Full-life-cycle management method and system for environmental impact evaluation project
Through the full life cycle management methods and systems of environmental impact assessment projects, the environmental impact assessment industry management chaos and the quality of employees have been solved, the entire process of the project has been achieved, the technical support and automatic database retrieval has been achieved, the efficiency and quality of environmental impact assessment work have been improved, and the standardized development of the industry has been promoted. and ecological civilization construction.
Patent Information
- Application Number
- CN202411010170.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-15
AI Technical Summary
There are problems in the environmental impact assessment industry with confusion in management, incomplete quality of practitioners, and insufficient technical ability cultivation, resulting in low efficiency and quality of environmental impact assessment work, affecting the promotion of industry norms and ecological civilization construction.
A method and system for the whole life cycle management of environmental impact assessment projects is proposed, including full process technical support such as project pre-programming, project execution, and project after-sales. Through automatic database search matching and natural language processing technology, the efficiency and quality of environmental impact assessment work are improved, and the formation of Mature management system and system.
It has improved the efficiency and quality of environmental impact assessment work, promoted the standardized development of the industry, enhanced the ability to control pollution at the source, and provided stronger support for the construction of ecological civilization.
Smart Images

Figure CN118967027A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of environmental impact assessment project management, and in particular to a method, system, electronic device and computer-readable storage medium for full life cycle management of environmental impact assessment projects. Background Art
[0002] As an important system and tool for ecological and environmental management, environmental impact assessment has played an irreplaceable and important role in environmental access for construction projects, source pollution prevention, and ecological and environmental protection. Faced with huge market demand, a large number of units and personnel have poured into the environmental impact assessment industry, and the number of environmental impact assessment practitioners has increased sharply across the country. Since the launch of the National Environmental Impact Assessment Credit Platform in 2019, more than 15,000 acts of dishonesty by environmental impact assessment practitioners and personnel have been recorded, which fully reflects the problems of chaotic internal management of many environmental impact assessment units, uneven quality of practitioners, and insufficient technical training of new personnel. This patent proposes a management method for the entire life cycle of an environmental impact assessment project, covering all aspects such as project acceptance, project management, project execution, talent training, quality control, project completion, and project after-sales. It can provide a set of mature management systems and systems for environmental impact assessment practitioners. At the same time, relying on the establishment of a database, automatic retrieval and matching technologies, it can further improve the efficiency and quality of environmental impact assessment work, promote the standardized, continuous, healthy and high-quality development of the environmental impact assessment industry, and promote the environmental impact assessment system to better play its advantages in source pollution control, and continue to play a positive role in realizing my country's ecological civilization construction. Summary of the invention
[0003] The present invention proposes a full life cycle management method and system for environmental impact assessment projects. The purpose of the present invention is to establish new project pre-project establishment and project after-sales stages on the basis of the existing project management method, add a new project chief engineer to provide full-process technical support, form a mature full life cycle management system and system for environmental impact assessment projects, improve the efficiency and quality of environmental impact assessment work, discover new project needs, and improve benefits.
[0004] According to the present invention, a method for managing the entire life cycle of an environmental impact assessment project is proposed, the method comprising the following steps:
[0005] Step S1: Carry out preliminary preparations for project acceptance. After obtaining the letter of authorization or notice of winning the bid, carry out project pre-project establishment. Through the pre-project establishment link, the project will be included in standardized management as early as possible. After the contract is signed, the project will be formally established, and the financial budget, personnel arrangement, and project management nodes will be clarified;
[0006] Step S2: Enter the early stage of project execution and collect project information, including the collection of early project progress, engineering design data, and other special research data of the project;
[0007] Step S3: Convene a pre-deployment meeting, with the project chief engineer involved, to determine the type of project environmental impact assessment documents, the evaluation level of each environmental factor of the project, to clarify the list of materials that need to be further collected, the list of departmental investigations, the key issues to be focused on in the on-site survey, the key issues to be focused on in the environmental status monitoring, and form a preliminary plan for the project schedule;
[0008] Step S4: Organize on-site investigation, conduct on-site survey of construction projects, and preliminarily screen environmental monitoring points, and conduct departmental investigation and data collection according to the list of materials that need to be further collected and the departmental investigation list described in step S3;
[0009] Step S5: Convene a post-deployment meeting to report on the results of the on-site investigation, sort out and report on the data collection, and enter the on-site investigation and survey results into the regional environmental quality database. The responsible chief engineer intervenes to determine the key restrictive issues of the project environmental impact assessment and enter them into the typical problem database, identify environmentally sensitive targets and enter the basic information of the sensitive targets into the regional environmental sensitive target database, determine the environmental status monitoring plan, and determine the project progress plan and work priorities;
[0010] Step S6: Enter the mid-term stage of project implementation, conduct environmental status monitoring data analysis, special impact assessment and forecast analysis of various environmental factors, propose environmental protection measures, and draft the report. The draft for comments, internal review draft, external review draft, and submission draft are formed in sequence. At the same time, information is publicized and public participation instructions are formed in accordance with regulations;
[0011] Step S7: Entering the later stage of project implementation, submit the project entrusting party's environmental impact assessment approval application letter, the draft environmental impact assessment report, the public participation statement and other necessary documents to the administrative approval department;
[0012] Step S8: Convene an expert review meeting;
[0013] Step S9: Modify the report after the meeting according to the expert review results in step S8 to form a draft for approval;
[0014] Step S10: Obtaining environmental impact assessment approval;
[0015] Step S11: Archiving, including internal archiving, submission of work results to the client for archiving, project settlement and payment collection;
[0016] Step S12: Enter the after-sales stage and provide extended technical consulting to the client. While improving customer satisfaction, it can also discover the client's service needs early and then discover new project opportunities, organically combining project production and market operations.
[0017] Preferably, the preliminary preparation work in step S1 specifically includes the following steps:
[0018] Step S1.1: After the project is pre-established, personnel arrangements can be made according to the project content, the project leader can be confirmed, the project content can be divided into topics, the topic leader can be determined, and the responsible general engineer can be determined. The responsible general engineer is a technical manager for a certain type of project or several projects with similar contents. While following up the progress of the project, he or she should focus on providing technical guidance and decision-making support for the identification and resolution of key issues;
[0019] Step S1.2: After the project is pre-approved, the financial budget can be developed, including the outsourcing budget, conference budget, travel budget, and other budgets, to clarify the project execution cost control goals and profit expectations;
[0020] Step S1.3: After the project is pre-approved, the contract nodes can be clearly defined, including the start time, payment nodes, and completion deadline, to facilitate standardized project management.
[0021] Preferably, the regional environmental quality database in step S5 is used to store on-site surveys of the project target area and its surroundings and collected environmental quality-related graphic and text materials. The overlapping parts of the area involved in the new project and the areas stored in the regional environmental quality database can achieve automatic matching of environmental quality profiles; the typical problem database is used to store key restrictive issues in project environmental impact assessments, and similar types of projects can be referenced through keyword retrieval; the regional environmentally sensitive target library is used to store the basic conditions of environmentally sensitive targets identified by the project, and the basic conditions of environmentally sensitive targets involved in new projects can be automatically matched.
[0022] Preferably, the after-sales stage in step S12 includes but is not limited to the following:
[0023] (1) Provide necessary after-sales technical consultation according to the client's needs;
[0024] (2) Follow up environmental monitoring, supervision and environmental acceptance inspection of completed projects according to the progress of project construction;
[0025] (3) Provide comprehensive environmental protection consulting and environmental steward services during the operation period.
[0026] According to the present invention, a full life cycle management system for environmental impact assessment projects is also proposed, the system comprising the following modules:
[0027] Module M1: Project acceptance module, used to accept projects and generate project orders;
[0028] Module M2: Personnel allocation module, used to allocate project orders to the responsible chief engineer, project leader, and subject leader according to the specific content of the project. The personnel allocation module includes a personnel information database, which stores personnel names, ages, education, majors, qualification levels, certificate numbers, areas of expertise, completed or ongoing project status, etc., and is updated regularly;
[0029] Module M3: Project information storage and automatic retrieval matching module, used to store basic project information and automatically retrieve and match the content required for the current project from the stored content of the regional environmental quality database, typical problem database, and regional environmental sensitive target database;
[0030] Module M4: Report preparation module, used to form the report draft for comments, internal review draft, external review draft, and submission draft;
[0031] Module M5: Review module, used to receive project review drafts and conduct project review;
[0032] Module M6: Prompt and warning module, used to remind the completion and submission of tasks at each stage according to the contract time nodes during the whole project process, and to issue warnings when tasks are about to expire or overdue;
[0033] Module M7: After-sales module, used to provide necessary after-sales technical consultation, track environmental monitoring, supervision and completion environmental protection acceptance services, and provide comprehensive environmental protection consultation and environmental steward services during the operation period.
[0034] Preferably, the module M3 project information storage and automatic retrieval matching module specifically includes the following modules:
[0035] Module M3.1: Project information storage module, used to store the progress of the early stage of the project, engineering design data, other special research data of the project, project progress plan, on-site survey graphic information and field research results, key restrictive issues of the project, environmental sensitive targets, and environmental status monitoring plan. The responsible chief engineer terminal, project leader terminal, and special leader terminal described in module M2 can view and edit the project information storage module;
[0036] Module M3.2: Database automatic retrieval and matching module, used to automatically retrieve and match the environmental quality profile and basic information of environmental sensitive targets in the area involved in the current project from the regional environmental quality database and the regional environmental sensitive target database, and automatically retrieve and match the key restrictive issues of environmental impact assessment determined in existing similar projects for reference. The relevant information of historical projects is structured and stored in the relational database MySQL. The automatic retrieval and matching is completed by using TF-IDF (term frequency-inverse document frequency) in natural language processing technology to vectorize the project description, and then use Jaccard similarity to calculate the similarity between the text description of the current project and the historical project to match the overlapping content. For the classification of environmental assessment projects, the Random Forest classification algorithm is used;
[0037] Module M3.3: Database automatic import module, which is used to automatically import the regional environmental quality database, typical problem database, and regional environmental sensitive target database after further improvement of the contents that have not been automatically matched or have a low matching degree in module M3.2.
[0038] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method for managing the entire life cycle of an environmental impact assessment project as described above is implemented.
[0039] The present invention also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the method for managing the entire life cycle of an environmental impact assessment project as described above is implemented.
[0040] Compared with the prior art, the present invention has the following beneficial technical effects:
[0041] 1. The present invention sets up a project pre-project establishment link before the formal signing of the contract, and incorporates the projects that have reached the commission intention into the formal project management, which is convenient for standardizing project management as soon as possible, improving the quality of project execution and improving work efficiency;
[0042] 2. The invention adds a new general manager of responsibility for technical guidance for the project leader, who tracks the progress of project implementation throughout the process, provides technical guidance and decision-making support, and sets up pre-project deployment meetings and post-project deployment meetings to help the project leader and project team members quickly identify key issues, clarify the key points and difficulties of project implementation, speed up the project progress and improve the quality of environmental impact assessment results;
[0043] 3. The present invention adds an after-sales service link after the project is completed, extending the long-tail effect of services, improving customer satisfaction, and at the same time facilitating the discovery of new project needs, deriving new project opportunities, and improving efficiency;
[0044] 4. The present invention constructs a regional environmental quality database, a typical problem database, and a regional environmental sensitive target database, and gives priority to obtaining relevant content required for the project from the database. At the same time, the database is automatically updated as new projects are carried out, avoiding unnecessary duplication of work while improving work efficiency by using big data technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0046] Figure 1 It is a flow chart of the whole life cycle management method of the environmental impact assessment project in the present invention;
[0047] Figure 2 This is a schematic diagram of the process of the early preparation stage of the project in the present invention;
[0048] Figure 3 This is a schematic diagram of the early stage process of executing the project in the present invention;
[0049] Figure 4 It is a schematic diagram of the mid-term process of executing the project in the present invention;
[0050] Figure 5 This is a schematic diagram of the process flow of the after-sales stage of the project in the present invention;
[0051] Figure 6 It is a structural schematic diagram of the full life cycle management system of the environmental impact assessment project in the present invention. DETAILED DESCRIPTION
[0052] The present invention is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several changes and improvements can also be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.
[0053] Embodiment 1
[0054] like Figure 1 As shown, this embodiment provides a method for managing the entire life cycle of an environmental impact assessment project, including:
[0055] Step S1: Carry out preliminary preparations for project acceptance. After obtaining the letter of authorization or the notice of winning the bid, carry out the pre-project establishment. Through the pre-project establishment link, the project will be included in the standardized management as soon as possible. After the contract is signed, the project will be formally established, and the financial budget, personnel arrangement, project management nodes, etc. will be clarified. In this embodiment, the type of project undertaken is the oil terminal project. The project establishment stage needs to clarify: ① monitoring the financial budget of outsourcing fees, data collection fees, special research fees, project personnel travel expenses, car rental fees, gasoline fees, document fees, conference fees, other miscellaneous fees and taxes; ② personnel arrangements such as project leader, technical leader, heads of various topics, auxiliary personnel, responsible chief engineer, etc.; ③ on-site investigation, topic completion, first draft of report, internal and external review of report, report submission for review, report approval, archiving, completion of the project, etc.
[0056] Step S2: Entering the early stage of project execution, collecting project information, including collecting the early progress of the project, collecting engineering design data, and collecting other special research data of the project. In this embodiment, the collected data include: engineering design documents and drawings, special reports on engineering sea use, aquatic germplasm resource demonstration, soil and water conservation, safety pre-evaluation, navigation conditions assessment, etc., environmental function zoning and ecological environment quality bulletin of the project area, and distribution of ecological environment sensitive targets;
[0057] Step S3: Convene a pre-deployment meeting, with the project chief engineer involved, to determine the type of project environmental impact assessment documents, the evaluation level of each environmental factor of the project, clarify the list of materials that need to be further collected, the department investigation list, and clarify the key issues of the on-site survey, including: environmental characteristics of the project area, the construction status of adjacent projects and their relative position relationship, the project status, the location, scale, protection objects and protection types of ecological and environmental sensitive areas, and the focus of environmental status monitoring, including marine ecological environment, atmospheric environment, soil environment and groundwater environment, to form a preliminary plan for the project schedule;
[0058] Step S4: Organize on-site investigation, conduct on-site survey of construction projects, and preliminarily screen environmental monitoring points, and conduct departmental investigation and data collection according to the list of materials that need to be further collected and the departmental investigation list described in step S3;
[0059] Step S5: Convene a post-deployment meeting to report on the results of the on-site survey, sort out and report on the data collection, and enter the on-site survey and research results into the regional environmental quality database. The responsible chief engineer intervenes and determines that the key restrictive issues of the project environmental impact assessment are the impact on the marine ecological environment and marine hydrodynamics and water quality caused by the construction of the project, the atmospheric environmental impact caused by the "big and small breathing" of ships and supporting tank areas during the loading and unloading operations of ships arriving at the port during the operation of the project, the marine environmental risk impact caused by the leakage of fuel oil tanks or cargo holds due to improper operation or collision of ships arriving at the port during the operation of the project, and the secondary environmental pollution caused by leakage, fire, explosion and other accidents in the supporting tank area. The key restrictive issues are entered into the typical problem database, the environmental sensitive target is identified as xxx, and the basic information of the sensitive target is entered into the regional environmental sensitive target database, and the environmental status monitoring plan is determined, and the project progress plan and work priorities are determined;
[0060] Step S6: Enter the mid-term stage of project implementation, conduct environmental status monitoring data analysis, special impact assessment and forecast analysis of various environmental factors, propose environmental protection measures, and draft the report. The draft for comments, internal review draft, external review draft, and submission draft are formed in sequence. At the same time, information is publicized and public participation instructions are formed in accordance with regulations;
[0061] Step S7: Entering the later stage of project implementation, submit the project entrusting party's environmental impact assessment approval application letter, the draft environmental impact assessment report, the public participation statement and other necessary documents to the administrative approval department;
[0062] Step S8: Convene an expert review meeting to specifically propose modification and improvement suggestions for the rationality of the general layout of the project and optimization suggestions, the reliability of the supporting project, the compliance of the construction organization arrangement with the requirements of ecological and environmental protection, the validity of the environmental status data, the impact of the marine ecological environment caused by the construction and the validity and rationality of the ecological protection measures, the rationality of the marine hydrodynamic model, the rationality and effectiveness of the environmental risk emergency prevention measures, the rationality and effectiveness of the allocation of environmental risk emergency rescue materials, the scale and technology of environmental protection facilities such as sewage treatment, and the rationality and effectiveness of the treatment effect;
[0063] Step S9: Modify the report after the meeting according to the expert review results in step S8 to form a draft for approval;
[0064] Step S10: Obtaining environmental impact assessment approval;
[0065] Step S11: Archiving, including internal archiving, submission of work results to the client for archiving, project settlement and payment collection;
[0066] Step S12: Enter the after-sales stage and provide extended technical consulting to the client. While improving customer satisfaction, it can also discover the client's service needs early and then discover new project opportunities, organically combining project production and market operations.
[0067] The preliminary preparation work in step S1 specifically includes the following steps:
[0068] Step S1.1: After the project is pre-established, personnel arrangements can be made according to the project content, the project leader can be confirmed, and the project content can be divided into topics. In this embodiment, the project content is divided into ecological topics, atmospheric topics, environmental risk topics, noise and solid waste and other topics, and the topic leader is determined for each topic; the project chief engineer is determined. In this embodiment, the responsible chief engineer should be a senior engineer or above with no less than 8 years of work experience and a registered environmental impact assessment engineer certificate. As a technical manager with experience in port and terminal projects, he should follow up the progress of the project throughout the process, and focus on providing technical guidance and decision-making support for the identification and resolution of key issues such as atmospheric environment, marine ecological environment, marine hydrodynamics and environmental risks;
[0069] Step S1.2: After the project is pre-approved, the financial budget can be developed, including the outsourcing budget, conference budget, travel budget, and other budgets, to clarify the project execution cost control goals and profit expectations;
[0070] Step S1.3: After the project is pre-approved, the contract nodes can be clearly defined, including the start time, payment nodes, and completion deadline, to facilitate standardized project management.
[0071] Among them, the regional environmental quality database in step S5 is used to store the on-site surveys and collected environmental quality-related graphic and text materials in the project target area and its surrounding areas. The overlapping parts of the area involved in the current project and the areas stored in the regional environmental quality database can realize automatic matching of environmental quality profiles; the typical problem database is used to store key restrictive issues in project environmental impact assessments, and similar types of projects can be referenced through keyword retrieval; the regional environmentally sensitive target library is used to store the basic information of environmentally sensitive targets identified by the project, and the environmentally sensitive targets involved in new projects can realize automatic matching of their basic information.
[0072] The after-sales stage in step S12 includes but is not limited to the following:
[0073] (1) Provide necessary after-sales technical consultation such as the conformity of the engineering design plan with the EIA approval requirements, management of whether the design change will cause major changes in the EIA, follow-up monitoring of the marine ecological environment during the construction period, and selection of environmental protection facilities according to the client's needs;
[0074] (2) Follow up environmental monitoring, supervision and environmental acceptance inspection of completed projects according to the progress of project construction;
[0075] (3) Provide comprehensive environmental protection consulting and environmental steward services during the operation period.
[0076] Embodiment 2
[0077] The same principle as the above-mentioned embodiment of a method for managing the entire life cycle of an environmental impact assessment project, such as Figure 2 As shown, this embodiment provides an environmental impact assessment project full life cycle management system, including:
[0078] Module M1: a project acceptance module, used to accept projects and generate project orders. In this embodiment, the accepted project type is an oil terminal project;
[0079] Module M2: Personnel allocation module, used to allocate project orders to the responsible chief engineer, project leader, and subject leader according to the specific content of the project. The personnel allocation module includes a personnel information database, which stores personnel names, ages, education, majors, qualification levels, certificate numbers, areas of expertise, completed or ongoing projects, etc., and is updated regularly. In this embodiment, project orders are allocated to the responsible chief engineer, project leader, and six subject leaders, including marine ecology, atmospheric environment, acoustic environment and solid waste, hydrodynamics and marine environmental risks, terrestrial environmental risks, and mapping. The personnel information database is updated every three months;
[0080] Module M3: Project information storage and automatic retrieval matching module, used to store basic project information and automatically retrieve and match the content required for the current project from the stored content of the regional environmental quality database, typical problem database, and regional environmental sensitive target database;
[0081] Module M4: Report preparation module, used to form the report draft for comments, internal review draft, external review draft, and submission draft;
[0082] Module M5: Review module, used to receive project review drafts and conduct project review;
[0083] Module M6: Prompt warning module, used to prompt the completion and submission of tasks at each stage according to the contract time nodes during the whole project process, and to issue warnings when tasks are about to expire or overdue. In this embodiment, a warning in the form of a task deadline countdown is activated 15 days before the task is due. When the task is completed and submitted, the warning is closed. The responsible chief engineer terminal and the project leader terminal will both display the completion status of each special task;
[0084] Module M7: After-sales module, used to provide necessary after-sales technical consultation, track environmental monitoring, supervision and completion environmental protection acceptance services, and provide comprehensive environmental protection consultation and environmental steward services during the operation period.
[0085] Among them, the module M3 project information storage and automatic retrieval matching module specifically includes the following modules:
[0086] Module M3.1: Project information storage module, used to store the early progress of the project, engineering design data, other special research data of the project, project progress plan, on-site survey graphic information and field investigation results, key restrictive issues of the project, environmentally sensitive targets, and environmental status monitoring plan. In this embodiment, the project proposal, engineering feasibility study report and design drawings, preliminary engineering design documents and design drawings, engineering geological surveys, engineering hydrological tests, marine surveys and sea area use demonstration reports, special demonstration reports on aquatic germplasm resources protection areas, soil and water conservation reports, safety pre-evaluation reports, navigation conditions assessment reports, etc. are stored. The responsible chief engineer end, project person in charge end, and special person in charge end of module M2 can view and edit the project information storage module through APP, mini-programs or web pages on mobile devices such as mobile phones, computers, and tablets. This module can save editing records, including editing content, editing time, and editors;
[0087] Module M3.2: Database automatic retrieval and matching module, used to automatically retrieve and match the environmental quality profile and basic information of environmental sensitive targets in the area involved in the current project from the regional environmental quality database and the regional environmental sensitive target database, and automatically retrieve and match the key restrictive issues of environmental impact assessment determined in existing similar projects for reference. The relevant information of historical projects is structured and stored in the relational database MySQL. The automatic retrieval and matching is completed by using TF-IDF (term frequency-inverse document frequency) in natural language processing technology to vectorize the project description, and then use Jaccard similarity to calculate the similarity between the text description of the current project and the historical project to match the overlapping content. For the classification of environmental assessment projects, the Random Forest classification algorithm is used;
[0088] Module M3.3: Database automatic import module, which is used to automatically import the regional environmental quality database, typical problem database, and regional environmental sensitive target database after further improvement of the contents that have not been automatically matched or have a low matching degree in module M3.2.
[0089] The protection content of the present invention is not limited to the above embodiments. Without departing from the spirit and scope of the present invention, changes and advantages that can be thought of by those skilled in the art are included in the present invention and are protected by the attached claims.
Claims
1. A method for managing the entire life cycle of an environmental impact assessment project, characterized in that: The steps include: Step S1: Carry out preliminary preparations for project acceptance. After obtaining the letter of authorization or notice of winning the bid, carry out project pre-project establishment. Through the pre-project establishment link, the project will be included in standardized management as early as possible. After the contract is signed, the project will be formally established, and the financial budget, personnel arrangement, and project management nodes will be clarified; Step S2: Enter the early stage of project execution and carry out project information collection, including the collection of early progress of the project, the collection of engineering design data, and the collection of other special research data of the project; Step S3: Convene a pre-deployment meeting, with the project chief engineer involved, to determine the type of project environmental impact assessment documents, the evaluation level of each environmental factor of the project, to clarify the list of materials that need to be further collected, the list of departmental investigations, the key issues to be focused on in the on-site survey, the key issues to be focused on in the environmental status monitoring, and form a preliminary plan for the project schedule; Step S4: Organize on-site investigation, conduct on-site survey of construction projects, and preliminarily screen environmental monitoring points, and conduct departmental investigation and data collection according to the list of materials that need to be further collected and the departmental investigation list described in step S3; Step S5: Convene a post-deployment meeting to report on the results of the on-site investigation, sort out and report on the data collection, and enter the on-site investigation and survey results into the regional environmental quality database. The responsible chief engineer intervenes to determine the key restrictive issues of the project environmental impact assessment and enter them into the typical problem database, identify environmentally sensitive targets and enter the basic information of the sensitive targets into the regional environmental sensitive target database, determine the environmental status monitoring plan, and determine the project progress plan and work priorities; Step S6: Enter the mid-term stage of project implementation, conduct environmental status monitoring data analysis, special impact assessment and forecast analysis of various environmental factors, propose environmental protection measures, and draft the report. The draft for comments, internal review draft, external review draft, and submission draft are formed in sequence. At the same time, information is publicized and public participation instructions are formed in accordance with regulations; Step S7: Entering the later stage of project implementation, submit the project entrusting party's environmental impact assessment application letter, the draft environmental impact assessment report, the public participation statement and other necessary documents to the administrative approval department; Step S8: Convene an expert review meeting; Step S9: Modify the report after the meeting according to the expert review results in step S8 to form a draft for approval; Step S10: Obtaining environmental impact assessment approval; Step S11: Archiving, including internal archiving, submission of work results to the client for archiving, project settlement and payment collection; Step S12: Enter the after-sales stage and provide extended technical consulting to the client. While improving customer satisfaction, it can also discover the client's service needs early and then discover new project opportunities, organically combining project production and market operations.
2. The method for managing the entire life cycle of an environmental impact assessment project according to claim 1, characterized in that: The preliminary preparation work in step S1 specifically includes the following steps: Step S1.1: After the project is pre-established, personnel arrangements can be made according to the project content, the project leader can be confirmed, the project content can be divided into topics, the topic leader can be determined, and the responsible general engineer can be determined. The responsible general engineer is a technical manager for a certain type of project or several projects with similar contents. While following up the progress of the project, he or she should focus on providing technical guidance and decision-making support for the identification and resolution of key issues; Step S1.2: After the project is pre-approved, the financial budget can be developed, including the outsourcing budget, conference budget, travel budget, and other budgets, to clarify the project execution cost control goals and profit expectations; Step S1.3: After the project is pre-approved, the contract nodes can be clearly defined, including the start time, payment nodes, and completion deadline, to facilitate standardized project management.
3. The method for managing the entire life cycle of an environmental impact assessment project according to claim 1, characterized in that: The regional environmental quality database in step S5 is used to store on-site surveys of the project target area and its surroundings and collected environmental quality-related graphic and text materials. The overlapping parts of the area involved in the new project and the areas stored in the regional environmental quality database can realize automatic matching of environmental quality profiles; the typical problem database is used to store key restrictive issues in project environmental impact assessments, and similar types of projects can be referenced through keyword retrieval; the regional environmentally sensitive target library is used to store the basic information of environmentally sensitive targets identified by the project, and the basic information of environmentally sensitive targets involved in the new project can be automatically matched.
4. The method for managing the entire life cycle of an environmental impact assessment project according to claim 1, characterized in that: The after-sales stage in step S12 includes but is not limited to the following: (1) Provide necessary after-sales technical consultation according to the client's needs; (2) Follow up environmental monitoring, supervision and environmental acceptance inspection of completed projects according to the progress of project construction; (3) Provide comprehensive environmental protection consulting and environmental steward services during the operation period.
5. A full life cycle management system for environmental impact assessment projects, characterized in that: Includes the following modules: Module M1: Project acceptance module, used to accept projects and generate project orders; Module M2: Personnel allocation module, used to allocate project orders to the responsible chief engineer, project leader, and subject matter leader according to the specific content of the project; Module M3: Project information storage and automatic retrieval matching module, used to store basic project information and automatically retrieve and match the content required for the current project from the stored content of the regional environmental quality database, typical problem database, and regional environmental sensitive target database; Module M4: Report preparation module, used to form the report draft for comments, internal review draft, external review draft, and submission draft; Module M5: Review module, used to receive project review drafts and conduct project review; Module M6: Prompt and warning module, used to remind the completion and submission of tasks at each stage according to the contract time nodes during the whole project process, and to issue warnings when tasks are about to expire or overdue; Module M7: After-sales module, used to provide necessary after-sales technical consultation, track environmental monitoring, supervision and completion environmental protection acceptance services, and provide comprehensive environmental protection consultation and environmental steward services during the operation period.
6. The environmental impact assessment project life cycle management system according to claim 5 is characterized in that The module M3 project information storage and automatic retrieval matching module specifically includes the following modules: Module M3.1: Project information storage module, used to store the progress of the early stage of the project, engineering design data, other special research data of the project, project progress plan, on-site survey graphic information and field research results, key restrictive issues of the project, environmental sensitive targets, and environmental status monitoring plan. The responsible chief engineer terminal, project leader terminal, and special leader terminal described in module M2 can view and edit the project information storage module; Module M3.2: Database automatic retrieval and matching module, used to automatically retrieve and match the environmental quality profile and basic information of environmental sensitive targets in the area involved in the current project from the regional environmental quality database and the regional environmental sensitive target database, and automatically retrieve and match the key restrictive issues of environmental impact assessment determined in existing similar projects for reference. The relevant information of historical projects is structured and stored in the relational database MySQL. The automatic retrieval and matching is completed by using TF-IDF (term frequency-inverse document frequency) in natural language processing technology to vectorize the project description, and then use Jaccard similarity to calculate the similarity between the text description of the current project and the historical project to match the overlapping content. For the classification of environmental assessment projects, the Random Forest classification algorithm is used; Module M3.3: Database automatic import module, which is used to automatically import the regional environmental quality database, typical problem database, and regional environmental sensitive target database after further improvement of the contents that have not been automatically matched or have a low matching degree in module M3.
2.
7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method for managing the entire life cycle of an environmental impact assessment project as described in any one of claims 1 to 4 is implemented.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method for managing the entire life cycle of an environmental impact assessment project as described in any one of claims 1 to 4 is implemented.