Temporary reinforcement and construction method for independent cylinder structure in super high-rise creeping formwork construction
By using components such as the inner frame body of the climbing mold, the outer frame body and C-type channel steel support to support the core cylinder in super high-rise buildings, the problem of reduced stability of the core cylinder structure at high levels is solved, and the problem of the core cylinder structure is realized Rapid construction and multiple working surfaces are synchronized to avoid idle work and extended construction periods.
Patent Information
- Application Number
- CN202411259602.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-09-10
AI Technical Summary
In the construction of super high-rise buildings, after the height is increased, the core cylinder structure is reduced due to the reduction of the shear wall thickness and the reduction of structural stiffness and stability, resulting in an increase in the load on the attachment support of the formwork frame, resulting in safety and stability of the core cylinder structure, limiting the safety and stability of the core cylinder structure. Construction height and may cause cracking or capsizing.
The components such as the inner frame body of the climbing mold, the outer frame body of the climbing mold, the outer frame body of the outer frame, the C-type channel steel support, the support node plate and the connecting plate are used to form an integral part by setting up multi-layer outer frame steel beams and the C-type channel steel support. Frame structure, supports and pulls the core cylinder, increases structural stability, and accelerates construction progress through recycling.
It effectively improves the wind pressure resistance and overall stability of the core cylinder, realizes the rapid construction of ultra-high-rise climbing mold construction, forms a "stratted-layer synchronous construction" model on multiple working surfaces, avoids the use of frames and shortens the construction period. And the construction method is environmentally friendly and recyclable.
Smart Images

Figure CN118979616A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building protection frame construction, and in particular to a temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof. Background Art
[0002] In the construction of buildings with a core tube-steel frame structure and a total height of more than 100 meters, the general principle of this type of building construction is the construction sequence of "core tube leading, outer frame structure following". During construction, the core tube structure must be constructed quickly and preferentially to provide a working surface for the subsequent installation of the outer frame steel structure and the construction of the outer frame floor slab structure. Therefore, the safety protection of such projects generally adopts hydraulic climbing formwork construction technology to ensure that the leading outer frame structure is constructed independently first, thus forming a favorable working condition of "staggered synchronous construction" of the three working layers of "core tube-steel structure outer frame-outer frame floor slab". The key to achieving the "staggered-level synchronous construction" model is to increase the construction speed of the core tube structure and create a height difference of at least six floors with the outer frame structure. However, the difficulty in forming this operation mode is that as the super-high-rise core tube structure of the project is constructed upward, after it exceeds a certain height: the thickness of the shear wall of the core tube structure decreases, and the wall becomes thinner; the elevators in the middle and low areas of the tube are all at the top, and the internal horizontal connecting beams and shear wall structures are partially cancelled, the connecting components between the walls are reduced, and the structural form is single; the wind load on the top of the building is getting bigger and bigger, which makes the horizontal load at the position where the climbing formwork is attached to the support also get bigger and bigger. The above three points The changes make the rigidity and overall stability of the core tube structure worse and worse; therefore, the independent height of the core tube structure is restricted, and if the expected design and construction height is not reached, there will be quality and safety risks such as cracks or even overturning and instability in the structure; for this reason, the applicant proposed a temporary reinforcement of the independent tube structure of super-high-rise climbing formwork construction and its construction method according to the characteristics of this type of building construction, which solves the above problems well, realizes the rapid construction of the core tube, forms a favorable working condition of "staggered synchronous construction" of multiple working surfaces of the outer frame, avoids the occurrence of idle work in the outer frame, and greatly shortens the construction period. Summary of the invention
[0003] In order to solve the above technical problems, the present invention proposes a temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof. By setting a climbing formwork inner frame, a climbing formwork outer frame, an outer frame steel beam, an outer frame steel, an attachment support, a C-shaped channel steel support, a support node plate, a connecting plate and a feeding port, the construction method is as follows: the climbing formwork inner frame and the climbing formwork outer frame are installed on the core tube, the outer frame is installed on the main structural plate outside the core tube, the C-shaped channel steel support layout is optimized on the outer frame, a feeding port is reserved, and a support node plate is welded on the outer frame steel beam and the outer frame steel column of the same layer, the C-shaped channel steel support is placed flat on the support node plate and bolted, so that the core tube structure, the C-shaped channel steel support, the outer frame steel beam and the outer frame steel column are connected into a whole, the thin core tube wall is supported-tensioned, and multi-layer and multi-channel outer frame steel beams and C-shaped channel steel supports are simultaneously set according to the actual required number of floors of the core tube and the outer frame; after the construction of the outer frame main structure is completed, they are dismantled and recycled to speed up the construction.
[0004] To achieve the above object, the technical solution adopted by the present invention is: A temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof, comprising a climbing formwork inner frame, a climbing formwork outer frame, an outer frame, an outer frame steel column, an outer frame steel beam, a C-shaped channel steel support, a feed opening, a support node plate, a connecting plate and an attachment support, characterized in that: the temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof are provided with a climbing formwork inner frame, a climbing formwork outer frame and an outer frame, the climbing formwork inner frame and the climbing formwork outer frame are installed on the core tube, and the outer frame is installed on the main structure plate outside the core tube; the climbing formwork inner frame and the climbing formwork outer frame are installed on the core tube through attachment supports, and the attachment supports and the connecting plates are pre-embedded and arranged on the core tube wall Structurally, the outer frame is provided with outer frame steel columns and outer frame steel beams, and the outer frame steel columns and outer frame steel beams are connected by bolts. The outer frame steel columns are installed on the main structure plate, and C-shaped channel steel supports are used between the planes of the outer frame steel columns and the outer frame steel beams to form a grid structure. A feeding port is reserved in the middle of the C-shaped channel steel support grid. Support node plates are provided on the outer frame steel columns and the outer frame steel beams, and the C-shaped channel steel supports are connected to the outer frame steel columns and the outer frame steel beams through the support node plates. The C-shaped channel steel supports are connected to the core tube through the support node plates and the connecting plates, and the support node plates are welded on the connecting plates. Multiple groups of outer frame steel beams are arranged between the outer frame steel columns and the core tube according to needs.
[0005] Furthermore, the outer side of the core tube of the temporary reinforcement of the independent cylinder structure for super-high-rise climbing formwork construction and its construction method is connected to the C-shaped channel steel support, outer frame steel column and outer frame steel beam, and the C-shaped channel steel support, outer frame steel column and outer frame steel beam form a frame support for the core tube.
[0006] Furthermore, the C-shaped channel steel supports and connections provided for temporary reinforcement of the independent cylinder structure of the super-high-rise climbing formwork construction and its construction method form a triangular structural network, which has strong stability.
[0007] Furthermore, the construction method of temporary reinforcement of the independent cylinder structure of the super-high-rise climbing formwork construction has the following specific construction steps: Step 1: Prepare the frame layout and construction plan of the climbing formwork according to the size of the building core tube and the size of the external main structure, and verify its safety performance to meet the safety protection and construction requirements, and have it approved by experts; Make and optimize the construction plan. Optimize the C-shaped channel steel support layout and reserve a large enough material discharge opening; Step 2: According to the climbing formwork frame layout and construction plan, make the inner climbing formwork frame, the outer climbing formwork frame, the outer frame steel beams, the outer frame steel columns and the C-shaped channel steel supports, and organize the acceptance after the production is completed; Step 3: When constructing the building core tube and the external main structure, pre-embed the attachment support and the connection plate on the core tube wall and the main structure plate; Step 4: After the inner frame, outer frame and outer frame of the climbing formwork have reached the installation height, install the inner frame, outer frame steel columns, outer frame steel beams and C-shaped channel steel supports simultaneously. Step 5: After the inner frame of the climbing formwork, the outer frame of the climbing formwork and the outer frame are lifted to a certain height, the outer frame is connected to the outer side of the core tube through C-shaped channel steel support to form an integral frame structure. The outer frame has a certain supporting effect on the outer side of the core tube, which can increase the construction height of the core tube and make the core tube have a stronger wind pressure resistance; Step 6: According to the number of floors of the building core tube and the external frame structure, multi-level and multi-channel outer frame steel beams and C-shaped channel steel supports are set to form a partitioned flow operation surface; Step 7. As the building height continues to increase, the inner frame, outer frame and outer frame of the climbing formwork are used in a cycle of climbing until the building is capped and completed, thereby speeding up the construction progress and ensuring construction safety.
[0008] The benefits of this application are: 1. Temporary reinforcement of independent cylinder structure for super-high-rise climbing formwork construction and its construction method effectively solve the problem of safe and stable independent construction of the core tube structure under the action of climbing formwork attachment support and wind load as the core tube structure increases in height and structural mutations; 2. Temporary reinforcement of the independent cylinder structure for super-high-rise climbing formwork construction and its construction method realize the rapid construction of the core tube, forming a favorable working condition of "staggered synchronous construction" of multiple working surfaces of the outer frame, avoiding the occurrence of idle work on the outer frame, and greatly shortening the construction period; 3. Temporary reinforcement of independent cylinder structure for super-high-rise climbing formwork construction and its construction method. The form and arrangement of the steel support on the outer side of the core tube and the outer frame do not affect other professional constructions, and can be used in rotation and finally recycled, making the construction green and environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 The local structure of the present invention is shown in FIG. Figure 1 ; Figure 3 The local structure of the present invention is shown in FIG. Figure 2 ; Figure 4 The local structure of the present invention is shown in FIG. Figure 3 .
[0010] Markings in the figure are: 1. Core tube; 1-1. Climbing formwork inner frame; 1-2. Climbing formwork outer frame; 2. Outer frame; 3. Outer frame steel column; 4. Outer frame steel beam; 5. C-shaped channel steel support; 6. Cutting port; 7. Support node plate; 8. Connecting plate; 9. Attachment support. DETAILED DESCRIPTION
[0011] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments: like Figure 1-4 As shown, a temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof are shown, including a climbing formwork inner frame 1-1, a climbing formwork outer frame 1-2, an outer frame 2, an outer frame steel column 3, an outer frame steel beam 4, a C-shaped channel steel support 5, a feed opening 6, a support node plate 7, a connecting plate 8 and an attachment support 9, as shown Figure 1 As shown, the temporary reinforcement of the independent cylinder structure of the super-high climbing formwork construction and the construction method thereof are provided with a climbing formwork inner frame 1-1, a climbing formwork outer frame 1-2 and an outer frame 2, and the climbing formwork inner frame 1-1, the climbing formwork outer frame 1-2 and the outer frame 2 are made by processing the finished climbing formwork frame, and the outer frame 2 is installed on the main structure plate outside the core tube 1; Figure 2 As shown, the inner frame 1-1 of the climbing formwork and the outer frame 1-2 of the climbing formwork are installed on the core tube 1 through the attachment support 9, and the attachment support 9 is pre-embedded on the wall structure of the core tube, and is partially installed by welding; the outer frame 2 is provided with an outer frame steel column 3 and an outer frame steel beam 4, and the outer frame steel column 3 and the outer frame steel beam 4 are connected by bolts, and a C-shaped channel steel support 5 is used between the planes of the outer frame steel column 3 and the outer frame steel beam 4 to form a grid structure, and the C-shaped channel steel support 5 is connected to form a triangular structure mesh, which has strong stability, and a feeding port 6 is reserved in the middle of the C-shaped channel steel support 5 grid; Figure 3As shown, a support node plate 7 is provided on the outer frame steel column 3 and the outer frame steel beam 4, and the C-shaped channel steel support 5 is connected to the outer frame steel column 3 and the outer frame steel beam 4 through the support node plate 7. As shown, multiple groups of outer frame steel beams 4 are provided between the outer frame steel column 3 and the core tube 1 according to needs; Figure 2 The outer side of the core tube 1 is connected with the C-shaped channel steel support 5, the outer frame steel column 3 and the outer frame steel beam 4 to form an integral frame structure. The outer frame 2 has a certain supporting effect on the outer side of the core tube 1, which can increase the construction height of the core tube and make the core tube have a strong wind pressure resistance. Figure 4 As shown, the C-shaped channel steel support 5 is connected to the core tube 1 through a support node plate 7 and a connecting plate 8, and the support node plate 5 is welded to the connecting plate 8. The C-shaped channel steel support 5, the outer frame steel column 3 and the outer frame steel beam 4 form a frame structure support for the climbing formwork outer frame 1-2 and the core tube 1.
[0012] The construction method of temporary reinforcement of independent cylinder structure for super high-rise climbing formwork construction is shown in the figure. The specific construction steps are as follows: Step 1: Prepare the frame layout and construction plan of the climbing formwork according to the size of the building core tube and the size of the external main structure, and verify its safety performance to meet the safety protection and construction requirements, and have it approved by experts; Make and optimize the construction plan. Optimize the C-shaped channel steel support layout and reserve a large enough material discharge opening; Step 2: According to the climbing formwork frame layout and construction plan, make the climbing formwork inner frame, climbing formwork outer frame, outer frame steel beams, outer frame steel columns and C-shaped channel steel supports, and organize acceptance after production is completed; prefabrication in advance, modular installation, speed up construction efficiency; ensure its safety through joint acceptance; Step 3: When constructing the building core tube and the external main structure, pre-embed the attachment support and connection plate on the core tube wall and the main structure plate; the pre-embedded connection plate is used to provide a stable connection node when the outer frame steel beam is installed and welded, and the maximum height from the steel support to the upper flange of the steel beam is guaranteed, which is helpful for the through arrangement of the main ribs of the steel pipes and the secondary ribs of the wood at the bottom of the slab during the construction of the outer frame concrete floor formwork project; Step 4: After the inner frame of the climbing formwork, the outer frame of the climbing formwork and the outer frame have reached the installation height, install the inner frame of the climbing formwork, the outer frame steel columns, the outer frame steel beams and the C-shaped channel steel supports; install them simultaneously, which can ensure the movement and use of longer materials such as steel pipes and steel bars or larger equipment such as concrete placing machines during the construction of the outer frame, ensuring the smooth operation of the outer frame construction; Step 5: After the inner frame of the climbing formwork, the outer frame of the climbing formwork and the outer frame are lifted to a certain height, the outer frame is connected to the outer side of the core tube through C-shaped channel steel supports to form an integral frame structure. The outer frame has a certain supporting effect on the outer side of the core tube, which can increase the construction height of the inner frame of the climbing formwork and the outer frame of the climbing formwork, so that the core tube has a strong wind pressure resistance effect; the horizontal load of the climbing formwork support is effectively transferred to the outer frame steel member, thereby reducing the independent height of the tube structure and increasing its overall stability; Step 6: According to the number of floors between the building core tube and the external frame structure, set up multi-level and multi-channel outer frame steel beams and C-shaped channel steel supports to form a partitioned flow operation surface; increase the construction surface and stagger the construction to ensure construction safety; Step 7. As the building height continues to increase, the inner frame, outer frame and outer frame of the climbing formwork are used in a cycle of climbing until the building is capped and completed, thereby speeding up the construction progress and ensuring construction safety.
[0013] The above description is only a preferred embodiment of the present invention and does not constitute any other form of limitation to the present invention. Any modification or equivalent change made based on the technical essence of the present invention still falls within the scope of protection required by the present invention.
Claims
1. A temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof, comprising a climbing formwork inner frame (1-1), a climbing formwork outer frame (1-2), an outer frame (2), an outer frame steel column (3), an outer frame steel beam (4), a C-shaped channel steel support (5), a feed opening (6), a support node plate (7), a connecting plate (8) and an attachment support (9), characterized in that: The temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and the construction method thereof are provided with a climbing formwork inner frame (1-1), a climbing formwork outer frame (1-2) and an outer frame (2); the climbing formwork inner frame (1-1) and the climbing formwork outer frame (1-2) are installed on a core tube (1); the outer frame (2) is installed on a main structure plate outside the core tube (1); the climbing formwork inner frame (1-1) and the climbing formwork outer frame (1-2) are installed on the core tube (1) via an attachment support (9); the attachment support (9) and the connecting plate (8) are pre-embedded on the wall structure of the core tube (1); the outer frame (2) is provided with an outer frame steel column (3) and an outer frame steel beam (4); the outer frame steel column (3) and the outer frame steel beam (4) are connected by bolts; The outer frame steel column (3) is installed on the main structure plate. A C-shaped channel steel support (5) is used between the planes of the outer frame steel column (3) and the outer frame steel beam (4) to form a grid structure. A feed opening (6) is reserved in the middle of the C-shaped channel steel support (5) grid. Support node plates (7) are provided on the outer frame steel column (3) and the outer frame steel beam (4). The C-shaped channel steel support (5) is connected to the outer frame steel column (3) and the outer frame steel beam (4) through the support node plate (7). The connection between the C-shaped channel steel support (5) and the core tube (1) is connected through the support node plate (7) and a connecting plate (8). The support node plate (5) is welded to the connecting plate (8). A plurality of groups of outer frame steel beams (4) are provided between the outer frame steel column (3) and the core tube according to needs.
2. According to claim 1, a temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof are characterized in that: The outer side of the core tube (1) of the temporary reinforcement of the independent cylinder structure for super-high-rise climbing formwork construction and the construction method thereof is connected to the C-shaped channel steel support (5), the outer frame steel column (3) and the outer frame steel beam (4), and the C-shaped channel steel support (5), the outer frame steel column (3) and the outer frame steel beam (4) form a frame structure support for the core tube (1).
3. According to claim 1, a temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof are characterized in that: The C-shaped channel steel supports (5) provided in the temporary reinforcement of the independent cylinder structure for super-high-rise climbing formwork construction and the construction method thereof are connected to form a triangular structure mesh, which has strong stability.
4. According to claims 1-3, a temporary reinforcement of an independent cylinder structure for super-high-rise climbing formwork construction and a construction method thereof, characterized in that: The construction method of temporary reinforcement of the independent cylinder structure of the super-high-rise climbing formwork construction has the following specific construction steps: Step 1: Prepare the frame layout and construction plan of the climbing formwork according to the size of the building core tube and the size of the external main structure, and verify its safety performance to meet the safety protection and construction requirements, and have it approved by experts; Make and optimize the construction plan. Optimize the C-shaped channel steel support layout and reserve a large enough material discharge opening; Step 2: According to the climbing formwork frame layout and construction plan, make the inner climbing formwork frame, the outer climbing formwork frame, the outer frame steel beams, the outer frame steel columns and the C-shaped channel steel supports, and organize the acceptance after the production is completed; Step 3: When constructing the building core tube and the external main structure plate, pre-embed the attachment support and the connection plate on the core tube wall and the main structure plate; Step 4: After the inner frame, outer frame and outer frame of the climbing formwork have reached the installation height, install the inner frame, outer frame steel columns, outer frame steel beams and C-shaped channel steel supports simultaneously. Step 5: After the inner frame of the climbing formwork, the outer frame of the climbing formwork and the outer frame are lifted to a certain height, the outer frame is connected to the outer side of the core tube through C-shaped channel steel support to form an integral frame structure. The outer frame has a certain supporting effect on the core tube, which can increase the construction height of the core tube and make the core tube have a stronger wind pressure resistance; Step 6: According to the number of floors of the building core tube and the external frame structure, multi-level and multi-channel outer frame steel beams and C-shaped channel steel supports are set to form a partitioned flow operation surface; Step 7. As the building height continues to increase, the inner frame, outer frame and outer frame of the climbing formwork are used in a cycle of climbing until the building is capped and completed, thereby speeding up the construction progress and ensuring construction safety.
Citation Information
Patent Citations
Super high-rise core tube horizontal direction and vertical direction synchronous construction top formwork system and construction method
CN106869489A
Core tube crisscross structure synchronous construction structure and construction method thereof
CN107246073A
Ultra-high special-shaped outer-frame steel structure construction method
CN111927111A
Tower crane high-altitude attachment conversion system
CN215101636U
Construction method for RC structured high rise building
KR100685147B1
Cited By
Building platform and material distributing machine system with vertical machine position and height difference and construction method
CN120486701A