The invention discloses an
asphalt shingle production process and an
asphalt shingle product. The
asphalt shingle production process comprises the following steps of tire feeding,
drying, dip-
coating,
crude oil preparation, sanding, leveling, cooling, self-
adhesive coating and roller
cutting forming. Wherein in the dip-
coating and
crude oil preparation process, raw materials including 60-70 parts by
mass of asphalt, 5-15 parts by
mass of SBS, 3-10 parts by
mass of SBR, 3-8 parts by mass of particles and 3-8 parts by mass of rubber
powder are taken, the asphalt in parts by mass is input into a preparation tank, the
oil temperature is increased to 200-230 DEG C, stirring is conducted for 10 + / -2 minutes, then the modified materials SBS, SBR, particles and rubber
powder in parts by mass are sequentially added, stirring and melting are conducted, and the raw materials are evenly mixed; the
oil temperature is kept unchanged, the stirring rotating speed is controlled to be 1500
revolutions per minute, the interval time is 1 hour, the modification time is kept between 4 hours and 5 hours, after the modified material is completely molten in the asphalt, the filler is added, the
oil temperature is kept, the mixture is stirred to be completely uniform, and the stirring time is not shorter than 1.5 hours.