Project data classification analysis method and system for medium and small enterprises, and medium
Through the risk estimate method and real-time update module, the risk types and proportions of project data of small and medium-sized enterprise are analyzed, and the problem of risk types covering multiple projects in the project data classification of small and medium-sized enterprise projects is solved, which improves the efficiency of risk investigation and reduces property losses.
Patent Information
- Application Number
- CN202410976811.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Small and medium-sized enterprises have fewer types of project data but face multiple risk types, resulting in the same risk type covering multiple project data. Classification based on project types leads to low efficiency in risk investigation and property losses.
Use risk estimate method to analyze project data, obtain the risk type and risk proportion of each project data, conduct preliminary classification based on the risk critical value, and adjust the classification in real-time updates, and use the risk and proportion analysis module and preliminary classification module and real-time classification update module.
Through risk estimates and real-time updates, we ensure accurate classification of project data, improve risk investigation efficiency, reduce property losses, and ensure that the number and amount of risk involved in project data in the same category are roughly the same.
Smart Images

Figure CN118981675A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data classification, and in particular to a project data classification and analysis method, system and medium for small and medium-sized enterprises. Background Art
[0002] Small and medium-sized enterprises refer to enterprises with relatively small staff and business scale, including medium-sized enterprises, small enterprises and micro-enterprises; the classification of project data for small and medium-sized enterprises involves the organization, archiving and management of project data, which includes but is not limited to the collection, storage, processing and analysis of project data to ensure the integrity and accuracy of the data; the classification of project data helps to improve work efficiency and facilitate the retrieval and use of data. Through reasonable classification, project data can be better organized and managed, thereby supporting the decision-making and operation of enterprises.
[0003] In the existing project data classification methods, core data is usually screened through data classification in data management to meet the complex management needs of the project. The specific project data classification is usually a simple classification based on the project type of the project data. However, small and medium-sized enterprises generally have fewer types of project data and face more types of risks. Therefore, the same risk type generally covers most of the project data of small and medium-sized enterprises, resulting in the risk caused by a single risk type affecting multiple project data of small and medium-sized enterprises. If project data is classified only based on project type, project data involving multiple risks and project data involving a small number of risks will be mixed in the same category, thereby affecting the risk screening of small and medium-sized enterprises. The screening efficiency is reduced, resulting in property losses for small and medium-sized enterprises. For example, in the Chinese patent with publication number CN117455315A, a project data management system for R&D of small and medium-sized enterprises is disclosed. The solution is to classify the project R&D data in data management to screen the core data to meet the management needs of small and medium-sized enterprises with many projects and complicated projects. Improvements in the classification of project data for other small and medium-sized enterprises are usually based on improving classification efficiency and data accuracy. This classification method still cannot provide effective assistance to small and medium-sized enterprises in risk screening through data classification. In view of the comparison, it is necessary to improve the existing project data classification and analysis method for small and medium-sized enterprises. Summary of the invention
[0004] The present invention aims to solve one of the technical problems in the prior art to at least a certain extent. By proposing a project data classification and analysis method, system and medium for small and medium-sized enterprises, the present invention is used to solve the problem that the existing project data classification method for small and medium-sized enterprises is usually based on the simple classification of the project type in which the project data is located. However, small and medium-sized enterprises generally have fewer types of project data and face more types of risks. Therefore, the same risk type generally covers most of the project data of small and medium-sized enterprises, resulting in the risk caused by a single risk type affecting multiple project data of small and medium-sized enterprises. If the project data is classified only based on the project type, project data involving multiple risks and project data involving a small number of risks will be mixed in the same category, thereby affecting the risk screening efficiency of small and medium-sized enterprises and causing property losses to small and medium-sized enterprises.
[0005] To achieve the above objectives, in a first aspect, the present application provides a project data classification and analysis method for small and medium-sized enterprises, comprising the following steps:
[0006] Based on the risk types faced by SMEs, risk analysis is performed on all project data in SMEs using risk estimation methods, and based on the results of risk analysis, the risk type and risk proportion corresponding to the project type of each project data are obtained;
[0007] Based on the risk types contained in the project data, obtain the risk critical value of the project data, and preliminarily classify all project data based on the risk proportion and risk critical value;
[0008] In the actual operation of small and medium-sized enterprises, the classification of all project data is updated in real time based on the project data obtained in real time.
[0009] Furthermore, the risk assessment method includes:
[0010] The SMEs to be analyzed are recorded as analyzed enterprises; based on big data and the industry to which the analyzed enterprises belong, multiple risk types that the analyzed enterprises may be involved in are obtained and recorded as enterprise risk types QF1 to QF h ; Obtain the project types corresponding to all project data in the analyzed enterprise; Establish a table of T rows × R columns, recorded as the risk project table, where R is h+1, and fill in the top row of the risk project table with enterprise risk types QF1 to QF from left to right except the first cell h , fill in all project types from top to bottom in the leftmost column of the risk project table except the first cell; mark the risk types that each project type may involve in the risk project table.
[0011] Furthermore, the risk estimation method also includes:
[0012] Use big data to obtain and analyze the latest annual reports of multiple small and medium-sized enterprises in the same industry as the enterprise, and record them as reference annual reports; establish a plane rectangular coordinate system, record it as the proportion analysis coordinate system, where the coordinate points from the coordinate origin to the right in the X-axis of the proportion analysis coordinate system are enterprise risk type QF1 to enterprise risk type QF h , the unit of the Y axis is the amount; based on the amount of profit loss caused by all enterprise risk types QF in the reference annual reports, punctuate in the proportion analysis coordinate system, and fit the punctuation points corresponding to the same reference annual report into a curve, recorded as the risk loss curve; draw the risk loss curve corresponding to all reference annual reports in the same proportion analysis coordinate system; connect the risk loss curve, X-axis, Y-axis and X = enterprise risk type QF h The enclosed area is recorded as the risk loss area; the distance between the coordinate points of two adjacent enterprise risk types QF in the X-axis is recorded as L.
[0013] Furthermore, the risk estimation method also includes:
[0014] For any enterprise risk type QF in the X-axis h1 , the horizontal axis of all risk loss curves is the enterprise risk type QF h1 The point with the largest ordinate among the points is recorded as the loss peak point SF h1 ; In the proportion analysis coordinate system, the enterprise risk type QF h1 Make a bar chart for the midpoint and record it as the loss bar chart SZT h1 , where the loss histogram SZT h1 The width is L / 2, and the loss histogram SZT h1 The highest point is the loss peak SF h1 The vertical axis of the loss histogram SZT h1 The independent areas divided by multiple risk loss curves are recorded as loss sub-areas. For any loss sub-area, the number of risk loss areas containing the loss sub-areas is recorded as the risk coverage number, the highest point and the lowest point in the loss sub-area are recorded as the loss sub-peak point and the loss sub-valley point respectively, and the value of the vertical coordinate of the loss sub-peak point minus the vertical coordinate of the loss sub-valley point is recorded as the risk span amount; the risk coverage number and risk span amount of all loss sub-areas in the loss histogram SZTh1 are obtained, and the risk analysis algorithm is used to obtain the risk mean value of the enterprise risk type QFh1 corresponding to the loss histogram SZTh1. The risk analysis algorithm includes: Among them, F is the risk mean, sum is the number of loss sub-areas in the loss histogram SZTh1, KDi is the risk span amount corresponding to the i-th loss sub-area in the loss histogram SZTh1, and FSi is the risk coverage quantity corresponding to the i-th loss sub-area in the loss histogram SZTh1.
[0015] Furthermore, the risk estimation method also includes:
[0016] Based on the proportion analysis coordinate system and risk analysis algorithm, the risk mean corresponding to all enterprise risk types QF is obtained, and the sum of all risk means is recorded as the total risk value. For any enterprise risk type QFh1, the value obtained by dividing the risk mean of enterprise risk type QFh1 by the total risk value is recorded as the risk proportion of enterprise risk type QFh1.
[0017] For any project type in the risk project table, obtain multiple enterprise risk types QF corresponding to the project type, record them as associated risks GF, and record the sum of the risk proportions corresponding to all associated risks as the risk proportion of the project type; obtain the risk proportions of all project types.
[0018] Furthermore, based on the risk type included in the project data, obtaining the risk threshold of the project data includes:
[0019] Obtain the number of associated risk GFs corresponding to each project type in the risk project table, and record the number of associated risk GFs as the risk number of the project type, record the maximum value of the risk number as SLmax, and record the minimum value of the risk number as SLmin, and record the value of SLmax minus SLmin as the risk number difference;
[0020] For any project type in the risk project table, the value of the risk number of the project type minus SLmin is recorded as the project number difference, and the value obtained by dividing the project number difference by the risk number difference is recorded as the critical ratio; obtain the critical ratio corresponding to all project types;
[0021] Obtain and analyze the revenue obtained by each project type in the risk project table of the enterprise in the most recent operating cycle, and record the revenue of each project type as the near-term revenue of the project type; record the value obtained by multiplying the near-term revenue by the critical ratio as the risk critical value of the project type; obtain the risk critical values corresponding to all project types in the risk project table.
[0022] Furthermore, preliminary classification of all project data based on risk proportion and risk threshold also includes:
[0023] The mean classification method is used to preliminarily classify the project data corresponding to all project types. The mean classification method includes: recording the mean of all risk proportions as the mean proportion; recording the mean of all risk critical values as the critical mean; recording the project data corresponding to the project types whose risk proportion is greater than the mean proportion and whose risk critical value is greater than the critical mean as Class I data; recording the project data corresponding to the project types whose risk proportion is less than or equal to the mean proportion and whose risk critical value is greater than the critical mean as Class II data; recording the project data corresponding to the project types whose risk critical value is less than or equal to the critical mean and whose risk proportion is greater than the mean proportion as Class II data; recording the project data corresponding to the project types whose risk proportion is less than or equal to the mean proportion and whose risk critical value is less than or equal to the critical mean as Class III data.
[0024] Furthermore, in the actual operation of small and medium-sized enterprises, the classification of all project data is updated in real time based on the project data obtained in real time, including:
[0025] In the actual operation process of the analyzed enterprise, the risk critical value and risk ratio corresponding to each project type of the analyzed enterprise are re-obtained every operation cycle of the analyzed enterprise, and the mean classification method is used to classify the project data corresponding to all project types in the risk project table based on the latest obtained risk critical value and risk ratio.
[0026] In a second aspect, the present application also provides a project data classification and analysis system for small and medium-sized enterprises, including a risk and proportion analysis module, a preliminary classification module, and a real-time classification update module;
[0027] The risk and proportion analysis module is used to perform risk analysis on all project data in SMEs based on the risk types faced by SMEs using risk estimation methods, and obtain the risk type and risk proportion corresponding to the project type of each project data based on the results of the risk analysis;
[0028] The preliminary classification module is used to obtain the risk threshold of the project data based on the risk type contained in the project data, and to perform preliminary classification of all project data based on the risk proportion and risk threshold;
[0029] The real-time classification update module is used to update the classification of all project data in real time based on the project data obtained in real time during the actual operation of small and medium-sized enterprises.
[0030] In a third aspect, the present application provides a storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps in the above method are performed.
[0031] Beneficial effects of the present invention: The present invention first uses a risk estimation method to perform risk analysis on project data, and obtains the risk type and risk proportion corresponding to the project type of each project data based on the result of the risk analysis. The advantage of this is that by obtaining the risk type corresponding to the project data and obtaining the risk proportion based on the risk type of the project data, the project data can be analyzed in combination with all the risks involved in each project data and the profit and loss amount corresponding to the risk, and based on the analysis result, the proportion of each project data in all project data considering the risk and profit loss borne, that is, the risk proportion, is obtained, which helps to classify each project data based on the risk and profit loss borne in the subsequent classification;
[0032] The present invention also obtains the risk critical value of the project data, performs a preliminary classification of all project data based on the risk ratio and the risk critical value, and finally updates the classification of all project data in real time based on the project data obtained in real time. The advantage of this is that by combining the benefits of the project data in an operation cycle and the number of risks involved, a numerical value related to the number of risks and benefits borne by each project data, that is, the risk critical value, can be obtained, which helps to classify the data based on the number of risks and benefits borne by each project data in subsequent classification. By classifying all project data based on the risk ratio and the risk critical value, it can be ensured that the number of risks and the amount involved in each project data in the same category after classification are roughly the same, which helps to select heavy or light screening of project data in different categories based on the classification of project data when conducting risk screening in small and medium-sized enterprises, so as to improve the efficiency of risk screening. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 is a functional block diagram of the system of the present invention;
[0034] Figure 2 A connection block diagram of the electronic device of the present invention;
[0035] Figure 3 A schematic diagram of a proportion analysis coordinate system of the present invention;
[0036] Figure 4 is a schematic diagram of a loss histogram SZT of the present invention;
[0037] Figure 5 The figure is a flow chart of the steps of the method of the present invention. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] Example 1, first aspect, please refer to Figure 1 As shown, the present application provides a project data classification and analysis system for small and medium-sized enterprises, including a risk and proportion analysis module, a preliminary classification module, and a real-time classification update module.
[0040] The risk and proportion analysis module is used to perform risk analysis on all project data in SMEs based on the risk types faced by SMEs using risk estimation methods, and obtain the risk type and risk proportion corresponding to the project type of each project data based on the results of the risk analysis.
[0041] The risk and proportion analysis module includes a risk type analysis unit and a risk proportion acquisition unit; the risk type analysis unit is configured with a risk type sorting strategy, which includes:
[0042] The SMEs to be analyzed are recorded as analyzed enterprises; based on big data and the industry to which the analyzed enterprises belong, multiple risk types that the analyzed enterprises may be involved in are obtained and recorded as enterprise risk types QF1 to QF h ; Obtain the project types corresponding to all project data in the analyzed enterprise; Establish a table of T rows × R columns, recorded as the risk project table, where R is h+1, and fill in the top row of the risk project table with enterprise risk types QF1 to QF from left to right except the first cell h , fill in all project types from top to bottom in the leftmost column of the risk project table except the first cell; mark the risk types that each project type may involve in the risk project table.
[0043] In the specific implementation process, for example, in an analysis process, the analysis enterprise is a logistics management enterprise. Through big data, the risk types involved in the logistics management enterprise include: liability risk, customer churn risk, contract risk, litigation risk, investment and financing risk, financial liquidity risk, human resource risk, market changes and policy and regulatory changes. Risks, logistics project risks and enterprise logistics outsourcing risks, then the value of h is 10. At the same time, all project data of the logistics management enterprise correspond to project types including supply chain management, procurement and supply management, transportation management, warehousing management, order processing and management, information technology support, distribution and transportation optimization management and reverse logistics management. For part of the risk analysis table obtained during the analysis process, please refer to Table 1: Risk analysis sub-table as shown:
[0044] Table 1: Risk analysis subtable
[0045]
[0046] The risk type corresponding to the project type in the risk analysis sub-table is marked with "√";
[0047] The risk ratio acquisition unit is configured with a risk ratio acquisition strategy, which includes:
[0048] Use big data to obtain and analyze the latest annual reports of multiple small and medium-sized enterprises in the same industry as the enterprise, and record them as reference annual reports; establish a plane rectangular coordinate system, record it as the proportion analysis coordinate system, where the coordinate points from the coordinate origin to the right in the X-axis of the proportion analysis coordinate system are enterprise risk type QF1 to enterprise risk type QF h , the unit of the Y axis is the amount; based on the amount of profit loss caused by all enterprise risk types QF in the reference annual reports, punctuate in the proportion analysis coordinate system, and fit the punctuation points corresponding to the same reference annual report into a curve, recorded as the risk loss curve; draw the risk loss curve corresponding to all reference annual reports in the same proportion analysis coordinate system; connect the risk loss curve, X-axis, Y-axis and X = enterprise risk type QF h The enclosed area is recorded as the risk loss area; the distance between the coordinate points of two adjacent enterprise risk types QF in the X-axis is recorded as L. For example, in an analysis process, the analyzed enterprise is a logistics management enterprise, and the number of risk types of logistics management enterprises obtained through analysis is 6; the proportion analysis coordinate system drawn from the latest annual reports of 3 logistics management enterprises obtained through big data can be found in Figure 3 As shown, FF1 to FF6 are enterprise risk types QF1 to QF6, curves LL1, LL2 and LL3 are risk loss curves drawn based on the latest annual reports of three logistics management companies, the point corresponding to curve LL1 based on enterprise risk type QF and profit loss amount is the center point of △, the point corresponding to curve LL2 based on enterprise risk type QF and profit loss amount is the center point of ○, and the point corresponding to curve LL3 based on enterprise risk type QF and profit loss amount is the center point of □; Figure 3 In , the distance between FF1 and FF2 is the distance between the coordinate points of the two enterprise risk types QF, i.e., L;
[0049] For any enterprise risk type QF in the X-axis h1 , the horizontal axis of all risk loss curves is the enterprise risk type QF h1 The point with the largest ordinate among the points is recorded as the loss peak point SF h1; In the proportion analysis coordinate system, the enterprise risk type QF h1 Make a bar chart for the midpoint and record it as the loss bar chart SZT h1 , where the loss histogram SZT h1 The width is L / 2, and the loss histogram SZT h1 The highest point is the loss peak SF h1 The vertical axis of the loss histogram SZT h1 The independent areas divided by multiple risk loss curves are recorded as loss sub-areas. For any loss sub-area, the number of risk loss areas containing the loss sub-area is recorded as the risk coverage number. The highest point and the lowest point in the loss sub-area are recorded as the loss sub-peak point and the loss sub-valley point respectively. The value of the vertical coordinate of the loss sub-peak point minus the vertical coordinate of the loss sub-valley point is recorded as the risk span amount. Obtain the loss bar chart SZT h1 The risk coverage quantity and risk span amount of all loss sub-areas in the , and use the risk analysis algorithm to obtain the loss histogram SZT h1 Corresponding enterprise risk type QF h1 The risk mean, risk analysis algorithm includes: Among them, F is the risk mean, sum is the loss histogram SZT h1 The number of loss sub-regions in KD i The loss histogram SZT h1 The risk span amount corresponding to the i-th loss sub-area in FS i The loss histogram SZT h1 The risk coverage quantity corresponding to the i-th loss sub-area in . For example, in the analysis process of a logistics management company, the proportion analysis coordinate system obtained is as follows: Figure 3 As shown, the corresponding loss bar graph SZT2 of enterprise risk type QF2, i.e. FF2, can be found in Figure 4 As shown, the rectangle corresponding to ZZ1 is the loss histogram SZT2. For the independent area P1 in the rectangle ZZ1, through analysis, it can be obtained that the number of risk loss areas containing the independent area P1 is 3, the ordinate of the highest point in the independent area P1, that is, the ordinate of the loss sub-peak point is 10,000 yuan, and the ordinate of the lowest point in the independent area P1, that is, the ordinate of the loss sub-valley point is 0 yuan, so the risk span amount is 10,000 yuan;
[0050] For example, the risk coverage numbers corresponding to all loss sub-areas of a loss bar chart SZT are 3, 1, 0, 0, 1, 2, 0, 0, 3 and 1 respectively, and the risk span amounts corresponding to all loss sub-areas are 2000, 12000, 3453, 322, 500, 2000, 500, 3453, 2000 and 12000 respectively. The risk mean value calculated by the risk analysis algorithm is 4050;
[0051] Based on the proportion analysis coordinate system and risk analysis algorithm, the risk mean corresponding to all enterprise risk types QF is obtained, and the sum of all risk means is recorded as the total risk value. For any enterprise risk type QF h1 , the enterprise risk type QF h1 The value obtained by dividing the mean risk by the total risk value is recorded as the enterprise risk type QF h1 of risk.
[0052] In the specific implementation process, for example, in a data processing process, the risk mean value of an enterprise risk type QF is 4050, and the total risk value is 10000. Then, by calculation, the risk proportion of the enterprise risk type QF is 0.405;
[0053] For any project type in the risk project table, obtain multiple enterprise risk types QF corresponding to the project type, record them as associated risks GF, and record the sum of the risk proportions corresponding to all associated risks as the risk proportion of the project type; obtain the risk proportions of all project types.
[0054] In the specific implementation process, by obtaining the risk proportion of each enterprise risk type QF and thus the risk proportion of the project type, the proportion of each project data in all project data can be obtained in consideration of the risk and profit loss, which helps to classify the subsequent classification based on the risk and profit loss of each project data;
[0055] The preliminary classification module is used to obtain the risk critical value of the project data based on the risk type contained in the project data, and to perform preliminary classification of all project data based on the risk proportion and risk critical value.
[0056] The preliminary classification module includes a data preliminary classification unit, and the data preliminary classification unit is configured with a preliminary classification strategy, which includes:
[0057] Obtain the number of associated risk GFs corresponding to each project type in the risk project table, and record the number of associated risk GFs as the risk number of the project type, and record the maximum risk number as SL max And the minimum value of the risk amount is recorded as SL min , SL max Subtract SL min The value of is recorded as the risk number difference;
[0058] For any project type in the risk project table, subtract SL from the risk amount of the project type. minThe value of is recorded as the difference in the number of items, and the value obtained by dividing the difference in the number of items by the difference in the number of risks is recorded as the critical ratio; obtain the critical ratio corresponding to all project types; for example, in the process of analyzing a logistics management company, the risk project table obtained is shown in Table 1: Risk analysis subtable, then through analysis, SL max 5, SL min is 2, and the risk number difference is 3. Then the number difference of the items in "supply chain management" in Table 1: Risk analysis subtable is 4. Through calculation, it can be obtained that the critical ratio corresponding to "supply chain management" is 0.8. By obtaining the critical ratio, the proportion of the number of risk types involved in each project type in all project types can be obtained. If a project type has a larger critical ratio, it means that compared with all project types, the number of risk types involved in this project type is larger.
[0059] Obtain and analyze the revenue obtained by each project type in the risk project table of the enterprise in the most recent operating cycle, and record the revenue of each project type as the near-term revenue of the project type; record the value obtained by multiplying the near-term revenue by the critical ratio as the risk critical value of the project type; obtain the risk critical values corresponding to all project types in the risk project table.
[0060] In the specific implementation process, obtaining the risk critical value will help to classify the data based on the amount of risk and benefits of each project in the subsequent classification. For example, in an analysis process, the critical ratio of a project type of "supply chain management" in a logistics management company is 0.8, and the income of "supply chain management" in the most recent operation cycle of the logistics management company is 10,000 yuan. Then, through calculation, the risk critical value of "supply chain management" is 8,000.
[0061] The mean classification method is used to preliminarily classify the project data corresponding to all project types. The mean classification method includes: recording the mean of all risk proportions as the mean proportion; recording the mean of all risk critical values as the critical mean; recording the project data corresponding to the project types whose risk proportion is greater than the mean proportion and whose risk critical value is greater than the critical mean as Class I data; recording the project data corresponding to the project types whose risk proportion is less than or equal to the mean proportion and whose risk critical value is greater than the critical mean as Class II data; recording the project data corresponding to the project types whose risk critical value is less than or equal to the critical mean and whose risk proportion is greater than the mean proportion as Class II data; recording the project data corresponding to the project types whose risk proportion is less than or equal to the mean proportion and whose risk critical value is less than or equal to the critical mean as Class III data.
[0062] In this embodiment, after classification by the above classification method, the project data corresponding to the first category of data is the project data involving a large number of risks and a large number of profit losses, the project data corresponding to the second category of data is the project data involving a large number of risks or a large number of profit losses, and the project data corresponding to the third category of data is the project data involving a small number of risks and a small number of profit losses; for example, in a data processing process, the average proportion obtained is 0.5, the critical mean is 5000, the risk proportion of the project type "supply chain management" is 0.405, and the risk critical value is 8000. It can be obtained through analysis that the project data corresponding to the project type "supply chain management" should be recorded as the second category of data;
[0063] The real-time classification update module is used to update the classification of all project data in real time based on the project data obtained in real time during the actual operation of small and medium-sized enterprises.
[0064] The real-time classification update module includes: in the actual operation process of the analysis enterprise, every operation cycle of the analysis enterprise, the risk critical value and risk ratio corresponding to each project type of the analysis enterprise are re-obtained, and the mean classification method is used to classify the project data corresponding to all project types in the risk project table based on the latest acquired risk critical value and risk ratio. In the specific implementation process, by reclassifying the project data every operation cycle, it is helpful to timely change the category of the project data when the risks and profit losses involved in the project data change, thereby ensuring that the classification of the project data is able to fit the actual operation of the analysis enterprise, thereby facilitating risk investigation at any time, and at the same time, the time for reclassification can be adjusted according to the actual operation of the analysis enterprise during actual processing.
[0065] Example 2, second aspect, please refer to Figure 5 As shown, the present application also provides a project data classification and analysis method for small and medium-sized enterprises, comprising the following steps:
[0066] Step S1, based on the risk types faced by SMEs, a risk estimation method is used to perform risk analysis on all project data in SMEs, and based on the results of the risk analysis, the risk type and risk proportion corresponding to the project type of each project data are obtained;
[0067] The risk estimation method comprises: step S101, recording the analyzed SME as the analyzed enterprise; obtaining multiple risk types that the analyzed enterprise may be involved in based on big data and the industry to which the analyzed enterprise belongs, and recording them as enterprise risk types QF1 to QF h; Obtain the project types corresponding to all project data in the analyzed enterprise; Establish a table of T rows × R columns, recorded as the risk project table, where R is h+1, and fill in the top row of the risk project table with enterprise risk types QF1 to QF from left to right except the first cell h , except for the first cell in the leftmost column of the risk project table, fill in all project types from top to bottom; mark the risk types that each project type may involve in the risk project table;
[0068] Step S102, using big data to obtain the latest annual reports of multiple small and medium-sized enterprises in the same industry as the analyzed enterprise, and record them as reference annual reports; establish a plane rectangular coordinate system, record it as the proportion analysis coordinate system, where the coordinate points on the X-axis of the proportion analysis coordinate system from the coordinate origin to the right are enterprise risk type QF1 to enterprise risk type QF h , the unit of the Y axis is the amount; based on the amount of profit loss caused by all enterprise risk types QF in the reference annual reports, punctuate in the proportion analysis coordinate system, and fit the punctuation points corresponding to the same reference annual report into a curve, recorded as the risk loss curve; draw the risk loss curve corresponding to all reference annual reports in the same proportion analysis coordinate system; connect the risk loss curve, X-axis, Y-axis and X = enterprise risk type QF h The enclosed area is recorded as the risk loss area; the distance between the coordinate points of two adjacent enterprise risk types QF in the X-axis is recorded as L;
[0069] Step S103: for any enterprise risk type QF in the X-axis h1 , the horizontal axis of all risk loss curves is the enterprise risk type QF h1 The point with the largest ordinate among the points is recorded as the loss peak point SF h1 ; In the proportion analysis coordinate system, the enterprise risk type QF h1 Make a bar chart for the midpoint and record it as the loss bar chart SZT h1 , where the loss histogram SZT h1 The width is L / 2, and the loss histogram SZT h1 The highest point is the loss peak SF h1 The vertical axis of the loss histogram SZT h1 The independent areas divided by multiple risk loss curves are recorded as loss sub-areas. For any loss sub-area, the number of risk loss areas containing the loss sub-area is recorded as the risk coverage number. The highest point and the lowest point in the loss sub-area are recorded as the loss sub-peak point and the loss sub-valley point respectively. The value of the vertical coordinate of the loss sub-peak point minus the vertical coordinate of the loss sub-valley point is recorded as the risk span amount. Obtain the loss bar chart SZT h1The risk coverage quantity and risk span amount of all loss sub-areas in the , and use the risk analysis algorithm to obtain the loss histogram SZT h1 Corresponding enterprise risk type QF h1 The risk mean, risk analysis algorithm includes: Among them, F is the risk mean, sum is the loss histogram SZT h1 The number of loss sub-regions in KD i The loss histogram SZT h1 The risk span amount corresponding to the i-th loss sub-area in FS i The loss histogram SZT h1 The risk coverage quantity corresponding to the i-th loss sub-area in ;
[0070] Step S104: Based on the proportion analysis coordinate system and the risk analysis algorithm, the risk mean values corresponding to all enterprise risk types QF are obtained, and the sum of all risk means is recorded as the total risk value. For any enterprise risk type QF h1 , the enterprise risk type QF h1 The value obtained by dividing the mean risk by the total risk value is recorded as the enterprise risk type QF h1 The risk ratio
[0071] Step S105, for any project type in the risk project table, obtain multiple enterprise risk types QF corresponding to the project type, record them as associated risks GF, and record the sum of the risk proportions corresponding to all associated risks as the risk proportion of the project type; obtain the risk proportions of all project types.
[0072] Step S2, based on the risk types contained in the project data, obtain the risk critical value of the project data, and preliminarily classify all project data based on the risk proportion and the risk critical value;
[0073] Step S2 includes: Step S201, obtaining the number of associated risk GFs corresponding to each project type in the risk project table, and recording the number of associated risk GFs as the risk number of the project type, and recording the maximum value of the risk number as SL max And the minimum value of the risk amount is recorded as SL min , SL max Subtract SL min The value of is recorded as the risk number difference;
[0074] Step S202: for any project type in the risk project table, subtract SL from the risk quantity of the project type. min The value of is recorded as the project number difference, and the value obtained by dividing the project number difference by the risk number difference is recorded as the critical ratio; obtain the critical ratio corresponding to all project types;
[0075] Step S203, obtaining the revenue obtained by each project type in the risk project table of the analyzed enterprise in the most recent operation cycle, and recording the revenue of each project type as the near-term revenue of the project type; recording the value obtained by multiplying the near-term revenue by the critical ratio as the risk critical value of the project type; obtaining the risk critical values corresponding to all project types in the risk project table;
[0076] Step S204, use the mean classification method to preliminarily classify the project data corresponding to all project types, the mean classification method includes: recording the mean of all risk proportions as the proportion mean; recording the mean of all risk critical values as the critical mean; recording the project data corresponding to the project type whose risk proportion is greater than the proportion mean and the risk critical value is greater than the critical mean as Class I data; recording the project data corresponding to the project type whose risk proportion is less than or equal to the proportion mean and the risk critical value is greater than the critical mean as Class II data; recording the project data corresponding to the project type whose risk critical value is less than or equal to the critical mean and the risk proportion is greater than the proportion mean as Class II data; recording the project data corresponding to the project type whose risk proportion is less than or equal to the proportion mean and the risk critical value is less than or equal to the critical mean as Class III data.
[0077] Step S3, in the actual operation of small and medium-sized enterprises, the classification of all project data is updated in real time based on the project data obtained in real time; Step S3 includes: in the actual operation process of the analysis enterprise, every operation cycle of the analysis enterprise, the risk critical value and risk ratio corresponding to each project type of the analysis enterprise are re-obtained, and the mean classification method is used to classify the project data corresponding to all project types in the risk project table based on the latest acquired risk critical value and risk ratio.
[0078] Example 3, please refer to Figure 2 As shown, Figure 2 The schematic diagram of the structure of an electronic device is illustrated, and the electronic device may include: a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other through the communication bus. The memory stores computer-readable instructions, and the processor can call the instructions in the memory. When the computer-readable instructions are executed by the processor, the steps in a project data classification and analysis method for small and medium-sized enterprises are executed to achieve the following functions: first, a risk assessment method is used to perform risk analysis on the project data, and based on the results of the risk analysis, the risk type and risk proportion corresponding to the project type of each project data are obtained, and then the risk critical value of the project data is obtained, and all project data are preliminarily classified based on the risk proportion and the risk critical value, and finally, the classification of all project data is updated in real time based on the project data obtained in real time.
[0079] In addition, the logic instructions in the above-mentioned memory can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art, and the computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk.
[0080] Embodiment 4, the present application also provides a computer-readable storage medium, the present application provides a storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above project data classification and analysis method for small and medium-sized enterprises are executed to achieve the following functions: first, a risk assessment method is used to perform risk analysis on the project data, and based on the results of the risk analysis, the risk type and risk ratio corresponding to the project type of each project data are obtained, and then the risk critical value of the project data is obtained, and all project data are preliminarily classified based on the risk ratio and the risk critical value, and finally the classification of all project data is updated in real time based on the project data obtained in real time.
[0081] Through the description of the above implementation methods, the embodiments of the present invention can be provided as methods, systems or computer program products. Based on such an understanding, the above technical solutions can be essentially or partly contributed to the prior art in the form of software products, which can be stored in a computer-readable storage medium, such as ROM / RAM, a magnetic disk, an optical disk, etc., and include several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.
[0082] In the embodiments provided in the present application, it should be understood that the disclosed system or method can be implemented in other ways. The embodiments described above are merely schematic. For example, the division of modules or units is only a logical function division. There may be other division methods in actual implementation. For example, multiple modules or units can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of systems, modules and units can be electrical, mechanical or other forms.
[0083] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A project data classification and analysis method for small and medium-sized enterprises, characterized in that: The steps include: Based on the risk types faced by SMEs, risk analysis is performed on all project data in SMEs using risk estimation methods, and based on the results of risk analysis, the risk type and risk proportion corresponding to the project type of each project data are obtained; Based on the risk types contained in the project data, obtain the risk critical value of the project data, and preliminarily classify all project data based on the risk proportion and risk critical value; In the actual operation of small and medium-sized enterprises, the classification of all project data is updated in real time based on the project data obtained in real time.
2. A project data classification and analysis method for small and medium-sized enterprises according to claim 1, characterized in that: Risk assessment methods include: The SMEs to be analyzed are recorded as analyzed enterprises; based on big data and the industry to which the analyzed enterprises belong, multiple risk types that the analyzed enterprises may be involved in are obtained and recorded as enterprise risk types QF1 to QF h ; Obtain the project types corresponding to all project data in the analyzed enterprise; Establish a table of T rows × R columns, recorded as the risk project table, where R is h+1, and fill in the top row of the risk project table with enterprise risk types QF1 to QF from left to right except the first cell h , fill in all project types from top to bottom in the leftmost column of the risk project table except the first cell; mark the risk types that each project type may involve in the risk project table.
3. A project data classification and analysis method for small and medium-sized enterprises according to claim 2, characterized in that: Risk assessment methods also include: Use big data to obtain and analyze the latest annual reports of multiple small and medium-sized enterprises in the same industry as the enterprise, and record them as reference annual reports; establish a plane rectangular coordinate system, record it as the proportion analysis coordinate system, where the coordinate points from the coordinate origin to the right in the X-axis of the proportion analysis coordinate system are enterprise risk type QF1 to enterprise risk type QF h , the unit of the Y axis is the amount; based on the amount of profit loss caused by all enterprise risk types QF in the reference annual reports, punctuate in the proportion analysis coordinate system, and fit the punctuation points corresponding to the same reference annual report into a curve, recorded as the risk loss curve; draw the risk loss curve corresponding to all reference annual reports in the same proportion analysis coordinate system; connect the risk loss curve, X-axis, Y-axis and X = enterprise risk type QF h The enclosed area is recorded as the risk loss area; the distance between the coordinate points of two adjacent enterprise risk types QF in the X-axis is recorded as L.
4. A project data classification and analysis method for small and medium-sized enterprises according to claim 3, characterized in that: Risk assessment methods also include: For any enterprise risk type QF in the X-axis h1 , the horizontal axis of all risk loss curves is the enterprise risk type QF h1 The point with the largest ordinate among the points is recorded as the loss peak point SF h1 ; In the proportion analysis coordinate system, the enterprise risk type QF h1 Make a bar chart for the midpoint and record it as the loss bar chart SZT h1 , where the loss histogram SZT h1 The width is L / 2, and the loss histogram SZT h1 The highest point is the loss peak SF h1 The vertical axis of the loss histogram SZT h1 The independent areas divided by multiple risk loss curves are recorded as loss sub-areas. For any loss sub-area, the number of risk loss areas containing the loss sub-area is recorded as the risk coverage number. The highest point and the lowest point in the loss sub-area are recorded as the loss sub-peak point and the loss sub-valley point respectively. The value of the vertical coordinate of the loss sub-peak point minus the vertical coordinate of the loss sub-valley point is recorded as the risk span amount. Obtain the loss bar chart SZT h1 The risk coverage quantity and risk span amount of all loss sub-areas in the , and use the risk analysis algorithm to obtain the loss histogram SZT h1 Corresponding enterprise risk type QF h1 The risk analysis algorithm includes: Among them, F is the risk mean, sum is the loss histogram SZT h1 The number of loss sub-regions in KD i The loss histogram SZT h1 The risk span amount corresponding to the i-th loss sub-area in FS i The loss histogram SZT h1 The risk coverage quantity corresponding to the i-th loss sub-area in .
5. A project data classification and analysis method for small and medium-sized enterprises according to claim 4, characterized in that: Risk assessment methods also include: Based on the proportion analysis coordinate system and risk analysis algorithm, the risk mean corresponding to all enterprise risk types QF is obtained, and the sum of all risk means is recorded as the total risk value. For any enterprise risk type QF h1 , the enterprise risk type QF h1 The value obtained by dividing the mean risk by the total risk value is recorded as the enterprise risk type QF h1 of risk. For any project type in the risk project table, obtain multiple enterprise risk types QF corresponding to the project type, record them as associated risks GF, and record the sum of the risk proportions corresponding to all associated risks as the risk proportion of the project type; obtain the risk proportions of all project types.
6. A project data classification and analysis method for small and medium-sized enterprises according to claim 5, characterized in that: Based on the risk types contained in the project data, the risk thresholds for obtaining project data include: Obtain the number of associated risk GFs corresponding to each project type in the risk project table, and record the number of associated risk GFs as the risk number of the project type, and record the maximum risk number as SL max And the minimum value of the risk amount is recorded as SL min , SL max Subtract SL min The value of is recorded as the risk number difference; For any project type in the risk project table, subtract SL from the risk amount of the project type. min The value of is recorded as the project number difference, and the value obtained by dividing the project number difference by the risk number difference is recorded as the critical ratio; obtain the critical ratio corresponding to all project types; Obtain and analyze the revenue obtained by each project type in the risk project table of the enterprise in the most recent operating cycle, and record the revenue of each project type as the near-term revenue of the project type; record the value obtained by multiplying the near-term revenue by the critical ratio as the risk critical value of the project type; obtain the risk critical values corresponding to all project types in the risk project table.
7. A project data classification and analysis method for small and medium-sized enterprises according to claim 6, characterized in that: The preliminary classification of all project data based on risk proportion and risk threshold also includes: The mean classification method is used to preliminarily classify the project data corresponding to all project types. The mean classification method includes: recording the mean of all risk proportions as the mean proportion; recording the mean of all risk critical values as the critical mean; recording the project data corresponding to the project types whose risk proportion is greater than the mean proportion and whose risk critical value is greater than the critical mean as Class I data; recording the project data corresponding to the project types whose risk proportion is less than or equal to the mean proportion and whose risk critical value is greater than the critical mean as Class II data; recording the project data corresponding to the project types whose risk critical value is less than or equal to the critical mean and whose risk proportion is greater than the mean proportion as Class II data; recording the project data corresponding to the project types whose risk proportion is less than or equal to the mean proportion and whose risk critical value is less than or equal to the critical mean as Class III data.
8. A project data classification and analysis method for small and medium-sized enterprises according to claim 7, characterized in that: In the actual operation of small and medium-sized enterprises, the classification of all project data is updated in real time based on the project data obtained in real time, including: In the actual operation process of the analyzed enterprise, the risk critical value and risk ratio corresponding to each project type of the analyzed enterprise are re-obtained every operation cycle of the analyzed enterprise, and the mean classification method is used to classify the project data corresponding to all project types in the risk project table based on the latest obtained risk critical value and risk ratio.
9. A project data classification and analysis system for small and medium-sized enterprises, used to implement the deep learning-based intellectual property management classification and storage method described in any one of claims 1 to 8, characterized in that: Includes risk and proportion analysis module, preliminary classification module and real-time classification update module; The risk and proportion analysis module is used to perform risk analysis on all project data in SMEs based on the risk types faced by SMEs using risk estimation methods, and obtain the risk type and risk proportion corresponding to the project type of each project data based on the results of the risk analysis; The preliminary classification module is used to obtain the risk threshold of the project data based on the risk type contained in the project data, and to perform preliminary classification of all project data based on the risk proportion and risk threshold; The real-time classification update module is used to update the classification of all project data in real time based on the project data obtained in real time during the actual operation of small and medium-sized enterprises.
10. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 8 are executed.
Citation Information
Patent Citations
Project data management system for research and development of small and medium-sized enterprises
CN117455315A
