Flowmeter calibration device and calibration method

Through the combination of PLC system interlocking control and flowmeter components, the density change error problem in CO2 flow metering is solved, accurate flow metering and data recording of multivariate media are realized, and the evaluation needs of CO2 oil displacement effect is met.

CN118960912AActive Publication Date: 2024-11-15PETROCHINA CO LTD

Patent Information

Application Number
CN202310542117.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-15
Publication Date
2024-11-15
Estimated Expiration
2043-05-15

AI Technical Summary

Technical Problem

The error caused by density changes in existing flowmeters when measuring CO2 flow, cannot meet the precise measurement requirements of multivariate media, which affects the evaluation of CO2 oil displacement effect.

Method used

The PLC system is used to interlock the various components, calculate the mass and density of gas and liquids, and form a flow curve library of different media, through medium storage tanks, hot and cold units, booster pumps, pressure stabilization tanks, metering pumps, and samplers. and other components to realize flow metering at different temperatures and pressures.

Benefits of technology

Accurate flow metering for different media is realized, errors are reduced, and the measurement needs of multivariate media are met. The data is uploaded to the PLC database to establish isocapacity and isodensity curves, providing a basis for later flowmeter verification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118960912A_ABST
    Figure CN118960912A_ABST
Patent Text Reader

Abstract

The invention relates to a flowmeter calibration device and calibration method, and belongs to the technical field of flow measurement. Comprising a medium storage tank, a booster pump, a surge tank, a constant-volume water tank, an air conditioner, a metering pump, a cooling and heating unit, a sampler, a vacuum pump, a flowmeter, a pore plate, a PLC and a hot air drying device. The PLC performs detection alarm, analysis and interlocking control on the device, receives data such as temperature, pressure and liquid level, performs weighing metering by using the sampler, calibrates the density of a medium to be calibrated at different temperatures and pressures, and measures the CO2 circulation volume in unit time by using the metering pump to obtain volume flow so as to correct the mass flow of the flowmeter to be detected; meanwhile, all data are uploaded to a PLC database in real time, an isovolumetric curve and an isodensity curve are established, and a basis is provided for later verification of flowmeters of the same type.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a flow meter calibration device and a calibration method, belonging to the technical field of flow metering. Background Art

[0002] In the early stage of the pilot test blocks such as Heilongjiang 59, Heilongjiang 79 South, and Heilongjiang 125 in the Jilin Oilfield area in my country's oilfield industry, in order to verify the effect of CO2 flooding, the amount of CO2 injected into a single well needs to be accurately measured by mass flow. The flowmeter used on site is a volume flowmeter, which calculates the mass flow rate by measuring the flow volume flow and the corresponding density. The temperature and pressure range of the measured CO2 medium is large during injection, that is, the density is a variable. The flowmeter calibration uses water as the calibration medium for calibration, and water is an incompressible fluid. The density is basically constant under different ambient temperatures and pressures. At the same time, the physical properties of water and CO2 such as viscosity and density detected in production are quite different. Therefore, there will be a certain error in measuring the CO2 flow rate using a water-calibrated flowmeter, which results in the flowmeter calibrated with water not being able to meet the production needs of measuring the mass flow of multivariable media, and the error size cannot be determined, which will affect the evaluation of the CO2 flooding effect. Summary of the invention

[0003] In order to solve the above-mentioned problems existing in the prior art, the present application provides a flow meter calibration device and a calibration method, which interlock and control each component through a PLC system, calculate the mass, density and other related parameters of gas and liquid, and form a flow curve library for different flow meters to measure different media, so as to meet the needs of flow meter calibration under different temperatures, pressures and volume flow rates.

[0004] To achieve the above purpose, the technical solution of the present application is a flow meter calibration device, comprising:

[0005] Medium storage tank, used for storing medium;

[0006] The cooling and heating units are used to ensure the gas phase balance of the medium storage tank. When the pressure in the tank is too high, the tank is cooled, and when the pressure is too low, the tank is heated and gasified.

[0007] Booster pump, used to increase the medium pressure in the pipeline;

[0008] Pressure stabilizing tank, used to maintain medium pressure in pipeline;

[0009] Constant volume water tank, a container used to provide a constant volume of medium;

[0010] Air conditioning is used to ensure that the medium temperature in the constant volume water tank is kept constant under standard atmospheric pressure;

[0011] Metering pumps are used to transport, measure and adjust the flow rate and flow velocity of the medium;

[0012] Sampler, used to measure the mass of the medium;

[0013] The heating and cooling unit is used to heat or cool the medium in the pipeline to keep the medium at a constant temperature;

[0014] Vacuum pump is used to evacuate the pipeline to ensure vacuum in the system and avoid residual gas in the pipeline during measurement, which may affect the measurement results.

[0015] Flow meter, used to measure the medium flowing through;

[0016] Orifice plate, used to form a pressure difference in the pipeline to ensure that the medium enters the sampler;

[0017] PLC controller, used to realize automatic control and data storage.

[0018] Furthermore, the calibration device also includes a hot air drying device, which is used to blow hot air on the pipeline after the water calibration of the metering pump is completed to avoid the inclusion of impurity water affecting the accuracy of the calibration;

[0019] Furthermore, the calibration device also includes a pressure sensor, a temperature sensor, and a filter. The filter is used to filter impurities in the medium in the pipeline; the pressure sensor is used to detect the medium pressure in the pipeline and transmit a signal, and the temperature sensor is used to detect the medium temperature in the pipeline and transmit a signal. The PLC controller is electrically connected to the pressure sensor and the temperature sensor. The PLC controller receives pressure and temperature signals, compares them with set values, and controls the cooling and heating units, booster pumps, and pressure-stabilizing tank control valves to stabilize system parameters.

[0020] Furthermore, the cooling and heating unit is connected to the medium storage tank, the output end of the medium storage tank is connected to the booster pump, and the other end of the booster pump is respectively connected to the pressure stabilizing tank, the metering pump, and the cooling and heating unit;

[0021] The first branch of the constant volume water tank is connected to the air conditioner, and the second branch of the constant volume water tank is connected to the metering pump; the output end of the metering pump is respectively connected to the sampler and the orifice plate, the cold and hot units are respectively connected to the flow meter and the vacuum pump, the other end of the pressure regulating tank is also connected to the input end of the medium storage tank, a gas phase control valve is installed on the pipeline at the input end of the medium storage tank, a pressure regulating tank control valve is installed between the gas phase control valve and the pressure regulating tank, and the PLC controller is respectively electrically connected to the cold and hot units, booster pump, air conditioner, metering pump, pressure regulating tank control valve and cold and hot units.

[0022] Furthermore, a filter is provided between the cooling and heating unit and the flow meter and the vacuum pump, and the filter is connected to the flow meter and the vacuum pump respectively.

[0023] Furthermore, the booster pump input end is also provided with a booster pump control valve, and the booster pump output end is also provided with a check valve; a control valve and a metering pump control valve are also installed in sequence between the check valve and the metering pump; a metering pump check valve is also installed at the metering pump output end, and a constant volume water tank electric valve is also installed on the control valve and the constant volume water tank connecting pipeline, a flat gate valve is also installed between the metering pump check valve and the external pipeline, an electric valve is also provided between the check valve and the cold and hot units, and a sampler input end control valve is also provided between the metering pump check valve and the sampler; the PLC controller is electrically connected to the constant volume water tank electric valve and the electric valve respectively.

[0024] The control valve at the sampler input end is used to prevent water from entering the sampler when calibrating the metering pump.

[0025] Furthermore, the hot air drying device is installed between the constant volume water tank and the metering pump, and an output control valve is also installed on the output end pipeline of the hot air drying device.

[0026] Furthermore, a low-temperature flat gate valve and a low-temperature flat gate valve are installed at both ends of the flow meter respectively; a pressure sensor and a temperature sensor are installed between the orifice plate and the low-temperature flat gate valve; a sampler control valve A and a sampler control valve B are installed at both ends of the sampler respectively, and a relief valve is installed at the output end of the vacuum pump.

[0027] Furthermore, a gas phase low temperature flat gate valve is installed between the gas phase control valve and the control valve at the sampler input end.

[0028] The calibration method of the present invention comprises the following specific steps:

[0029] Step 1: Open the electric valve and flat gate valve of the constant volume water tank, start the air conditioner and the metering pump, and transport water at standard atmospheric pressure and 20°C from the constant volume water tank to the metering pump. The water flowing through the metering pump is transported to the designated location; the standard volume displacement of the metering pump is calibrated by calculating the number of revolutions of the metering pump.

[0030] Step 2: After the metering pump is calibrated, open the output control valve and hot air drying device to dry the medium in the pipeline.

[0031] Step 3: Close the output control valve, constant volume water tank electric valve, gas phase control valve, booster pump control valve and flat gate valve, open other valves, and use PLC to automatically control the vacuum pump to extract the air in the pipeline to avoid the formation of a two-phase zone due to too many impurities, resulting in slug flow, bubbly flow, half-pipe flow and other phenomena.

[0032] Step 4: Then turn on the booster pump, the pressure-stabilizing tank and the cooling and heating units, fill the liquid measured medium into the device for closed-loop pre-cooling, and return the gaseous medium to the medium storage tank through the gas-phase low-temperature flat gate valve and the gas-phase control valve. After the system cools down, close the gas-phase low-temperature flat gate valve. By continuously adjusting the cooling and heating units and the booster pump, the pressure in the device will change continuously as the temperature rises or falls. The signal transmitted by the pressure sensor is fed back to the PLC controller, and the PLC controller automatically controls the pressure. When pressure replenishment is required, the booster pump is used to increase the pressure; when pressure relief is required, the pressure-stabilizing tank control valve is used to relieve the pressure, so that the pressure and temperature in the system reach the target set values.

[0033] Step 5: After the temperature and pressure are stable, measure the mass by weighing the sampler and calculate the corresponding density. At the same time, measure the medium circulation volume per unit time by the metering pump, measure the volume flow rate, calculate the mass flow rate according to the formula, and check it with the actual number of the flow meter being tested to determine the accuracy of the flow meter.

[0034] The present invention adopts the above technical scheme and can achieve the following technical effects: the PLC controller detects, alarms, analyzes and interlocks the device, receives temperature, pressure, liquid level and other data, uses a sampler to weigh and measure, calibrates the density of the medium under different temperatures and pressures, and measures the CO2 circulation volume per unit time through a metering pump to obtain the volume flow rate to correct the mass flow rate of the flow meter being measured; at the same time, all data are uploaded to the PLC controller database in real time, and isochoric curves and isodensity curves are established to provide a basis for the subsequent calibration of the same type of flow meters. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a structural schematic diagram of the present invention.

[0036] Explanation of the numbers in the figure: 1. Medium storage tank; 2. Chiller; 3. Pressure regulator; 4. Booster pump; 5. Constant volume water tank; 6. Metering pump; 7. Pressure regulator control valve; 10. Chiller; 11. Filter; 12. Sampler; 13. Vacuum pump; 14. Orifice plate; 15. Air conditioner; 16. Hot air drying device; 17. Flow meter; 19. Gas phase control valve; 20. Output control valve; 21. Constant volume water tank electric valve; 22. Metering pump control valve; 25. Flat gate valve; 26. Electric valve; 31. Booster pump control valve; 36. Air relief valve; 40. Cryogenic flat gate valve A; 41. Cryogenic flat gate valve B; 44. Sampler control valve A; 45. Sampler control valve B; 47. Gas phase cryogenic flat gate valve; 49. Control valve; 53. Sampler input control valve; 60. PLC controller; 65. Temperature sensor; 66. Pressure sensor; 71. Check valve; 73. Metering pump check valve. DETAILED DESCRIPTION

[0037] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments: this example is used to further describe the present application.

[0038] Embodiment 1:

[0039] In this embodiment, the medium in the medium storage tank 1 is CO2.

[0040] like Figure 1 As shown, this embodiment provides a flow meter calibration device, including a medium storage tank 1, which is used to store CO2 and provide a medium for calibration of the entire device;

[0041] The cooling and heating unit 2 is used to ensure the gas phase balance of the medium storage tank 1, and to cool when the pressure in the tank is too high, and to heat and gasify when the pressure is too low;

[0042] A pressure stabilizing tank 3, used to maintain the medium pressure in the pipeline;

[0043] A booster pump 4, used to increase the medium pressure in the pipeline;

[0044] Constant volume water tank 5, used to provide a container of constant volume medium;

[0045] Metering pump 6, used for conveying, metering and regulating the flow rate and flow velocity of the medium;

[0046] The cooling and heating unit 10 is used to heat or cool the medium in the pipeline to keep the medium at a constant temperature;

[0047] A sampler 12, used for measuring the mass of the medium;

[0048] The vacuum pump 13 is used to evacuate the pipe to ensure the vacuum in the system and avoid residual gas in the pipe during measurement, which may affect the measurement result.

[0049] The orifice plate 14 is used to form a pressure difference in the pipeline to ensure that the medium enters the sampler 12;

[0050] The air conditioner 15 is used to ensure that the temperature of the medium in the constant volume water tank 5 is kept constant under standard atmospheric pressure;

[0051] A flow meter 17, used to measure the medium flowing through;

[0052] The PLC controller 60 is used to realize automatic control and data storage.

[0053] Furthermore, the calibration device also includes a hot air drying device 16, which is used to blow hot air on the pipeline after the water calibration of the metering pump 6 is completed to prevent the inclusion of impurity water from affecting the accuracy of the calibration;

[0054] Furthermore, the calibration device further includes a pressure sensor 66, a temperature sensor 65, and a filter 11, wherein the filter 11 is used to filter impurities in the medium in the pipeline; the PLC controller 60 is electrically connected to the pressure sensor 66 and the temperature sensor 65; the pressure sensor 66 is used to detect the pressure of the medium in the pipeline and transmit a signal, and the temperature sensor 65 is used to detect the temperature of the medium in the pipeline and transmit a signal;

[0055] The PLC controller 60 receives the pressure and temperature signals, compares them with the set values, and controls the cooling and heating units 10, the booster pump 4, and the pressure-stabilizing tank control valve 7 to stabilize the system parameters.

[0056] Furthermore, the cooling and heating unit 2 is connected to the medium storage tank 1, the output end of the medium storage tank 1 is connected to the booster pump 4, and the other end of the booster pump 4 is respectively connected to the pressure stabilizing tank 3, the metering pump 6, and the cooling and heating unit 10;

[0057] The first branch of the constant volume water tank 5 is connected to the air conditioner 15, and the second branch of the constant volume water tank 5 is connected to the metering pump 6; the output end of the metering pump 6 is respectively connected to the sampler 12 and the orifice plate 14, the cold and hot unit 10 is respectively connected to the flow meter 17 and the vacuum pump 13, the other end of the pressure-stabilizing tank 3 is also connected to the input end of the medium storage tank 1, and a gas phase control valve 19 is installed on the pipeline at the input end of the medium storage tank 1, and a pressure-stabilizing tank control valve 7 is installed between the gas phase control valve 19 and the pressure-stabilizing tank 3, and the PLC controller 60 is respectively electrically connected to the cold and hot unit 2, the booster pump 4, the air conditioner 15, the metering pump 6, the pressure-stabilizing tank control valve 7 and the cold and hot unit 10.

[0058] Furthermore, a filter 11 is provided between the cooling and heating unit 10 and the flow meter 17 and the vacuum pump 13, and the filter 11 is connected to the flow meter 17 and the vacuum pump 13 respectively.

[0059] Furthermore, the boosting pump 4 input end is also provided with a boosting pump control valve 31, and the boosting pump 4 output end is also provided with a check valve 71; the control valve 49 and the metering pump control valve 22 are also installed in sequence between the check valve 71 and the metering pump 6; the metering pump check valve 73 is also installed at the output end of the metering pump 6, and the constant volume water tank electric valve 21 is also installed on the connecting pipeline between the control valve 49 and the constant volume water tank 5, and a flat gate valve 25 is also installed between the metering pump check valve 73 and the external pipeline, and an electric valve 26 is also provided between the check valve 71 and the cold and hot unit 10, and a sampler input end control valve 53 is also provided between the metering pump check valve 73 and the sampler 12; the PLC controller 60 is electrically connected to the constant volume water tank electric valve 21 and the electric valve 26 respectively.

[0060] The control valve 53 at the sampler input end is used to prevent water from entering the sampler 12 when the metering pump 6 is calibrated.

[0061] Furthermore, the hot air drying device 16 is installed between the constant volume water tank 5 and the metering pump 6, and an output control valve 20 is also installed on the output end pipeline of the hot air drying device 16.

[0062] Furthermore, the flow meter 17 is provided with a cryogenic flat gate valve A40 and a cryogenic flat gate valve B41 at both ends respectively; the pressure sensor 66 and the temperature sensor 65 are provided between the orifice plate 14 and the cryogenic flat gate valve A40; the sampler 12 is provided with a sampler control valve A44 and a sampler control valve B45 at both ends respectively, and the vacuum pump 13 is provided with an air relief valve 36 at the output end.

[0063] Furthermore, a gas phase low temperature flat gate valve 47 is installed between the gas phase control valve 19 and the sampler input end control valve 53 .

[0064] The calibration method of the present invention comprises the following specific steps:

[0065] Step 1: Open the electric valve 21 and the flat gate valve 25 of the constant volume water tank, start the air conditioner 15 and the metering pump 6, and transport water at standard atmospheric pressure and 20°C from the constant volume water tank 5 to the metering pump 6. The water flowing through the metering pump 6 is transported to a designated location; the standard volume displacement of the metering pump 6 is calibrated by calculating the number of revolutions of the metering pump 6.

[0066] Step 2: After the metering pump 6 is calibrated, the output control valve 20 and the hot air drying device 16 are opened to dry the medium in the pipeline.

[0067] Step 3: Close the output control valve 20, the constant volume water tank electric valve 21, the gas phase control valve 19, the booster pump control valve 31 and the flat gate valve 25, open other valves, and automatically control the vacuum pump 13 through the PLC to extract the air in the pipeline to avoid the formation of a two-phase zone due to too many impurities, resulting in slug flow, bubbly flow, or half-pipe flow.

[0068] Step 4: Then open the booster pump 4, the pressure-stabilizing tank 3 and the cold and hot unit 10, fill the liquid CO2 measured medium into the device for closed-loop pre-cooling, and return the gasified CO2 to the medium storage tank 1 through the gas-phase low-temperature flat gate valve 47 and the gas-phase control valve 19. After the system is cooled, close the gas-phase low-temperature flat gate valve 47. By continuously adjusting the cold and hot unit 10 and the booster pump 4, the pressure in the device will continue to change as the temperature rises or falls. The signal transmitted by the pressure sensor 66 is fed back to the PLC controller 60, and the PLC controller 60 automatically controls the pressure. When pressure supplementation is required, the booster pump 4 is used for pressure increase; when pressure relief is required, the pressure-stabilizing tank control valve 7 is used for pressure relief, so that the pressure and temperature in the system reach the target set values.

[0069] Step 5: After the temperature and pressure are stable, the mass is measured by weighing the sampler 12 and the corresponding density is calculated; at the same time, the CO2 circulation volume per unit time is measured by the metering pump 6, the volume flow rate is measured, the mass flow rate is calculated according to the formula, and the actual number is checked with the flow meter 17 being tested to determine the accuracy of the flow meter 17.

[0070] When different mass flow meters 17 need to be calibrated, close the cryogenic flat gate valve A40 and the cryogenic flat gate valve B41, replace other flow meters 17, and repeat the above steps 2-5 to calibrate the mass flow of other measured flow meters 17.

[0071] In addition, it is convenient to simplify the calibration of the same type of flow meter 17 in the later stage. The temperature is changed by the cold and hot unit 10 or the pressure is changed by the booster pump 4, and the medium data under different pressures and temperatures are measured. The sampler 12 is used for weighing and measuring. The CO2 circulation amount per unit time is measured by the metering pump 6, and the volume flow rate is measured. The mass flow rate is calculated according to the formula. During the process, all data are uploaded to the PLC controller 60 database in real time, and an isochoric curve is established to provide a basis for the later calibration of the same type of flow meter 17. There is no need to repeatedly calibrate the same type of flow meter 17, and only the isochoric curve needs to be found. That is, when the pressure is constant, the temperature is changed by the cold and hot unit 10, and the real-time phase state of CO2 is measured for every increase of 5° or other degrees, and the density, mass flow rate and other parameters are recorded; similarly, when the temperature is constant, the pressure is changed by the booster pump 4, the real-time phase state of CO2 is measured, and the density, mass flow rate and other parameters are recorded; the medium data under different pressures and temperatures are measured, and the sampler 12 is used for weighing and metering. The CO2 circulation volume per unit time is measured by the metering pump 6, the volume flow rate is measured, and the mass flow rate is calculated according to the formula, which provides a basis for the later calibration of the same type of flow meter 17.

[0072] It should be noted that the medium in the medium storage tank of the present invention includes but is not limited to carbon dioxide, nitrogen, and oxygen.

[0073] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A flow meter calibration device, It is characterized in that include A medium storage tank (1), used for storing the medium and providing the medium for calibration of the entire device; The cooling and heating unit (2) is used to ensure the gas phase balance of the medium storage tank (1), and to cool when the pressure in the tank is too high, and to heat and gasify when the pressure is too low; A pressure-stabilizing tank (3), used to maintain the medium pressure in the pipeline; A booster pump (4), used to increase the medium pressure in the pipeline; A constant volume water tank (5), used to provide a container of a constant volume medium; A metering pump (6) is used to transport, meter and adjust the flow rate and flow velocity of the medium; The cooling and heating unit (10) is used to heat or cool the medium in the pipeline to keep the medium at a constant temperature; A sampler (12) for measuring the mass of the medium; A vacuum pump (13) is used to evacuate air from the pipeline to ensure vacuum in the system and avoid residual gas in the pipeline during measurement, which may affect the measurement result; An orifice plate (14) is used to form a pressure difference in the pipeline to ensure that the medium enters the sampler (12); An air conditioner (15) is used to ensure that the temperature of the medium in the constant volume water tank (5) is kept constant under standard atmospheric pressure; A flow meter (17) for measuring the medium flowing through; The PLC controller (60) is used to realize automatic control and data storage.

2. A flow meter calibration device according to claim 1, It is characterized in that The cooling and heating unit (2) is connected to the medium storage tank (1), the output end of the medium storage tank (1) is connected to the booster pump (4), and the other end of the booster pump (4) is respectively connected to the pressure stabilizing tank (3), the metering pump (6), and the cooling and heating unit (10); The first branch of the constant volume water tank (5) is connected to the air conditioner (15), and the second branch of the constant volume water tank (5) is connected to the metering pump (6); the output end of the metering pump (6) is respectively connected to the sampler (12) and the orifice plate (14); the cold and hot unit (10) is respectively connected to the flow meter (17) and the vacuum pump (13); the other end of the pressure stabilizing tank (3) is also connected to the input end of the medium storage tank (1); a gas phase control valve (19) is installed on the pipeline at the input end of the medium storage tank (1); a pressure stabilizing tank control valve (7) is installed between the gas phase control valve (19) and the pressure stabilizing tank (3); and the PLC controller (60) is respectively electrically connected to the cold and hot unit (2), the booster pump (4), the air conditioner (15), the metering pump (6), the pressure stabilizing tank control valve (7) and the cold and hot unit (10).

3. A flow meter calibration device according to claim 2, It is characterized in that Also includes A hot air drying device (16) is used to blow hot air on the pipeline after the metering pump (6) has completed the water calibration; A pressure sensor (66), used to detect the pressure of the medium in the pipeline and transmit a signal; A temperature sensor (65) is used to detect the temperature of the medium in the pipeline and transmit a signal; A filter (11) is used to filter impurities in the medium in the pipeline; The hot air drying device (16) is installed between the constant volume water tank (5) and the metering pump (6), and an output control valve (20) is also installed on the output end pipeline of the hot air drying device (16); the filter (11) is connected to the flow meter (17) and the vacuum pump (13) respectively; the PLC controller (60) is electrically connected to the pressure sensor (66) and the temperature sensor (65).

4. A flow meter calibration device according to claim 3, It is characterized in that The booster pump (4) input end is also provided with a booster pump control valve (31), and the booster pump (4) output end is also provided with a check valve (71); a control valve (49) and a metering pump control valve (22) are also installed in sequence between the check valve (71) and the metering pump (6); a metering pump check valve (73) is also installed at the metering pump (6) output end, a constant volume water tank electric valve (21) is also installed on the connection pipeline between the control valve (49) and the constant volume water tank (5), a flat gate valve (25) is also installed between the metering pump check valve (73) and the external pipeline, an electric valve (26) is also installed between the check valve (71) and the cold and hot unit (10), and a sampler input end control valve (53) is also provided between the metering pump check valve (73) and the sampler (12); the PLC controller (60) is electrically connected to the constant volume water tank electric valve (21) and the electric valve (26) respectively; A low-temperature flat gate valve (40) and a low-temperature flat gate valve (41) are respectively installed at both ends of the flow meter (17).

5. A flow meter calibration device according to claim 4, It is characterized in that The two ends of the sampler (12) are respectively provided with a sampler control valve A (44) and a sampler control valve B (45), and the output end of the vacuum pump (13) is provided with a gas relief valve (36).

6. A flow meter calibration device according to claim 4, It is characterized in that The pressure sensor (66) and the temperature sensor (65) are installed between the orifice plate (14) and the low-temperature flat gate valve (40).

7. A flow meter calibration device according to claim 4, It is characterized in that A gas phase low temperature flat gate valve (47) is also installed between the gas phase control valve (19) and the sampler input end control valve (53).

8. A method for calibrating a flow meter using the flow meter calibration device according to claim 1, It is characterized in that The specific steps are as follows: Step 1: Open the electric valve (21) of the constant volume water tank and the flat gate valve (25), start the air conditioner (15) and the metering pump (6), and transport water at standard atmospheric pressure and 20° C. from the constant volume water tank (5) to the metering pump (6), and transport the water flowing through the metering pump (6) to a designated location; calibrate the standard volume displacement of the metering pump (6) by calculating the number of revolutions of the metering pump (6); Step 2: After the metering pump (6) is calibrated, the output control valve (20) and the hot air drying device (16) are opened to dry the medium in the pipeline; Step 3: Close the output control valve (20), the constant volume water tank electric valve (21), the gas phase control valve (19), the booster pump control valve (31) and the flat gate valve (25), open other valves, and automatically control the vacuum pump (13) through the PLC to extract the air in the pipeline; Step 4: Then, the booster pump (4), the pressure regulating tank (3) and the cooling and heating unit (10) are turned on, and the liquid medium to be tested is charged into the device for closed cycle pre-cooling, and the gasified medium is returned to the medium storage tank (1) through the gas phase low temperature flat gate valve (47) and the gas phase control valve (19). After the system is cooled, the gas phase low temperature flat gate valve (47) is closed again. By continuously adjusting the cooling and heating unit (10) and the booster pump (4), the pressure in the device will change continuously as the temperature rises or falls. The signal transmitted by the pressure sensor (66) is fed back to the PLC controller (60), and the PLC controller (60) automatically controls the pressure. When pressure supplementation is required, the booster pump (4) is used to increase the pressure; when pressure relief is required, the pressure regulating tank control valve (7) is used to relieve the pressure, so that the pressure and temperature in the system reach the target set values; Step 5: After the temperature and pressure are stable, the mass is measured by weighing the sampler (12) and the corresponding density is calculated; at the same time, the medium circulation volume per unit time is measured by the metering pump (6), the volume flow rate is measured, the mass flow rate is calculated according to the formula, and the actual number is checked with the flow meter (17) to determine the accuracy of the flow meter (17).

9. The calibration method according to claim 8, It is characterized in that When it is necessary to calibrate different mass flow meters (17), after closing the cryogenic flat gate valve A (40) and the cryogenic flat gate valve B (41), replace other flow meters (17) and repeat the above steps 2-5 to calibrate the mass flow of other measured flow meters (17).

Citation Information

Patent Citations

  • Supercritical CO2 flowmeter calibration device and calibration method thereof

    CN104568082A

  • High-temperature and high-pressure supercritical CO2 flowmeter constant-current calibration device and method applying P.V.T.t method

    CN114993423A

  • Novel large -traffic LNG mass flow meter calbiration system

    CN205506176U

  • Device for measuring a component contained in a raw gas stream

    DE102018129195A1

  • Absolute flow rate calibration system in flow rate control device

    JP2006337346A

Cited By

  • Multifunctional mass flow meter calibration device

    CN119756531A

  • Flowmeter verification system and method

    CN119958673A

  • Volume tube high-low temperature working medium test board

    CN120702568A

  • Device for testing indication value error and pressure influence of gas-liquid flow instrument

    CN121540252A