A method for grouting mortar for embedded airport navigation lights
By using customized tamping tools and layered tamping methods, the filling mortar of the airport embedded navigation lights is tamped, which solves the problems of low construction quality and efficiency in the existing technology, and achieves an efficient and standardized tamping effect of the filling mortar.
Patent Information
- Application Number
- CN202411360834.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2044-09-27
AI Technical Summary
The existing airport embedded navigation lights have a lack of standardization, the construction quality and efficiency are not high, and there are vibration leakage and edge damage.
Customized tamping tools are used, including annular cast iron rings, circular cast iron plates and stainless steel rods, and are applied layer by layer through layered tamping method to ensure the compactness of the mortar and the standardization of construction.
The construction quality has been improved, vibration leakage and edge damage have been avoided, construction efficiency has been improved, and construction costs have been reduced.
Smart Images

Figure CN118996972B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of airport navigation lights, and in particular to a method for grouting mortar for embedded airport navigation lights. Background Art
[0002] At present, the installation method of embedded navigation lights in airports generally adopts the core drilling method, and the mainstream method is cement mortar grouting. However, how to ensure the density and high-efficiency construction of the mortar for grouting embedded lamps is a common difficulty in the industry.
[0003] In the prior art, there is no unified process for tamping and compacting the mortar for grouting navigation lights. In actual construction, it is mostly based on the experience of operators. Some use hammering bamboo strips or wooden squares for tamping, while others use hammering steel plates for tamping. The construction quality is uneven, there is a lack of standardized construction methods, and the construction efficiency is low, so there is room for improvement. Summary of the invention
[0004] In view of the shortcomings of the prior art, the embodiment of the present application provides a method for grouting mortar for airport embedded navigation lights to solve the problems existing in the related technology. The technical solution is as follows:
[0005] The embodiment of the present application provides a method for tamping mortar for filling seams of embedded navigation lights at an airport, comprising: pouring a cushion layer of mortar into a lamp pit that has been drilled and cored, placing a tamping tool into the lamp pit, and placing a wooden block on the pit and hammering it to make it dense; after the bottom mortar has been tamped and made dense, placing the embedded lamp base; carrying out tamping construction of seams on the side walls of the lamp pit; after the dry-mixed mortar on the side walls of the lamp pit has been tamped and made dense, taking out the tamping tool, removing mud stains on the surface and allowing it to dry naturally for future use; curing the grouting mortar, and applying upper silicone sealant after the bottom mortar has dried thoroughly.
[0006] In one embodiment, the pouring of cushion mortar for the lamp pit that has been drilled and cored specifically includes: leveling the bottom of the lamp pit after drilling and coring, supporting and fixing the lamp base, and making the lamp base meet the elevation requirements; when tamping the bottom mortar, sealing the pipe opening of the pre-buried cable protection pipe at the bottom of the lamp pit with geotextile.
[0007] In one embodiment, the tamping tool includes: an annular cast iron ring, a circular cast iron plate, and a plurality of stainless steel rods; one end of the stainless steel rod is connected to the annular cast iron ring, and the other end of the stainless steel rod is connected to the circular cast iron plate.
[0008] In one embodiment, a threaded connection portion is provided at one end of the stainless steel rod, and a smooth connection portion is provided at the other end of the stainless steel rod.
[0009] In one embodiment, placing the tamping tool into the lamp pit specifically includes: after installing the stainless steel rod on the circular cast iron plate, placing the circular cast iron plate and the stainless steel rod together into the lamp pit.
[0010] In one embodiment, the tamping construction of the side wall gap of the lamp pit specifically includes: adopting a layered tamping construction method according to the depth of the lamp pit; installing an annular cast iron ring on a stainless steel rod and inserting it into the gap of the lamp pit, plugging a circular cast iron plate on it, and then padding it with wood and hammering it to make it dense.
[0011] In one embodiment, the layered tamping construction method specifically includes: the height of each layer of the layered tamping construction does not exceed 50 mm, and the construction is carried out layer by layer until it is 20 mm below the pit top, and silicone glue is poured in to seal the joints.
[0012] In one embodiment, the lamp pit side wall is rammed with dry-mixed mortar, specifically comprising: digging out mortar between the wire inlet hole of the embedded lamp base and the embedded pipe, so that a cavity is formed from the pipe mouth of the embedded pipe to the wire inlet hole of the lamp base.
[0013] The method of taking out the tamping tool specifically includes: taking out the circular cast iron plate and the annular cast iron ring, removing the stainless steel rod, cleaning the mud stains on the surface of each component, and naturally drying them for use in the next cycle.
[0014] In one embodiment, the curing of the grouting mortar specifically includes: curing by wet curing, the curing period is not less than three days, and after the curing is completed, it is continuously exposed to sunlight for not less than four days before the silicone glue is poured in.
[0015] The advantages or beneficial effects of the above technical solution include at least:
[0016] The present application uses a tamping tool that can be customized according to the size of the lamp pit to tamp and compact the grouting mortar in the lamp pit of the embedded navigation light. The construction method is standardized, and the pit corners will not be touched during the entire construction process, which effectively protects the lamp pit opening and ensures the integrity of the construction quality. In addition, the tamping tool is easy to load and unload, can be reused, and does not require maintenance, saving construction costs.
[0017] The above summary is for illustrative purposes only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the present application will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In the accompanying drawings, unless otherwise specified, the same reference numerals throughout the multiple drawings represent the same or similar parts or elements. These drawings are not necessarily drawn to scale. It should be understood that these drawings only depict some embodiments disclosed in the present application and should not be regarded as limiting the scope of the present application.
[0019] Figure 1 It is a schematic flow diagram of the tamping method in the present invention;
[0020] Figure 2 It is a structural schematic diagram of the tamping tool in the present invention.
[0021] In the figure: 1. annular cast iron ring; 2. round cast iron plate; 3. stainless steel rod. DETAILED DESCRIPTION
[0022] Hereinafter, in order to make the purpose, features and advantages of the present invention more clearly understood, only certain exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present application. Therefore, the drawings and description are considered to be exemplary and non-restrictive in nature.
[0023] The present invention is described in detail below in conjunction with the accompanying drawings and embodiments.
[0024] like Figure 1 As shown, the present invention provides a method for grouting mortar for embedded airport navigation lights, comprising:
[0025] S01: Pour the cushion mortar into the lamp pit where the core has been drilled, put the tamping tool into the lamp pit, and put the padding wood on it and hammer it to make it dense;
[0026] S02: After the bottom mortar is compacted, put the embedded lamp base in;
[0027] S03: Carry out tamping construction of the gaps on the side walls of the lamp pit;
[0028] S04: After the dry-mixed mortar on the side wall of the lamp pit is compacted, take out the tamping tool, remove the mud stains on the surface and let it dry naturally for future use;
[0029] S05: Cure the grouting mortar and apply the upper silicone sealant after the bottom mortar is completely dry.
[0030] In the prior art, workers' manual tamping has the following defects: ① If the method of hammering wood or bamboo pieces is adopted, the hammering force cannot be too large, and the grouting mortar is difficult to be dense, which may easily lead to cracking and damage of the upper potting glue in the later stage; if the method of hammering steel plates is adopted, due to the small gap between the side walls, the steel plates are easy to damage the corners of the lamp pit when hammered vigorously, and the later repair is time-consuming and labor-intensive, and it will affect the overall strength of the pavement. ② Due to the limited cross-sectional area of the plate-like components, the position of the wood or steel plates needs to be constantly changed during the construction process, resulting in low work efficiency. In actual construction, workers often skip vibrations in order to save trouble and meet deadlines, resulting in uneven quality. ③ The force of each hammering cannot be consistent, resulting in uneven tamping. The square cross-section of the plate cannot be completely fitted with the annular side wall of the lamp pit, and vibration leakage in some areas cannot be avoided. Therefore, uniformity and density cannot be guaranteed, resulting in insufficient strength and uneven settlement and cracking in the later stage.
[0031] In this embodiment, a tamping tool is used to tamp and compact the grouting mortar in the lamp pit of the embedded navigation light. With the assistance of the tamping tool, a layered tamping construction method is adopted according to the depth of the lamp pit. One layer can be tamped at one time, and the tamping effect is more uniform, thereby effectively protecting the lamp pit opening and preventing corner damage. In addition, the tamping tool is adapted to the shape of the inner wall of the lamp pit, and full coverage can be achieved during tamping, thereby effectively avoiding vibration leakage and making the force more uniform, thereby improving construction efficiency. The tamping tool is assembled from metal parts and can be directly customized at a hardware store according to the size of the lamp pit. The production, assembly and disassembly processes are relatively convenient, and the tools require almost no maintenance. They can be reused for a long time, saving raw materials and thus reducing construction costs.
[0032] Furthermore, the pouring of cushion mortar for the lamp pit that has been drilled and cored specifically includes: leveling the bottom of the lamp pit after drilling and coring, supporting and fixing the lamp base, and making the lamp base meet the elevation requirements; when tamping the bottom mortar, sealing the pipe opening of the pre-buried cable protection pipe at the bottom of the lamp pit with geotextile.
[0033] In this embodiment, the functions of pouring the cushion mortar in the lamp pit are as follows: 1. leveling the bottom of the lamp pit after drilling and coring; 2. supporting and fixing the lamp base and making the lamp base meet the elevation requirements, so that the lamp installation elevation meets the design requirements;
[0034] Because a cable protection pipe is embedded in the bottom of the lamp pit, geotextile should be used to seal the pipe opening of the cable protection pipe when tamping the bottom mortar to prevent the mortar from entering the embedded pipe. After the bottom mortar is compacted and meets the elevation requirements, the embedded lamp base is placed in. The direction, centrality and other parameters of the base should meet the design requirements.
[0035] Furthermore, if Figure 2As shown, the tamping tool includes: an annular cast iron ring 1, a circular cast iron plate 2, and a plurality of stainless steel rods 3; one end of the stainless steel rod 3 is connected to the annular cast iron ring 1, and the other end of the stainless steel rod 3 is connected to the circular cast iron plate 2.
[0036] In this embodiment, three stainless steel rods 3 are provided, and the three stainless steel rods 3 are arranged in an equilateral triangle shape and are respectively connected to the annular cast iron ring 1 and the circular cast iron plate 2;
[0037] The thickness of the annular cast iron ring 1 is 8mm, the outer diameter is the diameter of the lamp pit minus 5mm, and the ring width is 25mm (the gap between the general lamp and the lamp pit is 30mm. If the gap is different due to different processes, the ring width should be adjusted appropriately. Otherwise, if the gap is too large, the vibration leakage area will be large, and if it is too small, it will be too tight and inconvenient to place. In principle, it is appropriate to have a 2.5mm gap with both sides for easy placement and tamping). Three screw holes are arranged in an equilateral triangle shape at a position 12.5mm away from the outer edge (in principle, half of the ring width), with a hole depth of 4mm and a hole diameter of 10mm;
[0038] The circular cast iron plate 2 has a thickness of 5 mm and a diameter that is the same as the outer diameter of the annular cast iron ring 1. Three screw holes are arranged in an equilateral triangle shape at a position 12.5 mm away from the outer edge. The hole depth is 4 mm and the hole diameter is 10 mm. The two ends of the stainless steel rod 3 can be inserted into the screw holes of the annular cast iron ring 1 and the circular cast iron plate 2 respectively, so as to achieve the connection effect between the annular cast iron ring 1 and the circular cast iron plate 2.
[0039] Furthermore, a threaded connection portion is provided at one end of the stainless steel rod 3 , and a smooth connection portion is provided at the other end of the stainless steel rod 3 .
[0040] In this embodiment, one end of the stainless steel rod 3 is set to be threaded, and can be screwed into the annular cast iron ring 1 or the circular cast iron plate 2 through the thread, and the other end is set to be smooth, and can be quickly plugged into the annular cast iron ring 1 or the circular cast iron plate 2 through the smooth surface, which is more convenient to operate.
[0041] Furthermore, placing the tamping tool into the lamp pit specifically includes: after installing the stainless steel rod 3 on the circular cast iron plate 2, placing the circular cast iron plate 2 and the stainless steel rod 3 into the lamp pit together.
[0042] In this embodiment, when the tamping tool is placed in the lamp pit, the three stainless steel rods 3 are first screwed into the circular cast iron plate 2 to prevent the mortar from entering the screw holes of the circular cast iron plate 2, making it easier to remove the circular cast iron plate 2; the circular cast iron plate 2 and the stainless steel rods 3 are placed in the lamp pit together, and this step does not require the insertion of the annular cast iron ring 1.
[0043] Furthermore, the tamping construction of the side wall gap of the lamp pit specifically includes: according to the depth of the lamp pit, a layered tamping construction method is adopted; the annular cast iron ring 1 is installed on the stainless steel rod 3, and inserted into the gap of the lamp pit, and the round cast iron plate 2 is inserted and plugged, and then the pad is placed on the pad and hammered to compact. The layered tamping construction method specifically includes: the height of each layer of the layered tamping construction does not exceed 50mm, and the construction is carried out layer by layer until 20mm below the top of the pit, and silicone glue is poured to seal the caulking.
[0044] In this embodiment, a layered tamping construction method is adopted according to the depth of the lamp pit, and the height of each layer in the layered tamping construction does not exceed 50 mm; in the single-layer construction, the annular cast iron ring 1 is screwed into the stainless steel rod 3 and then inserted into the gap, and the circular cast iron plate 2 is inserted on it, and then it is padded with wood and hammered to be dense, and so on, layer by layer is applied until 20 mm below the top of the pit, and the subsequent 20 mm is operated in the same way as usual and silicone glue is poured to seal the seam.
[0045] Furthermore, the side wall of the lamp pit is rammed with dry-mixed mortar, which specifically includes: digging out mortar between the wire inlet hole of the embedded lamp base and the embedded pipe, so that a cavity is formed from the pipe mouth of the embedded pipe to the wire inlet hole of the lamp base.
[0046] In this embodiment, after the dry-mixed mortar on the side wall of the lamp pit is compacted, the mortar between the wire entry hole of the embedded lamp base and the embedded pipe is dug out to form a cavity from the pre-buried pipe mouth to the wire entry hole of the lamp base, which is convenient for later threading and maintenance;
[0047] Since the cable protection tube is pre-buried when the pavement concrete is poured, and the lamp pit is formed by drilling and coring at a later stage, the embedded lamp base and the lamp are installed in the lamp pit. Due to the error between the pre-buried tube construction and the drilling construction, it is inevitably difficult to align the pre-buried tube mouth and the lamp base. The conventional practice is to set a hose transition connection between the pre-buried pipe mouth and the lamp base. However, in the actual construction process, this practice requires a large cost for the sleeve hose, and it will affect the efficacy. Therefore, the construction method of the present application is more efficient and less costly, and can also achieve the same technical effect as the sleeve hose.
[0048] Furthermore, the removing of the tamping tool specifically includes: removing the circular cast iron plate 2 and the annular cast iron ring 1, removing the stainless steel rod 3, cleaning the mud stains on the surface of each component, and naturally drying them for use in the next cycle.
[0049] In this embodiment, the tamping tool can be directly taken out of the lamp pit and disassembled after use, and the mud stains on the surface of each component can be cleaned and naturally dried; the tamping tool is simple to produce, assemble and disassemble, can be reused in different processes, and requires almost no maintenance, which can reduce construction costs.
[0050] Furthermore, the curing of the grouting mortar specifically includes: curing by wet curing, the curing period is not less than three days, and after the curing is completed, it is continuously exposed to sunlight for not less than four days before the silicone glue can be poured in.
[0051] In this embodiment, the grouting mortar is cured by wet curing for no less than three days. After the curing, it is exposed to sunlight for about four consecutive days. After the bottom mortar is completely dry, 20 mm silicone sealant is applied on the top to avoid quality defects such as bulging and cracking of the silicone sealant in the later stage.
[0052] The present invention provides a method for grouting mortar for embedded airport navigation lights. The functions of each module in each device in the embodiment can refer to the corresponding description in the above method. It has the advantages of standardized construction methods, which can improve construction efficiency and reduce construction costs.
[0053] In the description of this specification, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances. The terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features.
[0054] In the present invention, unless otherwise clearly specified and limited, the first feature being "above" or "below" the second feature may include the first and second features being in direct contact, or may include the first and second features being in contact not directly but through another feature between them. Moreover, the first feature being "above", "above" and "above" the second feature includes the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature includes the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature. The terms "vertical", "horizontal", "left", "right", "above", "below" and similar expressions are for illustrative purposes only, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0055] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A method for grouting mortar for airport embedded navigation lights, characterized in that: include: Pour the cushion mortar into the lamp pit where the core has been drilled, put the tamping tool into the lamp pit, and put the padding wood on it and hammer it to make it dense; After the bottom mortar is compacted, put in the recessed lamp base; Carry out tamping construction of gaps on the side walls of the lamp pit; After the dry-mixed mortar on the side wall of the lamp pit is compacted, take out the tamping tool, clean the mud stains on the surface and let it dry naturally for future use; Cure the grouting mortar, and apply the upper silicone sealant after the bottom mortar is completely dry; The tamping tool comprises: an annular cast iron ring, a circular cast iron plate, and a plurality of stainless steel rods; One end of the stainless steel rod is connected to the annular cast iron ring, and the other end of the stainless steel rod is connected to the circular cast iron plate; A threaded connection portion is arranged at one end of the stainless steel rod, and a smooth connection portion is arranged at the other end of the stainless steel rod.
2. The method for grouting mortar for airport embedded navigation lights according to claim 1, characterized in that: The method of pouring the cushion mortar on the lamp pit from which the core has been drilled specifically includes: Level the bottom of the lamp pit after drilling and coring, support and fix the lamp base, and make the lamp base meet the elevation requirements; When tamping the bottom mortar, use geotextile to seal the opening of the pre-buried cable protection pipe at the bottom of the lamp pit.
3. The method for grouting mortar for airport embedded navigation lights according to claim 1, characterized in that: The step of placing the tamping tool into the lamp pit specifically comprises: After installing the stainless steel rod on the round cast iron plate, place the round cast iron plate and the stainless steel rod together into the lamp pit.
4. The method for grouting mortar for airport embedded navigation lights according to claim 3 is characterized in that: The construction of tamping the gaps on the side walls of the lamp pit specifically includes: According to the depth of the lamp pit, the layered tamping construction method is adopted; Install the annular cast iron ring onto the stainless steel rod and insert it into the gap of the lamp pit. After inserting the round cast iron plate, place a wooden pad on it and hammer it tightly.
5. The method for grouting mortar for airport embedded navigation lights according to claim 4, characterized in that: The layered tamping construction method specifically comprises: The height of each layer of the layered tamping construction shall not exceed 50mm, and it shall be applied layer by layer until 20mm below the pit top, and silicone glue shall be poured in to seal the joints.
6. The method for grouting mortar for airport embedded navigation lights according to claim 1, characterized in that: The lamp pit side wall dry-mixed mortar tamping specifically includes: Dig out the mortar between the wire entry hole of the embedded lamp base and the embedded pipe to form a cavity from the pre-buried pipe mouth to the wire entry hole of the lamp base.
7. The method for grouting mortar for airport embedded navigation lights according to claim 1, characterized in that: The removing of the tamping tool specifically comprises: Take out the round cast iron plate and annular cast iron ring, dismantle the stainless steel rods, clean the mud stains on the surface of each component, and let it air dry naturally for use in the next cycle.
8. The method for grouting mortar for airport embedded navigation lights according to claim 1, characterized in that: The curing of the grouting mortar specifically includes: Use wet curing method for curing, the curing period is not less than three days. After the curing is completed, it must be exposed to sunlight for not less than four days before silicone glue can be poured in.
Citation Information
Patent Citations
Kerb joint filling and compacting device and construction method thereof
CN111335130A
Embedded aid-to-navigation lamp assembly line method based on connection of new and old road surfaces
CN116526365A