Combined flood prevention box for water conservancy project
By adopting a combined design of insertion rods, anti-slip holes and anti-slip springs in the combined flood control box, the problem of poor connection stability of flood control box is solved, and higher flood control effect and lower transportation workload are achieved. At the same time, the compensation components are compensated. It fills the gaps with sealing sleeves to improve the overall performance of flood control box.
Patent Information
- Application Number
- CN202411406701.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing combined flood control box has poor stability when connected in the vertical direction, resulting in poor flood control effect.
Using a combination design of insertion rod, anti-slip hole, anti-slip rod and anti-slip spring, the anti-slip rod is pushed into the anti-slip hole through the anti-slip spring to lock the insertion rod, increasing the connection stability of the flood prevention box, and filling the gap with compensation components and sealing sleeves , improve the stacking height and sealing of flood control boxes.
It improves the vertical connection stability of flood control boxes, reduces the use of flood control boxes, reduces the transportation workload, and avoids water leakage caused by gaps.
Smart Images

Figure CN118997058A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of flood prevention boxes, and in particular to a combined flood prevention box for water conservancy projects. Background Art
[0002] A modular flood control box is a type of equipment used for flood prevention and control, usually composed of multiple flood control box units; this type of flood control box has a modular design, which is easy to transport, store and quickly deploy. When a flood comes, these flood control boxes can be quickly combined to form a temporary flood control barrier to protect the safety of important facilities and residential areas.
[0003] At present, in the prior art, when combined flood-proof boxes are combined into a flood-proof wall, two adjacent flood-proof boxes in the vertical direction are generally connected only by inserting the shaft at the lower end of the upper box into the lower box. However, with such a connection method, the flood prevention box located above can still move in the vertical direction, that is, the stability of the connection is poor, which can easily lead to poor flood prevention effects. Summary of the invention
[0004] In order to improve the problems existing in the above-mentioned technology, the present application provides a combined flood prevention box for water conservancy projects.
[0005] The present application provides a combined flood prevention box for water conservancy projects, which adopts the following technical solution: A combined flood prevention box for a water conservancy project comprises: a first flood prevention box and a second flood prevention box, wherein the first flood prevention box is provided with an insertion hole, and an anti-slip hole is penetrated through the inner wall of the insertion hole, the second flood prevention box is provided with an insertion rod, and the insertion rod is arranged in the insertion hole, and an accommodating hole is provided on the insertion rod, an anti-slip rod is arranged between the accommodating hole and the anti-slip hole, and an anti-slip spring is arranged between the anti-slip rod and the bottom of the accommodating hole.
[0006] By adopting the above technical solution, after the insertion rod is inserted into the insertion hole, the anti-slip spring will push the anti-slip rod to automatically insert into the anti-slip hole to lock the insertion rod, so that the second flood prevention box is not easy to separate from the first flood prevention box, so as not to affect the flood prevention effect.
[0007] Optionally, an annular groove is provided on the second flood-proof box, and a sliding plate is sleeved in the annular groove, the insertion rod is fixed on the sliding plate, and a compensation component is provided between the sliding plate and the second flood-proof box.
[0008] By adopting the above technical solution, after the insertion rod is fixed, the second flood-proof box can be pulled upwards. At this time, the second flood-proof box slides up relative to the sliding plate, and the second flood-proof box can be fixed by setting the compensation component, thereby increasing the stacking height of the second flood-proof box and reducing the number of flood-proof boxes in use, thereby eliminating the need to increase the workload due to transporting too many flood-proof boxes.
[0009] Optionally, the compensation component includes: an anti-drop part, which includes: a clamping rod, a clamping gear, a clamping rack, a pawl and a ratchet, and the inner wall of the annular groove is provided with a clearance hole, the clamping rod is rotatably installed on the second flood prevention box, and one end thereof passes through the clearance hole and is coaxially fixed with the clamping gear, and the other end passes through the second flood prevention box and is coaxially fixed with the ratchet, one end of the clamping rack is fixed to the sliding plate, and the other end extends into the clearance hole and meshes with the clamping gear, and the pawl is installed in the second flood prevention box and cooperates with the ratchet.
[0010] By adopting the above technical solution, after the second flood prevention box is raised, the cooperation between the pawl and the ratchet wheel will limit the clamping rod, so that the clamping rod is not easy to rotate, and the clamping gear and the clamping rack are clamped to each other, so that the second flood prevention box can be locked and is not easy to fall automatically.
[0011] Optionally, the compensation component also includes: a transmission part, a filling part and a compensation part, the compensation part is arranged between the sliding plate and the second flood prevention box, the filling part is arranged between the second flood prevention box and the compensation part, and the driving part is arranged between the clamping rod and the filling part.
[0012] By adopting the above technical solution, the compensation component can fill the space between the second flood prevention box and the sliding plate after the second flood prevention box is lifted, so that after the horizontal flood prevention boxes are connected, it is not easy to cause serious water leakage due to the gap.
[0013] Optionally, the compensation part includes: a lifting plate, a baffle plate, an inner bag and a sealing sleeve, the inner wall of the annular groove is provided with a lifting groove, the lifting plate is slidably arranged in the lifting groove, the baffle plate is fixed between the lifting plate and the sliding plate, the sealing sleeve is fixedly sleeved on the inner bag, and the sealing sleeve is fixed between the lifting plate, the baffle plate and the sliding plate, and the filling part is arranged between the second flood-prevention box and the inner bag.
[0014] By adopting the above technical solution, when the clamping rod rotates, the transmission part drives the filling part to operate, and the filling part can squeeze the liquid into the inner bag, so that the inner bag can drive the sealing sleeve to expand, thereby filling the space generated between the second flood control box and the sliding plate after it is lifted.
[0015] Optionally, the filling part includes: a surrounding plate, a lifting plate and a filling tube, the surrounding plate is fixed in the second flood-proof box and forms a accommodating cavity between the surrounding plate and the second flood-proof box, the lifting plate is slidably arranged in the accommodating cavity, one end of the filling tube is connected to the accommodating cavity, and the other end is connected to the inner bag, and the transmission part is arranged between the clamping rod and the lifting plate.
[0016] By adopting the above technical solution, during the rising process of the second flood-proof box, the clamping rod rotates, and through the setting of the transmission part, the lifting plate moves upward to squeeze the liquid in the accommodating chamber, and through the setting of the filling tube, the liquid will flow into the inner bag, so that the inner bag can drive the sealing sleeve to expand, thereby filling the space generated between the second flood-proof box and the sliding plate after it is lifted.
[0017] Optionally, the transmission part includes: a driving gear, a driven gear, a transmission screw and a transmission nut, one end of the transmission nut is fixed to the lifting plate, and the other end passes through the enclosure, the transmission screw is rotatably installed in the second flood control box and one end is coaxially fixed to the driven gear, and the other end is threadedly connected to the transmission nut, the driving gear is coaxially sleeved on the clamping rod, and the driving gear is meshed with the driven gear.
[0018] By adopting the above technical solution, when the clamping rod rotates, the clamping rod drives the driving gear, the driven gear and the transmission screw to rotate in sequence, so that the transmission screw sleeve can drive the lifting plate to rise, thereby squeezing the liquid.
[0019] Optionally, a friction pad is fixedly provided on the sliding plate, a first rubber sleeve is provided on the fixed sleeve of the lifting plate, and a second rubber sleeve is provided on the fixed sleeve of the transmission screw sleeve.
[0020] By adopting the above technical solution, the friction pad can increase the friction between the sliding plate and the first flood control box, so that sliding is not easy to occur.
[0021] Optionally, a protective arc surface is provided at the opening of the lifting slot.
[0022] By adopting the above technical solution, the protective arc surface can protect the sealing sleeve to reduce the wear of the sealing sleeve when it moves.
[0023] Optionally, an anti-locking assembly is arranged between the second flood-proof box and the anti-slip rod, and the anti-locking assembly includes: a slider, a connecting rope, an anti-locking rod and an anti-locking spring; the sliding plate is provided with a sliding groove, one end of the slider is fixed to the second flood-proof box, and the other end is slidably arranged in the sliding groove; an accommodation hole is arranged on the inner wall of the anti-slip hole, and an anti-locking hole is arranged on the anti-slip rod; one end of the anti-locking rod is arranged in the accommodation hole, and the other end is arranged in the anti-locking hole; the anti-locking spring is fixed between the bottom of the accommodation hole and the anti-locking rod, and one end of the connecting rope is fixed to the anti-locking rod, and the other end is fixed to the slider.
[0024] By adopting the above technical solution, when the second flood prevention box rises, the connecting rope can be loosened so that the anti-locking rod can be inserted into the anti-locking hole; when the second flood prevention box descends, the connecting rope will pull the anti-locking rod back into the placement hole, thereby releasing the lock on the anti-slip rod.
[0025] In summary, the present application includes at least one of the following beneficial effects: 1. After the insertion rod is inserted into the insertion hole, the anti-slip spring will push the anti-slip rod to automatically insert into the anti-slip hole to lock the insertion rod, so that the second flood prevention box is not easy to separate from the first flood prevention box, so as not to affect the flood prevention effect.
[0026] 2. After the insertion rod is fixed, the second flood-proof box can be pulled upward. At this time, the second flood-proof box slides up relative to the sliding plate, and the second flood-proof box can be fixed by setting the compensation component, thereby increasing the stacking height of the second flood-proof box to reduce the number of flood-proof boxes used, thereby eliminating the need to increase the workload due to transporting too many flood-proof boxes.
[0027] 3. The friction pad can increase the friction between the sliding plate and the first flood control box, thereby preventing sliding. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 is a schematic diagram of the structure according to an embodiment of the present application; Figure 2 yes Figure 1 A schematic top view of Figure 3 is along Figure 2 A schematic cross-sectional view taken along the cutting line AA in FIG. Figure 4 yes Figure 3 Schematic partial enlarged view of part B.
[0029] In the figure: 1, first flood-proof box; 11, insertion hole; 12, anti-skid hole; 13, placement hole; 2, second flood-proof box; 21, insertion rod; 211, accommodation hole; 212, anti-skid rod; 2121, anti-locking hole; 213, anti-skid spring; 22, ring groove; 221, sliding plate; 2211, friction pad; 2212, slide groove; 23, clearance hole; 24, lifting groove; 241, protective arc surface; 4, anti-drop part; 41, clamping rod; 42, clamping gear; 43, clamping rack; 44, ratchet Claw; 45, ratchet; 5, compensation part; 51, lifting plate; 52, baffle plate; 53, inner bag; 54, sealing sleeve; 6, filling part; 61, enclosure; 611, accommodating chamber; 62, lifting plate; 621, first rubber sleeve; 63, filling tube; 7, transmission part; 71, driving gear; 72, driven gear; 73, transmission screw; 74, transmission screw sleeve; 741, second rubber sleeve; 8, anti-locking assembly; 81, slider; 82, connecting rope; 83, anti-locking rod; 84, anti-locking spring. DETAILED DESCRIPTION
[0030] The present application provides a combined flood prevention box for a water conservancy project.
[0031] See also Figure 1 A combined flood prevention box for a water conservancy project includes: a first flood prevention box 1 and a second flood prevention box 2, wherein the second flood prevention box 2 is stacked on top of the first flood prevention box 1. This embodiment only takes the first flood prevention box 1 and the second flood prevention box 2 as examples, and the bottom wall of the first flood prevention box 1 is fixedly provided with anchor nails to improve stability during flood control.
[0032] See also Figure 2 and Figure 3 The top wall of the first flood-proof box 1 is provided with an insertion hole 11; the bottom wall of the second flood-proof box 2 is provided with an insertion rod 21, and the insertion rod 21 is arranged in the insertion hole 11. The insertion rod 21 can connect the first flood-proof box 1 with the second flood-proof box 2, so that the second flood-proof box 2 is not easy to separate from the first flood-proof box 1 in the horizontal direction.
[0033] See also Figure 3 Furthermore, an anti-skid hole 12 is formed through the inner wall of the insertion hole 11, and a receiving hole 211 is formed on the side wall of the insertion rod 21; and an anti-skid rod 212 is provided between the receiving hole 211 and the anti-skid hole 12, and the anti-skid rod 212 can prevent the second flood-proof box 2 from being easily separated from the first flood-proof box 1 in the vertical direction, thereby not easily affecting the flood prevention effect. An anti-skid spring 213 is provided between the anti-skid rod 212 and the bottom of the receiving hole 211, and after the insertion rod 21 is inserted into the insertion hole 11, the anti-skid spring 213 will push the anti-skid rod 212 to automatically insert into the anti-skid hole 12, so as to lock the insertion rod 21, so that the second flood-proof box 2 is not easily separated from the first flood-proof box 1.
[0034] See also Figure 3 The outer wall of the second flood-proof box 2 is provided with an annular groove 22, and a sliding plate 221 is sleeved in the groove 22. The sliding plate 221 can move up and down in the vertical direction; and the insertion rod 21 is fixed on the bottom wall of the sliding plate 221. A compensation component is provided between the sliding plate 221 and the second flood-proof box 2. After the insertion rod 21 is fixed, the second flood-proof box 2 can be pulled upward. At this time, the second flood-proof box 2 slides up relative to the sliding plate 221, and the second flood-proof box 2 can be fixed by the setting of the compensation component, so that the stacking height of the second flood-proof box 2 can be increased to reduce the number of flood-proof boxes in use, so that there is no need to increase the workload due to transporting too many flood-proof boxes; Furthermore, the compensation component can fill the space between the second flood-proof box 2 and the sliding plate 221 after the second flood-proof box 2 is lifted, so that after the flood-proof boxes in the horizontal direction are connected, it is not easy to cause serious water leakage due to the gap.
[0035] See also Figure 3 Furthermore, a friction pad 2211 is fixedly provided on the bottom wall of the sliding plate 221. In this embodiment, the friction pad 2211 can be made of rubber or other materials. The friction pad 2211 can increase the friction between the sliding plate 221 and the first flood control box 1, so that sliding is not easy to occur.
[0036] See also Figure 3 Furthermore, an anti-locking assembly 8 is provided between the second flood-proof box 2 and the anti-slip bar 212, and the anti-locking assembly 8 includes: a slider 81, a connecting rope 82, an anti-locking rod 83 and an anti-locking spring 84. A slide groove 2212 is provided on the inner side wall of the sliding plate 221 in the vertical direction; one end of the slider 81 is fixedly connected to the second flood-proof box 2, and the other end is slidably provided in the slide groove 2212. A placement hole 13 is provided on the inner top wall of the anti-slip hole 12, and an anti-locking hole 2121 is provided on the top wall of the anti-slip bar 212; one end of the anti-locking rod 83 is provided in the placement hole 13, and the other end is provided in the anti-locking hole 2121. The anti-locking rod 83 can lock and fix the anti-slip bar 212, thereby improving the stability of fixing the sliding plate 221.
[0037] See also Figure 3 The anti-lock spring 84 is fixed between the anti-lock rod 83 and the bottom of the placement hole 13, and the anti-lock spring 84 is used to push the anti-lock rod 83 to automatically insert into the anti-lock hole 2121. One end of the connecting rope 82 is fixed to one end of the anti-lock rod 83 close to the anti-lock spring 84, and the other end passes through the slide groove 2212 and is fixed to the top wall of the slider 81. When the second flood-proof box 2 rises, the connecting rope 82 is loosened so that the anti-lock rod 83 can be inserted into the anti-lock hole 2121; when the second flood-proof box 2 descends, the connecting rope 82 will pull the anti-lock rod 83 back into the placement hole 13, thereby releasing the lock on the anti-slip rod 212.
[0038] See also Figure 3 and Figure 4 The compensation component includes: an anti-drop part 4, a transmission part 7, a filling part 6 and a compensation part 5.
[0039] See also Figure 3 The anti-drop part 4 includes: a clamping rod 41, a clamping gear 42, a clamping rack 43, a pawl 44 and a ratchet 45. The inner top wall of the annular groove 22 is provided with a clearance hole 23. One end of the clamping rack 43 is fixedly connected to the top wall of the sliding plate 221, and the other end extends into the clearance hole 23. The clamping rod 41 is rotatably mounted on the second flood control box 2 and is arranged horizontally. One end of the clamping rod 41 penetrates into the second flood control box 2 and is coaxially fixed with the ratchet 45, and the other end penetrates into the clearance hole 23 and is coaxially fixed with the clamping gear 42, and the clamping gear 42 is meshed with the clamping rack 43.
[0040] See also Figure 3 The pawl 44 is installed on the inner wall of the second flood prevention box 2, and the pawl 44 cooperates with the ratchet 45. When the second flood prevention box 2 rises, the cooperation between the pawl 44 and the ratchet 45 does not limit the clamping rod 41, so that the clamping rod 41 can rotate smoothly; after the second flood prevention box 2 is completely raised, the cooperation between the pawl 44 and the ratchet 45 will limit the clamping rod 41, so that the clamping rod 41 is not easy to rotate, and the clamping gear 42 and the clamping rack 43 are clamped to each other, so that the second flood prevention box 2 can be locked and not easy to automatically fall; if the second flood prevention box 2 needs to be lowered, the pawl 44 and the ratchet 45 can be directly separated manually.
[0041] See also Figure 3 The filling part 6 includes: a surrounding plate 61, a lifting plate 62 and a filling pipe 63. The surrounding plate 61 is fixed in the second flood-proof box 2. The surrounding plate 61 is annular and a receiving chamber 611 is formed between the surrounding plate 61 and the second flood-proof box 2. The receiving chamber 611 is used to store liquid. The lifting plate 62 is arranged in the receiving chamber 611, and the lifting plate 62 can move in the vertical direction.
[0042] See also Figure 3 One end of the filling tube 63 is connected to the accommodating chamber 611 and the other end is connected to the compensation part 5. During the rising process of the second flood-proof box 2, the clamping rod 41 rotates, and through the setting of the transmission part 7, the lifting plate 62 moves upward to squeeze the liquid in the accommodating chamber 611, and through the setting of the filling tube 63, the liquid will flow into the compensation part 5, so that the space generated between the second flood-proof box 2 and the sliding plate 221 after the second flood-proof box 2 is lifted can be filled, so that after the flood-proof boxes in the horizontal direction are connected, it is not easy to cause serious water leakage due to the gap.
[0043] See also Figure 3Furthermore, a first rubber sleeve 621 is fixedly sleeved on the peripheral wall of the lifting plate 62 , and the first rubber sleeve 621 can improve the sealing line between the lifting plate 62 and the inner wall of the second flood control box 2 and the enclosure 61 .
[0044] See also Figure 3 The transmission part 7 includes: a driving gear 71, a driven gear 72, a driving screw 73 and a driving screw sleeve 74. One end of the driving screw sleeve 74 is fixed on the top wall of the lifting plate 62, and the other end penetrates the top wall of the enclosure 61 and extends outward. The driving screw 73 is rotatably installed on the inner wall of the second flood control box 2, and one end of the driving screw 73 is threadedly connected in the driving screw sleeve 74, and the other end is coaxially fixed with the driven gear 72; the driving gear 71 is coaxially sleeved on the clamping rod 41, and the driving gear 71 is meshed with the driven gear 72. When the clamping rod 41 rotates, the clamping rod 41 drives the driving gear 71, the driven gear 72 and the driving screw 73 to rotate in sequence, so that the driving screw sleeve 74 can drive the lifting plate 62 to rise, thereby squeezing the liquid.
[0045] See also Figure 3 Furthermore, a second rubber sleeve 741 is fixedly mounted on the transmission screw sleeve 74 , and the second rubber sleeve 741 can improve the sealing performance between the transmission screw sleeve 74 and the enclosure 61 .
[0046] See also Figure 4 The compensation part 5 includes: a lifting plate 51, a baffle plate 52, an inner bag 53 and a sealing sleeve 54. The inner top wall of the annular groove 22 is provided with an annular lifting groove 24. The lifting plate 51 is slidably arranged on the lifting plate 51 and moves in the vertical direction; one end of the baffle plate 52 is fixedly connected to the sliding plate 221, and the other end is integrally formed with the lifting plate 51. The lifting plate 51 and the baffle plate 52 are both annular, and the baffle plate 52 and the lifting plate 51 are perpendicular to each other. The baffle plate 52 can block the clamping rack 43 so that the clamping rack 43 is not easy to touch the sealing sleeve 54 and the bag.
[0047] See also Figure 4 The sealing sleeve 54 is fixed between the lifting plate 51, the baffle plate 52 and the sliding plate 221, and is located on the side of the baffle plate 52 away from the clamping rack 43; the sealing sleeve 54 is sleeved on the inner bag 53. In this embodiment, the inner bag 53 can be made of latex or other materials, and the inner bag 53 itself contains a certain amount of liquid. During the rising process of the second flood-proof box 2, the sealing sleeve 54 extends out of the lifting groove 24, and the liquid in the accommodating chamber 611 continuously flows into the inner bag 53, so that the inner bag 53 continuously drives the sealing sleeve 54 to expand to increase the volume, thereby filling the space generated between the second flood-proof box 2 and the sliding plate 221 after it is lifted.
[0048] See also Figure 3Furthermore, a protective arc surface 241 is provided at the opening of the lifting groove 24 and at one side away from the baffle plate 52. The protective arc surface 241 can protect the sealing sleeve 54 to reduce the wear of the sealing sleeve 54 when it moves.
[0049] The working principle of a combined flood-prevention box for a water conservancy project of the present application when in use is specifically as follows: after the insertion rod 21 is inserted into the insertion hole 11, the anti-slip spring 213 will push the anti-slip rod 212 to automatically insert into the anti-slip hole 12 to lock the insertion rod 21, so that the second flood-prevention box 2 is not easy to separate from the first flood-prevention box 1.
[0050] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A combined flood prevention box for water conservancy projects, characterized in that: include: A first flood prevention box (1) and a second flood prevention box (2), wherein the first flood prevention box (1) is provided with an insertion hole (11), and an anti-slip hole (12) is provided through the inner wall of the insertion hole (11), and the second flood prevention box (2) is provided with an insertion rod (21), and the insertion rod (21) is arranged in the insertion hole (11), and a receiving hole (211) is provided on the insertion rod (21), and an anti-slip rod (212) is provided between the receiving hole (211) and the anti-slip hole (12), and an anti-slip spring (213) is provided between the anti-slip rod (212) and the bottom of the receiving hole (211).
2. The combined flood prevention box for water conservancy projects according to claim 1 is characterized in that: The second flood-proof box (2) is provided with an annular groove (22), and a sliding plate (221) is sleeved in the annular groove (22), the insertion rod (21) is fixed on the sliding plate (221), and a compensation component is provided between the sliding plate (221) and the second flood-proof box (2).
3. The combined flood prevention box for water conservancy projects according to claim 2 is characterized in that: The compensation component comprises: an anti-drop part (4), the anti-drop part (4) comprises: a clamping rod (41), a clamping gear (42), a clamping rack (43), a pawl (44) and a ratchet (45), the inner wall of the annular groove (22) is provided with a clearance hole (23), the clamping rod (41) is rotatably mounted on the second flood prevention box (2), one end of which passes through the clearance hole (23) and is coaxially fixed with the clamping gear (42), and the other end of which passes through the second flood prevention box (2) and is coaxially fixed with the ratchet (45), one end of which is fixed to the sliding plate (221), and the other end of which extends into the clearance hole (23) and meshes with the clamping gear (42), and the ratchet (44) is mounted in the second flood prevention box (2) and matches with the ratchet (45).
4. The combined flood prevention box for water conservancy projects according to claim 3 is characterized in that: The compensation component further comprises: a transmission part (7), a filling part (6) and a compensation part (5); the compensation part (5) is arranged between the sliding plate (221) and the second flood prevention box (2); the filling part (6) is arranged between the second flood prevention box (2) and the compensation part (5); and the driving part is arranged between the clamping rod (41) and the filling part (6).
5. The combined flood prevention box for water conservancy projects according to claim 4 is characterized in that: The compensation part (5) comprises: a lifting plate (51), a baffle plate (52), an inner bag (53) and a sealing sleeve (54); the inner wall of the annular groove (22) is provided with a lifting groove (24); the lifting plate (51) is slidably arranged in the lifting groove (24); the baffle plate (52) is fixed between the lifting plate (51) and the sliding plate (221); the sealing sleeve (54) is fixedly sleeved on the inner bag (53); and the sealing sleeve (54) is fixed between the lifting plate (51), the baffle plate (52) and the sliding plate (221); the filling part (6) is arranged between the second flood prevention box (2) and the inner bag (53).
6. The combined flood prevention box for water conservancy projects according to claim 5 is characterized in that: The filling part (6) comprises: a surrounding plate (61), a lifting plate (62) and a filling tube (63); the surrounding plate (61) is fixed in the second flood-proof box (2) and forms a receiving chamber (611) with the second flood-proof box (2); the lifting plate (62) is slidably arranged in the receiving chamber (611); one end of the filling tube (63) is connected to the receiving chamber (611) and the other end is connected to the inner bag (53); the transmission part (7) is arranged between the clamping rod (41) and the lifting plate (62).
7. The combined flood prevention box for water conservancy projects according to claim 6 is characterized in that: The transmission part (7) comprises: a driving gear (71), a driven gear (72), a driving screw (73) and a driving screw sleeve (74); one end of the driving screw sleeve (74) is fixed to the lifting plate (62) and the other end passes through the enclosure (61); the driving screw (73) is rotatably installed in the second flood control box (2) and one end is coaxially fixed to the driven gear (72) and the other end is threadedly connected to the driving screw sleeve (74); the driving gear (71) is coaxially sleeved on the clamping rod (41), and the driving gear (71) is meshed with the driven gear (72).
8. The combined flood prevention box for water conservancy projects according to claim 7 is characterized in that: A friction pad (2211) is fixedly provided on the sliding plate (221), a first rubber sleeve (621) is fixedly provided on the lifting plate (62), and a second rubber sleeve (741) is fixedly provided on the transmission screw sleeve (74).
9. The combined flood prevention box for water conservancy projects according to claim 5, characterized in that: A protective arc surface (241) is provided at the opening of the lifting groove (24).
10. The combined flood prevention box for water conservancy projects according to claim 2, characterized in that: A reverse locking assembly (8) is arranged between the second flood prevention box (2) and the anti-slip rod (212), and the reverse locking assembly (8) comprises: a slider (81), a connecting rope (82), a reverse locking rod (83) and a reverse locking spring (84). The sliding plate (221) is provided with a sliding groove (2212), one end of the slider (81) is fixed to the second flood prevention box (2), and the other end is slidably arranged in the sliding groove (2212). The inner wall of the anti-slip hole (12) A placement hole (13) is provided, a reverse locking hole (2121) is provided on the anti-slip rod (212), one end of the reverse locking rod (83) is arranged in the placement hole (13), and the other end is arranged in the reverse locking hole (2121), the reverse locking spring (84) is fixed between the bottom of the placement hole (13) and the reverse locking rod (83), one end of the connecting rope (82) is fixed to the reverse locking rod (83), and the other end is fixed to the sliding block (81).