Virtual power plant dynamic interaction system and method
Through the cloud-side interconnection and cloud-cloud interconnection of the dynamic interactive system of the virtual power plant, the resource aggregation and market transactions of the virtual power plant are realized, and the problem of difficulty in integrating virtual power plants into the dispatching business scenarios is solved, and the intelligent commercial operation of the power market and the power supply capacity of the power grid is improved. .
Patent Information
- Application Number
- CN202410987230.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing virtual power plants are difficult to deal with the complex new energy consumption situation and difficult to integrate massive dispersed resources into the dispatching business scenarios, making it difficult to solve the problem of large regional electricity demand and insufficient grid margin.
A dynamic interaction system for virtual power plants is designed, including production control areas and Internet platforms, and data interaction is carried out through cloud-edge interconnection and cloud-cloud interconnection to realize the provincial scheduling automation system, prefecture-level scheduling automation system and edge clusters. Data interaction, forming a minimum control unit, aggregator aggregation and electrical topological aggregation, and participating in market transactions.
By aggregating the power supply capacity of edge clusters, providing the best allocation solution, realizing intelligent commercial operations in the power market, solving the problem of large regional electricity demand and insufficient grid margin, and improving the commercial operation efficiency and safety of the power market.
Smart Images

Figure CN118971340A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a virtual power plant dynamic interaction system and method, belonging to the technical field of power operation. Background Art
[0002] A virtual power plant (VPP) is an entity that uses advanced digital, control, IoT, and information and communications technologies to aggregate, manage, and optimize the control of distributed resources such as distributed power sources, energy storage, and adjustable loads, allowing it to participate in grid operations and electricity markets. VPPs can effectively mitigate the impact of distributed generation on distribution network operations and power quality; efficiently utilize and promote distributed energy generation; promote the optimal allocation of power generation and consumption resources through market-based mechanisms; and support the development of new power systems.
[0003] However, the current virtual power plants are unable to handle the current complex situation of new energy consumption and are unable to integrate massive distributed resources into scheduling business scenarios. Summary of the Invention
[0004] Purpose of the invention: In view of the deficiencies in the prior art, the present invention provides a virtual power plant dynamic interaction system and method to solve the problems mentioned in the above background technology.
[0005] Technical solution: A dynamic interactive system for a virtual power plant, including a production control area and an internet platform;
[0006] The production control area includes: a provincial dispatching automation system, a prefecture-level dispatching automation system and an edge cluster. The provincial dispatching automation system, the prefecture-level dispatching automation system and the edge cluster exchange data through cloud-edge interconnection.
[0007] The Internet platform includes: an external Internet center, a unified access platform for virtual power plants, and a dispatching / trading center platform; the external Internet center includes a third energy system and an aggregation platform; the external Internet center, the unified access platform for virtual power plants, the dispatching / trading center platform and the production control area exchange data through cloud-to-cloud interconnection.
[0008] The dispatching / trading center includes: a market declaration module, a market clearing module, a market release module and a market settlement module.
[0009] The provincial dispatching automation system includes: an analysis and decision-making center, a real-time monitoring center, a safety verification center, and a cloud data acquisition base;
[0010] The analysis and decision-making center includes: a power and electricity balance module, a margin assessment module and a section over-limit safety correction module;
[0011] The real-time monitoring center includes: a virtual power plant panoramic monitoring module, a virtual power plant provincial collaborative control module, and a UGC module;
[0012] The safety verification center includes: a base state power flow analysis module, a verification and clearing result module, a sensitivity analysis module and a market joint safety verification module;
[0013] The local dispatching automation system includes: a main and distribution integrated analysis and decision-making center, a main network monitoring center and a distribution network monitoring center;
[0014] The main and distribution integrated analysis and decision center includes: a main and distribution integrated safety verification module, a main and distribution integrated fault processing module, an adjustable margin analysis module, a main transformer over-limit safety correction module, a distribution over-limit safety correction module and a load forecasting module;
[0015] The edge cluster includes: virtual power plants, microgrids and distributed power supply terminals above 10kV;
[0016] The virtual power plant includes at least one minimum control unit.
[0017] A virtual power plant dynamic interaction method specifically includes the following steps:
[0018] Step 1: Establish cloud-edge interconnection between systems in the production control area, and cloud-cloud interconnection between modules on the Internet platform;
[0019] The production control area is divided into a provincial dispatching automation system, a prefecture-level dispatching automation system and an edge cluster;
[0020] The Internet platform is divided into a virtual power plant unified access platform, a dispatching / trading center platform, a third energy system and an aggregation platform;
[0021] Step 2: The local dispatching automation system sends a regulation request to the provincial dispatching automation system based on the local power regulation demand;
[0022] Step 3: The provincial dispatching automation system confirms the adjustment request, decomposes the strategy after confirmation, forms the minimum unit control instruction, verifies it, and sends it to the local dispatching automation system after successful verification;
[0023] Step 4: After receiving the minimum unit control instruction, the local dispatching automation system performs verification by sending the minimum unit control instruction to the edge cluster;
[0024] Step 5: Use the aggregation platform to aggregate edge clusters based on aggregators, electrical topology, and response time.
[0025] Step 6: The edge cluster accesses the aggregator aggregation model through cloud-to-cloud interconnection to enable the edge cluster to participate in market transactions. When the grid reserve is insufficient, the minimum control unit is sent to the edge cluster, and the edge cluster performs load decomposition control.
[0026] The cloud-edge interconnection process between the provincial dispatching automation system, the prefectural dispatching automation system, and the edge cluster in step 1 is as follows:
[0027] Regional access: Edge clusters such as virtual power plants use wireless private networks through secure access zones, adopting 104 protocols and E-files to upload basic information about virtual power plants and control capabilities to the corresponding regional dispatch automation system at a frequency of seconds or minutes.
[0028] The basic information of the virtual power plant includes: name, resource type, account number, rdf_id (rdf_id: unique ID of the smallest aggregation unit on the virtual power plant side, the unique ID of the control instruction issued by the dispatcher to the virtual power plant), the operator to which it belongs, and the regional information;
[0029] The control capability includes: control direction, response time, duration, upper adjustable amount and lower adjustable amount;
[0030] The prefecture-level dispatching automation system pushes local prefecture-level dispatching automation systems to the provincial dispatching automation system through the cross-domain service bus at a frequency of seconds. The prefecture-level dispatching automation system processes the virtual power plant data, and the processed virtual power plant data is then transmitted to the provincial dispatching automation system for aggregation.
[0031] The cloud-to-cloud interconnection process between the virtual power plant unified access platform, the dispatching / trading center platform, the third energy system, and the aggregation platform is as follows:
[0032] Through cross-platform Webservice or Restful interface services, the system uploads measurement data such as the active power and adjustable capacity of the minimum control unit at a frequency of 1 minute, and supports active data acquisition through data call.
[0033] The steps 2, 3 and 4 are specifically as follows:
[0034] The prefectural dispatching automation system sends an adjustment request to the provincial dispatching automation system. The adjustment request includes: target adjustment amount for the region / district / main transformer, response time, and duration.
[0035] The provincial dispatch automation system confirms the adjustment request and then decomposes the strategy to form the minimum unit control instruction. The minimum unit control instruction includes: rdf_id sequence, adjustment amount, response time and duration.
[0036] The safety verification module of the provincial dispatching automation system conducts a main network safety verification on the control instructions. If the verification passes, the minimum unit control instruction is sent to the local dispatching automation system. If the verification fails, the system returns to perform strategy decomposition.
[0037] After receiving the minimum unit control instruction, the local dispatching automation system will conduct a regional safety check. If the check fails, the verification failure information will be sent to the provincial dispatching automation system. The provincial dispatching automation system will re-decompose the strategy, check, and provide feedback. When the regional safety check passes, the minimum control unit instruction will be sent to the virtual power plant.
[0038] The step 5 is specifically as follows:
[0039] Aggregate according to the minimum control unit to form an aggregator aggregation model. According to the minimum control unit account number, match and analyze the data in the middle platform to obtain the main network connection point information and electrical topology aggregation to form a multi-level electrical aggregation model.
[0040] The resource response time of the minimum control unit of the edge cluster is divided into seven levels, corresponding to seconds, minutes, 15 minutes, 30 minutes, 2 hours, 4 hours, and more than 4 hours; based on the response time and duration of the minimum control unit sent by the edge cluster, the sustainable duration of resources under different electrical topology aggregation models is calculated.
[0041] The step 6 is specifically as follows:
[0042] Obtain attribute information of each virtual power plant, and model each virtual power plant as an equivalent virtual machine group in the power grid APC based on the attribute information to obtain the virtual power plant frequency control model, where the attribute information includes basic information and regulation capabilities;
[0043] Basic information includes: name, resource type, account number, rdf_id, operator and region;
[0044] Control capabilities include: control direction, response time, duration, upper adjustable amount, lower adjustable amount, etc.
[0045] Perform security verification on the edge cluster control model and real-time measurement data. After passing the verification, the edge cluster control model will be connected to the provincial dispatching automation system. The security verification includes the rationality verification of the edge cluster control parameters, the data measurement quality code verification, and the rationality verification of the measurement data, ensuring that the measurement data of the virtual power plant connected to the master station control is safe and reliable.
[0046] The edge cluster control model obtains the frequency modulation bidding results of the edge clusters, which include the edge clusters that won the bid and the edge clusters that did not win the bid;
[0047] The edge cluster control model obtains the edge cluster frequency modulation market clearing result file parsing results or frequency modulation plan;
[0048] The winning edge cluster is put into automatic frequency regulation mode. After calculating the frequency regulation demand based on the grid control method, it is allocated to the winning virtual power plant according to the allocation strategy. The allocation strategy sets the control time, adjustment step size, and correction strategy according to the regulation characteristics of the virtual power plant.
[0049] For edge clusters that did not win the bid, the planned tracking mode is put into use, and the power generation plan curve formulated according to the dispatch plan / spot market is tracked and controlled.
[0050] Beneficial effects: By aggregating information such as the power supply capacity of edge clusters, the present invention evaluates current resources, decomposes strategies, and provides optimal allocation plans through the provincial dispatching automation system when the local dispatching automation system issues an adjustment demand. Through online bidding, it automatically matches suitable edge clusters to realize intelligent commercial operations in the power market. This not only solves the problem of large regional electricity demand and insufficient grid surplus, but also drives the commercial operation of the power market, with a high degree of matching and a safe and fast execution process. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are merely embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0052] Figure 1 This is a structural diagram of the cloud-edge interconnection of the production area in an embodiment of the present invention.
[0053] Figure 2 This is a cloud-edge interconnection control flow chart of an embodiment of the present invention.
[0054] Figure 3 Schematic diagram of the cloud-to-cloud interconnection structure of an embodiment of the present invention.
[0055] Figure 4 A schematic diagram of virtual power plant aggregator generation according to an embodiment of the present invention. DETAILED DESCRIPTION
[0056] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0057] In the description of the present invention, it should be understood that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as limiting the present invention.
[0058] In the present invention, unless otherwise expressly specified or limited, a first feature being "above" or "below" a second feature may include the first and second features being in direct contact, or may include the first and second features being in contact not directly but through another feature between them. Furthermore, a first feature being "above," "above," and "above" a second feature may include the first feature being directly above or obliquely above the second feature, or may simply mean that the first feature is higher in level than the second feature. A first feature being "below," "below," and "below" a second feature may include the first feature being directly below or obliquely below the second feature, or may simply mean that the first feature is lower in level than the second feature.
[0059] like Figures 1 to 4 As shown, a virtual power plant dynamic interactive system includes a production control area and an Internet platform;
[0060] The production control area includes: a provincial dispatching automation system, a prefecture-level dispatching automation system and an edge cluster. The provincial dispatching automation system, the prefecture-level dispatching automation system and the edge cluster exchange data through cloud-edge interconnection.
[0061] The Internet platform includes: an external Internet center, a unified access platform for virtual power plants, and a dispatching / trading center platform; the external Internet center includes a third energy system and an aggregation platform; the external Internet center, the unified access platform for virtual power plants, the dispatching / trading center platform and the production control area exchange data through cloud-to-cloud interconnection.
[0062] The dispatching / trading center includes: a market declaration module, a market clearing module, a market release module and a market settlement module.
[0063] The provincial dispatching automation system includes: an analysis and decision-making center, a real-time monitoring center, a safety verification center, and a cloud data acquisition base;
[0064] The analysis and decision-making center includes: a power and electricity balance module, a margin assessment module and a section over-limit safety correction module;
[0065] The real-time monitoring center includes: a virtual power plant panoramic monitoring module, a virtual power plant provincial collaborative control module, and a UGC module;
[0066] The safety verification center includes: a base state power flow analysis module, a verification and clearing result module, a sensitivity analysis module and a market joint safety verification module;
[0067] The local dispatching automation system includes: a main and distribution integrated analysis and decision-making center, a main network monitoring center and a distribution network monitoring center;
[0068] The main and distribution integrated analysis and decision center includes: a main and distribution integrated safety verification module, a main and distribution integrated fault processing module, an adjustable margin analysis module, a main transformer over-limit safety correction module, a distribution over-limit safety correction module and a load forecasting module;
[0069] The edge cluster includes: virtual power plants, microgrids and distributed power supply terminals above 10kV;
[0070] The virtual power plant includes at least one minimum control unit.
[0071] A virtual power plant dynamic interaction method specifically includes the following steps:
[0072] Step 1: Establish cloud-edge interconnection between systems in the production control area, and cloud-cloud interconnection between modules on the Internet platform;
[0073] The production control area is divided into a provincial dispatching automation system, a prefecture-level dispatching automation system and an edge cluster;
[0074] The Internet platform is divided into a virtual power plant unified access platform, a dispatching / trading center platform, a third energy system and an aggregation platform;
[0075] Step 2: The local dispatching automation system sends a regulation request to the provincial dispatching automation system based on the local power regulation demand;
[0076] Step 3: The provincial dispatching automation system confirms the adjustment request, decomposes the strategy after confirmation, forms the minimum unit control instruction, verifies it, and sends it to the local dispatching automation system after successful verification;
[0077] Step 4: After receiving the minimum unit control instruction, the local dispatching automation system performs verification by sending the minimum unit control instruction to the edge cluster;
[0078] Step 5: Use the aggregation platform to aggregate edge clusters based on aggregators, electrical topology, and response time.
[0079] Step 6: The edge cluster accesses the aggregator aggregation model through cloud-to-cloud interconnection to enable the edge cluster to participate in market transactions. When the grid reserve is insufficient, the minimum control unit is sent to the edge cluster, and the edge cluster performs load decomposition control.
[0080] In this embodiment, taking the virtual power plant in the edge cluster as an example, the cloud-edge interconnection process between the provincial dispatching automation system, the prefecture-level dispatching automation system, and the edge cluster in step 1 is specifically as follows:
[0081] Cloud-edge interconnection between virtual power plants and prefecture-level dispatching automation systems: Each virtual power plant is connected to a secure access zone through an edge gateway, and then connected to the prefecture-level dispatching automation system in the corresponding region through the secure access zone;
[0082] Among them, the local-level dispatching automation system is equipped with a cloud-based data acquisition and processing base, which has multiple data parallel processing nodes and processes the massive virtual power plant minimum control unit data that is continuously connected through data parallel processing technology.
[0083] Cloud-edge interconnection between the prefectural and provincial dispatching automation systems: The prefectural dispatching automation system communicates with the provincial dispatching automation system via a cross-domain service bus, sending data to the provincial dispatching automation system and receiving instructions from the provincial dispatching automation system. Data interaction scenario between the prefectural and provincial dispatching automation systems: The provincial dispatching automation system decomposes the load regulation target strategy, generates minimum control unit adjustment instructions, and issues them to the virtual power plant through the prefectural dispatching automation system.
[0084] The virtual power plant and the provincial dispatching automation system are cloud-to-cloud interconnected: the provincial dispatching automation system exchanges data with each virtual power plant through the cloud server. Data interaction scenario between the provincial dispatching automation system and the virtual power plant: when the power grid reserve is insufficient, the market clearing result (minimum control unit) is sent to the virtual power plant, and the virtual power plant performs load decomposition control. Specifically, the virtual power plant can upload the virtual power plant parameter information to the control cloud through interaction methods such as Restful and Webservice. The control cloud generates the virtual power plant and minimum control unit model based on the virtual power plant parameter information. The virtual power plant model can be constructed according to the D5000 power grid model. The control cloud synchronizes the virtual power plant model to the prefecture-level dispatching automation system and the provincial dispatching automation system.
[0085] After receiving the update information of the virtual power plant, the control cloud can update the virtual power plant model and publish the modified data in the form of messages. The provincial dispatching automation system and the local dispatching automation system will subscribe to the model change messages published by the control cloud in real time to obtain the latest model information.
[0086] When the local dispatch automation system sends the load regulation instructions to the virtual power plant, the document signing / verification mechanism and timestamp identification are used to prevent the load regulation instructions from being stolen, forged, and replayed. The details are as follows:
[0087] The same key library is established at the local dispatch automation system and the virtual power plant. The key library contains multiple keys, each with a corresponding ID. The key library can be, for example, multiple quantum keys obtained through a quantum key distribution network.
[0088] The local dispatching automation system is the sender and the virtual power plant is the receiver.
[0089] S1. The sender sends a load instruction request to the receiver. After receiving the request, the receiver generates a pair of DH public key HA and private key Ha and a timestamp, and sends the DH public key HA and timestamp to the sender.
[0090] S2. After receiving the information from the receiver, the sender determines whether it is within the preset time based on the timestamp. If so, proceed to S2; if not, proceed to S1.
[0091] S3. The sender randomly selects a key I and a corresponding key identifier A from the key library, performs a hash operation on the key I, and obtains a first hash value.
[0092] S4. The sender generates a pair of DH public key HB and private key Hb, along with a timestamp. The DH public key is symmetrically encrypted using key I to obtain the encrypted DH public key HB'. The timestamp is then converted to hexadecimal to obtain a string m1. This string m1 is concatenated with the first hash value using a predefined concatenation method to obtain a string m2. The concatenation method can be, for example, end-to-end concatenation or cross-concatenation.
[0093] S5. The sender calculates a shared key KB based on the receiver's public key HA and its own private key Hb, concatenates the first hash value to the header of the load adjustment instruction to obtain plaintext, and encrypts the plaintext using the shared key KB to obtain encrypted ciphertext.
[0094] S5. The sender sends the encrypted DH public key HB', string m2 and encrypted ciphertext to the receiver.
[0095] S6. The receiver obtains key I from the key library based on key identifier A, performs a hash operation on key I to obtain a first hash value, splits string m2 based on the first hash value to obtain a timestamp, and determines whether the timestamp is within a preset time. If so, execute S7; otherwise, execute S1.
[0096] S7. The receiver decrypts the encrypted DH public key HB' using the key I to obtain the DH public key HB. The shared key KA is calculated based on the public key HB and the private key Ha, and the encrypted ciphertext is decrypted using the shared key KA to obtain the plaintext.
[0097] S8. Check whether the header of the plaintext is consistent with the first hash value. If they are consistent, execute the load adjustment instruction.
[0098] During the aforementioned data exchange process, by configuring the same keystore on both the sender and receiver, only the key ID is transmitted instead of the key itself, effectively improving transmission security. Furthermore, the timestamp is not transmitted directly, but converted to a string to ensure its authenticity. This multi-step encryption and verification process maximizes the security of load regulation instructions.
[0099] The basic information of the virtual power plant includes: name, resource type, account number, rdf_id, operator and region information;
[0100] The control capability includes: control direction, response time, duration, upper adjustable amount and lower adjustable amount;
[0101] The prefecture-level dispatching automation system pushes local prefecture-level dispatching automation systems to the provincial dispatching automation system through the cross-domain service bus at a frequency of seconds. The prefecture-level dispatching automation system processes the virtual power plant data, and the processed virtual power plant data is then transmitted to the provincial dispatching automation system for aggregation.
[0102] The cloud-to-cloud interconnection process between the virtual power plant unified access platform, the dispatching / trading center platform, the third energy system, and the aggregation platform is as follows:
[0103] Through cross-platform Webservice or Restful interface services, the system uploads measurement data such as the active power and adjustable capacity of the minimum control unit at a frequency of 1 minute, and supports active data acquisition through data call.
[0104] The control process of cloud-to-cloud interconnection is as follows: when the grid reserve is insufficient, the market clearing results (minimum control unit) are sent to the virtual power plant aggregator, which then performs load decomposition control.
[0105] The steps 2, 3 and 4 are specifically as follows:
[0106] The prefectural dispatching automation system sends an adjustment request to the provincial dispatching automation system. The adjustment request includes: target adjustment amount for the region / district / main transformer, response time, and duration.
[0107] The provincial dispatch automation system confirms the adjustment request and then decomposes the strategy to form the minimum unit control instruction. The minimum unit control instruction includes: rdf_id sequence, adjustment amount, response time and duration.
[0108] Strategy decomposition is performed according to the preset strategy decomposition algorithm, as follows:
[0109] The time period control is performed in a 15-minute cycle, and the following steps d and e are repeated in each time period until the adjustment time period ends.
[0110] Step a: Obtain the winning bid time period, winning bid capacity and operation baseline of the virtual power plant from the virtual power plant control model.
[0111] Step b: Calculate the winning capacity to obtain the winning power, where the winning power P is the ratio of the winning peak-shaving capacity to the regulation response time period.
[0112] Step c: Obtain the target value A1 of the virtual power plant's operating power and the overall baseline value A2 of the virtual power plant, where A2-A1 is the target power.
[0113] Step d: Obtain the real-time operating power value A3 of the virtual power plant, A3-(A2-A1), and obtain the power value that the virtual power plant should adjust at the current moment.
[0114] Step e: Sort the virtual power plants from low to high according to their peak-shaving contract prices, and add up the adjustable powers of the resources in sequence according to the ranking until the adjusted power is reached; if the contract prices are the same, sort them from large to small according to the adjustable powers.
[0115] (2) Frequency modulation control strategy
[0116] Step a: Regularly measure the grid frequency of the node to determine whether the frequency deviation exceeds the preset threshold; if the frequency deviation exceeds the preset threshold, determine the regulation demand ARR ESS .
[0117] ARR ESS = -10*B*(f-f0);
[0118] ARR ESS —Regulate demand;
[0119] B--Frequency deviation coefficient (MW / 0.1HZ), take a positive value.
[0120] f—measured frequency (HZ)
[0121] f0—rated frequency (HZ)
[0122] The frequency deviation coefficient is determined according to the different frequency change rates. The larger the frequency change rate, the higher the corresponding frequency deviation coefficient.
[0123] Step b: Determine the frequency regulation capability and frequency regulation contract price P of each virtual power plant aggregator. The frequency regulation capability may include the historical frequency regulation response time T, the historical frequency regulation action rate V, and the historical frequency regulation response accuracy C.
[0124] Step d: Sort the resources from high to low according to k=(V*C) / (P*T), and add the adjustable power of each resource in sequence according to the sorting until the required adjustment amount is reached.
[0125] (3) Smoothing control strategy:
[0126] Control Deviation ARR ESS The target area output smoothing target - the actual output of the target area - the total active power of each resource is calculated. The target area smoothing target is completed using the following table filtering algorithm:
[0127] P com (k) = P com (k-1)+τ·(P w-pv (k)-P com (k-1))
[0128] in:
[0129] K: Kth filtering;
[0130] τ: discrete filter factor, a given value between 0 and 1;
[0131] P com : Smoothing target, expected joint output active power;
[0132] P w-pv : Smoothing object, usually the total active power of each resource;
[0133] ARR ESS =P com (k)-P w-pv (k)-P ess (k)
[0134] The safety verification module of the provincial dispatching automation system conducts a main network safety verification on the control instructions. If the verification passes, the minimum unit control instruction is sent to the local dispatching automation system. If the verification fails, the system returns to perform strategy decomposition.
[0135] Safety checks may include:
[0136] (1) Identity verification: Authentication of the sender of the control instruction
[0137] (2) Over-limit check: Calculate the power flow of the main grid to determine whether the lines, transformers, and stable sections are over-limit;
[0138] (3) Adjustment amount verification: determine whether the adjustment increment corresponding to the adjustment instruction is greater than the given maximum adjustment amount;
[0139] (4) Adjustment range check: determine whether the adjustment instruction is within the maximum allowable discharge and maximum allowable charge range;
[0140] (5) Section constraint check: determine whether the adjustment instructions must meet the section constraints;
[0141] After receiving the minimum unit control instruction, the local dispatching automation system will conduct a regional safety check. If the check fails, the verification failure information will be sent to the provincial dispatching automation system. The provincial dispatching automation system will re-decompose the strategy, check, and provide feedback. When the regional safety check passes, the minimum control unit instruction will be sent to the virtual power plant.
[0142] Among them, for virtual power plants connected to the secure access area, a file signing / verification mechanism and timestamp identification are used to prevent load adjustment instructions from being stolen, forged and replayed.
[0143] The step 5 is specifically as follows:
[0144] Aggregate according to the minimum control unit to form an aggregator aggregation model. According to the minimum control unit account number, match and analyze the data in the middle platform to obtain the main network connection point information and electrical topology aggregation to form a multi-level electrical aggregation model.
[0145] The resource response time of the minimum control unit of the edge cluster is divided into seven levels, corresponding to seconds, minutes, 15 minutes, 30 minutes, 2 hours, 4 hours, and more than 4 hours; based on the response time and duration of the minimum control unit sent by the edge cluster, the sustainable duration of resources under different electrical topology aggregation models is calculated.
[0146] Unified access platform for virtual power plants: supports access to the external Internet through cloud-to-cloud interconnection interfaces, receives virtual power plant aggregator models, and enables virtual power plant aggregators to participate in market transactions.
[0147] The dispatching / trading center includes: market declaration, market clearing, market release and market settlement. The details are as follows:
[0148] Market declaration: Market registration and market quotation are carried out through the declaration release platform; day-ahead adjustment capabilities are uploaded through the external Internet platform, and real-time adjustment capabilities are uploaded through local distribution and adjustment;
[0149] Market Clearing: For scenarios such as peak shaving, valley filling, DC blocking, and local overload, the provincial regulator will determine the demand or the local regulator will declare the demand, and the market clearing results will be formed based on the declared prices.
[0150] Market release: The declaration release platform releases day-ahead and real-time market information and settlement results; the internet aggregation platform issues day-ahead adjustment instructions, and the local distribution platform issues real-time adjustment instructions;
[0151] Market settlement: Obtain actual electricity consumption data from marketing, combine it with predicted power to calculate forecast deviation and baseline load, and calculate market returns based on actual response and clearing results.
[0152] The step 6 is specifically as follows:
[0153] Obtain attribute information of each virtual power plant, and model each virtual power plant as an equivalent virtual machine group in the power grid APC based on the attribute information to obtain the virtual power plant frequency control model, where the attribute information includes basic information and regulation capabilities;
[0154] Basic information includes: name, resource type, account number, rdf_id, operator and region;
[0155] Control capabilities include: control direction, response time, duration, upper adjustable amount, lower adjustable amount, etc.
[0156] Conduct security verification on the virtual power plant control model and real-time measurement data. Once the verification passes, the virtual power plant control model will be connected to the provincial dispatching automation system. The security verification includes the rationality verification of the virtual power plant control parameters, the data measurement quality code verification, and the rationality verification of the measurement data, ensuring that the measurement data of the virtual power plant connected to the master station is safe and reliable.
[0157] The virtual power plant control model obtains the frequency regulation bidding results of the virtual power plant, which includes the virtual power plants that won the bid and the virtual power plants that did not win the bid;
[0158] The virtual power plant control model obtains the analysis results of the virtual power plant frequency regulation market clearing result file or the frequency regulation plan;
[0159] The winning virtual power plant is put into automatic frequency regulation mode. After calculating the frequency regulation demand based on the grid control method, it is allocated to the winning virtual power plant according to the allocation strategy. The allocation strategy sets the control time, adjustment step size and correction strategy according to the regulation characteristics of the virtual power plant.
[0160] For virtual power plants that did not win the bid, the plan tracking mode is put into use, and the power generation plan curve formulated according to the dispatch plan / spot market is tracked and controlled.
[0161] The automatic frequency modulation process includes:
[0162] ① Decompose the strategy based on the frequency regulation requirements to form the control instructions for the smallest unit of the virtual power plant, including: rdf_id sequence, control time, adjustment step size, and correction strategy.
[0163] ② The provincial dispatching automation system safety verification module performs a main network safety verification on the control instructions, and sends the control instructions to the local distribution after the verification passes; if the verification fails, it returns to perform strategy decomposition.
[0164] ③ After receiving the control instruction, the local dispatching automation system will conduct a regional safety check. If the check fails, the verification failure information will be sent to the provincial dispatching automation system, and the provincial dispatching automation system will re-decompose the strategy, check, and provide feedback.
[0165] ④ When the regional safety check is passed, the minimum control unit instruction is sent to the virtual power plant.
[0166] The system also includes a virtual power plant frequency regulation control performance evaluation unit, which automatically calculates and compiles statistics for the virtual power plant's regulation performance and contribution. This unit supports the calculation and statistics of subsequent assessment and compensation costs for the virtual power plant. The unit primarily includes online statistics for virtual power plant regulation performance indicators, online statistics for regulation contribution, and regulation deviation assessment statistics. Virtual power plant regulation performance indicators can include response time, regulation speed, and regulation accuracy.
[0167] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. Reference can be made to the common and similar parts between the various embodiments. For the devices disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple, and the relevant parts can be referred to the method description.
[0168] The above description of the disclosed embodiments is intended to enable one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention is not limited to the embodiments shown herein but is intended to conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A virtual power plant dynamic interactive system, characterized by: Including production control area and Internet platform; The production control area includes: a provincial dispatching automation system, a prefectural dispatching automation system and an edge cluster, and the provincial dispatching automation system, the prefectural dispatching automation system and the edge cluster interact with each other through cloud-edge interconnection; The Internet platform includes: an external Internet center, a unified access platform for virtual power plants, and a dispatching / trading center platform; the external Internet center includes a third energy system and an aggregation platform; the external Internet center, the unified access platform for virtual power plants, the dispatching / trading center platform, and the production control area interact with data through cloud-to-cloud interconnection.
2. The virtual power plant dynamic interaction system according to claim 1, characterized in that: The provincial dispatching automation system includes: an analysis and decision-making center, a real-time monitoring center, a safety verification center and a cloud data acquisition base; The analysis and decision-making center includes: an electric power balance module, a margin assessment module and a section over-limit safety correction module; The real-time monitoring center includes: a virtual power plant panoramic monitoring module, a virtual power plant provincial collaborative control module, and a UGC module; The safety verification center includes: a base state power flow analysis module, a verification and clearing result module, a sensitivity analysis module and a market joint safety verification module; The local dispatching automation system includes: a main and distribution integrated analysis and decision-making center, a main network monitoring center and a distribution network monitoring center; The main and distribution integrated analysis and decision center includes: a main and distribution integrated safety verification module, a main and distribution integrated fault processing module, an adjustable margin analysis module, a main transformer over-limit safety correction module, a distribution over-limit safety correction module and a load prediction module; The edge cluster includes: virtual power plants, microgrids and distributed power supply terminals above 10kv; The virtual power plant includes at least one minimum control unit.
3. The virtual power plant dynamic interaction system according to claim 1, characterized in that: The dispatching / trading center includes: a market declaration module, a market clearing module, a market publishing module and a market settlement module.
4. A virtual power plant dynamic interaction method, characterized in that: Step 1: Establish cloud-edge interconnection between systems in the production control area, and cloud-cloud interconnection between modules of the Internet platform; The production control area is divided into a provincial dispatching automation system, a prefecture-level dispatching automation system and an edge cluster; The Internet platform is divided into a virtual power plant unified access platform, a dispatching / trading center platform, a third energy system and an aggregation platform; Step 2: The local dispatching automation system sends a regulation request to the provincial dispatching automation system according to the local power regulation demand; Step 3: The provincial dispatching automation system confirms the adjustment request, decomposes the strategy after confirmation, forms the minimum unit control instruction, verifies it, and sends it to the local dispatching automation system after successful verification; Step 4: After receiving the minimum unit control instruction, the local dispatching automation system performs verification by sending the minimum unit control instruction to the edge cluster; Step 5: Through the aggregation platform, perform aggregator aggregation, electrical topology aggregation, and response time aggregation on the edge cluster; Step 6: The edge cluster accesses the aggregator aggregation model through cloud-to-cloud interconnection to enable the edge cluster to participate in market transactions. When the power grid reserve is insufficient, the minimum control unit is sent to the edge cluster, and the edge cluster performs load decomposition control.
5. The virtual power plant dynamic interaction method according to claim 4, characterized in that: The cloud-edge interconnection process between the provincial dispatching automation system, the prefectural dispatching automation system and the edge cluster in step 1 is specifically as follows: Regional access: The edge cluster uses the wireless private network through the secure access zone, adopts 104 protocol and E file, and sends the basic information of the virtual power plant and the control capability information data to the local dispatching automation system of the corresponding region at a frequency of seconds or minutes; The basic information of the virtual power plant includes: name, resource type, account number, rdf_id, operator and region information; The control capability includes: control direction, response time, duration, upper adjustable amount and lower adjustable amount; The local dispatching automation system pushes local dispatching automation systems to access the provincial dispatching automation system through the cross-domain service bus at a frequency of seconds. The local dispatching automation system processes the virtual power plant data, and the processed virtual power plant data is then transmitted to the provincial dispatching automation system for aggregation; The cloud-to-cloud interconnection process between the virtual power plant unified access platform, the dispatching / trading center platform, the third energy system and the aggregation platform is as follows: Through the cross-platform interface service mode, the active power and adjustable capacity data of the minimum control unit are sent at a frequency of 1 minute, and the data call method is supported to actively obtain data.
6. The virtual power plant dynamic interaction method according to claim 4, characterized in that: The steps 2, 3 and 4 are specifically as follows: The local dispatching automation system sends a regulation request to the provincial dispatching automation system. The regulation request includes: target regulation amount of the region / district / main transformer, response time and duration; The provincial dispatching automation system confirms the adjustment request, decomposes the strategy after confirmation, and forms the minimum unit control instruction; wherein the minimum unit control instruction includes: rdf_id sequence, adjustment amount, response time and duration; The safety verification module of the provincial dispatching automation system conducts a main network safety verification on the control instructions. After the verification passes, the minimum unit control instruction is sent to the local dispatching automation system. If the verification fails, it returns to perform strategy decomposition. After receiving the minimum unit control instruction, the local dispatching automation system will conduct a regional safety check. If the check fails, the verification failure information will be sent to the provincial dispatching automation system. The provincial dispatching automation system will re-decompose, check and feedback the strategy. When the regional safety check passes, the minimum control unit instruction will be issued to the virtual power plant.
7. The virtual power plant dynamic interaction method according to claim 4, characterized in that: The step 5 is specifically as follows: Aggregate according to the minimum control unit to form an aggregator aggregation model. According to the minimum control unit account number, the main network connection point information and electrical topology aggregation are obtained through data center matching and topology analysis to form a multi-level electrical aggregation model. The minimum control unit resource response time of the edge cluster is divided into seven levels, corresponding to seconds, minutes, 15 minutes, 30 minutes, 2 hours, 4 hours, and more than 4 hours. According to the response time and duration of the minimum control unit sent by the edge cluster, the sustainable duration of resources under different electrical topology aggregation models is calculated.
8. The virtual power plant dynamic interaction method according to claim 4, characterized in that: The step 6 is specifically as follows: Obtain the attribute information of each virtual power plant, and model each virtual power plant as an equivalent virtual machine group in the power grid APC according to the attribute information to obtain the frequency regulation control model of the virtual power plant, wherein the attribute information includes basic information and regulation capability; Basic information includes: name, resource type, account number, rdf_id, operator and region; The control capability includes: control direction, response time, duration, upper adjustable amount and lower adjustable amount; Conduct security verification on the edge cluster control model and real-time measurement data. After passing the verification, the edge cluster control model will be connected to the provincial dispatching automation system. Among them, the security verification includes the rationality verification of edge cluster control parameters, data measurement quality code verification and measurement data rationality verification to ensure that the measurement data of the virtual power plant connected to the master station control is safe and reliable. The edge cluster control model obtains the frequency modulation winning results of the edge clusters, and the frequency modulation winning results include the edge clusters that have won the bid and the edge clusters that have not won the bid; The edge cluster control model obtains the edge cluster frequency modulation market clearing result file parsing result or frequency modulation plan; The winning edge cluster is put into automatic frequency regulation mode. After the frequency regulation demand is calculated according to the power grid control method, it is allocated to the winning virtual power plant according to the allocation strategy. The allocation strategy sets the control time, adjustment step and correction strategy according to the regulation characteristics of the virtual power plant. The edge clusters that did not win the bid are put into plan tracking mode and track and control the power generation plan curve formulated according to the dispatch plan / spot market.
Citation Information
Patent Citations
Cloud group edge power grid hierarchical group control and group scheduling system
CN115313393A
Cloud edge collaborative virtual power plant scheduling method and device and computer equipment
CN116207793A
Cited By
Shared energy storage configuration method and apparatus for new energy power station cluster, electronic device and storage medium
WO2026108005A1