Single-phase earth fault monitoring and fault section isolation method for direct-current power supply system of electrified road
By real-time monitoring and analysis of the positive and negative electrode-to-ground voltages and differential currents of the DC power supply system of the electrified highway, combined with the operation of the isolating switch in a 'sequential order' or 'binary selection' method, the problems of single-phase grounding fault monitoring and isolation are solved, and the problem of The rapid isolation and power supply recovery of the faulty section improve the power supply reliability of the system.
Patent Information
- Application Number
- CN202411112240.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-15
AI Technical Summary
The existing electrified highway DC power supply system cannot effectively monitor and isolate the faulty sections when a single-phase grounding fault occurs, resulting in unreliable power supply and the inability to quickly restore power supply to other non-fault sections.
By monitoring the positive and negative electrode to ground voltage and up and downstream differential currents in the substation partition in real time, the fault type and position are determined by the voltage difference ratio and differential current set value, and the 'one-by-one order' or 'bipartite selection' method is used Operate the electric isolation switch and gradually determine the faulty small partition to achieve faulty isolation and power supply recovery.
It realizes rapid monitoring of single-phase grounding faults of electrified highway DC power supply systems and minimizes isolation of fault sections, ensuring the maximum range of power supply recovery of the system and improving the reliability of power supply.
Smart Images

Figure CN118962516A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of protection of a DC power supply system for an electrified highway, and in particular to a single-phase grounding fault monitoring and fault section isolation method for a DC power supply system for an electrified highway. Background Art
[0002] Electrified highways refer to roads with electric traction power supply systems installed along the highways, which allow motor vehicles to obtain continuous driving power from the traction network during driving, and are characterized by providing uninterrupted power for vehicles in motion. At present, the DC power supply system of electrified highways adopts a DC 1500V positive and negative pole suspension system, with positive pole contact network power supply and negative pole contact network return current.
[0003] The insulation resistance of the positive and negative poles of the contact network to the ground reaches tens of megohms. When it is working normally, the insulation resistance of the positive and negative poles to the ground is equal or not much different, and the voltage to the ground is also relatively balanced. When a single-phase single-point grounding fault occurs, the voltage of the positive or negative pole to the ground changes, the voltage of the grounding pole to the ground decreases, and the voltage of the non-grounding pole to the ground increases. The reliability of power supply will be greatly reduced. At this time, it will not cause secondary faults in the system and will not cause harm to personnel. However, if it is not handled in time, when the system develops to two-point or multi-point grounding faults, or the non-grounding pole has a grounding fault, it will not only make the motor vehicle unable to drive normally, but also cause short-circuit faults and serious consequences such as casualties.
[0004] At present, the single-phase grounding fault monitoring of DC power supply system can be done by directly measuring the insulation resistance or by using a balanced bridge monitoring circuit. Among them, the balanced bridge monitoring circuit is more common. However, no matter which method is used, for the monitoring of single-phase grounding in DC system, only the single pole (positive or negative pole) where the fault occurs and the specific feeder circuit can be determined, but the more specific grounding point cannot be determined, so that effective fault isolation cannot be achieved. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a method for monitoring single-phase grounding faults in a DC power supply system of an electrified highway and isolating a faulty section, thereby achieving effective monitoring of single-phase grounding faults in a DC power supply system, minimizing isolation of the faulty section, and ultimately quickly restoring power supply to other non-faulty sections.
[0006] The present invention achieves this object through the following technical solutions:
[0007] A method for monitoring single-phase ground faults and isolating fault sections in a DC power supply system for an electrified highway, which is applicable to a DC power supply system for an electrified highway in which a plurality of parallel normally closed electric isolating switches are provided in a power supply section of a substation, and each power supply section is divided into a plurality of electrically connected small sections, and includes the following contents:
[0008] Monitor the real-time data of positive and negative pole-to-ground voltage and uplink and downlink differential current in each substation area;
[0009] According to the substation input voltage U m , parallel resistance R0, insulation resistance threshold drop coefficient L (L represents the multiple of the positive or negative insulation resistance to ground dropped to the parallel resistance R0) to calculate the differential pressure ratio setting value A and the differential current setting value B, where U m =|U + |+|U - |, U+ is the positive voltage of the power supply, U- is the negative voltage of the power supply, The value range of L is (0,1];
[0010] The voltage difference ratio k is calculated based on the positive and negative voltages to ground collected in each substation area. If k ≥ A, the negative pole is grounded, and if k ≤ -A, the positive pole is grounded;
[0011] If the uplink differential current ≥ B, there is an uplink ground fault, and if the downlink differential current ≥ B, there is a downlink ground fault;
[0012] After determining that the fault partition is located in the up and down lines and the positive and negative poles, use the "one by one sequence" method or the "binary selection" method to select the corresponding disconnector to close and open the operation, and gradually determine the final fault sub-partition;
[0013] The specific method of "one by one sequence" is as follows: according to the arrangement order of the electric disconnectors in the power supply partition, according to the distance from the substation, the switches are opened one by one from far to near, and the sub-partitions are isolated from the power supply partition one by one. The corresponding fault section is: if the ground fault disappears after the feeder circuit breaker is closed, the sub-partition after the last opened electric disconnector is the faulty sub-partition; if the ground fault still does not disappear after all the electric disconnectors are opened one by one, the first sub-partition is the faulty section;
[0014] The specific method of "two-way selection" is as follows: during operation, according to the arrangement order of the electric isolating switches in the power supply partition, open the electric isolating switch in the middle position, and divide the entire power supply partition into two groups, before and after the electric isolating switch. If the grounding fault disappears after the feeder circuit breaker is closed, the faulty sub-area is located after the open electric isolating switch; otherwise, it is located before the open electric isolating switch; after a round of "two-way" operation of the electric isolating switch determines that the "half" fault range, select the next round of operation range, and repeat the operation until the "half" fault range is reached. "The fault range corresponds to the fault sub-area; in each round of judgment, when the fault sub-segment is located in the "half" fault range after the breakpoint, the opened electric disconnector needs to be closed to restore the original power supply section; the fault section corresponds to: if the grounding fault disappears after the feeder circuit breaker is closed when the "half" fault range corresponds to the sub-area, the sub-area after the last opened electric disconnector is the fault section; if the grounding fault does not disappear after the feeder circuit breaker is closed, the sub-area before the last opened electric disconnector is the fault section;
[0015] Open the isolating switches at both ends of the faulty sub-area to isolate the faulty sub-area. The substation in the area supplies power to the sub-areas between the faulty sub-area and the power supply. Close the connecting switch between the adjacent substation area. The adjacent substation supplies power to the sub-areas between the faulty sub-area and the area supplied by the adjacent power supply station.
[0016] Furthermore, the number of electric disconnectors operated in each "binary selection" method is related to the number of small partitions N, and the number of small partitions N satisfies 2 C-1 <N≤2 C When the number of small partitions N satisfies 2, the maximum number of operations is C, C = Roundup (log2 N, 0), Roundup is the EXCEL round-up function; C-1 <N<2 C When setting the (N+1) to 2 C The virtual sub-divisions, the operation steps and the corresponding electric disconnectors in the determination process are based on the number of sub-divisions N = 2 C deal with.
[0017] Furthermore, the operation steps of the "binary selection" method are as follows:
[0018] S1, calculate the maximum number of operations C according to the number of power supply subareas N, C = Roundup (log2 N, 0);
[0019] S2, select the position of the electric disconnector for the first round of pre-operation, that is, the electric disconnector in the middle position considering all the electric disconnectors including the virtual electric disconnector;
[0020] S3, open the corresponding feeder circuit breaker;
[0021] S4, open the mth electric disconnector and perform the first round of operation on the middle position electric disconnector;
[0022] S5, close the corresponding feeder circuit breaker;
[0023] S6, judging whether the fault disappears, if the judgment is "no", go to S7; if the judgment is "yes", go to S12;
[0024] S7, conclude that "the faulty small partition is before the mth electric disconnector";
[0025] S8, judging whether the operation times C is less than 2, that is, whether the operation times are completed; if the judgment is "no", go to S9; if the judgment is "yes", go to S11;
[0026] S9, select the position of the electric disconnector for the next round of pre-operation;
[0027] S10, reset the operation number C, and the operation number is reduced by 1;
[0028] S11, draw the conclusion that “the mth fault sub-partition is faulty”;
[0029] S12, conclude that "the faulty sub-area is after the mth electric disconnector";
[0030] S13, judging whether the number of sub-divisions N is equal to the number m of the electric isolating switch operated in this round plus 1, that is, whether the electric isolating switch operated in this round is the electric isolating switch in the last position; if the judgment is "no", go to S14; if the judgment is "yes", go to S20;
[0031] S14, judging whether the operation times C is less than 2, that is, whether the operation times are completed; if the judgment is "no", go to S15; if the judgment is "yes", go to S20;
[0032] S15, close the mth electric isolating switch; if it is determined that the faulty sub-area is located behind the opened electric isolating switch and before the next round of line operation, close the electric isolating switch;
[0033] S16, select the position of the electric disconnector for the next round of pre-operation;
[0034] S17, reset the operation number C, and the operation number is reduced by 1;
[0035] S18, select whether the position of the pre-operated electric disconnect switch is within the sub-division number N, that is, whether it is a virtual position, and the position greater than or equal to the sub-division number N is a virtual position; if it is judged as "no", go to S19; if it is judged as "yes", go to S4;
[0036] S19, if the position of the electric isolating switch selected for pre-operation in this round is a virtual position, the position of the electric isolating switch in the previous round of operation is returned;
[0037] S20, draw the conclusion that "fault occurs within the m+1th fault sub-partition".
[0038] The present invention also provides a computer program product, including a computer program / instruction, which, when executed by a processor, implements the steps of the method for monitoring single-phase grounding faults and isolating fault sections in a DC power supply system for an electrified highway.
[0039] The present invention also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the method for monitoring single-phase grounding faults and isolating fault sections in a DC power supply system for an electrified highway are implemented.
[0040] The present invention also provides an electronic device, comprising a processor, a memory, and a computer program stored in the memory and capable of running on the processor, wherein when the computer program is executed by the processor, the steps of the method for monitoring single-phase grounding faults and isolating fault sections in a DC power supply system of an electrified highway are implemented.
[0041] The present invention also provides a device for monitoring single-phase grounding faults and isolating fault sections in a DC power supply system for an electrified highway, which is used to implement the method for monitoring single-phase grounding faults and isolating fault sections in a DC power supply system for an electrified highway, comprising:
[0042] The input module is used to collect the positive and negative voltages to the ground and the uplink and downlink differential currents in each substation partition for real-time data monitoring;
[0043] A / D conversion module, converts the data signal collected by the input module and inputs it into the CPU processor module;
[0044] The CPU processor module determines whether a ground fault occurs based on the positive and negative voltages to the ground and the uplink and downlink differential current values collected by the input module. If a ground fault occurs, the location of the faulty sub-area is further determined according to the determination procedure, and the faulty sub-area is isolated;
[0045] Output module, used to output the instructions issued by the CPU processor module to the corresponding switch circuit to control the opening and closing of the electric disconnector and feeder circuit breaker;
[0046] Data storage module, used to store collected and processed data information;
[0047] Communication module, used to connect to PSCADA and transmit data;
[0048] The display module is used to display real-time operating data, view event records and data information, and the opening and closing status of each electric disconnector and feeder circuit breaker.
[0049] Compared with the prior art, the present invention has the following beneficial effects:
[0050] The present invention provides a single-phase grounding fault monitoring and fault section isolation method for a DC power supply system of an electrified highway, which can quickly realize fault monitoring and range determination of single-pole grounding on an electrified highway, and can restore power supply to the maximum extent after a single-pole grounding fault occurs on the electrified highway. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0052] Figure 1 This is a schematic diagram of the insulation monitoring circuit principle of the present invention;
[0053] Figure 2 This is a schematic diagram of DC power supply divisions for electrified highways of the present invention;
[0054] Figure 3 This is a flow chart of the isolation judgment of a single-pole grounding fault section of a DC power supply system of the present invention;
[0055] Figure 4 A flow chart of the "one by one sequence" method for judging the single-pole grounding fault section of a DC power supply system of the present invention;
[0056] Figure 5 A flow chart of the "binary selection" method for judging a single-pole grounding fault section of a DC power supply system of the present invention.
[0057] Figure 6 A schematic structural diagram of a single-phase ground fault monitoring and fault section isolation device for an electrified highway DC power supply system according to the present invention. DETAILED DESCRIPTION
[0058] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to be able to fully convey the scope of the present invention to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
[0059] Aiming at the equivalent principle circuit of the DC power supply system of the electrified highway, the present invention utilizes the balanced bridge insulation monitoring principle to give setting value suggestions for the voltage difference ratio and differential current of the insulation monitoring circuit, and on the basis of the DC power supply partitions, positive and negative poles, and up and down lines determined thereby, proposes abnormal monitoring, fault isolation and power supply restoration of single-pole grounding faults for the DC power supply optimization partitions of the existing electrified highway.
[0060] In the DC power supply system of electrified highways, the DC positive and negative insulation monitoring adopts a balanced bridge circuit. The circuit principle diagram is as follows Figure 1 shown.
[0061] R + : Insulation resistance of the positive pole of the contact network to the ground. Normally, the value is MΩ level and is equal to R-;
[0062] R - : Insulation resistance of the negative pole of the contact network to the ground. Normally, the value is MΩ level and is equal to R+;
[0063] R0: Parallel resistance, the selected value is kΩ level;
[0064] Then the equivalent resistance of the DC positive electrode to ground is Normally R0< <R + , then R0 / / R + ≈R0;
[0065] The equivalent resistance of the DC negative pole to ground is Normally R0< <R - , then R0 / / R - ≈R0.
[0066] U m : The voltage between the positive and negative poles of DC, corresponding to 1500V for electrified roads;
[0067] U + : Voltage of positive pole of contact network to ground, Normal R + =R - ,
[0068] U - : Negative voltage of the catenary to the ground, When normal, R + = R - ,
[0069] And U m = |U + | + |U - |.
[0070] Differential pressure ratio:
[0071] When a single - pole positive - ground fault occurs in the DC power supply system, such as when the positive insulation degrades until the R + resistance value is lower than LR0 (0 < L < 1), where L is the threshold coefficient of insulation degradation, that is, R + ≤ LR0, while the negative insulation is normal and the R - resistance value is still much larger than R0, that is, R - >> R0,
[0072] Since R ->> R0, then approximately calculate
[0073] That is, the differential pressure ratio When, the corresponding positive - to - ground insulation resistance drops to L (0 < L < 1) times the parallel resistance R0, determining a single - point positive - ground fault.
[0074] Similarly, when a single - pole negative - ground fault occurs in the DC power supply system, such as when the negative insulation degrades until the R - resistance value is lower than LR0 (0 < L < 1), where L is the corresponding threshold coefficient of insulation degradation, that is, R - ≤ LR0, while the positive insulation is normal and the R + resistance value is still much larger than R0, that is, R + >> R0,
[0075] Since R + >> R0, then approximately calculate
[0076] That is, the differential pressure ratio When, the corresponding negative - to - ground insulation resistance drops to L (0 < L < 1) times the parallel resistance R0, determining a single - point negative - ground fault.
[0077] It can be seen from this that the differential pressure ratio is related to the insulation degradation threshold coefficient L, and is also weakly related to the parallel resistance R0 and the insulation resistance of the non-grounding electrode to the ground. When the insulation resistance of the non-grounding electrode to the ground is 20 MΩ or more and 10 MΩ (in accordance with TB / T 3256-2014, the insulation resistance of the catenary to the ground is not less than 20 M, and after the insulation resistances of the up and down lines are connected in parallel, the equivalent insulation resistance is considered as 10 MΩ), for different insulation degradation threshold coefficients L (taking 0.8, 0.5, and 0.3 as different example values in Table 1), and different parallel resistances R0 are connected in parallel. When the insulation resistance of the grounding electrode is as low as different LR0s, the corresponding differential pressure ratios (accurate calculation ( (positive electrode grounded), (negative electrode grounded)) and approximate calculation ( (positive electrode grounded), (negative electrode grounded)) are shown in Table 1 below:
[0078] Table 1 Corresponding accurate calculation values and approximate calculation values of differential pressure ratios under different parameters
[0079]
[0080] I0: Current flowing through the parallel resistance,
[0081] I + : Current flowing out from the positive electrode of the power supply (after the parallel resistance R0), that is, the input current of the positive electrode of the catenary,
[0082] I - : Current flowing back to the negative electrode of the power supply (after the parallel resistance R0), that is, the output current of the negative electrode of the catenary,
[0083] I d : Differential current,
[0084]
[0085] When the insulation of the positive electrode degrades until the resistance value of R + is lower than LR0 (0 < L < 1), that is, R + ≤ LR0, while the insulation of the negative electrode is normal and the resistance value of R - is still much greater than R0, that is, R - >> R0,
[0086] Since R - >> R0, then approximate calculation
[0087] Similarly, when the insulation of the negative electrode degrades until R- When the resistance value is lower than LR0 (0 < L < 1), that is, R - ≤LR0, and the positive electrode insulation is normal, R + the resistance value is still much greater than R0, that is, R + >>R0,
[0088] Since R + >>R0, then approximately calculate Considering the direction factor,
[0089] It can be seen from this that the differential current is related not only to the voltage U between the positive and negative electrodes m but also to the parallel resistance R0 and the threshold coefficient L of insulation degradation, and is weakly related to the insulation resistance of the non-grounding electrode to the ground. When U m = 1500V and the insulation resistance of the non-grounding electrode to the ground is 10MΩ, for different parallel resistances R0, when the insulation resistance of the grounding electrode is as low as different LR0, the corresponding differential current I d (accurate calculation (positive electrode grounded), (negative electrode grounded) and approximate calculation ) are shown in Table 2 below (when the positive electrode is grounded, the current direction is from the bus to the feeder; when the negative electrode is grounded, the current direction is from the feeder to the bus):
[0090] Table 2 Accurate calculation values and approximate calculation values of differential current corresponding to different parameters
[0091]
[0092] When the pressure difference ratio k exceeds the set value, it can be determined that a single-pole grounding fault of the positive or negative electrode has occurred; further monitoring the differential current I detected by the current transformer of the upstream or downstream feeder switch d , it can be determined that a grounding fault has occurred in the upstream or downstream feeder. Through comprehensive judgment, it can be known that a single-pole grounding fault has occurred in the positive or negative electrode of the upstream or downstream.
[0093] According to the selected threshold coefficient L of insulation degradation, input voltage U m , and parallel resistance R0, calculate the set value of the pressure difference ratio k as A and the set value of the differential current I d as B (as can be seen from Table 1 and Table 2 above, the difference between accurate calculation and approximate calculation is not significant, so the approximate calculation value is selected in the judgment process). The single-pole grounding fault judgment process is as follows:
[0094] S1, collects the current and voltage values of each substation in the power supply system. Including the DC positive pole to ground voltage U+, DC negative pole to ground voltage U-, and the differential current I d上 , differential current I of the downstream feeder d下 .
[0095] S2, calculates the set value A of the pressure difference ratio k according to the input insulation drop threshold coefficient L.
[0096] S3, according to the input insulation drop threshold coefficient L, input voltage U m , parallel resistor R0 calculates the difference current I d Setting value B.
[0097] S4, based on the DC positive pole to ground voltage U collected from each substation + , DC negative pole to ground voltage U - Calculate the pressure difference ratio k.
[0098] S5, determine the differential current I of the upstream and downstream feeders d Whether the up is greater than or equal to the set value B, if it is greater than or equal to B, it is determined that a ground fault occurs in the corresponding up or down route; determine whether the pressure difference ratio k is greater than or equal to the set value A, if k≥A, the negative pole is grounded, if ≤-A, the positive pole is grounded.
[0099] Based on this, the DC power supply partition, positive or negative pole, and up or down line where the ground fault occurs can be determined.
[0100] In order to narrow the scope of investigation of grounding fault points and quickly and accurately detect the faulty grounding points, the present invention provides a single-phase grounding fault monitoring and fault section isolation method for an electrified highway DC power supply system, which is used to investigate the small partition where the grounding fault occurs, isolate the faulty partition, and restore power supply to other partitions.
[0101] In order to minimize the impact range of single-phase grounding fault, multiple parallel normally closed electric disconnectors are installed in the power supply section of the electrified highway DC power supply system substation to divide each power supply section into several electrically connected small sections, such as Figure 2As shown. Each DC power supply partition is divided into N small partitions by n segment insulators, N = n + 1, and each segment insulation is connected in parallel with an electric isolating switch. Under normal circumstances, the electric isolating switch is closed to keep the small partitions at both ends of the electric isolating switch electrically connected, that is, the power supply partition still maintains the original power supply range; when insulation degradation or single-pole grounding fault occurs in a small partition, the electric isolating switches at both ends are opened to achieve isolation of the faulty small partition and normal power supply to the remaining small partitions. When the number of small partitions in the power supply station partition is less than the number of installed insulators, that is, each small partition contains multiple insulators, after determining the faulty small partition and isolating the fault, and restoring the power supply to the remaining small partitions, the insulators installed in the isolated faulty small partition are checked one by one to achieve rapid and accurate positioning of the grounding fault.
[0102] At present, the DC power supply area of electrified highways does not exceed 4km, and the power supply is unilateral; the overhead contact network is suspended on the pillars along the line through insulators at intervals of about 50m. If there are about 80 insulators in each DC power supply area, there are about 80 potential grounding fault points in the area.
[0103] After the DC power supply partition of the electrified highway is converted into several small partitions, the voltage difference ratio k and the differential current I d Determine the small partition where the ground fault occurs, the corresponding DC bus positive or negative pole, and the up or down line. Then open the corresponding feeder circuit breaker CB, open the electric disconnector GK, isolate the small partition after the electric disconnector from the power supply partition before the electric disconnector, and then close the feeder circuit breaker CB. Determine the voltage difference ratio k and the differential current I again. d If the fault disappears, the fault occurs on the side of the disconnecting electric isolating switch GK that is far from the power supply; if the fault still exists, the fault occurs on the side of the disconnecting electric isolating switch GK that is close to the power supply. According to the judgment result, repeat the operation and continuously narrow the partition range until the small partition where the fault is located is determined.
[0104] When there are few electric disconnectors GK in the substation partition, according to the arrangement order of the electric disconnectors GK in the power supply partition, they are opened one by one according to the distance from the substation, from far to near, to isolate the small partitions from the power supply partition one by one. The fault section corresponds to the small partition after the feeder circuit breaker CB is closed and the ground fault disappears, and the last electric disconnector GK is opened; when all the electric disconnectors GK are opened one by one and the ground fault still does not disappear, the first small partition is the fault section.
[0105] The "one by one sequence" method determines the process as follows Figure 4 The steps are as follows:
[0106] S1, assign an initial value to the index m of the pre-operated electric disconnector GK, which is the last one in the DC power supply partition. N small partitions need to be equipped with N-1 electric disconnectors, and the last one in the ranking is the N-1th electric disconnector. Assign m=N-1.
[0107] S2, open the feeder circuit breaker.
[0108] S3, open the mth electric disconnector GK.
[0109] S4, close the feeder circuit breaker.
[0110] S5, determine whether the fault disappears. If the fault disappears, then conclude that "the fault sub-area is after the mth electric disconnector GK", and conclude that "the fault is within the m+1th fault sub-area".
[0111] If the fault does not disappear, determine whether the index m of the just-operated electric disconnector GK is less than 2. If it is less than 2, it is concluded that "the fault sub-division is before the first electric disconnector GK" and "the fault is in the first fault sub-division".
[0112] If the answer is no (greater than or equal to 2), the next pre-operated electric disconnector GK is selected, and the number m of the next round of pre-operated electric disconnector GK is moved forward by one position, and m=m-1 is assigned.
[0113] When there are many electric disconnectors GK in the substation partition, according to the arrangement order of the electric disconnectors GK in the power supply partition, open the electric disconnectors GK in the middle position to "divide" the entire power supply partition into two groups, before and after the electric disconnectors GK. When the feeder circuit breaker CB is closed and the grounding fault disappears, the faulty sub-division is located after the open electric disconnector GK; otherwise, it is located before the open electric disconnector GK. After a round of "two-division" operation of the electric disconnector GK determines the "one-half" fault range, select the next round of operation range, and repeat the operation until the "one-half" fault range corresponds to the sub-division. However, in each round of judgment cycle, when the faulty sub-section is located in the "one-half" fault range after the breakpoint, the open electric disconnector GK needs to be closed to restore the original power supply partition. The fault section corresponds to: when the "half" fault range corresponds to a small partition, the feeder circuit breaker CB is closed, the ground fault disappears, and the small partition after the last opened electric disconnector GK; the feeder circuit breaker CB is closed, the ground fault does not disappear, and the small partition before the last opened electric disconnector GK. This method is suitable for a mode with a large number of small partitions.
[0114] The operation process of the "binary selection" method is as follows Figure 6 The steps are as follows:
[0115] S1, calculate the maximum number of operations C according to the number of power supply subareas N, C = Roundup (log2 N, 0).
[0116] S2, select the position of the electric disconnector GK for the first round of pre-operation, that is, consider all the electric disconnectors (at that time) including the virtual electric disconnector, and the electric disconnector GK in the middle position.
[0117] S3, open the corresponding feeder circuit breaker.
[0118] S4, open the mth electric disconnector GK. Perform the first round of operation on the middle position electric disconnector GK.
[0119] S5, close the corresponding feeder circuit breaker.
[0120] S6, judge whether the fault disappears. If it is judged as "N", go to S7; if it is judged as "Y", go to S12.
[0121] S7, conclude that "the faulty small partition is before the mth electric disconnector GK".
[0122] S8, judging whether the operation times C is less than 2, that is, whether the operation times are completed. If the judgment is "N", go to S9; if the judgment is "Y", go to S11.
[0123] S9, selects the position of the electric disconnector GK for the next round of pre-operation.
[0124] S10, reset the operation number C, and reduce the operation number by 1.
[0125] S11, conclude that "the mth fault is within the small partition".
[0126] S12, conclude that "the faulty sub-partition is after the mth electric disconnector GK".
[0127] S13, determine whether the number of sub-divisions N is equal to the number m of the electric isolating switch GK operated in this round plus 1, that is, whether the electric isolating switch GK operated in this round is the electric isolating switch GK in the last position. If it is determined to be "N", go to S14; if it is determined to be "Y", go to S20.
[0128] S14, judging whether the operation times C is less than 2, that is, whether the operation times are completed. If the judgment is "N", go to S15; if the judgment is "Y", go to S20.
[0129] S15, close the mth electric disconnector GK. After determining that the faulty sub-area is located in the opened GK and before the next round of line operation, close the electric disconnector GK.
[0130] S16, selects the position of the electric disconnector GK for the next round of pre-operation.
[0131] S17, reset the operation times C, and reduce the operation times by 1.
[0132] S18, select whether the position of the pre-operated electric disconnector GK is within the sub-division number N, that is, whether it is a virtual position, and a virtual position is greater than or equal to the sub-division number N. If it is judged to be "N", go to S19; if it is judged to be "Y", go to S4.
[0133] S19, if the position of the electric isolating switch GK selected for pre-operation in this round is a virtual position, the position of the electric isolating switch GK in the previous round of operation is returned.
[0134] S20, draw the conclusion that "fault occurs within the m+1th fault sub-partition".
[0135] After the faulty cell is identified and isolated, the power supply of other power supply sub-areas can be realized. The power supply of other sub-areas includes the power supply of the sub-area and the power supply of the adjacent sub-areas. The power supply restoration process is as follows:
[0136] Open the partition feeder circuit breaker of the substation where you are located, open the electric isolating switches at both ends of the faulty sub-partition, and close the partition feeder circuit breaker of the substation where you are located, so that the substation where you are located can supply power to the sub-partitions between the faulty sub-partition and the power supply; open the partition feeder circuit breaker of the adjacent substation, close the connecting switch between the two adjacent power supply partitions, and then close the partition feeder circuit breaker of the adjacent substation, so that the adjacent substation can supply power to the sub-partitions between the faulty sub-partition and the partition supplied by the adjacent power supply station.
[0137] Therefore, the judgment process of isolating the single-pole grounding fault section of the electrified highway DC power supply system is as follows: Figure 3 As shown, the details are as follows:
[0138] S1, according to the substation input voltage U m , parallel resistance R0, insulation resistance threshold drop coefficient L calculates the voltage difference ratio setting value A and the differential current setting value B, where U m =|U + ∣+∣U - ∣,U + is the positive voltage of the power supply, U - is the negative voltage of the power supply,
[0139] S2, collects the real-time data of the positive and negative pole-to-ground voltage and the uplink and downlink differential current in each substation partition, and calculates the voltage difference ratio k.
[0140] S3, preliminarily determine the scope of the ground fault zone:
[0141] If the uplink differential current ≥ B, there is an uplink ground fault. If the downlink differential current ≥ B, there is a downlink ground fault.
[0142] If k ≥ A, the negative pole is grounded, and if k ≤ -A, the positive pole is grounded;
[0143] S4, the isolating switch provided in the substation partition divides the power supply partition into multiple small partitions. After preliminarily determining the uplink, downlink, positive pole, and negative pole of the faulty partition, the corresponding isolating switch is selected for closing and opening operations using the "one by one sequence" method or the "binary selection" method until the final faulty small partition is determined;
[0144] The "one-by-one sequential" method is applicable to the DC power supply partition with a small number of small partitions, and the "binary selection" method is applicable to the DC power supply partition with a large number of small partitions. For this system, when 80 insulators are set in each DC power supply partition and the maximum number of small partitions is 79, the maximum number of operations of the "one-by-one sequential" method and the number of operations of the "binary selection" method corresponding to different numbers of faulty small partitions are shown in Table 3 below:
[0145] Table 3 Comparison of the number of operations of the “one by one sequence” method and the “binary selection” method for different numbers of small partitions
[0146]
[0147]
[0148] The number of operations of the "one by one sequence" method is not certain. The data shown in the table is the maximum number of operations corresponding to the number of faulty partitions N. The final number of operations is related to the specific partition location where the fault occurs. According to the same probability of failure at each partition location, the average number of operations of the "one by one sequence" method is Therefore, it is recommended to use the “one-by-one sequential” method when N≤7, and the “binary selection” method when N>7.
[0149] S5, open the isolating switches at both ends of the faulty sub-area to isolate the faulty sub-area, and the substation in the area supplies power to the sub-areas between the faulty sub-area and the power supply, close the connecting switch between the adjacent substation area, and the adjacent substation supplies power to the sub-areas between the faulty sub-area and the area supplied by the adjacent power supply station.
[0150] The present invention will be further described below with reference to specific cases.
[0151] Input voltage U of traction substation in DC power supply system of electrified highway m=1500V, the insulation resistance of the non-grounded electrode to the ground meets the standard of 10MΩ, the parallel resistance R0 = 60kΩ, 11 electric disconnectors GK are set in the DC power supply section of the electrified highway, so as to convert the DC power supply section into 12 small sections. If a positive grounding fault occurs in the 10th small section, when the insulation resistance of the positive electrode to the ground drops to 20kΩ, the fault section determination process is as follows:
[0152] Positive pole to ground insulation resistance R + When the parallel resistance R0 is 60kΩ,
[0153] Negative pole to ground insulation resistance R - Assuming that the standard 10MΩ is met, the parallel resistance R0 = 60kΩ,
[0154] Measured positive pole to ground voltage U + For U + =301.4V,
[0155] Measured negative pole to ground voltage U - For U - =-1198.6V,
[0156] The pressure difference ratio calculated from the measurement results is
[0157] The measured positive input current I + For I + =15.1mA,
[0158] The measured output current I of the upstream negative pole of the contact network - For I - =-0.1mA,
[0159] The measured upstream differential current I d =I + +I - =15.1-0.1=15mA.
[0160] According to the input voltage U m =1500V, parallel resistance R0 = 60kΩ, insulation resistance threshold drop coefficient L is set to Calculated
[0161] According to the above content, the pressure difference ratio k (-0.60) is less than the set value -A (-0.50), and the upstream differential current Id (15mA) is greater than the set value B (12.5mA), which determines that a positive grounding fault occurs in the upstream.
[0162] Then, the specific location of the fault section is evaluated according to the "binary selection" method. The power supply section is divided into 12 sub-sections by 11 electric disconnectors GK, that is, the number of sub-sections N = 12, which meets the "binary selection" method, and the number of operations C is Roundup (log212, 0) = 4 times. The 13th to 16th sub-sections exist virtually in the judgment procedure, and the operation steps are based on the consideration of N = 16.
[0163] During the execution of the program according to the "binary selection" method (where 12-15 electric disconnector GK and the corresponding 13-16 sub-division exist virtually), a total of 4 calculations are performed, and 3 electric disconnector GK opening operations are actually performed. The fault area is judged based on whether the fault disappears after each GK operation.
[0164] Step 1: Select the 8th electric disconnector GK according to the 16 sub-areas for opening and closing operations. If the fault disappears after opening the switch, it is determined that the fault section is after the switch, and the switch is closed;
[0165] Step 2: Select the 12th electric disconnector GK for opening and closing operations. Since this switch is a virtual switch, it does not need to be opened and closed. The fault section is before the 12th electric disconnector GK.
[0166] Step 3: Select the 10th electric disconnector GK for opening and closing operations. If the fault does not disappear after the switch is opened, it is determined that the fault section is before the switch.
[0167] Step 4: Open and close the 9th electric disconnector GK. If the fault disappears after disconnecting the switch, it is determined that the faulty section is after the switch.
[0168] It is thus determined that the faulty subdivision is the 10th subdivision between the 9th and 10th electric disconnectors GK.
[0169] After the faulty subarea is identified and isolated, power supply to other subareas is carried out, including power supply to the subarea itself and supporting power supply to adjacent subareas. The faulty subarea is numbered 10. The 9th and 10th electric disconnectors GK before and after the subarea are opened, and the remaining electric disconnectors are closed, so that the substation subarea can supply power to subareas 1-9. The contact switch connecting subarea 12 with the adjacent substation subarea is closed, so that the adjacent substation subarea can supply power to subareas 11 and 12.
[0170] The present invention also discloses a single-phase ground fault monitoring and fault section isolation device for an electrified highway DC power supply system, such as Figure 6As shown, it includes an input module, an A / D conversion module, a CPU processor module, a data storage module, an output module, a communication module and a display module. The input module is connected to the A / D conversion module. The input module, the A / D conversion module, the CPU processor module, the data storage module, the output module, the communication module and the display module are connected by a universal protocol bus. The communication module adopts Ethernet.
[0171] The input module collects real-time data of the positive and negative poles to ground voltage and the up and down differential current. The signal is converted by the A / D conversion module and then input into the CPU processor module. The CPU processor module analyzes and processes the data according to the fault judgment logic process, determines the scope and partition of the ground fault, and issues corresponding instructions to the output module. The output module outputs the instruction signal from the CPU processor module to the corresponding switch circuit, controls the electric disconnector and feeder circuit breaker, completes the isolation of the faulty sub-partition and restores power supply to the remaining sub-partitions. At the same time, the event information is uploaded to PSCADA through the communication module. The data storage module is used to store the real-time data collected by the input module and the data processed by the CPU processor module. The display module displays the working status, voltage, current, equipment operation status, function activation and deactivation and other operating information of the device, and can adjust the event information, self-test information and other data.
[0172] The present invention has been described in detail above through embodiments, but the contents described are only exemplary embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. The protection scope of the present invention is defined by the claims. Anyone who utilizes the technical solution described in the present invention, or a technician in the field, inspired by the technical solution of the present invention, designs a similar technical solution within the essence and protection scope of the present invention to achieve the above technical effects, or makes equal changes or improvements to the scope of application, etc., shall still fall within the scope of protection covered by the patent of the present invention.
Claims
1. A method for monitoring single-phase ground faults and isolating fault sections in a DC power supply system for an electrified highway, wherein a plurality of parallel normally closed electric isolating switches are arranged in a power supply section of the DC power supply system, and each power supply section is divided into a plurality of electrically connected small sections, characterized in that: Includes the following: Monitor the real-time data of positive and negative pole-to-ground voltage and uplink and downlink differential current in each substation area; According to the substation input voltage U m , parallel resistance R0, insulation resistance threshold drop coefficient L calculates the voltage difference ratio setting value A and the differential current setting value B, where U m =|U + |+|U-|, U+ is the positive voltage of the power supply, U- is the negative voltage of the power supply, The value range of L is (0,1]; The voltage difference ratio k is calculated based on the collected positive and negative voltages to ground. If k ≥ A, the negative pole is grounded, and if k ≤ -A, the positive pole is grounded; If the uplink differential current ≥ B, there is an uplink ground fault, and if the downlink differential current ≥ B, there is a downlink ground fault; After determining that the fault partition is located in the up and down lines and the positive and negative poles, use the "one by one sequence" method or the "binary selection" method to select the corresponding disconnector for closing and opening operations, and gradually determine the final fault sub-partition; The "one by one sequence" method is as follows: according to the arrangement order of the electric disconnectors in the power supply partition, according to the distance from the substation, the switches are opened one by one from far to near, and the sub-partitions are isolated from the power supply partition one by one. The corresponding fault section is: if the ground fault disappears after the feeder circuit breaker is closed, the sub-partition after the last opened electric disconnector is the faulty sub-partition; if the ground fault still does not disappear after all the electric disconnectors are opened one by one, the first sub-partition is the faulty section; The "two-way selection" method is as follows: during operation, according to the arrangement order of the electric disconnectors in the power supply partition, open the electric disconnector in the middle position to "divide" the entire power supply partition into two groups, before and after the electric disconnector. If the grounding fault disappears after the feeder circuit breaker is closed, the faulty sub-area is located after the open electric disconnector; otherwise, it is located before the open electric disconnector. After a round of "two-way" operation of the electric disconnector determines that the "half" fault range is reached, select the next round of operation range, and repeat the operation until the "half" fault range is reached. "The fault range corresponds to the fault sub-area; in each round of judgment, when the fault sub-segment is located in the "half" fault range after the breakpoint, the opened electric disconnector needs to be closed to restore the original power supply section; the fault section corresponds to: if the grounding fault disappears after the feeder circuit breaker is closed when the "half" fault range corresponds to the sub-area, the sub-area after the last opened electric disconnector is the fault section; if the grounding fault does not disappear after the feeder circuit breaker is closed, the sub-area before the last opened electric disconnector is the fault section; Open the isolating switches at both ends of the faulty sub-area to isolate the faulty sub-area. The substation in the area supplies power to the sub-areas between the faulty sub-area and the power supply. Close the connecting switch between the adjacent substation area. The adjacent substation supplies power to the sub-areas between the faulty sub-area and the area supplied by the adjacent power supply station.
2. A method for monitoring single-phase grounding faults and isolating fault sections in a DC power supply system for an electrified highway according to claim 1, characterized in that: In the "binary selection" method, the number of electric disconnectors operated each time is related to the number of small partitions N, and the number of small partitions N satisfies 2 C-1 <N≤2 C When the number of small partitions N satisfies 2, the maximum number of operations is C, C = Roundup (log2 N, 0), Roundup is the EXCEL round-up function; C-1 <N<2 C When (N+1) to (N+2) C The virtual sub-divisions, the operation steps and the corresponding electric disconnectors in the determination process are based on the number of sub-divisions N = 2 C deal with.
3. A method for monitoring single-phase grounding faults and isolating fault sections in a DC power supply system for an electrified highway according to claim 2, characterized in that: The specific steps of the "binary selection" method are as follows: S1, calculate the maximum number of operations C according to the number of power supply sub-areas N, C = Roundup (log2 N, 0); S2, select the position of the electric disconnector for the first round of pre-operation, that is, the electric disconnector in the middle position considering all the electric disconnectors including the virtual electric disconnector; S3, open the corresponding feeder circuit breaker; S4, open the mth electric disconnector and perform the first round of operation on the middle position electric disconnector; S5, close the corresponding feeder circuit breaker; S6, judging whether the fault disappears, if the judgment is "no", go to S7; if the judgment is "yes", go to S12; S7, conclude that "the faulty small partition is before the mth electric disconnector"; S8, judging whether the operation times C is less than 2, that is, whether the operation times are completed; if the judgment is "no", go to S9; if the judgment is "yes", go to S11; S9, select the position of the electric disconnector for the next round of pre-operation; S10, reset the operation number C, and the operation number is reduced by 1; S11, draw the conclusion that "the mth fault sub-partition is faulty"; S12, conclude that "the faulty sub-area is after the mth electric disconnector"; S13, judging whether the number of sub-divisions N is equal to the number m of the electric isolating switch operated in this round plus 1, that is, whether the electric isolating switch operated in this round is the electric isolating switch in the last position; if the judgment is "no", go to S14; if the judgment is "yes", go to S20; S14, judging whether the operation times C is less than 2, that is, whether the operation times are completed; if the judgment is "no", go to S15; if the judgment is "yes", go to S20; S15, close the mth electric isolating switch; if it is determined that the faulty sub-area is located behind the opened electric isolating switch and before the next round of line operation, close the electric isolating switch; S16, select the position of the electric disconnector for the next round of pre-operation; S17, reset the operation number C, and the operation number is reduced by 1; S18, select whether the position of the pre-operated electric disconnect switch is within the sub-division number N, that is, whether it is a virtual position, and the position greater than or equal to the sub-division number N is a virtual position; if it is judged as "no", go to S19; if it is judged as "yes", go to S4; S19, if the position of the electric isolating switch selected for pre-operation in this round is a virtual position, the position of the electric isolating switch in the previous round of operation is returned; S20, conclude that "fault occurs within the m+1th fault sub-partition".
4. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by the processor, the steps of the method for single-phase grounding fault monitoring and fault section isolation of an electrified highway DC power supply system as described in any one of claims 1-3 are implemented.
5. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by the processor, the steps of the method for single-phase grounding fault monitoring and fault section isolation of an electrified highway DC power supply system as described in any one of claims 1-3 are implemented.
6. An electronic device, characterized in that: The invention comprises a processor, a memory and a computer program stored in the memory and capable of running on the processor, wherein when the computer program is executed by the processor, the steps of the method for monitoring single-phase ground faults and isolating fault sections of a DC power supply system for an electrified highway are implemented as described in any one of claims 1 to 3.
7. A single-phase ground fault monitoring and fault section isolation device for an electrified highway DC power supply system, characterized in that: The device is used to implement the method for monitoring single-phase grounding faults and isolating fault sections in a DC power supply system for an electrified highway as described in any one of claims 1 to 3, comprising: Input module, used to collect the positive and negative voltages to ground and the uplink and downlink differential currents in each substation partition for real-time data monitoring; A / D conversion module, converts the data signal collected by the input module and inputs it into the CPU processor module; The CPU processor module determines whether a ground fault occurs based on the positive and negative voltages to the ground and the uplink and downlink differential current values collected by the input module. If a ground fault occurs, the location of the faulty sub-area is further determined according to the determination procedure, and the faulty sub-area is isolated; Output module, used to output the instructions issued by the CPU processor module to the corresponding switch circuit to control the opening and closing of the electric disconnector and feeder circuit breaker; Data storage module, used to store collected and processed data information; Communication module, used to connect to PSCADA and transmit data; The display module is used to display real-time operating data, view event records and data information, and the opening and closing status of each electric disconnector and feeder circuit breaker.
Citation Information
Cited By
Leakage protection method for rail transit power supply system with all-line negative electrode connection
CN119297933A
