A steel structure curtain wall that is easy to assemble

By designing a steel structure curtain wall system including rubber pads, sliders, fixed frames, glass, connecting rings and first rubber blocks, the problems of collision damage during hoisting and difficulty in high-altitude disassembly are solved, achieving a safer and more convenient Working at heights and stronger glass fixation.

CN118958570BActive Publication Date: 2025-01-24SHANWEI HONGSHENG STEEL STRUCTURE CO LTD

Patent Information

Application Number
CN202411387742.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-07
Publication Date
2025-01-24
Estimated Expiration
2044-10-07

AI Technical Summary

Technical Problem

During the lifting process of steel structure curtain walls, the steel structure curtain walls are prone to damage due to collisions, and it is difficult to disassemble the buffer material in high altitude environments, which poses a risk of falling.

Method used

Designed a steel structure curtain wall system that includes rubber pads, slider, fixed racks, glass, connecting rings, and first rubber blocks. The rubber pads protect the fixed rack and glass during the hanging process, and no need to disassemble, which enhances high -altitude operations. Safety and convenience.

Benefits of technology

Effectively avoid the collision damage of fixed racks and glass during the hanging process, simplify high -altitude operations, improve safety and convenience, and enhance the fixed strength of the glass.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958570B_ABST
    Figure CN118958570B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of steel structure curtain walls, and in particular to a steel structure curtain wall that is easy to assemble, including a mounting frame; a rubber pad, a slider, a fixing frame, etc.; a rubber pad is provided on the mounting frame; a plurality of sliders are fixedly connected to the rubber pad; and all the sliders are slidably connected to the fixing frame together. The present invention protects the fixing frame and the glass through the rubber pad, so as to avoid the fixing frame and the glass directly colliding with the wall during the hoisting process, and to avoid the fixing frame and the glass colliding with the mounting frame when the fixing frame and the glass are hoisted around the mounting frame, so as to avoid the fixing frame and the glass being damaged during the hoisting process. In addition, the present invention uses the rubber pad as a seal during the use of the glass, that is, the rubber pad does not need to be disassembled after being hoisted to the installation position, so that the high-altitude operation is safer and more convenient. In addition, when installing the glass, there is no need to install additional seals.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of steel structure curtain walls, and in particular to a steel structure curtain wall which is easy to assemble. Background Art

[0002] Steel structure curtain wall is a building facade system, mainly composed of steel structure frame and glass panels. It can not only provide a beautiful appearance for the building, but also effectively protect the interior of the building from external factors such as weather and noise. However, during its installation, especially the installation of high-rise buildings, it is usually installed by hoisting. In order to avoid damage caused by collision of steel structure curtain wall during the hoisting process, it is necessary to wrap the outer layer of the hoisted object with sponge and rubber and other buffer materials to reduce the damage after the impact. However, after hoisting to high altitude, the staff above need to remove the wrapped sponge and rubber and other buffer materials. However, due to the large size of steel structure curtain wall, it is difficult for staff to install and dismantle it. In the process of dismantling, the curtain wall will collide with the mounting frame or wall. It is extremely difficult to operate in a high-altitude environment, which requires a lot of time and there is a risk of the steel structure curtain wall falling. Summary of the invention

[0003] In order to avoid damage to the steel structure curtain wall caused by collision during the hoisting process, it is necessary to wrap the outer layer of the hoisted object with cushioning materials such as sponge and rubber to reduce the damage after the impact. However, after hoisting to a high altitude, the staff above need to remove the wrapped cushioning materials such as sponge and rubber. However, due to the large size of the steel structure curtain wall, it is difficult for the staff to install and disassemble. The present invention provides a steel structure curtain wall that is easy to assemble.

[0004] The technical implementation scheme of the present invention is: a steel structure curtain wall that is easy to assemble, including a mounting frame; also including a rubber pad, a slider, a fixing frame, glass, a connecting ring and a first rubber block; a rubber pad is arranged on the mounting frame; a plurality of sliders are fixedly connected to the rubber pad; all the sliders are slidably connected to the fixing frame together, a plurality of second sliding grooves are provided on the fixing frame, and the sliders slide in the second sliding grooves; the glass is fixedly connected to the fixing frame; a plurality of connecting rings are fixedly connected to the fixing frame; a plurality of first rubber blocks are fixedly connected to the rubber pad, and each first rubber block is located inside the connecting ring; the rubber pad is used to protect the fixing frame and the glass.

[0005] As a further preferred solution, a wedge-shaped structure is provided on the first rubber block.

[0006] As a further preferred solution, a fixing assembly is also included, which includes a limit plate and a second bolt; a plurality of limit plates are arranged on the rubber pad; a plurality of second bolts are screwed on the fixing frame, and each second bolt passes through the mounting frame, the rubber pad and the slider.

[0007] As a further preferred solution, the width of the rubber pad is greater than that of the mounting frame and the fixing frame to enhance the sealing effect thereof.

[0008] As a further preferred solution, each limiting plate is provided with a plurality of second through holes.

[0009] As a further preferred solution, a limiting groove is provided on the mounting frame.

[0010] As a further preferred solution, each second bolt is provided with an extrusion block.

[0011] As a further preferred scheme, it also includes an adjustment component, which includes a connecting plate, a limiting rod, a first bolt and a nut; a plurality of first sliding grooves are provided on the mounting frame; a connecting plate is slidably connected in each first sliding groove provided on the mounting frame; a limiting rod is fixedly connected to each connecting plate; a first bolt is fixedly connected to each connecting plate, and the first bolt passes through the mounting frame; a nut is screwed on each first bolt, and the nut is in contact with the mounting frame.

[0012] As a further preferred solution, a first through hole is provided on the rubber pad; the diameter of the first through hole is larger than the limiting rod.

[0013] As a further preferred solution, a second rubber block is arranged on the limiting plate.

[0014] The present invention has the following advantages: 1. The present invention protects the fixing frame and the glass through the rubber pad, so as to avoid the fixing frame and the glass directly colliding with the wall during the hoisting process, and avoids the fixing frame and the glass colliding with the mounting frame when the fixing frame and the glass are hoisted around the mounting frame, so as to avoid the fixing frame and the glass being damaged during the hoisting process. In addition, the present invention uses the rubber pad as a seal during the use of the glass, that is, the rubber pad does not need to be removed after being hoisted to the installation position, so that the high-altitude operation is safer and more convenient. In addition, when installing the glass, there is no need to install an additional seal.

[0015] 2. In the process of tightening the second bolt, the extrusion block of the present invention squeezes the limit plate, so that the limit plate moves toward the direction of the rubber pad and squeezes the rubber pad. Since the limit plate is embedded in the rubber pad and the rubber pad is wider than the mounting frame and the fixing frame, under the extrusion of the limit plate, the parts of the rubber pad on both sides that are wider than the mounting frame and the fixing frame are respectively tilted toward the direction of the mounting frame and the fixing frame, and fit the mounting frame and the fixing frame to enhance the sealing effect. At the same time, in the process of making the limit plate squeeze the rubber pad to move, since the rubber pad is squeezed by the limit plate, a local part of the rubber pad is forced to enter the second through hole, and then in the process of further tightening the second bolt, the rubber pad enters the limit groove through the second through hole, further enhancing the sealing effect.

[0016] 3. In the present invention, the staff screws the nearby nut to separate the limit rod from the connecting ring, and then uses a rubber hammer to knock the rubber pad, slider and fixing frame there, so that the mounting holes on them are aligned. That is, the above method is convenient for the staff to adjust the position of the mounting hole. After completing the pre-tightening of all the second bolts, the staff tightens the second bolts in sequence, and then screws the nut in a clockwise direction to move the limit rod toward the mounting frame and fit tightly with the connecting ring. At the same time, in the process of tightening the second bolt, the second bolt squeezes the limit plate to move the limit plate toward the connecting ring, and the limit plate drives the second rubber block to follow the movement and squeeze the connecting ring, that is, the connecting ring and the first rubber block cooperate to enhance the fixing strength, so that the second rubber block is close to the limit rod to enhance the fixing strength of the glass. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of a steel structure curtain wall that is easy to assemble according to the present invention;

[0018] Figure 2 The structural exploded diagram of the steel structure curtain wall rubber pad, slider, fixing frame and glass for easy assembly of the present invention;

[0019] Figure 3 It is a schematic diagram of the working state structure of the hoisting process of the steel structure curtain wall which is easy to assemble according to the present invention;

[0020] Figure 4 It is a structural schematic diagram of a steel structure curtain wall fixing assembly that is easy to assemble according to the present invention;

[0021] Figure 5 A schematic diagram of the structure of a steel structure curtain wall limit plate and a second bolt for easy assembly of the present invention;

[0022] Figure 6 A schematic diagram of the combined structure of the second through hole and the second rubber block of the steel structure curtain wall for easy assembly of the present invention;

[0023] Figure 7 It is a structural schematic diagram of a steel structure curtain wall adjustment assembly that is easy to assemble according to the present invention;

[0024] Figure 8 For the present invention Figure 7 Magnified view of area A in .

[0025] Among them: 1-mounting frame, 1001-limiting groove, 1002-first slide groove, 2-rubber pad, 2001-first through hole, 3-slider, 4-fixing frame, 4001-second slide groove, 5-glass, 6-connecting ring, 7-first rubber block, 101-limiting plate, 10101-second through hole, 10102-second rubber block, 102-second bolt, 10201-extrusion block, 201-connecting plate, 202-limiting rod, 203-first bolt, 204-nut. DETAILED DESCRIPTION

[0026] The present invention is further described below in conjunction with specific embodiments. It should also be noted that, unless otherwise clearly specified and limited, terms such as: setting, installing, connecting, and connecting should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0027] Embodiment 1: A steel structure curtain wall that is easy to assemble, such as Figure 1-Figure 5 As shown, it includes a mounting frame 1;

[0028] It also includes a rubber pad 2, a slider 3, a fixing frame 4, a glass 5, a connecting ring 6 and a first rubber block 7; a rubber pad 2 is provided on the mounting frame 1; eight sliders 3 distributed in a rectangular shape are fixedly connected to the rubber pad 2; all the sliders 3 are slidably connected to the fixing frame 4 together, and sixteen second sliding grooves 4001 distributed in a rectangular shape are provided on the fixing frame 4, and the sliders 3 slide in the second sliding grooves 4001; a glass 5 is fixedly connected to the fixing frame 4; twelve connecting rings 6 distributed in a rectangular shape are fixedly connected to the fixing frame 4; twelve first rubber blocks 7 distributed in a rectangular shape are fixedly connected to the rubber pad 2, and each first rubber block 7 is located inside the connecting ring 6; the rubber pad 2 is used to protect the fixing frame 4 and the glass 5.

[0029] The first rubber block 7 is provided with a wedge-shaped structure for limiting the fixed rope for hoisting on the connecting ring 6 .

[0030] First, the staff will install and fix several mounting frames 1 on the outer wall of the building by welding or bolting, and then the staff will install the curtain wall. The main components of the curtain wall are the fixing frame 4 and the glass 5. During the installation of the high-altitude curtain wall, the staff will first use the ropes on the lifting equipment to fix the two connecting rings 6 located above the fixing frame 4, and then carry out the lifting work. However, in order to avoid the fixing frame 4 and the glass 5 from colliding with the wall under the action of external wind and airflow during the lifting process, resulting in damage and deformation of the fixing frame 4 and the glass 5. That is, before lifting, the staff will put the rubber pad 2 on the fixing frame 4 and insert the slider 3 into the second slide groove 4001. After completing the assembly, the staff will push the rubber pad 2, and then use an external tool to push the rubber pad 2 backward. The rubber pad 2 drives the slider 3 to slide backward in the second slide groove 4001, so that the rubber pad 2 protrudes backward, and the rubber pad 2 drives the first rubber The rubber block 7 moves backwards to approach the rope on the connecting ring 6 and fixes the rope. Relatively speaking, the first rubber block 7 is also fixed by the rope on the connecting ring 6. The above-mentioned fixing method can make it more stable in the subsequent hoisting. In the hoisting process of the hoisting equipment, the rubber pad 2 is used to protect the fixing frame 4 and the glass 5 to avoid the fixing frame 4 and the glass 5 directly colliding with the wall during the hoisting process, and to avoid the fixing frame 4 and the glass 5 colliding with the mounting frame 1 when the fixing frame 4 and the glass 5 are hoisted around the mounting frame 1. After the external hoisting equipment drives the rubber pad 2, the slider 3, the fixing frame 4, the glass 5, the connecting ring 6 and the first rubber block 7 to move to the corresponding mounting frame 1, the staff then uses a traction tool (suction cup pull rod) to fix the fixing frame 4 and the glass 5, and then pulls the traction tool (suction cup pull rod) so that the traction tool (suction cup pull rod) drives the rubber pad 2, the slider 3, the fixing frame 4, the glass 5, the connecting ring 6 and the first rubber block 7 to move close to the mounting frame 1 to Figure 3The state shown, at this time, the rubber pad 2, the slider 3, the fixing frame 4, the glass 5, the connecting ring 6 and the first rubber block 7 are located in front of the mounting frame 1, and then the staff loosens the rope fixing the connecting ring 6, and then the staff further pulls the traction tool (suction cup pull rod) to drive the fixing frame 4 and the glass 5, so that the fixing frame 4 and the glass 5 enter the mounting frame 1 first, that is, the fixing frame 4 slides on the slider 3, and then the staff traction tool (suction cup pull rod) drives the fixing frame 4 and the glass 5 to move up, down, left and right to adjust the position, so that the fixing frame 4 and the glass 5 are located in the center position of the mounting frame 1, and the fixing frame 4 drives the rubber pad 2 to align with the mounting frame 1, and then the staff uses a rubber hammer to knock the rubber pad 2 to make the rubber pad 2 enter the mounting frame 1, that is, the rubber pad 2 drives the slider 3 to slide on the second slide groove 4001, so that the rubber pad 2 is flush with the fixing frame 4, and then the staff uses fasteners to fix the mounting frame 1, the fixing frame 4 and the glass 5 together, so that it should be known that during the high-altitude hoisting In the process, it is unavoidable that the hoisted object collides with the building. The damage after the collision can be reduced by wrapping the outer layer of the hoisted object with cushioning materials such as sponge and rubber. However, after hoisting to a high altitude, the staff above needs to remove the wrapped sponge and rubber and other cushioning materials before carrying out the subsequent installation of the glass 5. However, due to the large size of the glass 5, it is difficult to remove the wrapped sponge and rubber and other cushioning materials, and during the disassembly process, the fixing frame 4 and the glass 5 often collide with the mounting frame 1, which leads to damage to the mounting frame 1, the fixing frame 4 and the glass 5. That is, through the above-mentioned method, the fixing frame 4 and the glass 5 are protected by the rubber pad 2 to prevent the fixing frame 4 and the glass 5 from being damaged during the hoisting process. In addition, the present invention uses the rubber pad 2 as a seal during the use of the glass 5, that is, the rubber pad 2 does not need to be removed after hoisting to the installation position, making it safer and more convenient to work at high altitude. In addition, when the glass 5 is installed, there is no need to install an additional seal.

[0031] Embodiment 2: Based on the above embodiment 1, Figure 4-Figure 6 As shown, a fixing assembly is also included, which includes a limit plate 101 and a second bolt 102; four limit plates 101 distributed in a rectangular shape are arranged on the rubber pad 2; eight second bolts 102 are screwed on the fixing frame 4, and each second bolt 102 passes through the mounting frame 1, the rubber pad 2 and the slider 3.

[0032] The width of the rubber pad 2 is greater than that of the mounting frame 1 and the fixing frame 4 to enhance the sealing effect thereof.

[0033] A plurality of second through holes 10101 are formed on each limiting plate 101 . When the limiting plate 101 squeezes the rubber pad 2 , the rubber pad 2 passes through the second through holes 10101 and contacts the mounting frame 1 , so as to enhance the sealing effect.

[0034] The mounting frame 1 is provided with a limiting groove 1001 for cooperating with the rubber pad 2 and the second through hole 10101 to enhance the sealing effect.

[0035] Each second bolt 102 is provided with an extrusion block 10201 for cooperating with the limiting plate 101 to extrude the rubber pad 2 .

[0036] After the rubber pad 2, the slider 3, the fixing frame 4 and the glass 5 are installed on the mounting frame 1, during this process, the staff uses a rubber hammer to knock the mounting holes opened on the mounting frame 1, the rubber pad 2, the slider 3 and the limiting plate 101 to align with the built-in threaded holes on the fixing frame 4 to make them concentric, and then the staff makes the second bolt 102 pass through the mounting holes on the mounting frame 1, the rubber pad 2, the slider 3 and the limiting plate 101, and then tighten it on the built-in thread of the fixing frame 4, that is, the mounting frame 1, the rubber pad 2, the slider 3, the fixing frame 4 and the glass 5 are strung together and fixed by the second bolt 102 to ensure the stability of the present invention after assembly. In the process of tightening the second bolt 102, the extrusion block 10201 squeezes the limiting plate 101, so that the limiting plate 101 Move toward the direction of the rubber pad 2 and squeeze the rubber pad 2. Since the limiting plate 101 is embedded in the rubber pad 2 and the rubber pad 2 is wider than the mounting frame 1 and the fixing frame 4, under the squeezing action of the limiting plate 101, the parts of the rubber pad 2 on both sides that are wider than the mounting frame 1 and the fixing frame 4 are respectively tilted toward the direction of the mounting frame 1 and the fixing frame 4, and fit the mounting frame 1 and the fixing frame 4 to enhance the sealing effect. At the same time, in the process of making the limiting plate 101 squeeze the rubber pad 2 to move, since the rubber pad 2 is squeezed by the limiting plate 101, a local part of the rubber pad 2 is forced to enter the second through hole 10101, and then in the process of further tightening the second bolt 102, the rubber pad 2 enters the limiting groove 1001 through the second through hole 10101, further enhancing the sealing effect.

[0037] Embodiment 3: Based on the above embodiment 2, Figure 4-Figure 8 As shown, an adjustment component is also included, which includes a connecting plate 201, a limiting rod 202, a first bolt 203 and a nut 204; twelve first sliding grooves 1002 distributed in a rectangular shape are opened on the mounting frame 1; a connecting plate 201 is slidably connected in each first sliding groove 1002 opened on the mounting frame 1; a limiting rod 202 is fixedly connected to each connecting plate 201; a first bolt 203 is fixedly connected to each connecting plate 201, and the first bolt 203 passes through the mounting frame 1; a nut 204 is screwed on each first bolt 203, and the nut 204 is in contact with the mounting frame 1.

[0038] A first through hole 2001 is formed on the rubber pad 2; the diameter of the first through hole 2001 is larger than the limiting rod 202, so that the limiting rod 202 can enter the first through hole 2001 easily, thereby reducing the adjustment time of the staff.

[0039] A second rubber block 10102 is provided on the limiting plate 101 to cooperate with the connecting ring 6 , the first rubber block 7 and the limiting rod 202 to enhance the fixing strength.

[0040] When the staff uses the traction tool (suction cup pull rod) to drive the rubber pad 2, the slider 3, the fixing frame 4 and the glass 5 to be installed on the mounting frame 1, the limiting rod 202 first passes through the first through hole 2001 and enters the interior thereof, and then the limiting rod 202 enters the connecting ring 6. During this process, the first bolt 203 can be moved and adjusted on the mounting frame 1 by screwing the nut 204, that is, when the first bolt 203 is screwed in the clockwise direction, the first bolt 203 drives the connecting plate 201 to slide in the first slide groove 1002 toward the mounting frame 1, and when the first bolt 203 is screwed in the counterclockwise direction, the first bolt 203 drives the connecting plate 201 to slide in the first slide groove 1002 toward the fixing frame 1. The fixing frame 4 slides in the direction of the fixing frame 4, that is, in this process, the first bolt 203 is first screwed in a clockwise direction, so that the connecting plate 201 drives the limiting rod 202 to move in the direction of the mounting frame 1, so that the limiting rod 202 is close to and contacts the connecting ring 6, that is, the fixing frame 4 and the glass 5 are simply fixed in this way, and then the staff puts the second bolt 102 in the mounting holes on the mounting frame 1, the rubber pad 2, the sliding block 3 and the limiting plate 101. However, in this process, since the connection between the rubber pad 2 and the fixing frame 4 is mainly connected by the sliding mode of the sliding block 3, that is, the staff uses the traction tool (suction cup pull rod) to drive the rubber pad 2, the sliding block 3, the fixing frame 4 and the glass 5 to be installed on the mounting frame 1, it is impossible to accurately make the mounting frame 1, The mounting holes on the rubber pad 2, the slider 3 and the limiting plate 101 are aligned, that is, a secondary adjustment is required. That is, during this adjustment process, in order to facilitate fixation, a simple fixation is performed by limiting the limiting rod 202 and the connecting ring 6. Then the staff places the second bolt 102 in the mounting holes on the mounting frame 1, the rubber pad 2, the slider 3 and the limiting plate 101, and uses a screwdriver to pre-tighten the second bolt 102 on the built-in thread on the fixing frame 4. When the second bolt 102 at this location cannot be screwed, the staff screws the nearby nut 204 to separate the limiting rod 202 from the connecting ring 6, and then uses a rubber hammer to knock on the rubber pad 2, the slider 3 and the fixing frame 4 at this location to align the mounting holes on them. That is, through the upper The above-mentioned method is convenient for the staff to adjust the position of the mounting hole. After completing the pre-tightening of all the second bolts 102, the staff tightens the second bolts 102 in sequence, and then turns the nut 204 in a clockwise direction to move the limiting rod 202 toward the mounting frame 1 and fit tightly with the connecting ring 6. At the same time, in the process of tightening the second bolt 102, the second bolt 102 squeezes the limiting plate 101 to move the limiting plate 101 toward the connecting ring 6. The limiting plate 101 drives the second rubber block 10102 to follow the movement and squeeze the connecting ring 6, that is, the connecting ring 6 and the first rubber block 7 cooperate to enhance the fixing strength, so that the second rubber block 10102 is close to the limiting rod 202 to enhance the fixing strength of the glass 5.

[0041] Although the present disclosure has been described with respect to only a limited number of embodiments, those skilled in the art having benefit of this disclosure will appreciate that various other embodiments can be devised without departing from the scope of the present invention. Accordingly, the scope of the present invention should be limited only by the appended claims.

Claims

1. A steel structure curtain wall that is easy to assemble, comprising a mounting frame (1); wherein: It also comprises a rubber pad (2), a slider (3), a fixing frame (4), a glass (5), a connecting ring (6) and a first rubber block (7); the mounting frame (1) is provided with a rubber pad (2); a plurality of sliders (3) are fixedly connected to the rubber pad (2); all the sliders (3) are slidably connected to the fixing frame (4); a plurality of second sliding grooves (4001) are provided on the fixing frame (4), and the sliders (3) slide in the second sliding grooves (4001); the fixing frame (4) is fixedly connected to the glass (5); the fixing frame (4) is fixedly connected to the plurality of connecting rings (6); the rubber pad (2) is fixedly connected to the plurality of first rubber blocks (7), and each of the first rubber blocks (7) is located inside the connecting ring (6); the rubber pad (2) is used to protect the fixing frame (4) and the glass (5); The first rubber block (7) is configured to have a wedge-shaped structure; It also includes a fixing assembly, which includes a limit plate (101) and a second bolt (102); a plurality of limit plates (101) are arranged on the rubber pad (2); a plurality of second bolts (102) are screwed onto the fixing frame (4), and each second bolt (102) passes through the mounting frame (1), the rubber pad (2) and the sliding block (3); The width of the rubber pad (2) is greater than that of the mounting frame (1) and the fixing frame (4); Each limiting plate (101) is provided with a plurality of second through holes (10101); A limiting groove (1001) is provided on the mounting frame (1); Each second bolt (102) is provided with an extrusion block (10201).

2. A steel structure curtain wall that is easy to assemble according to claim 1, characterized in that: The invention also comprises an adjustment component, which comprises a connecting plate (201), a limiting rod (202), a first bolt (203) and a nut (204); a plurality of first sliding grooves (1002) are provided on the mounting frame (1); a connecting plate (201) is slidably connected in each first sliding groove (1002) provided on the mounting frame (1); each connecting plate (201) is fixedly connected to the limiting rod (202); each connecting plate (201) is fixedly connected to a first bolt (203), the first bolt (203) passing through the mounting frame (1); each first bolt (203) is screwed with a nut (204), the nut (204) being in contact with the mounting frame (1).

3. A steel structure curtain wall that is easy to assemble according to claim 2, characterized in that: A first through hole (2001) is provided on the rubber pad (2); the diameter of the first through hole (2001) is larger than the limiting rod (202).

4. A steel structure curtain wall that is easy to assemble according to claim 1, characterized in that: A second rubber block (10102) is arranged on the limiting plate (101).

Citation Information

Patent Citations

  • Glass unit and installation method thereof

    CN113802734A

  • Installation structure and installation method of color curtain wall convenient to install

    CN116791803A

Cited By

  • Dynamic response type connecting assembly of steel structure and curtain wall system and construction method

    CN120819196A