certain range. Generally, it is 120% to 150%.
[0060] (3) Limit load (or limit overload): The maximum axial load that the sensor can withstand without losing its working ability. When the working load exceeds this value, the sensor will be damaged.
[0061] (4) Sensitivity: The ratio of the output increment to the added load increment. Usually the rated output mV for every 1V input voltage. The sensitivity coefficient must be consistent.
[0062] (5) Nonlinearity: This is a parameter that characterizes the accuracy of the correspondence between the voltage signal output by this sensor and the load.
[0063] (6) Repeatability: Repeatability indicates whether the output value of the sensor can be repeated when the same load is repeatedly applied under the same conditions. This characteristic is more important and can better reflect the quality of the sensor. The national standard describes the repeatability error: Repeatability error can be measured simultaneously with nonlinearity. The repeatability error (R) of the sensor is calculated as follows: R = ΔθR / θ n × 100%. ΔθR--The maximum difference (mv) between the actual output signal values measured 3 times at the same test point.
[0064] (7) Hysteresis: The common meaning of hysteresis is that when the load is applied step by step and then removed step by step, the readings corresponding to each load level should be the same under ideal conditions, but in fact, they are inconsistent. The degree of inconsistency is expressed by the hysteresis error indicator. The national standard calculates the hysteresis error as follows: The hysteresis error (H) of the sensor is calculated as follows: H = ΔθH / θ n × 100%. ΔθH--The maximum difference (mv) between the arithmetic mean of the actual output signal values of 3 strokes at the same test point and the arithmetic mean of the actual output signal values of 3 upper strokes.
[0065] (8) Creep and creep recovery: The creep error of the sensor is required to be tested from two aspects: one is creep: add the rated load without impact for 5-10 seconds, read the value 5-10 seconds after the load is added, and then record the output value at a certain time interval within 30 minutes. The creep of the sensor (CP) is calculated as follows: CP = θ2-θ3 / θ n×100%. The second is creep recovery: remove the rated load as quickly as possible (within 5 to 10 seconds), read the value immediately within 5 to 10 seconds after unloading, and then record the output value at a certain time interval within 30 minutes. The creep recovery (CR) of the sensor is calculated as follows: CR = θ5-θ6 / θ n ×100%.
[0066] (9) Allowable operating temperature: specifies the application scenarios of this sensor. For example, normal temperature sensors are generally marked as: -20℃-+70℃. High temperature sensors are marked as: -40℃-250℃.
[0067] (10) Temperature compensation range: The sensor has been compensated within this temperature range during production. For example, a normal temperature sensor is generally marked as -10℃-+55℃.
[0068] (11) Zero point temperature influence (commonly known as zero point temperature drift): It characterizes the stability of the zero point of this sensor when the ambient temperature changes. It is usually measured in units of drift per 10°C range.
[0069] (12) Temperature influence on output sensitivity coefficient (commonly known as coefficient temperature drift): This parameter characterizes the stability of the output sensitivity of the sensor when the ambient temperature changes. It is generally measured in units of drift within a range of 10°C.
[0070] (13) Output impedance: When sensors are used in parallel, the output impedance of the sensor must be understood and this value must be consistent with it, otherwise it will directly affect the output characteristics of the electronic screen and the debugging of the four-corner error.
[0071] (14) Input impedance: Due to the elastic modulus compensation resistor and sensitivity coefficient adjustment resistor at the input end of the sensor, the input resistance of the sensor is greater than the output resistance, but it can be changed by connecting resistors in parallel. The input impedance of each sensor is required to be consistent and the sensors are matched in combination. The input impedance should be consistent with it, otherwise the working hours will be increased when debugging the four-corner error, because the input impedance of the sensor is a load for the regulated power supply. Only when the load is the same, the same regulated power supply will provide the same power supply voltage.
[0072] (15) Insulation impedance: Insulation impedance is equivalent to a resistor with a resistance of the same value between the sensor bridge and the ground. The value of insulation resistance will affect the performance of the sensor. When the insulation impedance is lower than a certain value, the bridge will not work properly.
[0073] (16) Excitation voltage: generally 5 to 10 volts. The voltage regulator in most electronic instruments is 5 or 10 volts.
[0074] (17) Maximum allowable excitation voltage: In order to increase the output signal, in some cases it is required to increase the excitation voltage to obtain a larger signal.
[0075] (18) Cable length: It is related to the site layout. Before placing an order, you must clearly understand the conventional cable length of the company's products. In addition, pay attention to whether the environment is corrosive, impact-prone, high or low temperature.
[0076] (19) Sealing protection level IP67: Waterproof, performance is not affected by immersion in water at a specified pressure and time. Sensors protected by glue can reach IP67. In addition to being oil-proof and waterproof, it can also be resistant to general corrosive gases and corrosive media 52.
[0077] The novel flyover is designed at a road intersection. The bridge is in the shape of a ring flyover main bridge. A waterproof groove is designed on the upper edge of the bridge deck (1) to prevent the bridge deck from getting slippery in rainy and snowy weather. The bridge has two sides connected to the main road with two-way roads (2). The overall bridge shape is a circular hollow main bridge (1). The outer periphery of the bridge is a 50-meter built circle. The circular bridge deck is 20 meters wide. The inner circle of the bridge deck is a 30-meter built circle. The middle of the flyover is a hollow circle. A 1-meter high guardrail (8) is built on the edge of the circular bridge. A 3.5-meter high bridge street light is set at the edge of the guardrail at a distance of 5 meters. The bridge height is 4.5 meters. There are 20 bridge columns (7) along the route below the flyover. The bridge columns are triangular support bridge columns with an interval of about 10 meters. The bridge columns are designed to have a T-shaped bridge column part with a 1-meter built cylinder at the top. The front and rear of the circular flyover are connected to the upper bridge channel (4) and the lower bridge channel (5) for paving two-way traffic. The paved channel is 30 meters long and 5 meters wide. The slope is about 20 degrees. The road surface of the channel is finely corrugated to prevent slipping. Two pedestrian overpasses (6) are arranged on both sides of the circular bridge of the flyover along the main road direction. The height is 3.5 meters, the width is 3 meters, and the length is 30 meters. The overpass ladder is set as a slope ladder. The bridge ladder is 3 meters wide and the middle 2 meters wide is a ladder. There is a half-meter slope ladder on both sides to facilitate the passage of bicycles. The step height is 15 cm and the step width is 24 cm. The height of the overpass guardrail is 1.2 meters. There are pedestrian zebra crossings on both sides of the flyover along the paved road. The main design of the circular flyover technology is that vehicles and pedestrians pass separately. 1. The circular flyover dredges the vehicles on the auxiliary road channel beside the main road connecting the bridge deck to pass on the circular bridge or in the examples. The accompanying drawings used in the following description are briefly introduced. The accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can also be obtained based on these accompanying drawings without paying creative labor.
[0078] Figure 1 It is a schematic diagram of a new type of overpass according to the present new example.
[0079] Figure 2 It is a three-dimensional schematic diagram of a new type of overpass according to the present invention.
[0080] 1. Circular main bridge; 2. Main road on the bridge; 3. Paved road under the bridge; 4. Paved road on the upper bridge; 5. Paved road on the lower bridge; 6. Electronic information sensors installed at the upper and lower bridge entrances of the circular bridge: 7. Bridge columns; 8. Bridge guardrails; 9. Zebra crossing on the pedestrian walkway; 10. Electronic display on the bridge; 11. Diagonal line on the upper bridge intersection of the outer ring of the bridge deck; 12. Buffer lane with dotted line on the outer ring of the bridge deck; 13. Pedestrian overpass
[0081] Bridge Background Technology
[0082] Bridge Technology
[0083] BAEL 91
[0084] BPEL 91
[0085] ·CPC Fascicule n°61, Titre II
[0086] ·Fascicule 62
[0087] Guide SETRA:
[0088] ·Pont
[0089] Constraints in the design
[0090] Bridge category: First-class bridge
[0091] · Meteorological zoning: Class B area (mild or dry area)
[0092] Ambient humidity: ρh = 55%
[0093] Design load: road load series A and B, civil load for sidewalks 1.5 kN / m 2 , military load Mc120, Me80
[0094] And special load D240.
[0095] Main Materials
[0096] 1) Concrete
[0097] ·Expansion joint: C40 / 50 steel fiber concrete;
[0098] Prefabricated prestressed concrete T-beam: C35 / 45 concrete;
[0099] Cast-in-place concrete bridge deck: C35 / 45 concrete;
[0100] Guardrail base concrete: C30 / 37;
[0101] ·Slab: C30 / 37 concrete;
[0102] 2) Steel
[0103] The deformation elastic modulus of steel is Es = 2.0 × 105MPa, and the bulk density of steel is γ = 7850kg / m3;
[0104] Plain round steel bars shall comply with NF A35-015 standard, using Fe E235, with elastic limit strength fe = 235MPa;
[0105] Threaded steel bars shall comply with NF A35-016 standard, using Fe E500-3, elastic limit strength fe = 500MPa;
[0106] Welded steel mesh should comply with NF A35-016 and NF A35-019 standards, using Fe E500-2, elastic limit strength fe = 500MPa;
[0107] ·The technical parameters of other plates and steel sections shall comply with the relevant specifications and standards stipulated in the contract.
[0108] 3) Prestressed steel strand
[0109] According to French standard XP A35-045 and 62 Volume 2.1 (Part 2), high-strength and low-relaxation steel strands are used.
[0110] Parameters see Table 1
[0111] Table 1 Prestressing parameters
[0112]
[0113] Method to prevent the anchor from overheating and causing thread slippage.
[0114] ② Sealing anchor: Use cotton soaked in cement slurry to fill the gap between the prestressed tendons outside the anchor to prevent slurry from leaking out and causing loss of grouting pressure. When sealing the anchor, pay attention to leaving vent holes to prevent clogging.
[0115] ③. Flushing the hole: The hole should be flushed with pressurized water before grouting to remove debris in the hole and ensure that the hole is unobstructed. After flushing, use an air compressor to blow away the accumulated water in the hole, but keep the hole moist to ensure good bonding between the cement slurry and the hole wall.
[0116] (2) Mixing of cement slurry:
[0117] According to the technical specifications, pure cement slurry should be used for grouting of holes. For holes with large voids, an appropriate amount of fine sand can be added to the cement slurry. The water-cement ratio is required to be 0.4-0.45, the cement grade is not less than 425, and the water seepage rate is not more than 3%. After 3 hours of mixing, the water seepage rate should be controlled at 2%. After 24 hours, the water seepage should be completely absorbed by the slurry, and its fluidity should not exceed 6S. The expansion agent is about 0.01% of the cement dosage. The mixing time should not be less than 1 minute. Water should be added first and then cement, and sufficient quantity should be ensured to meet the continuous grouting of each pipe at one time. The time from the preparation of cement slurry to the pressing into the pipe should not exceed 40 minutes.
[0118] (3) Grouting:
[0119] ①. The grouting sequence is from bottom to top. If there is a pause in the middle for some reason, the cement slurry in the hole should be flushed clean immediately so that the hole will be unobstructed when grouting again.
[0120] ② After the prestressed tendons are tensioned, the holes should be grouted as soon as possible, generally not more than 5 days. Grouting is generally carried out twice, and each hole should be grouted once at both ends. The interval between the two times should be such that the cement slurry injected first is full of water but not initially solidified, generally 30-45 minutes.
[0121] ③. A piston grouting pump is used for grouting. The pressure is generally 0.5-0.7Mpa. The pressure can also be increased appropriately, but each channel must have a certain pressure stabilization time (about 3 minutes) to make the other end of the grouting hole full and slurry discharge, and until the exhaust hole discharges cement slurry with the same specified consistency.
[0122] ④. When grouting the hole, workers should wear protective glasses to prevent cement slurry from spraying and injuring their eyes.
[0123] ⑤. Standard test blocks should be made while mixing cement slurry. Each work shift should reserve no less than 3 groups of test pieces (each group consists of 3 70.7mm×70.7mm×70.7mm cubic test pieces), cure them for 28 days, and check their compressive strength as the basis for evaluating the quality of cement slurry.
[0124] ⑥ The pipe filled with cement slurry should be protected to avoid vibration within one day. The temperature of the structural concrete should not be lower than 5℃ within 48 hours after the cement slurry is injected into the pipe, otherwise insulation measures should be taken. When the daytime temperature is higher than 35℃, grouting should be carried out at night.
[0125] ⑦. After the grouting is completed, the construction log should be filled in carefully, including the grouting date, water-cement ratio and admixtures, grouting pressure, details of obstacles and accidents, and work that needs to be done for each pipeline.
[0126] 8 Anchor
[0127] After grouting, rinse the area around the anchor and roughen the concrete at the beam end, then set the steel mesh and pour the anchor concrete according to the design requirements. Then, the anchor concrete is well cured to reduce shrinkage and prevent cracks from forming between the beam body.
[0128] 9T beam lifting, transportation and storage
[0129] (1) The T-beam can be lifted only when its strength reaches the design lifting requirements and the tensioning and grouting are completed. (2) The lifting of the T-beam is based on the lifting method of the bottom of the beam, without a lifting ring. During prefabrication, a movable bottom mold for the bottom of the beam is reserved (set at a position 1 meter away from both ends) for the cable to pass through, and holes for cable passing are reserved at the corresponding positions on the main beam wing plate.
[0130] (3) Use a gantry crane to lift the beams on site (the type of gantry crane and the allowable lifting weight are specified in the manufacturer's design instructions), and transport them to the beam storage yard and place them on the beam storage pedestal.
[0131] Quality Assurance Measures:
[0132] 1. Quality target: 100% qualified rate, over 95% excellent rate.
[0133] 2. Quality assurance system: (see attached figure) IX. Safety assurance measures:
[0134] (I) Safety protection
[0135] 1. All construction and operation personnel must undergo safety training and must not work without a license. All operators must wear appropriate safety protection equipment and labor protection supplies. Operators are strictly prohibited from operating in violation of regulations, and managers are strictly prohibited from giving illegal instructions.
[0136] 2. The on-site lighting facilities are complete, reasonably configured and regularly maintained.
[0137] 3. Strengthen construction monitoring and measurement to ensure construction safety and the safety of ground buildings.
[0138] 4. Clear signs shall be set up at the tensioning site and personnel not related to the work are strictly prohibited from entering.
[0139] 5. Check whether the tensioning equipment and tools (such as jacks, oil pumps, pressure gauges, top wedges and hydraulic top pressure valves, etc.) meet the construction safety requirements, and the pressure gauges should be calibrated according to the prescribed period. 6. Anchor rings and anchor plugs should be inspected and qualified before use.
[0140] 7. All connection points between the oil pump and the jack must be intact, and the oil pump operator must wear protective glasses.
[0141] 8. When the oil pump is started, the oil inlet and return speed and the rise and fall of the pressure gauge pointer should be stable and uniform. The safety valve should always be sensitive and reliable.
[0142] 9. During tensioning or wedging, no one should stand behind the jack to prevent the prestressed tendons from breaking or the anchors and clips from popping out and injuring people. The tensioning personnel should stand on both sides of the jack.
[0143] 10. If any abnormal phenomenon occurs during the tensioning operation (such as severe vibration of the oil gauge resulting in oil leakage, abnormal motor sound, support disconnection, sliding), etc., the machine should be stopped immediately for inspection.
[0144] 11. After the steel strands are tensioned, safety precautions should be taken when leaving the site. Do not use strong force when manually dismantling the jack.
[0145] 12. After tensioning is completed, both ends of the tensioning anchor should be properly protected. Before the pipeline is grouted, guardrails and railings should be installed at the beam ends. It is strictly forbidden to hit the anchor, steel bundle and steel bars.
[0146] 13. When grouting the pipeline, the specified pressure should be strictly followed. The safety valve should be adjusted before applying pressure, and the operator should stand on the side when closing the valve.
[0147] 14. Traffic red lights, traffic signs and traffic guidance personnel shall be set up at the construction site to guide pedestrians and vehicles (including bicycles).
[0148] 5. Provide regular safety education to construction workers to improve their safety awareness. 16. Appoint full-time safety officers at the construction site.
[0149] 17. Set up clear slogan signs at construction intersections and assign dedicated personnel to guard and direct traffic. 18. Set up safety slogan signs on the construction site.
[0150] 19. Strictly abide by the "Technical Specifications for Safety in Highway Engineering Construction" (JTJ76-95).
[0151] (II) Temporary power supply
[0152] 1. All construction personnel must master the basic knowledge of safe use of electricity and the performance of the equipment used. Electricity users must protect the load lines, ground lines and switches of the equipment. If any problems are found, they must seek help from electricians in a timely manner. Non-professional electrical operators are strictly prohibited from tampering with electrical equipment.
[0153] 2. A substation must be set up indoors where the high-voltage line is led to the construction site. The room must be well ventilated and drained, with the door opening outwards and locked and managed by a dedicated person. Personnel are not allowed to enter the transformer installation location at will, and the grounding resistance must meet the requirements of the specifications.
[0154] 3. The power distribution system is hierarchical, and the distribution boxes and switch boxes have a complete and firm appearance, are rainproof and dustproof, are painted with safety colors, and are uniformly numbered. Their installation forms comply with relevant regulations, the electrical appliances in the boxes are reliable and intact, the selection and setting values comply with regulations, and the purpose is indicated.
[0155] 4. The bottom of the poles for the on-site supported lines must be solid, not tilted or sunk, and must be at a certain safety distance from the edge of the pit and nearby buildings. Insulated wires must be used and not laid in bundles overhead. If these requirements are not met, effective protective measures must be taken.
[0156] 5. All electrical equipment and their metal casing or structure shall be equipped with reliable zero connection and grounding protection as required.
[0157] 6. All electrical equipment at the construction site must be equipped with leakage protection devices as required, and must be inspected regularly, and any problems discovered must be dealt with in a timely manner.
[0158] 7. The installation and use of all electrical equipment on site, especially electric welding, electric heating equipment, and electric tools, must comply with regulatory requirements and be maintained by dedicated personnel.
[0159] (III) Mechanical safety
[0160] 1. All kinds of machines have dedicated personnel responsible for repair and maintenance, and key parts of the machines are regularly inspected to prevent mechanical failures and mechanical injuries.
[0161] 2. No one is allowed to stand under the lifting robot arm. During operation, the distance between the robot arms must comply with safety regulations.
[0162] 3. Various mechanical equipment shall be equipped with dustproof, rainproof, smashproof and noiseproof devices according to their working nature and performance.
[0163] Signboards and rule signs should be set up near equipment such as sound sheds and mechanical equipment.
[0164] 4. Transport vehicles must obey commands, have complete signals, not exceed the speed limit, slow down and honk when passing intersections or encountering obstacles, and have complete brakes in good working order.
[0165] (IV) Safety technical measures for the transportation of prefabricated T-beams 1. The requirements for the transportation of T-beams are as follows:
[0166] (1) Track gauge 2000mm, allowable error -2mm~6mm (2) Height difference of rail tops on both sides, T-beam top ≤±10mm; (3) Height difference of rail surface at rail joint ≤2mm;
[0167] (4) The track surface should be visually smooth, vertical curve adjustment should be set at the longitudinal slope change, and the track center deviation should be ≤±30mm;
[0168] (5) The spacing between sleepers should be arranged as required and the track gauge should be controlled. The bottom surface of the sleepers should be firmly padded and no part should be suspended.
[0169] 2. The holes of the erected T-beams must be welded to each other in the middle partition wall before the auxiliary bridge lines can be installed. 3. The running speed of the beam transport trolley on the erected T-beams and guide beams is 20m / min and 5m / min respectively.
[0170] 4. When transporting, the T-beam should have reliable lateral support, the tractor should have sensitive brakes, and the trolley should have effective anti-slip measures.
[0171] 5. The lifting and transportation of beams must be directed by a dedicated person.
[0172] 6. All beam erection equipment must be inspected and debugged in advance to achieve normal operation before use. 7. After the gantry crane is assembled in the prefabrication yard, it must be checked and tested for operation. Only after it is confirmed to be reliable can it be put into hoisting construction. When hoisting the first beam, the T-beam must be lifted 5 to 10 cm off the ground, and the main load-bearing components of the gantry crane (wire rope, winch, lifting point, etc.) must be checked for reliability. The hoisting operation can only be officially carried out after the static hoisting for more than half an hour.
[0173] 8. Before each lifting operation, a dedicated person will inspect the gantry crane. After the operation is completed, the main power supply will be turned off. Iron shoes and mooring ropes must be placed under the running wheels of the gantry crane to ensure that the gantry crane is safe and reliable when idle and at night.
[0174] 9. In case of severe weather conditions such as strong winds (wind force greater than level 3 to 4), heavy fog (visibility less than 30m), heavy rain, heavy snow, etc., lifting operations are prohibited.
[0175] 10. Measures to ensure construction period:
[0176] 1. Strengthen construction management, establish and improve the reward and punishment system, and fully mobilize the enthusiasm of employees.
[0177] 2. Develop a thorough construction plan and schedule, break it down into months, ten days, and weeks, and make timely adjustments based on the actual completion status to ensure that the monthly target is achieved. In terms of construction methods, it is necessary to combine the specific situation and fully consider the specific details of the project. In other words, it must be specific enough to determine the process, labor organization, and equipment according to the specified construction method to ensure the smooth implementation of the production plan.
[0178] 3. Provide good logistical support to allow employees to devote themselves to production with full enthusiasm and energy.
[0179]
[0180] Prestressed system
[0181] High-strength, low-relaxation-rate (TBR) steel strands conforming to French standard XP A35-045 are used; their characteristics are shown below.
[0182] Prestressed steel strand anchorages. For post-tensioned prestressed steel strands, OVM series anchorages will be used, which shall comply with European standards and meet their relevant facilities.
[0183] The stranded steel pipe will comply with the standards specified in the CCTP.
[0184] Key points of bridge design
[0185] 1) This design is a prestressed concrete continuous T-beam, which is erected by simply supporting first and then continuously. The prefabricated T-beam is simply supported on a temporary support first. After the continuous construction of the structure is completed, the temporary support is removed and converted to support on a permanent support located on the center line of the pier.
[0186] 2) Beam length and support point: (unit: m)
[0187]
[0188] 3) Main beam section: Main beam height 1.36m, beam spacing 1.75m, T beam prefabrication width 1.00m, flange plate middle wet joint width 0.75m. Main beam mid-span rib thickness 0.2m, horseshoe width 0.5m, middle uniform section length 16.04m, horseshoe gradient section length 2.4m.
[0189] 4) Bridge deck paving: Asphalt concrete thickness is 5cm, and a 0.5cm thick waterproof layer is added between the asphalt and the cast-in-place layer of the bridge deck.
[0190] 5) Guardrail: The guardrail adopts S8 guardrail.
[0191] 6) Expansion device: Use D80 expansion joint.
[0192] Key points of bridge construction
[0193] 1. The part of this document available for construction is only the upper part and auxiliary structure of the PS bridge with a span of 2×25m and a width of 11.5m.
[0194] 2. During construction, various specifications and requirements stipulated by CCTP must be followed.
[0195] 3. Before construction, there should be a complete construction organization plan and detailed construction plan steps, and the construction period of each link of prefabrication and erection should be reasonably arranged to achieve continuous and uninterrupted construction.
[0196] 4. The main beam prefabrication process, including template making and pedestal layout, should pay attention to the slope setting and symmetry of each part of the main beam prefabrication caused by the longitudinal and transverse slopes of the bridge. At the same time, attention should be paid to the setting position, size and method of prestressed pipes and various embedded parts.
[0197] 5. Before pouring T-beam concrete, check all embedded parts to see if they are complete. Only pour after confirming that they are correct. During construction, the position of prestressed pipes and steel bars should be accurate. The concrete within 2m of the beam end, especially the concrete under the anchor, has large local stress and dense steel bars. It should be fully vibrated and compacted, and its quality should be strictly controlled.
[0198] 6. The ordering and procurement of all major materials must comply with relevant specifications and requirements. Before use, they must be strictly tested according to relevant quality standards and constructed in accordance with relevant specifications. Prestressed steel strand tensioning, anchoring, grouting and other equipment must be strictly calibrated and tested before use.
[0199] 7. Before concrete construction, a mix ratio test must be conducted, taking into account various factors such as construction procedures, construction schedule, and environmental impact. Through experiments, the strength of concrete is guaranteed and the impact of concrete shrinkage and creep is reduced. Attention should be paid to the sampling and curing conditions of concrete strength test pieces, which must be consistent with the concrete of the main beam. In order to ensure the appearance and color of the bridge, the concrete of the same bridge should be cast with the same type of cement from the same manufacturer, and the crushed stone should be produced by hammer crushing. The maximum particle size of the crushed stone should not exceed 20mm to prevent the concrete from being difficult to cast or vibrating and not dense.
[0200] 8. The position of the prestressed pipe must be strictly located according to the coordinates provided in the design drawing and fixed with positioning steel bars. The positioning steel bars are spot welded to the T-beam web stirrups to prevent dislocation and pipe sagging. If the pipe collides with the steel bars, the position of the pipe should be kept unchanged and the position of the ordinary steel bars should be appropriately moved. Before pouring, check whether the corrugated pipe is sealed to prevent the pipe from being blocked when pouring concrete.
[0201] 9. The concrete surface of the precast beam top, the wet joints of the main beam wing plate and the continuous end must be roughened and washed to ensure that the new and old concrete are combined to form a whole. This should be done in time after the T-beam is cast.
[0202] 10. Before pouring the cast-in-place concrete layer of the bridge deck, the floating slurry and oil stains on the top of the beam should be cleaned, and attention should be paid to pre-embedded drainage pipes.
[0203] 11. When embedding the steel plate for the bottom support of the prefabricated beam, a trial installation of the support should be carried out.
[0204] 12. Permanent supports should be set horizontally, and the installation direction should be noted. The joint steel plates on the permanent supports corresponding to each main beam of the continuous pier longitudinal bridge should be set up with care to ensure close contact, so as to ensure that the joint steel plates do not warp when the longitudinal bridge is erected on one side of the prefabricated main beam. The specifications of the auxiliary steel plates of the supports should be strictly adopted according to the design requirements. To prevent rust, the embedded steel plates of the supports are all hot-dip galvanized steel plates. The steel plates are required to be flat and welding deformation is not allowed.
[0205] 13. During the lifting, transportation and installation of the main beam, the beam should always be kept in a simply supported state. When the beam is moved horizontally, both ends should be moved at the same time. Pay attention to the horizontal and stable state of the beam to prevent the beam from being twisted, tilted or even overturned. During installation, pay attention to ensuring the stability of a bare beam.
[0206] 14. The main beam hoisting equipment can be double guide beams or cross-pier gantry, etc. The specific construction method is determined by the construction unit. The construction hoisting plan should pay attention to the bearing capacity of the bridge substructure and the control of pier top displacement during the construction phase to ensure that the pier top displacement before the system conversion is close to zero and ensure the safety of the bridge structure.
[0207] 15. During construction, notches and embedded steel bars shall be set according to the specific expansion joint type and product requirements. However, the expansion index of the adopted product shall not be lower than that of the indicated model, and the installed steel bars can only be embedded in the cast-in-place bridge deck.
[0208] 16. The construction and use of bridges should be strictly managed. Vehicles are prohibited from passing during the entire construction process before the bridge deck pavement reaches the design strength; regular inspections and maintenance must be carried out during use.
[0209] 17. Attention should be paid to the overall construction concept of the structure. Some related drawings need to be used at the same time, and relevant embedded parts must not be omitted.
[0210] 6Prestressing tendon tensioning construction
[0211] (1) Preparation:
[0212] ① The jack and the matching oil pump shall be calibrated by the Technical Supervision Bureau to ensure good working condition and the error does not exceed the specified value before use. The oil gauge reading shall be calculated based on the relevant calibration data as the basis for controlling the tension force. The elongation shall be determined according to the measured elastic modulus of the steel strand and the relevant parameters of the pipeline friction resistance.
[0213] ② Check whether the number of steel strands at corresponding positions is correct, whether there are cards installed flush, and all prestressed anchor systems must be inspected and qualified before use.
[0214] (2) Tensioning process:
[0215] ①. The concrete strength of the T-beam reaches 100% of the design strength at the age of not less than 7 days before the prestressed steel strands can be tensioned. The tensioning sequence is: N1→N2→N3→N4. The precast beam steel strands are tensioned at both ends simultaneously. The controlled stress under the anchor is 0.75fpk=1395MPa. The prestressing is graded according to 0→15%→30%→100%.
[0216] ② Prestressing should be done by controlling both tension and elongation. When the prestressed steel strand reaches the designed tension, the error between the actual elongation and the theoretical elongation should be controlled within 6%.
[0217] (3) Key points of tensioning:
[0218] ①. Minimize the friction between the prestressed tendons and the holes to avoid excessive stress loss or cracks, warping and deformation of the components.
[0219] ②. The loss value of prestress in batches should be calculated and added to the positive value of the controlled stress of the prestressed tendons, but σk cannot exceed the specified requirements, otherwise a second tensioning should be carried out after all tensioning to make up for the prestressing loss. ③. During tensioning, the lifting and lowering speeds of the jacks at both ends should be roughly equal. After the jacks are in place, the prestressed tendons should be straightened first. When the prestressed tendons are pulled to the specified initial stress (15% σk), they should be stopped, the elongation should be measured, and then tensioned in stages to the controlled tensioning force. After holding the load for 5 minutes, the elongation value should be measured and anchored.
[0220] (4) Prevention of wire slippage, wire breakage and safety accidents:
[0221] According to regulations, no more than one wire in each strand of steel strands is broken or slipped, and the sum of broken wires in each section is no more than 1% of the total number of wires in that section. To prevent slipping and breaking of wires and ensure construction safety, the following points should be noted:
[0222] ①. Strengthen the inspection of equipment, anchors and prestressed steel strands;
[0223] A. The jack and oil gauge must be checked regularly to ensure that the error does not exceed the specified value.
[0224] B. The size of the anchor should be correct to ensure processing accuracy. The dimensions of the anchor rings and clips should be checked one by one, and those with errors of the same sign should be used together.
[0225] C. The clamping piece should have the specified hardness value to prevent the clamping piece from damaging the steel strand.
[0226] D. The installation position of the anchor must be accurate. The installation surfaces of the anchor plate bearing surface, anchor ring, limit plate, etc. must be perpendicular to the center line of the hole, and the center line of the anchor must coincide with the center line of the hole.
[0227] E. The anchor ring hole should be aligned with the groove of the pad to prevent displacement during tensioning.
[0228] F. Before using the anchor, debris must be removed and oil stains must be brushed off.
[0229] G. The oil supply and oil return process of the jack should be carried out slowly and steadily to avoid excessive oil return caused by too fast a speed.
[0230] H. Winter construction should be carried out under positive temperature conditions.
[0231] ②. Carry out safe operations according to safety regulations;
[0232] A. The tensioning site should be clearly marked and personnel not related to the work are strictly prohibited from entering.
[0233] B. During tensioning or anchoring, no one should stand behind the jack to prevent the prestressed tendons from breaking or the anchors or tool clips from popping out and injuring people.
[0234] C. If the oil pump is running abnormally, stop and check immediately. Do not twist the screws of the oil pump or jack at will under pressure.
[0235] D. The operation shall be directed by a dedicated person. It is strictly forbidden to collide with the prestressed tendons during operation. When measuring elongation and tightening nuts, stop operating the jack.
[0236] E. During tensioning, the steel strand must be of sufficient length and the clamp should have sufficient clamping capacity to prevent the anchor clamp from slipping out due to looseness.
[0237] F. The limit plate of the jack must be in good contact with the anchor ring and the position must be straight and symmetrical. G. Add a protective cover to the joint of the high-pressure oil pipe to prevent oil spray from injuring people.
[0238] H. It is strictly forbidden to vibrate the beams that have been tensioned but not yet grouted violently to prevent the prestressed tendons from breaking and causing major accidents.
[0239] 7 Grouting
[0240] Hole grouting is to press cement slurry into the hole with a grouting machine to fill the gaps between the prestressed tendons and the hole, so that the prestressed tendons and concrete are firmly bonded into a whole. The second purpose is to prevent the prestressed tendons from rusting.
[0241] (1) Preparation work before grouting:
[0242] ①. Cutting the outer strand of the anchor: Use a hand-grinding wheel cutter to cut off the remaining strand of the anchor, leaving 1-2cm outside each card. Gas cutting is strictly prohibited.
Claims
1. Regarding the claims of the divisional application for the new type of circular overpass, it is undeniable that the design of the new type of circular overpass, regardless of the overall design concept and the internal electronic facilities, is a scientific and practical functional bridge. The bridge takes the actual needs of the crossroads on the road as the coordinates for solving the problem, and designs a complete bridge technical structure for the new type of circular overpass with a pragmatic and scientific and rigorous attitude. In terms of the rights protection of the divisional application, the protection is requested for the part of the intelligent electronic sensor navigation innovation technology installed on the new type of circular overpass. The new type of circular overpass is installed at the right side of the upper bridge and the right side of the lower bridge, a total of 8 intersections. The intelligent electronic sensor system navigator uses the central brain processing chip system installed inside the intelligent electronic sensor system navigator to combine the navigation satellite system with the information of ground sensing for processing and analysis, and improve the overall navigation technology structure of the bridge. This technology uses intelligent electronic sensors to link the satellite navigation system and service satellite systems such as new climate satellites, and uses intelligent electronic technology to set up a convenient and fast passage mode for the circular overpass. This technology uses intelligent electronic sensor navigators to serve vehicles and pedestrians traveling on roads and bridges. This technology adds intelligent traffic concepts and capabilities to the circular overpass and strengthens the effective combination of electronic information engineering and road and bridge automation services. Therefore, it is requested to grant patent rights protection to the technical methods of intelligent electronic sensor navigators installed at the intersections of the new type of circular overpass, so that industry innovation is more motivated. With rights protection, scientific research and technology can be better promoted, scientific and technological achievements can be transformed into productivity, and people's travel needs can be facilitated.