Control method for improving AGC performance of thermal power generating unit by using heat supply network

By setting a high load change rate in the coordination system of the thermal power unit and using the adjustment strategy of the heating adjuster, the problem of the slow load change rate of the thermal power unit is solved, and a higher AGC response rate and auxiliary service capabilities are achieved.

CN118963123APending Publication Date: 2024-11-15CHINA RESOURCES POWER JINZHOU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411022130.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the coordinated mode, the boiler fuel volume and feed water swing due to the rapid load change rate, and the prior art is difficult to effectively improve the AGC response rate.

Method used

By setting a high load change rate in the coordination system of the thermal power unit, and using the initial adjustment and callback stages of the heating control door to quickly lower and slow upward respectively, the steam volume is adjusted to improve the load response rate, ensuring the safe and stable operation of the thermal power unit.

Benefits of technology

On the premise of ensuring safe and stable operation, the AGC load response rate of the thermal power unit is significantly improved and the auxiliary service capabilities of the thermal power unit are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118963123A_ABST
    Figure CN118963123A_ABST
Patent Text Reader

Abstract

The invention discloses a control method for improving the AGC performance of a thermal power generating unit through a heat supply network. The thermal power generating unit is a combined heat and power generation unit and is provided with a heat supply control valve. A coordination system of the thermal power generating unit is set to be at a high load change rate, and the coordination system works at the high load change rate after a load instruction of load change is sent to the thermal power generating unit; when the coordination system works, the difference value between the load instruction and the actual load of the thermal power generating unit is calculated, if the difference value exceeds a preset first condition value, the opening degree of the heat supply control valve is adjusted according to a certain proportion, and after the opening degree of the heat supply control valve is kept for a period of time, the opening degree of the heat supply control valve is restored to the original opening degree; the two times of adjustment on the heat supply control valve are an initial adjustment stage and a callback stage respectively; if the load instruction is larger than the actual load of the thermal power generating unit, the heat supply control valve is lowered in the initial adjustment stage; if the load instruction is smaller than the actual load of the thermal power generating unit, the adjusting mode is opposite. According to the invention, a high AGC response rate can be obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of thermal power generation units, and in particular to a control method for improving the AGC performance of a thermal power generation unit by utilizing a heat network. Background Art

[0002] In the process of rapid development in my country, the peak and frequency regulation pressure faced by the power grid is also increasing day by day. On the one hand, my country's electricity load peaks and valleys are relatively large, and the randomness of electricity load increases. On the other hand, with the large-scale grid connection of new energy, it is difficult for fluctuating energy such as wind power to participate in the peak and frequency regulation of the power grid. Therefore, the power grid company has introduced a series of auxiliary frequency regulation policies to encourage thermal power units to regulate the frequency and obtain compensation benefits at the same time. In the coordinated mode, thermal power units usually complete the tracking of AGC load instructions by setting a relatively large load change rate, but too fast a rate will cause the boiler fuel amount and feed water to swing, so most thermal power units are generally set at a rate of about 1.5-2%. In order to obtain a higher AGC response rate based on the current rate and improve the AGC performance of thermal power units, a control method is proposed. Summary of the invention

[0003] Purpose of the invention: In order to overcome the deficiencies in the prior art, the present invention provides a control method for improving the AGC performance of a thermal power unit by utilizing a heat network, aiming to obtain a higher AGC response rate.

[0004] Technical solution: To achieve the above-mentioned purpose, the present invention provides a control method for improving the AGC performance of a thermal power unit by utilizing a heat network, wherein the thermal power unit is a cogeneration unit having a heating damper; the coordination system of the thermal power unit is set to a high load change rate, and after a load instruction for changing the load is issued to the thermal power unit, the coordination system operates at a high load change rate; when the coordination system is operating, the difference between the load instruction and the actual load of the thermal power unit is calculated, and if the difference exceeds a preset first condition value, the opening of the heating damper is adjusted according to a certain ratio, and after maintaining the opening of the heating damper for a period of time, the heating damper is restored to its original opening.

[0005] Furthermore, after a load command is issued to the thermal power unit, the two adjustments to the heating control valve are the initial adjustment stage and the callback stage; if the load command is greater than the actual load of the thermal power unit, the initial adjustment stage is to lower the heating control valve; if the load command is less than the actual load of the thermal power unit, the adjustment method is opposite.

[0006] Furthermore, if the load command is greater than the actual load of the thermal power unit, the heating control valve is quickly lowered in the initial adjustment stage; in the callback stage, the heating control valve is first slowly and gradually increased to a certain value exceeding the original opening, and then the heating control valve is quickly lowered back to the original opening; if the load command is less than the actual load of the thermal power unit, the adjustment method is opposite.

[0007] Furthermore, in the initial adjustment stage, the adjustment ratio of the heating damper opening is negatively correlated with the actual load of the thermal power unit.

[0008] Furthermore, when the actual load of the thermal power unit is above 80%, the opening of the heating damper is quickly adjusted to 4-6%; when the actual load of the thermal power unit is 70-80%, the opening of the heating damper is quickly adjusted to 6.5-8.5%; when the actual load of the thermal power unit is 60-70%, the opening of the heating damper is quickly adjusted to 9-11%; when the actual load of the thermal power unit is 50-60%, the opening of the heating damper is quickly adjusted to 14-16%; when the actual load of the thermal power unit is 45-50%, the opening of the heating damper is quickly adjusted to 19-21%; when the actual load of the thermal power unit is 40-45%, the opening of the heating damper is quickly adjusted to 29-31%.

[0009] Furthermore, in the process of slowly adjusting the heating damper in the callback stage, the opening change rate of the heating damper is negatively correlated with the actual load of the thermal power unit.

[0010] Furthermore, when the actual load of the thermal power unit is above 80%, the heating regulating valve is slowly adjusted at a rate of 0.4-0.6% / S; when the actual load of the thermal power unit is 70-80%, the heating regulating valve is slowly adjusted at a rate of 0.65-0.85% / S; when the actual load of the thermal power unit is 60-70%, the heating regulating valve is slowly adjusted at a rate of 0.7-0.9% / S; when the actual load of the thermal power unit is 50-60%, the heating regulating valve is slowly adjusted at a rate of 0.9-1.1% / S; when the actual load of the thermal power unit is 45-50%, the heating regulating valve is slowly adjusted at a rate of 1.4-1.6% / S; when the actual load of the thermal power unit is 40-45%, the heating regulating valve is slowly adjusted at a rate of 1.9-2.1% / S.

[0011] Furthermore, when the slow adjustment is changed to the fast adjustment in the callback stage, there is a difference between the current opening of the heating damper and the original opening. This difference is called the over-adjustment difference, and the over-adjustment difference is negatively correlated with the actual load of the thermal power unit.

[0012] Furthermore, when the actual load of the thermal power unit is above 80%, the over-modulation difference is 0.8-1.2%; when the actual load of the thermal power unit is 70-80%, the over-modulation difference is 1.3-1.7%; when the actual load of the thermal power unit is 60-70%, the over-modulation difference is 1.8-2.2%; when the actual load of the thermal power unit is 50-60%, the over-modulation difference is 2.8-3.2%; when the actual load of the thermal power unit is 45-50%, the over-modulation difference is 3.8-4.2%; when the actual load of the thermal power unit is 40-45%, the over-modulation difference is 5.8-6.2%.

[0013] Furthermore, after adjusting the opening of the heating damper according to a certain ratio, maintain the opening of the heating damper for 50-70S. If the difference between the load command and the actual load exceeds the preset second condition value at this time, restore the heating damper to the original opening; if the difference between the load command and the actual load does not exceed the preset second condition value at this time, restore the heating damper to the original opening after a delay of 8-12S; the value range of the first condition value is 7-9MW, and the value range of the second condition value is 2-4MW.

[0014] Beneficial effects: The control method of the present invention utilizes the heat network to improve the AGC performance of a thermal power unit. When the coordination system of the thermal power unit operates at a high load change rate, the opening of the heating valve is changed, thereby utilizing the heat network to quickly change the power generation capacity of the thermal power unit. Under the premise of ensuring the safe and stable operation of the thermal power unit, the load response rate of the AGC can be greatly improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Attached Figure 1 is a flow chart of the control method of the present invention. DETAILED DESCRIPTION

[0016] The present invention will be further described below in conjunction with the accompanying drawings.

[0017] As attached Figure 1 The control method for improving the AGC performance of a thermal power unit by using a heat network is described. The thermal power unit is a cogeneration unit. The thermal power unit has a heat supply regulating valve. Through the heat supply regulating valve, the thermal power unit can control the amount of steam entering the heat network.

[0018] In a thermal power unit, an excessively high load change rate will cause the boiler fuel amount and feed water to fluctuate, so the load change rate of most thermal power units is relatively low, generally about 1.5-2%; in the present invention, the coordination system of the thermal power unit is set to a high load change rate, and the operator is allowed to manually enter the frequency modulation logic. After the operator issues a load instruction to change the load to the thermal power unit, the coordination system works at a high load change rate. When the coordination system is working, the difference between the load instruction and the actual load of the thermal power unit is calculated. If the difference exceeds the preset first condition value, the opening of the heating valve is adjusted according to a certain ratio, and after maintaining the opening of the heating valve for a period of time, the heating valve is restored to the original opening. If the difference does not exceed the preset first condition value, the opening of the heating valve is not adjusted during the operation of the coordination system. The value range of the first condition value is generally 7-9MW, preferably 8MW.

[0019] The change of the opening of the heating valve will change the amount of steam entering the heating network, thereby changing the load of the thermal power unit. Therefore, when coordinating the system work, the load response rate of the AGC can be improved by adjusting the opening of the heating valve.

[0020] After the load command is issued to the thermal power unit, the two adjustments to the heating control valve are the initial adjustment stage and the callback stage; if the load command is greater than the actual load of the thermal power unit, the initial adjustment stage is to lower the heating control valve. This is equivalent to using the heat network to store heat and energy, and then using this part of the heat storage to improve the rapid response capability of the thermal power unit in a short time. If the load command is less than the actual load of the thermal power unit, the adjustment method is opposite, that is, if the load command is greater than the actual load of the thermal power unit, the initial adjustment stage is to increase the heating control valve.

[0021] If the load command is greater than the actual load of the thermal power unit, the heating valve is quickly adjusted down in the initial adjustment stage to enable the thermal power unit to respond quickly. After maintaining the opening of the heating valve for a period of time, the callback stage begins. In the callback stage, the heating valve is first slowly raised to a certain value exceeding the original opening, and then the heating valve is quickly lowered back to the original opening. In the callback stage, the heating valve is first slowly raised to leave enough time for the coordination system to adaptively adjust the load of the thermal power unit.

[0022] In the process of the coordination system adaptively adjusting the load of the thermal power unit, the adjustment rate of the coordination system is actually related to whether the heating valve is in the adjustment state. Since the coordination system has a certain hysteresis, if the heating valve is slowly raised to the original opening and then stops, the difference that the coordination system needs to adjust will gradually decrease, so the adjustment rate of the coordination system will also decrease; and if the heating valve is slowly raised to the original opening and continues to be raised to exceed the original opening, the difference that the coordination system needs to adjust will be greater, so the adjustment rate of the coordination system can be maintained at a higher state. Therefore, by slowly raising the heating valve to exceed the original opening, and then quickly lowering the heating valve back to the original opening, the response rate of the thermal power unit can be improved.

[0023] If the load command is less than the actual load of the thermal power unit when the load command is issued, the adjustment method is opposite. That is, in the initial adjustment stage, the heating adjustment valve is quickly adjusted upward, and in the callback stage, the heating adjustment valve is first slowly adjusted downward to a certain value below the original opening, and then the heating adjustment valve is quickly adjusted back to the original opening.

[0024] In the initial adjustment stage, the adjustment ratio of the heating valve opening is negatively correlated with the actual load of the thermal power unit, that is, the greater the actual load of the thermal power unit, the smaller the adjustment ratio of the heating valve opening. This is because when the actual load of the thermal power unit is large, a small change in the heating valve opening will cause a correspondingly large change in the load of the thermal power unit. The details are as follows:

[0025] When the actual load of the thermal power unit is above 80%, excluding 80%, the range of the opening of the heating valve is quickly adjusted to 4-6%, preferably 5%;

[0026] When the actual load of the thermal power unit is between 70% and 80%, excluding 70%, the range of the opening of the heating valve is quickly adjusted to be between 6.5% and 8.5%, preferably 7.5%;

[0027] When the actual load of the thermal power unit is between 60% and 70%, excluding 60%, the range of the opening of the heating damper is 9% to 11%, preferably 10%;

[0028] When the actual load of the thermal power unit is between 50% and 60%, excluding 50%, the range of the opening of the heating damper is quickly adjusted to 14% to 16%, preferably 15%;

[0029] When the actual load of the thermal power unit is between 45% and 50%, excluding 45%, the range of the opening of the heating damper is quickly adjusted to 19% to 21%, preferably 20%;

[0030] When the actual load of the thermal power unit is between 40% and 45%, excluding 40%, the range of the opening of the rapid adjustment heating damper is between 29% and 31%, preferably 30%.

[0031] In addition, the opening of the heating damper has a lower limit. If the opening of the heating damper is adjusted down quickly, it will be lower than the lower limit, so it is adjusted down to the lower limit of the heating damper. For example, the lower limit of the heating damper is 15%, and when the load needs to be adjusted, the actual load of the thermal power unit is 55%, and the opening of the heating damper is 42%. If the opening of the heating damper is adjusted down by 14-16%, it will be lower than the lower limit of 30%, so the opening of the heating damper is only adjusted down to 30%.

[0032] During the process of slowly adjusting the heating valve in the callback stage, the rate of change of the heating valve opening is negatively correlated with the actual load of the thermal power unit, that is, the greater the actual load of the thermal power unit, the smaller the adjustment rate of the heating valve. Similarly, when the actual load of the thermal power unit is large, a small change in the opening of the heating valve will cause a correspondingly large change in the load of the thermal power unit, so the adjustment rate of the heating valve will be smaller. The details are as follows:

[0033] When the actual load of the thermal power unit is above 80%, excluding 80%, the heating valve is gradually adjusted to the original opening at a rate of 0.4-0.6% / S, preferably 0.5% / S;

[0034] When the actual load of the thermal power unit is between 70% and 80%, excluding 70%, the heating valve is gradually adjusted to the original opening at a rate of 0.65% to 0.85% / S, preferably 0.75% / S;

[0035] When the actual load of the thermal power unit is between 60% and 70%, excluding 60%, the heating damper is gradually adjusted to the original opening at a rate of 0.7% to 0.9% / S, preferably 0.8% / S;

[0036] When the actual load of the thermal power unit is between 50% and 60%, excluding 50%, the heating valve is gradually adjusted to the original opening at a rate of 0.9% to 1.1% / S, preferably 1% / S;

[0037] When the actual load of the thermal power unit is between 45% and 50%, excluding 45%, the heating valve is gradually adjusted to the original opening at a rate of 1.4% to 1.6% / S, preferably 1.5% / S;

[0038] When the actual load of the thermal power unit is between 40% and 45%, excluding 40%, the heating damper is gradually adjusted to the original opening at a rate of 1.9% to 2.1% / S, preferably 2% / S.

[0039] When the slow adjustment turns to the fast adjustment in the callback stage, there is a difference between the current opening of the heating valve and the original opening. This difference is called the over-adjustment difference. The over-adjustment difference is negatively correlated with the actual load of the thermal power unit, that is, the greater the actual load of the thermal power unit, the smaller the over-adjustment difference. For the same reason as mentioned above, when the actual load of the thermal power unit is large, a small change in the opening of the heating valve will cause a correspondingly large change in the load of the thermal power unit, so the value of the over-adjustment difference will also be smaller. The details are as follows:

[0040] When the actual load of the thermal power unit is above 80%, excluding 80%, the over-regulation difference is 0.8-1.2%, preferably 1%;

[0041] When the actual load of the thermal power unit is between 70% and 80%, excluding 70%, the over-regulation difference is 1.3% to 1.7%, preferably 1.5%;

[0042] When the actual load of the thermal power unit is between 60% and 70%, excluding 60%, the over-regulation difference is 1.8% to 2.2%, preferably 2%;

[0043] When the actual load of the thermal power unit is between 50% and 60%, excluding 50%, the over-regulation difference is 2.8% to 3.2%, preferably 3%;

[0044] When the actual load of the thermal power unit is between 45% and 50%, excluding 45%, the over-regulation difference is 3.8% to 4.2%, preferably 4%;

[0045] When the actual load of the thermal power unit is between 40% and 45%, excluding 40%, the over-regulation difference is 5.8% to 6.2%, preferably 6%.

[0046] After adjusting the opening of the heating regulating valve according to a certain ratio, the opening of the heating regulating valve is maintained for 50-70S, preferably 60S. If the difference between the load instruction and the actual load exceeds the preset second condition value at this time, the heating regulating valve is restored to the original opening; if the difference between the load instruction and the actual load does not exceed the preset second condition value at this time, the heating regulating valve is restored to the original opening after a delay of 8-12S, preferably 10S. The value range of the second condition value is 2-4MW, preferably 3MW.

[0047] An embodiment of the present invention under the operating conditions of a thermal power unit is as follows: Take the thermal power unit at 458MW as an example. At this time, the steam extraction capacity of the heat network is greater than 300t, and the opening of the heating control valve is 32%. When the heating control valve is about to close to 21%, the actual load of the unit rises from 458 to 469MW within 24S, and the actual conversion rate is 28MW / min, while the conventional AGC rate is generally 9.9MW / min, so the actual conversion rate is about 3 times the conventional AGC rate change. On the basis of the AGC high load change rate, the load response speed of the thermal power unit can be greatly improved, thereby improving the AGC response capability and obtaining greater auxiliary service benefits.

[0048] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A control method for improving the AGC performance of thermal power units using a heat network. Features: The thermal power unit is a cogeneration unit with a heating damper; the coordination system of the thermal power unit is set to a high load change rate, and after a load instruction for changing the load is issued to the thermal power unit, the coordination system works at a high load change rate; when the coordination system is working, the difference between the load instruction and the actual load of the thermal power unit is calculated, and if the difference exceeds a preset first condition value, the opening of the heating damper is adjusted according to a certain ratio, and after maintaining the opening of the heating damper for a period of time, the heating damper is restored to its original opening.

2. A control method for improving the AGC performance of a thermal power unit by utilizing a heat network according to claim 1, Features: After a load command is issued to the thermal power unit, the two adjustments to the heating control valve are the initial adjustment stage and the callback stage; if the load command is greater than the actual load of the thermal power unit, the initial adjustment stage is to lower the heating control valve; if the load command is less than the actual load of the thermal power unit, the adjustment method is opposite.

3. A control method for improving the AGC performance of a thermal power unit by utilizing a heat network according to claim 2, Features: If the load command is greater than the actual load of the thermal power unit, the heating control valve will be quickly lowered during the initial adjustment stage; during the callback stage, the heating control valve will be gradually increased slowly to a certain value exceeding the original opening, and then the heating control valve will be quickly lowered back to the original opening; if the load command is less than the actual load of the thermal power unit, the adjustment method is opposite.

4. A control method for improving the AGC performance of a thermal power unit by using a heat network according to claim 3, Features: In the initial adjustment stage, the adjustment ratio of the heating valve opening is negatively correlated with the actual load of the thermal power unit.

5. A control method for improving the AGC performance of a thermal power unit by using a heat network according to claim 4, Features: When the actual load of the thermal power unit is above 80%, quickly adjust the opening of the heating valve by 4-6%; When the actual load of the thermal power unit is 70-80%, quickly adjust the opening of the heating valve to 6.5-8.5%; When the actual load of the thermal power unit is 60-70%, quickly adjust the opening of the heating valve to 9-11%; When the actual load of the thermal power unit is 50-60%, quickly adjust the opening of the heating valve by 14-16%; When the actual load of the thermal power unit is 45-50%, quickly adjust the opening of the heating valve to 19-21%; When the actual load of the thermal power unit is between 40% and 45%, the opening of the heating valve is quickly adjusted to 29% to 31%.

6. A control method for improving the AGC performance of a thermal power unit by using a heat network according to claim 3, Features: During the slow adjustment of the heating damper in the callback stage, the opening change rate of the heating damper is negatively correlated with the actual load of the thermal power unit.

7. A control method for improving the AGC performance of a thermal power unit by utilizing a heat network according to claim 6, Features: When the actual load of the thermal power unit is above 80%, the heating valve is slowly adjusted at a rate of 0.4-0.6% / S; When the actual load of the thermal power unit is 70-80%, the heating valve is slowly adjusted at a rate of 0.65-0.85% / S; When the actual load of the thermal power unit is 60-70%, the heating valve is slowly adjusted at a rate of 0.7-0.9% / S; When the actual load of the thermal power unit is 50-60%, the heating valve is slowly adjusted at a rate of 0.9-1.1% / S; When the actual load of the thermal power unit is 45-50%, the heating valve is slowly adjusted at a rate of 1.4-1.6% / S; When the actual load of the thermal power unit is between 40% and 45%, the heating valve is slowly adjusted at a rate of 1.9% to 2.1% per second.

8. A control method for improving the AGC performance of a thermal power unit by using a heat network according to claim 3, Features: When the slow adjustment is changed to the fast adjustment in the callback stage, there is a difference between the current opening of the heating valve and the original opening. This difference is called the over-adjustment difference. The over-adjustment difference is negatively correlated with the actual load of the thermal power unit.

9. A control method for improving the AGC performance of a thermal power unit by using a heat network according to claim 8, Features: When the actual load of the thermal power unit is above 80%, the over-regulation difference is 0.8-1.2%; When the actual load of the thermal power unit is 70-80%, the over-regulation difference is 1.3-1.7%; When the actual load of the thermal power unit is 60-70%, the over-regulation difference is 1.8-2.2%; When the actual load of the thermal power unit is 50-60%, the over-regulation difference is 2.8-3.2%; When the actual load of the thermal power unit is 45-50%, the over-regulation difference is 3.8-4.2%; When the actual load of the thermal power unit is 40-45%, the over-regulation difference is 5.8-6.2%.

10. A control method for improving the AGC performance of a thermal power unit by using a heat network according to claim 1, Features: After adjusting the opening of the heating damper according to a certain ratio, maintain the opening of the heating damper for 50-70S. If the difference between the load command and the actual load exceeds the preset second condition value at this time, restore the heating damper to the original opening; if the difference between the load command and the actual load does not exceed the preset second condition value at this time, restore the heating damper to the original opening after a delay of 8-12S; the value range of the first condition value is 7-9MW, and the value range of the second condition value is 2-4MW.