Complex steep dip bare rock high-low special-shaped blade foot double-wall steel cofferdam and construction method
By adopting high and low-shaped double-wall steel cofferdams and intelligent construction methods on complex steep and tilted rock terrain, the stability and efficiency of traditional cofferdams in complex terrain are solved, and an efficient and safe underwater foundation is achieved. Construction reduces construction costs and environmental impact.
Patent Information
- Application Number
- CN202411448984.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Under complex steep and bare rock terrain, traditional cofferdam technology is difficult to accurately match the terrain, resulting in unstable foundations, low construction efficiency and poor safety, and construction on unstable terrain is prone to accidents, increasing material consumption and construction costs.
The double-wall steel cofferdam with complex steep tilt bare rocks and the corresponding construction methods are adopted, including the installation of floating assembly platform, the layout of guide anchor cable systems, the rolling airbag drainage, the leveling of the intelligent control system and the installation of internal support, combined with the self-contained Adapt to high and low-leaf foot design and intelligent complex posture adjustment technology to ensure the stability and safety of the cofferdam.
It significantly improves construction efficiency and safety, saves materials and construction costs, reduces the impact on the environment, and realizes structural optimization and data-driven decision-making support through intelligent technology, improving the efficiency and sustainability of engineering projects.
Smart Images

Figure CN118965837A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of steel cofferdam construction, and in particular relates to a complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam and a construction method. Background Art
[0002] In underwater infrastructure construction, such as bridges and docks, cofferdams are common auxiliary construction structures used to isolate water bodies and create a dry land working environment. Traditional cofferdam technologies, such as steel sheet pile cofferdams and concrete cofferdams, are widely used on flat and soft foundations, but under complex geological conditions, such as steeply inclined bare rock areas, traditional cofferdam technologies face many challenges: the steeply inclined bare rock terrain causes the cofferdam foundation to be unstable and prone to slippage or tilting; traditional cofferdams are difficult to adapt to uneven surfaces, and a large amount of manual adjustments are required during construction, which is inefficient and unsafe; under complex geological conditions, the material consumption and construction costs of traditional cofferdams increase significantly.
[0003] At present, the cofferdam technology for complex steep bare rock terrain is still immature, and there are mainly the following problems: traditional cofferdam design is difficult to accurately match the complex terrain, especially in bare rock areas with uneven heights and large inclination angles, the fit and stability of the cofferdam are greatly limited; the complex terrain increases the difficulty of construction, and traditional construction methods often require long-term manual adjustments, seriously affecting the progress of the project; cofferdam construction on unstable terrain is prone to safety accidents, such as cofferdam collapse and personal injuries.
[0004] In view of the above problems, there is an urgent need for a new cofferdam technology that can effectively cope with the challenges of complex steep bare rock terrain and provide a more stable, efficient and safe underwater foundation construction solution. Summary of the invention
[0005] The purpose of the invention is to overcome the deficiencies in the prior art and to provide a complex steeply inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam and a construction method.
[0006] The construction method of the complex steep bare rock high and low special-shaped blade foot double-wall steel cofferdam comprises the following steps: S1. Build the floating assembly platform, arrange the guide ship anchor cable system on the outside of the floating assembly platform barge, and carry out the side-lying assembly construction of the cofferdam; S2. The steel cofferdam is rolled into the water using airbags, the anchor cable system controls the lower position of the cofferdam, and the guide ship lifts the steel cofferdam for lowering; S3. Water is poured into the blade foot compartment to level the steel cofferdam, and a guide boat is used to assist in correction; S4, the intelligent management and control system uses jacks to level and lift the steel cofferdam; S5. After the cofferdam support is completed, the outer periphery of the steel cofferdam is reinforced with stone cages and the steel cofferdam blade foot is sealed; S6. Pump out the water inside the steel cofferdam and install an internal support system to ensure the stability of the steel cofferdam structure.
[0007] Preferably, in step S2, in order to control the lower position of the steel cofferdam during sinking, lifting ears are symmetrically arranged on the outer walls on both sides of the top mouth upstream of the first steel cofferdam, and a wire cable lower pull rope is set. The wire cable lower pull rope connects the lifting ears of the steel cofferdam to the pulley group, and the sinking position of the steel cofferdam is controlled by the winch and the pulley group; the blade foot part of the steel cofferdam is customized according to the riverbed terrain to adapt to the slope of the riverbed; the wall surface of the steel cofferdam includes inner and outer two layers of wall panels, and a cabin is formed in the middle. In step S3, the buoyancy and pressure are adjusted by injecting water into the cabin.
[0008] Preferably, in step S1, the assembly process flow of the steel cofferdam lying on its side is: cleaning the site, measuring and arranging points, placing and leveling steel piers, assembling the bottom surface of the cofferdam, assembling the oblique side surfaces of the cofferdam, assembling the vertical surface of the cofferdam, hoisting the top surface as a whole, assembling the oblique side surfaces of the cofferdam, and acceptance.
[0009] Preferably, in steps S4 to S6, the intelligent management and control system includes a sensor, which is arranged on the top of the steel cofferdam. The sensor monitors the water pressure inside and outside the steel cofferdam, the deformation of the steel cofferdam, the stability of the riverbed and the displacement of the top of the steel cofferdam, and transmits the information to the data processing center for analysis. The hoisting, leveling, pumping and installation of the internal support of the steel cofferdam are adjusted according to the results. When pumping, the water pressure and the deformation of the steel cofferdam are detected by the intelligent management and control system, and an internal support is set every time a certain depth of water is pumped out until it is drained.
[0010] Preferably, the steel cofferdam adopts an adaptive high and low blade foot design, which includes a reaction bracket, a hydraulic jack, a steel pipe, a guide track and a kick wheel. The track and the kick wheel are arranged between the steel cofferdam and the steel pipe to ensure the verticality of the steel pipe and limit the displacement of the steel pipe in the radial direction. The guide track is extended, and the reaction bracket is welded from an I-beam. The reaction bracket is welded to the top of the steel cofferdam, and the top of the hydraulic jack is against the bottom of the reaction bracket. The reaction force is applied by the jack to adjust the height of the steel cofferdam to adapt to bare rocks of different heights.
[0011] Preferably, in step S4, the overall state of the steel cofferdam is analyzed through the data collected by the intelligent management and control system through intelligent complex posture adjustment technology, and the jacks and cranes are controlled by intelligent algorithms to achieve the adjustment of the steel cofferdam's posture.
[0012] Preferably, the intelligent management and control system issues a reminder when abnormal data is detected.
[0013] Preferably, with the adaptive high and low blade foot design, after the construction of the steel cofferdam is completed, the hydraulic jack, steel pipe, guide rail and buckle wheel are removed for reuse.
[0014] A complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam is obtained by any of the above-mentioned methods.
[0015] The beneficial effects of the present invention are: 1) The present invention adopts an optimization layout method for socket-type vertical bulkheads based on intelligent technology, which can significantly improve construction efficiency and structural safety. By collecting data, building models, and using intelligent optimization algorithms to automatically adjust the layout of bulkheads, the optimal balance between structural optimization, material saving, and construction convenience is achieved. During the implementation phase, the optimized layout is converted into construction drawings, and the status of the cofferdam is monitored in real time using IoT sensors to ensure construction quality and safety. After the construction is completed, the optimization algorithm is continuously iterated through on-site evaluation and data analysis to form a closed-loop learning and improvement mechanism. This process fully demonstrates how intelligent technology can be integrated with traditional engineering practices to improve the efficiency, safety, and sustainability of engineering projects through data-driven decision support.
[0016] 2) The present invention adopts modular double-wall steel cofferdam side-lying assembly technology, which does not require the erection of a large support frame. It can be assembled directly on site using the side of the cofferdam as the bottom reference surface, saving construction costs and shortening construction period.
[0017] 3) The present invention adopts the technology of placing the cofferdam first and then forming piles, which improves the efficiency and quality of underwater foundation construction, ensures construction safety, and reduces the impact on the environment.
[0018] 4) The present invention adopts an intelligent management and control system, which monitors the internal and external water pressure of the steel cofferdam, the deformation of the steel cofferdam, the stability of the riverbed, and the displacement of the top of the steel cofferdam, and transmits the data to the data processing center for analysis. According to the results, the hoisting, leveling, pumping and installation of the internal support of the steel cofferdam are adjusted. In addition, when the system detects abnormal data, it will remind you in time to ensure the safety of the construction personnel.
[0019] 5) The present invention adopts adaptive high and low blade foot design and intelligent complex posture adjustment technology, combined with the data collected by the intelligent management and control system, to analyze the state of the steel cofferdam, control the jack to apply reaction force, and adjust the height of the steel cofferdam. By adjusting the height of the blade foot, the height of the steel cofferdam is adjusted to level and adapt to different heights of bare rock. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is the construction flow chart of steel cofferdam of the present invention; Figure 2 is a schematic diagram of a steel cofferdam of the present invention; Figure 3 is a top view of the steel cofferdam of the present invention; Figure 4 It is a schematic diagram of the adaptive high and low blade foot and leveling design of the present invention; Figure 5It is a schematic diagram of the present invention for torsion control and positioning of a steel cofferdam by using a cable; Figure 6 It is a flow chart of the socket-type vertical bulkhead optimization layout method based on intelligent technology of the present invention; Figure 7 It is a flow chart of the side-lying assembly of modular double-walled steel cofferdam of the present invention; Figure 8 It is the detection and control logic diagram of the intelligent management and control system of the present invention.
[0021] In the figure: 1. Bare rock; 2. Bottom concrete; 3. Bottom truss; 4. Top surface of the first concrete layer; 5. Top surface of the second concrete layer; 6. Top surface of the third concrete layer; 7. Internal support; 8. Steel cofferdam; 9. Blade foot filling; 10. Reaction bracket; 11. Hydraulic jack; 12. Water level; 13. Track; 14. Steel pipe; 15. Reverse pulley; 16. Sensor; 17. Lifting lug; 18. Rod connecting beam; 19. Cable; 20. Pulley block; 21. Winch. DETAILED DESCRIPTION
[0022] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0023] Embodiment 1 As an example, Figure 1 and Figure 2 As shown, the construction method of this complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam 8 includes: first placing the steel cofferdam 8 and then piling, a self-floating structure of a high and low special-shaped blade foot double-wall steel cofferdam, a modular double-wall steel cofferdam side-lying assembly technology, an optimized layout method of socket-type vertical bulkheads based on intelligent technology, an adaptive high and low blade foot design, and an intelligent complex posture adjustment technology.
[0024] The construction method of the complex steep bare rock high and low special-shaped blade foot double-wall steel cofferdam comprises the following steps: S1. Construction site floating assembly platform construction: The floating assembly platform is set up, including the floating structure and the plywood structure. The floating structure is the main body of the platform and is composed of a buoyancy box or a buoyancy barrel. The deck structure is located on the upper part of the floating structure. The platform is equipped with a pillar and truss support system and a crane. S2. Installation of guide ship anchor cable system The guide boats are two deck barges with partially reinforced keels. The two waist-positioned barges are arranged in parallel on the outside of the floating assembly platform barge. Anchor chains are arranged on the main tail side, down-pull cables are arranged upstream of the steel cofferdam 8, down-pull cables are arranged on both sides to connect with the shore net box, and down-pull cables on the water side are connected with the guide boats to form symmetrical traction.
[0025] S3, side-lying assembly of steel cofferdam 8 The side surface of the steel cofferdam 8 is used as the bottom reference surface, and the cofferdam is assembled from one side surface to the other side surface, and finally closed to realize the side-lying assembly construction of the steel cofferdam 8.
[0026] S4. Roll into the water using airbags After the steel cofferdam 8 is assembled sideways, it is rolled into the water using an air bag. The height of the steel pier is determined according to the diameter of the air bag used to ensure that the height of the air bag in the inflated state is higher than the steel pier, so that the steel cofferdam 8 is supported and detached from the steel pier.
[0027] S5. The anchor cable system controls the lower position of the steel cofferdam 8, and the guide ship lifts the steel cofferdam 8 like Figure 5 As shown, in order to control the lower position of the steel cofferdam 8 during sinking, two lifting ears 17 are symmetrically arranged on the outer wall of the top opening upstream of the first steel cofferdam 8 with the center line of the steel cofferdam 8 as the standard, and two steel wire cable lower cables are set. The upstream end of the lower cable is tied to the front end of the guide ship, and the downstream end is tied to the lifting ear 17 on the wall of the steel cofferdam 8. The anchor cable system controls the lower position of the steel cofferdam 8. Two lifting ears 17 are symmetrically arranged on the outer wall of the top opening upstream of the first steel cofferdam 8 with the center line of the steel cofferdam 8 as the standard, and two cables 17 are set. The upstream end of the cable 17 is tied to the pulley group, and the downstream end is tied to the lifting ear 17 of the steel cofferdam 8. The sinking position of the steel cofferdam 8 is controlled by the winch 21 and the pulley group 20.
[0028] S6, steel cofferdam 8 is filled with water for leveling after entering the water After the steel cofferdam 8 is put into the water, the top of the steel cofferdam 8 will tilt due to the special-shaped blade feet, and it is necessary to inject water into some cabins with higher blade feet for leveling. During the process of the steel cofferdam 8 falling into place, the adjustment and control equipment on the guide ship is used to give corrections.
[0029] S7, intelligent control system combined with adaptive high and low blade foot design to level the steel cofferdam 8 The steel cofferdam 8 will tilt during the sinking process. The intelligent management and control system is used to analyze the collected data and perform leveling and lifting using jacks.
[0030] S8, Steel Cofferdam 8 Bottom Sealing and Leakage Stopping Treatment After the steel cofferdam 8 is supported and before the blade foot is sealed, the outer periphery of the steel cofferdam 8 is reinforced with stone cages to enhance its stability and durability. Stone cages are thrown from the lower part of the riverbed and gradually extend to the higher part of the riverbed. For the location with larger pores in the blade foot, multiple concrete sacks are stacked together to form a cluster bag of concrete, and a safety net is used for reinforcement to perform forced sealing.
[0031] S9, steel cofferdam 8 pumping, support installation Pump out the water inside the steel cofferdam 8, install the inner support 7 to ensure the structural stability of the steel cofferdam 8, and create a dry land environment for the subsequent foundation construction. When pumping water, the water pressure and the deformation of the steel cofferdam 8 are detected through the intelligent management and control system. Every time a certain depth of water is pumped out, an inner support 7 is installed until it is pumped dry.
[0032] Embodiment 2 As another embodiment, based on the first embodiment, the second embodiment proposes a more specific construction method of a complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam, wherein the intelligent technology involves: The socket-type vertical bulkhead optimization layout method based on intelligent technology collects detailed geological and hydrological data, conducts in-depth analysis in combination with historical project data, establishes a three-dimensional model and uses finite element analysis technology to provide a scientific basis for the layout of the bulkhead. Subsequently, the layout of the bulkhead is automatically adjusted using an intelligent optimization algorithm to achieve the best balance between structural optimization, material savings and construction convenience. During the implementation phase, the optimized layout is converted into construction drawings, and the status of the steel cofferdam 8 is monitored in real time using sensors 16 to ensure construction quality and safety. After the construction is completed, the optimization algorithm is continuously iterated through on-site evaluation and data analysis to form a closed-loop learning and improvement mechanism.
[0033] The intelligent complex posture adjustment technology analyzes the overall state of the steel cofferdam 8 through the data collected by the intelligent management and control system, and uses intelligent algorithms to control the jacks and cranes to achieve the adjustment of the posture of the steel cofferdam 8.
[0034] like Figure 3 As shown, a sensor 16 is provided on the top of the steel cofferdam 8. The intelligent management and control system S7 monitors the water pressure inside and outside the steel cofferdam 8, the deformation of the steel cofferdam 8, the stability of the riverbed, and the displacement of the top of the steel cofferdam 8, and transmits the data to the data processing center for analysis, and adjusts the hoisting, leveling, pumping and installation of the internal support 7 of the steel cofferdam 8 according to the results.
[0035] Combining intelligent complex posture adjustment technology with remote monitoring: The integrated remote monitoring system enables project managers to monitor the posture adjustment process of the steel cofferdam 8 in real time, and can effectively manage it even in bad weather or at night. Through satellite communication and cloud service platforms, on-site data is transmitted to the command center to support remote expert diagnosis and decision-making, and improve the safety and efficiency of construction.
[0036] As a preferred method, use big data to intelligently optimize the layout of bulkheads: use big data analysis and artificial intelligence technology to deeply mine historical project data, establish a more accurate prediction model, and guide the layout design of bulkheads. By analyzing the performance data of steel cofferdams 8 under different riverbed conditions, intelligent algorithms can automatically adjust the layout of bulkheads to adapt to specific construction environments, reduce material waste, and improve construction efficiency.
[0037] As a priority, green and environmentally friendly construction technology is adopted: during the construction process, environmentally friendly materials and technologies are comprehensively used to reduce the impact on the natural environment. Biodegradable sealing materials are used to reduce water pollution; the construction process is optimized to reduce noise and dust emissions; through the intelligent management and control system, construction time and resources are rationally planned to reduce energy consumption and carbon emissions.
[0038] The intelligent management and control system will promptly remind when abnormal data is detected and adjust the construction to ensure the safety of personnel.
[0039] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.
[0040] Embodiment 3 As another embodiment, this embodiment 3 proposes, on the basis of embodiments 1 and 2, a more specific construction method of a complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam: The high and low special-shaped blade foot double-walled steel cofferdam self-floating structure can float in the water by itself, which is convenient for positioning and movement. The blade foot part is customized according to the riverbed topography to adapt to the slope of the riverbed; the steel cofferdam 8 is composed of inner and outer two layers of wall panels, forming a cavity in the middle, which can adjust the buoyancy and pressure.
[0041] The assembly process of the steel cofferdam 8 lying on its side in S3 is: cleaning the site → measuring and arranging points → placing and leveling the steel piers → assembling the bottom surface of the steel cofferdam 8 → assembling the oblique side surfaces of the steel cofferdam 8 → assembling the vertical surface of the steel cofferdam 8 → hoisting the top surface as a whole → assembling the oblique side surfaces of the steel cofferdam 8 and closing them → acceptance.
[0042] like Figure 4As shown, the adaptive high and low blade foot design, the adaptive high and low blade foot is composed of a reaction bracket 10, a hydraulic jack 11, a steel pipe 14, a guide track 13, and a buckle wheel 15. The track 13 and the buckle wheel 15 ensure the verticality of the steel pipe 14 and limit the displacement of the steel pipe 14 in the radial direction. In the later assembly process, the guide track 13 is extended, the reaction bracket 10 is welded by I-beams, and the reaction bracket is welded to the top of the steel cofferdam 8 to provide a reaction force for the jack. The reaction force is applied by the jack 11 to adjust the height of the steel cofferdam 8. The height of the steel cofferdam 8 is adjusted by adjusting the height of the blade foot.
[0043] Specifically, with the adaptive high and low blade foot design, after the construction of the steel cofferdam 8 is completed, the hydraulic jack 11, the steel pipe 14, the guide rail 13, and the buckle wheel 15 can be dismantled for reuse.
[0044] It should be noted that the parts in this embodiment that are the same or similar to those in Embodiments 1 and 2 can be referenced to each other and will not be described in detail in this application.
[0045] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
Claims
1. A construction method for a complex steeply inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam, characterized in that: The following steps are involved: S1. Build the floating assembly platform, arrange the guide ship anchor cable system on the outside of the floating assembly platform barge, and carry out the side-lying assembly construction of the cofferdam; S2. The steel cofferdam is rolled into the water using airbags, the anchor cable system controls the lower position of the cofferdam, and the guide ship lifts the steel cofferdam for lowering; S3. Water is poured into the blade foot compartment to level the steel cofferdam, and a guide boat is used to assist in correction; S4, the intelligent management and control system uses jacks to level and lift the steel cofferdam; S5. After the cofferdam support is completed, the outer periphery of the steel cofferdam is reinforced with stone cages and the steel cofferdam blade foot is sealed; S6. Pump out the water inside the steel cofferdam and install an internal support system to ensure the stability of the steel cofferdam structure.
2. The construction method of the complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam according to claim 1 is characterized in that: In step S2, in order to control the lower position of the steel cofferdam during sinking, lifting ears are symmetrically arranged on the outer walls on both sides of the top mouth of the first steel cofferdam upstream, and a steel cable lower pull rope is set. The steel cable lower pull rope connects the lifting ears of the steel cofferdam to the pulley group, and the sinking position of the steel cofferdam is controlled by the winch and the pulley group; the blade foot part of the steel cofferdam is customized according to the riverbed terrain to adapt to the slope of the riverbed; the wall surface of the steel cofferdam includes inner and outer two layers of wall panels, and a cabin is formed in the middle. In step S3, the buoyancy and pressure are adjusted by injecting water into the cabin.
3. The construction method of the complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam according to claim 1 is characterized in that: In step S1, the assembly process flow of the side-lying assembly of the steel cofferdam is: cleaning the site, measuring and arranging points, placing and leveling the steel piers, assembling the bottom surface of the cofferdam, assembling the oblique side surfaces of the cofferdam, assembling the vertical surface of the cofferdam, hoisting the top surface as a whole, assembling the oblique side surfaces of the cofferdam, and acceptance.
4. The construction method of the complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam according to claim 1 is characterized in that: In steps S4 to S6, the intelligent management and control system includes a sensor, which is arranged on the top of the steel cofferdam. The sensor monitors the water pressure inside and outside the steel cofferdam, the deformation of the steel cofferdam, the stability of the riverbed and the displacement of the top of the steel cofferdam, and transmits the data to the data processing center for analysis. The hoisting, leveling, pumping and installation of the internal support of the steel cofferdam are adjusted according to the results. When pumping, the water pressure and the deformation of the steel cofferdam are detected by the intelligent management and control system, and an internal support is set every time a certain depth of water is pumped out until it is drained.
5. The construction method of the complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam according to claim 2 is characterized in that: The steel cofferdam adopts an adaptive high and low blade foot design. The adaptive high and low blade foot includes a reaction bracket, a hydraulic jack, a steel pipe, a guide track and a kick wheel. The track and the kick wheel are arranged between the steel cofferdam and the steel pipe to ensure the verticality of the steel pipe and limit the displacement of the steel pipe in the radial direction. The guide track is extended, and the reaction bracket is welded from an I-beam. The reaction bracket is welded to the top of the steel cofferdam. The top of the hydraulic jack is against the bottom of the reaction bracket. The reaction force is applied by the jack to adjust the height of the steel cofferdam to adapt to bare rocks of different heights.
6. The construction method of the complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam according to claim 5 is characterized in that: In step S4, the overall state of the steel cofferdam is analyzed through the data collected by the intelligent management and control system through the intelligent complex posture adjustment technology, and the jacks and cranes are controlled by the intelligent algorithm to achieve the adjustment of the steel cofferdam posture.
7. The construction method of the complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam according to claim 6 is characterized in that: The intelligent management and control system issues reminders when abnormal data is detected.
8. The construction method of the complex steep-inclined bare rock high and low special-shaped blade foot double-wall steel cofferdam according to claim 5 is characterized in that: With the adaptive high and low blade foot design, after the steel cofferdam construction is completed, the hydraulic jack, steel pipe, guide rail and buckle wheel can be dismantled for reuse.
9. Complex steep bare rock high and low special-shaped blade foot double-wall steel cofferdam, characterized by: Obtained by the method according to any one of claims 1 to 8.
Citation Information
Patent Citations
Accurate positioning landing bed method of double-wall steel cofferdam by using deep-water drilling rock-socketed foundation
CN108532608A