Information processing method, device and equipment

By calculating the SL-PRS channel busyness rate, using information such as received signal strength and pattern occupancy rate, the problem of difficulty in determining the channel busyness rate in the prior art is solved, and the success rate of SL-PRS transmission is improved.

CN118972003APending Publication Date: 2024-11-15DATANG MOBILE COMM EQUIP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202310544251.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-15
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The prior art cannot accurately determine the channel busy rate of the direct link positioning reference signal (SL-PRS), which leads to difficulty in selecting transmission parameters and affects the transmission success rate.

Method used

By calculating the SL-PRS channel busyness rate, using the SL-PRS measurement information, including received signal strength, received power, pattern occupancy rate, etc., a specific formula and method are used to determine the channel busyness rate, and the transmission parameters are adjusted according to this rate.

Benefits of technology

Effectively obtain the busy rate of SL-PRS channel, support appropriate transmission parameters selection, reduce the probability of transmission failure, and improve the transmission success rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118972003A_ABST
    Figure CN118972003A_ABST
Patent Text Reader

Abstract

The invention provides an information processing method, device and equipment, and the information processing method comprises the steps: calculating the channel busy rate of a direct link positioning reference signal (SL-PRS) according to first information; wherein the first information at least comprises measurement information of the SL-PRS. According to the scheme, the SL-PRS channel busy rate can be effectively obtained, so that the appropriate SL-PRS transmission parameters are determined according to the SL-PRS channel busy rate, the probability of SL-PRS transmission failure caused by the improper SL-PRS transmission parameters is reduced, and the SL-PRS transmission success rate is improved; the problem that the busy rate of the SL-PRS channel cannot be accurately determined in the prior art is well solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communication technology, and in particular to an information processing method, device and equipment. Background Art

[0002] In the existing NR (new radio access technology) positioning technology, only the downlink positioning reference signal and the uplink positioning reference signal are defined in the air interface between the base station and the terminal, and the direct link positioning reference signal (SL-PRS) is not defined in the PC5 (short range communication port 5) interface between the terminals. Considering the relative positioning between terminals, that is, the need for direct link positioning, it is necessary to introduce the direct link positioning reference signal transmitted between the terminals, so that the terminals do not rely on the downlink positioning reference signal or the uplink positioning reference signal, but directly use the SL-PRS to complete the relative positioning process between the terminals (that is, the terminals do not rely on the base station, but directly complete the positioning process in the direct link).

[0003] However, when SL-PRS is introduced, it is necessary to clarify the relevant conditions of the channel (such as the channel busy condition) to ensure the accurate transmission of SL-PRS, but there is no relevant solution in the prior art.

[0004] As described above, the existing technology has problems such as being unable to accurately determine the SL-PRS channel busy rate. Summary of the invention

[0005] The purpose of the present application is to provide an information processing method, apparatus and device to solve the problem in the prior art that it is impossible to accurately determine the busy rate of the SL-PRS channel.

[0006] In order to solve the above technical problems, an embodiment of the present application provides an information processing method, which is applied to a terminal, including:

[0007] Calculate the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information;

[0008] The first information at least includes measurement information of SL-PRS.

[0009] In some embodiments, the measurement information of the SL-PRS includes at least one of the following:

[0010] Fully perceived measurement information;

[0011] Measurement information for partial or periodic sensing;

[0012] Measurement information of the configured full-sensing measurement window;

[0013] Measurement information for reappraisal or short-term perception.

[0014] In some embodiments, the first information includes at least one of the following sub-information:

[0015] Direct link positioning reference signal received signal strength indication SL-PRS RSSI;

[0016] Direct link positioning reference signal received power SL-PRS RSRP;

[0017] Physical direct link control channel received signal strength indication PSCCH RSSI;

[0018] Physical direct link control channel reference signal received power PSCCH RSRP;

[0019] Through link received signal strength indication SL-RSSI;

[0020] Direct link reference signal received power SL-RSRP;

[0021] Physical direct link shared channel received signal strength indication PSSCH RSSI;

[0022] Physical direct link shared channel reference signal received power PSSCH RSRP;

[0023] SL-PRS pattern occupancy.

[0024] In some embodiments, the first information includes at least two items of the sub-information;

[0025] The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0026] The SL-PRS channel busy rate is calculated according to the sub-information with the largest value among the at least two items of the sub-information.

[0027] In some embodiments, the first information is based on SL-PRS dedicated resource pool measurement.

[0028] In some embodiments, the first information is based on SL-PRS shared resource pool measurement;

[0029] The method further comprises:

[0030] In the SL-PRS shared resource pool, measuring second information related to a busy rate of a direct link SL channel;

[0031] The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0032] Calculate the SL-PRS candidate channel busy rate according to the first information;

[0033] Calculate the SL channel busy rate according to the second information;

[0034] The maximum value of the SL-PRS candidate channel busy rate and the SL channel busy rate is obtained as the SL-PRS channel busy rate.

[0035] In some embodiments, the second information includes at least one of the following sub-information:

[0036] SL-PRS RSSI;

[0037] SL-PRS RSRP;

[0038] PSCCH RSSI;

[0039] PSCCH RSRP;

[0040] SL-RSSI;

[0041] SL-RSRP;

[0042] PSSCH RSSI;

[0043] PSSCH RSRP;

[0044] SL-PRS pattern occupancy.

[0045] In some embodiments, the SL-PRS pattern occupancy rate refers to a ratio between the number of first combs and the number of second combs in the SL-PRS comb pattern;

[0046] Wherein, the first number of combs refers to the number of combs that have been occupied;

[0047] The second number of combs refers to the number of all available combs.

[0048] In some embodiments, the first information is obtained by measuring the terminal performing full sensing operation within a first sensing measurement window;

[0049] Or, the first information is measured by the terminal performing a partial sensing operation or a periodic sensing operation within a second sensing measurement window;

[0050] Or, the first information is measured by the terminal performing a re-evaluation operation or a short-term sensing operation within a third sensing measurement window;

[0051] The first perception measurement window is a full perception measurement window, the second perception measurement window is a partial perception measurement window or a periodic perception measurement window, and the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window.

[0052] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the first subchannel in the resource pool;

[0053] The first sub-channel refers to a sub-channel in which the first information measured by the terminal exceeds a configured or pre-configured threshold value.

[0054] In some embodiments, the first information is periodically measured in the first perception measurement window, the second perception measurement window, or the third perception measurement window;

[0055] Alternatively, the first information is obtained by measuring triggered by SL-PRS transmission requirement information.

[0056] In some embodiments, the calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0057] The first formula is used to calculate the SL-PRS channel busy rate;

[0058] Among them, the first formula is:

[0059]

[0060] SL_PRS_CBR n Indicates the SL-PRS channel busy rate at time slot or time n;

[0061] N SC Indicates the number of sub-channels for which the first information measured by the terminal exceeds a configured or preconfigured threshold value;

[0062] N SC_Total Indicates the total number of subchannels in the resource pool.

[0063] In some embodiments, the first information is measured by the terminal performing the partial sensing operation in the first time slot;

[0064] The first time slot refers to the time slot in which the terminal receives the physical direct link control channel PSCCH and / or SL-PRS within the channel busy rate CBR measurement window.

[0065] In some embodiments, the calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0066] In the time slot where the first information is measured, the SL-PRS channel busy rate is calculated according to the first information.

[0067] In some embodiments, it also includes:

[0068] In a case where the number of the first time slots is less than a configured or pre-configured first threshold, the configured or pre-configured first preset value is used as the SL-PRS channel busy rate.

[0069] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the second subchannel in the resource pool;

[0070] Among them, the second subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

[0071] In some embodiments, the K SL-PRS sensing opportunities or periodic sensing opportunities are opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters.

[0072] In some embodiments, for each sub-channel, the corresponding value of the first information is: an average value or a maximum value of all measured values ​​of the first information in the K SL-PRS sensing occasions or periodic sensing occasions.

[0073] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the third subchannel in the resource pool;

[0074] Among them, the third subchannel refers to the subchannel where the first information measured by the terminal exceeds the configured or preconfigured threshold value, and the first information is sensed and measured by the terminal in all perception opportunities or periodic perception opportunities within the fourth perception measurement window.

[0075] In some embodiments, the start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, a third perception measurement window, or a fourth perception measurement window;

[0076] The value of T is configured by signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100 ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0077] In some embodiments, for each sub-channel, the corresponding value of the first information is: an average value or a maximum value of all measurement values ​​of the first information in all sensing occasions or periodic sensing occasions within the fourth sensing measurement window.

[0078] In some embodiments, it also includes:

[0079] Sending the SL-PRS channel busy rate and first indication information to the first device;

[0080] Wherein, the first device is a terminal or a network device;

[0081] The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0082] In some embodiments, it also includes:

[0083] Determining SL-PRS transmission parameters according to the SL-PRS channel busy rate;

[0084] The SL-PRS transmission parameters include: SL-PRS maximum transmit power, and / or SL-PRS sub-channel number range.

[0085] The embodiment of the present application further provides an information processing method, which is applied to a first device, including:

[0086] receiving a SL-PRS channel busy rate and first indication information sent by a terminal;

[0087] Wherein, the first device is a terminal or a network device;

[0088] The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0089] In some embodiments, it also includes:

[0090] A first perception measurement window is configured for the terminal performing a full perception operation; the first perception measurement window is a full perception measurement window; or, a second perception measurement window is configured for the terminal performing a partial perception operation or a periodic perception operation; the second perception measurement window is a partial perception measurement window or a periodic perception measurement window; or, a third perception measurement window is configured for the terminal performing a reassessment operation or a short-term perception operation; the third perception measurement window is a reassessment measurement window or a short-term perception measurement window;

[0091] and / or, sending a configured threshold value to the terminal, so that the terminal can obtain the first sub-channel, the second sub-channel, or the third sub-channel;

[0092] and / or, configuring the first perception measurement window, the second perception measurement window or the third perception measurement window periodically for the terminal, so that the terminal can periodically measure the first information in the first perception measurement window, the second perception measurement window or the third perception measurement window;

[0093] And / or, configuring a first threshold for the terminal so that the terminal can use a configured or preconfigured first preset value as the SL-PRS channel busy rate when the number of first time slots is less than the first threshold; the first time slot refers to a time slot in which the terminal receives PSCCH and / or SL-PRS within a channel busy rate CBR measurement window;

[0094] And / or, configure high-level parameters of SL-PRS perception timing or periodic perception timing to the terminal, so that the terminal can use the timings corresponding to all bits configured as 1 in the high-level parameters as K SL-PRS perception timings or periodic perception timings, where K is a natural number greater than or equal to 1.

[0095] In some embodiments, the start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, or a third perception measurement window;

[0096] The value of T is configured to the terminal by the first device through signaling, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0097] The embodiment of the present application further provides an information processing device, which is a terminal and includes a memory, a transceiver, and a processor:

[0098] A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations:

[0099] Calculate the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information;

[0100] The first information at least includes measurement information of SL-PRS.

[0101] In some embodiments, the measurement information of the SL-PRS includes at least one of the following:

[0102] Fully perceived measurement information;

[0103] Measurement information for partial or periodic sensing;

[0104] Measurement information of the configured full-sensing measurement window;

[0105] Measurement information for reappraisal or short-term perception.

[0106] In some embodiments, the first information includes at least one of the following sub-information:

[0107] Direct link positioning reference signal received signal strength indication SL-PRS RSSI;

[0108] Direct link positioning reference signal received power SL-PRS RSRP;

[0109] Physical direct link control channel received signal strength indication PSCCH RSSI;

[0110] Physical direct link control channel reference signal received power PSCCH RSRP;

[0111] Through link received signal strength indication SL-RSSI;

[0112] Direct link reference signal received power SL-RSRP;

[0113] Physical direct link shared channel received signal strength indication PSSCH RSSI;

[0114] Physical direct link shared channel reference signal received power PSSCH RSRP;

[0115] SL-PRS pattern occupancy.

[0116] In some embodiments, the first information includes at least two items of the sub-information;

[0117] The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0118] The SL-PRS channel busy rate is calculated according to the sub-information with the largest value among the at least two items of the sub-information.

[0119] In some embodiments, the first information is based on SL-PRS dedicated resource pool measurement.

[0120] In some embodiments, the first information is based on SL-PRS shared resource pool measurement;

[0121] The operations also include:

[0122] In the SL-PRS shared resource pool, measuring second information related to a busy rate of a direct link SL channel;

[0123] The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0124] Calculate the SL-PRS candidate channel busy rate according to the first information;

[0125] Calculate the SL channel busy rate according to the second information;

[0126] The maximum value of the SL-PRS candidate channel busy rate and the SL channel busy rate is obtained as the SL-PRS channel busy rate.

[0127] In some embodiments, the second information includes at least one of the following sub-information:

[0128] SL-PRS RSSI;

[0129] SL-PRS RSRP;

[0130] PSCCH RSSI;

[0131] PSCCH RSRP;

[0132] SL-RSSI;

[0133] SL-RSRP;

[0134] PSSCH RSSI;

[0135] PSSCH RSRP;

[0136] SL-PRS pattern occupancy.

[0137] In some embodiments, the SL-PRS pattern occupancy rate refers to a ratio between the number of first combs and the number of second combs in the SL-PRS comb pattern;

[0138] Wherein, the first number of combs refers to the number of combs that have been occupied;

[0139] The second number of combs refers to the number of all available combs.

[0140] In some embodiments, the first information is obtained by measuring the terminal performing full sensing operation within a first sensing measurement window;

[0141] Or, the first information is measured by the terminal performing a partial sensing operation or a periodic sensing operation within a second sensing measurement window;

[0142] Or, the first information is measured by the terminal performing a re-evaluation operation or a short-term sensing operation within a third sensing measurement window;

[0143] The first perception measurement window is a full perception measurement window, the second perception measurement window is a partial perception measurement window or a periodic perception measurement window, and the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window.

[0144] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the first subchannel in the resource pool;

[0145] The first sub-channel refers to a sub-channel in which the first information measured by the terminal exceeds a configured or pre-configured threshold value.

[0146] In some embodiments, the first information is periodically measured in the first perception measurement window, the second perception measurement window, or the third perception measurement window;

[0147] Alternatively, the first information is obtained by measuring triggered by SL-PRS transmission requirement information.

[0148] In some embodiments, the calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0149] The first formula is used to calculate the SL-PRS channel busy rate;

[0150] Among them, the first formula is:

[0151]

[0152] SL_PRS_CBR n Indicates the SL-PRS channel busy rate at time slot or time n;

[0153] N SC Indicates the number of sub-channels for which the first information measured by the terminal exceeds a configured or preconfigured threshold value;

[0154] N SC_Total Indicates the total number of subchannels in the resource pool.

[0155] In some embodiments, the first information is measured by the terminal performing the partial sensing operation in the first time slot;

[0156] The first time slot refers to the time slot in which the terminal receives the physical direct link control channel PSCCH and / or SL-PRS within the channel busy rate CBR measurement window.

[0157] In some embodiments, the calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0158] In the time slot where the first information is measured, the SL-PRS channel busy rate is calculated according to the first information.

[0159] In some embodiments, the operations further include:

[0160] In a case where the number of the first time slots is less than a configured or pre-configured first threshold, the configured or pre-configured first preset value is used as the SL-PRS channel busy rate.

[0161] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the second subchannel in the resource pool;

[0162] Among them, the second subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

[0163] In some embodiments, the K SL-PRS sensing opportunities or periodic sensing opportunities are opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters.

[0164] In some embodiments, for each sub-channel, the corresponding value of the first information is: an average value or a maximum value of all measured values ​​of the first information in the K SL-PRS sensing occasions or periodic sensing occasions.

[0165] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the third subchannel in the resource pool;

[0166] Among them, the third subchannel refers to the subchannel where the first information measured by the terminal exceeds the configured or preconfigured threshold value, and the first information is sensed and measured by the terminal in all perception opportunities or periodic perception opportunities within the fourth perception measurement window.

[0167] In some embodiments, the start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, a third perception measurement window, or a fourth perception measurement window;

[0168] The value of T is configured by signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100 ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0169] In some embodiments, for each sub-channel, the corresponding value of the first information is: an average value or a maximum value of all measurement values ​​of the first information in all sensing occasions or periodic sensing occasions within the fourth sensing measurement window.

[0170] In some embodiments, the operations further include:

[0171] Sending the SL-PRS channel busy rate and first indication information to the first device through the transceiver;

[0172] Wherein, the first device is a terminal or a network device;

[0173] The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0174] In some embodiments, the operations further include:

[0175] Determining SL-PRS transmission parameters according to the SL-PRS channel busy rate;

[0176] The SL-PRS transmission parameters include: SL-PRS maximum transmit power, and / or SL-PRS sub-channel number range.

[0177] The embodiment of the present application further provides an information processing device, which is a first device and includes a memory, a transceiver, and a processor:

[0178] A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations:

[0179] Receiving, by the transceiver, the SL-PRS channel busy rate and the first indication information sent by the terminal;

[0180] Wherein, the first device is a terminal or a network device;

[0181] The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0182] In some embodiments, the operations further include:

[0183] By means of the transceiver, a first perception measurement window is configured for the terminal that performs a full perception operation; the first perception measurement window is a full perception measurement window; or, a second perception measurement window is configured for the terminal that performs a partial perception operation or a periodic perception operation; the second perception measurement window is a partial perception measurement window or a periodic perception measurement window; or, a third perception measurement window is configured for the terminal that performs a reassessment operation or a short-term perception operation; the third perception measurement window is a reassessment measurement window or a short-term perception measurement window;

[0184] and / or, sending a configured threshold value to the terminal, so that the terminal can obtain the first sub-channel, the second sub-channel, or the third sub-channel;

[0185] and / or, configuring the first perception measurement window, the second perception measurement window or the third perception measurement window periodically for the terminal, so that the terminal can periodically measure the first information in the first perception measurement window, the second perception measurement window or the third perception measurement window;

[0186] And / or, configuring a first threshold for the terminal so that the terminal can use a configured or preconfigured first preset value as the SL-PRS channel busy rate when the number of first time slots is less than the first threshold; the first time slot refers to a time slot in which the terminal receives PSCCH and / or SL-PRS within a channel busy rate CBR measurement window;

[0187] And / or, configure high-level parameters of SL-PRS perception timing or periodic perception timing to the terminal, so that the terminal can use the timings corresponding to all bits configured as 1 in the high-level parameters as K SL-PRS perception timings or periodic perception timings, where K is a natural number greater than or equal to 1.

[0188] In some embodiments, the start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, or a third perception measurement window;

[0189] The value of T is configured to the terminal by the first device through signaling, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0190] The embodiment of the present application further provides an information processing device, applied to a terminal, including:

[0191] A first calculation unit is used to calculate a direct link positioning reference signal SL-PRS channel busy rate according to the first information;

[0192] The first information at least includes measurement information of SL-PRS.

[0193] In some embodiments, the measurement information of the SL-PRS includes at least one of the following:

[0194] Fully perceived measurement information;

[0195] Measurement information for partial or periodic sensing;

[0196] Measurement information of the configured full-sensing measurement window;

[0197] Measurement information for reappraisal or short-term perception.

[0198] In some embodiments, the first information includes at least one of the following sub-information:

[0199] Direct link positioning reference signal received signal strength indication SL-PRS RSSI;

[0200] Direct link positioning reference signal received power SL-PRS RSRP;

[0201] Physical direct link control channel received signal strength indication PSCCH RSSI;

[0202] Physical direct link control channel reference signal received power PSCCH RSRP;

[0203] Through link received signal strength indication SL-RSSI;

[0204] Direct link reference signal received power SL-RSRP;

[0205] Physical direct link shared channel received signal strength indication PSSCH RSSI;

[0206] Physical direct link shared channel reference signal received power PSSCH RSRP;

[0207] SL-PRS pattern occupancy.

[0208] In some embodiments, the first information includes at least two items of the sub-information;

[0209] The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0210] The SL-PRS channel busy rate is calculated according to the sub-information with the largest value among the at least two items of the sub-information.

[0211] In some embodiments, the first information is based on SL-PRS dedicated resource pool measurement.

[0212] In some embodiments, the first information is based on SL-PRS shared resource pool measurement;

[0213] The device also includes:

[0214] A first measuring unit, configured to measure second information related to a busy rate of a direct link SL channel in the SL-PRS shared resource pool;

[0215] The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0216] Calculate the SL-PRS candidate channel busy rate according to the first information;

[0217] Calculate the SL channel busy rate according to the second information;

[0218] The maximum value of the SL-PRS candidate channel busy rate and the SL channel busy rate is obtained as the SL-PRS channel busy rate.

[0219] In some embodiments, the second information includes at least one of the following sub-information:

[0220] SL-PRS RSSI;

[0221] SL-PRS RSRP;

[0222] PSCCH RSSI;

[0223] PSCCH RSRP;

[0224] SL-RSSI;

[0225] SL-RSRP;

[0226] PSSCH RSSI;

[0227] PSSCH RSRP;

[0228] SL-PRS pattern occupancy.

[0229] In some embodiments, the SL-PRS pattern occupancy rate refers to a ratio between the number of first combs and the number of second combs in the SL-PRS comb pattern;

[0230] Wherein, the first number of combs refers to the number of combs that have been occupied;

[0231] The second number of combs refers to the number of all available combs.

[0232] In some embodiments, the first information is obtained by measuring the terminal performing full sensing operation within a first sensing measurement window;

[0233] Or, the first information is measured by the terminal performing a partial sensing operation or a periodic sensing operation within a second sensing measurement window;

[0234] Or, the first information is measured by the terminal performing a re-evaluation operation or a short-term sensing operation within a third sensing measurement window;

[0235] The first perception measurement window is a full perception measurement window, the second perception measurement window is a partial perception measurement window or a periodic perception measurement window, and the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window.

[0236] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the first subchannel in the resource pool;

[0237] The first sub-channel refers to a sub-channel in which the first information measured by the terminal exceeds a configured or pre-configured threshold value.

[0238] In some embodiments, the first information is periodically measured in the first perception measurement window, the second perception measurement window, or the third perception measurement window;

[0239] Alternatively, the first information is obtained by measuring triggered by SL-PRS transmission requirement information.

[0240] In some embodiments, the calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0241] The first formula is used to calculate the SL-PRS channel busy rate;

[0242] Among them, the first formula is:

[0243]

[0244] SL_PRS_CBR n Indicates the SL-PRS channel busy rate at time slot or time n;

[0245] N SC Indicates the number of sub-channels for which the first information measured by the terminal exceeds a configured or preconfigured threshold value;

[0246] N SC_Total Indicates the total number of subchannels in the resource pool.

[0247] In some embodiments, the first information is measured by the terminal performing the partial sensing operation in the first time slot;

[0248] The first time slot refers to the time slot in which the terminal receives the physical direct link control channel PSCCH and / or SL-PRS within the channel busy rate CBR measurement window.

[0249] In some embodiments, the calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes:

[0250] In the time slot where the first information is measured, the SL-PRS channel busy rate is calculated according to the first information.

[0251] In some embodiments, it also includes:

[0252] The first processing unit is configured to use a configured or preconfigured first preset value as a SL-PRS channel busy rate when the number of the first time slots is less than a configured or preconfigured first threshold.

[0253] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the second subchannel in the resource pool;

[0254] Among them, the second subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

[0255] In some embodiments, the K SL-PRS sensing opportunities or periodic sensing opportunities are opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters.

[0256] In some embodiments, for each sub-channel, the corresponding value of the first information is: an average value or a maximum value of all measured values ​​of the first information in the K SL-PRS sensing occasions or periodic sensing occasions.

[0257] In some embodiments, the SL-PRS channel busy rate at time slot or time n refers to the portion of the third subchannel in the resource pool;

[0258] Among them, the third subchannel refers to the subchannel where the first information measured by the terminal exceeds the configured or preconfigured threshold value, and the first information is sensed and measured by the terminal in all perception opportunities or periodic perception opportunities within the fourth perception measurement window.

[0259] In some embodiments, the start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, a third perception measurement window, or a fourth perception measurement window;

[0260] The value of T is configured by signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100 ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0261] In some embodiments, for each sub-channel, the corresponding value of the first information is: an average value or a maximum value of all measurement values ​​of the first information in all sensing occasions or periodic sensing occasions within the fourth sensing measurement window.

[0262] In some embodiments, it also includes:

[0263] A first sending unit, configured to send the SL-PRS channel busy rate and first indication information to a first device;

[0264] Wherein, the first device is a terminal or a network device;

[0265] The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0266] In some embodiments, it also includes:

[0267] A first determining unit, configured to determine a SL-PRS transmission parameter according to the SL-PRS channel busy rate;

[0268] The SL-PRS transmission parameters include: SL-PRS maximum transmit power, and / or SL-PRS sub-channel number range.

[0269] The embodiment of the present application further provides an information processing apparatus, applied to a first device, including:

[0270] A first receiving unit, configured to receive an SL-PRS channel busy rate and first indication information sent by a terminal;

[0271] Wherein, the first device is a terminal or a network device;

[0272] The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0273] In some embodiments, it also includes:

[0274] A first configuration unit is configured to configure a first perception measurement window for the terminal performing a full perception operation; the first perception measurement window is a full perception measurement window; or, configure a second perception measurement window for the terminal performing a partial perception operation or a periodic perception operation; the second perception measurement window is a partial perception measurement window or a periodic perception measurement window; or, configure a third perception measurement window for the terminal performing a reassessment operation or a short-term perception operation; the third perception measurement window is a reassessment measurement window or a short-term perception measurement window;

[0275] and / or, sending a configured threshold value to the terminal, so that the terminal can obtain the first sub-channel, the second sub-channel, or the third sub-channel;

[0276] and / or, configuring the first perception measurement window, the second perception measurement window or the third perception measurement window periodically for the terminal, so that the terminal can periodically measure the first information in the first perception measurement window, the second perception measurement window or the third perception measurement window;

[0277] And / or, configuring a first threshold for the terminal so that the terminal can use a configured or preconfigured first preset value as the SL-PRS channel busy rate when the number of first time slots is less than the first threshold; the first time slot refers to a time slot in which the terminal receives PSCCH and / or SL-PRS within a channel busy rate CBR measurement window;

[0278] And / or, configure high-level parameters of SL-PRS perception timing or periodic perception timing to the terminal, so that the terminal can use the timings corresponding to all bits configured as 1 in the high-level parameters as K SL-PRS perception timings or periodic perception timings, where K is a natural number greater than or equal to 1.

[0279] In some embodiments, the start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, or a third perception measurement window;

[0280] The value of T is configured to the terminal by the first device through signaling, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0281] An embodiment of the present application also provides a non-transitory readable storage medium, which stores a computer program, and the computer program is used to enable a processor to execute the above-mentioned method on the terminal side or the first device side.

[0282] The beneficial effects of the above technical solution of the present application are as follows:

[0283] In the above scheme, the information processing method calculates the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information; wherein the first information at least includes the measurement information of the SL-PRS; it is capable of effectively obtaining the SL-PRS channel busy rate, and then supporting the determination of appropriate SL-PRS transmission parameters based on this, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters, and improving the SL-PRS transmission success rate; it is a good solution to the problem that the existing technology cannot accurately determine the SL-PRS channel busy rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0284] Figure 1 A schematic diagram of the wireless communication system architecture of an embodiment of the present application;

[0285] Figure 2 This is a schematic diagram of positioning using a direct link positioning reference signal (SL-PRS) in an embodiment of the present application;

[0286] Figure 3 Schematic diagram of the information processing method of the present invention Figure 1 ;

[0287] Figure 4 Schematic diagram of the information processing method of the present invention Figure 2 ;

[0288] Figure 5 Specific implementation diagram of the information processing method in the embodiment of the present application Figure 1 ;

[0289] Figure 6 Specific implementation diagram of the information processing method in the embodiment of the present application Figure 2 ;

[0290] Figure 7 Specific implementation diagram of the information processing method in the embodiment of the present application Figure 3 ;

[0291] Figure 8 Specific implementation diagram of the information processing method in the embodiment of the present application Figure 4 ;

[0292] Fig. 9 Specific implementation diagram of the information processing method in the embodiment of the present application Figure 5 ;

[0293] Fig.10 Specific implementation diagram of the information processing method in the embodiment of the present application Figure 6 ;

[0294] Fig.11 Schematic diagram of the information processing device structure in the embodiment of the present application Figure 1 ;

[0295] Fig.12 Schematic diagram of the information processing device structure in the embodiment of the present application Figure 2 ;

[0296] Fig.13 Schematic diagram of the structure of the information processing device in the embodiment of the present application Figure 1 ;

[0297] Fig.14 Schematic diagram of the structure of the information processing device in the embodiment of the present application Figure 2 . DETAILED DESCRIPTION

[0298] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0299] In the embodiments of the present application, the term "and / or" describes the association relationship of the associated objects, indicating that three relationships may exist. For example, A and / or B may represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the associated objects before and after are in an "or" relationship.

[0300] In the embodiments of the present application, the term "plurality" refers to two or more than two, and other quantifiers are similar.

[0301] It is explained here that the technical solution provided in the embodiment of the present application can be applicable to a variety of systems, especially 5G systems. For example, the applicable system can be a global system of mobile communication (GSM) system, a code division multiple access (CDMA) system, a wideband code division multiple access (WCDMA) general packet radio service (GPRS) system, a long term evolution (LTE) system, a LTE frequency division duplex (FDD) system, a LTE time division duplex (TDD) system, an advanced long term evolution (LTE-A) system, a universal mobile telecommunication system (UMTS), a world-wide interoperability for microwave access (WiMAX) system, a 5G new air interface (NR) system, etc. These various systems include terminal equipment and network equipment. The system may also include a core network part, such as an evolved packet system (EPS), a 5G system (5GS), etc.

[0302] Figure 1 A block diagram of a wireless communication system applicable to the embodiments of the present application is shown. The wireless communication system includes a terminal device (also referred to as a terminal) and a network device.

[0303] The terminal device involved in the embodiment of the present application may be a device that provides voice and / or data connectivity to a user, a handheld device with a wireless connection function, or other processing devices connected to a wireless modem. In different systems, the name of the terminal device may also be different. For example, in a 5G system, the terminal device may be called a user equipment (UE). The wireless terminal device can communicate with one or more core networks (CN) via a radio access network (RAN). The wireless terminal device can be a mobile terminal device, such as a mobile phone (or a "cellular" phone) and a computer with a mobile terminal device. For example, it can be a portable, pocket-sized, handheld, computer-built-in or vehicle-mounted mobile device that exchanges language and / or data with a wireless access network. For example, personal communication service (PCS) phones, cordless phones, session initiation protocol (SIP) phones, wireless local loop (WLL) stations, personal digital assistants (PDA) and other devices. The wireless terminal device may also be referred to as a system, a subscriber unit, a subscriber station, a mobile station, a mobile station, a remote station, an access point, a remote terminal device, an access terminal device, a user terminal device, a user agent, and a user device, but is not limited in the embodiments of the present application.

[0304] The network device involved in the embodiment of the present application may be a base station, which may include multiple cells providing services for the terminal. Depending on the specific application scenario, the base station may also be called an access point, or may be a device in the access network that communicates with the wireless terminal device through one or more sectors on the air interface, or other names. The network device may be used to interchange received air frames with Internet Protocol (IP) packets, and serve as a router between the wireless terminal device and the rest of the access network, wherein the rest of the access network may include an Internet Protocol (IP) communication network. The network device may also coordinate the attribute management of the air interface. For example, the network device involved in the embodiments of the present application may be a network device (Base Transceiver Station, BTS) in the Global System for Mobile communications (Global System for Mobile communications, GSM) or Code Division Multiple Access (Code Division Multiple Access, CDMA), or a network device (NodeB) in Wide-band Code Division Multiple Access (WCDMA), or an evolutionary network device (evolutional Node B, eNB or e-NodeB) in the long term evolution (long term evolution, LTE) system, a 5G base station (gNB) in the 5G network architecture (next generation system), or a home evolved Node B (Home evolved Node B, HeNB), a relay node, a home base station (femto), a pico base station (pico), etc., which is not limited in the embodiments of the present application. In some network structures, the network device may include a centralized unit (CU) node and a distributed unit (DU) node, and the centralized unit and the distributed unit may also be arranged geographically separately.

[0305] Network devices and terminal devices can each use one or more antennas for multiple-input multiple-output (MIMO) transmission. MIMO transmission can be single-user MIMO (SU-MIMO) or multi-user MIMO (MU-MIMO). Depending on the form and number of antenna combinations, MIMO transmission can be 2D-MIMO, 3D-MIMO, FD-MIMO or massive-MIMO, or it can be diversity transmission, precoded transmission or beamforming transmission, etc.

[0306] The following first introduces the contents involved in the solution provided in the embodiment of the present application.

[0307] like Figure 2 As shown in the figure, it is a schematic diagram of terminal 1 sending a direct link positioning reference signal to terminals 2 to 4 to complete its own positioning process; wherein, terminal 1 uses time-frequency resources to send SL-PRS to terminals 2 to 4 respectively (such as sending SL-PRS1 to UE2, SL-PRS2 to UE3, and SL-PRS3 to UE4 in the figure); after receiving the SL-PRS, terminal 2 to terminal 4 send the measurement results to UE1 to assist UE1 in completing the positioning solution.

[0308] Specifically, before sending SL-PRS, the terminal needs to first determine the channel busyness of SL-PRS in the resource pool, so as to determine the time-frequency resources, transmission power and other parameters occupied by SL-PRS through the channel busyness in the resource pool. Therefore, it is still necessary to define and calculate the SL-PRS channel busy rate so that the terminal can select SL-PRS transmission parameters according to the SL-PRS channel busy rate. However, the SL-PRS channel busy rate is not defined at present, nor is it stipulated how the terminal calculates the channel busy rate, so that terminals in full perception or partial perception cannot select appropriate SL-PRS transmission parameters according to the channel busy rate. Therefore, how to define the calculation method of SL-PRS channel busy rate for terminals in full perception or partial perception, so as to effectively assist the terminal in determining SL-PRS transmission parameters, is a key problem that needs to be solved.

[0309] Based on the above, the embodiments of the present application provide an information processing method, device and equipment to solve the problem that the SL-PRS channel busy rate cannot be accurately determined in the prior art. Among them, the method, device and equipment are based on the same application concept. Since the principles of solving the problem by the method, device and equipment are similar, the implementation of the method, device and equipment can refer to each other, and the repeated parts will not be repeated.

[0310] The information processing method provided in the embodiment of the present application is applied to a terminal, such as Figure 3 As shown, including:

[0311] Step 31: Calculate the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information; wherein the first information at least includes the measurement information of the SL-PRS.

[0312] The information processing method provided in the embodiment of the present application calculates the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information; wherein the first information at least includes the measurement information of the SL-PRS; it is capable of effectively obtaining the SL-PRS channel busy rate, and then supporting the determination of appropriate SL-PRS transmission parameters based on this, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters and improving the SL-PRS transmission success rate; it is a good solution to the problem that the prior art cannot accurately determine the SL-PRS channel busy rate.

[0313] The measurement information of the SL-PRS includes at least one of the following: full-perception measurement information; partial-perception or periodic-perception measurement information; configured full-perception measurement window measurement information; re-evaluation or short-term-perception measurement information.

[0314] This can support obtaining the SL-PRS channel busy rate based on a variety of measurement information.

[0315] In an embodiment of the present application, the first information includes at least one of the following sub-information: direct link positioning reference signal received signal strength indication SL-PRS RSSI; direct link positioning reference signal received power SL-PRS RSRP; physical direct link control channel received signal strength indication PSCCH RSSI; physical direct link control channel reference signal received power PSCCH RSRP; direct link received signal strength indication SL-RSSI; direct link reference signal received power SL-RSRP; physical direct link shared channel received signal strength indication PSSCH RSSI; physical direct link shared channel reference signal received power PSSCH RSRP; SL-PRS pattern occupancy.

[0316] In this way, the specific first information can be clarified; it can also be understood that the above measurement information includes at least one of the above sub-information, but is not limited to this.

[0317] Among them, the first information includes at least two items of sub-information; the calculating the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information includes: calculating the SL-PRS channel busy rate according to the sub-information with the largest value among the at least two items of sub-information.

[0318] In this way, the SL-PRS channel busy rate can be accurately obtained.

[0319] In the embodiment of the present application, the first information may be measured based on the SL-PRS dedicated resource pool; it may also be understood that: the first information may be measured within the SL-PRS dedicated resource pool.

[0320] In this way, the SL-PRS channel busy rate calculation for the SL-PRS dedicated resource pool can be supported. The SL-PRS dedicated resource pool may be a Sidelink positioning dedicated resource pool, but is not limited thereto.

[0321] Among them, the first information can be measured based on the SL-PRS shared resource pool (it can also be understood that the first information can be measured in the SL-PRS shared resource pool); the method also includes: measuring the second information related to the busy rate of the direct link SL channel in the SL-PRS shared resource pool; the calculation of the direct link positioning reference signal SL-PRS channel busy rate based on the first information includes: calculating the SL-PRS candidate channel busy rate based on the first information; calculating the SL channel busy rate based on the second information; obtaining the maximum value of the SL-PRS candidate channel busy rate and the SL channel busy rate as the SL-PRS channel busy rate.

[0322] In this way, the SL-PRS channel busy rate can be accurately obtained. The shared resource pool may be a resource pool shared by Sidelink positioning and other purposes, and the other purposes may include Sidelink data transmission, Sidelink communication, etc., which are not limited here.

[0323] In an embodiment of the present application, the second information includes at least one of the following sub-information: SL-PRS RSSI; SL-PRSRSRP; PSCCH RSSI; PSCCH RSRP; SL-RSSI; SL-RSRP; PSSCH RSSI; PSSCH RSRP; SL-PRS pattern occupancy rate.

[0324] This makes it possible to clarify the specific first information.

[0325] The SL-PRS pattern occupancy rate refers to the ratio between the number of first combs and the number of second combs in the SL-PRS comb pattern; wherein the number of first combs refers to the number of occupied combs; and the number of second combs refers to the number of all available combs.

[0326] This makes it possible to clarify the specific SL-PRS pattern occupancy.

[0327] In an embodiment of the present application, the first information is measured by the terminal performing a full perception operation within a first perception measurement window; or, the first information is measured by the terminal performing a partial perception operation or a periodic perception operation within a second perception measurement window; or, the first information is measured by the terminal performing a re-evaluation operation or a short-term perception operation within a third perception measurement window; wherein, the first perception measurement window is a full perception measurement window, the second perception measurement window is a partial perception measurement window or a periodic perception measurement window, and the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window.

[0328] In this way, it is possible to measure the first information in different time windows for terminals performing different operations.

[0329] The SL-PRS channel busy rate in time slot or time n refers to the part of the first subchannel in the resource pool; wherein the first subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or preconfigured threshold value.

[0330] In this way, the meaning of the SL-PRS channel busy rate can be made clear.

[0331] In an embodiment of the present application, the first information is obtained by periodically measuring in the first perception measurement window, the second perception measurement window or the third perception measurement window; or, the first information is obtained by measuring triggered by SL-PRS transmission requirement information.

[0332] In this way, periodic measurement or aperiodic measurement of the first information can be achieved.

[0333] The calculating, according to the first information, the channel busy rate of the direct link positioning reference signal SL-PRS includes: using a first formula to calculate the channel busy rate of the SL-PRS; wherein the first formula is: Indicates the SL-PRS channel busy rate at time slot or time n; N SC Indicates the number of sub-channels for which the first information measured by the terminal exceeds a configured or preconfigured threshold; N SC_Total Indicates the total number of subchannels in the resource pool.

[0334] In this way, the SL-PRS channel busy rate can be accurately calculated. The resource pool may be a resource pool configured for the terminal (including a SL-PRS dedicated resource pool or a SL-PRS shared resource pool), but is not limited thereto.

[0335] In an embodiment of the present application, the first information is measured by the terminal that performs a partial sensing operation in the first time slot; wherein, the first time slot refers to the time slot in which the terminal receives the physical direct link control channel PSCCH and / or SL-PRS within the channel busy rate CBR measurement window.

[0336] In this way, the measurement of the first information can be implemented for the terminal that performs the partial sensing operation. The CBR measurement window may correspond to the second sensing measurement window, but is not limited thereto.

[0337] The calculating of the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information includes: calculating the channel busy rate of the SL-PRS according to the first information in the time slot in which the first information is measured.

[0338] In this way, the SL-PRS channel busy rate can be accurately calculated.

[0339] Furthermore, the information processing method further includes: when the number of the first time slots is less than a configured or pre-configured first threshold, using a configured or pre-configured first preset value as a SL-PRS channel busy rate.

[0340] In this way, the accuracy of the obtained SL-PRS channel busy rate can be guaranteed to a certain extent.

[0341] Among them, the SL-PRS channel busy rate in time slot or time n refers to the part of the second subchannel in the resource pool; wherein, the second subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

[0342] In this way, the meaning of the SL-PRS channel busy rate can be made clear.

[0343] In an embodiment of the present application, the K SL-PRS sensing opportunities or periodic sensing opportunities are opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters.

[0344] In this way, K SL-PRS sensing opportunities or periodic sensing opportunities can be accurately obtained.

[0345] Among them, for each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measurement values ​​of the first information in the K SL-PRS sensing opportunities or periodic sensing opportunities.

[0346] This can improve the accuracy of the corresponding numerical value of the first information.

[0347] In an embodiment of the present application, the SL-PRS channel busy rate in time slot or time n refers to the part of the third subchannel in the resource pool; wherein, the third subchannel refers to the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in all perception opportunities or periodic perception opportunities within the fourth perception measurement window.

[0348] In this way, the meaning of the SL-PRS channel busy rate can be made clear.

[0349] Among them, the start time of the target time window is the time slot or moment nT, and the end time is the time slot or moment n-1; the target time window is the first perception measurement window, the second perception measurement window, the third perception measurement window or the fourth perception measurement window; wherein, the value of T is configured by signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, wherein M and L are both positive integers greater than or equal to 1.

[0350] In this way, the target time window can be accurately obtained.

[0351] In an embodiment of the present application, for each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measurement values ​​of the first information in all sensing opportunities or periodic sensing opportunities within the fourth sensing measurement window.

[0352] This can improve the accuracy of the corresponding numerical value of the first information.

[0353] Furthermore, the information processing method also includes: sending the SL-PRS channel busy rate and first indication information to a first device; wherein the first device is a terminal or a network device; the first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool, or calculated for the SL-PRS shared resource pool.

[0354] In this way, the first device can also accurately obtain the SL-PRS channel busy rate.

[0355] In an embodiment of the present application, the information processing method further includes: determining the SL-PRS transmission parameters based on the SL-PRS channel busy rate; wherein the SL-PRS transmission parameters include: SL-PRS maximum transmission power, and / or, SL-PRS sub-channel number range.

[0356] In this way, appropriate SL-PRS transmission parameters can be accurately obtained.

[0357] The present application also provides an information processing method, which is applied to a first device, such as Figure 4 As shown, including:

[0358] Step 41: Receive the SL-PRS channel busy rate and first indication information sent by the terminal; wherein the first device is a terminal or a network device; the first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0359] The information processing method provided in the embodiment of the present application receives the SL-PRS channel busy rate and the first indication information sent by the terminal; wherein the first device is a terminal or a network device; the first indication information is used to indicate that the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or the SL-PRS shared resource pool; the SL-PRS channel busy rate sent by the terminal can be accurately obtained to support subsequent operations; and the problem that the SL-PRS channel busy rate cannot be accurately determined in the prior art is well solved.

[0360] Further, the information processing method further includes: configuring a first perception measurement window for the terminal performing a full perception operation; the first perception measurement window is a full perception measurement window; or, configuring a second perception measurement window for the terminal performing a partial perception operation or a periodic perception operation; the second perception measurement window is a partial perception measurement window or a periodic perception measurement window; or, configuring a third perception measurement window for the terminal performing a reassessment operation or a short-term perception operation; the third perception measurement window is a reassessment measurement window or a short-term perception measurement window;

[0361] And / or, sending a configured threshold value to the terminal for the terminal to obtain the first subchannel or the second subchannel or the third subchannel; and / or, configuring the first perception measurement window, the second perception measurement window or the third perception measurement window periodically to the terminal, so that the terminal can periodically measure the first information in the first perception measurement window, the second perception measurement window or the third perception measurement window; and / or, configuring a first threshold to the terminal, so that the terminal can use the configured or pre-configured first preset value as the SL-PRS channel busy rate when the number of first time slots is less than the first threshold; the first time slot refers to the time slot in which the terminal receives PSCCH and / or SL-PRS within the channel busy rate CBR measurement window; and / or, configuring high-level parameters of SL-PRS perception timing or periodic perception timing to the terminal, so that the terminal can use the timings corresponding to all bits configured as 1 in the high-level parameters as K SL-PRS perception timings or periodic perception timings, where K is a natural number greater than or equal to 1.

[0362] In this way, the terminal can accurately obtain information such as the first perception measurement window, the second perception measurement window, the third perception measurement window, the configured threshold value, the first threshold value, and / or high-level parameters of the SL-PRS perception timing or the periodic perception timing, so as to accurately perform related operations.

[0363] Among them, the start time of the target time window is the time slot or moment nT, and the end time is the time slot or moment n-1; the target time window is the first perception measurement window, the second perception measurement window or the third perception measurement window; wherein, the value of T is configured to the terminal by the first device through signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0364] This will allow the target time window to be clearly defined.

[0365] The information processing method provided in the embodiments of the present application is described below with examples.

[0366] In response to the above technical problems, an embodiment of the present application provides an information processing method, which can be specifically implemented as a method for determining (or calculating) a SL-PRS channel busy rate, involving: the terminal calculates the SL-PRS resource pool subchannel busy rate (i.e., SL-PRS channel busy rate (CBR, Channel Busy Ratio)) based on at least one of the measurement information of full sensing (FullSensing) of SL-PRS, partial sensing (Partial Sensing) or periodic sensing (Periodic Sensing) measurement information, the measurement information of the configured continuous sensing measurement window, and re-evaluation (Re-evaluation) or short-term sensing (Short-term Sensing) measurement information, to ensure direct link positioning. Specifically, using this method, the SL-PRS channel busy rate can be effectively calculated, and the appropriate SL-PRS transmission parameters can be determined based on the SL-PRS channel busy rate, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters, improving the SL-PRS transmission success rate, and better ensuring that the terminal can perform direct link positioning based on the SL-PRS. Among them, the UE can obtain the SL-PRS configuration information of other UEs through partial perception and periodic perception, but it is not limited to this. The CBR calculation can include the SL-PRS signal sent by the UE itself and the SL-PRS signal sent by other UEs, but it is not limited to this.

[0367] Specifically, this plan includes the following contents:

[0368] 1. Calculation method of SL-PRS channel busy rate;

[0369] (1) The UE measures the first information and calculates the SL-PRS channel busy rate (corresponding to calculating the direct link positioning reference signal SL-PRS channel busy rate according to the first information).

[0370] (2) The first information includes at least one item of information such as SL (direct link)-PRS (positioning reference signal) RSSI (received signal strength indication), SL-PRS RSRP (reference signal received power), PSCCH (physical direct link control channel) RSSI, PSCCH RSRP, SL-RSSI, SL-RSRP, PSSCH (physical direct link shared channel) RSSI, PSSCH RSRP, and SL-PRS pattern occupancy (or SL-PRS pattern occupancy).

[0371] (3) The second information includes at least one item of information such as SL-PRS RSSI, SL-PRS RSRP, PSCCH RSSI, PSCCH RSRP, SL-RSSI, SL-RSRP, PSSCH RSSI, PSSCH RSRP, and SL-PRS pattern occupancy rate.

[0372] (4) The SL-PRS pattern occupancy rate refers to the ratio between the number of occupied combs in the SL-PRS comb pattern (corresponding to the first number of combs mentioned above) and the number of all available combs (corresponding to the second number of combs mentioned above) (for example: the SL-PRS comb pattern includes 4 available combs, and the number of occupied combs is 1, then the SL-PRS pattern occupancy rate is 25%).

[0373] (5) The UE uses the maximum value of at least two of the information including SL-PRS RSSI, SL-PRS RSRP, PSCCH RSSI, PSCCH RSRP, SL-RSSI, SL-RSRP, PSSCH RSSI, and PSSCH RSRP to calculate the SL-PRS channel busy rate (corresponding to the first information including at least two of the sub-information; the SL-PRS channel busy rate is calculated according to the sub-information with the largest value among the at least two of the sub-information).

[0374] (6) In the SL-PRS dedicated resource pool, the UE measures the first information and calculates the SL-PRS channel busy rate (corresponding to the first information being measured in the SL-PRS dedicated resource pool).

[0375] (7) In the SL-PRS shared resource pool, the UE measures the first information (corresponding to the first information being measured in the SL-PRS shared resource pool), and calculates the SL-PRS channel busy rate (corresponding to the SL-PRS candidate channel busy rate). At the same time, the UE measures the second information, calculates the SL channel busy rate, and uses the maximum value between the SL-PRS channel busy rate and the SL channel busy rate as the final SL-PRS channel busy rate (corresponding to the maximum value between the SL-PRS candidate channel busy rate and the SL channel busy rate being obtained as the SL-PRS channel busy rate).

[0376] (8) The terminal sends the measured SL-PRS channel busy rate to other terminals, base stations or positioning management functions LMF, and indicates whether the SL-PRS channel busy rate is measured in the SL-PRS dedicated resource pool or in the SL-PRS shared resource pool (corresponding to the above-mentioned sending of the SL-PRS channel busy rate and the first indication information to the first device). Among them, the other terminal may be a head node responsible for SL-PRS resource allocation. The terminal sends the CBR to the head node to assist the head node in resource allocation, but is not limited to this.

[0377] 2. Fully perceived measurement results (taking SL-PRS RSSI as an example);

[0378] (9) The UE performing the full perception operation measures the first information within the [nT, n-1] measurement window (corresponding to the above-mentioned first perception measurement window) for calculating the channel busy rate.

[0379] (10) The SL-PRS channel busy rate at time slot or time n refers to the ratio of the number of subchannels whose SL-PRS RSSI sensed and measured by the UE within the [nT,n-1] measurement window exceeds the (pre) configured threshold value to the total number of subchannels in the resource pool; the corresponding SL-PRS channel busy rate at time slot or time n refers to the part of the first subchannel in the resource pool, or the SL-PRS channel busy rate at time slot or time n refers to the corresponding part of the first subchannel in the resource pool, or the SL-PRS channel busy rate at time slot or time n refers to the corresponding part of the first subchannel in the resource pool; wherein, the first subchannel refers to: the subchannel whose first information measured by the terminal exceeds the configured or pre-configured threshold value.

[0380] (11) The value of T is configured by signaling, or the value of T is preconfigured. When the value of T is preconfigured, T is M×100 ms or L×100 time slots, where M and L (both) are positive integers greater than or equal to 1.

[0381] (12) Configuring a periodic SL-PRS channel busy rate measurement window: The UE periodically performs SL-PRS channel busy rate measurement within the measurement window; the corresponding first information is periodically measured within the first perception measurement window.

[0382] (13) Non-periodic SL-PRS channel busy rate measurement window: The channel busy rate measurement window is triggered by the SL-PRS transmission demand; corresponding to the first information mentioned above, the measurement is triggered by the SL-PRS transmission demand information.

[0383] (14) SL-PRS channel busy rate SL_PRS_CBR of the UE in time slot or time n n The calculation formula is as follows (corresponding to the above-mentioned use of the first formula to calculate the SL-PRS channel busy rate):

[0384]

[0385] Among them, N SC_SL_PRS_RSSI Indicates the number of subchannels in the resource pool whose SL-PRS RSSI exceeds the (pre)configured threshold; that is, the number of subchannels whose first information measured by the terminal exceeds the configured or preconfigured threshold;

[0386] N SC_Total Indicates the total number of subchannels in the resource pool.

[0387] 3. Processing method for partial perception (taking SL-PRS RSSI as an example of measurement information);

[0388] (15) When the UE is configured to perform partial sensing, the SL-PRS RSSI is measured in the time slot (in which the UE performs partial sensing within the CBR measurement window and the UE performs PSCCH or SL-PRS reception); the first information corresponding to the above is measured in the first time slot by the terminal performing the partial sensing operation; wherein the first time slot refers to the time slot in which the terminal performs the physical direct link control channel PSCCH and / or SL-PRS reception within the channel busy rate CBR measurement window.

[0389] (16) The calculation of SL-PRS CBR is limited to the time slot for measuring SL-PRS RSSI (i.e., CBR is calculated in the time slot for measuring SL-PRS RSSI); corresponding to the above, in the time slot for measuring the first information, the SL-PRS channel busy rate is calculated according to the first information.

[0390] (17) If the number of SL-PRS RSSI measurement time slots within the CBR measurement window is lower than the (pre) configured threshold (corresponding to the above-mentioned first threshold), the (pre) set SL-PRS CBR value (corresponding to the above-mentioned first preset value) is used; corresponding to the above-mentioned case where the number of the first time slots is less than the configured or preconfigured first threshold, the configured or preconfigured first preset value is used as the SL-PRS channel busy rate.

[0391] 4. Measurement results of K partial sensing opportunities (a partial sensing opportunity configured as 1 in the sensing window, and the measurement information takes SL-PRS RSSI as an example);

[0392] (18) The SL-PRS channel busy rate at time slot or time n refers to the ratio of the number of sub-channels whose SL-PRS RSSI exceeds the (pre-)configured threshold value sensed and measured by the UE during the K SL-PRS partial sensing opportunities or periodic sensing opportunities before the time slot or time n to the total number of sub-channels in the resource pool; the corresponding SL-PRS channel busy rate at time slot or time n refers to the part of the second sub-channel in the resource pool; wherein the second sub-channel refers to: the sub-channel whose first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal during the K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

[0393] Wherein, K is a natural number greater than or equal to 1, and the K SL-PRS partial sensing opportunities or periodic sensing opportunities are determined by the high-level configuration parameters of the partial sensing or periodic sensing opportunities, that is, the K SL-PRS partial sensing opportunities or periodic sensing opportunities are the partial sensing opportunities and periodic sensing opportunities corresponding to all bits configured as 1 in the high-level parameters (corresponding to the above K SL-PRS sensing opportunities or periodic sensing opportunities are the opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters). This (18) can be used in combination with the above (14), but is not limited thereto.

[0394] (19) The SL-PRS RSSI is the average value measured by the UE in K partial sensing opportunities or periodic sensing opportunities (that is, for one subchannel, the SL-PRS RSSI refers to the average value of the SL-PRS RSSI measurement values ​​in these opportunities; corresponding to the above-mentioned for each subchannel, the corresponding value of the first information is: the average value of all measurement values ​​of the first information in the K SL-PRS sensing opportunities or periodic sensing opportunities), that is:

[0395]

[0396] Where K is the total number of partial sensing or periodic sensing opportunities measured by the UE; K ≥ 1;

[0397] SL_PRS_RSSI i is the SL-PRSRSSI measured at the i-th partial sensing opportunity or periodic sensing opportunity.

[0398] (20) The SL-PRS RSSI is the maximum value measured by the UE in K partial sensing opportunities or periodic sensing opportunities (i.e., for one subchannel, the SL-PRS RSSI refers to the maximum value of the SL-PRS RSSI measurement values ​​in these opportunities; corresponding to the above-mentioned for each subchannel, the corresponding value of the first information is: the maximum value of all measurement values ​​of the first information in the K SL-PRS sensing opportunities or periodic sensing opportunities), that is:

[0399] SL_PRS_RSSI=max 1≤i≤K SL_PRS_RSSI i ;

[0400] Where K is the total number of partial sensing or periodic sensing opportunities measured by the UE; K ≥ 1;

[0401] SL_PRS_RSSI i is the SL-PRSRSSI measured at the i-th partial sensing opportunity or periodic sensing opportunity.

[0402] 5. Measurement results of all partial sensing opportunities within the T period (all partial sensing opportunities within the sensing window, the measurement information takes SL-PRS RSSI as an example);

[0403] (21) The SL-PRS channel busy rate at time slot or time n refers to the ratio of the number of sub-channels whose SL-PRS RSSI exceeds the (pre-) configured threshold value sensed and measured by the UE at all partial sensing opportunities or periodic sensing opportunities within the [nT, n-1] time period (corresponding to the above-mentioned fourth sensing measurement window) to the total number of sub-channels in the resource pool; The SL-PRS channel busy rate corresponding to the above-mentioned time slot or time n refers to the part of the third sub-channel in the resource pool; wherein the third sub-channel refers to the sub-channel whose first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal at all sensing opportunities or periodic sensing opportunities within the fourth sensing measurement window.

[0404] (22) The value of T is configured by signaling, or the value of T is preconfigured. When the value of T is preconfigured, T is M×100 ms or L×100 time slots, where M and L (both) are positive integers greater than or equal to 1.

[0405] (23) The SL-PRS RSSI is the average value of all X partial sensing opportunities or periodic sensing opportunities measured by the UE in the [nT, n-1] period (that is, for one subchannel, the SL-PRS RSSI refers to the average value of the SL-PRS RSSI measurement values ​​in these opportunities; corresponding to the above-mentioned for each subchannel, the corresponding value of the first information is: the average value of all measurement values ​​of the first information in all sensing opportunities or periodic sensing opportunities in the fourth sensing measurement window), that is:

[0406]

[0407] Where X is the total number of partial sensing or periodic sensing opportunities measured by the UE; X ≥ 1;

[0408] SL_PRS_RSSI i is the SL-PRSRSSI measured at the i-th partial sensing opportunity or periodic sensing opportunity.

[0409] (24) The SL-PRS RSSI is the maximum value of X partial sensing opportunities or periodic sensing opportunities measured by the UE in the [nT, n-1] period (that is, for one subchannel, the SL-PRS RSSI refers to the maximum value of the SL-PRS RSSI measurement values ​​in these opportunities; corresponding to the above for each subchannel, the corresponding value of the first information is: the maximum value of all measurement values ​​of the first information in all sensing opportunities or periodic sensing opportunities in the fourth sensing measurement window), that is:

[0410] SL_PRS_RSSI=max 1≤i≤X SL_PRS_RSSI i ;

[0411] Where X is the total number of partial sensing or periodic sensing opportunities measured by the UE; X ≥ 1

[0412] SL_PRS_RSSI i is the SL-PRSRSSI measured at the i-th partial sensing opportunity or periodic sensing opportunity.

[0413] The above (15)-(24) are all for "measurement information of partial sensing or periodic sensing".

[0414] 6. Configure a continuous sensing measurement window for the UE that performs partial sensing (the measurement information takes SL-PRS RSSI as an example);

[0415] (25) A continuous sensing SL-PRS measurement window [nT,n-1] (corresponding to the second sensing measurement window) is configured for the UE that performs partial sensing or periodic sensing, for measuring the SL-PRS channel busy rate.

[0416] (26) The SL-PRS channel busy rate at time slot or time n refers to the ratio of the number of subchannels whose SL-PRS RSSI measured by the UE during SL-PRS sensing within the measurement window [nT,n-1] exceeds the (pre-)configured threshold value to the total number of subchannels in the resource pool; The corresponding SL-PRS channel busy rate at time slot or time n refers to the portion of the first subchannel in the resource pool; wherein the first subchannel refers to: the subchannel whose first information measured by the terminal exceeds the configured or pre-configured threshold value.

[0417] (27) The value of T is configured by signaling, or the value of T is preconfigured. When the value of T is preconfigured, T is M×100 ms or L×100 time slots, where M and L are positive integers greater than or equal to 1.

[0418] (28) Configuring a periodic SL-PRS channel busy rate measurement window: The UE periodically performs SL-PRS channel busy rate measurement in this measurement window; the corresponding first information is periodically measured in the second perception measurement window.

[0419] (29) Non-periodic SL-PRS channel busy rate measurement window: The channel busy rate measurement window is triggered by the SL-PRS transmission demand; corresponding to the first information mentioned above, it is measured by triggering the SL-PRS transmission demand information.

[0420] 7. Use re-evaluation or short-term sensing to measure the channel busy rate (taking SL-PRS RSSI as an example of measurement information);

[0421] (30) The SL-PRS channel busy rate at time slot or time n refers to the ratio of the number of sub-channels whose SL-PRS RSSI exceeds the (pre-)configured threshold value measured by the UE after re-evaluation or short-term perception within the [nT,n-1] time period (corresponding to the above-mentioned third perception measurement window) to the total number of sub-channels in the resource pool; The SL-PRS channel busy rate corresponding to the above-mentioned time slot or time n refers to the part of the first sub-channel in the resource pool; wherein, the first sub-channel refers to: the sub-channel whose first information measured by the terminal exceeds the configured or pre-configured threshold value.

[0422] 8. Application of channel busy rate (corresponding to the above “determining appropriate SL-PRS transmission parameters”);

[0423] (31) The UE determines at least one parameter (of SL-PRS transmission) such as the maximum SL-PRS transmission power and the range of the number of SL-PRS subchannels according to the obtained SL-PRS channel busy rate; corresponding to the above-mentioned determination of the SL-PRS transmission parameters according to the SL-PRS channel busy rate.

[0424] The present solution is specifically described below with an example (taking the calculation of the SL-PRS channel busy rate of time slot n as an example).

[0425] Example 1 (measurement results of full sensing opportunities, measurement information takes SL-PRS RSSI as an example);

[0426] This example scenario involves:

[0427] 1) The terminal calculates the SL-PRS channel busy rate (SL-PRS CBR, Channel Busy Ratio) based on the measurement information of the SL-PRS full sensing (Full Sensing); then determines the SL-PRS transmission parameters based on the SL-PRS channel busy rate, so that the terminal performs direct link positioning based on the SL-PRS.

[0428] 2) The UE performing the full sensing operation measures the first information within the [nT, n-1] measurement window for calculating the channel busy rate.

[0429] 3) The SL-PRS channel busy rate in time slot n refers to the ratio of the number of sub-channels whose SL-PRS RSSI sensed and measured by the UE within the [nT,n-1] measurement window exceeds the (pre-)configured threshold value to the total number of sub-channels in the resource pool.

[0430] 4) The value of T is configured by signaling, or the value of T is preconfigured. When the value of T is preconfigured, T is M×100 ms or L×100 time slots, where M and L are positive integers greater than or equal to 1.

[0431] 5) Configure a periodic SL-PRS channel busy rate measurement window: The UE periodically performs SL-PRS channel busy rate measurement within the measurement window.

[0432] 6) Non-periodic SL-PRS channel busy rate measurement window: The channel busy rate measurement window is triggered by the SL-PRS transmission demand.

[0433] 7) SL-PRS channel busy rate SL_PRS_CBR of UE in time slot n n The calculation formula is as follows:

[0434]

[0435] Among them, N SC_SL_pRS_RSSI Indicates the number of subchannels in the resource pool whose SL-PRS RSSI exceeds the (pre-)configured threshold;

[0436] N SC_Total Indicates the total number of subchannels in the resource pool.

[0437] Specifically, in order to calculate the SL-PRS channel busy rate in time slot n, the UE will sense all SL-PRS transmissions in the [nT,n-1] period. During the sensing process, the UE will measure the SL-PRS RSSI of all subchannels in its configured (i.e. configured for the UE) resource pool, and the ratio of the number of subchannels whose SL-PRS RSSI exceeds the (pre-)configured threshold value to the number of all subchannels in the resource pool is the SL-PRS channel busy rate of the UE in time slot n.

[0438] like Figure 5 As shown in (Schematic diagram of SL-PRS channel busy rate (full measurement)), T = 1000ms. In order to calculate the channel busy rate of time slot n, the UE senses all SL-PRS transmissions in the time period [n-1000ms, n-1ms], and measures the SL-PRS RSSI of all subchannels in the resource pool in all time slots within the time period, and then determines whether the SL-PRS RSSI of these subchannels exceeds the (pre-) configured threshold value. The ratio of the number of subchannels whose SL-PRS RSSI exceeds the threshold value to the total number of all subchannels in the resource pool is the SL-PRS channel busy rate of the UE in time slot n. Figure 5 T1 and T2 in the figure represent duration.

[0439] From the above, this example adopts this method of calculating the channel busy rate based on the measurement information of Full Sensing, so that the terminal can calculate the SL-PRS resource pool sub-channel busy rate for guaranteeing the direct link positioning. Using this method, the SL-PRS channel busy rate can be effectively calculated, and the appropriate SL-PRS transmission parameters can be determined based on the SL-PRS channel busy rate, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters and improving the SL-PRS transmission success rate.

[0440] Example 2 (measurement results of K partial sensing opportunities (partial sensing opportunities configured as 1 in the sensing window), the measurement information takes SL-PRS RSSI as an example);

[0441] This example scenario involves:

[0442] 1) The terminal calculates the SL-PRS channel busy rate (SL-PRS CBR, Channel Busy Ratio) based on the measurement information of partial sensing (Partial Sensing) or periodic sensing (Periodic Sensing) of SL-PRS; then determines the parameters of SL-PRS transmission based on the SL-PRS channel busy rate, so that the terminal performs direct link positioning based on SL-PRS.

[0443] 2) The SL-PRS channel busy rate in time slot n refers to the ratio of the number of sub-channels whose SL-PRS RSSI exceeds the (pre-) configured threshold value sensed and measured by the UE in the K SL-PRS partial sensing opportunities or periodic sensing opportunities before time slot n to the total number of sub-channels in the resource pool, where K is a natural number greater than or equal to 1.

[0444] 3) The K SL-PRS partial sensing opportunities or periodic sensing opportunities are determined by the high-level configuration parameters of the partial sensing or periodic sensing opportunities, that is, the K SL-PRS partial sensing opportunities or periodic sensing opportunities are the partial sensing opportunities and periodic sensing opportunities corresponding to all bits configured as 1 in the high-level parameters.

[0445] 4) SL-PRS channel busy rate SL_PRS_CBR of UE in time slot n n The calculation formula is as follows:

[0446]

[0447] Among them, N SC_SL_PRS_RSSI Indicates the number of subchannels in the resource pool whose SL-PRS RSSI exceeds the (pre-)configured threshold;

[0448] N SC_Total Indicates the total number of subchannels in the resource pool.

[0449] 5) The above SL-PRS RSSI is the average value measured by the UE in K partial sensing opportunities or periodic sensing opportunities, that is:

[0450]

[0451] Where K is the total number of partial sensing or periodic sensing opportunities measured by the UE; K ≥ 1;

[0452] SL_PRS_RSSI i is the SL-PRSRSSI measured at the i-th partial sensing opportunity or periodic sensing opportunity.

[0453] Alternatively, the SL-PRS RSSI is the maximum value measured by the UE in K partial sensing opportunities or periodic sensing opportunities, that is:

[0454] SL_PRS_RSSI=max 1≤i≤K SL_PRS_RSSI i ;

[0455] Where K is the total number of partial sensing or periodic sensing opportunities measured by the UE; K ≥ 1;

[0456] SL_PRS_RSSI i is the SL-PRSRSSI measured at the i-th partial sensing opportunity or periodic sensing opportunity.

[0457] Specifically, in order to calculate the SL-PRS channel busy rate in time slot n, the UE will sense the K SL-PRS partial sensing opportunities or periodic sensing opportunities before time slot n. During the sensing process, the UE will measure the SL-PRS RSSI of all subchannels in its configured resource pool (measure all subchannels in partial opportunities), and the ratio of the number of subchannels whose SL-PRS RSSI exceeds the (pre) configured threshold value to the number of all subchannels in the resource pool is the SL-PRS channel busy rate of the UE in time slot n. The K SL-PRS partial sensing opportunities or periodic sensing opportunities are determined by the high-level configuration parameters of the partial sensing or periodic sensing opportunities, that is, the K SL-PRS partial sensing opportunities or periodic sensing opportunities are the partial sensing opportunities and periodic sensing opportunities corresponding to all bits configured as 1 in the high-level parameters.

[0458] like Figure 6 and Figure 7 As shown in (Schematic diagram of obtaining channel busy rate by measuring according to K partial sensing opportunities or periodic sensing opportunities), in order to calculate the SL-PRS channel busy rate of time slot n, the UE senses the K=4 SL-PRS partial sensing opportunities before time slot n, and measures the SL-PRS RSSI of all subchannels in these 4 partial sensing opportunities, and then determines whether the SL-PRS RSSI of these subchannels exceeds the (pre) configured threshold value, and the ratio of the number of subchannels whose SL-PRS RSSI exceeds the threshold value to the total number of all subchannels in the resource pool is the SL-PRS channel busy rate of the UE in time slot n. P in the figure step Indicates the timing interval.

[0459] It should be noted that the partial sensing or periodic sensing timing within the resource sensing window [n-1000ms,n] is determined by the kth bit of the high-level parameter. Figure 6As shown in , k = [1111000000], so all the consecutive K = 4 SL-PRS partial sensing opportunities corresponding to k = 1 are enabled, and SL-PRS resource sensing can be performed. Figure 7 As shown, k = [1101100000], so the enabled K = 4 SL-PRS partial sensing opportunities corresponding to all k = 1 are discontinuous, so it is necessary to select all K = 4 partial sensing opportunities corresponding to k = 1 for SL-PRS resource sensing.

[0460] From the above, this example adopts the method of calculating the SL-PRS channel busy rate based on K SL-PRS partial sensing opportunities or periodic sensing opportunities, which can enable the terminal that cannot perform full perception but can only perform partial perception or periodic perception opportunities to effectively calculate the SL-PRS channel busy rate, and determine the appropriate SL-PRS transmission parameters based on the SL-PRS channel busy rate, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters and improving the SL-PRS transmission success rate.

[0461] Example 3 (measurement results (full measurement) of all partial sensing opportunities within the T period, the measurement information takes SL-PRS RSSI as an example);

[0462] This example scenario involves:

[0463] 1) The terminal calculates the SL-PRS channel busy rate (SL-PRS CBR, Channel Busy Ratio) based on the measurement information of partial sensing (Partial Sensing) or periodic sensing (Periodic Sensing) of SL-PRS; then determines the parameters of SL-PRS transmission based on the SL-PRS channel busy rate, so that the terminal performs direct link positioning based on SL-PRS.

[0464] 2) The channel busy rate in time slot n refers to the ratio of the number of sub-channels whose SL-PRS RSSI exceeds the (pre-) configured threshold value sensed and measured by the UE at all SL-PRS partial sensing opportunities or periodic sensing opportunities within the time period [nT,n-1] to the total number of sub-channels in the resource pool; and the corresponding bits of these partial sensing opportunities or periodic sensing opportunities in the high-level configuration parameters of the partial sensing or periodic sensing are configured to 1.

[0465] 3) The value of T is configured by signaling, or the value of T is preconfigured. When the value of T is preconfigured, T is M×100ms or L×100 time slots, where M and L are positive integers greater than or equal to 1;

[0466] 4) The above SL-PRS RSSI is the average value of all X partial sensing opportunities or periodic sensing opportunities measured by the UE in the [nT, n-1] period, that is:

[0467]

[0468] Where X is the total number of partial sensing or periodic sensing opportunities measured by the UE; X ≥ 1;

[0469] SL_PRS_RSSI i is the SL-PRSRSSI measured at the i-th partial sensing opportunity or periodic sensing opportunity.

[0470] Alternatively, the SL-PRS RSSI is the maximum value of X partial sensing opportunities or periodic sensing opportunities measured by the UE in the [nT, n-1] period, that is:

[0471] SL_PRS_RSSI=max 1≤i≤X SL_PRS_RSSI i ;

[0472] Where X is the total number of partial sensing or periodic sensing opportunities measured by the UE; X ≥ 1;

[0473] SL_PRS_RSSI i is the SL-PRSRSSI measured at the i-th partial sensing opportunity or periodic sensing opportunity.

[0474] Specifically, in order to calculate the SL-PRS channel busy rate in time slot n, the UE will sense all SL-PRS partial sensing opportunities or periodic sensing opportunities in the [nT,n-1] time period. During the sensing process, the UE will measure the SL-PRS RSSI of all subchannels in its configured resource pool, and the ratio of the number of subchannels whose SL-PRS RSSI exceeds the (pre) configured threshold value to the number of all subchannels in the resource pool is the SL-PRS channel busy rate of the UE in time slot n. The SL-PRS partial sensing opportunity or periodic sensing opportunity is determined by the high-level configuration parameters of the partial sensing or periodic sensing opportunity, that is, these K partial sensing opportunities or periodic sensing opportunities are the partial sensing opportunities and periodic sensing opportunities corresponding to all bits configured as 1 in the high-level parameters.

[0475] like Figure 8As shown in (Schematic diagram of obtaining the SL-PRS channel busy rate by measuring all SL-PRS partial sensing opportunities or periodic sensing opportunities in the [nT, n-1] time period), in order to calculate the SL-PRS channel busy rate of time slot n, the UE senses the SL-PRS partial sensing opportunities in the [nT, n-1] time period, and measures the SL-PRS RSSI of all subchannels in these X=2 partial sensing opportunities, and then determines whether the SL-PRS RSSI of these subchannels exceeds the (pre) configured threshold value, and the ratio of the number of subchannels whose SL-PRS RSSI exceeds the threshold value to the total number of all subchannels in the resource pool is the SL-PRS channel busy rate of the UE in time slot n.

[0476] It should be noted that the timing of partial or periodic SL-PRS sensing within the resource sensing window [nT,n-1] is determined by the kth bit of the high-level parameter. Figure 8 As shown, k = [1101100000], so there are only 2 SL-PRS partial sensing or periodic sensing opportunities within the [nT, n-1] period, so it is necessary to select all X = 2 partial sensing opportunities corresponding to k = 1 (within the time window T) for resource sensing.

[0477] From the above, this example adopts the method of calculating the channel busy rate based on all SL-PRS partial sensing opportunities or periodic sensing opportunities within the [nT, n-1] time period, which can enable the terminal that cannot perform full perception but can only perform partial perception or periodic perception opportunities to effectively calculate the SL-PRS channel busy rate, and determine the appropriate SL-PRS transmission parameters based on the SL-PRS channel busy rate, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters and improving the SL-PRS transmission success rate.

[0478] Example 4 (configuring an SL-PRS continuous perception measurement window for a UE that performs partial perception, and taking SL-PRS RSSI as an example of measurement information);

[0479] This example scenario involves:

[0480] 1) The terminal calculates the SL-PRS channel busy ratio (SL-PRSCBR) according to the measurement information of the configured continuous perception measurement window; then determines the SL-PRS transmission parameters according to the SL-PRS channel busy ratio, so that the terminal performs through link positioning according to the SL-PRS.

[0481] 2) A continuous sensing SL-PRS measurement window [nT,n-1] is configured for the UE that performs partial or periodic sensing of SL-PRS, for measuring the SL-PRS channel busy rate.

[0482] 3) The SL-PRS channel busy rate in time slot n refers to the ratio of the number of sub-channels whose SL-PRS RSSI sensed and measured by the UE within the [nT,n-1] measurement window exceeds the (pre-)configured threshold value to the total number of sub-channels in the resource pool.

[0483] 4) The value of T is configured by signaling, or the value of T is preconfigured. When the value of T is preconfigured, T is M×100 ms or L×100 time slots, where M and L are positive integers greater than or equal to 1.

[0484] 5) Configure a periodic channel busy rate measurement window: The UE periodically performs channel busy rate measurement within the measurement window.

[0485] 6) Non-periodic channel busy rate measurement window: The channel busy rate measurement window is triggered by the SL-PRS transmission demand.

[0486] like Fig. 9 As shown in (Schematic diagram of obtaining SL-PRS channel busy rate by measuring according to continuous sensing measurement window), for non-periodic continuous sensing measurement quantity, assuming that UE can predict the data arrival time n in advance, then UE can pre-configure an SL-PRS continuous sensing measurement window before time n, and then UE can calculate the SL-PRS channel busy rate according to Fig. 9 The continuous sensing SL-PRS measurement window (ie, measurement window T) shown in FIG. 1 is used to measure the SL-PRS channel busy rate.

[0487] From the above, this example adopts the method of calculating the SL-PRS channel busy rate according to the configured continuous perception measurement window, which can enable the terminal that cannot perform full perception but can only perform partial perception or periodic perception to effectively calculate the SL-PRS channel busy rate, and determine the appropriate SL-PRS transmission parameters based on the SL-PRS channel busy rate, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters and improving the SL-PRS transmission success rate.

[0488] Example 5 (using re-evaluation or short-term sensing for measurement, the measurement information takes SL-PRS RSSI as an example);

[0489] This example scenario involves:

[0490] 1) The terminal calculates the SL-PRS channel busy rate (SL-PRS CBR) based on the measurement information of re-evaluation or short-term sensing, and then determines the parameters of SL-PRS transmission based on the SL-PRS channel busy rate, so that the terminal performs direct link positioning based on the SL-PRS.

[0491] 2) The SL-PRS channel busy rate in time slot n refers to the ratio of the number of sub-channels whose SL-PRS RSSI measured by the UE exceeds the (pre-)configured threshold value to the total number of sub-channels in the resource pool after re-evaluation or short-term perception within the [n+Tx,n+Ty] period.

[0492] like Fig.10 As shown, calculating the SL-PRS channel busy rate of time slot n requires using the re-evaluation or short-term sensing measurement information after time slot n to complete the SL-PRS RSSI measurement. Fig.10 Tx and Ty in the figure represent duration.

[0493] From the above, this example adopts the method of calculating the SL-PRS channel busy rate based on the measurement information of re-evaluation or short-term perception, which can enable the terminal that cannot perform full perception and can only perform re-evaluation or short-term perception to effectively calculate the SL-PRS channel busy rate, and determine the appropriate SL-PRS transmission parameters based on the SL-PRS channel busy rate, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters and improving the SL-PRS transmission success rate.

[0494] It should be noted that the relevant contents of the above examples can be referenced to each other, and the repeated contents will not be repeated.

[0495] The present application also provides an information processing device, which is a terminal. Fig.11 As shown, it includes a memory 111, a transceiver 112, and a processor 113:

[0496] The memory 111 is used to store computer programs; the transceiver 112 is used to send and receive data under the control of the processor 113; the processor 113 is used to read the computer program in the memory 111 and perform the following operations:

[0497] Calculate the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information;

[0498] The first information at least includes measurement information of SL-PRS.

[0499] The information processing device provided in the embodiment of the present application calculates the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information; wherein the first information at least includes the measurement information of the SL-PRS; it is capable of effectively obtaining the SL-PRS channel busy rate, and then supporting the determination of appropriate SL-PRS transmission parameters based on this, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters and improving the SL-PRS transmission success rate; it is a good solution to the problem that the prior art cannot accurately determine the SL-PRS channel busy rate.

[0500] Specifically, the transceiver 112 is used to receive and send data under the control of the processor 113 .

[0501] Among them, Fig.11 In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically one or more processors represented by processor 113 and various circuits of memory represented by memory 111 are linked together. The bus architecture may also link together various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 112 may be a plurality of components, namely, a transmitter and a receiver, providing a unit for communicating with various other devices on a transmission medium, including transmission media such as wireless channels, wired channels, and optical cables. For different user devices, the user interface 114 may also be an interface capable of externally and internally connecting required devices, and the connected devices include but are not limited to a keypad, a display, a speaker, a microphone, a joystick, and the like.

[0502] The processor 113 is responsible for managing the bus architecture and general processing, and the memory 111 can store data used by the processor 113 when performing operations.

[0503] Optionally, the processor 113 may be a CPU (central processing unit), an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array) or a CPLD (Complex Programmable Logic Device), and the processor may also adopt a multi-core architecture.

[0504] The processor calls the computer program stored in the memory to execute any of the methods provided in the embodiments of the present application according to the obtained executable instructions. The processor and the memory can also be arranged physically separately.

[0505] The measurement information of the SL-PRS includes at least one of the following: full-perception measurement information; partial-perception or periodic-perception measurement information; configured full-perception measurement window measurement information; re-evaluation or short-term-perception measurement information.

[0506] In an embodiment of the present application, the first information includes at least one of the following sub-information: direct link positioning reference signal received signal strength indication SL-PRS RSSI; direct link positioning reference signal received power SL-PRS RSRP; physical direct link control channel received signal strength indication PSCCH RSSI; physical direct link control channel reference signal received power PSCCH RSRP; direct link received signal strength indication SL-RSSI; direct link reference signal received power SL-RSRP; physical direct link shared channel received signal strength indication PSSCH RSSI; physical direct link shared channel reference signal received power PSSCH RSRP; SL-PRS pattern occupancy.

[0507] Among them, the first information includes at least two items of sub-information; the calculating the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information includes: calculating the SL-PRS channel busy rate according to the sub-information with the largest value among the at least two items of sub-information.

[0508] In this embodiment of the present application, the first information is measured based on the SL-PRS dedicated resource pool.

[0509] Among them, the first information is measured based on the SL-PRS shared resource pool; the operation also includes: measuring the second information related to the busy rate of the direct link SL channel in the SL-PRS shared resource pool; calculating the direct link positioning reference signal SL-PRS channel busy rate based on the first information, including: calculating the SL-PRS candidate channel busy rate based on the first information; calculating the SL channel busy rate based on the second information; obtaining the maximum value of the SL-PRS candidate channel busy rate and the SL channel busy rate as the SL-PRS channel busy rate.

[0510] In an embodiment of the present application, the second information includes at least one of the following sub-information: SL-PRS RSSI; SL-PRSRSRP; PSCCH RSSI; PSCCH RSRP; SL-RSSI; SL-RSRP; PSSCH RSSI; PSSCH RSRP; SL-PRS pattern occupancy rate.

[0511] The SL-PRS pattern occupancy rate refers to the ratio between the number of first combs and the number of second combs in the SL-PRS comb pattern; wherein the number of first combs refers to the number of occupied combs; and the number of second combs refers to the number of all available combs.

[0512] In an embodiment of the present application, the first information is measured by the terminal performing a full perception operation within a first perception measurement window; or, the first information is measured by the terminal performing a partial perception operation or a periodic perception operation within a second perception measurement window; or, the first information is measured by the terminal performing a re-evaluation operation or a short-term perception operation within a third perception measurement window; wherein, the first perception measurement window is a full perception measurement window, the second perception measurement window is a partial perception measurement window or a periodic perception measurement window, and the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window.

[0513] The SL-PRS channel busy rate in time slot or time n refers to the part of the first subchannel in the resource pool; wherein the first subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or preconfigured threshold value.

[0514] In an embodiment of the present application, the first information is obtained by periodically measuring in the first perception measurement window, the second perception measurement window or the third perception measurement window; or, the first information is obtained by measuring triggered by SL-PRS transmission requirement information.

[0515] The calculating, according to the first information, the channel busy rate of the direct link positioning reference signal SL-PRS includes: using a first formula to calculate the channel busy rate of the SL-PRS; wherein the first formula is: Indicates the SL-PRS channel busy rate at time slot or time n; N SC Indicates the number of sub-channels for which the first information measured by the terminal exceeds a configured or preconfigured threshold; N SC_Total Indicates the total number of subchannels in the resource pool.

[0516] In an embodiment of the present application, the first information is measured by the terminal that performs a partial sensing operation in the first time slot; wherein, the first time slot refers to the time slot in which the terminal receives the physical direct link control channel PSCCH and / or SL-PRS within the channel busy rate CBR measurement window.

[0517] The calculating of the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information includes: calculating the channel busy rate of the SL-PRS according to the first information in the time slot in which the first information is measured.

[0518] Furthermore, the operation also includes: when the number of the first time slots is less than a configured or pre-configured first threshold, using a configured or pre-configured first preset value as a SL-PRS channel busy rate.

[0519] Among them, the SL-PRS channel busy rate in time slot or time n refers to the part of the second subchannel in the resource pool; wherein, the second subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

[0520] In an embodiment of the present application, the K SL-PRS sensing opportunities or periodic sensing opportunities are opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters.

[0521] Among them, for each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measurement values ​​of the first information in the K SL-PRS sensing opportunities or periodic sensing opportunities.

[0522] In an embodiment of the present application, the SL-PRS channel busy rate in time slot or time n refers to the part of the third subchannel in the resource pool; wherein, the third subchannel refers to the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in all perception opportunities or periodic perception opportunities within the fourth perception measurement window.

[0523] Among them, the start time of the target time window is the time slot or moment nT, and the end time is the time slot or moment n-1; the target time window is the first perception measurement window, the second perception measurement window, the third perception measurement window or the fourth perception measurement window; wherein, the value of T is configured by signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, wherein M and L are both positive integers greater than or equal to 1.

[0524] In an embodiment of the present application, for each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measurement values ​​of the first information in all sensing opportunities or periodic sensing opportunities within the fourth sensing measurement window.

[0525] Furthermore, the operation also includes: sending the SL-PRS channel busy rate and first indication information to a first device through the transceiver; wherein the first device is a terminal or a network device; the first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool, or for the SL-PRS shared resource pool.

[0526] In an embodiment of the present application, the operation also includes: determining the SL-PRS transmission parameters based on the SL-PRS channel busy rate; wherein the SL-PRS transmission parameters include: SL-PRS maximum transmission power, and / or, SL-PRS sub-channel number range.

[0527] It should be noted here that the above-mentioned device provided in the embodiment of the present application can implement all the method steps implemented in the above-mentioned terminal side method embodiment, and can achieve the same technical effect. The parts and beneficial effects of this embodiment that are the same as the method embodiment will not be described in detail here.

[0528] The embodiment of the present application also provides an information processing device, wherein the information processing device is a first device, such as Fig.12 As shown, it includes a memory 121, a transceiver 122, and a processor 123:

[0529] The memory 121 is used to store computer programs; the transceiver 122 is used to send and receive data under the control of the processor 123; the processor 123 is used to read the computer program in the memory 121 and perform the following operations:

[0530] Receiving, by the transceiver 122, the SL-PRS channel busy rate and the first indication information sent by the terminal;

[0531] Wherein, the first device is a terminal or a network device;

[0532] The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0533] The information processing device provided in the embodiment of the present application receives the SL-PRS channel busy rate and the first indication information sent by the terminal; wherein the first device is a terminal or a network device; the first indication information is used to indicate that the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or the SL-PRS shared resource pool; the SL-PRS channel busy rate sent by the terminal can be accurately obtained to support subsequent operations; and the problem that the SL-PRS channel busy rate cannot be accurately determined in the prior art is well solved.

[0534] Specifically, the transceiver 122 is used to receive and send data under the control of the processor 123.

[0535] Among them, Fig.12 In the embodiment, the bus architecture may include any number of interconnected buses and bridges, specifically one or more processors represented by processor 123 and various circuits of memory represented by memory 121 are linked together. The bus architecture may also link together various other circuits such as peripheral devices, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 122 may be a plurality of components, namely, a transmitter and a receiver, providing a unit for communicating with various other devices on a transmission medium, which transmission medium may include a wireless channel, a wired channel, an optical cable, and other transmission media. The processor 123 is responsible for managing the bus architecture and general processing, and the memory 121 may store data used by the processor 123 when performing operations.

[0536] The processor 123 may be a central processing unit (CPU), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or a complex programmable logic device (CPLD). The processor may also adopt a multi-core architecture.

[0537] It is explained here that when the first device is implemented as a terminal, its architecture may also include a user interface, for details, see Fig.11 The relevant content will not be repeated here.

[0538] Further, the operation also includes: configuring, by the transceiver, a first perception measurement window for the terminal performing a full perception operation; the first perception measurement window is a full perception measurement window; or, configuring a second perception measurement window for the terminal performing a partial perception operation or a periodic perception operation; the second perception measurement window is a partial perception measurement window or a periodic perception measurement window; or, configuring a third perception measurement window for the terminal performing a reassessment operation or a short-term perception operation; the third perception measurement window is a reassessment measurement window or a short-term perception measurement window;

[0539] And / or, sending a configured threshold value to the terminal for the terminal to obtain the first subchannel or the second subchannel or the third subchannel; and / or, configuring the first perception measurement window, the second perception measurement window or the third perception measurement window periodically to the terminal, so that the terminal can periodically measure the first information in the first perception measurement window, the second perception measurement window or the third perception measurement window; and / or, configuring a first threshold to the terminal, so that the terminal can use the configured or pre-configured first preset value as the SL-PRS channel busy rate when the number of first time slots is less than the first threshold; the first time slot refers to the time slot in which the terminal receives PSCCH and / or SL-PRS within the channel busy rate CBR measurement window; and / or, configuring high-level parameters of SL-PRS perception timing or periodic perception timing to the terminal, so that the terminal can use the timings corresponding to all bits configured as 1 in the high-level parameters as K SL-PRS perception timings or periodic perception timings, where K is a natural number greater than or equal to 1.

[0540] Among them, the start time of the target time window is the time slot or moment nT, and the end time is the time slot or moment n-1; the target time window is the first perception measurement window, the second perception measurement window or the third perception measurement window; wherein, the value of T is configured to the terminal by the first device through signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0541] It should be noted here that the above-mentioned device provided in the embodiment of the present application can implement all the method steps implemented in the above-mentioned first device side method embodiment, and can achieve the same technical effect. The parts and beneficial effects that are the same as the method embodiment in this embodiment will not be described in detail here.

[0542] The present application also provides an information processing device, which is applied to a terminal, such as Fig.13 As shown, including:

[0543] The first calculation unit 131 is used to calculate the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information;

[0544] The first information at least includes measurement information of SL-PRS.

[0545] The information processing device provided in the embodiment of the present application calculates the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information; wherein the first information at least includes the measurement information of the SL-PRS; it is capable of effectively obtaining the SL-PRS channel busy rate, and then supporting the determination of appropriate SL-PRS transmission parameters based on this, thereby reducing the probability of SL-PRS transmission failure due to inappropriate SL-PRS transmission parameters and improving the SL-PRS transmission success rate; it is a good solution to the problem that the prior art cannot accurately determine the SL-PRS channel busy rate.

[0546] The measurement information of the SL-PRS includes at least one of the following: full-perception measurement information; partial-perception or periodic-perception measurement information; configured full-perception measurement window measurement information; re-evaluation or short-term-perception measurement information.

[0547] In an embodiment of the present application, the first information includes at least one of the following sub-information: direct link positioning reference signal received signal strength indication SL-PRS RSSI; direct link positioning reference signal received power SL-PRS RSRP; physical direct link control channel received signal strength indication PSCCH RSSI; physical direct link control channel reference signal received power PSCCH RSRP; direct link received signal strength indication SL-RSSI; direct link reference signal received power SL-RSRP; physical direct link shared channel received signal strength indication PSSCH RSSI; physical direct link shared channel reference signal received power PSSCH RSRP; SL-PRS pattern occupancy.

[0548] Among them, the first information includes at least two items of sub-information; the calculating the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information includes: calculating the SL-PRS channel busy rate according to the sub-information with the largest value among the at least two items of sub-information.

[0549] In this embodiment of the present application, the first information is measured based on the SL-PRS dedicated resource pool.

[0550] Among them, the first information is measured based on the SL-PRS shared resource pool; the device also includes: a first measurement unit, used to measure the second information related to the busy rate of the direct link SL channel in the SL-PRS shared resource pool; the calculation of the direct link positioning reference signal SL-PRS channel busy rate based on the first information includes: calculating the SL-PRS candidate channel busy rate based on the first information; calculating the SL channel busy rate based on the second information; obtaining the maximum value of the SL-PRS candidate channel busy rate and the SL channel busy rate as the SL-PRS channel busy rate.

[0551] In an embodiment of the present application, the second information includes at least one of the following sub-information: SL-PRS RSSI; SL-PRSRSRP; PSCCH RSSI; PSCCH RSRP; SL-RSSI; SL-RSRP; PSSCH RSSI; PSSCH RSRP; SL-PRS pattern occupancy rate.

[0552] The SL-PRS pattern occupancy rate refers to the ratio between the number of first combs and the number of second combs in the SL-PRS comb pattern; wherein the number of first combs refers to the number of occupied combs; and the number of second combs refers to the number of all available combs.

[0553] In an embodiment of the present application, the first information is measured by the terminal performing a full perception operation within a first perception measurement window; or, the first information is measured by the terminal performing a partial perception operation or a periodic perception operation within a second perception measurement window; or, the first information is measured by the terminal performing a re-evaluation operation or a short-term perception operation within a third perception measurement window; wherein, the first perception measurement window is a full perception measurement window, the second perception measurement window is a partial perception measurement window or a periodic perception measurement window, and the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window.

[0554] The SL-PRS channel busy rate in time slot or time n refers to the part of the first subchannel in the resource pool; wherein the first subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or preconfigured threshold value.

[0555] In an embodiment of the present application, the first information is obtained by periodically measuring in the first perception measurement window, the second perception measurement window or the third perception measurement window; or, the first information is obtained by measuring triggered by SL-PRS transmission requirement information.

[0556] The calculating, according to the first information, the channel busy rate of the direct link positioning reference signal SL-PRS includes: using a first formula to calculate the channel busy rate of the SL-PRS; wherein the first formula is: Indicates the SL-PRS channel busy rate at time slot or time n; N SC Indicates the number of sub-channels for which the first information measured by the terminal exceeds a configured or preconfigured threshold; N SC_Total Indicates the total number of subchannels in the resource pool.

[0557] In an embodiment of the present application, the first information is measured by the terminal that performs a partial sensing operation in the first time slot; wherein, the first time slot refers to the time slot in which the terminal receives the physical direct link control channel PSCCH and / or SL-PRS within the channel busy rate CBR measurement window.

[0558] The calculating of the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information includes: calculating the channel busy rate of the SL-PRS according to the first information in the time slot in which the first information is measured.

[0559] Furthermore, the information processing device also includes: a first processing unit, which is used to use a configured or pre-configured first preset value as the SL-PRS channel busy rate when the number of the first time slots is less than a configured or pre-configured first threshold.

[0560] Among them, the SL-PRS channel busy rate in time slot or time n refers to the part of the second subchannel in the resource pool; wherein, the second subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

[0561] In an embodiment of the present application, the K SL-PRS sensing opportunities or periodic sensing opportunities are opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters.

[0562] Among them, for each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measurement values ​​of the first information in the K SL-PRS sensing opportunities or periodic sensing opportunities.

[0563] In an embodiment of the present application, the SL-PRS channel busy rate in time slot or time n refers to the part of the third subchannel in the resource pool; wherein, the third subchannel refers to the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in all perception opportunities or periodic perception opportunities within the fourth perception measurement window.

[0564] Among them, the start time of the target time window is the time slot or moment nT, and the end time is the time slot or moment n-1; the target time window is the first perception measurement window, the second perception measurement window, the third perception measurement window or the fourth perception measurement window; wherein, the value of T is configured by signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, wherein M and L are both positive integers greater than or equal to 1.

[0565] In an embodiment of the present application, for each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measurement values ​​of the first information in all sensing opportunities or periodic sensing opportunities within the fourth sensing measurement window.

[0566] Furthermore, the information processing device also includes: a first sending unit, used to send the SL-PRS channel busy rate and first indication information to a first device; wherein the first device is a terminal or a network device; the first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool, or for the SL-PRS shared resource pool.

[0567] In an embodiment of the present application, the information processing device further includes: a first determination unit, used to determine the SL-PRS transmission parameters according to the SL-PRS channel busy rate; wherein the SL-PRS transmission parameters include: SL-PRS maximum transmission power, and / or, SL-PRS sub-channel number range.

[0568] It should be noted here that the above-mentioned device provided in the embodiment of the present application can implement all the method steps implemented in the above-mentioned terminal side method embodiment, and can achieve the same technical effect. The parts and beneficial effects of this embodiment that are the same as the method embodiment will not be described in detail here.

[0569] The present application also provides an information processing device, which is applied to a first device, such as Fig.14 As shown, including:

[0570] The first receiving unit 141 is configured to receive the SL-PRS channel busy rate and the first indication information sent by the terminal;

[0571] Wherein, the first device is a terminal or a network device;

[0572] The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

[0573] The information processing device provided in the embodiment of the present application receives the SL-PRS channel busy rate and the first indication information sent by the terminal; wherein the first device is a terminal or a network device; the first indication information is used to indicate that the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool; it is possible to accurately obtain the SL-PRS channel busy rate sent by the terminal to support subsequent operations; and it is a good solution to the problem in the prior art that it is impossible to accurately determine the SL-PRS channel busy rate.

[0574] Further, the information processing device further includes: a first configuration unit, configured to configure a first perception measurement window for the terminal performing a full perception operation; the first perception measurement window is a full perception measurement window; or, configure a second perception measurement window for the terminal performing a partial perception operation or a periodic perception operation; the second perception measurement window is a partial perception measurement window or a periodic perception measurement window; or, configure a third perception measurement window for the terminal performing a reassessment operation or a short-term perception operation; the third perception measurement window is a reassessment measurement window or a short-term perception measurement window;

[0575] And / or, sending a configured threshold value to the terminal for the terminal to obtain the first subchannel or the second subchannel or the third subchannel; and / or, configuring the first perception measurement window, the second perception measurement window or the third perception measurement window periodically to the terminal, so that the terminal can periodically measure the first information in the first perception measurement window, the second perception measurement window or the third perception measurement window; and / or, configuring a first threshold to the terminal, so that the terminal can use the configured or pre-configured first preset value as the SL-PRS channel busy rate when the number of first time slots is less than the first threshold; the first time slot refers to the time slot in which the terminal receives PSCCH and / or SL-PRS within the channel busy rate CBR measurement window; and / or, configuring high-level parameters of SL-PRS perception timing or periodic perception timing to the terminal, so that the terminal can use the timings corresponding to all bits configured as 1 in the high-level parameters as K SL-PRS perception timings or periodic perception timings, where K is a natural number greater than or equal to 1.

[0576] Among them, the start time of the target time window is the time slot or moment nT, and the end time is the time slot or moment n-1; the target time window is the first perception measurement window, the second perception measurement window or the third perception measurement window; wherein, the value of T is configured to the terminal by the first device through signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

[0577] It should be noted here that the above-mentioned device provided in the embodiment of the present application can implement all the method steps implemented in the above-mentioned first device side method embodiment, and can achieve the same technical effect. The parts and beneficial effects of this embodiment that are the same as the method embodiment will not be described in detail here.

[0578] It should be noted that the division of units in the embodiments of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation. In addition, each functional unit in each embodiment of the present application may be integrated into a processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0579] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a processor-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) or a processor (processor) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), disk or optical disk and other media that can store program codes.

[0580] An embodiment of the present application also provides a non-transitory readable storage medium, which stores a computer program, and the computer program is used to enable a processor to execute the above-mentioned method on the terminal side or the first device side.

[0581] The non-transitory readable storage medium can be any available medium or data storage device that can be accessed by the processor, including but not limited to magnetic storage (such as floppy disks, hard disks, magnetic tapes, magneto-optical disks (MO), etc.), optical storage (such as CD, DVD, BD, HVD, etc.), and semiconductor storage (such as ROM, EPROM, EEPROM, non-volatile memory (NANDFLASH), solid-state drive (SSD)), etc.

[0582] Among them, the implementation embodiments of the method on the above-mentioned terminal side or the first device side are all applicable to the embodiments of the non-transitory readable storage medium, and can also achieve the same technical effect.

[0583] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage and optical storage, etc.) that contain computer-usable program code.

[0584] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer executable instructions. These computer executable instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0585] These processor executable instructions may also be stored in a processor readable memory that can direct a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the processor readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0586] These processor-executable instructions may also be loaded onto a computer or other programmable data processing device so that a series of operational steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for executing on the computer or other programmable device to implement the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0587] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. An information processing method, applied to a terminal, It is characterized in that include: Calculate the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information; The first information at least includes measurement information of SL-PRS.

2. The information processing method according to claim 1, It is characterized in that The SL-PRS measurement information includes at least one of the following: Fully perceived measurement information; Measurement information for partial or periodic sensing; Measurement information of the configured full-sensing measurement window; Measurement information for reappraisal or short-term perception.

3. The information processing method according to claim 1, It is characterized in that The first information includes at least one of the following sub-information: Direct link positioning reference signal received signal strength indication SL-PRS RSSI; Direct link positioning reference signal received power SL-PRS RSRP; Physical direct link control channel received signal strength indication PSCCH RSSI; Physical direct link control channel reference signal received power PSCCH RSRP; Through link received signal strength indication SL-RSSI; Direct link reference signal received power SL-RSRP; Physical direct link shared channel received signal strength indication PSSCH RSSI; Physical direct link shared channel reference signal received power PSSCH RSRP; SL-PRS pattern occupancy.

4. The information processing method according to claim 3, It is characterized in that The first information includes at least two items of the sub-information; The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes: The SL-PRS channel busy rate is calculated according to the sub-information with the largest value among the at least two items of the sub-information.

5. The information processing method according to claim 3, It is characterized in that The first information is measured based on the SL-PRS dedicated resource pool.

6. The information processing method according to claim 3, It is characterized in that The first information is measured based on the SL-PRS shared resource pool; The method further comprises: In the SL-PRS shared resource pool, measuring second information related to a busy rate of a direct link SL channel; The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes: Calculate the SL-PRS candidate channel busy rate according to the first information; Calculate the SL channel busy rate according to the second information; The maximum value of the SL-PRS candidate channel busy rate and the SL channel busy rate is obtained as the SL-PRS channel busy rate.

7. The information processing method according to claim 6, It is characterized in that The second information includes at least one of the following sub-information: SL-PRS RSSI; SL-PRS RSRP; PSCCH RSSI; PSCCH RSRP; SL-RSSI; SL-RSRP; PSSCH RSSI; PSSCH RSRP; SL-PRS pattern occupancy.

8. The information processing method according to claim 3 or 7, It is characterized in that The SL-PRS pattern occupancy rate refers to the ratio between the number of first combs and the number of second combs in the SL-PRS comb pattern; Wherein, the first number of combs refers to the number of combs that have been occupied; The second number of combs refers to the number of all available combs.

9. The information processing method according to claim 3, It is characterized in that The first information is obtained by measurement by the terminal performing a full sensing operation within a first sensing measurement window; Or, the first information is measured by the terminal performing a partial sensing operation or a periodic sensing operation within a second sensing measurement window; Or, the first information is measured by the terminal performing a re-evaluation operation or a short-term sensing operation within a third sensing measurement window; The first perception measurement window is a full perception measurement window, the second perception measurement window is a partial perception measurement window or a periodic perception measurement window, and the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window.

10. The information processing method according to claim 1, It is characterized in that The SL-PRS channel busy rate at time slot or time n refers to the portion of the first subchannel in the resource pool; The first sub-channel refers to a sub-channel in which the first information measured by the terminal exceeds a configured or pre-configured threshold value.

11. The information processing method according to claim 9, It is characterized in that The first information is obtained by periodically measuring in the first perception measurement window, the second perception measurement window or the third perception measurement window; Alternatively, the first information is obtained by measuring triggered by SL-PRS transmission requirement information.

12. The information processing method according to claim 3, It is characterized in that The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes: The first formula is used to calculate the SL-PRS channel busy rate; Among them, the first formula is: SL_PRS_CBR n Indicates the SL-PRS channel busy rate at time slot or time n; N SC Indicates the number of sub-channels for which the first information measured by the terminal exceeds a configured or preconfigured threshold value; N SC_Total Indicates the total number of subchannels in the resource pool.

13. The information processing method according to claim 3, It is characterized in that The first information is measured by the terminal performing the partial sensing operation in the first time slot; The first time slot refers to the time slot in which the terminal receives the physical direct link control channel PSCCH and / or SL-PRS within the channel busy rate CBR measurement window.

14. The information processing method according to claim 13, It is characterized in that The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes: In the time slot where the first information is measured, the SL-PRS channel busy rate is calculated according to the first information.

15. The information processing method according to claim 13, It is characterized in that Also includes: In a case where the number of the first time slots is less than a configured or pre-configured first threshold, the configured or pre-configured first preset value is used as the SL-PRS channel busy rate.

16. The information processing method according to claim 3 or 13, It is characterized in that The SL-PRS channel busy rate at time slot or time n refers to the portion of the second subchannel in the resource pool; Among them, the second subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

17. The information processing method according to claim 16, It is characterized in that The K SL-PRS sensing opportunities or periodic sensing opportunities are opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters.

18. The information processing method according to claim 16, It is characterized in that For each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measured values ​​of the first information in the K SL-PRS sensing opportunities or periodic sensing opportunities.

19. The information processing method according to claim 13, It is characterized in that The SL-PRS channel busy rate at time slot or time n refers to the portion of the third subchannel in the resource pool; Among them, the third subchannel refers to the subchannel where the first information measured by the terminal exceeds the configured or preconfigured threshold value, and the first information is sensed and measured by the terminal in all perception opportunities or periodic perception opportunities within the fourth perception measurement window.

20. The information processing method according to claim 9 or 19, It is characterized in that The start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, a third perception measurement window, or a fourth perception measurement window; The value of T is configured by signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100 ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

21. The information processing method according to claim 19, It is characterized in that For each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measurement values ​​of the first information in all sensing occasions or periodic sensing occasions within the fourth sensing measurement window.

22. The information processing method according to claim 1, It is characterized in that Also includes: Sending the SL-PRS channel busy rate and first indication information to the first device; Wherein, the first device is a terminal or a network device; The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

23. The information processing method according to claim 1, It is characterized in that Also includes: Determining SL-PRS transmission parameters according to the SL-PRS channel busy rate; The SL-PRS transmission parameters include: SL-PRS maximum transmit power, and / or SL-PRS sub-channel number range.

24. An information processing method, applied to a first device, It is characterized in that include: receiving a SL-PRS channel busy rate and first indication information sent by a terminal; Wherein, the first device is a terminal or a network device; The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

25. The information processing method according to claim 24, It is characterized in that Also includes: configuring a first perception measurement window for the terminal performing a full perception operation; the first perception measurement window is a full perception measurement window; Or, configuring a second sensing measurement window for the terminal that performs a partial sensing operation or a periodic sensing operation; the second sensing measurement window is a partial sensing measurement window or a periodic sensing measurement window; Or, configuring a third perception measurement window for the terminal that performs the re-evaluation operation or the short-term perception operation; the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window; and / or, sending a configured threshold value to the terminal, so that the terminal can obtain the first sub-channel, the second sub-channel, or the third sub-channel; and / or, configuring the first perception measurement window, the second perception measurement window or the third perception measurement window periodically for the terminal, so that the terminal can periodically measure the first information in the first perception measurement window, the second perception measurement window or the third perception measurement window; And / or, configuring a first threshold for the terminal so that the terminal can use a configured or preconfigured first preset value as the SL-PRS channel busy rate when the number of first time slots is less than the first threshold; the first time slot refers to a time slot in which the terminal receives PSCCH and / or SL-PRS within a channel busy rate CBR measurement window; And / or, configure high-level parameters of SL-PRS perception timing or periodic perception timing to the terminal, so that the terminal can use the timings corresponding to all bits configured as 1 in the high-level parameters as K SL-PRS perception timings or periodic perception timings, where K is a natural number greater than or equal to 1.

26. The information processing method according to claim 25, It is characterized in that The start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, or a third perception measurement window; The value of T is configured to the terminal by the first device through signaling, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

27. An information processing device, the information processing device being a terminal, It is characterized in that Including memory, transceiver, processor: A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations: Calculate the channel busy rate of the direct link positioning reference signal SL-PRS according to the first information; The first information at least includes measurement information of SL-PRS.

28. The information processing device according to claim 27, It is characterized in that The SL-PRS measurement information includes at least one of the following: Fully perceived measurement information; Measurement information for partial or periodic sensing; Measurement information of the configured full-sensing measurement window; Measurement information for reappraisal or short-term perception.

29. The information processing device according to claim 27, It is characterized in that The first information includes at least one of the following sub-information: Direct link positioning reference signal received signal strength indication SL-PRS RSSI; Direct link positioning reference signal received power SL-PRS RSRP; Physical direct link control channel received signal strength indication PSCCH RSSI; Physical direct link control channel reference signal received power PSCCH RSRP; Through link received signal strength indication SL-RSSI; Direct link reference signal received power SL-RSRP; Physical direct link shared channel received signal strength indication PSSCH RSSI; Physical direct link shared channel reference signal received power PSSCH RSRP; SL-PRS pattern occupancy.

30. The information processing device according to claim 29, It is characterized in that The first information includes at least two items of the sub-information; The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes: The SL-PRS channel busy rate is calculated according to the sub-information with the largest value among the at least two items of the sub-information.

31. The information processing device according to claim 29, It is characterized in that The first information is measured based on the SL-PRS dedicated resource pool.

32. The information processing device according to claim 29, It is characterized in that The first information is measured based on the SL-PRS shared resource pool; The operations also include: In the SL-PRS shared resource pool, measuring second information related to a busy rate of a direct link SL channel; The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes: Calculate the SL-PRS candidate channel busy rate according to the first information; Calculate the SL channel busy rate according to the second information; The maximum value of the SL-PRS candidate channel busy rate and the SL channel busy rate is obtained as the SL-PRS channel busy rate.

33. The information processing device according to claim 32, It is characterized in that The second information includes at least one of the following sub-information: SL-PRS RSSI; SL-PRS RSRP; PSCCH RSSI; PSCCH RSRP; SL-RSSI; SL-RSRP; PSSCH RSSI; PSSCH RSRP; SL-PRS pattern occupancy.

34. The information processing device according to claim 29 or 33, It is characterized in that The SL-PRS pattern occupancy rate refers to the ratio between the number of first combs and the number of second combs in the SL-PRS comb pattern; Wherein, the first number of combs refers to the number of combs that have been occupied; The second number of combs refers to the number of all available combs.

35. The information processing device according to claim 29, It is characterized in that The first information is obtained by measurement by the terminal performing a full sensing operation within a first sensing measurement window; Or, the first information is measured by the terminal performing a partial sensing operation or a periodic sensing operation within a second sensing measurement window; Or, the first information is measured by the terminal performing a re-evaluation operation or a short-term sensing operation within a third sensing measurement window; The first perception measurement window is a full perception measurement window, the second perception measurement window is a partial perception measurement window or a periodic perception measurement window, and the third perception measurement window is a re-evaluation measurement window or a short-term perception measurement window.

36. The information processing device according to claim 27, It is characterized in that The SL-PRS channel busy rate at time slot or time n refers to the portion of the first subchannel in the resource pool; The first sub-channel refers to a sub-channel in which the first information measured by the terminal exceeds a configured or pre-configured threshold value.

37. The information processing device according to claim 35, It is characterized in that The first information is obtained by periodically measuring in the first perception measurement window, the second perception measurement window or the third perception measurement window; Alternatively, the first information is obtained by measuring triggered by SL-PRS transmission requirement information.

38. The information processing device according to claim 29, It is characterized in that The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes: The first formula is used to calculate the SL-PRS channel busy rate; Among them, the first formula is: SL_PRS_CBR n Indicates the SL-PRS channel busy rate at time slot or time n; N SC Indicates the number of sub-channels for which the first information measured by the terminal exceeds a configured or preconfigured threshold value; N SC_Total Indicates the total number of subchannels in the resource pool.

39. The information processing device according to claim 29, It is characterized in that The first information is measured by the terminal performing the partial sensing operation in the first time slot; The first time slot refers to the time slot in which the terminal receives the physical direct link control channel PSCCH and / or SL-PRS within the channel busy rate CBR measurement window.

40. The information processing device according to claim 39, It is characterized in that The calculating, according to the first information, a direct link positioning reference signal SL-PRS channel busy rate includes: In the time slot where the first information is measured, the SL-PRS channel busy rate is calculated according to the first information.

41. The information processing device according to claim 39, It is characterized in that The operations also include: In a case where the number of the first time slots is less than a configured or pre-configured first threshold, the configured or pre-configured first preset value is used as the SL-PRS channel busy rate.

42. The information processing device according to claim 29 or 39, It is characterized in that The SL-PRS channel busy rate at time slot or time n refers to the portion of the second subchannel in the resource pool; Among them, the second subchannel refers to: the subchannel in which the first information measured by the terminal exceeds the configured or pre-configured threshold value, and the first information is sensed and measured by the terminal in K SL-PRS sensing opportunities or periodic sensing opportunities before the time slot or time n; K is a natural number greater than or equal to 1.

43. The information processing device according to claim 42, It is characterized in that The K SL-PRS sensing opportunities or periodic sensing opportunities are opportunities corresponding to all bits configured as 1 in the corresponding high-level parameters.

44. The information processing device according to claim 42, It is characterized in that For each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measured values ​​of the first information in the K SL-PRS sensing opportunities or periodic sensing opportunities.

45. The information processing device according to claim 39, It is characterized in that The SL-PRS channel busy rate at time slot or time n refers to the portion of the third subchannel in the resource pool; Among them, the third subchannel refers to the subchannel where the first information measured by the terminal exceeds the configured or preconfigured threshold value, and the first information is sensed and measured by the terminal in all perception opportunities or periodic perception opportunities within the fourth perception measurement window.

46. ​​The information processing device according to claim 35 or 45, It is characterized in that The start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, a third perception measurement window, or a fourth perception measurement window; The value of T is configured by signaling notification, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100 ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

47. The information processing device according to claim 45, It is characterized in that For each sub-channel, the corresponding value of the first information is: the average value or maximum value of all measurement values ​​of the first information in all sensing occasions or periodic sensing occasions within the fourth sensing measurement window.

48. The information processing device according to claim 27, It is characterized in that The operations also include: Sending the SL-PRS channel busy rate and first indication information to the first device through the transceiver; Wherein, the first device is a terminal or a network device; The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

49. The information processing device according to claim 27, It is characterized in that The operations also include: Determining SL-PRS transmission parameters according to the SL-PRS channel busy rate; The SL-PRS transmission parameters include: SL-PRS maximum transmit power, and / or SL-PRS sub-channel number range.

50. An information processing device, the information processing device being a first device, It is characterized in that Including memory, transceiver, processor: A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations: Receiving, by the transceiver, the SL-PRS channel busy rate and the first indication information sent by the terminal; Wherein, the first device is a terminal or a network device; The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

51. The information processing device according to claim 50, It is characterized in that The operations also include: By means of the transceiver, a first perception measurement window is configured for the terminal that performs a full perception operation; the first perception measurement window is a full perception measurement window; or, a second perception measurement window is configured for the terminal that performs a partial perception operation or a periodic perception operation; the second perception measurement window is a partial perception measurement window or a periodic perception measurement window; or, a third perception measurement window is configured for the terminal that performs a reassessment operation or a short-term perception operation; the third perception measurement window is a reassessment measurement window or a short-term perception measurement window; and / or, sending a configured threshold value to the terminal, so that the terminal can obtain the first sub-channel, the second sub-channel, or the third sub-channel; and / or, configuring the first perception measurement window, the second perception measurement window or the third perception measurement window periodically for the terminal, so that the terminal can periodically measure the first information in the first perception measurement window, the second perception measurement window or the third perception measurement window; And / or, configuring a first threshold for the terminal so that the terminal can use a configured or preconfigured first preset value as the SL-PRS channel busy rate when the number of first time slots is less than the first threshold; the first time slot refers to a time slot in which the terminal receives PSCCH and / or SL-PRS within a channel busy rate CBR measurement window; And / or, configure high-level parameters of SL-PRS perception timing or periodic perception timing to the terminal, so that the terminal can use the timings corresponding to all bits configured as 1 in the high-level parameters as K SL-PRS perception timings or periodic perception timings, where K is a natural number greater than or equal to 1.

52. The information processing device according to claim 51, It is characterized in that The start time of the target time window is a time slot or a moment nT, and the end time is a time slot or a moment n-1; the target time window is a first perception measurement window, a second perception measurement window, or a third perception measurement window; The value of T is configured to the terminal by the first device through signaling, or the value of T is pre-configured; when the value of T is pre-configured, T is M×100ms or L×100 time slots, where M and L are both positive integers greater than or equal to 1.

53. An information processing device, applied to a terminal, It is characterized in that include: A first calculation unit is used to calculate a direct link positioning reference signal SL-PRS channel busy rate according to the first information; The first information at least includes measurement information of SL-PRS.

54. An information processing device, applied to a first device, It is characterized in that include: A first receiving unit, configured to receive an SL-PRS channel busy rate and first indication information sent by a terminal; Wherein, the first device is a terminal or a network device; The first indication information is used to indicate whether the SL-PRS channel busy rate is calculated for the SL-PRS dedicated resource pool or for the SL-PRS shared resource pool.

55. A non-transitory readable storage medium, It is characterized in that The non-transitory readable storage medium stores a computer program, and the computer program is used to cause a processor to execute the method according to any one of claims 1 to 26.

Citation Information

Cited By

  • Information processing method, apparatus and device

    EP4716117A1