Container ship bow air duct structure and manufacturing method thereof

By integrating the hatch enclosure and wave blocking structure of the container ship with the air duct, the air duct structure is designed between the hatch enclosure and wave blocking, the problem of independent design of the air duct structure affecting the beauty and traffic is solved, and the simplicity is achieved Beauty and strength enhancement effect.

CN118992080AActive Publication Date: 2024-11-22HUDONG ZHONGHUA SHIPBUILDINGGROUP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411352953.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-11-22
Estimated Expiration
2044-09-26

AI Technical Summary

Technical Problem

The air duct structure of existing container ships is independently designed or combined with wave blocking boards, which affects the beauty and field of view of the bow and hinders the passage of personnel and the arrangement of mooring equipment.

Method used

The hatch enclosure and wave blocking structure are integrated with the air duct. Through the design of the roof, longitudinal wall and rear bulkhead, the air duct structure is formed between the hatch enclosure and wave blocking to ensure ventilation and structural strength, while taking into account both the Beautiful and space utilization.

Benefits of technology

It realizes a simple and beautiful design of the air duct structure, avoids occupying deck space, reduces manufacturing costs, meets the integration needs of wave blocking, hatch enclosure and air duct structure, and improves the aesthetics and strength of the overall structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118992080A_ABST
    Figure CN118992080A_ABST
Patent Text Reader

Abstract

The invention discloses a container ship bow air duct structure and a manufacturing method thereof.The container ship bow air duct structure is defined by a top plate, a hatch coaming bulkhead, a longitudinal wall plate, a rear bulkhead and a manger board bulkhead, and a hatch coaming, a manger board structure and an air duct are integrated, so that the air duct is formed between the hatch coaming and the manger board structure; the air duct at the cabin bottom reaches the air duct space after penetrating through each layer of deck platform, and is communicated with the outside through the air duct hole of the top plate, so that ventilation is achieved, and the design application requirements of a manger board structure, a hatch coaming structure and an air duct structure are met while passing of personnel is not affected and reverse top reinforcing arrangement of a lashing bridge structure is achieved at the same time; and the whole structure is concise and beautiful.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of shipbuilding, and in particular to a bow air duct structure of a container ship and a manufacturing method thereof. Background Art

[0002] On large container ships, the entire cargo hold area is arranged with a hatch coaming structure on the main deck for hatch cover support, and the hatch cover base, lashing bridge columns and other anti-top reinforcements are arranged on the top plate structure of the hatch coaming to meet the structural strength requirements of stacking containers on the hatch cover; a wave plate structure is arranged at the bow of the ship to block the waves when sailing in wind and waves to protect the safety of container cargo. A lashing bridge is set between each cargo hold to fix the containers stacked on the hatch cover. In the bow area, the hatch coaming, wave plate and lashing bridge are adjacent to each other. At the same time, due to the need for ventilation in the cabin, a duct structure must be designed to connect with the outside world.

[0003] At present, the wind duct structure is either independently designed on the forecastle deck or only integrated with the wave-breaking board structure, which not only affects the overall appearance and vision of the bow, but also hinders the passage of personnel and even affects the arrangement of the bow mooring equipment. Summary of the invention

[0004] In view of this, the present invention provides a bow air duct structure of a container ship and a manufacturing method thereof, by integrating the hatch coaming, the wave-breaking plate structure and the air duct, so that the air duct is formed between the hatch coaming and the wave-breaking plate structure, without affecting the passage of personnel and the anti-top reinforcement setting of the lashing bridge structure, it also meets the design and application requirements of the wave-breaking plate structure, the hatch coaming structure and the air duct structure, ensuring the simplicity and beauty of the overall structure.

[0005] A bow air duct structure of a container ship comprises a top plate, a longitudinal wall plate,

[0006] One end of the top plate is connected to the top of the hatch coaming bulkhead, and the other end extends horizontally to the wave-breaking bulkhead, and a ventilation hole is provided on the top plate;

[0007] The longitudinal wall plates are provided with two, the two longitudinal wall plates are fixed on both sides of the bottom of the top plate, the bottom of the longitudinal wall plates is fixed to the deck, one end of the longitudinal wall plates is fixed to the hatch coaming bulkhead, and the other end is fixed to the wave-breaking bulkhead, a longitudinal wall bracket is provided at the connection between the longitudinal wall plates and the top plate, and a wave-breaking bulkhead bracket is provided at the connection between the wave-breaking bulkhead and the top plate;

[0008] The rear bulkhead is arranged between the hatch coaming bulkhead and the wave-breaking bulkhead, and its two sides are respectively fixed to the two longitudinal wall plates, the top is fixed to the top plate, and the bottom is fixed to the deck, so as to form a hatch coaming structure together with the hatch coaming bulkhead, the top plate, the deck and the two longitudinal wall plates, and form an air duct structure together with the wave-breaking bulkhead, the top plate, the deck and the two longitudinal wall plates.

[0009] Preferably, the top plate is provided with hatch side reinforcement ribs, the rear bulkhead is arranged at the location of the hatch side reinforcement ribs, and the rear bulkhead is provided with bulkhead reinforcement ribs.

[0010] Preferably, the top plate is also provided with anti-top reinforcement ribs for tying the bridge columns and top plate reinforcement ribs.

[0011] Preferably, the bottom of the longitudinal wall plate is aligned with the longitudinal strong structure on the deck, and the top is aligned with the lashing bridge column.

[0012] Preferably, a manhole is provided on the plate surface where the air duct structure of the longitudinal wall plate is located.

[0013] Preferably, the longitudinal wall elbow plate at the connection between the longitudinal wall plate and the top plate includes a first elbow plate and a second elbow plate, the first elbow plate is aligned with the lashing bridge column to serve as a reverse top reinforcement of the lashing bridge column, and the second elbow plate is aligned with the wave-breaking board structure to serve as an extension reinforcement of the wave-breaking board structure, and the wave-breaking board structure is arranged on the top surface of the top plate.

[0014] Preferably, the first bracket and the second bracket are both arranged in the area where the air duct structure is located.

[0015] Preferably, the longitudinal wall panels are inclined as a continuous extension of the upper and lower strong structures.

[0016] Preferably, a patch plate is provided at one end of the longitudinal wall plate fixed to the breakwater bulkhead to ensure the air tightness of the breakwater horizontal member after passing through the longitudinal wall plate.

[0017] A method for manufacturing a bow air duct structure of a container ship specifically comprises the following steps:

[0018] S1, a segmentation line is drawn on the bow air duct structure of the container ship to divide the structure into two parts: a hatch coaming section and a wave breakers section. The top plate, the longitudinal wall plate, the wave breakers bracket and the top plate reinforcement rib are all divided into two parts, one part is in the hatch coaming section and the other part is in the wave breakers section;

[0019] S2, during the hatch coaming block construction stage, the corresponding top plate is placed on the tire frame, and then the positioning lines of the longitudinal wall plate, the rear bulkhead, the hatch coaming bulkhead and the longitudinal wall bracket are marked on the top plate. The longitudinal wall plate, the rear bulkhead, the hatch coaming bulkhead and the longitudinal wall bracket are welded in place in sequence according to the marked positioning lines;

[0020] Then, the bridge column anti-top reinforcement ribs, wave-break brackets, hatch coaming side reinforcement ribs and top plate reinforcement ribs are welded and fixed on the top plate to form hatch coaming sections;

[0021] S3, the stage of block construction of the breakwater, the breakwater bulkhead is placed on the tire frame, and then the positioning lines of the breakwater bracket and the top plate reinforcement are marked on the corresponding top plate, and the breakwater bracket and the top plate reinforcement are welded in place according to the marked positioning lines;

[0022] Then, the positioning lines of the top plate and the longitudinal wall plate are marked on the wave-breaking bulkhead, and the top plate and the longitudinal wall plate are welded in place according to the marked positioning lines to form the wave-breaking segment;

[0023] S4, during the docking stage, the hatch coaming sections and wave breakers sections are brought together and docked to form a complete air duct structure.

[0024] The beneficial effects of the present invention are:

[0025] 1. The bow air duct structure of the present invention is surrounded by a top plate, a hatch coaming bulkhead, a longitudinal wall plate, a rear bulkhead and a wave-breaking board bulkhead. The hatch coaming, the wave-breaking board structure and the air duct are integrated so that the air duct is formed between the hatch coaming and the wave-breaking board structure. The air duct at the bottom of the cabin passes through each deck platform to reach the air duct space, and communicates with the outside through the air duct hole of the top plate to achieve ventilation. The design of the present invention does not affect the passage of personnel and the anti-top reinforcement setting of the lashing bridge structure, and at the same time, it also meets the design and application requirements of the wave-breaking board structure, the hatch coaming structure and the air duct structure, thereby ensuring the simplicity and beauty of the overall structure.

[0026] 2. The present invention fully considers the spatial arrangement of hatch coaming, wave breakers and lashing bridge columns, and connects the air duct structure with the hatch coaming and wave breakers structure into a whole. The top plate is the top plate of the air duct, the top plate of the hatch coaming, and the horizontal reinforcement of the wave breakers. The hatch coaming longitudinal wall plate is not only the side wall of the air duct, but also the vertical component of the wave breakers, and also the reverse top reinforcement of the lashing bridge columns. It avoids the air duct from occupying the limited space on the deck, and the integrity and aesthetics of the design are enhanced.

[0027] 3. The present invention integrates the design and construction of the air duct structure with the hatch coaming and the wave breakers, so that the air duct structure is a part of the main structure of the hull. The installation position and form of the air duct structure are taken into consideration when designing and manufacturing the hatch coaming and the wave breakers. The air duct structure is assembled and welded in the segmented stage of the hatch coaming and the wave breakers. In the docking stage, after the hatch coaming and the wave breakers are closed, the air duct structure can be butt-jointed and formed. The integrated design and manufacturing of the three components of the present invention reduces the manufacturing cost and meets the design requirements.

[0028] 4. The longitudinal wall elbow plate provided at the connection between the longitudinal wall plate and the top plate of the present invention can not only increase the connection strength between the longitudinal wall plate and the top plate, but also serve as the top reinforcement of the binding bridge column and the extension reinforcement of the wave-breaking plate structure, and can also serve as the reinforcement structure of the longitudinal wall of the duct to increase the structural strength of the duct structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0030] Figure 1 It is a top view of the arrangement structure of the bow air duct of a container ship according to the present invention.

[0031] Figure 2 yes Figure 1 A view in the figure.

[0032] Figure 3 yes Figure 1 B view in the figure.

[0033] Figure 4 yes Figure 1 C-direction view in.

[0034] Figure 5 yes Figure 2 D-direction view in.

[0035] Figure 6 yes Figure 2 E view in the figure.

[0036] Figure 7 yes Figure 1 F view in the figure.

[0037] Figure 8 yes Figure 1 G view in .

[0038] The meanings of the numbers in the figure are:

[0039] 1—top plate, 2—rear bulkhead, 3—breakwater bulkhead, 4—air duct hole, 5—hatch coaming bulkhead, 6—longitudinal wall plate, 7—first bracket, 8—second bracket, 9—breakwater structure, 10—bulkhead reinforcement, 11—lashing bridge column top reinforcement, 12—breakwater bracket, 13—hatch coaming side reinforcement, 14—top plate reinforcement, 15—patch plate, 16—manhole, 17—deck, 18—section dividing line, 19—air duct. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific embodiments shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0041] The terms used in this disclosure are for the purpose of describing specific embodiments only and are not intended to limit the disclosure. The singular forms of "a", "said" and "the" used in this disclosure and the appended claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.

[0042] It should be understood that although the terms first, second, third, etc. may be used in the present disclosure to describe various information, such information should not be limited to these terms and should not be understood as indicating or implying relative importance. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present disclosure, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".

[0043] In the description of the present invention, it is necessary to understand that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0044] In order to better understand the technical solution of the present invention, the present invention is described in detail below with reference to the accompanying drawings.

[0045] The present invention provides a bow air duct structure of a container ship, comprising a top plate 1, a hatch coaming bulkhead 5, a longitudinal wall plate 6, a rear bulkhead 2 and a wave-breaking bulkhead 3.

[0046] like Figure 1 As shown, one end of the top plate 1 is connected to the top of the hatch coaming bulkhead 5, and the other end extends horizontally to the breakwater bulkhead 3. In this embodiment, the top plate 1 is π-shaped as a whole, the rear end of the top plate 1 extends to connect with the hatch coaming bulkhead 5, and the front end extends to connect with the breakwater bulkhead 3. Both sides of the front end of the top plate 1 are provided with connecting ends protruding outwards, and the connecting ends extend to the vertical fixings of the breakwater, respectively. The top plate 1 serves as both the top plate of the hatch coaming and the top plate of the air duct structure, and is also a component of the horizontal strong member of the breakwater.

[0047] The top plate 1 is provided with ventilation holes 4, which are arranged on the plate surface where the air duct structure of the top plate 1 is located, and the size of the ventilation holes 4 is smaller than the size of the air duct.

[0048] Preferably, the top plate 1 is also provided with hatch side reinforcement ribs 13, bridge column anti-top reinforcement ribs 11 and top plate reinforcement ribs 14.

[0049] like Figure 1 , Figure 2 , Figure 3 As shown, two longitudinal wall plates 6 are provided, the upper parts of the two longitudinal wall plates 6 are fixed to the top plate 1, the bottoms of the longitudinal wall plates 6 are fixed to the deck 17, one end of the longitudinal wall plates 6 is fixed to the hatch coaming bulkhead 5, and the other end is fixed to the wave-breaking bulkhead 3. The two longitudinal wall plates 6 serve as both side walls of the hatch coaming and the side walls of the air duct structure.

[0050] In this embodiment, the two longitudinal wall plates 6 are arranged at an angle as continuous extensions of the upper and lower strong structures. Preferably, the bottom of the longitudinal wall plate 6 is aligned with the longitudinal strong structure on the deck 17, and the top is aligned with the lashing bridge column, so that the bottom of the longitudinal wall plate 6 can obtain strong support through the longitudinal strong structure on the lower surface of the deck, and the longitudinal wall plate 6 itself can serve as a reverse top support for the lashing bridge column, effectively supporting the lashing bridge structure.

[0051] The two longitudinal wall panels 6 simultaneously serve as the two side walls of the hatch coaming and the air duct structure. A manhole 16 is provided on the plate surface of the longitudinal wall panel 6 at the location of the air duct structure to facilitate the passage of personnel.

[0052] A patch plate 15 is provided at one end of the longitudinal wall plate 6 fixed to the breakwater bulkhead 3 to ensure the air tightness of the breakwater horizontal member after passing through the longitudinal wall plate 6 .

[0053] like Figure 5 , Figure 6 As shown, a longitudinal wall bracket is also provided at the connection between the longitudinal wall plate 6 and the top plate 1. The longitudinal wall bracket includes a first bracket 7 and a second bracket 8. The first bracket 7 is aligned with the lashing bridge column to double as a counter-top reinforcement of the lashing bridge column. One side of the first bracket 7 is welded and fixed to the longitudinal wall plate 6, and the other side is welded and fixed to the top plate 1; the second bracket 8 is aligned with the wave-breaking plate structure 9 to double as a wave-breaking plate structure extension reinforcement. One side of the second bracket 8 is welded and fixed to the longitudinal wall plate 6, and the other side is welded and fixed to the top plate 1. The wave-breaking plate structure 9 is arranged on the top surface of the top plate 1, and the wave-breaking plate structure 9 is aligned with the second bracket 8 up and down.

[0054] In this embodiment, the first bracket 7 and the second bracket 8 are both arranged in the area where the air duct structure is located. In this way, the first bracket 7 and the second bracket 8 can also serve as reinforcement structures of the longitudinal wall of the air duct to increase the structural strength of the air duct structure.

[0055] like Figure 1As shown, the rear bulkhead 2 is vertically arranged between the hatch coaming bulkhead 5 and the breakwater bulkhead 3 and its two sides are respectively fixed to the two longitudinal wall plates 6, the top of the rear bulkhead 2 is fixed to the top plate 1, and the bottom of the rear bulkhead 2 is fixed to the deck 17. Therefore, the rear bulkhead 2, the hatch coaming bulkhead 5, the top plate 1, the deck 17 and the two longitudinal wall plates 6 together enclose a hatch coaming structure, and the rear bulkhead 2, the breakwater bulkhead 3, the top plate 1, the deck 17 and the two longitudinal wall plates 6 together enclose an air duct structure, so that the hatch coaming, the air duct structure and the breakwater structure are integrated, and the air duct structure is formed between the hatch coaming and the breakwater structure.

[0056] The rear bulkhead 2 serves as both the front bulkhead of the hatch coaming and the rear bulkhead of the air duct structure. Figure 4 As shown, the rear bulkhead 2 is arranged at the position of the hatch coaming edge reinforcement rib 13, and the hatch coaming edge reinforcement rib 13 can strengthen the edge of the hatch coaming and also strengthen the connection between the rear bulkhead 2 and the top plate 1. The hatch coaming edge reinforcement rib 13 separated by the rear bulkhead 2 is also welded and fixed to the longitudinal wall plate 6. The rear bulkhead 2 is also provided with a plurality of bulkhead reinforcement ribs 10.

[0057] like Figure 7 As shown, the breakwater bulkhead 3 serves as the front bulkhead of the wind duct structure, the bottom of the breakwater bulkhead 3 is fixed to the deck 17, the top of the breakwater bulkhead 3 extends out of the top plate 1 and extends upward, and the two sides of the breakwater bulkhead 3 are respectively fixed to two longitudinal wall plates 6. The breakwater horizontal member passes through the longitudinal wall plates 6, and the bulkhead of the penetration portion thereof is sealed by a patch plate 15 to ensure the air tightness of the longitudinal wall plates 6.

[0058] like Figure 8 As shown, a wave-breaking plate elbow plate 12 is provided at the connection between the wave-breaking plate bulkhead 3 and the top plate 1. One side of the wave-breaking plate elbow plate 12 is welded and fixed to the top plate 1, and the other side is welded and fixed to the wave-breaking plate bulkhead 3. The wave-breaking plate elbow plate 12 is used to enhance the connection stiffness between the wind duct and the wave-breaking plate.

[0059] The present invention also provides a method for manufacturing the bow air duct structure of a container ship, which specifically comprises the following steps:

[0060] S1, a segmentation dividing line 18 is drawn on the bow air duct structure of the container ship to divide the structure into two parts: a hatch coaming section and a wave breakers section, that is, the top plate 1, the longitudinal wall plate 6, the wave breakers bracket 12 and the top plate reinforcement rib 14 are all divided into two parts, one part is in the hatch coaming section, and the other part is in the wave breakers section;

[0061] S2, the hatch coaming block construction stage, the corresponding top plate 1 is placed on the tire frame, and then the positioning lines of the longitudinal wall plate 6, the rear bulkhead 2, the hatch coaming bulkhead 5, and the longitudinal wall bracket are marked on the top plate 1, and the longitudinal wall plate 6, the rear bulkhead 2, the hatch coaming bulkhead 5 and the longitudinal wall bracket are welded in place in sequence according to the marked positioning lines;

[0062] Then, the bridge column anti-top reinforcement ribs 11, the wave-breaking plate brackets 12, the hatch coaming side reinforcement ribs 13 and the top plate reinforcement ribs 14 are welded and fixed on the top plate 1 to form the hatch coaming sections;

[0063] S3, the wave-breaking board segmented construction stage, the wave-breaking board bulkhead 3 is placed on the tire frame, and then the positioning lines of the wave-breaking board bracket 12 and the top plate reinforcement 14 are marked on the corresponding top plate 1, and the wave-breaking board bracket 12 and the top plate reinforcement 14 are welded in place according to the marked positioning lines;

[0064] Then, the positioning lines of the top plate 1 and the longitudinal wall plate 6 are marked on the wave-breaking board bulkhead 3, and the top plate 1 and the longitudinal wall plate 6 are welded in place according to the marked positioning lines to form the wave-breaking board segment;

[0065] S4, during the docking stage, the hatch coaming sections and wave breakers sections are brought together and docked to form a complete air duct structure.

[0066] It should be clear that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

Claims

1. A bow air duct structure of a container ship, characterized in that: It comprises a top plate (1), a hatch coaming bulkhead (5), a longitudinal wall plate (6), a rear bulkhead (2) and a wave-break bulkhead (3), One end of the top plate (1) is connected to the top of the hatch coaming bulkhead (5), and the other end extends horizontally to the wave-breaking bulkhead (3); a ventilation hole (4) is provided on the top plate (1); The longitudinal wall plates (6) are provided with two longitudinal wall plates (6), the upper parts of the two longitudinal wall plates (6) are fixed to the top plate (1), the bottoms of the longitudinal wall plates (6) are fixed to the deck (17), one end of the longitudinal wall plate (6) is fixed to the hatch coaming bulkhead (5), and the other end is fixed to the wave-breaking bulkhead (3), a longitudinal wall bracket is provided at the connection between the longitudinal wall plate (6) and the top plate (1), and a wave-breaking bulkhead (12) is provided at the connection between the wave-breaking bulkhead (3) and the top plate (1); The rear bulkhead (2) is arranged between the hatch coaming bulkhead (5) and the wave-breaking bulkhead (3), and its two sides are respectively fixed to the two longitudinal wall plates (6), the top is fixed to the top plate (1), and the bottom is fixed to the deck (17), so as to form a hatch coaming structure together with the hatch coaming bulkhead (5), the top plate (1), the deck (17) and the two longitudinal wall plates (6), and form a wind duct structure together with the wave-breaking bulkhead (3), the top plate (1), the deck (17) and the two longitudinal wall plates (6).

2. The bow air duct structure of a container ship according to claim 1, characterized in that: The top plate (1) is provided with hatch side reinforcement ribs (13), the rear bulkhead (2) is arranged at the location of the hatch side reinforcement ribs (13), and the rear bulkhead (2) is provided with bulkhead reinforcement ribs (10).

3. The bow air duct structure of a container ship according to claim 1, characterized in that: The top plate (1) is also provided with bridge column binding top reinforcing ribs (11) and top plate reinforcing ribs (14).

4. The bow air duct structure of a container ship according to claim 1, characterized in that: The bottom of the longitudinal wall plate (6) is aligned with the longitudinal strong structure on the deck (17), and the top is aligned with the lashing bridge column.

5. The bow air duct structure of a container ship according to claim 1 or 4, characterized in that: A manhole (16) is provided on the plate surface of the longitudinal wall plate (6) at the location where the air duct structure is located.

6. The bow air duct structure of a container ship according to claim 1, characterized in that: The longitudinal wall bracket at the connection between the longitudinal wall plate (6) and the top plate (1) comprises a first bracket (7) and a second bracket (8); the first bracket (7) is aligned with the lashing bridge column to serve as a top reinforcement of the lashing bridge column; the second bracket (8) is aligned with the wave-breaking board structural member (9) to serve as an extension reinforcement of the wave-breaking board structure; the wave-breaking board structural member (9) is arranged on the top surface of the top plate (1).

7. The bow air duct structure of a container ship according to claim 6, characterized in that: The first bracket (7) and the second bracket (8) are both arranged in the area where the air duct structure is located.

8. The bow air duct structure of a container ship according to claim 1, characterized in that: The longitudinal wall plate (6) is arranged to be inclined as a continuous extension of the upper and lower strong structures.

9. The bow air duct structure of a container ship according to claim 1, characterized in that: A patch plate (15) is provided at one end of the longitudinal wall plate (6) fixed to the breakwater bulkhead (3) to ensure the air tightness of the breakwater horizontal component after passing through the longitudinal wall plate (6).

10. A method for manufacturing a bow air duct structure of a container ship according to any one of claims 1 to 9, characterized in that: The specific steps include: S1, a segmentation line is drawn on the bow air duct structure of the container ship to divide the structure into two parts: a hatch coaming section and a wave breakers section, and the top plate (1), the longitudinal wall plate (6), the wave breakers bracket (12) and the top plate reinforcement rib (14) are all divided into two parts, one part is in the hatch coaming section and the other part is in the wave breakers section; S2, the hatch coaming block construction stage, the corresponding top plate (1) is placed on the tire frame, and then the positioning lines of the longitudinal wall plate (6), the rear bulkhead (2), the hatch coaming bulkhead (5), and the longitudinal wall bracket are marked on the top plate (1), and the longitudinal wall plate (6), the rear bulkhead (2), the hatch coaming bulkhead (5) and the longitudinal wall bracket are welded in place in sequence according to the marked positioning lines; Then, the bridge column anti-top reinforcement ribs (11), the wave-breaking plate brackets (12), the hatch coaming side reinforcement ribs (13) and the top plate reinforcement ribs (14) are welded and fixed on the top plate (1) to form the hatch coaming sections; S3, the wave-breaking board segmented construction stage, the wave-breaking board bulkhead (3) is placed on the tire frame, and then the positioning lines of the wave-breaking board bracket (12) and the top plate reinforcement rib (14) are marked on the corresponding top plate (1), and the wave-breaking board bracket (12) and the top plate reinforcement rib (14) are assembled and welded in place according to the marked positioning lines; Then, the positioning lines of the top plate (1) and the longitudinal wall plate (6) are marked on the wave-breaking board bulkhead (3), and the top plate (1) and the longitudinal wall plate (6) are assembled and welded in place according to the marked positioning lines to form the wave-breaking board segments; S4, during the docking stage, the hatch coaming sections and wave breakers sections are brought together and docked to form a complete air duct structure.

Citation Information

Patent Citations

  • Integral container transverse bulkhead structure combined with air pipe

    CN117087810A

  • Marine wave-resistant ventilation device

    CN117163274A

  • Cargo hold and container ship

    CN117446095A

  • Abdominal wall air duct and ship ventilation system

    CN218751350U

  • JP1991088899U