Assembled integral shear wall structure system and construction method thereof

The invention discloses an assembled integral shear wall structure system and a construction method thereof. Prefabricated composite wallboards are hoisted and assembled integrally at a construction site; a board body of the prefabricated composite wallboards comprises a structural layer, an insulating layer and a protective layer from the inside to the outside in turn; a reinforcement cage is arranged in the structural layer; the insulating layer is an extruded polystyrene foam plastic board; steel meshes are arranged in the concrete of the protective layer; and anchor bolts in a dotted distribution are connected among the structural layer, the insulating layer and the protective layer. Vertical seams and horizontal seams of prefabricated composite walls adopt structural self-waterproofing, so that common quality problems such as leakage and cracks and the like in a traditional process are solved. The prefabricated composite walls simplify construction processes, speed up the construction, and lower the construction cost. Furthermore, products prefabricated in a factory have uniform specifications and unified quality, so that the construction quality of a building construction can be sufficiently guaranteed; the industrialization, standardization, and generalization of the building walls are realized; and the products can be widely applicable to the construction of reinforced concrete buildings in the construction industry.
Owner:华筑(辽宁)建筑工程设计有限公司

Efficient vertical takeoff and landing aircraft

PendingCN106672232ASimplify the tail control mechanismReduce structural weightAircraft controlWing adjustmentsAirplanePower unit
The invention relates to an efficient vertical takeoff and landing aircraft, and discloses an efficient vertical takeoff and landing fixed-wing unmanned aerial vehicle, which comprises a fuselage, a wing, a horizontal tail, a vertical tail, a control surface, a power unit, a tilting mechanism and an undercarriage. The tilting mechanism controls the tilting angle of the wing and the horizontal tail to realize the mutual conversion of a vertical takeoff and landing state and a flat flight state of the aircraft. A propeller power unit is arranged on each of the wing and the horizontal tail, a part of lift at the vertical takeoff and landing stage is provided by the wing propeller power unit, and the tail propeller power unit is responsible for the aircraft pitch balance adjustment; the power device installed on the wing is closed in the flat flight state, and the tail propeller power unit provides forward thrust in order to improve the efficiency of the aircraft in a cruising state. Compared with the existing vertical takeoff and landing fixed-wing unmanned aerial vehicle design scheme, the flight aerodynamic efficiency of the aircraft in the fixed-wing flat flight state is taken into account while the layout is simplified, and reliability and practicability are relatively high.
Owner:北京天宇新超航空科技有限公司

Shrinkage creep and prestress loss computation method of concrete bridge

The invention provides a shrinkage creep and prestress loss computation method of a concrete bridge. According to the invention, the shrinkage creep and prestress loss computation method of the concrete bridge, in which the time variation and the uncertainty are simultaneously considered, is obtained by analyzing the time variation of concrete through utilizing an age-adjusted effective modulus method (AEMM) and analyzing the uncertainty of the concrete through utilizing an accurate and rapidly-sampled Latin hypercube sampling (LHS) method; a prestress loss computation formula in which the time variation and the uncertainty of shrinkage creep and the interaction between the shrinkage creep and reinforcement stress relaxation are simultaneously considered is deduced according to a prestressed reinforcing steel and concrete stress balance equation and deformation coordination conditions and on the basis of the AEEM method and the LHS method; and a prestress loss computation method of the concrete bridge, in which the shrinkage creep and the stress relaxation are considered, is formed. In the structural internal force value field interval computed according to the shrinkage creep and prestress loss computation method disclosed by the invention, the unfavorable stress state of the bridge structure can be considered from multiple aspects in the designing process, so that the reliability of structure computation result is higher and the structure safety is better.
Owner:WUHAN UNIV OF TECH

Precast concrete wallboard and preparation method thereof

The invention relates to a precast concrete wallboard and a preparation method thereof. A wall body has a structural layer and a protection layer from inside to outside, wherein the structural layer is internally provided with a reinforcement cage, and a reinforcement fabric is arranged in the concrete of the protection layer; the protection layer is connected with the structural layer through a transverse connecting reinforcement connected to the reinforcement fabric; the left edge and the right edge of the protection layer protrude out of the structural layer; the lower edge of the protection layer downwards extends out of a protruded port; and the top of the protection layer upwards protrudes out of the structural layer; the upper edge of the protection layer has a dent corresponding to the protruded port of the adjacent precast concrete wallboard on the upper layer; and the two ends of a transverse bar of the reinforcement cage protrudes out of the left side surface and the right side surface of the structural layer of the wall body and form two rows of transverse steel ties bending inwards. The wallboard has the advantages that the construction process is simplified, the construction speed is accelerated, and the construction cost is reduced. Meanwhile, products precast by a factory have uniform specification and quality, and thus, the construction quality of a building structure can be guaranteed sufficiently. The precast concrete wallboard can be widely applied to construction of concrete steel buildings in building industry.
Owner:华筑(辽宁)建筑工程设计有限公司

Three-cylinder type large-capacity magneto-rheological damper

InactiveCN101793302AMeet the needs of earthquake resistance and wind resistanceIncreased sensitivityNon-rotating vibration suppressionSolid based dampersVibration controlControl theory
The invention discloses a three-cylinder type large-capacity magneto-rheological damper for vibration control of a large civil engineering structure, which comprises a magneto-rheological damping cylinder (9), a puddle damping cylinder (5), an auxiliary cylinder (19), a magneto-rheological main piston (23), a puddle piston (6), a piston rod (17), a sealing baffle (20), a damping channel (16), a cylinder cover (3) and a spherical hinge joint (13), wherein magneto-rheological liquid (11) is filled in the magneto-rheological damping cylinder, and an annular excitation coil (8) capable of generating a magnetic field is arranged in the magneto-rheological damping cylinder; and the puddle damping cylinder is arranged adjacent to the magneto-rheological damping cylinder, and elastic puddle (7) is filled in the inner cavity of the puddle damping cylinder, thus the damper can generate large damping under the condition of large displacement, and the safety of the damper can be improved. By arranging a displacement splitting mechanism (18), the magneto-rheological damper has high rigidity and large damping in a low-frequency region and has low rigidity and small damping in a high-frequency region. Compared with the traditional magneto-rheological damper with the same size, the maximum capacity of the damper of the invention is improved by more than one time, and the vibration control of the large civil engineering structure is more effective.
Owner:HOHAI UNIV

Seamless bridge deck expansion joint structure for road engineering and construction process of seamless bridge deck expansion joint structure

The invention discloses a seamless bridge deck expansion joint structure for road engineering and a construction process of the seamless bridge deck expansion joint structure. The seamless bridge deck expansion joint structure for the road engineering comprises a bridge body and an expansion join, wherein concrete paving layers are arranged on the bridge body; a preserved notch is formed between two adjacent concrete paving layers; a clearance is reserved between two adjacent bridge bodies or between the bridge body and a bridge abutment; the seamless bridge deck expansion joint structure further comprises an elastic-plastic body and a backing plate; the backing plate is positioned on the bottom surface of the preserved notch for closing the clearance; the backing plate is arranged below the elastic-plastic body; the elastic-plastic body is positioned in the preserved notch for forming an elastic-plastic body expansion joint; and asphalt concrete layers are paved on the concrete paving layers and the elastic-plastic body expansion joint in a penetrating way. According to the seamless bridge deck expansion joint structure disclosed by the invention, a real seamless bridge deck can be formed; and the seamless bridge deck expansion joint structure has the advantages of higher structural safety, greater convenience in construction and convenience in replacement.
Owner:SICHUAN EXPRESSWAY COMPANY

Exterior wall external insulation composite wall body with support

The invention discloses an exterior wall external insulation composite wall body with a support, relates to a building insulation composite wall body and aims to solve the problem of a large number of thermal bridges in the conventional insulation wall. A first structure of the composite wall body is that: a concrete cantilever beam supporting member is fixed in a main body structure of a building; an insulating layer is positioned outside a substrate wall body; a vertical reinforced steel bar is arranged outside the insulating layer and welded with an embedded steel plate of the concrete cantilever beam supporting member; a metal mesh is fixed with the vertical reinforced steel bar; a door and a window are arranged on insulating layers on openings; protective layers are formed outside the insulating layer and on the insulating layers on both sides of the door and the window; and the vertical reinforced steel bar and the metal mesh are positioned in the protective layers. A second structure of the composite wall body is that: the concrete cantilever beam supporting member is fixed in the main body structure of the building; profile steel is welded at the outer end of the concrete cantilever beam supporting member; a decorating large plate protective layer is fixed with the profile steel; and an insulating layer is formed between an external decorating large plate protective layer and a substrate wall body. The composite wall body has the advantages of capacity of reducing the thermal bridges in a large scale, best insulating effect, safe external protective layer and decorating surface layer, high fire resistance, high durability, simple structure and convenient construction.
Owner:吴淑环

Debris flow gabion prevention and control structural body and design method thereof

The invention discloses a debris flow gabion prevention and control structural body and a design method of the debris flow gabion prevention and control structural body. The flexible debris flow blocking structural body aims to overcome the defects that an existing permeable dam is limited in water permeability and is cracked and destroyed easily by over large instantaneous impact force. The debris flow gabion prevention and control structural body comprises at least one gabion dam prevention and control structural single body. Each single body comprises a lower steel pipe pile group and an upper gabion dam, wherein the steel pipe pile group is formed by arranging a plurality of steel pipe piles in the transverse direction of a debris flow channel, the lower pile bodies of the steel pipe piles are embedded into a debris flow gulley bed, and the upper portions of the steep pipe piles are exposed out of the gulley surface and are connected with the gabion dam in a penetrating mode. The multiple gabion dam prevention and control structural single bodies are arranged adjacently in the longitudinal direction of the debris flow channel. Through the optimization design, the gabion dam is of a multi-layer structure, each layer of the gabion dam is composed of a plurality of gabion nets, and the gabion nets of each layer are arranged in a staggered mode. The invention further provides the design method of the debris flow gabion prevention and control structural body. The debris flow gabion prevention and control structural body can fully utilize the water permeability of the gabion combined structure and deformation feedback of the gabion combined structure on the impact to achieve a good prevention and control effect.
Owner:INST OF MOUNTAIN HAZARDS & ENVIRONMENT CHINESE ACADEMY OF SCI

Construction process of main bridge of double-tower single-cable-plane extradosed cable-stayed bridge

The invention relates to a construction process of a main bridge of a double-tower single-cable-plane extradosed cable-stayed bridge. The main bridge comprises two main piers and two transition piers.A girder is a whole single-box three-chamber straight web box beam; a main span is arranged in a single-hole two-way navigation manner; the girder adopts a longitudinal, transverse and vertical three-direction prestress system, and is designed according to a full-prestressed concrete member. The sequence of the girder construction process is as follows: No.0 and No.1 beam sections are constructedat the same time; the No.0 beam section is connected with the main pier through a tower beam consolidation system; then, a cantilever symmetrically pours No. 2 to No. 20 beam sections on the side span side and the main span side; meanwhile, a cable bent tower is constructed, inhaul cable supporting facilities are installed, a synchronous suspension pouring beam body and stay cable lagging two sections are installed, a No. 22 beam section located on a transition pier is constructed in due time, then a side span closure section and a middle span closure section are constructed, finally, auxiliary facilities are constructed, and main bridge construction is completed. The construction process is reasonable in step design, short in construction period, safe and reliable in construction and high in quality.
Owner:THE FOURTH ENG CO LTD OF CCCC FIRST HIGHWAY ENG

Comprehensive formwork system for super high-rise building construction

The invention discloses a comprehensive formwork system for super high-rise building construction. The comprehensive formwork system for super high-rise building construction comprises a climbing system of a stereoscopic structure, and the climbing system is formed by climbing formwork units in an enclosure mode. A jacking system composed of jacking units is arranged inside the stereoscopic structure. A space where steel structures and steel bars are installed and a concrete wall is poured is formed between the climbing system and the jacking system. The climbing system and the jacking system can move in the vertical direction. The climbing formwork units correspond to the jacking units close to the side wall separately and can move synchronously or separately with the jacking units. Each jacking unit is provided with a vertical adjusting device and a horizontal adjusting device which are used for positioning position junctions in the vertical direction and the horizontal direction correspondingly. Each jacking unit is internally provided with a plurality of sets of tensioning devices for improving structure stability. The formwork system is low in dead weight, low in center of gravity and good in structure safety, the construction operating surface is broad, the preparation time and lifting time for each climbing are the shortest, the working efficiency is the highest, and in standard floor construction of a super high-rise building, the formwork system can shorten the construction period by one day or over compared with other systems.
Owner:SICHUAN HUASHI GRP CO LTD +2

Anti-typhoon and anti-leakage metal roof system

The invention discloses an anti-typhoon and anti-leakage metal roof system. The metal roof system sequentially comprises a main steel structure, main roof purline, secondary roof purline, pressed steel bottom plates and purline laid on the pressed steel bottom plates from top to bottom. A plurality of fixed seats are fixed to the purline at intervals, concave roof plates which are engaged with thefixed seats are arranged between the fixed seats, and multiple layers of sound-insulation and vapor-proof thermal insulation materials are laid on the pressed steel bottom plates. The fixed seats include fixed supporting seats and panel engaging plates, wherein the purline is fixedly connected with the lower ends of the fixed supporting seats; the panel engaging plates are fixedly connected withthe fixed supporting seats, and small angles are formed between the panel engaging plates and the fixed supporting seats in the length direction of the roof plates so that the panel engaging plates and the fixed supporting seats can rotate relatively; and panel engaging parts are formed in the upper parts of the panel engaging plates, and the panel engaging parts and both side edges of the roof plates form engaging connection. The anti-typhoon and anti-leakage metal roof system solves the problems that a traditional metal roof system with vertical lockrands has low wind resistance, and is prone to leaking and prone to producing expansion deformation damage, and the safety of upper supporting facilities is affected.
Owner:CENT INT GROUP +1

Al/La co-doped high-nickel ternary precursor with core-shell structure and preparation method thereof, and positive electrode material

The invention relates to the field of lithium ion battery materials, and provides an Al/La co-doped high-nickel ternary precursor with a core-shell structure and a preparation method thereof, and a positive electrode material prepared from the precursor. The preparation method mainly comprises the following three steps: step 1, synthesizing an Al-doped high-nickel ternary precursor with rod-like primary particles under the condition of a low pH value; 2, increasing the pH value on the basis of the step 1, growing a La-doped high-nickel ternary precursor shell with needle-shaped primary particles by taking the Al-doped high-nickel ternary precursor as an inner core so as to synthesize an Al/La co-doped high-nickel ternary precursor with a core-shell structure; and 3, mixing the Al/La co-doped high-nickel ternary precursor with the core-shell structure and a lithium salt, and carrying out high-temperature calcination in an oxygen atmosphere to obtain the Al/La co-doped ternary positive electrode material with the core-shell structure. Due to the unique co-doped core-shell structure, the stability of an internal structure is effectively enhanced, the generation of mixed phases such ascation mixing and rock salt structures is inhibited, the breakage of grain boundaries is reduced, the average oxidation state of manganese ions is improved, the Jahn-Teller effect is effectively inhibited, the rapid attenuation of the capacity in a cycle process is reduced, the cycle stability of the material is remarkably improved, and the cycle life of the material is remarkably prolonged. Theproduct synthesized by adopting a coprecipitation method is uniform in component, good in sphericity, good in reproducibility, easy in condition control, low in preparation cost, high in economic value and wide in application prospect.
Owner:ZHUJI PAWA NEW ENERGY

Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock

The invention relates to a tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock. Particularly, the tunnel advance pre-supporting technology used in the discrete gravelly soil and the broken surrounding rock is applied to the tunnel construction field. The tunnel advance pre-supporting technology used in the discrete gravelly soil and the broken surrounding rock can reduce tunnel over excavation amount, improves construction safety assurance, improves safety performance and durability of a tunnel, reduces radial grouting amount, and saves engineering investment. The tunnel advance pre-supporting technology used in the discrete gravelly soil and the broken surrounding rock includes following steps: a, driving small grouting ducts into the tunnel along the outer periphery of an excavation contour line of the tunnel; b, pouring grout into the discrete gravelly soil and the broken surrounding rock through the small grouting ducts, wherein a grouting amount limiting method is used to pour the grout into the discrete gravelly soil and the broken surrounding rock. The tunnel advance pre-supporting technology used in the discrete gravelly soil and the broken surrounding rock improves maneuverability of construction, reduces the tunnel over excavation amount, enlarges a tunnel reinforce range, improves the safety assurance of the construction, and improves the safety performance and the durability of the tunnel.
Owner:POWERCHINA CHENGDU ENG

Pipe-jacking working well applicable to desert waterless sand area and construction method

The invention provides a pipe-jacking working well applicable to desert waterless sand area and a construction method. The pipe-jacking working well is characterized in that a plurality of bore pilesare circumferentially uniformly arranged around the circle center the working well to form the main protecting and stress structure of the working well, a crown beam is arranged at the top of each bored pile, each circular crown beam and the working well are of a concentric circle structure, a liner is located on the inner side of each bored pile and vertically arranged along the depth direction of the working well, hidden beams are embedded into each liner and arranged at intervals along the length direction of the liner from top to bottom, a bottom plate is located at the bottom of the working well, a well bottom reinforcing jet grouting pile is arranged below the bottom plate, and hole reinforcing jet grouting piles located at positions where jacking pipe joints enter and exit holes arearranged on the outer sides of the bored piles. The pipe-jacking working well has the advantages that soil stability during excavation can be guaranteed by the bored piles, and the bored piles can bear large counter force needed by pipe-jacking construction; the liners can increase sand stability among the piles and evenly transmits horizontal load to the bored piles.
Owner:CHINA TIESIJU CIVIL ENG GRP CO LTD +1

Standing assisting chair for old people

The invention discloses a standing assisting chair for old people. The standing assisting chair comprises chair bodies and a seat plate, wherein the space between the seat plate and a plate at the lower portions of the chair bodies is internally and fixedly provided with a scissors fork mechanism, the scissors fork mechanism is symmetrically distributed, the upper and lower ends of the left and right sides of the scissors fork mechanism are all fixedly provided with a slide rail, the slide rails are provided with sliding blocks, the left and right sides of the scissors fork mechanism are bothprovided with a pair of cross-distributed scissors fork links, the upper and lower ends of the scissors fork links are connected with the sliding blocks respectively, the sliding blocks are further connected with a crank sliding block mechanism, and a tension spring is connected between the top end of the crank sliding block mechanism and the chair bodies; the top of the scissors fork mechanism isfurther fixedly provided with a roller, and the roller is in contact with the seat plate. The standing assisting chair has the advantages of pure mechanical structure, convenient maintenance, simpleoperation, simple structure and strong adaptability, and is suitable for indoor places and outdoor places with frequent use and complicated environment.
Owner:SOUTHEAST UNIV

Yarn guiding device for textile machinery yarn

The invention discloses a yarn guiding device for textile machinery yarn. The yarn guiding device comprises a fixed frame and a yarn guiding frame; the yarn guiding frame comprises an arc-shaped rotating plate and an arc-shaped fixed plate; an upper pressure roller is arranged at the right end of the arc-shaped rotating plate, and the left end of the arc-shaped rotating plate is connected with anadjusting air cylinder; a lower pressure roller is arranged at the right end of the arc-shaped fixed plate, and a yarn arranging wheel is arranged on the arc-shaped fixed plate; and a first yarn guiding roller is arranged between the yarn arranging wheel and a yarn leading roller, and a second yarn guiding roller is arranged between the yarn arranging wheel and the lower pressure roller. The yarntransferred from different angles can be led, the yarn is prevented from being broken in the transferring process, burrs and impurities on the surface of the yarn can be removed in the yarn leading process through the design of the yarn arranging wheel, thus the surface of the yarn is smoother and flatter, and the quality of the yarn is improved; and meanwhile, electrostatic friction generated inthe yarn transferring process can be removed through a electrostatic eliminating assembly, and the problems of yarn fault increasing, yarn breaking and flying are reduced.
Owner:绍兴华清化纤纺织有限公司

Energy-saving heat-insulating wall body

InactiveCN104234256AEmission reductionEnsure the safety of people's livelihoodWallsHeat proofingThermal bridgeEngineering
The invention provides an energy-saving heat-insulating wall body, relates to a building wall body and aims at solving the problems that the fireproof performance of thin-plaster heat-insulating wall bodies is not good, the durability is poor, the amount of window heat bridges is great and the like. The energy-saving heat-insulating wall body structurally comprises a base layer wall body, a heat-insulating layer, anchor bolts and an external protection layer, wherein the external protection layer is a prefabricated protection layer; the prefabricated protection layer is a prefabricated plate protection layer or a prefabricated plaster protection layer; the external protection layer, the heat-insulating layer and the base layer wall body are sequentially arranged from the outer side to the inner side of the energy-saving heat-insulating wall body; the anchor bolts penetrate through the external protection layer and the heat-insulating layer to fix the external protection layer and the heat-insulating layer on the base layer wall body. An internal protection layer is further installed on the inner side of the heat-insulating layer of a prefabricated heat-insulating board to form a prefabricated heat-insulating wallboard, and the prefabricated heat-insulating wallboard is installed on the outer side of the base layer wall body or a building main body structure to form a fully assembled and mounted energy-saving heat-insulating wall body. The energy-saving heat-insulating wall body has the advantages that the wall body is fireproof and safe and is convenient to install, the durability is good, the energy saving and heat insulating performance is good, and the energy saving and emission reduction of the building and the control of the greenhouse effect are facilitated.
Owner:吴淑环
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products