Energy storage energy management system and implementation method thereof
By deploying three servers in the energy storage power station, detecting faults and switching working modes, the failure problem of large energy storage power stations when the host failure is solved, reducing investment costs and improving system reliability and security.
Patent Information
- Application Number
- CN202411013442.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-15
AI Technical Summary
When the main unit of a large energy storage power station fails, the existing energy storage energy management system is prone to failure, causing the entire energy storage station to be in an out-of-control operating state, increasing investment costs.
The configuration of three servers is adopted, including the first server working in the host mode, the second server working in the standby mode, and the third server working in the second standby mode. By detecting faults and switching the working mode, it ensures that the host failure can still be achieved. The main and backup mode reduces the investment cost of energy storage power stations.
The main and standby mode switching is realized in the event of a host failure, which reduces the investment cost of energy storage power stations and improves the reliability and safety of the system.
Smart Images

Figure CN118964099A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of power systems, and in particular, relates to an energy storage management system and an implementation method thereof. Background Art
[0002] As the proportion of new energy in the new power system continues to increase, energy storage, as a flexible resource, can effectively cope with wind and solar power output fluctuations, improve the utilization rate of new energy, and enhance the safety performance of grid connection. It is conducive to ensuring the safe and stable operation of electricity and promoting the high-quality development of new energy. It is an important support for building a new power system. The scale of new energy storage power stations is getting larger and larger. The capacity of energy storage power stations has gradually shifted from small and medium-sized power stations and demonstration-type MWh-level power stations to hundreds of MWh-level.
[0003] In order to ensure the reliability of the service, the energy storage management system generally adopts a master-slave mode of dual sets of equipment, namely the main machine and the backup machine. However, when the main machine fails, the master-slave mode of the energy storage management system may fail easily, causing the entire energy storage station to be out of control and affecting the safe and stable operation of the power system.
[0004] In large-scale energy storage power stations, due to the large number of access devices and the large number of measurement points for the four remote signals, in order not to affect the master-slave mode of the entire energy storage energy management system, the energy storage energy management system is generally configured with four servers, including two front-end servers and two Supervisory Control And Data Acquisition (SCADA) servers. The two front-end servers are a front-end host and a front-end standby server, and the two SCADA servers are a SCADA host and a SCADA standby server. However, the above energy storage energy management system requires four servers, which increases the investment cost of the energy storage power station. Summary of the invention
[0005] The embodiment of the present application provides an energy storage management system and an implementation method thereof, which can realize the active-standby mode and minimize the investment cost of the energy storage power station when a host fails.
[0006] In a first aspect, an embodiment of the present application provides an energy storage energy management system, comprising a first server operating in a host mode, a second server operating in a standby mode, and a third server operating in a secondary standby mode, wherein the first server comprises a primary management node, a primary front-end node, and a primary data acquisition and monitoring control SCADA node, the second server comprises a standby management node, a standby front-end node, and a standby SCADA node, and the third server comprises a secondary standby management node, a secondary standby front-end node, and a secondary standby SCADA node;
[0007] The primary management node or the backup management node is configured to switch the working mode of the second server from the backup mode to the host mode if a failure of the first server is detected, and send a first mode switching instruction to the secondary backup management node;
[0008] The secondary standby management node is used to switch the working mode of the third server from the secondary standby mode to the standby mode in response to the first mode switching instruction.
[0009] In an embodiment of the present application, the energy storage energy management system includes three servers, which are a first server working in a host mode, a second server working in a standby mode, and a third server working in a secondary standby mode. Each server includes a management node, a front node and a SCADA node, that is, the first server includes a main management node, a main front node and a main SCADA node, the second server includes a standby management node, a standby front node and a standby SCADA node, and the third server includes a secondary standby management node, a secondary standby front node and a secondary standby SCADA node. The main management node or the standby management node is used to switch the working mode of the second server from the standby mode to the host mode if a failure of the first server is detected, and send a first mode switching instruction to the secondary standby management node. The secondary standby management node responds to the first mode switching instruction and switches the working mode of the third server from the secondary standby mode to the standby mode. By deploying three servers in the energy storage energy management system, this solution can detect whether the first server fails through the main management node in the first server working in the host mode or the backup management node in the second server working in the backup mode, and when a failure occurs, the working mode of the second server is switched from the backup mode to the host mode, and the working mode of the third server is switched from the secondary backup mode to the backup mode. Therefore, when the first server serving as the host in the energy storage energy management system fails, the main-backup mode can still be realized, and only three servers need to be deployed in the energy storage energy management system, thereby reducing the investment cost of the energy storage power station.
[0010] In a possible implementation manner of the first aspect, the standby management node includes:
[0011] A first detection unit, used to detect whether a hardware failure or a main management node failure occurs in the first server;
[0012] A processing unit is used to switch the working mode of the second server from the standby mode to the host mode if a hardware failure or a main management node failure occurs in the first server, and send the first mode switching instruction to the secondary standby management node.
[0013] In a possible implementation manner of the first aspect, the first detection unit is specifically configured to:
[0014] Detecting whether there is a heartbeat interaction abnormality between the standby management node and the main management node;
[0015] If there is an abnormal heartbeat interaction between the standby management node and the main management node, it is determined that a hardware failure occurs on the first server or a main management node failure occurs;
[0016] If there is no heartbeat interaction abnormality between the standby management node and the main management node, it is determined that the first server has no hardware failure and main management node failure.
[0017] In a possible implementation manner of the first aspect, the primary management node includes:
[0018] A second detection unit, used to detect whether a main front-end node failure or a main SCADA node failure occurs in the first server;
[0019] A first sending unit is used to send a second mode switching instruction to the standby management node and send the first mode switching instruction to the third server if a main front-end node failure or a main SCADA node failure occurs in the first server;
[0020] The standby management node is used to switch the working mode of the second server from the standby mode to the host mode in response to the second mode switching instruction.
[0021] In a possible implementation manner of the first aspect, the second detection unit is specifically configured to:
[0022] Detecting whether there is a heartbeat interaction abnormality between the main management node and the main front-end node;
[0023] If there is an abnormal heartbeat interaction between the main management node and the main front-end node, it is determined that a main front-end node failure occurs on the first server;
[0024] If there is no abnormal heartbeat interaction between the main management node and the main front-end node, it is determined that the first server has no main front-end node failure;
[0025] Detect whether there is a heartbeat interaction abnormality between the main management node and the main SCADA node;
[0026] If there is a heartbeat interaction abnormality between the main management node and the main SCADA node, it is determined that a main SCADA node failure occurs on the first server;
[0027] If there is no heartbeat interaction abnormality between the main management node and the main SCADA node, it is determined that no main SCADA node failure occurs on the first server.
[0028] In a possible implementation manner of the first aspect, when the first server does not fail, the primary management node further includes:
[0029] A third detection unit, used for detecting whether a communication failure occurs between the main management node and a standby node, wherein the standby node is any one of the standby management node, the standby front node and the standby SCADA node;
[0030] The second sending unit is configured to send the first mode switching instruction to the secondary backup management node if a communication failure occurs between the primary management node and the backup node.
[0031] In a possible implementation manner of the first aspect, the third detection unit is specifically configured to:
[0032] Detect whether there is a heartbeat interaction abnormality between the main management node and the standby node;
[0033] If there is a heartbeat interaction abnormality between the main management node and the backup node, it is determined that a communication failure occurs between the main management node and the backup node;
[0034] If there is no heartbeat interaction abnormality between the main management node and the backup node, it is determined that no communication failure occurs between the main management node and the backup node.
[0035] In a possible implementation manner of the first aspect, the primary management node further includes:
[0036] A synchronization control unit is used to control data synchronization among the first server, the second server and the third server.
[0037] In a possible implementation manner of the first aspect, the synchronization control unit is specifically configured to:
[0038] After the first server acquires the data, a first target node is determined from the second server, and a second target node is determined from the third server, wherein the first target node is a node in the second server that needs to use the data, and the second target node is a node in the third server that needs to use the data;
[0039] The data is sent to the first target node and the second target node respectively.
[0040] In a second aspect, an embodiment of the present application provides an implementation method of an energy storage management system, wherein the energy storage management system includes a first server working in a host mode, a second server working in a standby mode, and a third server working in a secondary standby mode, wherein the first server includes a primary management node, a primary front node, and a primary SCADA node, the second server includes a standby management node, a standby front node, and a standby SCADA node, the third server includes a secondary standby management node, a secondary standby front node, and a secondary standby SCADA node, and the implementation method includes:
[0041] If the primary management node or the backup management node detects that the first server fails, the primary management node or the backup management node switches the working mode of the second server from the backup mode to the host mode, and sends a first mode switching instruction to the secondary backup management node;
[0042] The secondary standby management node switches the working mode of the third server from the secondary standby mode to the standby mode in response to the first mode switching instruction;
[0043] The switching of the working mode of the second server from the standby mode to the host mode includes using the standby management node as the main management node, the standby front node as the main front node, and the standby SCADA node as the main SCADA node;
[0044] Switching the working mode of the third server from the secondary standby mode to the standby mode includes using the secondary standby management node as the standby management node, the secondary standby front node as the standby front node, and the secondary standby SCADA node as the standby SCADA node.
[0045] It can be understood that the beneficial effects of the second aspect mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0047] Figure 1 It is a schematic diagram of the architecture of the energy storage management system provided in the embodiment of the present application;
[0048] Figure 2 This is an example diagram of the architecture of the energy storage management system provided in the embodiment of the present application;
[0049] Figure 3 It is a schematic flow chart of a method for implementing the energy storage energy management system provided in an embodiment of the present application. DETAILED DESCRIPTION
[0050] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0051] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0052] It should also be understood that the term "and / or" used in the present specification and the appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations. The character " / " generally indicates that the objects associated before and after are in an "or" relationship.
[0053] It should also be understood that in the embodiments of the present application, "plurality" refers to two or more than two.
[0054] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0055] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0056] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0057] See also Figure 1 , Figure 1 A schematic diagram of the architecture of an energy storage energy management system provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.
[0058] Reference Figure 1 The energy storage management system includes three servers, which are a first server 101 working in a host mode, a second server 102 working in a backup mode, and a third server 103 working in a secondary backup mode.
[0059] By adding a secondary backup mode on the basis of the main mode and the backup mode, the number of backup machines can be increased, thereby ensuring the reliability of the energy storage energy management system.
[0060] The first server 101 is a server working in a host mode, which may also be referred to as a host, and is always in a working state (ie, a running state).
[0061] The second server 102 is a server working in standby mode, which can also be called a standby machine and is in hot standby state. The second server 102 is a standby server deployed to realize the active standby mode and ensure the normal operation of the energy storage station when the first server 101 fails.
[0062] The third server 103 is a server working in a secondary standby mode, which can also be called a secondary standby, and is in a hot standby state. The third server 103 is a standby server deployed to realize the primary-standby mode and ensure the normal operation of the energy storage station after a communication failure occurs between the second server 102 and the first server 101 or the second server 102 switches to the host mode.
[0063] Nodes are deployed on these three servers, including management nodes, front-end nodes, and SCADA nodes. These three nodes can be software that implements corresponding functions. The main function of the management node can be used to schedule and control other nodes in the energy storage energy management system except the management node, and to perform heartbeat interaction with management nodes on other servers. By adding a secondary standby mode on the basis of the host mode and the standby mode, the number of management nodes can be increased from two to three, so that more management nodes can be used to support the energy storage energy management system, so that the reliability of the energy storage energy management system is guaranteed.
[0064] The main function of the front node can be used for data collection and communication with the dispatcher. The main function of the SCADA node can be used for data processing and storage.
[0065] Specifically, the first server 101 includes a primary management node, a primary front-end node and a primary SCADA node, the second server 102 includes a backup management node, a backup front-end node and a backup SCADA node, and the third server 103 includes a secondary backup management node, a secondary backup front-end node and a secondary backup SCADA node.
[0066] The nodes working in the host mode (i.e., the main management node, the main front-end node, and the main SCADA node) are the system master nodes, are in operation, and have complete node functions.
[0067] Nodes working in standby mode and secondary standby mode (i.e., standby management nodes, standby front nodes, standby SCADA nodes, secondary standby management nodes, secondary standby front nodes and secondary standby SCADA nodes) are in hot standby state, that is, the data information required by the nodes can be obtained in real time, but other functions are in standby state.
[0068] like Figure 2The diagram shows an example of the architecture of the energy storage management system. The architecture of the energy storage management system uses three servers, numbered 1, 2, and 3. According to the configuration order of the network node parameter table of the database of the energy storage management system, the server number is generally used as the default configuration. Server 1 works in the host mode, server 2 works in the standby mode, and server 3 works in the secondary standby mode. Management node 1 is the main management node of the energy storage management system, responsible for managing other nodes in the system except the management node (such as scheduling and control), while maintaining heartbeat interaction with management node 2 of server 2 and management node 3 of server 3. Management node 1, front node 1, and SCADA node 1 of server 1 are master nodes, in the running state, and have complete node functions. Management node 2, front node 2, SCADA node 2, management node 3, front node 3, and SCADA node 3 of servers 2 and 3 are all standby nodes and are in hot standby state.
[0069] In a possible implementation, the primary management node includes:
[0070] The synchronization control unit is used to control the data synchronization among the first server 101 , the second server 102 and the third server 103 .
[0071] In order to maintain the real-time performance of the energy storage management system, the three servers mentioned above will synchronize data. On this basis, when facing the switch between the main and backup machines, the main and backup switches can be completed directly without real-time data synchronization, making the main and backup switches more efficient, thereby solving the problem of inconsistent real-time data during the main and backup switches, and achieving higher real-time performance for up-to-down communication, making the energy management of the entire energy storage power station safer and more efficient. The above-mentioned main and backup switches can refer to the main switch and the backup switch.
[0072] Among them, the active-standby switching scenarios existing in the energy storage energy management system include but are not limited to hardware failure of the first server 101, failure of the main management node, failure of the main front-end node, failure of the main SCADA node, and communication failure between the main management node and the standby node.
[0073] The energy storage management system provided in the embodiment of the present application can be applied to large-scale energy storage power stations. In large-scale energy storage power stations, through the master-standby switching operation of the energy storage management system, only three servers need to be configured to realize the master-standby mode, and four servers do not need to be configured. That is, the embodiment of the present application can realize the functions of four servers through three servers, reducing the investment cost of large-scale energy storage power stations.
[0074] In a possible implementation manner, the synchronization control unit is specifically used to:
[0075] After the first server 101 obtains the data, a first target node is determined from the second server, and a second target node is determined from the third server. The first target node is a node in the second server 102 that needs to use the data, and the second target node is a node in the third server 103 that needs to use the data.
[0076] Data is sent to the first target node and the second target node respectively.
[0077] Since the function of the management node is mainly an administrator function and does not synchronize data, after the first server 101 obtains the data, the first target node can be determined from the backup front node and the backup SCADA node of the second server 102, and the second target node can be determined from the secondary backup front node and the secondary backup SCADA node of the third server 103. By sending data to the first target node and the second target node respectively, the data synchronization of the first server 101, the second server 102 and the third server 103 can be achieved.
[0078] The primary management node or the backup management node is used to switch the working mode of the second server 102 from the backup mode to the host mode if a failure of the first server 101 is detected, and send a first mode switching instruction to the secondary backup management node;
[0079] The secondary standby management node is configured to switch the working mode of the third server 103 from the secondary standby mode to the standby mode in response to the first mode switching instruction.
[0080] The main management node in the first server 101 and the backup management node in the second server 102 can be used to detect whether the first server 101 fails. When the first server 101 fails, the working mode of the second server 102 is switched to the host mode, and the working mode of the third server 103 is switched to the backup mode, so that when the first server 101 as the host fails in the energy storage energy management system, the main and backup modes can still be realized, and only three servers need to be deployed in the energy storage energy management system, which reduces the investment cost of the energy storage power station.
[0081] The failure of the first server 101 includes but is not limited to hardware failure and software failure. The software failure includes but is not limited to the failure of the main management node, the failure of the main front-end node and the failure of the main SCADA node.
[0082] The switching of the working mode of the second server 102 from the standby mode to the host mode may include using the standby management node as the main management node, the standby front-end node as the main front-end node, and the standby SCADA node as the main SCADA node.
[0083] Switching the working mode of the third server 103 from the secondary standby mode to the standby mode may include using the secondary standby management node as a standby management node, the secondary standby front node as a standby front node, and the secondary standby SCADA node as a standby SCADA node.
[0084] In a possible implementation, the standby management node may include:
[0085] A first detection unit, used to detect whether a hardware failure or a main management node failure occurs on the first server 101;
[0086] The processing unit is used to switch the working mode of the second server 102 from the standby mode to the master mode if a hardware failure or a master management node failure occurs in the first server 101, and send a first mode switching instruction to the secondary standby management node.
[0087] The standby management node can detect whether a hardware failure or a main management node failure occurs in the first server 101 , thereby realizing detection of whether a failure occurs in the first server 101 .
[0088] After the standby management node switches the working mode of the second server 102 to the host mode, the standby management node, as the main management node, can communicate with the secondary standby management node in the third server 103, thereby sending a first mode switching instruction to the secondary standby management node, so as to instruct the secondary standby management node to switch the working mode of the third server 103 to the standby mode through the first mode switching instruction, thereby ensuring that when a hardware failure occurs in the first server 101 or a failure of the main management node occurs, the master-standby mode of the entire energy storage management system is not affected.
[0089] In a possible implementation manner, the first detection unit is specifically used to:
[0090] Check whether there is any abnormal heartbeat interaction between the standby management node and the main management node;
[0091] If there is an abnormal heartbeat interaction between the standby management node and the main management node, it is determined that a hardware failure or a main management node failure occurs on the first server 101;
[0092] If there is no abnormal heartbeat interaction between the standby management node and the main management node, it is determined that the first server 101 has no hardware failure and main management node failure.
[0093] Heartbeat interaction can be performed between the standby management node and the main management node. The first detection unit can count the duration of the standby management node not receiving the heartbeat interaction data with the main management node. If the duration exceeds the duration threshold, it can be determined that there is a heartbeat interaction anomaly between the standby management node and the main management node. Otherwise, it is determined that there is no heartbeat interaction anomaly between the standby management node and the main management node. Optionally, the duration threshold can be set according to actual needs, and this application does not limit this. For example, the duration threshold can be set to 30 seconds.
[0094] In a possible implementation, the primary management node includes:
[0095] A second detection unit is used to detect whether a main front-end node failure or a main SCADA node failure occurs in the first server 101;
[0096] A first sending unit is used to send a second mode switching instruction to the standby management node and send a first mode switching instruction to the secondary standby management node if a main front-end node failure or a main SCADA node failure occurs in the first server 101;
[0097] The standby management node is configured to switch the working mode of the second server 102 from the standby mode to the host mode in response to the second mode switching instruction.
[0098] When the first server 101 has no hardware failure and main management node failure, the main management node in the first server 101 can operate normally, and it can detect whether the first server 101 has a software failure such as a main front-end node failure or a main SCADA node failure.
[0099] When the main management node detects that a main front-end node failure or a main SCADA node failure occurs in the first server 101, the main management node can instruct the standby management node to switch the working mode of the second server 102 to the host mode by sending a second mode switching instruction to the standby management node, and can instruct the secondary standby management node to switch the working mode of the third server 103 to the standby mode by sending a first mode switching instruction to the secondary standby management node, thereby ensuring that when a main front-end node failure or a main SCADA node failure occurs in the first server 101, the master-standby mode of the entire energy storage management system is not affected.
[0100] In a possible implementation manner, the second detection unit is specifically used to:
[0101] Check whether there is any abnormality in the heartbeat interaction between the main management node and the main front-end node;
[0102] If there is an abnormal heartbeat interaction between the main management node and the main front-end node, it is determined that a main front-end node failure occurs in the first server 101;
[0103] If there is no abnormal heartbeat interaction between the main management node and the main front-end node, it is determined that the first server 101 has no main front-end node failure;
[0104] Check whether there is any abnormal heartbeat interaction between the main management node and the main SCADA node;
[0105] If there is an abnormal heartbeat interaction between the main management node and the main SCADA node, it is determined that a main SCADA node failure occurs in the first server 101;
[0106] If there is no abnormal heartbeat interaction between the main management node and the main SCADA node, it is determined that no main SCADA node failure occurs in the first server 101.
[0107] Heartbeat interaction can be performed between the main management node and the main front-end node, and between the main management node and the front SCADA node; the second detection unit can count the duration of the main management node not receiving the heartbeat interaction data between the main front-end node, or the duration of the main management node not receiving the heartbeat interaction duration between the main SCADA node; if the duration of the main management node not receiving the heartbeat interaction data between the main front-end node exceeds the duration threshold, it can be determined that there is a heartbeat interaction abnormality between the main management node and the main front-end node, otherwise it is determined that there is no heartbeat interaction abnormality between the main management node and the main front-end node; if the duration of the main management node not receiving the heartbeat interaction data between the main SCADA node exceeds the duration threshold, it can be determined that there is a heartbeat interaction abnormality between the main management node and the main SCADA node, otherwise it is determined that there is no heartbeat interaction abnormality between the main management node and the main SCADA node.
[0108] In a possible implementation, when the first server 101 does not fail, the primary management node further includes:
[0109] A third detection unit is used to detect whether a communication failure occurs between the main management node and the standby node, where the standby node is any one of the standby management node, the standby front node and the standby SCADA node;
[0110] The second sending unit is configured to send a first mode switching instruction to the secondary backup management node if a communication failure occurs between the primary management node and the backup node.
[0111] When there is no failure in the first server 101, the main management node in the first server 101 can operate normally, and it can detect whether a communication failure occurs with the backup node in the second server 102. If a communication failure occurs, the secondary backup management node can be instructed to switch the working mode of the third server to the backup mode by sending a first mode switching instruction to the secondary backup management node, thereby ensuring that when a communication failure occurs between the main management node in the first server 101 and the backup node in the second server 102, the master-slave mode of the entire energy storage management system is not affected.
[0112] In a possible implementation manner, the third detection unit is specifically used to:
[0113] Check whether there is any abnormal heartbeat interaction between the main management node and the backup node;
[0114] If there is an abnormal heartbeat interaction between the main management node and the backup node, it is determined that a communication failure occurs between the main management node and the backup node;
[0115] If there is no abnormal heartbeat interaction between the primary management node and the backup node, it is determined that no communication failure occurs between the primary management node and the backup node.
[0116] Heartbeat interaction can be performed between the main management node and the backup node; the third detection unit can count the duration of time when the main management node has not received the heartbeat interaction data between the backup node; if the duration of time when the main management node has not received the heartbeat interaction data between the backup node exceeds the duration threshold, it can be determined that there is a heartbeat interaction abnormality between the main management node and the backup node, otherwise it is determined that there is no heartbeat interaction abnormality between the main management node and the backup node.
[0117] It should be noted that switching the working mode of the second server 102 from the standby mode to the host mode can be understood as using the second server 102 as the host, or switching the host from the first server 101 to the second server 102 (i.e., host switching). Switching the working mode of the third server 103 from the secondary standby mode to the standby mode can be understood as using the third server 103 as the standby, or switching the standby from the second server 102 to the third server 103 (i.e., standby switching).
[0118] By deploying three servers in the energy storage and energy management system, the embodiment of the present application can detect whether the first server fails through the main management node in the first server working in the host mode or the backup management node in the second server working in the backup mode, and when a failure occurs, the working mode of the second server is switched from the backup mode to the host mode, and the working mode of the third server is switched from the secondary backup mode to the backup mode. Therefore, when the first server serving as the host in the energy storage and energy management system fails, the main-backup mode can still be implemented, and only three servers need to be deployed in the energy storage and energy management system, thereby reducing the investment cost of the energy storage power station.
[0119] See also Figure 3 , Figure 3 A schematic flow chart of an implementation method of an energy storage energy management system provided by an embodiment of the present application is shown, wherein the energy storage energy management system includes a first server operating in a host mode, a second server operating in a standby mode, and a third server operating in a secondary standby mode, wherein the first server includes a primary management node, a primary front node, and a primary SCADA node, the second server includes a standby management node, a standby front node, and a standby SCADA node, and the third server includes a secondary standby management node, a secondary standby front node, and a secondary standby SCADA node. As an example and not a limitation, the implementation method includes the following steps:
[0120] Step 301: If the primary management node or the backup management node detects that a first server fails, the primary management node or the backup management node switches the working mode of the second server from the backup mode to the host mode, and sends a first mode switching instruction to the secondary backup management node.
[0121] Step 302: The secondary standby management node switches the working mode of the third server from the secondary standby mode to the standby mode in response to the first mode switching instruction.
[0122] Wherein, switching the working mode of the second server from the standby mode to the host mode includes using the standby management node as the main management node, the standby front node as the main front node, and the standby SCADA node as the main SCADA node;
[0123] Switching the working mode of the third server from the secondary standby mode to the standby mode includes using the secondary standby management node as a standby management node, the secondary standby front node as a standby front node, and the secondary standby SCADA node as a standby SCADA node.
[0124] In a possible implementation, the standby management node includes: a first detection unit and a processing unit; if the standby management node detects that the first server fails, the standby management node switches the working mode of the second server from the standby mode to the host mode, and sends a first mode switching instruction to the secondary standby management node, including:
[0125] The first detection unit detects whether a hardware failure or a main management node failure occurs on the first server;
[0126] When a hardware failure occurs on the first server or a failure occurs on the main management node, the processing unit switches the working mode of the second server from the standby mode to the main mode, and sends a first mode switching instruction to the secondary standby management node.
[0127] In a possible implementation, the first detection unit detects whether a hardware failure or a primary management node failure occurs on the first server, including:
[0128] Check whether there is any abnormal heartbeat interaction between the standby management node and the main management node;
[0129] If there is an abnormal heartbeat interaction between the standby management node and the main management node, it is determined that a hardware failure occurs on the first server or a failure occurs on the main management node;
[0130] If there is no abnormal heartbeat interaction between the standby management node and the main management node, it is determined that the first server has no hardware failure and main management node failure.
[0131] In a possible implementation, the primary management node includes a second detection unit and a first sending unit; if the primary management node detects that a failure occurs on the first server, the primary management node switches the working mode of the second server from a standby mode to a master mode, and sends a first mode switching instruction to the secondary standby management node, including:
[0132] The second detection unit detects whether a main front-end node failure or a main SCADA node failure occurs on the first server;
[0133] When a main front-end node failure or a main SCADA node failure occurs in the first server, the first sending unit sends a second mode switching instruction to the standby management node and sends a first mode switching instruction to the secondary standby management node. The second mode switching instruction is used to instruct the standby management node to switch the working mode of the second server from the standby mode to the host mode.
[0134] In a possible implementation, the second detection unit detects whether a main front-end node failure or a main SCADA node failure occurs in the first server, including:
[0135] Check whether there is any abnormality in the heartbeat interaction between the main management node and the main front-end node;
[0136] If there is an abnormal heartbeat interaction between the main management node and the main front-end node, it is determined that a main front-end node failure occurs on the first server;
[0137] If there is no abnormal heartbeat interaction between the main management node and the main front-end node, it is determined that the first server has no main front-end node failure;
[0138] Check whether there is any abnormal heartbeat interaction between the main management node and the main SCADA node;
[0139] If there is an abnormal heartbeat interaction between the main management node and the main SCADA node, it is determined that a main SCADA node failure occurs on the first server;
[0140] If there is no heartbeat interaction abnormality between the main management node and the main SCADA node, it is determined that no main SCADA node failure occurs on the first server.
[0141] In a possible implementation, the main management node further includes a third detection unit and a second sending unit; when the first server does not fail, the implementation method of the energy storage management system further includes:
[0142] The third detection unit detects whether a communication failure occurs between the main management node and the standby node, where the standby node is any one of the standby management node, the standby front node and the standby SCADA node;
[0143] The second sending unit sends a first mode switching instruction to the secondary backup management node if a communication failure occurs between the primary management node and the backup node.
[0144] In a possible implementation, the third detection unit detects whether a communication failure occurs between the primary management node and the backup node, including:
[0145] Check whether there is any abnormal heartbeat interaction between the main management node and the backup node;
[0146] If there is an abnormal heartbeat interaction between the main management node and the backup node, it is determined that a communication failure occurs between the main management node and the backup node;
[0147] If there is no abnormal heartbeat interaction between the primary management node and the backup node, it is determined that no communication failure occurs between the primary management node and the backup node.
[0148] In a possible implementation, the main management node further includes a synchronization control unit, and the implementation method of the energy storage energy management system further includes:
[0149] The synchronization control unit controls data synchronization among the first server, the second server, and the third server.
[0150] In a possible implementation manner, the synchronization control unit controls data synchronization among the first server, the second server, and the third server, including:
[0151] After the first server obtains the data, a first target node is determined from the second server, and a second target node is determined from the third server, where the first target node is a node in the second server that needs to use the data, and the second target node is a node in the third server that needs to use the data;
[0152] Data is sent to the first target node and the second target node respectively.
[0153] The implementation method provided in the embodiment of the present application can be used in the above-mentioned corresponding energy storage energy management system embodiment. For details, please refer to the above-mentioned energy storage energy management system embodiment, which will not be repeated here.
[0154] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0155] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0156] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the device / electronic device, a recording medium, a computer memory, a read-only memory (ROM), a random access memory (RAM), an electric carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0157] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0158] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0159] In the embodiments provided in the present application, it should be understood that the disclosed systems and methods can be implemented in other ways. For example, the system embodiments described above are merely schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.
[0160] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0161] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. An energy storage energy management system, It is characterized in that It includes a first server working in a host mode, a second server working in a standby mode, and a third server working in a secondary standby mode, wherein the first server includes a primary management node, a primary front-end node, and a primary data acquisition and monitoring control SCADA node, the second server includes a standby management node, a standby front-end node, and a standby SCADA node, and the third server includes a secondary standby management node, a secondary standby front-end node, and a secondary standby SCADA node; The primary management node or the backup management node is configured to switch the working mode of the second server from the backup mode to the host mode if a failure of the first server is detected, and send a first mode switching instruction to the secondary backup management node; The secondary standby management node is configured to switch the working mode of the third server from the secondary standby mode to the standby mode in response to the first mode switching instruction; The switching of the working mode of the second server from the standby mode to the host mode includes using the standby management node as the main management node, the standby front node as the main front node, and the standby SCADA node as the main SCADA node; Switching the working mode of the third server from the secondary standby mode to the standby mode includes using the secondary standby management node as the standby management node, the secondary standby front node as the standby front node, and the secondary standby SCADA node as the standby SCADA node.
2. The energy storage energy management system according to claim 1, It is characterized in that The standby management node includes: A first detection unit, used to detect whether a hardware failure or a main management node failure occurs in the first server; A processing unit is used to switch the working mode of the second server from the standby mode to the host mode if a hardware failure or a main management node failure occurs in the first server, and send the first mode switching instruction to the secondary standby management node.
3. The energy storage energy management system according to claim 2, It is characterized in that The first detection unit is specifically used for: Detecting whether there is a heartbeat interaction abnormality between the standby management node and the main management node; If there is an abnormal heartbeat interaction between the standby management node and the main management node, it is determined that a hardware failure occurs on the first server or a main management node failure occurs; If there is no heartbeat interaction abnormality between the standby management node and the main management node, it is determined that the first server has no hardware failure and main management node failure.
4. The energy storage energy management system according to claim 1, It is characterized in that The main management node includes: A second detection unit, used to detect whether a main front-end node failure or a main SCADA node failure occurs in the first server; A first sending unit is used to send a second mode switching instruction to the standby management node and send the first mode switching instruction to the secondary standby management node if a main front-end node failure or a main SCADA node failure occurs in the first server; The standby management node is used to switch the working mode of the second server from the standby mode to the host mode in response to the second mode switching instruction.
5. The energy storage management system according to claim 4, It is characterized in that The second detection unit is specifically used for: Detecting whether there is a heartbeat interaction abnormality between the main management node and the main front-end node; If there is an abnormal heartbeat interaction between the main management node and the main front-end node, it is determined that a main front-end node failure occurs on the first server; If there is no abnormal heartbeat interaction between the main management node and the main front-end node, it is determined that the first server has no main front-end node failure; Detect whether there is a heartbeat interaction anomaly between the main management node and the main SCADA node; If there is a heartbeat interaction abnormality between the main management node and the main SCADA node, it is determined that a main SCADA node failure occurs on the first server; If there is no heartbeat interaction abnormality between the main management node and the main SCADA node, it is determined that no main SCADA node failure occurs on the first server.
6. The energy storage management system according to any one of claims 1 to 5, It is characterized in that In the case that the first server does not fail, the main management node further includes: A third detection unit, used for detecting whether a communication failure occurs between the main management node and a standby node, wherein the standby node is any one of the standby management node, the standby front node and the standby SCADA node; The second sending unit is configured to send the first mode switching instruction to the secondary backup management node if a communication failure occurs between the primary management node and the backup node.
7. The energy storage energy management system according to claim 6, It is characterized in that The third detection unit is specifically used for: Detect whether there is a heartbeat interaction abnormality between the main management node and the standby node; If there is a heartbeat interaction abnormality between the primary management node and the backup node, it is determined that a communication failure occurs between the primary management node and the backup node; If there is no heartbeat interaction abnormality between the main management node and the backup node, it is determined that no communication failure occurs between the main management node and the backup node.
8. The energy storage management system according to any one of claims 1 to 5, It is characterized in that The main management node also includes: A synchronization control unit is used to control data synchronization among the first server, the second server and the third server.
9. The energy storage energy management system according to claim 8, It is characterized in that The synchronization control unit is specifically used for: After the first server acquires the data, a first target node is determined from the second server, and a second target node is determined from the third server, wherein the first target node is a node in the second server that needs to use the data, and the second target node is a node in the third server that needs to use the data; The data is sent to the first target node and the second target node respectively.
10. A method for implementing an energy storage energy management system, It is characterized in that The energy storage energy management system includes a first server working in a host mode, a second server working in a standby mode, and a third server working in a secondary standby mode, wherein the first server includes a primary management node, a primary front node, and a primary SCADA node, the second server includes a standby management node, a standby front node, and a standby SCADA node, the third server includes a secondary standby management node, a secondary standby front node, and a secondary standby SCADA node, and the implementation method includes: If the primary management node or the backup management node detects that the first server fails, the primary management node or the backup management node switches the working mode of the second server from the backup mode to the host mode, and sends a first mode switching instruction to the secondary backup management node; The secondary standby management node switches the working mode of the third server from the secondary standby mode to the standby mode in response to the first mode switching instruction; The switching of the working mode of the second server from the standby mode to the host mode includes using the standby management node as the main management node, the standby front node as the main front node, and the standby SCADA node as the main SCADA node; Switching the working mode of the third server from the secondary standby mode to the standby mode includes using the secondary standby management node as the standby management node, the secondary standby front node as the standby front node, and the secondary standby SCADA node as the standby SCADA node.
Citation Information
Patent Citations
Reconstruction degradation method of triple-redundancy computer system
CN107247644A
Integrated monitoring-based energy management system for microgrid
CN108062062A
Multi-machine redundancy efficient control method of comprehensive energy storage system
CN115276058A
Intelligent scheduling system
CN201853256U
Multi-agent hot-standby system and failover method for the same
US20080301489A1
Cited By
Method, apparatus, device, and medium for managing energy system
WO2026143347A1