Shallow water through arch bridge construction device and construction method thereof

By using a combination device of side beam frame, bottom beam frame and mobile door machine hoisting beam in shallow water arch bridge construction, the lifting and disassembly of steel trests is realized, solving the problems of high cost and low efficiency in traditional construction methods, and improving the Construction efficiency and material utilization.

CN118958161APending Publication Date: 2024-11-15THE FIRST CONSTRUCTION COMPANY OF CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411287364.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the traditional arch bridge construction method, steel trests need to be erected and dismantled when hoisting the cross beam and arch rib brackets, which is costly and inefficient, and the lifting process is time-consuming and labor-intensive, and wastes materials and manpower.

Method used

Design a shallow water area lower bearing arch bridge construction device, including two rows of side beam frames and bottom beam frames, equipped with mobile door machine and hanging beam. Through the cooperation of door machine and hanging beam, the side beam frame and bottom beam frame are realized. Flip the installation and disassembly, set up a support platform directly at the bottom of the riverbed, and connect it through the connecting beam system to achieve the lifting and disassembly of the middle beam and arch rib brackets, avoiding the use of floating cranes, track cranes or car crane equipment.

Benefits of technology

It improves construction efficiency, reduces material waste and construction costs, avoids the process of temporary construction and dismantling of steel trests, and realizes efficient bridge construction and dismantling, saving manpower and material resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958161A_ABST
    Figure CN118958161A_ABST
Patent Text Reader

Abstract

The invention provides a shallow water through arch bridge construction device and a construction method thereof.The shallow water through arch bridge construction device comprises two rows of side beam frames and two rows of bottom beam frames, the side beam frames are located on the outer sides of the bottom beam frames, a connecting beam system is arranged between the side beam frames and the bottom beam frames, two movable portal cranes are arranged on the side beam frames, and walking hanging beams are arranged on the portal cranes; a plurality of sliding lifting blocks are arranged on the lifting beam; the bottom beam frames on the two sides are used for installing middle cross beams and arch rib supports. The side beam frame, the bottom beam frame and the arch rib support are sequentially detached and hoisted from the middle to the two ends of a river through cooperation of the portal crane and the hoisting beam, a steel trestle is not needed in the arch bridge building process of the whole device, meanwhile, hoisting is completed without floating cranes or crawler cranes or truck cranes, and the portal crane and the hoisting beam can complete the whole process from installation and building to detachment. And the use efficiency is high, the construction cost is greatly reduced, the process of temporarily building a steel trestle and disassembling the steel trestle is avoided, time and labor are saved, and materials are greatly saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of arch bridge construction, and in particular to a shallow water bottom-supported arch bridge construction device and a construction method thereof. Background Art

[0002] Arch bridge is one of the most widely used bridge structures. When installing the middle beam and arch rib support in arch bridge construction, a steel trestle is usually built on one side of the bridge, and then a floating crane, crawler crane or truck crane is used to hoist the middle beam or arch rib support. The traditional construction method is to build a steel trestle and then use a crane to carry out construction on the steel trestle. The width of the steel trestle must meet the requirements of the crane, which wastes a lot of materials. This construction method is costly and inefficient. Floating cranes usually require ships and are usually used for water construction. They rely on buoyancy to support equipment, which has low construction efficiency and high construction method costs. Crawler cranes and truck cranes are limited in poor ground conditions and may not be used in all construction environments. At the same time, the temporary steel trestle built after the construction of the traditional bottom-supported arch bridge is difficult to dismantle, which is time-consuming and labor-intensive. It is also difficult to lift the middle beam and arch rib support during the hoisting process, which wastes a lot of manpower and material resources. To this end, we propose a shallow water bottom-supported arch bridge construction device and a construction method thereof to solve the above problems. Summary of the invention

[0003] The present invention provides a shallow water bottom-supported arch bridge construction device and a construction method thereof, which solve the problems that the traditional arch bridge construction is constructed by using a floating crane, a crawler crane or a truck crane to lift a middle cross beam or an arch rib support, and that the steel trestles need to be erected and dismantled, the construction method has high cost and low construction efficiency, and the lifting process of the middle cross beam and the arch rib support is time-consuming and labor-intensive.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a shallow water bottom-supported arch bridge construction device and a construction method thereof, comprising two rows of side beam frames and two rows of bottom beam frames, the side beam frames are located outside the bottom beam frames, a connecting beam system is arranged between the side beam frames and the bottom beam frames, two movable gantry cranes are arranged on the side beam frames, the gantry cranes are arranged on the walking hanging beams, and the hanging beams are arranged on the multiple sliding sliding blocks; The bottom beam frames on both sides are used to install the middle cross beam and arch rib supports.

[0005] In the preferred solution, a track is provided on the top of the side beam frame, an electrical system is provided at the bottom of both sides of the gantry machine, both ends of the gantry machine slide against the track, a horizontally movable crane is provided on the gantry machine, and side winches are provided on both sides of the gantry machine.

[0006] In the preferred scheme, pile caps, main cross beams, main longitudinal beams and distribution beams are provided on the top of the side beam frame and the bottom beam frame in sequence, the track is arranged on the distribution beam of the side beam frame, the bottom beam frame includes multiple second pile foundations, and the bottom beam frame is provided with a top lifting ear, multiple side lifting ears and multiple bottom lifting ears, and a guide wheel is provided on one side of the distribution beam on the top of the side beam frame.

[0007] In a preferred solution, a transport vehicle is provided on one side of the side beam frame at the end, and the transport vehicle is used to transport the middle cross beam, the arch rib bracket, the side beam frame and the bottom beam frame.

[0008] In the preferred solution, the hanging beam includes main beams on both sides, the main beams are connected to the crane, a plurality of sliding sliding blocks are provided on the main beams, an electric hoist is provided at the bottom of the sliding blocks, a positioning groove is provided on the main beam, a screw rod is provided between the two main beams, and a motor is provided at the end of the screw rod.

[0009] In the preferred solution, a hydraulic cylinder is provided on the sliding block, a bearing is provided on the top of the hydraulic cylinder, the bearing is connected to the screw rod, and a telescopic second hydraulic cylinder is provided on both sides of the sliding block, and the second hydraulic cylinder rests on the positioning groove of the main beam.

[0010] In a preferred solution, the connecting beam system includes a plurality of hoops installed on the first pile foundation and a plurality of ring frames installed on the second pile foundation, a connecting tie rod is provided between the horizontal hoops and the ring frames, and a rotating device is provided on the horizontal hoops.

[0011] In the preferred scheme, the rotating device includes a turntable rotatably connected to the clamp, the clamp is provided with multiple grooves, supports are provided on both sides of the turntable, a rotating locking rod is provided on the support, a locking block is provided at one end of the locking rod, and a hinged cylinder is provided at the other end of the locking rod, and the cylinder is installed on the clamp.

[0012] In a preferred solution, a connecting column is provided on the ring frame, and the connecting rod includes a first connecting rod and a second connecting rod, a bidirectional screw is provided between the first connecting rod and the second connecting rod, the first connecting rod is connected to the turntable, and a plurality of rotating linked clamps are provided at one end of the second connecting rod, the clamps are clamped on the connecting column, and both ends of the connecting column are connected to the ring frame through nuts.

[0013] A construction method for a shallow water bottom-supported arch bridge construction device, characterized by: S1, erecting side beam frames and bottom beam frames at the end from both ends of the river, erecting other structures of the end except the middle cross beam and the arch rib, and installing a gantry crane on the track; S2. Hoist the side beams and bottom beams at both ends of the two gantry cranes: When hoisting the side beams and bottom beams, use the hoisting beams and gantry cranes to turn the side beams and bottom beams in the air; S3, installing the side beam frame and the bottom beam frame at the bottom of the riverbed, and installing a connecting beam system between the side beam frame and the bottom beam frame; S4, repeat S2~S3 in sequence, and complete the bottom bracket erection of the two gantry cranes from both ends to the middle; S5. Two gantry cranes hoist multiple middle cross beams from both ends to the middle, install them on the top of the bottom beam frame, and build the bridge deck; S6. The gantry crane hoists the arch rib brackets from both ends to the middle in sequence: the arch rib brackets are hoisted from the transport vehicle and turned in the air using the hoisting beam; S7. Install the arch rib segment on the arch rib bracket through the gantry crane, and grout the arch rib segment; S8. Use two gantry cranes to lift and dismantle from the middle to both ends in sequence: dismantle the connecting beam system, and transport the side beam frame, bottom beam frame, middle cross beam and arch rib bracket to the transport vehicle by lifting and transporting them by gantry cranes; The side beam frame, bottom beam frame and arch rib support are all flipped in the air by gantry crane and hanging beam, from vertical position to horizontal position. The beneficial effects of the present invention are as follows: through the cooperation of the gantry crane and the hanging beam, the side beam frame and the bottom beam frame are set up on the supporting platform from both ends of the river in turn, and the side beam frame and the bottom beam frame are connected by a connecting beam system. Similarly, the bridge deck is built on the supporting platform by hoisting the middle crossbeam from both ends of the river to the center through the gantry crane. After the bridge deck is built, the arch rib bracket is hoisted by the gantry crane and the hanging beam until the entire bridge is built. Then, in the opposite order, through the cooperation of the gantry crane and the hanging beam, the side beam frame, the bottom beam frame and the arch rib bracket are disassembled and hoisted in turn from the middle to both ends of the river. The overall device does not require a steel trestle during the construction of the arch bridge, and does not require a floating crane, a crawler crane or a car crane to complete the hoisting. The gantry crane and the hanging beam can complete the entire process from installation and construction to disassembly, with high efficiency, greatly reducing construction costs, avoiding the process of temporarily building a steel trestle and disassembling a steel trestle, saving time and effort, and greatly saving materials.

[0014] The side winches on both sides of the gantry crane and the crane and hanging beam on the top cooperate with each other to lift the bottom beam frame installed at the bottom of the bridge to the top of the bridge, and then through coordinated operation, the bottom beam frame can be flipped, and the vertical bottom beam frame can be flipped to a horizontal state, and then moved to the transport vehicle through the gantry crane, realizing the process of lifting the bottom beam frame installed at the bottom of the bridge to the top of the bridge, avoiding the complex construction of lifting the bottom beam frame by floating crane using a floating boat, and greatly saving costs. Similarly, the gantry crane and hanging beam cooperate with each other to flip the side beam frame and the arch rib bracket in the air, and can lift the vertical hanging objects to a horizontal state, which greatly facilitates the lifting process, and can directly lift and unload the hanging objects from the transport vehicle, avoiding the process of using other equipment for flipping operations in the middle, and speeding up construction efficiency.

[0015] The overall device is highly safe, replacing the traditional process of using a crane to put up a steel trestle. The construction is efficient. Since the gantry crane and the hanging beam have the function of flipping, the transport vehicle directly transports the relevant structure to the bottom of one side of the bridge, and the gantry crane can directly hoist the relevant structure from the bottom of the bridge for installation. It has good economic benefits, saves materials, and is fast and efficient. At the same time, it avoids the waste of materials in erecting a steel trestle using the traditional construction method.

[0016] The connecting beam system is quick to connect and disassemble. By turning the bidirectional screw, the connecting tie rod can be telescopically tightened, the clamp can be quickly installed and removed from the side beam frame, and the clamp at the end of the connecting tie rod can be quickly installed and removed from the bottom beam frame. The connecting tie rod can adapt to different distances between the side beam frame and the bottom beam frame. At the same time, when the bottom beam frame and the side beam frame are installed, if they inevitably deflect and tilt due to the unevenness of the river or the riverbed bottom, the rotating device on the clamp can be rotated and locked, so that the connecting beam system can connect the two relatively inclined brackets, so that the side beam frame, the bottom beam frame and the connecting beam system are connected into a whole, so that the overall structure is stable and can withstand the impact of river water, which is convenient for installing and building the bridge deck, and has great promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The present invention will be further described below in conjunction with the accompanying drawings and embodiments; Figure 1 It is a front view of the overall structure of the present invention; Figure 2 It is a front view of the local structure of the present invention; Figure 3 It is a side view of the cross beam in the hoisting of the integral structure of the present invention; Figure 4 It is a side view of the integral structure hoisting arch rib support of the present invention; Figure 5 It is a side view of the hoisting bottom beam frame of the integral structure of the present invention; Figure 6 It is a front view of the hanging beam flip bottom beam frame of the present invention; Figure 7 It is a front view of the cross beam in the hoisting of the present invention; Figure 8 is a side view of the suspension beam of the present invention; Fig. 9 It is a front view of the local structure of the present invention; Fig.10 It is a top view of the local structure of the present invention; Fig.11 The present invention Fig.10 A magnified view of center A; Fig.12 It is an axial side view of the clamp of the present invention; Fig.13 The present invention Fig.12 Middle B: Enlarged view; Fig.14 It is an axial side view of the clamp of the present invention from another viewing angle; Fig.15 It is an axial side view of the ring frame of the present invention; Fig.16 is an axial side view of the second connecting rod and the clamp of the present invention; In the figure: gantry crane 1; crane 101; side winch 102; track 2; electrical system 3; side beam frame 4; first pile foundation 401; bottom beam frame 5; second pile foundation 501; bottom lifting lug 502; top lifting lug 503; side lifting lug 504; connecting beam system 6; hoop 601; ring frame 602; connecting column 6021; connecting tie rod 603; first connecting rod 6031; bidirectional screw 6032; second connecting rod Rod 6033; rotating device 604; turntable 6041; support 6042; locking rod 6043; locking block 6044; cylinder 6045; clamp 605; hanging beam 7; sliding block 701; screw rod 702; hydraulic cylinder 703; bearing 704; main beam 705; motor 706; roller 707; second hydraulic cylinder 708; middle cross beam 8; arch rib support 9; transport vehicle 10; wire pulley 11. DETAILED DESCRIPTION

[0018] Embodiment 1: like Figure 1-16 A shallow water bottom-supported arch bridge construction device and a construction method thereof are provided, comprising two rows of side beam frames 4 and two rows of bottom beam frames 5, the side beam frames 4 are located outside the bottom beam frames 5, a connecting beam system 6 is provided between the side beam frames 4 and the bottom beam frames 5, two movable gantry cranes 1 are provided on the side beam frames 4, a walking hanging beam 7 is provided on the gantry crane 1, and a plurality of sliding sliding blocks 701 are provided on the hanging beam 7; The bottom beams 5 on both sides are used to install the middle cross beam 8 and the arch rib bracket 9. With this structure, through the cooperation of the gantry crane 1 and the hanging beam 7, the side beams 4 and the bottom beams 5 are set up supporting platforms from both ends of the river in turn, and the side beams 4 and the bottom beams 5 are connected by the connecting beam system 6. Similarly, the middle cross beam 8 is hoisted from both ends of the river to the center through the gantry crane 1 to build the bridge deck on the supporting platform. After the bridge deck is built, the arch rib bracket 9 is hoisted by the gantry crane 1 and the hanging beam 7 until the entire bridge is built. Then, in the opposite order, through the cooperation of the gantry crane 1 and the hanging beam 7, the side beams 4, the bottom beams 5 and the arch rib bracket 9 are disassembled and hoisted in turn from the middle to the two ends of the river. The overall device does not need a steel trestle during the construction of the arch bridge, and does not need to be hoisted by a floating crane, a crawler crane or a car crane. The gantry crane 1 and the hanging beam 7 can complete the entire process from installation and construction to disassembly, with high efficiency, greatly reducing construction costs, avoiding the process of temporarily building a steel trestle and disassembling a steel trestle, saving time and effort, and greatly saving materials.

[0019] The side winches 102 on both sides of the gantry crane 1 and the crane 101 and the hanging beam 7 on the top cooperate with each other, and can hoist the bottom beam frame 5 installed at the bottom of the bridge to the top of the bridge, and then through coordinated operation, the bottom beam frame 5 can be turned over, and the bottom beam frame 5 in the vertical state can be turned over to the horizontal state, and then moved to the transport vehicle 10 through the gantry crane 1, realizing the process of hoisting the bottom beam frame 5 installed at the bottom of the bridge to the top of the bridge, avoiding the complex construction of hoisting the bottom beam frame 5 by floating crane using a floating ship, and greatly saving costs. Similarly, the gantry crane 1 and the hanging beam 7 cooperate with each other, and can realize the flipping of the side beam frame 4 and the arch rib bracket 9 in the air, and can lift the vertical state of the hanging objects to the horizontal state, which greatly facilitates the hoisting process, and can directly lift and unload the hanging objects from the transport vehicle 10, avoiding the process of using other equipment to perform the flipping operation in the middle, and speeding up the construction efficiency.

[0020] The overall device is highly safe, replacing the traditional process of using a crane to put up a steel trestle; the construction is efficient, because the gantry crane 1 and the hanging beam 7 have a flipping function, the transport vehicle 10 directly transports the relevant structure to the bottom of one side of the bridge, and the gantry crane 1 can directly hoist the relevant structure from the bottom of the bridge for installation; the economic benefits are good, the materials are saved, and the construction is fast and efficient. At the same time, it avoids the phenomenon of wasting materials in erecting a steel trestle using the traditional construction method.

[0021] The connecting beam system 6 is quickly connected and disassembled. By rotating the bidirectional screw 6032, the connecting tie rod 603 can be telescopically tightened, the clamp 601 can be quickly installed and removed from the side beam frame 4, and the clamp 605 at the end of the connecting tie rod 603 can be quickly installed and removed from the bottom beam frame 5. The connecting tie rod 603 can adapt to the different distances between the side beam frame 4 and the bottom beam frame 5. At the same time, when the bottom beam frame 5 and the side beam frame 4 are installed, if they inevitably deflect and tilt due to the uneven bottom of the river or the riverbed, the rotating device 604 on the clamp 601 can be rotated and locked, so that the connecting beam system 6 can connect the two relatively inclined brackets, so that the side beam frame 4, the bottom beam frame 5 and the connecting beam system 6 are connected into a whole, so that the overall structure is stable and can withstand the impact of river water, which is convenient for installing and building the bridge deck.

[0022] In the preferred solution, a track 2 is provided on the top of the side beam frame 4, an electrical system 3 is provided on the bottom of both sides of the gantry machine 1, both ends of the gantry machine 1 slide against the track 2, a horizontally movable crane 101 is provided on the gantry machine 1, and side winches 102 are provided on both sides of the gantry machine 1. With this structure, through the cooperation of the gantry machine 1 and the hanging beam 7, the side beam frame 4 and the bottom beam frame 5 are sequentially set up with supporting platforms from both ends of the river, and the side beam frame 4 and the bottom beam frame 5 are connected by a connecting beam system 6. Similarly, the middle cross beam 8 is hoisted from both ends of the river to the center through the gantry machine 1 to build the bridge deck on the supporting platform. After the bridge deck is built, the arch rib bracket 9 is hoisted by the gantry machine 1 and the hanging beam 7 until the entire bridge is built.

[0023] The steel cables of the two side winches 102 are against the wire wheel 11, and one end of the steel cables of the two side winches 102 are respectively connected to the side lifting ears 504 of the bottom beam frame 5, and one of the sliding blocks 701 of the hanging beam 7 is connected to the top lifting ear 503 of the bottom beam frame 5. One of the side winches 102 is extended and the other side winch 102 is contracted to realize the horizontal movement of the bottom beam frame 5.

[0024] In the preferred solution, pile caps, main cross beams, main longitudinal beams and distribution beams are sequentially arranged on the top of the side beam frame 4 and the bottom beam frame 5, the track 2 is arranged on the distribution beam of the side beam frame 4, the bottom beam frame 5 includes a plurality of second pile foundations 501, a top lifting lug 503, a plurality of side lifting lugs 504 and a plurality of bottom lifting lugs 502 are arranged on the bottom beam frame 5, and a guide wheel 11 is arranged on one side of the distribution beam at the top of the side beam frame 4. With this structure, when the bottom beam frame 5 moves horizontally: the steel cables of the two side winches 102 abut against the guide wheel 11, one end of the steel cables of the two side winches 102 is respectively connected to the side lifting lugs 504 of the bottom beam frame 5, one of the sliding blocks 701 of the suspension beam 7 is connected to the top lifting lug 503 of the bottom beam frame 5, one of the side winches 102 is extended, and the other side winch 102 is contracted, so as to realize the horizontal movement of the bottom beam frame 5.

[0025] When the bottom beam 5 is turned over in the air, the connection between the side lifting lug 504 and the side winch 102 is disconnected, and another sliding block 701 of the hanging beam 7 is connected to the bottom lifting lug 502. When the electric hoist at the bottom of the sliding block 701 is retracted, the position of the sliding block 701 connected to the bottom lifting lug 502 is moved, and the electric hoist on the bottom lifting lug 502 is tightened, so that the bottom beam 5 is turned over in the air. Similarly, the side beam 4 and the arch rib bracket 9 are provided with the same bottom lifting lug, top lifting lug and side lifting lug as the bottom beam 5, and the turning process of the side beam 4 and the arch rib bracket 9 is the same as that of the bottom beam 5.

[0026] In the preferred solution, a transport vehicle 10 is provided on one side of the side beam frame 4 at the end, and the transport vehicle 10 is used to transport the middle cross beam 8, the arch rib bracket 9, the side beam frame 4 and the bottom beam frame 5. With this structure, the overall device is highly safe, replacing the traditional process of using a crane to put on the steel trestle; the construction is efficient, because the gantry 1 and the hanging beam 7 have the flipping function, the transport vehicle 10 directly transports the relevant structure to the bottom of one side of the bridge, and the gantry 1 can directly hoist the relevant structure from the bottom of the bridge for installation; the economic benefits are good, the materials are saved, and the transportation is fast and convenient.

[0027] In the preferred solution, the hanging beam 7 includes two main beams 705 on both sides, the main beams 705 are connected to the crane 101, a plurality of sliding sliding blocks 701 are arranged on the main beams 705, an electric hoist is arranged at the bottom of the sliding blocks 701, a positioning groove is arranged on the main beams 705, a screw rod 702 is arranged between the two main beams 705, and a motor 706 is arranged at the end of the screw rod 702. According to this structure, the second hydraulic cylinders 708 on both sides of the sliding blocks 701 are retracted, the motor 706 is driven to rotate the screw rod 702, and the hydraulic cylinder 703 is driven to make the bearing 704 abut against the screw rod 702 to move the sliding block 701. When the sliding block 701 is moved into place, the bearing 704 is disconnected, and the second hydraulic cylinder 708 is extended to position the sliding block 701. The hanging beam 7 can adjust the positions of the plurality of sliding blocks 701, so that when different sliding blocks 701 are connected to the hanging objects, the hanging objects can be turned over.

[0028] In the preferred solution, a hydraulic cylinder 703 is provided on the sliding block 701, a bearing bush 704 is provided on the top of the hydraulic cylinder 703, the bearing bush 704 is connected to the screw rod 702, and a telescopic second hydraulic cylinder 708 is provided on both sides of the sliding block 701, and the second hydraulic cylinder 708 abuts on the positioning groove of the main beam 705. With this structure, rollers 707 are provided at the bottom of both ends of the sliding block 701, and the rollers 707 abut on the main beam 705 to slide.

[0029] In a preferred solution, the connecting beam system 6 includes a plurality of hoops 601 installed on the first pile foundation 401 and a plurality of ring frames 602 installed on the second pile foundation 501, a connecting tie rod 603 is provided between the horizontal hoops 601 and the ring frames 602, and a rotating device 604 is provided on the horizontal hoops 601. With this structure, the connecting beam system 6 can be connected and disassembled quickly, and the bidirectional screw 6032 can be rotated to allow the connecting tie rod 603 to be telescopically tightened, the clamp 601 can be quickly installed and removed from the side beam frame 4, and the clamp 605 at the end of the connecting tie rod 603 can be quickly installed and removed from the bottom beam frame 5. The connecting tie rod 603 can adapt to the different distances between the side beam frame 4 and the bottom beam frame 5. At the same time, when the bottom beam frame 5 and the side beam frame 4 are installed, if they inevitably deflect and tilt due to the uneven bottom of the river or the riverbed, the rotating device 604 on the clamp 601 can be rotated and locked, so that the connecting beam system 6 can connect the two relatively inclined brackets, so that the side beam frame 4, the bottom beam frame 5 and the connecting beam system 6 are connected into a whole, so that the overall structure is stable and can withstand the impact of river water, which is convenient for installing and building the bridge deck.

[0030] In a preferred embodiment, the rotating device 604 includes a rotating disk 6041 rotatably connected to the clamp 601, the clamp 601 is provided with a plurality of grooves, the rotating disk 6041 is provided with a support 6042 on both sides, the support 6042 is provided with a rotating locking rod 6043, one end of the locking rod 6043 is provided with a locking block 6044, the other end of the locking rod 6043 is provided with a hinged cylinder 6045, and the cylinder 6045 is installed on the clamp 601. According to this structure, when the side beam frame 4 and the bottom beam frame 5 are relatively tilted, the cylinder 6045 is driven to make the end of the locking rod 6043 away from the rotating disk 6041, the connecting tie rod 603 is rotated to make the axis center line of the clamp 605 parallel to the axis center line of the ring frame 602, and the rotation stops, and the cylinder 6045 is driven to make the locking block 6044 stuck on the groove of the rotating disk 6041, so that the rotating device 604 is locked.

[0031] In a preferred solution, a connecting column 6021 is provided on the ring frame 602, and the connecting tie rod 603 includes a first connecting rod 6031 and a second connecting rod 6033, a bidirectional screw 6032 is provided between the first connecting rod 6031 and the second connecting rod 6033, the first connecting rod 6031 is connected to the rotating disk 6041, and one end of the second connecting rod 6033 is provided with a plurality of rotating linked clamps 605, the clamps 605 are clamped on the connecting column 6021, and the two ends of the connecting column 6021 are connected to the ring frame 602 through nuts. According to this structure, the clamp 605 includes a second clamp, a locking nut and a locking handle are provided on the second clamp, a gasket is provided between the second clamp and the locking handle, and the second clamp is rotatably connected to the second connecting rod 6033.

[0032] A construction method of a shallow water bottom-through arch bridge construction device, characterized by: erecting the side beam frame 4 and the bottom beam frame 5 of the end from both ends of the river, erecting other structures of the end except the middle cross beam and the arch rib, and installing the gantry crane 1 on the track 2; The side beams 4 and the bottom beams 5 are hoisted at both ends of the two gantry cranes 1: when hoisting the side beams 4 and the bottom beams 5, the side beams 4 and the bottom beams 5 are turned over and rotated in the air by using the hoisting beams 7 and the gantry cranes 1; Install the side beam frame 4 and the bottom beam frame 5 at the bottom of the riverbed, and install the connecting beam system 6 between the side beam frame 4 and the bottom beam frame 5; Repeat S2 to S3 in sequence, and complete the bottom bracket erection of the two gantry cranes 1 from both ends to the middle; Two gantry cranes 1 sequentially hoist multiple middle cross beams 8 from both ends to the middle, and install them on the top of the bottom beam frame 5 to build the bridge deck; The gantry crane 1 sequentially hoists the arch rib brackets 9 from both ends to the middle: the arch rib brackets 9 are hoisted from the transport vehicle 10 and turned in the air by the hoisting beam 7; Install the arch rib segment on the arch rib bracket 9 through the gantry crane 1, and grout the arch rib segment; Use two gantry cranes 1 to lift and dismantle from the middle to both ends in sequence: remove the connecting beam system 6, and the side beam frame 4, the bottom beam frame 5, the middle cross beam 8 and the arch rib bracket 9 are lifted and transported to the transport vehicle 10 by the gantry crane 1; The side beam frame 4, the bottom beam frame 5 and the arch rib support 9 are all turned over in the air by using the gantry crane 1 and the hanging beam 7, and turned over from a vertical position to a horizontal position.

[0033] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A construction device for a shallow water through-type arch bridge, characterized by: The invention comprises two rows of side beam frames (4) and two rows of bottom beam frames (5), the side beam frames (4) are located outside the bottom beam frames (5), a connecting beam system (6) is provided between the side beam frames (4) and the bottom beam frames (5), two movable gantry cranes (1) are provided on the side beam frames (4), a walking hanging beam (7) is provided on the gantry crane (1), and a plurality of sliding sliding blocks (701) are provided on the hanging beam (7); The bottom beam frames (5) on both sides are used to install the middle cross beam (8) and the arch rib bracket (9).

2. According to claim 1, a shallow water through arch bridge construction device is characterized by: A track (2) is provided on the top of the side beam frame (4), an electrical system (3) is provided at the bottom of both sides of the gantry machine (1), both ends of the gantry machine (1) slide against the track (2), a horizontally movable crane (101) is provided on the gantry machine (1), and side winches (102) are provided on both sides of the gantry machine (1).

3. The shallow water through arch bridge construction device according to claim 1 is characterized by: The tops of the side beam frame (4) and the bottom beam frame (5) are provided with pile caps, main cross beams, main longitudinal beams and distribution beams in sequence, the track (2) is arranged on the distribution beam of the side beam frame (4), the bottom beam frame (5) includes a plurality of second pile foundations (501), the bottom beam frame (5) is provided with a top lifting lug (503), a plurality of side lifting lugs (504) and a plurality of bottom lifting lugs (502), and a guide wheel (11) is provided on one side of the distribution beam at the top of the side beam frame (4).

4. The shallow water through arch bridge construction device according to claim 1 is characterized by: A transport vehicle (10) is provided on one side of the side beam frame (4) at the end portion, and the transport vehicle (10) is used to transport the middle cross beam (8), the arch rib bracket (9), the side beam frame (4) and the bottom beam frame (5).

5. The shallow water through arch bridge construction device according to claim 1 is characterized by: The hanging beam (7) comprises main beams (705) on both sides, the main beams (705) are connected to the crane (101), a plurality of sliding lifting blocks (701) are provided on the main beams (705), an electric hoist is provided at the bottom of the sliding lifting blocks (701), a positioning groove is provided on the main beam (705), a screw rod (702) is provided between the two main beams (705), and a motor (706) is provided at the end of the screw rod (702).

6. The shallow water through arch bridge construction device according to claim 1 is characterized by: A hydraulic cylinder (703) is provided on the sliding block (701), a bearing bush (704) is provided on the top of the hydraulic cylinder (703), the bearing bush (704) is connected to the screw rod (702), and telescopic second hydraulic cylinders (708) are provided on both sides of the sliding block (701), and the second hydraulic cylinders (708) are against the positioning groove of the main beam (705).

7. The shallow water through arch bridge construction device according to claim 1 is characterized by: The connecting beam system (6) comprises a plurality of hoops (601) installed on the first pile foundation (401) and a plurality of ring frames (602) installed on the second pile foundation (501), a connecting tie rod (603) is provided between the hoops (601) in a horizontal position and the ring frames (602), and a rotating device (604) is provided on the hoops (601) in a horizontal position.

8. The shallow water through arch bridge construction device according to claim 1 is characterized by: The rotating device (604) comprises a rotating disk (6041) rotatably connected to the clamp (601); the clamp (601) is provided with a plurality of grooves; supports (6042) are provided on both sides of the rotating disk (6041); a rotating locking rod (6043) is provided on the supports (6042); a locking block (6044) is provided at one end of the locking rod (6043); a hinged cylinder (6045) is provided at the other end of the locking rod (6043); and the cylinder (6045) is mounted on the clamp (601).

9. The shallow water through arch bridge construction device according to claim 1 is characterized by: A connecting column (6021) is provided on the ring frame (602), and the connecting tie rod (603) comprises a first connecting rod (6031) and a second connecting rod (6033). A bidirectional screw rod (6032) is provided between the first connecting rod (6031) and the second connecting rod (6033). The first connecting rod (6031) is connected to a rotating disk (6041). One end of the second connecting rod (6033) is provided with a plurality of rotatably linked clamps (605), and the clamps (605) are clamped on the connecting column (6021). Both ends of the connecting column (6021) are connected to the ring frame (602) via nuts.

10. The construction method of a shallow water through arch bridge construction device according to any one of claims 1 to 9, characterized in that: S1, erecting the side beam frames (4) and bottom beam frames (5) at the ends of the river, erecting the other structures of the ends except the middle cross beam and arch ribs, and installing the gantry crane (1) on the track (2); S2, hoisting the side beams (4) and the bottom beams (5) at both ends of the two gantry cranes (1): when hoisting the side beams (4) and the bottom beams (5), the side beams (4) and the bottom beams (5) are turned over and rotated in the air by using the hoisting beams (7) and the gantry cranes (1); S3, installing the side beam frame (4) and the bottom beam frame (5) at the bottom of the riverbed, and installing a connecting beam system (6) between the side beam frame (4) and the bottom beam frame (5); S4, repeat S2 to S3 in sequence, and complete the installation of the bottom brackets of the two gantry cranes (1) from both ends to the middle; S5, two gantry cranes (1) sequentially hoist a plurality of middle cross beams (8) from both ends to the middle, install them on the top of the bottom beam frame (5), and build the bridge deck; S6. The gantry crane (1) sequentially hoists the arch rib brackets (9) from both ends to the middle: the arch rib brackets (9) are hoisted from the transport vehicle (10) and turned in the air using the hoisting beam (7); S7, installing the arch rib segment on the arch rib bracket (9) through the gantry crane (1), and grouting the arch rib segment; S8. Use two gantry cranes (1) to lift and dismantle from the middle to both ends in sequence: remove the connecting beam system (6), and lift and transport the side beam frame (4), the bottom beam frame (5), the middle cross beam (8) and the arch rib bracket (9) to the transport vehicle (10) by means of the gantry cranes (1); The side beam frame (4), the bottom beam frame (5) and the arch rib support (9) are all turned in the air by using the gantry crane (1) and the hanging beam (7), and turned from a vertical position to a horizontal position.