Novel high-strength three-dimensional geogrid processing system
The new high-strength three-dimensional geogrid processing system solves the problem of poor soil stabilization effect of single-layer fiberglass geogrid structure, and realizes the rapid laying of three-dimensional geogrid that simplifies construction and improves soil stabilization and slope protection effect.
Patent Information
- Application Number
- CN202411040204.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-07-31
AI Technical Summary
Existing fiberglass geogrids are usually single-layer structures, resulting in poor soil or slope stabilization effects. Double-layer laying and additional support components are required, which takes a long time to construct and has great limitations in application.
A new high-strength three-dimensional geogrid processing system is adopted, including a warp knitting device, a fastener installation device, and a connector installation device. Two layers of geogrid are processed by warp knitting and pre-stored on the winding device. After the fasteners and connectors are installed, a three-dimensional structure is formed, simplifying the laying process.
It enables rapid and simple installation of three-dimensional geogrids, improves soil stabilization and slope protection effects, and reduces construction time and installation complexity.
Smart Images

Figure CN118977504A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of glass fiber geogrid manufacturing technology, in particular to a novel high-strength three-dimensional geogrid processing system. Background Art
[0002] Geogrid is a major geosynthetic material. At present, in order to ensure the stability of the physical and chemical properties of geogrid, glass fiber is often used to complete the processing of geogrid. That is, glass fiber is used as the material, and a mesh structure is made through a weaving process, and then a special coating process is performed to finally obtain the finished glass fiber grid.
[0003] However, as far as the current fiberglass grating is concerned, the fiberglass grating woven by a warp knitting machine usually has only a single-layer structure, which makes its soil or slope fixing effect poor during use. Sometimes it is necessary to lay the fiberglass grating in double layers and add supports between the double layers of fiberglass grating so that the double layers of fiberglass grating can complete the soil or slope fixing work in a three-dimensional composite shape to improve the use effect of the fiberglass grating. However, this method of ensuring the use effect of the fiberglass grating through post-construction, on the one hand, requires a lot of time for double-layer laying, and on the other hand, the method of installing supports in the later stage will waste a lot of installation time, which makes the fiberglass grating still have great limitations in use during geotechnical construction. Summary of the invention
[0004] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides a novel high-strength three-dimensional geogrid processing system.
[0005] The technical solution of the present invention is as follows:
[0006] A novel high-strength three-dimensional geogrid processing system comprises a warp knitting device, a first winding device, a fixing installation device, a connecting installation device and a second winding device which are arranged in sequence, wherein the warp knitting device is used for the warp knitting processing of a fiberglass grid mesh, the processed grid mesh can be pre-stored on the first winding device, and the fixing installation device and the connecting installation device can perform secondary processing on the grid mesh on the first winding device, and finally complete the processing of the three-dimensional geogrid, and the processed geogrid can be wound up by the second winding device to facilitate later transportation and use.
[0007] As for the structure and coordination of the warp knitting device and the first winding device, the warp knitting device includes two warp knitting machines for processing grid meshes, and the first winding device includes two winding mechanisms, and the two winding mechanisms are configured to respectively complete the winding work of the grid meshes processed by the two warp knitting machines, and temporarily store the two grid meshes on the two winding mechanisms of the first winding device.
[0008] As the core technical concept of the present invention, the fixing member installation device and the connecting member installation device are configured to respectively complete the installation of the fixing members and the connecting members on the grid net, and the winding of the three-dimensional geogrid product can be completed through the second winding device.
[0009] Wherein, the fixing part includes a square upper bottom plate, an upper top plate, a lower bottom plate and a lower top plate, wherein a clamping structure that can be clamped and matched with each other is provided between the upper bottom plate and the upper top plate, and between the lower bottom plate and the lower top plate. On the basis of the above-mentioned fixing part structure, the fixing part installation device includes a first installation bracket and two groups of fixing part installation units arranged above and below it, and the grille nets on the two winding mechanisms can pass through the two fixing part installation units respectively, and the fixing part installation units on the upper side are arranged to press the upper top plate and the upper bottom plate on the upper and lower sides of the intersection of the grille nets, and clamp the grille net through the clamping structure, and the fixing part installation units on the lower side are arranged to press the lower top plate and the lower bottom plate on the upper and lower sides of the intersection of the grille nets, and clamp the grille net with each other through the clamping structure, thereby completing the installation of the upper bottom plate and the upper top plate on the upper grille net.
[0010] The middle parts of the upper top plate and the upper bottom plate are both provided with openings, and the upper side of the fixing piece installation unit along the side of the transportation direction of the grille net is also provided with a punching unit capable of punching holes in the grille net between the upper top plate and the upper bottom plate (corresponding to the opening position), and the upper side of the lower top plate is also provided with a threaded tube, and the connecting piece includes an adjusting pin, and the adjusting pin includes a plug column and two spring leaves arranged opposite to each other at one end thereof and with a gap therebetween, and a card groove capable of accommodating the upper top plate and the upper bottom plate to be inserted into the outer side of the end of the two spring leaves away from the plug column is provided. On the basis of the above structure, the connecting piece installation device includes a second bracket and a connecting piece installation unit arranged thereon, and the upper and lower layers of grille nets that complete the fixing piece installation work can pass through the connecting piece installation unit in a fitting state, and in the process of passing through the connecting piece installation unit, the upper bottom plate on the upper grille net is positioned one by one with the lower top plate on the lower grille net, and the connecting piece installation unit is configured to enable the plug column part of the adjusting pin to pass through the openings of the upper top plate and the upper bottom plate in sequence and be spirally connected to the threaded tube of the lower top plate.
[0011] On the basis of the above-mentioned warp knitting device, the first winding device, the fixing installation device, the connecting member installation device and the second winding device structure, the warp knitting processing work of the two layers of grid mesh can be completed respectively through the warp knitting device, the processed grid mesh can be pre-stored on the first winding device, the fixing installation device can complete the installation work of the upper bottom plate and the upper top plate of the upper grid mesh, and the installation work of the upper and lower bottom plates and the lower top plate of the lower grid mesh, and the position of the corresponding opening of the grid mesh between the upper top plate and the upper bottom plate can be punched through the punching unit, and the connecting member installation device can complete the installation work of the upper bottom plate and the upper top plate of the upper grid mesh. The component installation device can pass the adjusting pin through the openings of the upper top plate and the upper bottom plate and spirally connect them with the lower top plate. The finally obtained three-dimensional geogrid product can be rolled up on the second rolling device. When in use, the laying of the double-layer grid mesh can be completed in one laying. On the basis of fixing the lower grid mesh, it is only necessary to lift the upper grid mesh, and the upper top plate and the upper bottom plate can be slid into the grooves on the two spring leaves to complete the support work of the upper grid mesh, thereby finally ensuring the soil consolidation and slope protection effect of the three-dimensional geogrid, and the laying of the three-dimensional geogrid can be simpler and faster.
[0012] As described above, a new type of high-strength three-dimensional geogrid processing system is a preferred embodiment, and the warp knitting device also includes a first guide mechanism and a second guide mechanism respectively arranged on the discharge side of the first warp knitting machine and the second warp knitting machine, and the first guide mechanism and the second guide mechanism both include a guide frame and a first roller on its upper side, and the upper / lower side of the first roller is flush with the position of the discharge port of the warp knitting machine. On the basis of this structure, the grid mesh processed by the first warp knitting machine and the second warp knitting machine can be wound up by the winding mechanism in a fit with the upper / lower side of the first roller, thereby ensuring that the winding work and the processing work of the warp knitting machine will not interfere with each other.
[0013] A novel high-strength three-dimensional geogrid processing system as described above, specifically speaking of the structure of the first winding device, also includes a first winding frame, and two winding mechanisms are both arranged on the first winding frame, and the winding mechanism includes two sets of reversing components arranged opposite to each other, and two first winding shafts arranged with a horizontal gap, the two ends of the two first winding shafts are respectively connected to the two reversing components, and at least one end is provided with a driving motor capable of driving it to rotate; the two first winding shafts are arranged to be able to periodically complete the position exchange work under the action of the reversing component, on the basis of this structure, while the first winding shaft on one side of the winding mechanism is performing the grid mesh rewinding work, the grid mesh on the first winding shaft on the other side can complete the installation of the fixing parts and the connecting parts through the fixing part installation device and the connecting part installation device, thereby preventing interference problems caused by the mismatch between the warp knitting efficiency of the warp knitting device and the secondary processing efficiency of the fixing part installation device and the connecting part installation device, and ensuring that the processing of the grid mesh and the installation of the fixing parts and the connecting parts can be carried out separately.
[0014] A novel high-strength three-dimensional geogrid processing system as described above, with respect to the structure of the fixing member installation unit, it includes two first fixing blocks that are relatively arranged and fixed to the first mounting bracket, and two groups of fixing member installation modules are arranged up and down between the two fixing blocks; the fixing member installation module includes a first cross bar that is horizontal and arranged up and down between the two first fixing blocks, and the grid net can pass through between the two first cross bars, and a first slide seat is slidably provided on the first cross bar along its length direction, and a first support rod with one end connected to the first slide seat and perpendicular to the first cross bar is provided on one side of the first slide, and a first support is slidably provided on the first support rod along its length direction; the two groups of fixing member installation modules arranged up and down are respectively an upper fixing member installation module and a lower fixing member installation module, and a first slide groove is vertically provided on one side of the first support; the two groups of fixing member installation modules also include a first suction head, and the first suction head of the upper fixing member installation module is passed through the first The lower base plate is affixed to the chassis and the lower base plate is adapted to move the chassis to a position adjacent to the chassis to move the chassis to a position adjacent to the chassis.
[0015] As a preferred embodiment, the fixing installation device also includes a first bracket arranged on the outside of the first installation bracket, and a third guiding mechanism is provided on the first bracket corresponding to the positions of the two groups of fixing installation units on the grid entrance side and the grid exit side, so as to ensure that the grille net can smoothly pass through the two groups of fixing installation units and complete the installation of the fixing.
[0016] Specifically speaking, the structure of the third guide mechanism includes two second rollers that are horizontally and vertically arranged, and both ends of the two second rollers are connected to the first bracket through connecting blocks. The connecting blocks at both ends of one of the second rollers are vertically slidably connected to the first bracket and a spring is connected between the connecting block and the first bracket. The direction of the elastic force on the connecting block connected to the spring points to the connecting blocks at both ends of the other second roller, thereby ensuring that the two second rollers can elastically clamp the grille net, further ensuring the transportation guiding effect of the grille net.
[0017] As a further preference, the vertical height of the non-elastically arranged second roller is adjustable, and through this arrangement the transport height of the grille mesh / the clamping force of the two second rollers can be adjusted, further ensuring the guiding effect of the third guiding mechanism.
[0018] A new type of high-strength three-dimensional geogrid processing system as described above, with regard to the structure of the connecting piece installation unit, it includes a horizontally arranged second cross bar, the grid mesh can pass through the lower side of the second cross bar, a second slide seat is slidably provided on the second cross bar along its length direction, and a second support rod is provided on one side of the second slide seat at one end which is connected to the second slide seat and is perpendicular to the second cross bar, a second support is slidably provided on the second support rod along its length direction, and a second slide groove is vertically provided on one side of the second support; the connecting piece installation unit also includes a second suction head, which is vertically slidably connected to the second support through the second slide groove; a connecting piece conveying line for adjusting pin transportation is also provided on the outer side of the connecting piece installation unit, the adjusting pin can be transported vertically (with the spring leaf facing up) along the connecting piece conveying line, the second suction head can automatically pick up the adjusting pin on the connecting piece conveying line, and pass the adjusting pin through the openings on the upper top plate and the upper bottom plate, and spirally connect it with the threaded cylinder on the lower top plate.
[0019] As a preferred embodiment, in order to ensure the adsorption effect of the second adsorption head and enable the second adsorption head to smoothly complete the installation of the adjusting pin, the second adsorption head is configured to include a rotatable tightening shaft, the lower end of the tightening shaft is provided with a suction port that can accommodate the adjusting pin, and the suction port is provided with an insert plate that can be inserted between the two reeds.
[0020] The beneficial effects of the present invention are as follows: the present invention is a novel high-strength three-dimensional geogrid processing system. Under the action of the warp knitting device, the first winding device, the fixing installation device, the connecting member installation device and the second winding device, the warp knitting device can respectively complete the warp knitting processing of two layers of grid nets, and the processed grid nets can be pre-stored on the first winding device. The fixing installation device can complete the installation of the upper bottom plate and the upper top plate of the upper grid net, as well as the installation of the lower bottom plate and the lower top plate of the lower grid net, and the corresponding holes between the upper top plate and the upper bottom plate of the grid net can be punched through the punching unit. The opening position is punched, and the connecting piece installation device can pass the adjusting pin through the openings of the upper top plate and the upper bottom plate and spirally connect them to the lower top plate. The finally obtained three-dimensional geogrid product can be rolled up on the second rolling device. When in use, the laying of the double-layer grid mesh can be completed in one laying. On the basis of fixing the lower grid mesh, it is only necessary to lift the upper grid mesh, the upper top plate and the upper bottom plate and slide them into the slots on the two spring leaves to complete the support work of the upper grid mesh, thereby finally ensuring the soil consolidation and slope protection effect of the three-dimensional geogrid, and the laying of the three-dimensional geogrid can be simpler and faster. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] By reading the detailed description of the preferred embodiment below, the scheme and advantages of the present application will become clear to those skilled in the art. The accompanying drawings are only for the purpose of illustrating the preferred embodiment and are not to be considered as limiting the present invention.
[0022] In the attached picture:
[0023] Figure 1 It is a structural schematic diagram of the processing system in the embodiment;
[0024] Figure 2 It is a structural schematic diagram of a warp knitting device in an embodiment;
[0025] Figure 3 This is a schematic structural diagram of the first winding device in the embodiment;
[0026] Figure 4 It is a structural schematic diagram of the fixing member installation device in the embodiment;
[0027] Figure 5 for Figure 4 A schematic diagram of the local enlarged structure at point A in the middle;
[0028] Figure 6 is a structural schematic diagram of a fixing member installation unit in an embodiment;
[0029] Figure 7 It is a structural schematic diagram of the connecting member installation device in the embodiment;
[0030] Figure 8 is a structural schematic diagram of the second mounting mechanism in the embodiment;
[0031] Fig. 9 is a schematic structural diagram of a second winding device in the embodiment;
[0032] Fig.10 It is a schematic diagram of the structure of the three-dimensional geogrid processed by the processing system in the embodiment;
[0033] Fig.11 It is a schematic diagram of the coordinated fixing structure of the support device and the grille mesh in the embodiment;
[0034] Fig.12 This is a schematic diagram of the exploded structure of the support device in the embodiment;
[0035] Fig.13 It is a structural schematic diagram of the adjusting pin in the embodiment;
[0036] The components represented by the reference numerals in the figure are:
[0037] 1. Warp knitting device; 11. First warp knitting machine; 12. Second warp knitting machine; 13. First guide mechanism; 14. Second guide mechanism; 2. First winding device; 21. First winding frame; 22. Winding mechanism; 221. Reversing disk; 222. Reversing motor; 223. Driving motor; 224. First winding shaft; 3. Fixing member installation device; 31. First bracket; 32. Third guide mechanism; 33. First installation mechanism; 331. First installation bracket; 332. Fixing member installation unit; 3321. First fixing block; 332 2. Upper fixing part installation module; 3323. Lower fixing part installation module; 4. Connecting part installation device; 41. Second bracket; 42. Fourth guide mechanism; 43. Second installation mechanism; 431. Second fixing block; 432. Connecting part installation unit; 5. Second winding device; 51. Second winding frame; 52. Second winding shaft; 6. Grille; 7. Support device; 71. Lower bottom plate; 72. Lower top plate; 73. Upper bottom plate; 74. Upper top plate; 75. Adjusting pin; 751. Insert column; 752. Spring leaf; 7521. Card slot. DETAILED DESCRIPTION
[0038] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings.
[0039] Example
[0040] This embodiment provides a novel high-strength three-dimensional geogrid processing system for processing three-dimensional geogrids, see Figure 1 and Fig.10 , including a warp knitting device 1, a first winding device 2, a support component installation module and a second winding device 5 which are arranged in sequence, wherein the support component installation module includes a fixing component installation device 3 and a connecting component installation device 4 which are arranged in sequence, the warp knitting device 1 is used for warp knitting processing of a fiberglass grid mesh 6, the processed grid mesh 6 can be pre-stored on the first winding device 2, and the fixing component installation device 3 and the connecting component installation device 4 can perform secondary processing on the grid mesh 6 on the first winding device 2, and finally complete the processing of the three-dimensional geogrid, and the processed geogrid can be wound up by the second winding device 5 to facilitate the later transportation and use.
[0041] It should be noted that the above-mentioned support assembly installation device is used for the installation and fixing work of the support device 7. The support device 7 includes a fixing part and a connecting part, and the installation work on the grille mesh 6 is completed by the fixing part installation device 3 and the connecting part installation device 4 respectively.
[0042] Combination Fig.12 and Fig.13 , the structure of the fixing parts and the connecting parts are explained in advance.
[0043] First, regarding the structure of the fixing member, Fig.12 The cam 77 is a substantially rectangular shape, and the cam 77 has two bosses, each of which has two bosses, one of which is a square shape. The cam 77 has two bosses, and the other is a square shape. The cam 77 has two bosses, and the cam 77 has two bosses. The cam 77 has two bosses, and the cam 77 has two bosses.
[0044] In terms of the structure of the connecting member, Fig.13 , which includes an adjusting pin 75, and the adjusting pin 75 includes a plug post 751, the outer diameter of the plug post 751 is adapted to the opening diameters on the upper top plate 74 and the upper bottom plate 73, one end of the plug post 751 is oppositely provided with two spring leaves 752 with a gap between them, and the other end is an external thread structure that cooperates with the threaded barrel, and the outer side of the end of the two spring leaves 752 away from the plug post 751 is provided with a slot 7521 that can accommodate the upper top plate 74 and the upper bottom plate 73 to be inserted.
[0045] Next, the structure of the processing system (the above-mentioned novel high-strength three-dimensional geogrid processing system) is described in detail.
[0046] In this embodiment, combined with Figure 2 The warp knitting device 1 includes two warp knitting machines for processing the grid mesh 6, and the first winding device 2 is configured to complete the winding work of the grid mesh 6 processed by the two warp knitting machines.
[0047] As a preferred embodiment, the warp knitting device 1 also includes a first guide mechanism 13 and a second guide mechanism 14 respectively arranged on the discharge side of the first warp knitting machine 11 and the second warp knitting machine 12, and the first guide mechanism 13 and the second guide mechanism 14 both include a guide frame and a first roller on its upper side, and the upper side / lower side of the first roller is flush with the position of the discharge port of the warp knitting machine. On the basis of this structure, the grid mesh 6 processed by the first warp knitting machine 11 and the second warp knitting machine 12 can be wound up by the first winding device 2 in a manner that is in contact with the upper side / lower side of the first roller, thereby ensuring that the winding work and the processing work of the warp knitting machine will not interfere with each other.
[0048] In this embodiment, combined with Figure 3 The first winding device 2 includes two winding mechanisms 22, and the two winding mechanisms 22 are configured to respectively complete the winding work of the grid meshes 6 processed by the two warp knitting machines, and temporarily store the two grid meshes 6 on the two winding mechanisms 22 of the first winding device 2.
[0049] Specifically, the first winding device 2 also includes a first winding frame 21, and the two winding mechanisms 22 are both arranged on the first winding frame 21. The winding mechanism 22 includes two sets of reversing components arranged opposite to each other, and two first winding shafts 224 arranged with a horizontal gap. The two ends of the two first winding shafts 224 are respectively connected to the two reversing components, and at least one end is provided with a driving motor 223 capable of driving them to rotate; the two first winding shafts 224 are arranged to be able to periodically complete the position exchange work under the action of the reversing component. On the basis of this structure, while the first winding shaft 224 on one side of the winding mechanism 22 is performing the grid mesh 6 winding work, the grid mesh 6 on the first winding shaft 224 on the other side can complete the installation of the fixing parts and the connecting parts through the fixing part installation device 3 and the connecting part installation device 4, thereby preventing the interference problem caused by the mismatch between the warp knitting efficiency of the warp knitting device 1 and the secondary processing efficiency of the fixing part installation device 3 and the connecting part installation device 4, and ensuring that the processing of the grid mesh 6 and the installation of the fixing parts and the connecting parts can be carried out separately.
[0050] Furthermore, the reversing assembly includes two circular reversing disks 221 arranged opposite to each other, and both reversing disks 221 are rotatably connected to the first bracket 31. A reversing motor 222 is provided at a position corresponding to at least one reversing disk 221 on the first bracket 31, and the reversing motor 222 can drive the reversing disk 221 to rotate. Both ends of the two first winding shafts 224 are rotatably connected to the reversing disk 221, and the driving motor 223 is arranged on the reversing disk 221 for rotating and driving the first winding shaft 224.
[0051] In this embodiment, combined with Figure 4 The fixing member installation device 3 includes a first installation mechanism 33 for fixing member installation, the first installation mechanism 33 includes a first installation bracket 331 and two groups of fixing member installation units 332 arranged above and below, the grille nets 6 on the two winding mechanisms 22 can pass through the two fixing member installation units 332 respectively, and the fixing member installation units 332 on the upper side are configured to press the upper top plate 74 and the upper bottom plate 73 on the upper and lower sides of the intersection of the grille nets 6 respectively, and clamp the grille net 6 through the clamping structure, and the fixing member installation units 332 on the lower side are configured to press the lower top plate 72 and the lower bottom plate 71 on the upper and lower sides of the intersection of the grille nets 6 respectively, and clamp the grille net 6 with each other through the clamping structure, thereby completing the installation of the upper bottom plate 73 and the upper top plate 74 on the upper grille net 6.
[0052] Specifically speaking, the structure of the fixing member installation unit 332 is combined with Figure 6It includes two first fixed blocks 3321 that are arranged opposite to each other and fixed to the first mounting bracket 331, and two groups of fixing member installation modules are arranged above and below between the two fixing blocks. The fixing member installation module includes a first cross bar that is horizontal and arranged above and below between the two first fixed blocks 3321. The grille net 6 can pass through between the two first cross bars. A first slide seat is slidably provided on the first cross bar along its length direction, and a first support rod with one end connected to the first slide seat and perpendicular to the first cross bar is provided on one side of the first slide. A first support seat is slidably provided on the first support rod along its length direction.
[0053] Furthermore, the two groups of upper and lower fixing part installation modules are respectively an upper fixing part installation module 3322 and a lower fixing part installation module 3323, a first slide groove is vertically provided on one side of the first support, and the two groups of fixing part installation modules also include a first adsorption head, wherein the first adsorption head of the upper fixing part installation module 3322 is vertically slidably connected to the first support through the first slide groove, and an adapter is slidably provided in the first slide groove of the first support of the lower fixing part installation module 3323, and the adapter includes a vertically arranged turntable, and the first adsorption head of the lower fixing part installation module 3323 is arranged on the outside of the turntable.
[0054] On the basis of the above structure, the outer sides of the upper fixing piece installation module 3322 and the lower fixing piece installation module 3323 are also provided with accessory conveying lines for transporting the upper bottom plate 73, the upper top plate 74, the lower bottom plate 71 and the lower top plate 72, and the accessory conveying lines include an upper top plate 74 conveying line arranged on the upper fixing piece installation module 3322 corresponding to the upper side fixing piece installation unit 332, an upper bottom plate 73 conveying line arranged on the lower fixing piece installation module 3323 corresponding to the upper side fixing piece installation unit 332, a lower top plate 72 conveying line arranged on the upper fixing piece installation module 3322 corresponding to the lower side fixing piece installation unit 332, and a lower top plate 72 conveying line arranged on the lower fixing piece installation module 3323 corresponding to the lower side fixing piece installation unit 332. The upper fixing part installation module 3322 can automatically pick up the upper top plate 74 / lower top plate 72 on the accessory conveying line (upper top plate 74 conveying line / lower top plate 72 conveying line) through the first suction head, and convey the upper top plate 74 / lower top plate 72 to the upper side of the intersection position of the grille net 6. The first suction head of the lower fixing part installation module 3323 can first rotate downward under the action of the turntable, and automatically pick up the lower bottom plate 71 / upper bottom plate 73 on the accessory conveying line (lower bottom plate 71 conveying line / upper bottom plate 73 conveying line). After picking up, the turntable can be rotated again to convey the upper bottom plate 73 / lower bottom plate 71 to the lower side of the intersection position of the grille net 6, completing the clamping and fixing work between the upper bottom plates 73 and the upper bottom plates 73, and the lower bottom plates 71 and the lower top plate 72.
[0055] As a preferred embodiment, the fixing installation device 3 also includes a first bracket 31 arranged on the outside of the first installation bracket 331, and a third guiding mechanism 32 is provided on the first bracket 31 corresponding to the positions of the two groups of fixing installation units 332 on the inlet side and the outlet side, so as to ensure that the grille net 6 can smoothly pass through the two groups of fixing installation units 332 to complete the installation of the fixing.
[0056] Specifically speaking, the structure of the third guide mechanism 32 is Figure 5 It includes two second rollers that are horizontally and vertically arranged, and both ends of the two second rollers are connected to the first bracket 31 through connecting blocks. The connecting blocks at both ends of one of the second rollers are vertically slidably connected to the first bracket 31 and a spring is connected between the connecting block and the first bracket 31. The direction of the elastic force on the connecting block connected to the spring points to the connecting blocks at both ends of the other second roller, so as to ensure that the two second rollers can elastically clamp the grille net 6, further ensuring the transportation guiding effect of the grille net 6.
[0057] As a further preferred embodiment, the vertical height of the non-elastically arranged second roller is adjustable, and this arrangement enables the transport height of the grille mesh 6 / the clamping force of the two second rollers to be adjusted, further ensuring the guiding effect of the third guide mechanism 32 .
[0058] In this embodiment, combined with Figure 7 The connector installation device 4 includes a second bracket 41 and a second installation mechanism 43 for connector installation arranged thereon, the second installation mechanism 43 includes a connector installation unit 432, and the upper side of the fixing member installation unit 332 is provided with a punching unit capable of punching holes in the grille mesh 6 (corresponding to the opening position) between the upper top plate 74 and the upper bottom plate 73 on the side along the transportation direction of the grille mesh 6. The upper and lower layers of the grille mesh 6 that have completed the fixing member installation work can pass through the connector installation unit 432 in a fitted state, and in the process of passing through the connector installation unit 432, the upper bottom plate 73 on the upper grille mesh 6 is positioned one by one with the lower top plate 72 on the lower grille mesh 6, and the connector installation unit 432 is configured to allow the column 751 part of the adjustment pin 75 to pass through the openings of the upper top plate 74 and the upper bottom plate 73 in turn and be spirally connected to the threaded barrel of the lower top plate 72.
[0059] Combination Figure 8The second mounting mechanism 43 also includes two second fixed blocks 431 arranged opposite to each other, and the connecting member mounting unit 432 is arranged between the two second fixed blocks 431. Specifically, the structure of the connecting member mounting unit 432 includes a second cross bar which is arranged horizontally and connected to the two second fixed blocks 431 at both ends, and the grille 6 can pass through the lower side of the second cross bar. A second slide seat is slidably provided on the second cross bar along its length direction, and a second support rod with one end connected to the second slide seat and perpendicular to the second cross bar is provided on one side of the second slide seat. A second support rod is slidably provided on the second support rod along its length direction. Two supports, a second slide groove is vertically provided on one side of the second support; the connector installation unit 432 also includes a second suction head, which is vertically slidably connected to the second support through the second slide groove; the outer side of the connector installation unit 432 is also provided with a connector conveying line for transporting the adjusting pin 75, and the adjusting pin 75 can be transported vertically (with the reed 752 facing upward) along the connector conveying line, and the second suction head can automatically pick up the adjusting pin 75 on the connector conveying line, and pass the adjusting pin 75 through the openings on the upper top plate 74 and the upper bottom plate 73, and spirally connect it with the threaded barrel on the lower top plate 72.
[0060] As a preferred embodiment, in order to ensure the adsorption effect of the second adsorption head and enable the second adsorption head to smoothly complete the installation of the adjustment pin 75, the second adsorption head is configured to include a rotatable tightening shaft, and the lower end of the tightening shaft is provided with a suction port that can accommodate the adjustment pin 75, and the suction port is provided with an insertion plate that can be inserted between the two reeds 752.
[0061] As a further preference, in order to enable the adjusting pin 75 to smoothly pass through the upper top plate 74 and the upper bottom plate 73 and be spirally connected with the lower top plate 72 under the action of the second adsorption head, a support platform is also provided on the lower side of the connecting member installation unit 432, and the upper and lower layers of the grille mesh 6 can pass through the upper side of the support platform in a fitted state to prevent the grille mesh 6 from being compressed and deformed during the installation of the adjusting pin 75.
[0062] More preferably, in order to ensure that the two layers of grille mesh 6 can pass through the connecting piece installation unit 432 and the support platform in a fitted state, a fourth guide mechanism 42 is provided on the second bracket 41 at the positions corresponding to the inlet and outlet sides of the connecting piece installation unit 432, and the fourth guide mechanism 42 includes two third rollers which are horizontally arranged up and down, and both ends of the two third rollers are rotatably connected to the second bracket 41, wherein the fourth guide mechanism 42 corresponding to the outlet side of the connecting piece installation unit 432 has a third roller outer ring which is provided with an avoidance groove which can accommodate the passage of the adjustment pin 75.
[0063] In this embodiment, combined with Fig. 9The second winding device 5 is configured to complete the winding work of the three-dimensional geogrid product (after the fixing parts and connecting parts are installed). Specifically, the second winding device 5 includes a second winding frame 51, and a second winding shaft 52 is horizontally provided on the second winding frame 51, and both ends of the second winding shaft 52 are rotatably connected to the second winding frame 51. The second winding frame 51 is also provided with a winding motor that is transmission-connected to the second winding shaft 52, which is configured to drive the second winding shaft 52 to rotate to complete the winding work of the three-dimensional geogrid product.
[0064] In this embodiment, combined with Fig.11 In summary, based on the above-mentioned warp knitting device 1, the first winding device 2, the fixing member installation device 3, the connecting member installation device 4 and the second winding device 5 structure, the warp knitting device 1 can respectively complete the warp knitting processing of the two layers of grid mesh 6, and the processed grid mesh 6 can be pre-stored on the first winding device 2. The fixing member installation device 3 can complete the installation of the upper bottom plate 73 and the upper top plate 74 on the upper grid mesh 6, as well as the installation of the upper and lower bottom plates 71 and the lower top plate 72 of the lower grid mesh 6, and the punching unit can punch holes at the positions corresponding to the openings of the grid mesh 6 between the upper top plate 74 and the upper bottom plate 73, and the The connecting piece installation device 4 can spirally connect the adjusting pin 75 through the openings of the upper top plate 74 and the upper bottom plate 73 and the lower top plate 72. The finally obtained three-dimensional geogrid product can be rolled up on the second rolling device 5. When in use, the laying of the double-layer grid mesh 6 can be completed in one laying. On the basis of fixing the lower grid mesh 6, it is only necessary to lift the upper grid mesh 6, the upper top plate 74 and the upper bottom plate 73 and slide them into the slots 7521 on the two spring leaves 752 to complete the support work of the upper grid mesh 6, thereby finally ensuring the soil consolidation and slope protection effect of the three-dimensional geogrid, and the laying of the three-dimensional geogrid can be simpler and faster.
Claims
1. A new type of high-strength three-dimensional geogrid processing system, characterized in that: It comprises a warp knitting device (1), a first winding device (2), a fixing member installation device (3), a connecting member installation device (4) and a second winding device (5) which are arranged in sequence; The warp knitting device (1) comprises two warp knitting machines for processing a grid mesh (6), the first winding device (2) comprises two winding mechanisms (22), and the two winding mechanisms (22) are configured to respectively complete the winding work of the grid mesh (6) processed by the two warp knitting machines, the fixing part installation device (3) and the connecting part installation device (4) are configured to respectively complete the installation work of the fixing parts and the connecting parts on the grid mesh (6), and the winding work of the three-dimensional geogrid finished product can be completed by the second winding device (5); The fixing member comprises an upper bottom plate (73), an upper top plate (74), a lower bottom plate (71) and a lower top plate (72), wherein a clamping structure capable of mutually clamping and cooperating is provided between the upper bottom plate (73) and the upper top plate (74), and between the lower bottom plate (71) and the lower top plate (72); The fixing member installation device (3) comprises two groups of fixing member installation units (332) arranged in an upper and lower manner, the grille nets (6) on the two winding mechanisms (22) can pass through the two fixing member installation units (332) respectively, and the fixing member installation units (332) are arranged to press the upper top plate (74) and the upper bottom plate (73), and the lower top plate (72) and the lower bottom plate (71) respectively on the upper and lower sides of the intersection of the upper grille net (6) and the lower grille net (6), and can clamp the grille net (6) to each other through the clamping structure; The upper top plate (74) and the upper bottom plate (73) are both provided with openings in the middle, and a punching unit capable of punching holes in the grille net (6) between the upper top plate (74) and the upper bottom plate (73) is also provided on one side of the upper fixing member installation unit (332) along the transport direction of the grille net (6); A threaded cylinder is also provided on the upper side of the lower top plate (72), and the connecting piece includes an adjusting pin (75), and the adjusting pin (75) includes an inserting column (751) and two reeds (752) arranged opposite to each other at one end thereof and with a gap therebetween, and a slot (7521) capable of accommodating the upper top plate (74) and the upper bottom plate (73) to be inserted is provided on the outer side of one end of the two reeds (752) away from the inserting column (751); The connector installation device (4) comprises a connector installation unit (432), and the two grille nets (6) that complete the fixing installation work can pass through the connector installation unit (432) in a close-fitting state, and the connector installation unit (432) is configured to allow the plug column (751) part of the adjustment pin (75) to pass through the openings of the upper top plate (74) and the upper bottom plate (73) in sequence and be spirally connected to the threaded tube of the lower top plate (72).
2. A novel high-strength three-dimensional geogrid processing system according to claim 1, characterized in that: The warp knitting device (1) further comprises a first guide mechanism (13) and a second guide mechanism (14) respectively arranged on the discharge side of the first warp knitting machine (11) and the second warp knitting machine (12); The first guide mechanism (13) and the second guide mechanism (14) both comprise a guide frame and a first roller shaft on the upper side thereof, and the upper side / lower side of the first roller shaft is flush with the position of the discharge port of the warp knitting machine.
3. A novel high-strength three-dimensional geogrid processing system according to claim 1, characterized in that: The first winding device (2) further comprises a first winding frame (21), and the two winding mechanisms (22) are both arranged on the first winding frame (21); The winding mechanism (22) comprises two sets of reversing components arranged opposite to each other, and two first winding shafts (224) arranged with a horizontal gap, the two ends of the two first winding shafts (224) are respectively connected to the two reversing components, and at least one end is provided with a driving motor (223) capable of driving the first winding shafts (224) to rotate. The two first winding shafts (224) are arranged to be able to periodically complete position exchange work under the action of the reversing component.
4. A novel high-strength three-dimensional geogrid processing system according to claim 1, characterized in that: The fixing member installation device (3) further comprises a first installation bracket (331), and the fixing member installation unit (332) is arranged on the first installation bracket (331); The fixing member installation unit (332) comprises two first fixing blocks (3321) arranged opposite to each other and fixed to the first installation bracket (331), and two groups of fixing member installation modules are arranged above and below the two fixing blocks; The fixing member installation module comprises a first horizontal crossbar which is arranged vertically between two first fixing blocks (3321), the grille net (6) can pass through between the two first crossbars, a first slide seat is slidably provided on the first crossbar along its length direction, and a first support rod is provided on one side of the first slide seat, one end of which is connected to the first slide seat and is perpendicular to the first crossbar, and a first support rod is slidably provided on the first support rod along its length direction; The two sets of fixing member installation modules arranged up and down are respectively an upper fixing member installation module (3322) and a lower fixing member installation module (3323), and a first slide groove is vertically arranged on one side of the first support; The two groups of the fixing member installation modules also include a first adsorption head, wherein the first adsorption head of the upper fixing member installation module (3322) is vertically slidably connected to the first support through the first slide groove, and a transfer seat is slidably provided in the first slide groove of the first support of the lower fixing member installation module (3323), and the transfer seat includes a vertically arranged turntable, and the first adsorption head of the lower fixing member installation module (3323) is arranged on the outer side of the turntable; The outer sides of the upper fixing member installation module (3322) and the lower fixing member installation module (3323) are also provided with an accessory conveying line for transporting the upper bottom plate (73), the upper top plate (74), the lower bottom plate (71) and the lower top plate (72).
5. A novel high-strength three-dimensional geogrid processing system according to claim 4, characterized in that: The fixing member installation device (3) further comprises a first bracket (31) arranged outside the first installation bracket (331), and third guiding mechanisms (32) are provided on the first bracket (31) at positions corresponding to the gate inlet side and the gate outlet side of the two groups of fixing member installation units (332).
6. A novel high-strength three-dimensional geogrid processing system according to claim 5, characterized in that: The third guide mechanism (32) comprises two second rollers which are arranged horizontally and one above the other, and both ends of the two second rollers are connected to the first bracket (31) via a connecting block; The connecting blocks at both ends of one of the second roller shafts are vertically slidably connected to the first bracket (31) and a spring is connected between the connecting blocks and the first bracket (31). The direction of the elastic force exerted on the connecting blocks connected to the spring points to the connecting blocks at both ends of the other second roller shaft.
7. A novel high-strength three-dimensional geogrid processing system according to claim 6, characterized in that: The vertical height of the non-elastically arranged second roller is adjustable.
8. The novel high-strength three-dimensional geogrid processing system according to claim 1 is characterized in that: The connecting member installation unit (432) comprises a second horizontally arranged crossbar, the grille net (6) can pass through the lower side of the second crossbar, a second slide seat is slidably provided on the second crossbar along its length direction, and a second support rod is provided on one side of the second slide seat, one end of which is connected to the second slide seat and is perpendicular to the second crossbar, a second support is slidably provided on the second support rod along its length direction, and a second slide groove is vertically provided on one side of the second support; The connecting member installation unit (432) further comprises a second adsorption head which is vertically slidably connected to the second support via the second sliding groove; The outer side of the connecting piece installation unit (432) is also provided with a connecting piece conveying line for transporting the adjusting pin (75).
9. A novel high-strength three-dimensional geogrid processing system according to claim 8, characterized in that: The second adsorption head comprises a rotatable tightening shaft, the lower end of which is provided with an adsorption port capable of accommodating an adjustment pin (75), and a plug plate capable of being inserted between two reed sheets (752) is provided in the adsorption port.
Citation Information
Patent Citations
Plastic geogrid forming processing system
CN112238503A
Double-layer grid woven fabric, weaving method thereof and improved rapier loom
CN117758434A
Weaving method of high-strength three-dimensional composite geogrid
CN119407475A
Glass fiber geogrid production line
CN214878869U
Plastic warp knitting grid net
CN2813660Y