Air conditioner load prediction and optimization method

By constructing air conditioner archives and activity models, combining the internal and external environmental parameters of the building, we speculate future electricity loads and adjust the air conditioner optimization route, we solve the problems of poor air conditioner load prediction accuracy and waste of electricity, and achieve the guarantee of grid stability and user comfort. .

CN118998906AInactive Publication Date: 2024-11-22STATE GRID HEBEI ELECTRIC POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411105171.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The accuracy of air conditioner load prediction is poor, resulting in the inability to guarantee the stability of the power grid and the waste of electricity consumption. It is difficult for the existing technology to adjust the air conditioner in real time to avoid the tight power supply of the power grid.

Method used

By constructing air conditioner archives and activity models, combining the internal and external environmental parameters of the building, we speculate the electricity load in the future, and adjust the air conditioner optimization route according to the principles of comfort and energy consumption to achieve prediction and optimization of air conditioner load.

Benefits of technology

It improves the accuracy of air conditioner load prediction, avoids electricity concentration, reduces energy consumption, and ensures grid stability and user comfort.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118998906A_ABST
    Figure CN118998906A_ABST
Patent Text Reader

Abstract

The invention provides an air conditioner load prediction and optimization method, and belongs to the technical field of load optimization, and the method comprises the steps: calling the historical data of each air conditioner in a regulation and control region, and constructing an activity model for users in a building according to the historical data and the activity rule of people in the building. And determining an air conditioner optimization route according to the activity model in combination with the air conditioner file. And analyzing the difference between the internal and external environment parameters of the building in real time, and inferring the electrical load of the building in a period of time by combining the heat preservation property and the optimized route. And the optimized route is adjusted according to the principle of avoiding electricity concentration and meeting the comfort of most people. According to the air conditioner load prediction and optimization method provided by the invention, the concentration of electricity and the influence on the stability of the power grid can be effectively avoided, the energy consumption is reduced, and the comfort of a user is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of load optimization, and more specifically, relates to an air conditioning load prediction and optimization method. Background Art

[0002] When the temperature outside the building is high, users will turn on the air conditioner to lower the indoor temperature. However, since the air conditioner consumes a lot of electricity when it is running, and users will turn on the air conditioner in a relatively close time period, this will cause the air conditioner load to increase significantly in a period of time. Since electricity consumption is relatively concentrated, this poses a challenge to the power supply capacity of the power grid and the stability of the entire power system.

[0003] In order to accurately judge the air conditioning load, the current method is to build a load model and then infer the power consumption of the air conditioner based on the load model. However, there are many factors that affect the air conditioning load, and different external environments will also have a greater impact on the air conditioning load, which makes the load prediction less accurate, the stable operation of the power grid cannot be guaranteed, and because the air conditioner cannot be adjusted in real time, there is a problem of high power consumption and serious energy waste. Summary of the invention

[0004] The purpose of the present invention is to provide an air conditioning load prediction and optimization method, aiming to solve the problem that the accuracy of load prediction is poor and the stable operation of the power grid cannot be guaranteed.

[0005] To achieve the above object, the technical solution adopted by the present invention is: to provide an air conditioning load prediction and optimization method, including: Determine the construction specifications and thermal insulation of each building in the control area, and summarize the installation method, installation location, working efficiency, and heat loss of the air conditioners in the buildings into air conditioner files; Retrieving historical data of each of the air conditioners in the control area, and constructing an activity model for users in the building according to the historical data and the activity patterns of people in the building; Determine an air conditioning optimization route according to the activity model and the air conditioning file; Analyze the difference between the environmental parameters inside and outside the building in real time, and infer the power load of the building over a period of time by combining the thermal insulation and the optimized route; The optimization route is adjusted based on the principles of avoiding concentrated electricity consumption and satisfying the comfort of the majority of people.

[0006] In one possible implementation, determining the construction specifications and thermal insulation of each building in the control area includes: analyzing the heat exchange conditions and efficiency between each building in the control area and the surrounding environment based on construction information and related construction data and in combination with the location of each building and the influence of the location of surrounding structures.

[0007] In a possible implementation, the installation method, installation location, working efficiency, and heat loss of the air conditioner in the building are summarized and organized into an air conditioner file including: During the operation of the air conditioner, the temperature and humidity changes in the building are determined in real time, and the temperature control coverage of the air conditioner in the building is clarified; Determine the operating conditions of the various components of the air conditioner, and realize remote data reading and control of the air conditioner by installing a control component.

[0008] In a possible implementation, retrieving the historical data of each air conditioner in the control area includes: The temperature values ​​of various places in the building under different external environments are summarized from the historical data to determine the power consumption in different time periods and the total power load in the control area at that time.

[0009] In a possible implementation, constructing an activity model for users in the building according to the historical data and the activity patterns of people in the building includes: Determine the location and activity range of people in the building in real time, and determine the changes in the location of people throughout the day; The changes are summarized and summarized to provide data reference for the activity model.

[0010] In a possible implementation, determining the air conditioning optimization route according to the activity model and the air conditioning file includes: When there is no concentrated power consumption, the startup status and operating parameters of the air conditioner are determined based on the principle of satisfying the comfort of all persons and the standard of achieving the lowest energy consumption; When concentrated electricity consumption is estimated, the operating time and parameters of the air conditioner are adjusted based on the principle of satisfying the comfort of most people.

[0011] In a possible implementation, determining the air conditioning optimization route according to the activity model and the air conditioning file includes: Based on the principle of satisfying the comfort of users during most of the day, the area range of the building requiring temperature regulation is determined, and the operating parameters of the air conditioner are determined based on the range.

[0012] In a possible implementation, the real-time analysis of the difference between the internal and external environmental parameters of the building includes: Determine the temperature difference between the inside and outside of the building in real time, and analyze the impact of light and wind outside the building on the building; Based on the analysis results and the data fed back by relevant departments, it is inferred that the heat changes in the building will occur in the future.

[0013] In a possible implementation, the combining the thermal insulation and the optimized route to infer the power load of the building over a period of time includes: Estimate the power consumption of each air conditioner in the control area in the future and the coverage range in the building.

[0014] In a possible implementation, based on the principle of avoiding concentrated electricity consumption and satisfying the comfort of the majority of people, adjusting the optimization route includes: According to the installation position of the air conditioner and the activity model, the influence range of the adjusted air conditioner parameters and the influence on the comfort of each activity model are determined.

[0015] The beneficial effect of the air conditioning load prediction and optimization method provided by the present invention is that compared with the prior art, the air conditioning load prediction and optimization method of the present invention first determines the construction specifications and thermal insulation of each building in the control area, and summarizes the installation method, installation location, working efficiency, and heat loss of the air conditioners in the building into an air conditioning file. In order to build an activity model, it is necessary to retrieve the historical data of each air conditioner in the control area, based on the historical data and the activity patterns of the people in the building. After the above information is determined, the air conditioning optimization route is determined based on the activity model combined with the air conditioning file. The differences in the environmental parameters inside and outside the building are analyzed in real time, and the power load of the building over a period of time is inferred in combination with the thermal insulation and the optimization route. The optimization route is adjusted based on the principle of avoiding concentrated power consumption and satisfying the comfort of most people.

[0016] In this application, by accurately analyzing and investigating the air conditioners and combining them with historical data, it is ultimately possible to accurately analyze the air conditioning load in the control area in the future, which can effectively avoid the concentration of electricity consumption and the impact on the stability of the power grid, reduce energy consumption, and ensure user comfort. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 A flow chart of an air conditioning load prediction and optimization method provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0019] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0020] See also Figure 1 The air conditioning load prediction and optimization method provided by the present invention is now described. The air conditioning load prediction and optimization method comprises: Determine the construction specifications and thermal insulation of each building in the regulated area, and summarize the installation method, installation location, working efficiency, and heat loss of the air conditioners in the buildings into air conditioning files.

[0021] Retrieve the historical data of each air conditioner in the control area, and build an activity model for users in the building based on the historical data and the activity patterns of people in the building.

[0022] Based on the activity model and air conditioning files, the air conditioning optimization route is determined.

[0023] Real-time analysis of differences in environmental parameters inside and outside the building, combined with thermal insulation and optimized routes, to infer the building's power load over a period of time.

[0024] The optimization route is adjusted based on the principles of avoiding concentrated electricity consumption and satisfying the comfort of the majority of people.

[0025] The beneficial effect of the air conditioning load prediction and optimization method provided by the present invention is that compared with the prior art, the air conditioning load prediction and optimization method of the present invention first determines the construction specifications and thermal insulation of each building in the control area, and summarizes the installation method, installation location, working efficiency, and heat loss of the air conditioners in the building into an air conditioning file. In order to build an activity model, it is necessary to retrieve the historical data of each air conditioner in the control area, based on the historical data and the activity patterns of the people in the building. After the above information is determined, the air conditioning optimization route is determined based on the activity model combined with the air conditioning file. The differences in the environmental parameters inside and outside the building are analyzed in real time, and the power load of the building over a period of time is inferred in combination with the thermal insulation and the optimization route. The optimization route is adjusted based on the principle of avoiding concentrated power consumption and satisfying the comfort of most people.

[0026] In this application, by accurately analyzing and investigating the air conditioners and combining them with historical data, it is ultimately possible to accurately analyze the air conditioning load in the control area in the future, which can effectively avoid the concentration of electricity consumption and the impact on the stability of the power grid, reduce energy consumption, and ensure user comfort.

[0027] Central air conditioners have great control potential. The load group composed of multiple central air conditioners has large-scale control capabilities and can provide a variety of auxiliary services for the power grid. In recent years, central air conditioners have been widely used. Affected by seasonal air conditioning power load, the power load of each power grid has increased rapidly year by year, resulting in increased pressure on the safe operation of the power grid. Reasonable scheduling of central air conditioner load groups is conducive to alleviating the contradiction of power supply shortage and optimizing the way of electricity use, which has far-reaching significance for achieving optimal allocation of power resources and sustainable development.

[0028] With the development of society, the problem of energy resource shortage is becoming more and more serious. Electricity consumption by urban and rural residents and the tertiary industry is an important part of the country's electricity consumption. Among them, air conditioning, as an indispensable part of daily life and industrial production, accounts for a quarter of people's daily electricity consumption. During the peak period of summer, it accounts for nearly half. Among the flexible loads of large buildings, air conditioning load accounts for 50%-60% of the total electricity consumption.

[0029] Current air conditioners waste power and have serious energy consumption. When the temperature drops or rises significantly late at night, people are already asleep and cannot get up to turn off the air conditioner, resulting in a waste of power. When the indoor temperature drops to a certain level, the air conditioner cannot automatically adjust the power. In summer, it is impossible to detect the temperature difference between indoor and outdoor. When the outdoor temperature is lower than the indoor temperature, the air conditioner is still in operation, resulting in a waste of power. After the air conditioner is turned off, the indoor temperature can often be maintained for a period of time. For users who use air conditioners at night, many users turn off the air conditioner when they get up in the morning, failing to make reasonable use of this time and resulting in a waste of power.

[0030] For areas where the power supply of the power grid is tight, the power supply of the city electricity in the area is often restricted. In the case of limiting the power supply of the city electricity, if the user does not adjust the operation mode of the air conditioner in time, the stable operation of the air conditioner will be affected.

[0031] In some embodiments of the air conditioning load prediction and optimization method provided in the present application, determining the construction specifications and thermal insulation of each building in the control area includes: analyzing the heat exchange conditions and efficiency between each building in the control area and the surrounding environment based on construction information and related construction data and in combination with the location of each building and the influence of the location of surrounding structures.

[0032] As a symbol of modern civilization, air conditioners have entered our lives and are mainly installed in ordinary homes, offices, office buildings, shops, shopping malls, leisure and entertainment, factories, etc. While air conditioners bring us comfort and convenience, they also consume a lot of money and energy from the country, society, and users every year. According to a large number of surveys, the biggest waste of air conditioners is caused by: the air conditioner works continuously for too long, the interval downtime is short, and the air conditioner working temperature is set too high or too low.

[0033] Conventional unit-type air conditioners are turned on and off and the setting of the working temperature is achieved through manual remote control or buttons, which is greatly affected by the behavior of the user. It is difficult to ensure that the opening time and indoor temperature meet the requirements of relevant standards. At the same time, there are problems such as the air conditioner being turned on when a large number of people leave and the temperature set for the air conditioner being too low or too high. In response to this problem, a small number of air conditioner automatic controllers have appeared on the market, which automatically control the switching of the air conditioner and the adjustment of the temperature. However, this type of air conditioner automatic controller has the defect of not being able to truly control intelligently. For example, the existing air conditioner automatic controller cannot detect the current state of the air conditioner, and can only control the air conditioner in a one-way open loop according to its preset mode. Since most air conditioners use the same command to turn on and off, the air conditioner reverses the current state after receiving the command, that is, if the current state of the air conditioner is standby or off, the air conditioner is turned on after receiving the command, and vice versa. However, since the existing air conditioner automatic controller cannot detect the state of the air conditioner, if the current air conditioner is in standby state through manual control, the shutdown command sent by the air conditioner automatic controller will cause the air conditioner to turn on, resulting in abnormal control. Manual control is also prone to forgetting to turn off the air conditioner, or improperly adjusting the working temperature of the air conditioner, resulting in a waste of resources.

[0034] In some embodiments of the air conditioning load prediction and optimization method provided in the present application, the installation method, installation location, working efficiency, and heat loss of the air conditioners in the building are summarized and organized into air conditioning files including: During the operation of the air conditioner, the changes in temperature and humidity in the building are determined in real time, and the temperature control coverage of the air conditioner in the building is clarified.

[0035] Determine the operating status of each component of the air conditioner, and realize remote data reading and control of the air conditioner by installing control components.

[0036] At present, in order to adjust the indoor temperature, air conditioners are installed in buildings. The existing practice is to manually turn on or off the air conditioner through a remote control or mobile phone according to the current external environment and indoor temperature. The ultimate goal is to adjust the indoor temperature and other parameters to a suitable level through the operation of the air conditioner. Although the above approach seems reasonable, when the external temperature in an area is generally too high or too low, in order to meet the comfort requirements, more users in the area will turn on the air conditioner to achieve cooling or heating.

[0037] However, the above approach will lead to peak electricity consumption, that is, users consume electricity in a concentrated manner within a period of time, causing the power supply of the power grid to be tight or even unable to meet electricity demand, and concentrated electricity consumption will have a great impact on the stability of the power grid.

[0038] In some embodiments of the air conditioning load prediction and optimization method provided in the present application, retrieving historical data of each air conditioner in the control area includes: The temperature values ​​at various locations in the building under different external environments are summarized from historical data, and the power consumption in different time periods and the total power load in the control area at that time are determined.

[0039] It should be pointed out that, although the user can meet the comfort requirements by turning the air conditioner on and off by himself, the air conditioner parameters set by the user may far exceed the comfort requirements, that is, the temperature and air volume set by the user may deviate from the parameter settings under the optimal energy saving. More importantly, the current air conditioner needs to be turned on and off manually. In an embodiment, as the range of human activities changes, some areas in the building are no longer occupied by people, but at this time the air conditioner cannot be turned off in time due to reasons such as forgetting to operate.

[0040] All of the above situations are the reasons for the high power consumption of air conditioners. If the air conditioner usage parameters of each user can be set to the best energy saving and meet the comfort requirements, and some air conditioners can be turned on or off in time according to the activities of the personnel, the energy consumption can be effectively reduced. Because the power consumption of air conditioners of each user is reduced to a certain extent, the power consumption of the whole society will be reduced, and the concentration of peak power consumption will be reduced.

[0041] In some embodiments of the air conditioning load prediction and optimization method provided in the present application, constructing an activity model for users in a building according to historical data and the activity patterns of people in the building includes: Determine the location and activity range of people in the building in real time, and determine the changes in the location of people throughout the day.

[0042] Summarize the changes and provide data reference for the activity model.

[0043] The ultimate goal of this application is to be able to realize automatic control of the air conditioner by a host computer or related system according to the current environmental conditions, combined with the density of people and different comfort requirements. Through the above settings, there is no need to manually turn on or off the air conditioner, and there is no need to adjust the air conditioner operating parameters multiple times, and the air conditioner that does not need to be turned on can be turned off in time, ultimately reducing energy consumption.

[0044] In order to achieve the above technical effects, it is necessary to use the coordination of multiple sensors to determine the parameters of the external environment such as the light angle, light intensity, temperature, humidity, wind speed and wind direction. After the above conditions are determined, it is necessary to determine the thermal insulation of the building and the heat exchange coefficient with the surrounding environment. At the same time, it is necessary to determine the parameters such as the light angle, light intensity, temperature, humidity, wind speed and wind direction in various parts of the current building. For the air conditioner itself, it is mainly necessary to determine the impact on the temperature of various parts of the building.

[0045] When the above situation is determined, the determined information needs to be transmitted to the air conditioning load model for corresponding subsequent control.

[0046] In some embodiments of the air conditioning load prediction and optimization method provided in the present application, determining the air conditioning optimization route according to the activity model combined with the air conditioning file includes: When there is no concentrated electricity consumption, the startup and operation parameters of the air conditioner are determined based on the principle of satisfying the comfort of everyone and the standard of achieving the lowest energy consumption.

[0047] When concentrated electricity consumption is expected, the operating hours and parameters of the air conditioner are adjusted based on the principle of meeting the comfort of most people.

[0048] It should be pointed out that the main purpose of installing an air conditioner is to meet the comfort requirements of people and to ensure the normal operation of the equipment. The equipment usually does not change significantly due to its location, and usually meets the normal use conditions of the equipment and does not deviate significantly from the environmental conditions required by the equipment. Therefore, in this application, the main purpose is to meet the requirements of human comfort to achieve the adjustment and control of the air conditioner.

[0049] To do this, it is necessary to determine the locations of all people in the building and their current activity areas. For buildings with a constant flow of people, it is necessary to determine the range of people's activities and possible locations based on historical data.

[0050] In an embodiment, a person can be identified by a camera and the spatial position of the person can be inferred based on the location where the camera is installed, and the position of the person relative to the building can be determined in real time based on other devices such as mobile phones and other positioning devices.

[0051] In some embodiments of the air conditioning load prediction and optimization method provided in the present application, determining the air conditioning optimization route according to the activity model combined with the air conditioning file includes: Based on the principle of satisfying the user's comfort for most of the day, the area range that requires temperature regulation in the building is determined, and the operating parameters of the air conditioner are determined based on this range.

[0052] The main purpose of turning on the air conditioner is to ensure human comfort. Existing air conditioners mostly achieve indoor temperature conditions by circulating indoor air for heating or cooling. There is a temperature difference between the temperature of the air blown out from the air conditioner and the temperature of the indoor environment. It is because of this temperature difference that the indoor temperature gradually decreases or increases.

[0053] The main purpose of this application is to create an air-conditioning load model, and determine the location of people and the corresponding activity area through this model and the calculation of the host computer. After the above situation is determined, the host computer sets the air-conditioning parameters and the position and air volume of the air outlet based on economy and human comfort. The ultimate goal is to have the system automatically turn on and off the air-conditioning, and be able to adjust the parameters according to changes in the external environment.

[0054] Based on this, the present application needs to determine the location of all people in the building and infer their approximate activity area, and then the system controls the air conditioning based on the principle of satisfying comfort.

[0055] In some embodiments of the air conditioning load prediction and optimization method provided in the present application, real-time analysis of differences in environmental parameters inside and outside the building includes: Determine the temperature difference between inside and outside the building in real time, and analyze the impact of light and wind outside the building on the building; Based on the analysis results and the data feedback from relevant departments, it is speculated that the changes in heat in the building will occur in the future.

[0056] In order to realize automatic control of air conditioning, it is first necessary to create a three-dimensional body that proportionally restores the building in the host computer, mark the installation position of the air conditioner and the direction of the air duct in the three-dimensional body, and then simulate the detected external environment parameters such as temperature in the three-dimensional body.

[0057] In order to improve the referenceability, before determining the thermal conductivity and thermal insulation of each material in the three-dimensional body, the actual collected temperature and temperature change trend can be used to simulate the same thermal conductivity situation in the three-dimensional body. Ultimately, the heat transfer efficiency in the three-dimensional body is the same as the actual one, and the wind exhausted by the air conditioner has the same direction and volume as the wind simulated in the three-dimensional body.

[0058] In some embodiments of the air conditioning load prediction and optimization method provided in this application, the power load of the building in a period of time is inferred by combining thermal insulation and optimization route, including: Estimate the electricity consumption of each air conditioner in the regulated area in the future, as well as the coverage range in the building.

[0059] After the three-dimensional body is created, the corresponding comfort curve is set according to the different uses of the building. The comfort curve indicates the corresponding temperature and humidity that can achieve comfort in the building under a certain external environment temperature and humidity, which is also the final adjustment target of the air conditioner.

[0060] At this time, the host computer, that is, the relevant monitoring system, monitors the external environment and the indoor environment in real time. When the changing trend of the external environment cannot meet the indoor and comfort requirements, the position of people in the building and possible activity areas are first determined. After the above situation is determined, the system calculates the time and parameters for starting the air conditioner. The final result is to adjust the environment in the building to the standard indicated by the comfort curve.

[0061] In some embodiments of the air conditioning load prediction and optimization method provided in the present application, based on the principle of avoiding concentrated electricity consumption and satisfying the comfort of most people, the optimization route is adjusted including: According to the installation location and activity model of the air conditioner, determine the impact range of the air conditioning parameter adjustment and the impact on the comfort of each activity model.

[0062] An embodiment is that if the outside temperature gradually rises and the light intensity gradually increases, the system can selectively turn on the air conditioning in some areas while ensuring the comfort of people in the building, simulate the change of indoor temperature after turning on the air conditioning in the above areas in the three-dimensional body, and calculate that after a period of time, it is necessary to ensure that the areas where people may move in the three-dimensional body can meet the comfort requirements, and then control and adjust the actual air conditioning in a simulated air conditioning opening manner.

[0063] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. Air conditioning load prediction and optimization method, characterized in that: include: Determine the construction specifications and thermal insulation of each building in the control area, and summarize the installation method, installation location, working efficiency, and heat loss of the air conditioners in the buildings into air conditioner files; Retrieving historical data of each of the air conditioners in the control area, and constructing an activity model for users in the building according to the historical data and the activity patterns of people in the building; Determine the air conditioning optimization route according to the activity model and the air conditioning file; Analyze the difference between the environmental parameters inside and outside the building in real time, and infer the power load of the building over a period of time by combining the thermal insulation and the optimized route; The optimization route is adjusted based on the principles of avoiding concentrated electricity consumption and satisfying the comfort of the majority of people.

2. The air conditioning load prediction and optimization method according to claim 1, characterized in that: Determining the construction specifications and thermal insulation of each building in the control area includes: analyzing the heat exchange conditions and efficiency between each building in the control area and the surrounding environment based on construction materials and related construction data and in combination with the location of each building and the influence of the location of surrounding structures.

3. The air conditioning load prediction and optimization method according to claim 1, characterized in that: The installation method, installation location, working efficiency and heat loss of the air conditioners in the building are summarized and organized into air conditioner files including: During the operation of the air conditioner, the temperature and humidity changes in the building are determined in real time, and the temperature control coverage of the air conditioner in the building is clarified; Determine the operating conditions of the various components of the air conditioner, and realize remote data reading and control of the air conditioner by installing a control component.

4. The air conditioning load prediction and optimization method according to claim 1, characterized in that: The retrieving the historical data of each air conditioner in the control area includes: The temperature values ​​of various places in the building under different external environments are summarized from the historical data to determine the power consumption in different time periods and the total power load in the control area at that time.

5. The air conditioning load prediction and optimization method according to claim 1, characterized in that: The constructing an activity model for users in the building according to the historical data and the activity patterns of people in the building comprises: Determine the location and activity range of people in the building in real time, and determine the changes in the location of people throughout the day; The changes are summarized and summarized to provide data reference for the activity model.

6. The air conditioning load prediction and optimization method according to claim 5, characterized in that: Determining the air conditioning optimization route according to the activity model and the air conditioning file includes: When there is no concentrated power consumption, the startup status and operating parameters of the air conditioner are determined based on the principle of satisfying the comfort of all persons and the standard of achieving the lowest energy consumption; When concentrated electricity consumption is estimated, the operating time and parameters of the air conditioner are adjusted based on the principle of satisfying the comfort of most people.

7. The air conditioning load prediction and optimization method according to claim 5, characterized in that: Determining the air conditioning optimization route according to the activity model and the air conditioning file includes: Based on the principle of satisfying the comfort of users during most of the day, the area range of the building requiring temperature regulation is determined, and the operating parameters of the air conditioner are determined based on the range.

8. The air conditioning load prediction and optimization method according to claim 1, characterized in that: The real-time analysis of the difference between the internal and external environmental parameters of the building includes: Determine the temperature difference between the inside and outside of the building in real time, and analyze the impact of light and wind outside the building on the building; Based on the analysis results and the data fed back by relevant departments, it is inferred that the heat changes in the building will occur in the future.

9. The air conditioning load prediction and optimization method according to claim 1, characterized in that: The power load of the building in a period of time inferred by combining the thermal insulation and the optimization route includes: Estimate the power consumption of each air conditioner in the control area in the future and the coverage range in the building.

10. The air conditioning load prediction and optimization method according to claim 1, characterized in that: Based on the principle of avoiding concentrated electricity consumption and satisfying the comfort of the majority of people, the optimization route is adjusted as follows: According to the installation position of the air conditioner and the activity model, the influence range of the adjusted air conditioner parameters and the influence on the comfort of each activity model are determined.