Engineering cost management method based on cloud computing and related equipment
Through cloud computing-based methods, engineering cost data samples are processed and cost index curve distribution maps are generated, which solves the problem that engineering cost management in the existing technology is difficult to reflect market conditions in real time, and improves the accuracy and efficiency of cost management.
Patent Information
- Application Number
- CN202411015737.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-19
AI Technical Summary
In the prior art, engineering cost management is difficult to reflect market conditions in real time during the project bidding stage, resulting in the impact of cost accuracy, especially when using multiple software for calculations, the system resource allocation is uneven and the inability to update in real time.
Using cloud computing method, the cost index search information of the target user is obtained, and the cost data samples of each stage after noise reduction matches are generated to generate a cost index curve distribution chart to achieve reasonable calculation of project cost and market conditions. Real-time reflection.
It realizes the acquisition of engineering costs that meet the current market conditions within the preset time period, supports the application of the bill of quantities pricing model, and improves the accuracy and efficiency of cost management.
Smart Images

Figure CN118982373A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to a project cost management method based on cloud computing and related equipment. Background Art
[0002] Project cost, quality and progress constitute the three core elements of project construction management. Project cost management is of great significance in all stages of construction project decision-making, design and construction. For decades, my country has been using the "fixed price pricing model" for project cost management, that is, during the project bidding stage, the construction unit and the construction unit share the fixed price and cost standard to determine the bid base price and bid quotation. The fixed price pricing model has certain drawbacks. Once the fixed price is out of line with the market price, it will affect the accuracy of the cost. In the existing technology, the "bill of quantities pricing model" is gradually implemented, that is, during the project bidding stage, the construction unit determines the project quantity, and the construction unit independently fills in the unit price to realize the marketization of project cost management.
[0003] In the prior art, it is usually calculated manually using cost software. For example, the design budget is calculated using the budget calculation software, the construction drawing budget is calculated using the budget calculation software, and the final settlement is calculated using the final settlement calculation software. Different software has different functions. If the above contents are calculated at the same time, multiple software need to run at the same time. At this time, the computing power distribution of multiple software to the system or server is equal or unknown, and it is impossible to calculate the project cost that conforms to the current market conditions based on the real-time price.
[0004] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention
[0005] The purpose of this application is to provide a cloud computing-based project cost management method and related equipment, which at least overcomes the problems existing in the prior art to a certain extent, by receiving the cost index search information of the target user, thereby obtaining the noise-reduced cost data samples of each stage that match the cost index search information, and the target server processes the cost data samples of each stage to generate a cost index curve distribution diagram, so as to obtain the project cost that meets the current market conditions within a preset time period. As an empirical value that can reflect the changes in market conditions, the project cost index is an indispensable basic data in the "project quantity bill pricing model". The present invention realizes the reasonable calculation of the project cost index and can provide technical support for the promotion and application of the "project quantity bill pricing model".
[0006] Other features and advantages of the present application will become apparent from the following detailed description, or may be learned in part by the practice of the present invention.
[0007] According to one aspect of the present application, a cloud computing-based engineering cost management method is provided, including: obtaining cost index search information of a target user and cost data samples of each stage that match the cost index search information; processing the cost data samples of each stage to generate index keywords of the project cost and feature values corresponding to the index keywords, wherein the index keywords are set based on cost data of different levels; preprocessing the index keywords and feature values to generate denoised index keywords and feature values; processing the denoised index keywords and feature values to generate an initial cost index; processing the initial cost index to generate a target cost index; processing the cost index search information of the target user and the target cost index based on preset processing rules to generate a cost index curve distribution diagram.
[0008] In one embodiment of the present application, the preprocessing of indicator keywords and eigenvalues to generate denoised indicator keywords and eigenvalues includes: processing cost data samples of each stage based on the indicator keywords to generate grouped cost data samples; processing the grouped cost data samples based on the DBSCAN method to generate a data set with data density connected in several sets; obtaining the maximum data set with data density connected in several sets; processing the data set with data density connected in several sets based on the maximum data set with data density connected in several sets to generate a preliminary denoised data set.
[0009] In one embodiment of the present application, the preprocessing of indicator keywords and eigenvalues to generate denoised indicator keywords and eigenvalues also includes: processing a preliminary denoised data set to generate a sorted data set and a corresponding distribution curve; processing the distribution curve based on preset processing rules to generate a number of curve areas; if the curve slope corresponding to the curve area is greater than a preset slope threshold, setting the curve area corresponding to the curve slope as noise information; if the curve slope corresponding to the curve area is less than or equal to the preset slope threshold, setting the curve area corresponding to the curve slope as a target cost indicator data set; processing the target cost indicator data set to generate denoised indicator keywords and eigenvalues.
[0010] In one embodiment of the present application, the processing of the initial cost index to generate a target cost index includes: processing the initial cost index to generate an initial main material cost index and an initial sub-item cost index; obtaining historical time information corresponding to the initial main material cost index and the initial sub-item cost index; obtaining target cost cycle time information; processing the historical time information based on the target cost cycle time information to generate a price deviation value; processing the initial main material cost index based on the price deviation value to generate a target main material cost index increase index and a target sub-item cost index increase index; processing based on the target main material cost index increase index and the target sub-item cost index increase index to generate a target cost index.
[0011] In one embodiment of the present application, the processing of the initial cost index to generate the target cost index also includes: the method includes a calculation formula for obtaining the target main material cost index increase index and the target sub-item cost index increase index, and the calculation formula is: In = {in1, in2, ..., in n}; Among them, In is the increase set of main material unit price or sub-item cost rate, and the data item in In is i The increase in the unit price of the main materials or the increase in the rate of the sub-item costs, The unit price of the main materials at the time of sample document preparation or the rate of the sub-item costs at the time of sample document preparation, The current unit price of main materials or the current rate of sub-item costs; Among them, f' i represents the cost index of materials of category i; Among them, g' i Represents the cost indicator of the i-th category.
[0012] In one embodiment of the present application, the target cost index is generated based on the target main material cost index increase index and the target sub-item cost index increase index, including: the method includes a calculation formula for obtaining the target cost index, and the calculation formula is: i '=z i ×(1+IN Price +IN Rate ), where z i The unit price of the engineering cost index during the sample file preparation period, IN Price is the price increase index of main materials, IN Rate is the rate increase index of sub-item fees, z i ' is the predicted value of the unit price of the engineering cost indicator that reflects the current price level.
[0013] In one embodiment of the present application, the cost index search information of the target user and the target cost index are processed based on preset processing rules to generate a cost index curve distribution diagram, including: performing word segmentation processing on the cost index search information of the target user and the target cost index respectively to generate cost index search terms and target cost index standard keywords; matching processing is performed on the cost index search terms and the target cost index standard keywords to generate a cost index curve distribution diagram.
[0014] Another aspect of the present application is a cloud computing-based engineering cost management device, characterized in that the device includes: an acquisition module, used to obtain cost index search information of a target user and cost data samples of each stage that match the cost index search information; a processing module, used to process the cost data samples of each stage to generate index keywords of the project cost and characteristic values corresponding to the index keywords, wherein the index keywords are set based on cost data of different levels; pre-processing the index keywords and characteristic values to generate denoised index keywords and characteristic values; processing the denoised index keywords and characteristic values to generate an initial cost index; processing the initial cost index to generate a target cost index; processing the cost index search information of the target user and the target cost index based on preset processing rules to generate a cost index curve distribution diagram.
[0015] According to another aspect of the present application, an electronic device is provided, characterized in that it comprises: a first processor; and a memory for storing executable instructions of the first processor; wherein the first processor is configured to implement the above-mentioned cloud computing-based engineering cost management method by executing the executable instructions.
[0016] According to another aspect of the present application, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a second processor, the above-mentioned cloud computing-based engineering cost management method is implemented.
[0017] According to another aspect of the present application, a computer program product is provided, including a computer program, characterized in that when the computer program is executed by a third processor, the above-mentioned cloud computing-based engineering cost management method is implemented.
[0018] The present application provides a cloud computing-based project cost management method and related equipment, wherein the server obtains the target user's cost index search information and the cost data samples of each stage that match the cost index search information; processes the cost data samples of each stage to generate the index keywords of the project cost and the characteristic values corresponding to the index keywords, wherein the index keywords are set based on cost data of different levels; pre-processes the index keywords and characteristic values to generate the index keywords and characteristic values after noise reduction; processes the index keywords and characteristic values after noise reduction to generate the initial cost index; processes the initial cost index to generate the target cost index; processes the cost index search information and the target cost index of the target user based on the preset processing rules to generate the cost index curve distribution map. By receiving the cost index search information of the target user, the cost data samples of each stage after noise reduction that match the cost index search information are obtained, and the target server processes the cost data samples of each stage to generate the cost index curve distribution map, thereby obtaining the project cost that meets the current market conditions within the preset time period.
[0019] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A flowchart of a method for managing construction costs based on cloud computing provided by an embodiment of the present application is shown;
[0021] Figure 2 A schematic diagram of the structure of a cloud computing-based engineering cost management device provided in one embodiment of the present application is shown;
[0022] Figure 3 A schematic diagram of the structure of an electronic device provided by an embodiment of the present application is shown;
[0023] Figure 4 A schematic diagram of a storage medium provided by an embodiment of the present application is shown;
[0024] Figure 5 A schematic diagram of a data density noise set provided by an embodiment of the present application is shown;
[0025] Figure 6 A schematic diagram of a search result provided by an embodiment of the present application is shown. DETAILED DESCRIPTION
[0026] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0027] Combine the following Figure 1 To describe the engineering cost management method based on cloud computing according to the exemplary embodiment of the present application. It should be noted that the following application scenarios are only shown to facilitate understanding of the spirit and principles of the present application, and the embodiments of the present application are not limited in this regard. On the contrary, the embodiments of the present application can be applied to any applicable scenario.
[0028] In one implementation, the present application also proposes a cloud computing-based engineering cost management method and related equipment. Figure 1 The following schematically shows a flow chart of a method for project cost management based on cloud computing according to an embodiment of the present application. Figure 1 As shown, the method is applied to a server, comprising:
[0029] S101, obtaining cost index search information of a target user and cost data samples of each stage matching the cost index search information.
[0030] In one embodiment, cost data sample files of each stage such as feasibility study investment estimate, preliminary design budget, construction drawing design budget, and final settlement of railway engineering construction projects are collected. The key basic work of cost index analysis is to mark the data items in the cost data sample files of each stage with keywords and characteristic values. Since the sample files contain a large amount of data, the amount of data contained in a single data sample file can generally reach thousands of lines. Manually marking the names of various projects or expenses in the sample files with keywords and characteristic values is a large workload. In order to improve work efficiency, the present invention summarizes the corresponding relationship between the contents of the sample files at the same level and the upper and lower level projects or expense names and the cost index keywords and characteristic values, and then uses a computer program to achieve rapid marking of the cost index keywords and characteristic values of the sample projects.
[0031] Acquire the target user's engineering cost index search terms; remove duplicate keywords corresponding to each data item in the cost data sample file data set to obtain a sample keyword set after removal of duplicate keywords; perform word segmentation processing on the target user's engineering cost index search terms and all keywords in the sample keyword set after removal of duplicate keywords, respectively, to generate a cost index search term segmentation result set and a sample keyword segmentation result set; match the cost index search terms and the sample keywords after removal of duplicate keywords to generate keywords that match the target user's engineering cost index search terms, which will be explained in detail later.
[0032] In another implementation, sample files of cost data of each stage of railway engineering construction project, such as feasibility study investment estimate, preliminary design budget, construction drawing design budget, and final settlement, are collected. Here, the data set of the sample files of cost data is T = {t1, t2, …, t x}, for any data item t in the set Ti , t i =(code i ,name i ,c i ,d i ,e i ,f i ,g i ), where code i Represents the entry number, name i Represents the name of the project or cost, c i Representative unit, d i Represents the number of projects, e i represents the total price, f i Represents the main material cost details, g i Represents the detailed breakdown of sub-items of expenses. For example, a data item is “0202-01-01-01-01-02, (2) Mechanical construction, cubic meters, 2141712, RMB 12244376, material A RMB 1000, material B RMB 2000…, cost A RMB 10000, cost B RMB 20000…”.
[0033] Specifically, the feasibility study investment estimate is a document of all the investment costs required from the preparation of the project to its completion and delivery for production or use, compiled during the feasibility study phase of the project, based on the scope of the construction project, construction conditions, and technical and economic plans proposed in the feasibility study report. The preliminary design budget is a document of all the investment costs required from the preparation of the project to its completion and delivery for production or use, compiled during the preliminary design phase of the project, based on the preliminary design drawings, as the design budget. The construction drawing budget is a document of all the investment costs required from the preparation of the project to its completion and delivery for production or use, compiled during the construction drawing design phase of the project, based on more detailed construction drawings, as the construction drawing budget. The final settlement is a document of all the investment costs required from the preparation of the project to its completion and delivery for production or use, compiled after the project is fully completed and passes the final acceptance, based on the actual final settlement book, and taking into account the verification of new assets and the assessment of investment effects, as the final settlement, which is the final actual cost of the entire construction project. The item number is used to indicate the hierarchical relationship of each data in the file. The project or cost name is used to indicate the work content, project characteristics, etc. corresponding to each data item, and is generally defined independently by the document preparer based on the actual situation of the project.
[0034] S102, processing the cost data samples of each stage to generate index keywords of the project cost and characteristic values corresponding to the index keywords.
[0035] In one implementation, based on the different work contents and engineering features of railway engineering construction, standard engineering cost indicator keywords and characteristic values are generated as the "universal language" in the railway engineering cost indicator business field to achieve standardized representation of engineering cost indicators. Among them, the engineering cost indicator is the cost required to complete each unit of construction work content under specific engineering characteristics. The complete description of the engineering cost indicator includes unit price, unit, keywords and characteristic values. The unit price is the specific cost value of the engineering cost indicator, such as 1000, 20000, etc. The unit is the unit corresponding to the unit price of the engineering cost indicator, such as yuan / square meter, ten thousand yuan / main line kilometer, etc. The standard engineering cost indicator keyword is the specific work content of the engineering cost indicator. It is generally composed of nouns and verbs, such as tunnel excavation, laying rails, etc. For keywords with consensus on work content in the industry, they can be expressed only by nouns, such as roadbed, bridge, etc. The characteristic value is the specific engineering feature of the engineering cost indicator. For example, there are different surrounding rock levels such as Grade I surrounding rock, Grade II surrounding rock, Grade III surrounding rock, Grade IV surrounding rock, Grade V surrounding rock, and Grade VI surrounding rock.
[0036] The keywords of standard engineering cost indicators include but are not limited to roadbed; earthwork; bridge; lower part of bridge; bridge foundation; open-cut concrete; upper part of bridge; simply supported box girder; tunnel; main tunnel; tunnel excavation; transportation of abandoned ballast outside the tunnel; track; laying of rails; paving of roadbed; paving of ballast. The corresponding characteristic values are the number of main lines: single-line, double-line; construction procedures: excavation of earthwork, use of earth filling, borrowed earth filling, construction methods: manual construction, mechanical construction, transportation distance: within 1 km, 2-5 km, 5-10 km; number of main lines: single-line, double-line, bridge type 1: super-large bridge, large bridge, small and medium-sized bridge, frame bridge, bridge type 2: complex super-large bridge, general super-large bridge, super-large bridge for both highway and railway, complex bridge, general bridge, arch bridge, beam bridge, bridge type 3: cable-stayed bridge, suspension bridge, steel tube arch bridge, multi-line bridge, others, river names: Yangtze River, Yellow River, offshore, others; number of main lines: single-line, Double track, bridge types: complex super-large bridges, general super-large bridges, super-large bridges for both highway and railway, complex bridges, general bridges, arch bridges, small and medium-sized bridges, frame bridges; foundation types: open cut, pedestal, caisson, bored piles, bored piles, sunk piles, pipe columns, dug well foundations; project parts: open cut foundation, pedestal foundation, roadbed spoil field treatment, piers, retaining structures, slope protection, ditches, dug well foundations, continuous beams, steel-concrete composite beams, turnout beams, other special beams, bridge accessories; number of main lines: single track, double track, bridge types: complex super-large bridges, general super-large bridges, super-large bridges for both highway and railway, complex bridges, general bridges, arch bridges, small and medium-sized bridges, frame Bridge erection; Construction method: prefabricated erection, cast-in-place, Beam type: single-line, double-line, Beam span: 16m, 24m, 32m, 40m; Tunnel section: ≤40 square meters, ≤60 square meters, ≤85 square meters, >85 square meters; Construction method: drilling and blasting, TBM, shield, Surrounding rock level: Grade I surrounding rock, Grade II surrounding rock, Grade III surrounding rock, Grade IV surrounding rock, Grade V surrounding rock, Grade VI surrounding rock, Tunnel section: ≤40 square meters, ≤60 square meters, ≤85 square meters, >85 square meters; Transportation of abandoned ballast outside the tunnel: included, not included, Construction method: drilling and blasting, TBM, shield, Surrounding rock level: Grade I surrounding rock, Grade II surrounding rock, Level III surrounding rock, Level IV surrounding rock, Level V surrounding rock, Level VI surrounding rock, tunnel section: ≤40 square meters, ≤60 square meters, ≤85 square meters, >85 square meters; transportation distance: within 1 km, 2-5 km, 5-10 km; number of main lines: single track, double track, roadbed type: ballasted, ballastless; rail category: new rail, old rail, rail type: 43kg rail, 50kg rail, 60kg rail, 75kg rail, sleeper type: wooden sleeper, reinforced concrete sleeper, reinforced concrete bridge sleeper, reinforced concrete wide sleeper, ballastless roadbed, sleeperless, transition section; roadbed type: granular roadbed, ballastless roadbed; ballast position: surface ballast, bottom ballast. The specific standard engineering cost indicator keywords and characteristic values are not limited in this embodiment and can be set according to actual needs.
[0037] In another embodiment, the key basic work of engineering cost index analysis is to mark the data items in the cost data sample files of each stage with keywords and characteristic values. Since the sample files contain a large number of data items, generally a single data sample file contains thousands of data items, and the manual marking workload is large, in order to improve work efficiency, the present invention summarizes the corresponding relationship between the content of the data items in the sample files, the names of the projects or expenses at the same level and the upper and lower levels, and the keywords and characteristic values of the standard engineering cost indicators, and then with the help of computer programs, it is possible to quickly mark the keywords and characteristic values of the sample project cost indicators.
[0038] Summarize the correspondence between the contents of the sample files and the names of the projects or expenses at the same level and above and below and the keywords and characteristic values of the cost indicators. Traverse the massive cost data sample files of each stage such as the feasibility study investment estimate, preliminary design budget, construction drawing design budget, and final settlement of railway engineering construction projects. Based on the correspondence between the contents of the sample files and the names of the projects or expenses at the same level and above and below and the keywords and characteristic values of the cost indicators, use computer programs to quickly define the keywords and characteristic values of the cost indicators of the sample projects.
[0039] Specifically, it includes but is not limited to traversing the sample file. For the project or expense name of the data item in the sample file, if it contains the content of the project or expense name at this level in a certain corresponding relationship, and its upper or lower project or expense name contains the content of the upper or lower project or expense name in this corresponding relationship, then the keyword of this data item in the sample file is marked as the keyword in this corresponding relationship, and the feature value of this data item in the sample file is marked as the feature value in this corresponding relationship. Update the cost data sample file set T = {t1, t2, ..., t x}, for any data item t in the set T i , t i =(a i ,b i ,c i ,d i ,e i ), where a i Represents the keyword, b i represents the eigenvalue, c i Representative unit, d i Represents the number of projects, e i Represents the total price.
[0040] For example, for the data item with the entry number "0202-01-01-01-01-02", the name of its current-level project or expense item contains "mechanical construction", and the name of its parent project or expense contains "earthwork", "earth excavation", and "≤1 km", which meets the preset corresponding relationship. Therefore, the keyword of the data item "0202-01-01-01-01-02" is marked as "earthwork", and the characteristic value is marked as "construction process: earth excavation, transportation distance: within 1 km, construction method: mechanical construction". In addition, the keywords are set based on the cost data of different levels.
[0041] S103, pre-processing the indicator keywords and eigenvalues to generate denoised indicator keywords and eigenvalues.
[0042] In one implementation, cost data samples of each stage are processed based on indicator keywords to generate grouped cost data samples; the grouped cost data samples are processed based on the DBSCAN method to generate a data set with data density connected in several sets; the maximum data set with data density connected in several sets is obtained; the data sets with data density connected in several sets are processed based on the maximum data set with data density connected in several sets to generate a preliminary denoised data set.
[0043] Based on the keywords matching the target user's engineering cost index search terms, a set of cost data sample file data items marked with the keywords is extracted; combined with the unit information, all data items in the extracted cost data sample file data item set are grouped; based on the DBSCAN method, noise is removed from the grouped data items to generate the largest data set with connected data density within several sets.
[0044] Based on the keywords matching the target user's engineering cost index search terms, a set of cost data sample file data items marked with the keywords is extracted and grouped by unit. Data items with the same unit are grouped together. The grouped data set is Y = {Y1, Y2, ..., Y x}, for any data set Y in set Y j , Y j ={y1,y2,…,y n}, for the set Y j Any data y in i ,y i =(a,b i ,c j ,d i ,e i ,f i ,g i ), where a represents the keyword that matches the target user's search term for engineering cost indicators, and b i represents the eigenvalue, cj Representative unit, d i Represents the number of projects, e i represents the total price, f i Represents the main material cost details, g i Represents a detailed breakdown of itemized expenses.
[0045] Traverse the grouped data set Y = {Y1, Y2, ..., Y x}, for any data set Y in set Y j Any data y in i , through the price e i Divide by the project quantity d i The unit price of the engineering cost index of the data item can be obtained by this method. For example, if the engineering quantity of a data item is 47969.9212, the unit is masonry cubic meter, and the total price is 29271998 yuan, then the unit price of the engineering cost index of the data item is 29271998÷47969.9212=610.22 yuan / masonry cubic meter.
[0046] Let the set Y j The calculated unit price set of engineering cost indicators is Z j ={z1,z2,…,z n}, the “DBSCAN clustering” method is used to eliminate noise data within the set, and the rationality of the cost indicator results is ensured by eliminating abnormal results caused by irregular sample data file preparation.
[0047] For details, please refer to the following example. Set the threshold distance E. For the set Z j Any data item z in i , if E ≥ z i , then the interval [Ez i ,z i +E] is called data z i The E neighborhood; if E <z i , then the interval [z i -E,z i +E] is called data z i The E neighborhood.
[0048] Traverse the set Z j ={z1,z2,…,z n}, for the set Z j Any data item z in i , by calculating other data items z in the collection j With z i The distance D |i-j| =|z i -z j |, find data item z i The dataset Z in the neighborhood of Ezi-E .
[0049] Set the amount of data in the neighborhood threshold of E to M. If the data set Z zi-E If the amount of data is greater than or equal to M, then z i As a core object, if the data z j In the core object z i If z is in the E neighborhood of j With z i Direct density is reachable; for a data set X = {x1, x2, ..., x n}, if for any element x in the set i and x i-1 Direct density is reachable, then x1 and x n Density reachable; if data o is density reachable with data p, and data o is density reachable with data q, then data p is density connected with data q.
[0050] Finally determine the largest data set Z in which the data density in several sets is connected j '={Z1,Z2,…,Z m}, for the set Z j Any data set Z in ' i , Z i It is the unit price set of engineering cost indicators after noise removal by DBSCAN clustering method, that is, the preliminary denoising data set.
[0051] like Figure 5 As shown, the continuous area on the left is the largest data set connected by density, which can be used as the unit price data set of engineering cost indicators. Noise 1, noise 2, and noise 3 are not in the largest data set connected by density and are removed as noise values.
[0052] In another embodiment, the preliminary denoised data set is processed to generate a sorted data set and a corresponding distribution curve; the distribution curve is processed based on preset processing rules to generate a number of curve regions; if the curve slope corresponding to the curve region is greater than a preset slope threshold, the curve region corresponding to the curve slope is set as noise information; if the curve slope corresponding to the curve region is less than or equal to the preset slope threshold, the curve region corresponding to the curve slope is set as a target cost index data set; the target cost index data set is processed to generate denoised index keywords and feature values.
[0053] Determine the dataset Z by DBSCAN clustering method j '={Z1,Z2,…,Z m}, the distribution curve fitting method is used to remove the secondary noise. For details, please refer to the following content:
[0054] For the set Z′ j Any dataset Z ini , the data set Z i Arrange in order and then fit into a distribution curve; divide the distribution curve into regions according to the pre-set granularity; set the slope threshold K. If the slope of a certain curve segment is greater than the threshold K, the data in the region of the curve segment is defined as noise. If the slope of a certain curve segment is less than or equal to the threshold K, the data set corresponding to the curve segment is used as an acceptable cost index data set. Finally, the index value set after noise removal by the "DBSCAN clustering + distribution curve fitting" method is Z″ j ={Z'1,Z'2,…,Z' m}, as an acceptable cost indicator data set.
[0055] Based on the set Y j ={y1,y2,…,y n} data item content, extended set Z″ j ={Z'1,Z'2,…,Z' m} data item content, for the set Z″ j Any data set Z' i Any data item z in i , z i =(a,b i ,c j ,d i ,f i ,g i ,z i ), where a represents the keyword that matches the target user's search term for engineering cost indicators, and b i represents the eigenvalue, c j Representative unit, d i represents the number of projects, f i Represents the main material cost details, g i Represents the detailed itemized cost, z i Represents the unit price of engineering cost indicators.
[0056] The expanded set Z j " is a set of sample file data items after noise removal after grouping, and the data items in the set are the acceptable sample file data items. Each set of sample file data items after noise removal constitutes a set Z' = {Z'1', Z'2', ..., Z' x '}, as a set of acceptable sample file data items after noise removal.
[0057] S104, processing the index keywords and characteristic values after noise reduction to generate an initial cost index.
[0058] In one embodiment, the keywords of the indicators after noise reduction include but are not limited to demolition and land acquisition costs, relocation of roads, grade highways, mud-bound gravel roads, integrated drainage of flyovers, felling and root digging, relocation of three electricity networks, soundproof windows, land acquisition compensation, demolition compensation, roadbed, earthwork, AB group filling materials, and stonework. The corresponding characteristic values are the number of main lines: single-line, double-line, project type: new construction, adding a second line, capacity expansion and reconstruction; highway type: grade highway, mud-bound gravel road, dirt road, cement road, asphalt road; highway type: roadbed, pavement, highway bridge, culvert, tunnel; none; none; none; type: relocation of communication lines, relocation of power lines; none; nature of land acquisition: permanent land, temporary land; none; demolished objects: residential houses, factories, mines, enterprises and schools, communication lines, power lines; demolished objects: residential houses, factories, mines, enterprises and schools, communication lines, power lines; number of main lines: single-line, double-line; construction process: digging Earthwork, using earth to fill, borrowing earth to fill, construction methods: manual construction, mechanical construction, transportation distance: within 1 km, 2-5 km, 5-10 km; construction process: using earth, borrowing earth, construction methods: manual construction, mechanical construction, transportation distance: within 1 km, 2-5 km, 5-10 km; construction process: digging stone, using stone to fill, borrowing stone to fill, construction methods: manual construction, mechanical construction, transportation distance: within 1 km, 2-5 km, 5-10 km; construction methods: manual construction, mechanical construction, transportation distance: within 1 km, 2-5 km, 5-10 km. The specific initial cost index is not limited in this embodiment and can be set according to actual needs.
[0059] S105: Process the initial cost index to generate a target cost index.
[0060] In one implementation, the initial cost index is processed to generate an initial main material cost index and an initial sub-item cost index; historical time information corresponding to the initial main material cost index and the initial sub-item cost index is obtained; target cost cycle time information is obtained; the historical time information is processed based on the target cost cycle time information to generate a price deviation value; the initial main material cost index is processed based on the price deviation value to generate a target main material cost index increase index and a target sub-item cost index increase index; the target main material cost index increase index and the target sub-item cost index increase index are processed to generate a target cost index, i.e., a set of project cost indicators.
[0061] Since the sample files are compiled in different years, the unit prices of the engineering cost indicators calculated through each sample file reflect the price level during the period when the sample files were compiled. However, from the perspective of the application of engineering cost indicators, engineering cost indicators that reflect the current price level are more valuable for reference. For this reason, the present invention proposes a cost indicator prediction method based on the main material price increase index and the sub-item cost rate increase index.
[0062] For the acceptable sample file data item set Z'={Z'1', Z'2', ..., Z' x '}, any data set Z in the collection j Any data item z in " i =(a,b i ,c j ,d i ,f i ,g i ,z i ), set the main material cost details f i Any data item in Represents the cost of the yth category of materials, where "main materials" refer to materials that have a greater impact on the project cost after changes in material prices. Generally, the main material catalog is published by the cost standard management agency to calculate the main material cost index Get the main material cost indicators
[0063] Suppose the material unit price set of the main materials of categories 1 to n during the sample file preparation period is Investigate the current unit price set P1 of the main materials from category 1 to category n, set By formula Calculate the price increase of main materials in i , get the main material price increase set In Price ={in1,in2,…,in n}; Through the formula Calculate the main material price increase index IN Price .
[0064] For the acceptable sample file data item set Z'={Z'1', Z'2', ..., Z' x '}, any data set Z in the collection j Any data item z in " i =(a,b i ,c j ,d i ,f i ,g i ,z i ), set up detailed itemized expenses g i Any data item in Represents the yth category of sub-item costs, where "sub-item costs" refer to the cost structure of the construction project cost specified in the cost standard, including direct engineering costs, construction measures costs, special construction additional costs, etc. Calculate sub-item cost indicators Get detailed itemized cost indicators
[0065] Suppose the rate set of the itemized costs from category 1 to category n in the cost standard during the sample document preparation period is The rate set specified by the current cost standard is: By formula Calculate the rate increase of itemized expenses i , get the itemized fee rate increase set In Rate ={in1,in2,…,in n}; Through the formula Calculate the itemized expense rate increase index IN Rate .
[0066] For the acceptable sample file data item set Z'={Z'1', Z'2', ..., Z' x '}, any data set Z in the collection j Any data item z in " i =(a,b i ,c j ,d i ,f i ,g i ,z i ), through the formula z i '=z i ×(1+IN Price +IN Rate ), calculate the unit price forecast value of the engineering cost index that reflects the current price level, and update z i =(a,b i ,c j ,z i '), where a represents the keyword that matches the target user's search term for engineering cost indicators, and b i represents the eigenvalue, c j Representative unit, z i ' represents the unit price forecast value of the engineering cost index reflecting the current price level. Finally, the engineering cost index set Z'={Z'1',Z'2',…,Z' x '}.
[0067] S106: Process the cost index search information of the target user and the target cost index based on a preset processing rule to generate a cost index curve distribution diagram.
[0068] In one implementation, the target user's cost index search information and the target cost index are segmented to generate cost index search terms and target cost index standard keywords; the cost index search terms and target cost index standard keywords are matched to generate a cost index curve distribution diagram.
[0069] By constructing a database, the cost index data set that has been defined, analyzed, calculated, and predicted by keywords and characteristic values will be stored in the database, and cost index keyword retrieval will be performed, that is, the user enters the cost index search term and matches it with the cost index standard keyword.
[0070] Please refer to the following steps for details:
[0071] 1. Establish a Chinese word segmentation corpus with the characteristics of railway engineering construction.
[0072] This solution is the first in the railway industry to propose a Chinese word segmentation corpus with the characteristics of railway engineering construction. The corpus can be continuously optimized and supplemented during the application process. This solution does not limit the content of the corpus and can be set according to actual needs.
[0073] The word segmentation is to divide the sentence or phrase without punctuation into the smallest semantic unit. For example, if "They are a group of players" is correctly segmented, the segmentation result is "they", "are", "a group", "players". Word segmentation is the premise and basis of semantic understanding.
[0074] The segmentation corpus is the smallest semantic unit used to generate the segmentation result. For example, "they", "is", "a group", and "team members" are all segmentation corpus. The completeness of the segmentation corpus affects the quality of subsequent segmentation work. For Chinese segmentation, scholars have proposed a general Chinese basic corpus, but there is a lack of Chinese segmentation corpus with the characteristics of railway engineering construction. The Chinese segmentation corpus with the characteristics of railway engineering construction proposed in this solution can greatly improve the accuracy of subsequent segmentation work.
[0075] 2. De-duplicate the keywords corresponding to each data item in the cost data sample file data set to obtain a de-duplicated sample keyword set.
[0076] Suppose the keyword set corresponding to all data items in the cost data sample file data set T is A = {a1, a2, ..., a x}, remove duplicates from the data in set A, and obtain the keyword set A'={a1,a2,…,a y}.
[0077] 3. Segment the target users’ engineering cost index search terms and the sample keyword set after deduplication.
[0078] On the basis of the general Chinese basic corpus, the Chinese word segmentation corpus with railway engineering construction characteristics is used to segment the target user's engineering cost index search terms and the sample keyword set after deduplication. Word segmentation has relatively mature algorithms in the field of natural language processing. This solution uses the JIEBA word segmentation method for word segmentation.
[0079] 4. Traverse the word segmentation results of the sample keyword set after deduplication, calculate the matching weight between the target user's engineering cost indicator search terms and all keywords in the sample keyword set after deduplication, and traverse to find the sample keyword with the highest matching weight as the keyword that matches the target user's engineering cost indicator search terms.
[0080] Assume that the target user's engineering cost index search term segmentation result set is O = {o1, o2, ..., o n}, the segmentation result of a keyword is P = {p1, p2, ..., p m}, the number of consistent word segmentation results in set O and set P is x, then the matching weight calculation formula between the target user's engineering cost index search term and the keyword is: The sample keyword set after deduplication is traversed to find the keyword with the highest matching weight as the keyword matching the engineering cost indicator search term of the target user.
[0081] List all units and characteristic values of the engineering cost index set, and the user specifies the unit and characteristic value within the listed range; filter out the engineering cost index set that meets the user-specified unit and characteristic value conditions, and generate the maximum, minimum, average, and cost index curve distribution diagram of the engineering cost index. This application does not limit the specific cost index curve distribution diagram, and the applicant can set it according to actual needs.
[0082] Suppose the set of engineering cost indicators that meet the user-specified unit and characteristic value conditions is Z'={Z'1',Z'2',…,Z" m}, any dataset Z in dataset Z' j Any data item in " is z i =(a,b,c,z i '), calculate the minimum value z of the unit price forecast value of the engineering cost index in the data set Z' min ', the maximum value of the unit price forecast value of the engineering cost index z max ', the average value of the unit price forecast value of the engineering cost index z avg ', and draw a curve distribution diagram of the unit price forecast value of the engineering cost index, and z min '、z max '、z avg'The search results are presented to users, who can use them to estimate, estimate, budget or final accounts for railway construction, or make auxiliary references for investment management decisions. Figure 6 shown.
[0083] In this application, the server obtains the target user's cost index search information and the cost data samples of each stage that match the cost index search information; processes the cost data samples of each stage to generate the index keywords of the project cost and the characteristic values corresponding to the index keywords, wherein the index keywords are set based on the cost data of different levels; pre-processes the index keywords and characteristic values to generate the index keywords and characteristic values after noise reduction; processes the index keywords and characteristic values after noise reduction to generate the initial cost index; processes the initial cost index to generate the target cost index; processes the cost index search information and the target cost index of the target user based on the preset processing rules to generate the cost index curve distribution map. By receiving the cost index search information of the target user, the cost data samples of each stage after noise reduction that match the cost index search information are obtained, and the target server processes the cost data samples of each stage to generate the cost index curve distribution map, so as to obtain the project cost that meets the current market conditions within the preset time period.
[0084] Optionally, in another embodiment of the method of the present application, the target cost index is generated based on the target main material cost index and the target sub-item cost index, including:
[0085] The method includes a calculation formula for obtaining a target cost index, and the calculation formula is:
[0086] z i '=z i ×(1+IN Price +IN Rate );
[0087] Among them, z i The unit price of the engineering cost index during the sample file preparation period, IN Price is the price increase index of main materials, IN Rate is the rate increase index of sub-item fees, z i ' is the predicted value of the unit price of the engineering cost indicator that reflects the current price level.
[0088] In one implementation, by formula z i '=z i ×(1+IN Price +IN Rate ), calculate the predicted value of the cost index that reflects the current price level, and update z i =(a,b,c,zi ').
[0089] By applying the above technical solution, the server obtains the cost index search information of the target user and the cost data samples of each stage that match the cost index search information; processes the cost data samples of each stage based on the index keywords to generate grouped cost data samples; processes the grouped cost data samples based on the DBSCAN method to generate a data set with data density connected in several sets; obtains the maximum data set with data density connected in several sets; processes the data sets with data density connected in several sets based on the maximum data set with data density connected in several sets to generate a preliminary denoised data set; processes the preliminary denoised data set to generate a sorted data set and a corresponding distribution curve; processes the distribution curve based on a preset processing rule to generate a number of curve areas; if the curve slope corresponding to the curve area is greater than a preset slope threshold, the curve area corresponding to the curve slope is set as noise information; if the curve slope corresponding to the curve area is less than or equal to the preset slope threshold, the curve area corresponding to the curve slope is set as a target cost index data set; processes the target cost index data set to generate denoised index keywords and feature values; wherein the index keywords are set based on cost data of different levels.
[0090] Preprocess the indicator keywords and eigenvalues to generate denoised indicator keywords and eigenvalues;
[0091] The denoised indicator keywords and characteristic values are processed to generate an initial cost indicator; the initial cost indicator is processed to generate an initial main material cost indicator and an initial sub-item cost indicator; the historical time information corresponding to the initial main material cost indicator and the initial sub-item cost indicator is obtained; the target cost cycle time information is obtained; the historical time information is processed based on the target cost cycle time information to generate a price deviation value; the initial main material cost indicator is processed based on the price deviation value to generate a target main material cost indicator increase index and a target sub-item cost indicator increase index; including a calculation formula for obtaining the target main material cost indicator increase index and the target sub-item cost indicator increase index, the calculation formula is: In={in1,in2,…,in n}; Among them, In is the increase set of main material unit price or sub-item cost rate, and the data item in In is i The increase in the unit price of the main materials or the increase in the rate of the sub-item costs, The unit price of the main materials at the time of sample document preparation or the rate of the sub-item costs at the time of sample document preparation, The current unit price of main materials or the current rate of sub-item costs; Among them, f' irepresents the cost index of materials of category i; Among them, g' i Represents the i-th category sub-item cost indicator; based on the target main material cost indicator increase index and the target sub-item cost indicator increase index, it is processed to generate the target cost indicator.
[0092] In addition, the present invention also includes a calculation formula for obtaining the target cost index, which is: i '=z i ×(1+IN Price +IN Rate ), where z i The unit price of the engineering cost index during the sample file preparation period, IN Price is the price increase index of main materials, IN Rate is the rate increase index of sub-item fees, z i ' is the unit price forecast value of the engineering cost index that reflects the current price level; the cost index search information of the target user and the target cost index are segmented to generate the cost index search terms and the target cost index standard keywords; the cost index search terms and the target cost index standard keywords are matched to generate the cost index curve distribution map. By receiving the cost index search information of the target user, the noise-reduced cost data samples of each stage that match the cost index search information are obtained, and the target server processes the cost data samples of each stage to generate the cost index curve distribution map, so as to obtain the engineering cost that meets the current market conditions within the preset time period.
[0093] In one embodiment, if Figure 2 As shown, the present application also provides a cloud computing-based engineering cost management device, including:
[0094] An acquisition module 201 is used to acquire the cost index search information of the target user and cost data samples of each stage matching the cost index search information;
[0095] Processing module 202 is used to process cost data samples at each stage to generate indicator keywords of project cost and characteristic values corresponding to the indicator keywords, wherein the indicator keywords are set based on cost data at different levels; pre-process the indicator keywords and characteristic values to generate denoised indicator keywords and characteristic values; process the denoised indicator keywords and characteristic values to generate initial cost indicators; process the initial cost indicators to generate target cost indicators; and process the cost indicator search information of the target user and the target cost indicators based on preset processing rules to generate a cost indicator curve distribution diagram.
[0096] In another embodiment of the present application, the processing module 202 is configured to pre-process the indicator keywords and feature values to generate the indicator keywords and feature values after noise reduction, including:
[0097] Process the cost data samples of each stage based on the indicator keywords to generate grouped cost data samples;
[0098] Based on the DBSCAN method, the grouped cost data samples are processed to generate several data sets with connected data densities within the sets.
[0099] Get the largest data set with data density connected in several sets;
[0100] The data sets connected by data density in the several sets are processed based on the largest data set connected by data density in the several sets to generate a preliminary denoised data set.
[0101] In another embodiment of the present application, the processing module 202 is configured to pre-process the indicator keywords and feature values to generate the indicator keywords and feature values after noise reduction, and further includes:
[0102] Processing the preliminary denoised data set to generate a sorted data set and a corresponding distribution curve;
[0103] Processing the distribution curve based on preset processing rules to generate a plurality of curve regions;
[0104] If the curve slope corresponding to the curve area is greater than the preset slope threshold, the curve area corresponding to the curve slope is set as noise information;
[0105] If the curve slope corresponding to the curve region is less than or equal to the preset slope threshold, the curve region corresponding to the curve slope is set as the target cost index data set;
[0106] The target cost index data set is processed to generate index keywords and feature values after noise reduction.
[0107] In another embodiment of the present application, the processing module 202 is configured to process the initial cost index to generate a target cost index, including:
[0108] Process the initial cost index to generate the initial main material cost index and initial sub-item cost index;
[0109] Obtaining historical time information corresponding to the initial main material cost index and the initial sub-item cost index;
[0110] Obtain target cost cycle time information;
[0111] Processing the historical time information based on the target cost cycle time information to generate a price deviation value;
[0112] Processing the initial main material cost index based on the price deviation value to generate a target main material cost index increase index and a target sub-item cost index increase index;
[0113] The target cost index is generated by processing based on the target main material cost index increase index and the target sub-item cost index increase index.
[0114] In another embodiment of the present application, the processing module 202 is configured to process the initial cost index to generate a target cost index, and further includes:
[0115] The method includes a calculation formula for obtaining a target main material cost index increase index and a target sub-item cost index increase index, and the calculation formula is:
[0116] In={in1,in2,…,in n};
[0117]
[0118] Among them, In is the increase set of main material unit price or sub-item cost rate, and the data item in In is i The increase in the unit price of the main materials or the increase in the rate of the sub-item costs, The unit price of the main materials at the time of sample document preparation or the rate of the sub-item costs at the time of sample document preparation, The current unit price of main materials or the current rate of sub-item costs;
[0119]
[0120] Among them, f' i represents the cost index of materials of category i;
[0121]
[0122] Among them, g' i Represents the cost indicator of the i-th category.
[0123] In another embodiment of the present application, the processing module 202 is configured to generate a target cost index based on the target main material cost index increase index and the target sub-item cost index increase index, including:
[0124] The method includes a calculation formula for obtaining a target cost index, and the calculation formula is:
[0125] zi '=z i ×(1+IN Price +IN Rate );
[0126] Among them, z i The unit price of the engineering cost index during the sample file preparation period, IN Price is the price increase index of main materials, IN Rate is the rate increase index of sub-item fees, z i ' is the predicted value of the unit price of the engineering cost indicator that reflects the current price level.
[0127] In another embodiment of the present application, the processing module 202 is configured to process the cost index search information of the target user and the target cost index based on a preset processing rule to generate a cost index curve distribution diagram, including:
[0128] Performing word segmentation processing on the cost index search information of the target user and the target cost index respectively to generate cost index search terms and target cost index standard keywords;
[0129] The cost index search terms and the target cost index standard keywords are matched to generate a cost index curve distribution diagram.
[0130] The present application embodiment provides an electronic device, such as Figure 3 As shown, the electronic device 3 includes a first processor 300, a memory 301, a bus 302 and a communication interface 303. The first processor 300, the communication interface 303 and the memory 301 are connected via the bus 302; the memory 301 stores a computer program that can be run on the first processor 300, and when the first processor 300 runs the computer program, it executes the cloud computing-based engineering cost management method provided in any of the aforementioned embodiments of the present application.
[0131] The memory 301 may include a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk memory. The communication connection between the system network element and at least one other network element is realized through at least one communication interface 303 (which may be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. may be used.
[0132] The bus 302 may be an ISA bus, a PCI bus, or an EISA bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The memory 301 is used to store programs, and the first processor 300 executes the programs after receiving the execution instruction. The cloud computing-based engineering cost management method disclosed in any implementation of the embodiment of the present application may be applied to the first processor 300, or implemented by the first processor 300.
[0133] The first processor 300 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the first processor 300. The above-mentioned first processor 300 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a readily available programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present application can be implemented or executed. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiments of the present application can be embodied as a hardware decoding processor to be executed, or a combination of hardware and software modules in the decoding processor to be executed. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 301, and the first processor 300 reads the information in the memory 301 and completes the steps of the above method in combination with its hardware.
[0134] The electronic device provided in the above-mentioned embodiments of the present application and the cloud computing-based engineering cost management method provided in the embodiments of the present application are based on the same inventive concept and have the same beneficial effects as the methods adopted, run or implemented by the application programs stored therein.
[0135] The present application embodiment provides a computer-readable storage medium, such as Figure 4 As shown, the computer-readable storage medium stores 401 a computer program, and when the computer program is read and executed by the second processor 402, the aforementioned cloud computing-based engineering cost management method is implemented.
[0136] The technical solution of the embodiment of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for enabling an electronic device (which may be an air conditioner, a refrigeration device, a personal computer, a server, or a network device, etc.) or a processor to execute all or part of the steps of the method described in the embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a ROM, a RAM, a magnetic disk, or an optical disk.
[0137] The computer-readable storage medium provided in the above-mentioned embodiments of the present application and the cloud computing-based engineering cost management method provided in the embodiments of the present application are based on the same inventive concept and have the same beneficial effects as the methods adopted, run or implemented by the application programs stored therein.
[0138] The embodiment of the present application provides a computer program product, including a computer program, wherein the computer program is executed by a third processor to implement the method described above. The computer program product provided by the above embodiment of the present application and the cloud computing-based engineering cost management method provided by the embodiment of the present application are based on the same inventive concept and have the same beneficial effects as the method adopted, run or implemented by the application program stored therein.
[0139] Each embodiment in this application is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the evaluation of the cloud computing-based engineering cost management method, electronic device, electronic device, and readable storage medium embodiment, since it is basically similar to the above-mentioned cloud computing-based engineering cost management method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the above-mentioned cloud computing-based engineering cost management method embodiment.
[0140] Although the present application is disclosed as above, the present application is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present application. Therefore, the protection scope of the present application shall be subject to the scope defined by the claims.
Claims
1. A method for engineering cost management based on cloud computing, characterized in that: include: Obtaining the cost index search information of the target user and cost data samples of each stage matching the cost index search information; Processing cost data samples of each stage to generate index keywords of project cost and characteristic values corresponding to the index keywords, wherein the index keywords are set based on cost data of different levels; Preprocess the indicator keywords and eigenvalues to generate denoised indicator keywords and eigenvalues; Process the index keywords and characteristic values after noise reduction to generate the initial cost index; Processing the initial cost index to generate a target cost index; The cost index search information of the target user and the target cost index are processed based on preset processing rules to generate a cost index curve distribution diagram.
2. The method according to claim 1, characterized in that The preprocessing of the indicator keywords and the characteristic values to generate the indicator keywords and the characteristic values after noise reduction includes: Process the cost data samples of each stage based on the indicator keywords to generate grouped cost data samples; The grouped cost data samples are processed based on the DBSCAN method to generate several data sets with connected data densities within the sets. Get the largest data set with data density connected in several sets; The data sets connected by data density in the several sets are processed based on the largest data set connected by data density in the several sets to generate a preliminary denoised data set.
3. The method according to claim 2, characterized in that The preprocessing of the indicator keywords and the characteristic values to generate the indicator keywords and the characteristic values after noise reduction also includes: Processing the preliminary denoised data set to generate a sorted data set and a corresponding distribution curve; Processing the distribution curve based on preset processing rules to generate a plurality of curve regions; If the curve slope corresponding to the curve area is greater than the preset slope threshold, the curve area corresponding to the curve slope is set as noise information; If the curve slope corresponding to the curve region is less than or equal to the preset slope threshold, the curve region corresponding to the curve slope is set as the target cost index data set; The target cost index data set is processed to generate index keywords and feature values after noise reduction.
4. The method according to claim 1, characterized in that The initial cost index is processed to generate a target cost index, including: Process the initial cost index to generate the initial main material cost index and initial sub-item cost index; Obtaining historical time information corresponding to the initial main material cost index and the initial sub-item cost index; Obtain target cost cycle time information; Processing the historical time information based on the target cost cycle time information to generate a price deviation value; Processing the initial main material cost index based on the price deviation value to generate a target main material cost index increase index and a target sub-item cost index increase index; The target cost index is generated by processing based on the target main material cost index increase index and the target sub-item cost index increase index.
5. The method according to claim 4, characterized in that The processing of the initial cost index to generate the target cost index also includes: The method includes a calculation formula for obtaining a target main material cost index increase index and a target sub-item cost index increase index, and the calculation formula is: In={in1,in2,…,in n }; Among them, In is the increase set of main material unit price or sub-item cost rate, and the data item in In is i The increase in the unit price of the main materials or the increase in the rate of the sub-item costs, The unit price of the main materials at the time of sample document preparation or the rate of the sub-item costs at the time of sample document preparation, The current unit price of main materials or the current rate of sub-item costs; Among them, f' i represents the cost index of materials of category i; Among them, g' i Represents the cost indicator of the i-th category.
6. The method according to claim 5, characterized in that The target cost index is generated based on the target main material cost index increase index and the target sub-item cost index increase index, including: The method includes a calculation formula for obtaining a target cost index, and the calculation formula is: with i '=with i ×(1+IN Price +IN Rate ); Among them, z i The unit price of the engineering cost index during the sample file preparation period, IN Price is the price increase index of main materials, IN Rate is the rate increase index of sub-item fees, z i ' is the predicted value of the unit price of the engineering cost indicator that reflects the current price level.
7. The method according to claim 1, characterized in that The step of processing the target user's cost index search information and the target cost index based on a preset processing rule to generate a cost index curve distribution diagram includes: Performing word segmentation processing on the cost index search information of the target user and the target cost index respectively to generate cost index search terms and target cost index standard keywords; The cost index search terms and the target cost index standard keywords are matched to generate a cost index curve distribution diagram.
8. A cloud computing-based engineering cost management device, characterized in that: The device comprises: An acquisition module, used to acquire the cost index search information of the target user and cost data samples of each stage matching the cost index search information; A processing module is used to process cost data samples at each stage, generate index keywords of project cost and characteristic values corresponding to the index keywords, wherein the index keywords are set based on cost data at different levels; pre-process the index keywords and characteristic values to generate denoised index keywords and characteristic values; process the denoised index keywords and characteristic values to generate initial cost indicators; process the initial cost indicators to generate target cost indicators; process the cost indicator search information of the target user and the target cost indicators based on preset processing rules to generate a cost indicator curve distribution diagram.
9. An electronic device, characterized in that: include: a first processor; and a memory for storing executable instructions of the first processor; Wherein, the first processor is configured to execute the cloud computing-based construction cost management method described in any one of claims 1 to 7 by executing the executable instructions.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by the second processor, the cloud computing-based construction cost management method described in any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Intelligent processing method for power transmission and transformation project cost data
CN111932399A
Project cost information query method and system and storage medium
CN115545783A
Project cost compilation method and device, electronic equipment and storage medium
CN115760250A
Urban rail transit project cost index research method
CN115829403A
BIM (Building Information Modeling)-based highway cost rapid measuring and calculating method and system
CN117350757A