Bridge demolition swivel device and method for demolition of bridge by adopting same

By designing a spherical hinge rotary drive device and a bridge removal rotary device with high-strength concrete base, the problem that the existing technology cannot meet the removal needs of large bridges is solved, the stability and rapid removal of bridges are achieved, and the waterway and environment are reduced. Influence.

CN118958184APending Publication Date: 2024-11-15CHONGQING JIAOTONG UNIV +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411325116.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing bridge removal rotary device drives the main beam rotation to lift through the hydraulic lifting system, which cannot meet the needs of large bridge demolition and has an impact on the surrounding environment and shipping.

Method used

Design a bridge removal rotation device including a ball hinge lower base, a ball hinge upper base, a ball hinge lower base, a ball hinge, an upper ball hinge and a ball hinge rotation driving mechanism. The upper ball hinge rotates through gear transmission, and combines with a high-strength concrete foundation. The seat and curved groove structure ensures stable support and slow rotation of the bridge during the removal process.

Benefits of technology

The stable demolition of large bridges has been achieved, the demolition period has been shortened, the occupation time on the waterway has been reduced, the impact on the surrounding environment has been reduced, and the stability and safety of the bridge during rotation has been ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958184A_ABST
    Figure CN118958184A_ABST
Patent Text Reader

Abstract

The invention discloses a bridge demolition swivel device and a method for demolition of a bridge through the device, the bridge demolition swivel device comprises a spherical hinge lower base, a spherical hinge upper base, a lower spherical hinge, an upper spherical hinge and a spherical hinge rotation driving mechanism, the upper end face of the lower spherical hinge is a concave spherical surface, and the lower end face of the upper spherical hinge is a convex spherical surface; the lower spherical hinge is assembled and fixed in the spherical hinge lower base, the convex spherical surface of the upper spherical hinge is in sliding fit with the concave spherical surface of the lower spherical hinge, and the upper end of the upper spherical hinge is fixedly connected with the spherical hinge upper base; the centers of the spherical hinge upper base, the spherical hinge lower base, the upper spherical hinge and the lower spherical hinge are positioned on the same axis; the at least two spherical hinge rotation driving mechanisms are arranged around the upper spherical hinge in the circumferential direction and comprise driving motors, driving gears and driven gears, the driven gears are fixedly connected to the middle of the upper spherical hinge in a sleeved mode, and the driving gears are fixedly connected to output shafts of the driving motors in a sleeved mode and meshed with the driven gears.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bridge demolition, and in particular to a bridge demolition rotating device and a method for demolishing a bridge by using the device. Background Art

[0002] A considerable number of existing bridges have reached their service life or some old bridges that have not reached their service life have no longer met the requirements for normal use due to various reasons and need to be demolished. For some cross-river bridges with waterways under the bridges, traditional bridge demolition methods usually require long-term occupation of the waterway under the bridge, especially when the entire bridge deck is directly demolished, which will have an adverse impact on normal navigation; in order to ensure the safety of traffic under the bridge during its demolition, a long-term ban on navigation will be implemented on the river section in the bridge area, and the ban on navigation will be lifted only after the bridge above the navigation hole is demolished. For rivers with developed shipping, this will have a huge impact on the economic benefits of shipping during the construction period.

[0003] Based on this, in order to shorten the bridge demolition cycle and reduce the impact of bridge demolition on the surrounding environment. The Chinese patent with application number 202310558091X discloses a bridge demolition hinge and bridge demolition method based on hydraulic lifting, including a base, a hydraulic lifting system and a ball joint system; the hydraulic lifting system includes a cylinder and a piston rod, and the ball joint system includes an upper ball joint and a lower ball joint; the cylinder is arranged on the base, and the ball joint system is arranged above the piston rod; the cylinder is a multi-layer annular structure, from the inside to the outside, the layers are separated by the side wall of the annular cylinder, and a throttle hole is arranged below the side wall of the annular cylinder. The piston rod is an annular member, which is arranged in the gap between the side walls of the annular cylinder. A positioning pin shaft hole is arranged in the center of the cylinder, and a through hole is arranged in the center of the piston rod, the upper ball joint and the lower ball joint. The positioning pin shaft passes through the through hole to fix the piston rod, the upper ball joint and the lower ball joint; the multi-layer annular structure of the cylinder can still play a good explosion-proof role even when the structure is damaged or the hydraulic oil leaks. This method of using a hydraulic lifting system to drive the main beam to rotate and lift greatly reduces the blocking time of the road under the bridge. However, this method of supporting and rotating the bridge by hydraulic means is only applicable to the demolition of small bridges, and is not applicable to bridges with high heights and large main beams. In response to this problem, the applicant intends to design a rotating device and demolition method that can be applied to the demolition of various bridges and has simple installation and operation methods. Summary of the invention

[0004] In view of the above-mentioned deficiencies in the prior art, the purpose of the present invention is to provide a bridge demolition rotation device and a method for demolishing a bridge using the device, so as to solve the problem that the existing bridge demolition rotation device drives the main beam to rotate and lift through a hydraulic lifting system, which cannot meet the needs of large-scale bridge demolition rotation.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions: A bridge dismantling swivel device comprises a ball joint lower base, a ball joint upper base, a lower ball joint, an upper ball joint and a ball joint rotation drive mechanism, wherein the upper end surface of the lower ball joint is a concave spherical surface, and the lower end surface of the upper ball joint is a convex spherical surface; the lower ball joint is assembled and fixed in the ball joint lower base, the convex spherical surface of the upper ball joint is slidably matched with the concave spherical surface of the lower ball joint, and the upper end of the upper ball joint is fixedly connected to the ball joint upper base; the centers of the ball joint upper base, the ball joint lower base, the upper ball joint and the lower ball joint are all on the same axis; the ball joint rotation drive mechanism is provided with at least two, which are arranged circumferentially around the upper ball joint, and include a driving motor, a driving gear and a driven gear, the driven gear is sleeved and fixed on the middle part of the upper ball joint, and the driving gear is sleeved and fixed on the output shaft of the driving motor and meshes with the driven gear. In this way, a driven gear is provided on the upper ball joint of the swivel device, and a driving gear is provided on the ball joint rotation drive mechanism. After the upper ball joint is driven to rotate by gear transmission, the upper base of the ball joint rotates synchronously together, and the rotation is relatively stable. In a specific implementation, the rotation speed of the upper ball joint can be adjusted by controlling the rotation speed of the driving gear to ensure that when the bridge is demolished, the demolished bridge rotates slowly and the rotation speed is controllable. The lower ball joint is assembled on the lower base of the ball joint, and the structure is stable and has sufficient support. The upper ball joint and the lower ball joint cooperate through the convex spherical surface and the concave spherical surface, and the upper ball joint can be rotated under the drive of an external force.

[0006] Furthermore, an annular groove is provided on the lower end surface of the upper base of the ball joint, and the ball joint rotation drive mechanism also includes a support block that is loosely sleeved on the driving gear or the output shaft, and the upper end surface of the support block abuts against the annular groove and is placed in the annular groove. In this way, when the upper ball joint rotates, the support block will not rotate with the driving gear or the output shaft due to the loose sleeve assembly, and when the upper base of the ball joint rotates with the upper ball joint, the support block can always form support for the upper base of the ball joint, thereby ensuring that the bridge on the upper base of the ball joint is supported by the support block in addition to the support of the upper base of the ball joint during the rotation process, ensuring that the supporting force during the rotation process is not affected by the rotation.

[0007] Furthermore, the annular groove is formed by splicing a plurality of arc-shaped tracks, the upper base of the ball joint is in the shape of a ring, and the annular groove is coaxial with the upper base of the ball joint. In this way, the process of forming the annular groove by using an arc-shaped slideway is simpler than directly setting the groove. The annular groove is coaxial with the upper base of the ball joint, which can ensure that when the upper base of the ball joint rotates, the support block is in the annular groove without any obstruction.

[0008] Furthermore, the upper ball joint and the upper base of the ball joint are connected and fixed by fasteners, or fixed by threaded fitting. In this way, the threaded fitting fixing method or the fastener method can effectively ensure that the upper ball joint and the upper base of the ball joint are firmly connected, and are convenient for later disassembly or maintenance.

[0009] Furthermore, the upper base and the lower base of the spherical joint are both high-strength concrete bases. In this way, the upper base and the lower base of the spherical joint are formed by pouring concrete, and the upper base and the lower base of the spherical joint can be poured on site during on-site installation, so that the upper base of the spherical joint and the bridge, and the lower base of the spherical joint and the temporary bridge pier can be connected to form an integral whole and be tightly connected.

[0010] Furthermore, an external spline is provided in the middle of the upper ball joint, and the driven gear is connected and fixed to the upper ball joint through the spline. In this way, the driven gear and the upper ball joint are connected through the spline, and the connection structure is stable and convenient for later maintenance.

[0011] Furthermore, the ball joint rotation drive mechanism is provided with four, which are evenly distributed around the center of the upper ball joint. In this way, the upper ball joint is subjected to balanced force during rotation, and the rotation is more stable. The number and size of the driving gear teeth of each ball joint rotation drive mechanism are consistent, and they are synchronously driven by four drive motors, each of which shares a quarter of the power required for the rotation of the bridge, to ensure stable operation of the system and efficient torque transmission.

[0012] Furthermore, a circle of ball joint support legs are evenly arranged around the center periphery of the lower ball joint. In this way, when the upper ball joint rotates, its convex spherical surface is placed in the guide space formed by the ball joint support legs, preventing the upper ball joint from losing stability on the lower ball joint, and the upper ball joint can rotate smoothly.

[0013] A method for dismantling a bridge, using the bridge dismantling rotating device as described above, comprises the following steps: S1, build a temporary pier with a height smaller than the original pier next to each original pier of the bridge to be demolished, and the sum of the height of the temporary pier and the height of the bridge demolition rotating device is equal to the height of the original pier; S2, install the bridge demolition rotating device on each temporary pier, and fix the upper ball joint of each bridge demolition rotating device to the bottom surface of the main beam of the bridge to be demolished, and support the bridge through the temporary piers and the bridge demolition rotating device; S3, implement a navigation ban on the river section in the bridge area, demolish the mid-span closure section on the left and right sides above the piers and the connection between the original piers and the bridge, and fix a ball joint rotation drive mechanism above the original pier after cutting, so that the support block at the upper end of the ball joint rotation drive mechanism is against the annular groove on the upper base; S4, start the ball joint rotation drive mechanism of each bridge demolition rotating device, drive the upper ball joint to rotate, and then drive the bridge fixed with it to rotate; S5, lift the navigation ban and gradually complete the demolition of most bridges. In this way, by fixing the bridge swivel device to the bridge and cutting off the closing sections on both sides of the pier, the bridge to be demolished can be rotated, and the bridge can be demolished after being rotated to a position that does not affect the navigation conditions under the bridge, so as to avoid occupying the waterway for a long time and affecting the navigation of ships. The bridge demolition swivel device is first installed on a temporary pier column, and this part of the swivel device structure and the temporary pier column will play a role in supporting the bridge when cutting the top of the original pier. The remaining swivel device structure is installed on the original pier. The weight of the bridge will be borne by the complete swivel device, and the weight of the bridge and the swivel device is supported by the original pier and the temporary pier column; in addition to the temporary pier supporting the bridge, the original pier is retained as a support, and the swivel device does not need to be installed by lifting the bridge, so the stability is better.

[0014] Furthermore, when installing the bridge dismantling swivel device on the temporary bridge pier, first install or temporarily cast the lower base of the ball joint, then install the lower ball joint, the upper ball joint and the upper base of the ball joint. When installing the upper ball joint, first assemble the driven gear on the upper ball joint; finally, install at least two ball joint rotation drive mechanisms on the temporary bridge pier, and the driving motor of each ball joint rotation drive mechanism is fixed to the temporary bridge pier, and the driving gear is meshed with the driven gear. In this way, when installing the bridge swivel device, the upper base and the lower base of the ball joint are temporarily cast on site, and the remaining parts except the base can be removed and reused. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The schematic diagram of the overall layout of the bridge dismantling rotation and transposition structure; Figure 2 A top view of the swivel and transposition structure for bridge demolition; Figure 3 It is a top view of the annular slide structure; Figure 4 This is a schematic diagram of step 1 of the bridge demolition method of the present invention; Figure 5This is a schematic diagram of step 2 of the bridge demolition method of the present invention; Figure 6 This is a schematic diagram of step 3 of the bridge demolition method of the present invention; Figure 7 This is a schematic diagram of step 4 of the bridge demolition method of the present invention. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.

[0017] It should be noted that similar numbers and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In the description of the present invention, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the invention product is usually placed when used, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance. In addition, the terms "horizontal", "vertical", etc. do not mean that the components are absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted. In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0018] like Figure 1-Figure 3 As shown, a bridge dismantling swivel device provided in this embodiment includes a ball joint lower base 3, a ball joint upper base 12, a lower ball joint 4, an upper ball joint 5 and a ball joint rotation drive mechanism, wherein the upper end surface of the lower ball joint 4 is a concave spherical surface, and the lower end surface of the upper ball joint 5 is a convex spherical surface; the lower ball joint 4 is assembled and fixed in the ball joint lower base 3, the convex spherical surface of the upper ball joint 5 is slidably matched with the concave spherical surface of the lower ball joint 4, and the upper end of the upper ball joint 5 is fixedly connected to the ball joint upper base 12; the centers of the ball joint upper base 12, the ball joint lower base 3, the upper ball joint 5 and the lower ball joint 4 are all on the same axis; the ball joint rotation drive mechanism is provided with at least two, which are circumferentially arranged around the upper ball joint 5, including a driving motor 7, a driving gear 8 and a driven gear 10, the driven gear 10 is sleeved and fixed on the middle part of the upper ball joint 5, the driving gear 8 is sleeved and fixed on the output shaft of the driving motor 7, and meshes with the driven gear 10. In this way, the upper ball joint 5 of the swivel device is provided with a driven gear 10, and the ball joint rotation drive mechanism is provided with a driving gear 8. After the upper ball joint 5 is driven to rotate by gear transmission, the upper base 12 of the ball joint rotates synchronously, and the rotation is relatively stable. In the specific implementation, the rotation speed of the upper ball joint 5 can be adjusted by controlling the rotation speed of the driving gear 8 to ensure that when the bridge is dismantled, the dismantled bridge rotates slowly and the rotation speed is controllable. The lower ball joint 4 is assembled on the lower base 3 of the ball joint, and the structure is stable and has sufficient support. The upper ball joint 5 and the lower ball joint 4 cooperate through the convex spherical surface and the concave spherical surface, and the upper ball joint 5 can be rotated under the drive of an external force.

[0019] Furthermore, an annular groove 11 is provided on the lower end surface of the upper base 12 of the ball joint, and the ball joint rotation drive mechanism also includes a support block 9 which is loosely mounted on the driving gear 8 or the output shaft, and the upper end surface of the support block 9 abuts against the annular groove 11 and is placed in the annular groove 11. In this way, when the upper ball joint 5 rotates, the support block 9 will not rotate with the driving gear 8 or the output shaft due to the loose assembly, and when the upper base 12 of the ball joint rotates with the upper ball joint 5, the support block 9 can always form support for the upper base 12 of the ball joint, thereby ensuring that during the rotation of the bridge on the upper base 12 of the ball joint, in addition to the support of the upper base 12 of the ball joint, it also has the support of the support block 9, ensuring that the supporting force during the rotation is not affected by the rotation.

[0020] Furthermore, the annular groove 11 is formed by splicing a plurality of arc-shaped tracks, the upper base 12 of the ball joint is in the shape of a ring, and the annular groove 11 is coaxial with the upper base 12 of the ball joint. In this way, the process of forming the annular groove by using an arc-shaped slideway is simpler than that of directly setting the groove. The annular groove 11 is coaxial with the upper base 12 of the ball joint, which can ensure that when the upper base 12 of the ball joint rotates, the support block 9 is in the annular groove 11 without any obstruction.

[0021] Furthermore, the upper ball joint 5 is connected and fixed to the upper ball joint base 12 by fasteners or by threaded fixing. In this way, the threaded fixing method or the fastener method can effectively ensure that the upper ball joint 5 is firmly connected to the upper ball joint base 12, and facilitates later disassembly or maintenance.

[0022] Furthermore, the spherical joint upper base 12 and the spherical joint lower base 3 are both high-strength concrete bases. In this way, the spherical joint upper base 12 and the spherical joint lower base 3 are formed by concrete pouring, and the spherical joint upper base 12 and the spherical joint lower base 3 can be poured on site during on-site installation, so that the spherical joint upper base 12 and the bridge, and the spherical joint lower base 3 and the temporary bridge pier can be connected to form an integral body, and the connection is tight.

[0023] Furthermore, an external spline is provided in the middle of the upper ball joint 5, and the driven gear 10 is connected and fixed to the upper ball joint 5 through the spline matching. In this way, the driven gear 10 and the upper ball joint 5 are connected through the spline matching, and the connection structure is stable and convenient for later maintenance.

[0024] Furthermore, the ball joint rotation drive mechanism is provided with four, which are evenly distributed around the center of the upper ball joint 5. In this way, the upper ball joint 5 is subjected to balanced force during rotation, and the rotation is more stable. The driving gears 8 of each ball joint rotation drive mechanism have the same number of teeth and size, and are synchronously driven by four drive motors 7, each of which shares a quarter of the power required for the rotation of the bridge, so as to ensure stable operation of the system and efficient torque transmission.

[0025] Furthermore, a circle of ball joint legs 6 are evenly arranged around the center periphery of the lower ball joint 4. In this way, when the upper ball joint 5 rotates, its convex spherical surface is placed in the guide space formed by the ball joint legs 6, preventing the upper ball joint 5 from losing stability on the lower ball joint 4, and the upper ball joint 5 can rotate smoothly.

[0026] like Figure 4-Figure 7 As shown, this embodiment also provides a method for dismantling a bridge, using the bridge dismantling rotating device as described above, comprising the following steps: Step 1: construct a certain number and size of temporary piers 2 at reasonable positions around the original pier 1. The design of the temporary pier 2 meets the weight and center of gravity of the bridge; the height of the temporary pier 2 plus the height of the swivel device is consistent with the height of the original pier 1, so as to provide support for the bridge; cast the ball joint lower base 3 above the temporary pier 2, and the ball joint lower base 3 is reserved with an installation groove for assembling the lower ball joint 4; then install the initial components of the swivel device, first install the lower ball joint 4 in the groove reserved in the ball joint lower base 3, and then install the upper ball joint 5, the upper ball joint 5 has a driven gear 10; the center of the lower ball joint 4, the center of the upper ball joint 5, the center of the annular groove and the rotation center of the bridge are on the same vertical line; cast the ball joint upper base 12 between the upper ball joint 5 and the bottom of the bridge, and the top of the upper base is connected with the bottom of the bridge; install the ball joint rotation drive mechanism on the periphery of the ball joint structure of the ball joint lower base 3; Step 2: Smoothly cut the top of the original pier 1 to the same level as the lower base 3 of the ball joint. After cutting, the bridge is supported by the temporary pier column 2. Install the rotating device, the driving gear 8 and the arc track above the original pier 1 in the same way as the ball joint rotating drive mechanism and the slideway in step 2. All components are combined into a complete rotating device. After the rotating device is installed, the bridge is supported by the original pier 1 and the temporary pier column 2. Step 3: Confirm that the remaining bridge and structure will not lose stability and bearing capacity due to the removal of the mid-span closure sections 13 on both sides above the bridge piers, implement a navigation ban on the river section in the bridge area, and remove the mid-span closure sections 13 on both sides above the bridge piers; during the removal, mechanical cutting technology, such as diamond wire saws or hydraulic crushers, is preferred to reduce the impact on other parts of the bridge and avoid excessive vibration or damage. During the removal process, the crane will lift the cut bridge sections to the ground or onto a ship; Step 4: Start the ball joint rotation drive mechanism, the active gear 8 drives the driven gear 10 to rotate, that is, the upper ball joint 5 and the bridge rotate; use the swivel device to rotate the bridge to a position that will not affect the navigation conditions under the bridge, lift the ban on navigation, and gradually complete the demolition of most of the bridge.

[0027] By fixing the bridge swivel device to the bridge and cutting off the closing sections 13 on both sides of the pier, the bridge to be demolished can be rotated, and the bridge can be demolished after being rotated to a position that does not affect the navigation conditions under the bridge, so as to avoid occupying the waterway for a long time and affecting the navigation of ships. The bridge demolition swivel device is first installed on a temporary pier 2 that is being built, and this part of the swivel device structure and the temporary pier 2 will play a role in supporting the bridge when cutting the top of the original pier 1. The remaining swivel device structure is installed on the original pier 1, and the weight of the bridge will be borne by the complete swivel device, and the weight of the bridge and the swivel device are supported by the original pier 1 and the temporary pier 2; in addition to the temporary pier supporting the bridge, the original pier 1 is retained as a support, and the swivel device does not need to be installed by lifting the bridge, so the stability is better.

[0028] Furthermore, when installing the bridge dismantling swivel device on the temporary bridge pier, first install or temporarily cast the ball joint lower base 3, then install the lower ball joint 4, the upper ball joint 5 and the ball joint upper base 12. When installing the upper ball joint 5, the driven gear 10 must be assembled on the upper ball joint 5. Finally, at least two ball joint rotation drive mechanisms are installed on the temporary bridge pier, and the driving motor 7 of each ball joint rotation drive mechanism is fixed to the temporary bridge pier, and the driving gear 8 is meshed with the driven gear 10. In this way, when installing the bridge swivel device, the ball joint upper base 12 and the ball joint lower base 3 are temporarily cast on site, and the remaining parts except the base can be removed and reused.

[0029] The bridge demolition rotation device is debugged before use to ensure that the bridge deck can be smoothly rotated to the specified angle, and is equipped with necessary control systems to facilitate operation and monitoring by construction personnel.

[0030] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit the technical solution. Those skilled in the art should understand that those modifications or equivalent substitutions of the technical solution of the present invention that do not depart from the purpose and scope of the technical solution should be included in the scope of the claims of the present invention.

Claims

1. A bridge demolition rotation device, characterized in that: It includes a ball joint lower base, a ball joint upper base, a lower ball joint, an upper ball joint and a ball joint rotation drive mechanism, wherein the upper end surface of the lower ball joint is a concave spherical surface, and the lower end surface of the upper ball joint is a convex spherical surface; the lower ball joint is assembled and fixed in the ball joint lower base, the convex spherical surface of the upper ball joint is slidably matched with the concave spherical surface of the lower ball joint, and the upper end of the upper ball joint is fixedly connected to the ball joint upper base; the centers of the ball joint upper base, the ball joint lower base, the upper ball joint and the lower ball joint are all on the same axis; the ball joint rotation drive mechanism is provided with at least two, which are circumferentially arranged around the upper ball joint, including a driving motor, a driving gear and a driven gear, the driven gear is sleeved and fixed on the middle part of the upper ball joint, the driving gear is sleeved and fixed on the output shaft of the driving motor, and meshes with the driven gear.

2. The bridge demolition rotating device according to claim 1, characterized in that: An annular groove is arranged on the lower end surface of the ball joint upper base. The ball joint rotation drive mechanism also includes a support block which is loosely sleeved on the driving gear or the output shaft. The upper end surface of the support block abuts against the annular groove and is placed in the annular groove.

3. The bridge demolition rotating device according to claim 1 or 2, characterized in that: The annular groove is formed by splicing a plurality of arc-shaped tracks, the upper base of the ball joint is in the shape of a circular ring, and the annular groove is coaxial with the upper base of the ball joint.

4. The bridge demolition rotating device according to claim 3 is characterized in that: The upper ball joint and the upper base of the ball joint are connected and fixed by fasteners or by threaded fitting.

5. The bridge demolition rotating device according to claim 3, characterized in that: The spherical joint upper base and the spherical joint lower base are both high-strength concrete bases.

6. The bridge demolition rotating device according to claim 1, 2, 4 or 5, characterized in that: An external spline is arranged in the middle of the upper ball joint, and the driven gear is connected and fixed to the upper ball joint through the spline cooperation.

7. The bridge demolition rotating device according to claim 6, characterized in that: The ball joint rotation drive mechanisms are provided with four, which are evenly distributed around the center of the ball joint.

8. The bridge demolition rotating device according to claim 6, characterized in that: A circle of ball joint support feet are evenly arranged around the center of the lower ball joint.

9. A method for dismantling a bridge, characterized in that: The bridge dismantling rotating device according to any one of claims 2 to 8 is used, comprising the following steps: S1, build a temporary pier with a height smaller than the original pier next to each original pier of the bridge to be demolished, and the sum of the height of the temporary pier and the height of the bridge demolition rotating device is equal to the height of the original pier; S2, install the bridge demolition rotating device on each temporary pier, and fix the upper ball joint of each bridge demolition rotating device to the bottom surface of the main beam of the bridge to be demolished, and support the bridge through the temporary piers and the bridge demolition rotating device; S3, implement a navigation ban on the river section in the bridge area, demolish the mid-span closure section on the left and right sides above the piers and the connection between the original piers and the bridge, and fix a ball joint rotation drive mechanism above the original pier after cutting, so that the support block at the upper end of the ball joint rotation drive mechanism is against the annular groove on the upper base; S4, start the ball joint rotation drive mechanism of each bridge demolition rotating device, drive the upper ball joint to rotate, and then drive the bridge fixed with it to rotate; S5, lift the navigation ban and gradually complete the demolition of most bridges.

10. The method for dismantling a bridge according to claim 9, characterized in that: When installing the bridge dismantling swivel device on the temporary bridge pier, first install or temporarily cast the lower base of the ball joint, and then install the lower ball joint, the upper ball joint and the upper base of the ball joint. When installing the upper ball joint, first assemble the driven gear on the upper ball joint; finally, install at least two ball joint rotation drive mechanisms on the temporary bridge pier, and the driving motor of each ball joint rotation drive mechanism is fixed to the temporary bridge pier, and the driving gear is meshed with the driven gear.

Citation Information

Patent Citations

  • Bridge demolition rotating hinge based on hydraulic lifting and bridge demolition method

    CN116591068A