Method for calculating coupling critical conversion point of wind power plant under asymmetric short-circuit fault of power grid

By calculating the positive and negative sequence active current set value of the wind farm under asymmetric short circuit fault in the power grid, the problem that the synchronization stability of the wind farm is affected by inter-sequence coupling is solved, and the synchronization stability of the wind farm at the coupling critical conversion point is ensured. , improves the operating capacity of the wind farm.

CN118971126APending Publication Date: 2024-11-15CHONGQING UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410983412.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the case of asymmetric short circuit failure of the power grid, the synchronous stability of the wind farm is affected by intersequential coupling. The existing technology has failed to effectively study and solve this problem, resulting in the uncertain impact of the synchronous stability of the wind farm under different operating conditions. .

Method used

By calculating the positive and negative sequence active current setpoints, the wind farm works at the coupling critical conversion point, and the coupling impedance and reactive current ratio coefficients are calculated by using specific formulas and steps, and the positive is calculated according to different fault types and positions. , the critical value of negative sequence active current ensures the synchronous stability of the wind farm during the fault.

Benefits of technology

It realizes the rapid and accurate calculation of positive and negative sequence active current set value during asymmetric short circuit fault of the power grid, so that the wind farm works at the coupling critical conversion point, ensuring that the synchronization stability is not affected by inter-sequence coupling, and improving the wind farm operational capability and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

The invention discloses a wind power plant coupling critical conversion point calculation method under a power grid asymmetric short-circuit fault, and the method comprises the steps: quickly and accurately calculating positive and negative sequence active current given values during the power grid asymmetric short-circuit fault according to the asymmetric fault type, fault position, fault degree and wind power plant operation condition; during the duration of the fault, the wind power plant is given according to the calculated negative sequence active current value, so that the influence of the inter-sequence coupling on the positive sequence synchronization stability is zero, and the wind power plant works at the positive sequence coupling critical conversion point; the wind power plant is given according to the calculated positive sequence active current value, and even if the influence of the inter-sequence coupling on the negative sequence synchronization stability is zero, the wind power plant works at the negative sequence coupling critical conversion point. According to the method, the wind power plant can work at the coupling critical conversion point, and it is ensured that the synchronization stability of the wind power plant is not affected by inter-sequence coupling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wind power generation, and in particular to a method for calculating a wind farm coupling critical transition point under an asymmetric short-circuit fault in a power grid. The method can enable the wind farm to operate at the coupling critical transition point by calculating given values ​​of positive and negative sequence active currents, thereby ensuring that the synchronous stability of the wind farm is not affected by inter-sequence coupling. Background Art

[0002] In order to solve the energy crisis and environmental pollution problems, renewable energy power generation has been vigorously developed in recent years. Among them, wind energy has attracted widespread attention due to its advantages such as wide distribution and convenient development. With the increasing penetration rate of wind power, wind power grid-connected equipment will have the problem of synchronous instability. Especially under asymmetric faults, the positive sequence network and the negative sequence network are interconnected, resulting in coupling between the positive and negative sequence components, and then coupling between the positive and negative sequence synchronization behaviors. Therefore, in order to ensure the synchronous and stable operation of wind farms during low voltage ride-through, it is necessary to further study the influence of inter-sequence coupling and find the working point of the wind farm when the coupling influence is minimal or has no influence. At present, scholars at home and abroad have carried out relevant research, such as the following published literature:

[0003] [1]

[0004] [2]

[0005] Reference [1] comprehensively considers the transient stability constraints of phase-locked loop synchronization, the maximum available current constraints and the voltage constraints of the common connection point, and derives the analytical expression of the feasible domain of double-sequence current injection. This analytical expression only ensures that the wind farm can have a stable equilibrium point when inter-sequence coupling exists. And this document does not study the influence of inter-sequence coupling on the synchronization stability of the system. Reference [2] reveals the existence conditions of the steady-state equilibrium point, explores the type of instability caused by the lack of equilibrium point, and clarifies the influence of inter-sequence coupling on the current injection boundary. However, this document only studies the influence of inter-sequence coupling on the current limit value from the perspective of the non-existence of the equilibrium point, and does not deeply analyze the influence of inter-sequence coupling under different working conditions. In summary, the above-mentioned documents did not find that the influence of inter-sequence coupling on synchronization stability will change between improvement and reduction with different output currents. Therefore, considering the influence of inter-sequence coupling comprehensively and studying the calculation method of the critical conversion point of wind farm coupling under asymmetric short-circuit fault of the power grid can improve the operation capacity of wind farms, which is of great practical significance. Summary of the invention

[0006] In view of the above-mentioned deficiencies in the prior art, the purpose of the present invention is to propose a method for calculating the critical switching point of wind farm coupling under an asymmetric short-circuit fault in the power grid. The present invention can accurately calculate the given values ​​of the positive and negative sequence active currents, so that the wind farm operates at the critical switching point of coupling, ensuring that the synchronous stability of the wind farm is not affected by the inter-sequence coupling.

[0007] The technical solution of the present invention is achieved in this way:

[0008] A method for calculating the critical transition point of wind farm coupling under an asymmetric short circuit fault in a power grid, the specific steps are as follows:

[0009] A1) When an asymmetric short circuit fault occurs in the public transmission line of the power grid, if the wind farm needs to work at the positive sequence coupling critical conversion point, the negative sequence active current critical value is calculated according to the following formula:

[0010]

[0011] If the wind farm needs to operate at the negative sequence coupling critical conversion point, the positive sequence active current critical value is calculated according to the following formula:

[0012]

[0013] Where, |K1|, |K2|, |Z1|, |Z2| are all inter-sequence coupling impedance values; are the impedance angles of the inter-sequence coupling impedances K1, K2, Z1, and Z2 respectively; U g+ is the positive sequence grid voltage; δ + , δ - are the positive and negative sequence equivalent power angles of the wind farm respectively; They are respectively the positive and negative sequence components of the active current output by the wind farm; They are respectively the positive and negative sequence components of the reactive current output by the wind farm;

[0014] A2) When different types of asymmetric short-circuit faults occur in the power grid, the sequence coupling impedances K1, K2, Z1, and Z2 in step A1) are calculated according to the following formulas based on different fault types:

[0015] In case of single-phase grounding fault:

[0016] When two-phase ground fault occurs:

[0017] In case of two-phase short circuit fault:

[0018] Where Z g+ , Z g- and Z g0 are the positive, negative and zero sequence impedance values ​​of the power grid respectively; Z L+ and Z L0 is the positive sequence and zero sequence impedance value of the transmission line from the fault point to the wind farm; Z F is the fault branch impedance value;

[0019] A3) During the fault period, positive and negative sequence reactive currents are injected according to the requirements of the grid connection guidelines. and The expression is:

[0020]

[0021] Where K + , K - is the positive and negative sequence reactive current proportionality coefficient, U t - are the positive and negative sequence components of the grid-connected point voltage, I N is the rated current value of the wind farm;

[0022] A4) When an asymmetric short circuit occurs in the common line, the inter-sequence coupling impedance in step A2) and the positive and negative sequence reactive current values ​​in step A3) are substituted into step A1). If the wind farm needs to work at the positive sequence coupling critical conversion point, the positive sequence active current value is arbitrarily given at the same time. The negative sequence active current value can be solved If the wind farm needs to work at the negative sequence coupling critical transition point, the negative sequence active current value is given arbitrarily at the same time The positive sequence active current value can be solved

[0023] A5) During the fault duration, if the wind farm is given the negative-sequence active current value calculated according to step A4), the influence of inter-sequence coupling on the positive-sequence synchronous stability can be made zero, and the wind farm operates at the positive-sequence coupling critical transition point; if the wind farm is given the positive-sequence active current value calculated according to step A4), the influence of inter-sequence coupling on the negative-sequence synchronous stability can be made zero, and the wind farm operates at the negative-sequence coupling critical transition point.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] The present invention can quickly and accurately calculate the positive and negative sequence active current given values ​​during an asymmetric short circuit fault in the power grid according to the asymmetric fault type, fault location, fault degree and wind farm operating conditions, so that the wind farm operates at the coupling critical conversion point, ensuring that the synchronous stability of the wind farm is not affected by inter-sequence coupling. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a wind farm control block diagram of the present invention.

[0027] Figure 2 It is a simulation waveform diagram showing whether the proposed method is used to make the wind farm work at the critical transition point of positive sequence coupling when an asymmetric fault occurs in the power grid.

[0028] Figure 3 It is a simulation waveform diagram showing whether the proposed method is used to make the wind farm work at the critical transition point of negative sequence coupling when an asymmetric fault occurs in the power grid. DETAILED DESCRIPTION

[0029] The specific implementation modes of the present invention are further described in detail below with reference to the accompanying drawings.

[0030] The present invention calculates the positive and negative sequence active current given values ​​so that the wind farm works at the coupling critical conversion point. Figure 1 The wind farm control block diagram is shown in Figure 1. During the asymmetric short-circuit fault of the power grid, the wind farm is operated at the coupling critical conversion point by calculating the positive and negative sequence active current given values, thereby ensuring that the synchronous stability of the wind farm is not affected by the inter-sequence coupling.

[0031] The specific implementation steps of the present invention are as follows:

[0032] A1) When an asymmetric short circuit fault occurs in the public transmission line of the power grid, if the wind farm needs to work at the positive sequence coupling critical conversion point, the negative sequence active current critical value is calculated according to the following formula:

[0033]

[0034] If the wind farm needs to operate at the negative sequence coupling critical conversion point, the positive sequence active current critical value is calculated according to the following formula:

[0035]

[0036] Where, |K1|, |K2|, |Z1|, |Z2| are all inter-sequence coupling impedance values; are the impedance angles of the inter-sequence coupling impedances K1, K2, Z1, and Z2 respectively; U g+ is the positive sequence grid voltage; δ + , δ - are the positive and negative sequence equivalent power angles of the wind farm respectively; They are respectively the positive and negative sequence components of the active current output by the wind farm; They are respectively the positive and negative sequence components of the reactive current output by the wind farm;

[0037] A2) When different types of asymmetric short-circuit faults occur in the power grid, the sequence coupling impedances K1, K2, Z1, and Z2 in step A1) are calculated according to the following formulas based on different fault types:

[0038] In case of single-phase grounding fault:

[0039] When two-phase ground fault occurs:

[0040]

[0041] In case of two-phase short circuit fault:

[0042] Where Z g+ , Z g- and Z g0 are the positive, negative and zero sequence impedance values ​​of the power grid respectively; Z L+ and Z L0 is the positive sequence and zero sequence impedance value of the transmission line from the fault point to the wind farm; Z F is the fault branch impedance value;

[0043] A3) During the fault period, positive and negative sequence reactive currents are injected according to the requirements of the grid connection guidelines. and The expression is:

[0044]

[0045] Where K + , K - is the positive and negative sequence reactive current proportionality coefficient (the value is not less than 1.0), U t - are the positive and negative sequence components of the grid-connected point voltage, IN is the rated current value of the wind farm;

[0046] A4) When an asymmetric short circuit occurs in the common line, the inter-sequence coupling impedance in step A2) and the positive and negative sequence reactive current values ​​in step A3) are substituted into step A1). If the wind farm needs to work at the positive sequence coupling critical conversion point, the positive sequence active current value is arbitrarily given at the same time. The negative sequence active current value can be solved If the wind farm needs to work at the negative sequence coupling critical transition point, the negative sequence active current value is given arbitrarily at the same time The positive sequence active current value can be solved

[0047] A5) During the fault duration, if the wind farm is given the negative-sequence active current value calculated according to step A4), the influence of inter-sequence coupling on the positive-sequence synchronous stability can be made zero, and the wind farm operates at the positive-sequence coupling critical transition point; if the wind farm is given the positive-sequence active current value calculated according to step A4), the influence of inter-sequence coupling on the negative-sequence synchronous stability can be made zero, and the wind farm operates at the negative-sequence coupling critical transition point.

[0048] Effect description of the present invention:

[0049] A two-phase short circuit fault in a power grid is taken as an example to illustrate the effectiveness of the proposed method. Figure 2 The simulation waveforms are given to determine whether the proposed method is used to make the wind farm work at the positive sequence coupling critical transition point when a two-phase short circuit grounding fault occurs in the common line of the power grid. Condition 1 represents the situation of disorderly coupling, condition 2 represents the situation where only negative sequence reactive current is injected according to the requirements of the power grid guidelines, and condition 3 represents the situation where the negative sequence current reference value is given by the calculation method proposed by the present invention. It can be seen from the simulation results that the positive sequence stable balance point power angle under the three conditions is It can be seen that when the negative sequence current reference value is given by the calculation method proposed in the present invention, the positive sequence steady-state balance point power angle of the wind farm is consistent with the influence of the sequence-free coupling, that is, the method proposed in the present invention can make the influence of the sequence-free coupling on the positive sequence synchronization stability zero.

[0050] Figure 3 The simulation waveforms are given to determine whether the proposed method is used to make the wind farm work at the negative sequence coupling critical transition point when a two-phase short circuit grounding fault occurs in the common line of the power grid. Among them, working condition 4 represents the situation of disorderly coupling, working condition 5 represents the situation of injecting positive sequence reactive current only according to the requirements of the power grid guidelines, and working condition 6 is the situation of using the calculation method proposed by the present invention to give a positive sequence current reference value. It can be seen from the simulation results that the negative sequence stable balance point power angle δ under the three working conditions s- They are 8.3652°, 8.3491° and 8.3652° respectively. It can be seen that when the positive sequence current reference value is given by the calculation method proposed in the present invention, the negative sequence steady-state balance point power angle of the wind farm is consistent with that under the influence of disorderly coupling.

[0051] It can be seen that the wind farm coupling critical conversion point calculation method proposed in the present invention can accurately calculate the positive and negative sequence active current reference values, so that the wind farm operates at the coupling critical conversion point, thereby ensuring that the synchronous stability of the wind farm is not affected by inter-sequence coupling.

[0052] Finally, it should be noted that the above examples of the present invention are merely examples for illustrating the present invention, and are not intended to limit the embodiments of the present invention. Although the applicant has described the present invention in detail with reference to the preferred embodiments, for those of ordinary skill in the art, other different forms of changes and modifications can be made based on the above description. It is impossible to list all the embodiments here. Any obvious changes or modifications derived from the technical solution of the present invention are still within the scope of protection of the present invention.

Claims

1. A method for calculating the critical switching point of wind farm coupling under asymmetric short-circuit fault of power grid, characterized by: The specific steps are as follows: A1) When an asymmetric short circuit fault occurs in the public transmission line of the power grid, if the wind farm needs to work at the positive sequence coupling critical conversion point, the negative sequence active current critical value is calculated according to the following formula: If the wind farm needs to operate at the negative sequence coupling critical conversion point, the positive sequence active current critical value is calculated according to the following formula: Where, |K1|, |K2|, |Z1|, |Z2| are all inter-sequence coupling impedance values; are the impedance angles of the inter-sequence coupling impedances K1, K2, Z1, and Z2 respectively; U g+ is the positive sequence grid voltage; δ + , δ - are the positive and negative sequence equivalent power angles of the wind farm respectively; They are respectively the positive and negative sequence components of the active current output by the wind farm; They are respectively the positive and negative sequence components of the reactive current output by the wind farm; A2) When different types of asymmetric short-circuit faults occur in the power grid, the sequence coupling impedances K1, K2, Z1, and Z2 in step A1) are calculated according to the following formulas based on different fault types: In case of single-phase grounding fault: When two-phase ground fault occurs: In case of two-phase short circuit fault: Where Z g+ , Z g- and Z g0 are the positive, negative and zero sequence impedance values ​​of the power grid respectively; Z L+ and Z L0 is the positive sequence and zero sequence impedance value of the transmission line from the fault point to the wind farm; Z F is the fault branch impedance value; A3) During the fault period, positive and negative sequence reactive currents are injected according to the requirements of the grid connection guidelines. and The expression is: Where K + , K - is the positive and negative sequence reactive current proportionality coefficient, U t - are the positive and negative sequence components of the grid-connected point voltage, I N is the rated current value of the wind farm; A4) When an asymmetric short circuit occurs in the common line, the inter-sequence coupling impedance in step A2) and the positive and negative sequence reactive current values ​​in step A3) are substituted into step A1). If the wind farm needs to work at the positive sequence coupling critical conversion point, the positive sequence active current value is arbitrarily given at the same time. The negative sequence active current value can be solved If the wind farm needs to work at the negative sequence coupling critical transition point, the negative sequence active current value is given arbitrarily at the same time The positive sequence active current value can be solved A5) During the duration of the fault, if the wind farm is given the negative-sequence active current value calculated according to step A4), the influence of the inter-sequence coupling on the positive-sequence synchronous stability can be made zero, and the wind farm operates at the critical transition point of the positive-sequence coupling; if the wind farm is given the positive-sequence active current value calculated according to step A4), the influence of the inter-sequence coupling on the negative-sequence synchronous stability can be made zero, and the wind farm operates at the critical transition point of the negative-sequence coupling.