Construction process of main bridge of double-tower single-cable-plane extradosed cable-stayed bridge
A low-tower cable-stayed bridge and construction technology technology, applied to cable-stayed bridges, bridges, bridge forms, etc., can solve problems such as difficult construction, difficult quality and safety management, and complex engineering technology
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] During the specific implementation, the bridge span of Pumen Bridge is 4×30+90+165+90+4×30, the main bridge is 90+165+90 meters prestressed concrete low-tower cable-stayed bridge, and the approach bridges on both sides are 30 meters span First simply supported and then continuously prestressed concrete T-beam, the bridge is 593 meters long. For the elevation of the main bridge, see figure 1 As shown, it includes two main piers 1 and two transition piers 2. The main girder 3 is a single-box three-chamber straight-web box girder. The vertical prestressed system is designed according to the fully prestressed concrete components. The main tower of the bridge is 23 meters high above the bridge deck and is consolidated with the box girder. There are 2 main towers in the whole bridge. The concrete of the cable tower 4 is C55 composite fiber concrete. The cross-section of the main tower is a quadrilateral with grooves, and the transverse dimension is 2.5m. The dimension along...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com