Drilling and blasting method construction system and method considering group well effect surrounding rock deformation dynamic feedback

Through real-time monitoring and dynamic adjustment of the drilling and explosion construction system, the problems of group well effect and surrounding rock deformation during mining excavation are solved, construction efficiency and safety are improved, and surrounding rock stability is enhanced.

CN118997764APending Publication Date: 2024-11-22THE 2ND ENG CO LTD OF CHINA RAILWAY 17 BUREAU GRP +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410915184.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the mining process, the group-well effect and dynamic deformation of surrounding rocks generated by multiple vertical shafts are difficult to monitor and adjust in real time, resulting in inappropriate preset of blasting parameters, affecting construction efficiency and safety, and increasing surrounding rock instability and collapse risk.

Method used

Design a drilling and explosion construction system including sensor subsystem, data acquisition subsystem, data processing subsystem, feedback control subsystem and communication subsystem to monitor surrounding rock deformation and stress data in real time, and dynamic adjustment through data analysis and feedback control Blasting parameters and optimize construction strategies.

Benefits of technology

Real-time monitoring and dynamic adjustment of group well effect and surrounding rock deformation is achieved, the efficiency and safety of drilling and explosion construction is improved, construction risks are reduced, and surrounding rock stability and project quality are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997764A_ABST
    Figure CN118997764A_ABST
Patent Text Reader

Abstract

The invention discloses a drilling and blasting method construction system and method considering group well effect surrounding rock deformation dynamic feedback. The drilling and blasting method construction system comprises a sensor subsystem, a data acquisition subsystem, a data processing subsystem, a feedback control subsystem and a communication subsystem, and the sensor subsystem is responsible for initial acquisition of data; the data acquisition subsystem is responsible for acquiring and primarily processing sensor data in real time; the data processing subsystem is responsible for generating an analysis report and a chart and providing a decision basis; the feedback control subsystem is responsible for dynamically adjusting blasting parameters, and early warning potential risks in time through an alarm system; and the communication subsystem is responsible for ensuring data transmission and information exchange among the subsystems. According to the method, the influence of the group well effect and the surrounding rock deformation is comprehensively considered, the real-time monitoring data and the construction experience are combined, dynamic adjustment and optimization of the construction parameters are achieved, the efficiency, safety and quality of drilling and blasting method construction are improved, and powerful technical support is provided for underground engineering construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mine excavation, and relates to a drilling and blasting construction system and method, and in particular to a drilling and blasting construction system and method that considers dynamic feedback of surrounding rock deformation due to a well group effect. Background Art

[0002] In the process of mine excavation, shaft excavation is a very important link, which not only affects the mining efficiency of the entire mine, but also directly relates to construction safety and surrounding rock stability. The drilling and blasting method is widely used in shaft excavation due to its advantages such as simple equipment, convenient operation and wide application range.

[0003] With the expansion of engineering scale and the increase of complexity, in actual engineering, multiple shafts are usually excavated at the same time. In this case, a significant group well effect will be generated, that is, when multiple shafts are close to each other or excavated at the same time, they will affect each other and produce complex changes in the stress field and deformation field of the surrounding rock. If this effect cannot be effectively controlled, it may lead to stress concentration and aggravated deformation of the surrounding rock, which will lead to a series of engineering problems.

[0004] At the same time, the surrounding rock will undergo dynamic deformation during the blasting process. This deformation not only affects the blasting effect, but may also lead to uneven stress distribution in the surrounding rock, increasing the risk of surrounding rock instability and collapse. In the existing drilling and blasting construction, the blasting parameters are usually pre-set, lacking real-time feedback and adjustment of the well group effect and surrounding rock deformation during the actual construction process. This method of pre-setting parameters ignores the dynamic changes of the surrounding rock during the construction process, resulting in insufficient utilization of blasting energy, low construction efficiency, and difficulty in ensuring construction safety.

[0005] In addition, the traditional blasting construction method lacks real-time monitoring and dynamic feedback mechanisms during the blasting process, making it difficult to obtain and analyze the data of the well group effect and surrounding rock deformation in a timely manner, and it is impossible to make effective adjustments according to the actual situation. This not only reduces the effect of blasting construction, but also increases the construction risk, easily causing uncontrollable rock damage and threatening the safety of construction workers. Therefore, there is an urgent need for a drilling and blasting construction optimization method that can monitor and feedback the well group effect and surrounding rock deformation in real time, and improve construction efficiency, enhance surrounding rock stability, and ensure construction safety by dynamically adjusting blasting parameters to meet the needs of complex underground engineering construction. Summary of the invention

[0006] In view of the above problems existing in the background technology, the present invention provides a drilling and blasting construction system and method that considers the dynamic feedback of surrounding rock deformation caused by the well group effect. The present invention comprehensively considers the influence of the well group effect and surrounding rock deformation, combines real-time monitoring data and construction experience, realizes dynamic adjustment and optimization of construction parameters, improves the efficiency, safety and quality of drilling and blasting construction, and provides strong technical support for underground engineering construction.

[0007] The objective of the present invention is achieved through the following technical solutions:

[0008] A drilling and blasting construction system considering dynamic feedback of surrounding rock deformation of group well effect includes a sensor subsystem, a data acquisition subsystem, a data processing subsystem, a feedback control subsystem, and a communication subsystem, wherein:

[0009] The sensor subsystem is responsible for the initial data collection and transmits the surrounding rock deformation, stress, vibration and temperature data to the data acquisition subsystem;

[0010] The data acquisition subsystem is responsible for real-time acquisition and preliminary processing of sensor data to ensure the accuracy and integrity of the data;

[0011] The data processing subsystem is responsible for conducting in-depth analysis on the data collected by the data collection subsystem, generating analysis reports and charts, and providing a basis for decision-making;

[0012] The feedback control subsystem is responsible for dynamically adjusting blasting parameters according to data analysis results and timely warning potential risks through the alarm system;

[0013] The communication subsystem is responsible for ensuring data transmission and information exchange between the subsystems, and ensuring the overall coordination and real-time response of the drilling and blasting construction system.

[0014] A drilling and blasting construction method considering dynamic feedback of surrounding rock deformation due to well group effect comprises the following steps:

[0015] Step S1, construction preparation: obtain geological information of the construction area, determine the blasting plan, and purchase the required equipment and materials;

[0016] Step S2, monitoring system layout: select and install sensors to form a sensor subsystem, arrange data acquisition equipment to form a data acquisition subsystem, and establish a data processing subsystem and a communication subsystem to provide key data support for subsequent blasting operations;

[0017] Step S3, initial blasting operation: blasting is performed according to the designed blasting plan, and the monitoring system arranged in step S2 is started at the same time to measure the deformation and stress data of the surrounding rock in real time;

[0018] Step S4, data collection and analysis: collect surrounding rock data during the blasting process, and use the data processing subsystem to perform in-depth processing and analysis to evaluate the response of the surrounding rock and the impact of the well group effect;

[0019] Step S5, dynamically adjusting blasting parameters: Based on the data analysis results of the data processing subsystem, the feedback control subsystem determines whether the blasting parameters need to be adjusted, and updates the blasting plan in time when necessary;

[0020] Step S6, feedback adjustment and next round of blasting: perform the next round of blasting operation according to the adjusted blasting parameters, and continuously optimize the blasting effect through continuous monitoring and data collection;

[0021] Step S7, construction evaluation and summary: After the construction is completed, a comprehensive geological and safety evaluation is conducted to ensure the safety and engineering quality of the entire construction area, summarize the experience and data of the entire construction process, and provide valuable reference and guidance for subsequent similar projects.

[0022] Compared with the prior art, the present invention has the following advantages:

[0023] 1. Real-time monitoring and feedback: Through the sensor subsystem and data acquisition subsystem, key data such as deformation, stress and vibration of the surrounding rock can be monitored in real time, so that construction personnel can quickly obtain feedback on the surrounding rock status and adjust the construction strategy in time.

[0024] 2. Data analysis and optimization: The data processing subsystem can conduct in-depth analysis of the collected data, which helps construction personnel to more accurately understand the actual situation in the construction area, identify potential problems, and make scientific decisions based on the data.

[0025] 3. Dynamic adjustment and risk warning: Through the feedback control subsystem, blasting parameters can be dynamically adjusted and potential risks can be warned in time according to the data processing results, making the construction process more accurate and efficient, while reducing risks and improving safety.

[0026] 4. Improve project quality and efficiency: Through continuous data collection, analysis and parameter adjustment, it can help construction personnel find the blasting plan that best suits the current geological conditions, thereby improving project quality and efficiency.

[0027] 5. Wide scope of application: It is not only suitable for the field of mine shaft construction, but also widely applicable to other drilling and blasting projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is the architecture diagram of the drilling and blasting construction system considering the dynamic feedback of surrounding rock deformation due to the well group effect.

[0029] Figure 2 Flow chart of the drilling and blasting construction method considering the dynamic feedback of surrounding rock deformation due to the well group effect. DETAILED DESCRIPTION

[0030] The technical solution of the present invention is further described below in conjunction with the accompanying drawings, but is not limited thereto. Any modification or equivalent replacement of the technical solution of the present invention without departing from the spirit and scope of the technical solution of the present invention should be included in the protection scope of the present invention.

[0031] The present invention provides a drilling and blasting construction system that takes into account the dynamic feedback of surrounding rock deformation caused by the well group effect. Figure 1 As shown, the system includes a sensor subsystem, a data acquisition subsystem, a data processing subsystem, a feedback control subsystem, and a communication subsystem, wherein:

[0032] The sensor subsystem is responsible for the initial data collection and transmits the surrounding rock deformation, stress, vibration and temperature data to the data acquisition subsystem;

[0033] The data acquisition subsystem is responsible for real-time acquisition and preliminary processing of sensor data to ensure the accuracy and integrity of the data;

[0034] The data processing subsystem is responsible for conducting in-depth analysis on the data collected by the data collection subsystem, generating analysis reports and charts, and providing a basis for decision-making;

[0035] The feedback control subsystem is responsible for dynamically adjusting blasting parameters according to data analysis results and timely warning potential risks through the alarm system;

[0036] The communication subsystem is responsible for ensuring data transmission and information exchange between the subsystems, and ensuring the overall coordination and real-time response of the drilling and blasting construction system.

[0037] In the present invention, the sensor subsystem includes strain gauges, accelerometers, displacement meters, and infrared temperature sensors. Construction workers accurately arrange sensors at key locations based on the geological conditions and construction requirements of the construction area to ensure that the deformation, stress, vibration, and temperature data of the surrounding rock can be captured. The sensor subsystem transmits the real-time collected data to the data acquisition subsystem stably and accurately via wired or wireless means.

[0038] In the present invention, the data acquisition subsystem includes a data collector, a data cache module and a preliminary processing module. The data collector is responsible for receiving sensor data in real time, the data cache module is responsible for temporarily storing data to prevent data loss, and the preliminary processing module is responsible for cleaning, format conversion and preliminary statistical analysis of the data through filtering algorithms and data smoothing algorithms.

[0039] In the present invention, the data processing subsystem includes a data analysis module, a report generation module and a visualization display module. The data analysis module is responsible for analyzing the data through time domain analysis, frequency domain analysis, finite element analysis and regression analysis to evaluate the stability and deformation trend of the surrounding rock; the report generation module is responsible for automatically generating a detailed analysis report based on the analysis results; the visualization display module is responsible for intuitively displaying the analysis results in the form of charts, animations, etc., so as to facilitate decision makers to understand.

[0040] In the present invention, the feedback control subsystem includes a parameter adjustment module, a risk warning module and an emergency response module. The parameter adjustment module is responsible for automatically or manually adjusting the blasting parameters according to the analysis results, the risk warning module is responsible for issuing an alarm in time when abnormal data is detected, and the emergency response module is responsible for providing emergency plans and rapid response mechanisms to deal with possible emergencies.

[0041] In the present invention, the communication subsystem includes a data transmission network, a data exchange interface and a communication protocol. The data transmission network is responsible for ensuring fast and stable data transmission between the subsystems, the data exchange interface is responsible for realizing data format conversion and exchange between different subsystems, and the communication protocol is responsible for ensuring the accuracy and security of data transmission.

[0042] A drilling and blasting construction method using the above drilling and blasting construction system taking into account the dynamic feedback of surrounding rock deformation due to well group effect, such as Figure 2 As shown, the method comprises the following steps:

[0043] Step S1, construction preparation: obtain geological information of the construction area, determine the blasting plan, and purchase the required equipment and materials. The specific steps are as follows:

[0044] Step S11: Use drilling equipment, seismic exploration instruments, and geological radars in combination with in-situ tests to obtain geological structure and rock formation information in the construction area, and conduct indoor tests on the drilled rocks to obtain physical parameters of the rocks.

[0045] Step S12: Considering the well group effect, the initial blasting plan is designed using blasting design software, including blasting hole diameter, hole spacing, explosive dosage and blasting sequence, and blasting simulation software is used for simulation analysis to ensure the feasibility and safety of the plan.

[0046] Step S13: Purchase applicable sensors, explosives, construction equipment, etc. according to geological conditions and construction plans, and purchase possible emergency equipment.

[0047] Step S2, monitoring system layout: select and install sensors to form a sensor subsystem, arrange data acquisition equipment to form a data acquisition subsystem, and establish a data processing system and a communication subsystem to provide key data support for subsequent blasting operations. The specific steps are as follows:

[0048] Step S21: Based on the result of step S12, the sensor installation location is designed and installed, and appropriate encryption is performed in areas with greater disturbance and areas with significant well cluster effects to ensure the comprehensiveness and accuracy of the monitoring data.

[0049] Step S22: Install the data acquisition equipment, ensure that it is effectively connected to the sensor in step S21, and use a standard signal generator to calibrate the data acquisition system to ensure the accuracy and stability of the collected data.

[0050] Step S23: Establish a communication subsystem to ensure real-time transmission of data among the sensor subsystem, data acquisition subsystem, data processing subsystem, and feedback control subsystem.

[0051] Step S3, initial blasting operation: blasting is performed according to the designed blasting plan, and the monitoring system arranged in step S2 is started at the same time to measure the deformation and stress data of the surrounding rock in real time. The specific steps are as follows:

[0052] Step S31: Use the total station and laser pointer to accurately calibrate the blasting hole position to ensure that the position and depth of the blasting hole meet the design requirements, and drill and charge in strict accordance with the blasting design plan to ensure the quality of drilling and the accuracy of charging, thereby ensuring the blasting effect and safety.

[0053] Step S32: Start the monitoring system before the blasting operation, and use the sensor subsystem to measure the surrounding rock deformation, stress and vibration data during the blasting process in real time, providing a basis for subsequent data analysis.

[0054] Step S4, data collection and analysis: collect surrounding rock data during the blasting process, and conduct in-depth processing and analysis to evaluate the response of the surrounding rock and the impact of the well group effect. The specific steps are as follows:

[0055] Step S41: Use the data acquisition subsystem to record the surrounding rock deformation, stress and vibration data collected by the sensor in real time to ensure the comprehensiveness and accuracy of the data, and store the collected data in the data processing subsystem to facilitate subsequent data analysis.

[0056] Step S42: Use the data processing subsystem to conduct preliminary analysis on the collected data, identify the stress and deformation laws of the surrounding rock, consider the well group effect, provide a basis for subsequent blasting parameter adjustments, and automatically generate a detailed analysis report based on the analysis results, and intuitively display the analysis results to decision makers in the form of charts, animations, etc.

[0057] Step S5, dynamically adjust blasting parameters: Based on the data analysis results of the data processing subsystem, the feedback control subsystem decides whether the blasting parameters need to be adjusted, and updates the blasting plan in time when necessary. The specific steps are as follows:

[0058] Step S51: Evaluate the response of the surrounding rock according to the data analysis results of step S42, and determine whether the blasting parameters need to be adjusted to improve construction efficiency and safety.

[0059] Step S52: Analyze the influence of the well group effect on the surrounding rock deformation using statistical analysis tools to provide direction for the optimization of blasting parameters.

[0060] Step S53: The feedback control subsystem adjusts the blasting parameters according to the analysis results of steps S51 and S52, and updates the blasting design plan to improve the blasting effect.

[0061] Step S6, feedback adjustment and next round of blasting: perform the next round of blasting operation according to the adjusted blasting parameters, and continuously optimize the blasting effect through continuous monitoring and data collection. The specific steps are as follows:

[0062] Step S61: According to the scheme in step S53, new drilling and charging are performed according to the requirements of step S31.

[0063] Step S62: Repeat steps S32 to S53 to continuously monitor each blasting operation, continuously optimize the blasting effect and improve construction efficiency by continuously collecting data, analyzing results and adjusting blasting parameters. During this period, the feedback control subsystem continues to perform risk warnings and emergency responses until the construction is completed.

[0064] Step S63: Use data management software to record the data and adjustment experience of each round of blasting to provide reference for the construction summary in step 7.

[0065] Step S7, construction assessment and summary: After the construction is completed, a comprehensive geological and safety assessment is conducted to ensure the safety and engineering quality of the entire construction area, summarize the experience and data of the entire construction process, and provide valuable reference and guidance for subsequent similar projects. The specific steps are as follows:

[0066] Step S71: Use geological radar to conduct a comprehensive geological assessment of the construction area to ensure the stability and safety of the surrounding rock.

[0067] Step S72: Use data analysis and visualization tools to summarize the data and analysis results of the entire construction process, summarize the experience and lessons learned in the construction, and compile relevant manuals to provide reference and guidance for subsequent similar projects.

Claims

1. A drilling and blasting construction system that takes into account the dynamic feedback of surrounding rock deformation due to the well group effect, characterized in that The drilling and blasting construction system includes a sensor subsystem, a data acquisition subsystem, a data processing subsystem, a feedback control subsystem, and a communication subsystem, wherein: The sensor subsystem is responsible for the initial data collection and transmits the surrounding rock deformation, stress, vibration and temperature data to the data acquisition subsystem; The data acquisition subsystem is responsible for real-time acquisition and preliminary processing of sensor data to ensure the accuracy and integrity of the data; The data processing subsystem is responsible for conducting in-depth analysis on the data collected by the data collection subsystem, generating analysis reports and charts, and providing a basis for decision-making; The feedback control subsystem is responsible for dynamically adjusting blasting parameters according to data analysis results and timely warning potential risks through the alarm system; The communication subsystem is responsible for ensuring data transmission and information exchange between the subsystems, and ensuring the overall coordination and real-time response of the drilling and blasting construction system.

2. The drilling and blasting construction system considering dynamic feedback of surrounding rock deformation of well group effect according to claim 1 is characterized in that The sensor subsystem includes strain gauges, accelerometers, displacement meters, and infrared temperature sensors. Construction personnel accurately arrange sensors at key locations according to the geological conditions and construction requirements of the construction area to ensure that the deformation, stress, vibration, and temperature data of the surrounding rock can be captured; the data acquisition subsystem includes a data collector, a data cache module, and a preliminary processing module. The data collector is responsible for receiving sensor data in real time, the data cache module is responsible for temporarily storing data to prevent data loss, and the preliminary processing module is responsible for cleaning, format conversion, and preliminary statistical analysis of the data through filtering algorithms and data smoothing algorithms; the data processing subsystem includes a data analysis module, a report generation module, and a visualization display module. The data analysis module is responsible for analyzing the data through time domain analysis, frequency domain analysis, finite element analysis, and regression analysis to evaluate the stability and deformation trend of the surrounding rock; The report generation module is responsible for automatically generating detailed analysis reports based on the analysis results; The visualization display module is responsible for visually displaying the analysis results in the form of charts, animations, etc., so as to facilitate decision makers' understanding; the feedback control subsystem includes a parameter adjustment module, a risk warning module and an emergency response module. The parameter adjustment module is responsible for automatically or manually adjusting the blasting parameters according to the analysis results. The risk warning module is responsible for issuing an alarm in time when abnormal data is detected. The emergency response module is responsible for providing emergency plans and rapid response mechanisms to deal with possible emergencies; the communication subsystem includes a data transmission network, a data exchange interface and a communication protocol. The data transmission network is responsible for ensuring the rapid and stable transmission of data between subsystems. The data exchange interface is responsible for realizing data format conversion and exchange between different subsystems. The communication protocol is responsible for ensuring the accuracy and security of data transmission.

3. The drilling and blasting construction system considering dynamic feedback of surrounding rock deformation due to well group effect according to claim 1 or 2, characterized in that The sensor subsystem transmits the real-time collected data to the data acquisition subsystem stably and accurately via wired or wireless means.

4. A drilling and blasting construction method using the drilling and blasting construction system according to any one of claims 1 to 3 to carry out a drilling and blasting construction method taking into account the dynamic feedback of surrounding rock deformation due to a well group effect, characterized in that The method comprises the following steps: Step S1, construction preparation: obtain geological information of the construction area, determine the blasting plan, and purchase the required equipment and materials; Step S2, monitoring system layout: select and install sensors to form a sensor subsystem, arrange data acquisition equipment to form a data acquisition subsystem, and establish a data processing subsystem and a communication subsystem to provide key data support for subsequent blasting operations; Step S3, initial blasting operation: blasting is performed according to the designed blasting plan, and the monitoring system arranged in step S2 is started at the same time to measure the deformation and stress data of the surrounding rock in real time; Step S4, data collection and analysis: collect surrounding rock data during the blasting process, and use the data processing subsystem to perform in-depth processing and analysis to evaluate the response of the surrounding rock and the impact of the well group effect; Step S5, dynamically adjusting blasting parameters: Based on the data analysis results of the data processing subsystem, the feedback control subsystem determines whether the blasting parameters need to be adjusted, and updates the blasting plan in time when necessary; Step S6, feedback adjustment and next round of blasting: perform the next round of blasting operation according to the adjusted blasting parameters, and continuously optimize the blasting effect through continuous monitoring and data collection; Step S7, construction evaluation and summary: After the construction is completed, a comprehensive geological and safety evaluation is conducted to ensure the safety and engineering quality of the entire construction area, summarize the experience and data of the entire construction process, and provide valuable reference and guidance for subsequent similar projects.

5. The drilling and blasting construction method considering the dynamic feedback of surrounding rock deformation of the well group effect according to claim 4 is characterized in that The specific steps of step S2 are as follows: Step S21: Based on the result of step S12, the sensor installation location is designed and installed, and appropriate encryption is performed in areas with large disturbances and areas with significant well cluster effects to ensure the comprehensiveness and accuracy of the monitoring data; Step S22: Install the data acquisition equipment, ensure that it is effectively connected to the sensor in step S21, and calibrate the data acquisition system using a standard signal generator to ensure the accuracy and stability of the collected data; Step S23: Establish a communication subsystem to ensure real-time transmission of data among the sensor subsystem, data acquisition subsystem, data processing subsystem, and feedback control subsystem.

6. The drilling and blasting construction method considering the dynamic feedback of surrounding rock deformation of the well group effect according to claim 4 is characterized in that The specific steps of step S3 are as follows: Step S31: Use the total station and laser pointer to accurately calibrate the blasting hole position to ensure that the position and depth of the blasting hole meet the design requirements, and drill and charge in strict accordance with the blasting design plan to ensure the quality of the drilling and the accuracy of the charging, thereby ensuring the blasting effect and safety; Step S32: Start the monitoring system before the blasting operation, and use the sensor subsystem to measure the surrounding rock deformation, stress and vibration data during the blasting process in real time, providing a basis for subsequent data analysis.

7. The drilling and blasting construction method according to claim 4, characterized in that The specific steps of step S4 are as follows: Step S41: Use the data acquisition subsystem to record the surrounding rock deformation, stress and vibration data collected by the sensor in real time to ensure the comprehensiveness and accuracy of the data, and store the collected data in the data processing subsystem to facilitate subsequent data analysis; Step S42: Use the data processing subsystem to conduct preliminary analysis on the collected data, identify the stress and deformation laws of the surrounding rock, consider the well group effect, provide a basis for subsequent blasting parameter adjustments, and automatically generate a detailed analysis report based on the analysis results to intuitively display the analysis results to decision makers.

8. The drilling and blasting construction method considering the dynamic feedback of surrounding rock deformation of the well group effect according to claim 7 is characterized in that The specific steps of step S5 are as follows: Step S51: evaluating the response of the surrounding rock according to the data analysis results of step S42, and determining whether blasting parameters need to be adjusted to improve construction efficiency and safety; Step S52: using statistical analysis tools to analyze the impact of the well group effect on surrounding rock deformation, and provide direction for optimization of blasting parameters; Step S53: The feedback control subsystem adjusts the blasting parameters according to the analysis results of steps S51 and S52, and updates the blasting design plan to improve the blasting effect.

9. The drilling and blasting construction method considering the dynamic feedback of surrounding rock deformation of the well group effect according to claim 8 is characterized in that The specific steps of step S6 are as follows: Step S61: according to the scheme in step S53, new drilling and charging are performed according to the requirements of step S31; Step S62: Repeat steps S32 to S53 to continuously monitor each blasting operation, continuously optimize the blasting effect and improve the construction efficiency by continuously collecting data, analyzing results and adjusting blasting parameters. During this period, the feedback control subsystem continuously performs risk warning and emergency response until the construction is completed; Step S63: Use data management software to record the data and adjustment experience of each round of blasting to provide reference for the construction summary in step 7.

10. The drilling and blasting construction method considering the dynamic feedback of surrounding rock deformation of the well group effect according to claim 9 is characterized in that The specific steps of step S7 are as follows: Step S71: using geological radar to conduct a comprehensive geological assessment of the construction area to ensure the stability and safety of the surrounding rock; Step S72: Use data analysis and visualization tools to summarize the data and analysis results of the entire construction process, summarize the experience and lessons learned in the construction, and compile relevant manuals to provide reference and guidance for subsequent similar projects.

Citation Information

Patent Citations

  • Method for overbreak-underbreak control of tunnel based on building information modeling (BIM)

    CN108930539A

  • System and method for simultaneously forecasting rockburst and unfavorable geology in real time

    CN114856709A

  • Charging trolley and system for tunnel drilling and blasting method construction

    CN115111982A

  • Tunnel drilling and blasting method smooth blasting intelligent optimization system based on digital twinning

    CN118070670A