Steel crane beam load determination method and device, equipment and storage medium

By measuring the random variable data of cranes in industrial plants and simulating them, the load distribution of steel crane beams is solved, and the problems of cumbersomeness and poor representation of traditional testing methods are achieved, and more accurate load analysis is achieved.

CN119004878AInactive Publication Date: 2024-11-22UNIV OF SCI & TECH BEIJING
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411499105.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional on-site stress-strain test work is cumbersome, and the historical load and future load of steel crane beams are poorly represented, and they are incomplete in time and space.

Method used

The random variable data of the crane is measured by the industrial plant production system layout, random material handling simulation is performed, and the stress history curve is obtained. Based on this, the load distribution data of steel crane beams is determined, and numerical simulation method is used instead of cumbersome on-site testing.

Benefits of technology

It improves the spatial and temporal integrity of load distribution data, is suitable for the design and planning of existing buildings and new buildings, and reduces the cumbersomeness of testing work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119004878A_ABST
    Figure CN119004878A_ABST
Patent Text Reader

Abstract

The invention discloses a steel crane beam load determination method, device and equipment and a storage medium, and relates to the technical field of cranes, the method comprises the following steps: carrying out variable measurement on a crane according to a production system layout of an industrial factory building to obtain random variable data corresponding to the crane; carrying out random material carrying simulation on the crane according to the random variable data to obtain carrying simulation data of the crane; carrying out stress measurement on the carrying simulation data to obtain a stress course curve of the steel crane beam on which the crane is positioned; and determining load distribution data of the steel crane beam based on the stress course curve. According to the method, numerical simulation is carried out on the crane by taking the layout of the production system of the industrial factory building as a constraint to determine the load distribution data of the steel crane beam of the crane, so that the condition that the traditional field stress one-by-one strain test work is too complicated is avoided, the space-time completeness of the load distribution data is improved through simulation, and the test efficiency is improved. The method is suitable for design planning of existing buildings and newly-built buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of crane technology, and in particular to a method, device, equipment and storage medium for determining the load of a steel crane beam. Background Art

[0002] Cranes are one of the important equipment in the logistics handling system of industrial plants, used to realize the three-dimensional transportation of items in the plant. Among them, steel crane beams, as equipment that directly bears the operation of cranes, are prone to cyclic loads and fatigue damage. As for the standards, specifications, and guidelines for the steel structure design of steel cranes, both domestic and foreign countries have stipulated the fatigue performance verification methods of steel crane beams, and also stipulated the fatigue performance verification methods of steel crane beams. Practice has proved that these regulations have largely guaranteed industrial production safety and avoided catastrophic fatigue fracture accidents.

[0003] For fatigue performance evaluation of steel crane beams, the traditional method is generally to evaluate the fatigue life of steel crane beams by using fatigue load spectra measured on site. However, this method requires tedious on-site stress-strain testing, and because it is an on-site test, the representativeness of historical loads and future loads will become poor, and it has temporal and spatial incompleteness.

[0004] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention

[0005] The main purpose of this application is to provide a method, device, equipment and storage medium for determining the load of a steel crane beam, aiming to solve the technical problems that traditional on-site stress-strain testing is too cumbersome, has poor representativeness of historical loads and future loads, and has temporal and spatial incompleteness.

[0006] To achieve the above objectives, the present application proposes a method for determining the load of a steel crane beam, the method comprising: Variable measurement is performed on the crane according to the production system layout of the industrial plant to obtain random variable data corresponding to the crane; Performing random material handling simulation on the crane according to the random variable data to obtain handling simulation data of the crane; Performing stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located; Based on the stress history curve, load distribution data of the steel crane beam is determined.

[0007] In one embodiment, the step of measuring the variables of the crane according to the production system layout of the industrial plant to obtain the random variable data corresponding to the crane includes: Get the production system layout of industrial plants; Determine the handling task flow of each crane in the industrial plant according to the production system layout; Variables of the handling task process are measured to obtain random variable data of the crane.

[0008] In one embodiment, the random variable data includes an operation time variable, a random position variable and a variable distribution, and the step of performing variable measurement on the handling task process to obtain the random variable data of the crane includes: Performing operation measurement on the crane according to the handling task process to obtain the operation time variable and random position variable of the crane; Count the variable distributions of the operation time variable and the random position variable.

[0009] In one embodiment, the handling simulation data includes the position and lifting weight of the crane; the step of performing random material handling simulation on the crane according to the random variable data to obtain the handling simulation data of the crane includes: Taking the random variable data as constraints, a random load model is constructed through a preset logistics simulation software; Performing random material handling simulation by Monte Carlo method according to the random load model to obtain the position and lifting weight of the crane; Correspondingly, the step of performing stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located includes: Stress measurements are performed on the position and the hoisting weight to obtain a stress history curve of the steel crane beam where the crane is located.

[0010] In one embodiment, the step of measuring the stress of the position and the hoisting weight to obtain the stress history curve of the steel crane beam where the crane is located includes: Determining the stress influence line of the steel crane beam on which the crane is located; The stress of the lower flange at the mid-span of the steel crane beam is measured according to the stress influence line, the position and the hoisting weight to obtain a stress history curve of the steel crane beam.

[0011] In one embodiment, the load distribution data includes a load spectrum; the step of determining the load distribution data of the steel crane beam based on the stress history curve includes: Analyzing the stress history curve of the steel crane beam by the rain flow method to obtain the equivalent coefficient of the underload effect of the steel crane beam; According to the equivalent coefficient of the underload effect, the load spectrum of each steel crane beam in the industrial plant is determined.

[0012] In addition, to achieve the above-mentioned purpose, the present application also proposes a steel crane beam load determination device, the device comprising: A variable determination module, used to perform variable determination on the crane according to the production system layout of the industrial plant, and obtain random variable data corresponding to the crane; A random simulation module, used for performing random material handling simulation on the crane according to the random variable data to obtain handling simulation data of the crane; A stress measurement module, used to perform stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located; A load distribution module is used to determine the load distribution data of the steel crane beam based on the stress history curve.

[0013] In addition, to achieve the above-mentioned purpose, the present application also proposes a steel crane beam load determination device, which includes: a memory, a processor, and a computer program stored on the memory and executable on the processor, and the computer program is configured to implement the steps of the steel crane beam load determination method as described above.

[0014] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by the processor, the steps of the method for determining the load of a steel crane beam as described above are implemented.

[0015] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the steps of the method for determining the load of a steel crane beam as described above are implemented.

[0016] One or more technical solutions proposed in this application have at least the following technical effects: this application first measures the variables of the crane according to the production system layout of the industrial plant to obtain the random variable data corresponding to the crane; then performs random material handling simulation on the crane according to the random variable data to obtain the handling simulation data of the crane; then performs stress measurement on the handling simulation data to obtain the stress history curve of the steel crane beam where the crane is located; finally, based on the stress history curve, the load distribution data of the steel crane beam is determined. Since this application uses the production system layout of the industrial plant as a constraint, numerical simulation is performed on the crane to determine the load distribution data of the steel crane beam of the crane, thus avoiding the overly cumbersome traditional on-site stress-strain testing work, thereby improving the spatiotemporal completeness of the load distribution data through simulation, which is applicable to both existing buildings and the design and planning of new buildings. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0019] Figure 1 A schematic diagram of a flow chart provided for Embodiment 1 of the method for determining the load of a steel crane beam of the present application; Figure 2 A schematic diagram of a flow chart provided for Embodiment 2 of the method for determining the load of a steel crane beam of the present application; Figure 3 A schematic diagram of a fatigue assessment process for a newly constructed steel crane beam and an existing steel crane beam provided in Example 2 of the present application; Figure 4 A schematic diagram of the production process layout of a steelmaking and casting production plant provided in Example 2 of the present application; Figure 5 A schematic diagram of the wheel arrangement of a crane provided in Example 2 of the present application; Figure 6 (a) shows Figure 2 Stress history curve of A column / 5-6 crane beam in the middle AB span during a production cycle; Figure 6(b) shows Figure 2 The stress history curve of the A column / 6-7 crane beam in the middle AB span during a production cycle; Figure 6(c) shows Figure 2 The stress history curve of the A column / 7-7-1 crane beam in the middle AB span during a production cycle; Figure 6(d) Figure 2 The stress history curve of the A column / 8-8-1 crane beam in the middle AB span during a production cycle; Figure 6(e) shows Figure 2 The stress history curve of the A column / 9-9-1 crane beam in the middle AB span during a production cycle; Figure 6(f) shows Figure 2 The stress history curve of the A column / 10-11 crane beam in the middle AB span during a production cycle; Figure 7 This is a schematic diagram of the module structure of the device for determining the load of a steel crane beam according to an embodiment of the present application; Figure 8 Schematic diagram of the equipment structure of the hardware operating environment involved in the method for determining the load of a steel crane beam in an embodiment of the present application.

[0020] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0021] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0022] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0023] Relevant research shows that there are three reasons for the frequent fatigue problems of steel crane beams. The first is the wide use of variable-section supports of steel crane beams, but the lack of knowledge about their fatigue performance; the second is that there is no verification method for the neck effect (fatigue cracking of the weld connecting the upper flange and the web of the steel crane beam under local wheel pressure) in the relevant standards; the third is the improvement in production efficiency, which leads to the actual number of fatigue load actions on steel crane beams far exceeding the original design level (such as converter steelmaking replacing open-hearth steelmaking, and continuous casting technology replacing primary rolling technology, which has led to a significant increase in production efficiency, and the actual number of fatigue load actions on steel crane beams is far greater than the original design level). In actual projects, the uncertainty of fatigue loads on steel crane beams is often much greater than the randomness of the resistance of welded nodes of steel crane beams, which is the main reason for the premature fatigue damage failure of steel crane beams. It can be seen that obtaining the fatigue load of steel crane beams through testing or calculation methods is of great significance for their safety assessment.

[0024] Among them, the fatigue load of steel crane beams comes from the production operation of cranes, and the operation of cranes is constrained by production processes and production tasks. Therefore, the fatigue loads of steel crane beams in different industrial plants are obviously different, and even the fatigue loads of steel crane beams at different locations in the same plant will have significant individual differences. The existing methods either calculate the equivalent fatigue load of steel crane beams based on relatively uniform reference values; or obtain the fatigue load of specific steel crane beams by field measurements. However, the former ignores the individual differences between the fatigue loads of steel crane beams. Although the latter can obtain the current fatigue load of steel crane beams more accurately, and the longer the test time, the more representative it is for the heavy use of steel crane beams in the current production mode, this method can only obtain the fatigue load of the tested steel crane beam, and is not representative of other individuals. When the production process changes or the production task is unstable, the representativeness of the measured fatigue load for historical loads and future loads will become poor, or even unrepresentative.

[0025] The methods for obtaining fatigue loads of steel crane beams recommended in various standards are all closely linked to one foundation, that is, the fatigue loads of steel crane beams are derived from the operation of cranes in specific industrial environments. These methods first estimate the heavy use of cranes (including the number of load cycles and full load rate) based on production processes and target output, and classify the cranes into whole machine working levels; then predict the fatigue loads of steel crane beams based on the overall working level of the crane. The former crane equipment has its own lifting weight monitoring function, which can directly reflect the heavy use, so the prediction of the heavy use of cranes under various production processes and target output conditions has a large amount of data support, which also makes the classification of the whole machine working level more accurate. However, the latter steel crane beam does not have fatigue load monitoring function, so the supporting data of the prediction method is relatively scarce; in addition, the single variable of the whole machine working level of the crane simplifies the internal connection mechanism between the fatigue load source and the heavy use of steel crane beams, and ignores the constraint effect of factors such as production process on crane operation, which makes the prediction accuracy of this method poor, especially it is difficult to characterize the individual differences between fatigue loads of different steel crane beams, such as different steel crane beams under the action of the same crane in the span. Therefore, the unreasonable value of the equivalent coefficient of underload effect based on the working level of the whole crane is one of the important reasons for the frequent failure of steel crane beams. In order to avoid this problem, the "Industrial Building Reliability Appraisal Standard" recommends that the fatigue load spectrum measured on site be used to evaluate the fatigue life of steel crane beams. However, the fatigue load data obtained by this method also has temporal and spatial incompleteness. The additional safety factor of the remaining life assessment caused by the incompleteness can be as high as 3.0.

[0026] In view of the defects or shortcomings of the above-mentioned existing methods for obtaining fatigue loads of steel crane beams, the present application proposes a method for obtaining group fatigue loads of steel crane beams in industrial buildings with production process constraints. This method is based on the objective fact that the fatigue load of steel crane beams comes from the operation of cranes, and the operation of cranes in industrial plants has obvious production process constraints and will not produce a large number of movements unrelated to production. Based on the design concept of industrial production logistics, the random movement of cranes is discretized into a series of random events related to production, thereby establishing a method for determining the loads of steel crane beams in industrial buildings. This method does not require tedious on-site stress-strain testing, but directly obtains the fatigue loads of all steel crane beams in industrial buildings through numerical simulation methods. It is not only applicable to existing buildings, but also to the design and planning of new buildings.

[0027] It should be noted that the execution subject of this embodiment can be a computing service device with random variable measurement, random material handling simulation and load determination functions, such as an industrial computer, a server, etc., or an electronic device capable of realizing the above functions, a steel crane beam load determination device (hereinafter referred to as determination device) that executes the steel crane beam load determination method of this application, etc., and this embodiment does not limit this. The following takes the determination device as an example to illustrate this embodiment and the following embodiments.

[0028] Based on this, the present application embodiment provides a method for determining the load of a steel crane beam, referring to Figure 1 , Figure 1 A schematic flow chart of the first embodiment of the method for determining the load of a steel crane beam of the present application.

[0029] In order to more conveniently obtain the group fatigue load spectrum of steel crane beams in industrial buildings and avoid tedious on-site testing, this embodiment proposes a method for obtaining the group fatigue load of steel crane beams constrained by production process. This method discretizes the random motion of the crane into a series of random events related to the production process, and combines it with the industrial logistics design concept to determine the load distribution data of the steel crane beam.

[0030] In this embodiment, the method for determining the load of a steel crane beam includes steps S10 to S40: Step S10: Variables of the crane are measured according to the production system layout of the industrial plant to obtain random variable data corresponding to the crane.

[0031] It should be noted that the production system layout is the planning and arrangement of various elements used for production in an industrial plant to form an effective production operation system.

[0032] Exemplarily, the production system layout may include the layout of production equipment, processing stations, material handling routes, handling task processes, storage areas, personnel workspaces, etc., which are not limited in this embodiment.

[0033] It should be noted that a crane is a mechanical device used to lift heavy objects. By lifting heavy objects and moving, loading and unloading them through devices such as crane arms, wire ropes or chains, it can improve work efficiency and reduce labor intensity.

[0034] The steel crane beam is a structure used to carry the load of the crane operation and lifting. The crane runs on the steel crane beam, which provides support and guidance for the crane, bears the weight of the crane and various forces generated when lifting heavy objects, and ensures that the crane can safely and stably carry out operations such as material lifting. It can be said that the steel crane beam is an important load-bearing component used in conjunction with the crane.

[0035] It should be noted that the random variable data is the data obtained by measuring the variables of the crane according to the production system layout of the industrial plant. Because the fatigue load of the steel crane beam comes from the operation of the crane in a specific industrial environment, and the operation of the crane contains a lot of randomness (for example, different production processes and target outputs, the use of the crane is also different), therefore, the crane can be measured for variables, and the random variable data of the crane can be measured as a constraint to improve the accuracy of the fatigue load of the steel crane beam.

[0036] Exemplarily, the random variable data may include the operation time, operation position, time distribution, position distribution and other random variable data of the crane, which is not limited in this embodiment.

[0037] In one embodiment, the determination device can measure the variables of the crane according to the production system layout of the industrial plant, such as layout data such as processing stations, material handling routes, and handling task processes, and obtain random variable data corresponding to the crane, such as the crane's operating time, operating position, time distribution, position distribution, and other random variables, which can be used as constraints to improve the accuracy of obtaining the fatigue load of the steel crane beam.

[0038] Step S20: performing random material handling simulation on the crane according to the random variable data to obtain handling simulation data of the crane.

[0039] It should be noted that the handling simulation data is data corresponding to random material handling events generated by simulating the crane's handling process based on random variable data.

[0040] It should be noted that the handling simulation process can be simulated based on logistics simulation software, such as Flexsim software (a discrete event system simulation software), through which the crane handling, manufacturing, logistics, warehousing, etc. can be modeled and simulated. Other logistics simulation software may also be used, and this embodiment does not limit this.

[0041] Exemplarily, the handling simulation data may include data such as the operating time, operating position, operating power, and lifting weight of a crane when performing handling in an industrial plant, and this embodiment is not limited to this.

[0042] The reason why this embodiment measures the variables of the crane based on the production system layout is that the industrial production logistics design concept is based on the production system design. The goal of the production system design is to minimize the transportation cost of materials in the industrial plant and maximize the utilization of resources such as space, equipment, and personnel.

[0043] In order to achieve low carbon, environmental protection, energy saving and other requirements, the production operation mode of industrial plants or crane operation scheduling is no longer a highly random process, which is specifically reflected in the following two aspects.

[0044] On the one hand, the operation process of many industrial plants (including crane operation process) has been optimized and a production logistics scheduling system has been established. For example, the No. 2 hot-rolled slab warehouse of Wuhan Iron and Steel Co., Ltd. uses this logistics scheduling system. Each billet is marked with a number when it enters the warehouse. The scheduling system arranges the entry and exit of the warehouse reasonably according to the number and management method, thereby greatly improving production efficiency. In addition, some industrial plants have realized unmanned crane driving, such as Baosteel 1580 Plant.

[0045] This unmanned system records the scheduling data of production materials in detail (including the operation route of the crane, the weight of the materials, etc.). After obtaining these logistics scheduling data, more accurate fatigue load data of steel crane beams can be calculated.

[0046] On the other hand, as a member of the material handling system, the crane's main handling task process has been determined when the production system is designed. For a specific production system, the crane's transportation method is constrained by the production system, and the crane will not have significant or large movements that are not related to production. Therefore, by establishing logistics transportation constrained by the production process, the random movement of the crane can be realized, thereby approximately obtaining the group load distribution characteristics of each steel crane beam.

[0047] Similarly, the industrial production logistics design concept believes that the material transportation in the industrial plant is a random combination of a series of discrete events, and Flexsim software provides a platform for this discrete event process simulation. It has a complete C++ object-oriented programming model and provides a rich entity type, such as generators, temporary storage areas, processors, synthesizers, separators, cranes, etc., which provide basic classes for simulating various industrial equipment operations. All types of entities provide secondary development interfaces, which provide basic conditions for users to simulate various production processes. In this embodiment, when simulating the random material handling of the crane, a random load model of the industrial plant can be established. For example, synthesizers and separators can be used to simulate the synthesis and separation of materials; cranes and task executors can be used to simulate the material handling process; network nodes can be used to simulate transportation tracks, etc. Through the secondary development control model, the entry, exit, transfer, unloading and other triggering event reactions of each entity in the model are realized, and the random movement of the crane under the constraints of the actual production process is realized, thereby obtaining the random fatigue load of each steel crane beam in the plant.

[0048] In one embodiment, the determination device can perform simulation based on the random variable data and logistics simulation software. Specifically, when performing random material handling simulation on a crane, a random load model of an industrial plant can be established through Flexsim software to model and simulate the handling, manufacturing, logistics, warehousing, etc. of the crane. The random movement of the crane is realized under the constraints of the actual production process, thereby obtaining the handling simulation data of each steel crane beam in the plant.

[0049] Step S30: performing stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located.

[0050] It should be noted that the stress history curve is a curve that reflects the change of stress that the steel crane beam is borne during operation over time.

[0051] At different time points, the stress generated inside the steel crane beam is constantly changing due to different loads and actions. These stress values ​​are recorded and plotted in chronological order to form a stress history curve. By analyzing this curve, the stress state of the steel crane beam at different stages can be displayed to determine the load of the steel crane beam.

[0052] In one embodiment, the determination device can determine the stress influence line of a representative position of the steel crane beam (such as the mid-span lower flange or other verification points) according to structural mechanics, and then calculate the mid-span lower flange stress history curve of each beam based on the stress influence line.

[0053] Step S40: Determine the load distribution data of the steel crane beam based on the stress history curve.

[0054] It should be noted that the load distribution data is the relevant data information about the specific distribution of various loads borne by the steel crane beam in the length, width and other directions. The load distribution data describes the specific values ​​of the size, direction and other loads of the steel crane beam at different positions. The load distribution data can accurately understand the stress state of each part of the steel crane beam, so as to accurately determine the bearing capacity of the steel crane beam under different loads, which is of great significance for the effective arrangement and inspection of the steel crane beam.

[0055] Exemplarily, the load distribution data may include the moving load of the crane (such as the wheel pressure of the crane), the deadweight of the crane beam, etc., which is not limited in this embodiment.

[0056] In this embodiment, the determination device can interpret specific rules according to the shape of the curve (such as the rain flow method) to extract the complex stress cycles in the stress history curve, such as determining how many stress cycles of different sizes and types there are, and then extract simple stress data, so as to comprehensively obtain the load distribution data of all steel crane beams in the entire factory.

[0057] This embodiment provides a steel crane beam load determination. The determination device can first determine the variables of the crane according to the production system layout of the industrial plant, such as the layout data of the processing station, material handling route, and handling task flow, and obtain the random variable data corresponding to the crane, such as the operation time, operation position, time distribution, position distribution and other random variables of the crane, so that this can be used as a constraint to improve the acquisition accuracy of the fatigue load of the steel crane beam. Then, according to the random variable data, simulation is performed based on the logistics simulation software. Specifically, when the random material handling simulation of the crane is performed, the random load model of the industrial plant can be established through the Flexsim software, and the handling, manufacturing, logistics, warehousing, etc. of the crane can be modeled and simulated. The random movement of the crane is realized under the constraints of the actual production process, so as to obtain the handling simulation data of each steel crane beam in the plant. Then, the stress influence line of the representative part of the steel crane beam (such as the mid-span lower flange or other verification points) can be determined according to structural mechanics, and the mid-span lower flange stress history curve of each beam can be calculated according to the stress influence line. Finally, according to the shape of the curve, a specific rule interpretation (such as the rain flow method) is performed to extract the complex stress cycle in the stress history curve, such as determining how many stress cycles of different sizes and types there are, and then extracting simple stress data, so as to comprehensively obtain the load distribution data of all steel crane beams in the entire plant. Since this embodiment takes into account the objective fact that the operation of the crane in the industrial plant has obvious production process constraints and will not produce a large number of production-irrelevant movements, based on the industrial production logistics design concept, the random movement of the crane is discretized into a series of production-related random events, so that the production system layout of the industrial plant is constrained, and the crane is numerically simulated to determine the load distribution data of the steel crane beam of the crane, avoiding the traditional on-site stress-strain test work that is too cumbersome, thereby improving the spatiotemporal completeness of the load distribution data through simulation, which is suitable for both existing buildings and the design and planning of new buildings.

[0058] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can be referred to the above introduction, and will not be repeated in the following. Figure 1 and Figure 2 , Figure 2 A schematic flow chart of Embodiment 2 of the method for determining the load of a steel crane beam of the present application.

[0059] In this example, step S10 includes steps S11 to S13: Step S11: Obtain the production system layout of the industrial plant.

[0060] Step S12: Determine the handling task flow of each crane in the industrial plant according to the production system layout.

[0061] It should be noted that the handling task process is a series of steps and sequence to complete an item handling task using a crane.

[0062] Exemplarily, the process of a handling task usually includes the following main steps: first, determine the handling requirements, clarify the characteristics, weight, shape, and starting point and destination of the objects to be handled; then inspect and prepare the crane to ensure that it is in good working condition; plan the handling route, which involves factors such as space limitations and obstacles; drive the crane to a suitable position and secure it; operate the crane to lift the object, maintaining stability and balance; move the crane to move the object to the designated location according to the planned route; finally, put down the object steadily to complete the handling.

[0063] In this process, the crane's handling process is based on the steel crane beam. Therefore, the handling task process has a great impact on the load of the steel crane beam.

[0064] Step S13: Variable measurement is performed on the handling task process to obtain random variable data of the crane.

[0065] In this embodiment, the determination device can first obtain the production system layout of the industrial plant; since the operation of the crane in the industrial plant has obvious production process constraints and does not generate a large number of production-irrelevant movements, the handling task flow of each crane in the industrial plant can be directly determined according to the production system layout. Finally, the variable measurement of the handling task flow can be performed to obtain the random variable data of the crane, including variables such as the actual working position during the operation time. Therefore, accurate random variable data of the crane associated with the load can be obtained through the handling task flow of the crane.

[0066] In a feasible implementation, the random variable data includes operation time variables, random position variables and variable distribution. Step S13 of this embodiment may include the steps of: performing operation measurement on the crane according to the handling task process to obtain the operation time variables and random position variables of the crane; and statistically analyzing the variable distribution of the operation time variables and the random position variables.

[0067] It should be noted that the operation time variable is a variable related to the working time of equipment in industrial plants.

[0068] Exemplarily, the operation time variables may include rigid time and flexible time. For example, the operation time associated with a crane is mostly rigid time, and the time associated with other equipment in an industrial plant is mostly flexible time.

[0069] It should be noted that random position variables are position variables related to the handling process that are unexpected during the operation of the crane, such as random position variables generated by the crane giving way.

[0070] It should be noted that the variable distribution is the distribution and characteristics of a variable related to the operation time variable at different time points, as well as the distribution and characteristics of a variable related to the random position variable at different position points.

[0071] For example, the distribution parameters of the operation time of the crane and the equipment related to the crane can be counted (for example, the normal distribution can be truncated, which is not limited in this embodiment). The variable distribution of the random position variable is similar, and this embodiment will not elaborate on this.

[0072] In this embodiment, for ease of understanding, please refer to Figure 3 , Figure 3 A schematic diagram of the fatigue assessment process for newly built steel crane beams and existing steel crane beams provided in Example 2 of the present application. The load determination process of the steel crane beam is divided into two cases, one is for the design of newly built crane beams, and the other is for the assessment of existing crane beams. Regardless of whether the load determination is for newly built crane beams or existing crane beams, the production system layout must be determined first, and the handling task process must be determined based on the production system layout. Then there are differences in the process of obtaining the operation time variable, random position variable, and variable distribution.

[0073] For newly built crane beams, it is necessary to determine the operation time and other production constraints (such as 8-hour work system constraints or maintenance time constraints), and the location constraints must also be considered. For existing crane beams, it is relatively simple, and material scheduling statistics can be directly obtained. This is because when performing fatigue design of newly built steel crane beams, generally only the expected output of the plant, production process layout and other information are known, and the material handling process is relatively random. At this time, it is necessary to use various random operation times and constraints to obtain the upper limit of fatigue load constructed by each equipment, and provide more accurate fatigue load data for design. When performing fatigue strength verification of existing steel crane beams, there are more data to rely on than when designing. If detailed material scheduling records can be obtained, such as the storage records of the second hot-rolled slab warehouse of Wuhan Iron and Steel, relatively accurate fatigue load data can be calculated. This can further improve the practicality of the method of this embodiment and further improve the accuracy of the measurement. After determining the random variable data, the subsequent determination of random variables and their distribution characteristics, the process of newly built crane beams and existing crane beams is basically the same.

[0074] In another feasible implementation manner, the handling simulation data includes the position and lifting weight of the crane; Figure 3As shown, according to the above random variable data, the material handling flow of the crane can also be simulated based on Monte-Carlo to record the position and lifting weight of the crane at every moment. Step S20 of this embodiment may include the steps of: using the random variable data as a constraint, constructing a random load model through a preset logistics simulation software; performing random material handling simulation through the Monte Carlo method according to the random load model to obtain the position and lifting weight of the crane; correspondingly, the step S30 may include the steps of: performing stress measurement on the position and lifting weight to obtain the stress history curve of the steel crane beam where the crane is located.

[0075] It should be noted that the preset logistics simulation software is pre-set software for simulating and analyzing crane handling processes, such as Flexsim software, and this embodiment does not limit this.

[0076] It should be noted that the random load model is a model used to describe the random and uncertain loads acting on the steel crane beam.

[0077] In actual situations, the load of a steel crane beam is not a fixed value, but varies randomly within a certain range. The random load model can count and analyze the load of a steel crane beam, including its probability distribution, mean, variance, and related functions.

[0078] It can be understood that by establishing a random load model, the response (such as deformation, stress, etc.) of the steel crane beam under random loads can be better analyzed and predicted to improve the reliability of the evaluated loads.

[0079] It should be noted that the Monte Carlo method is a numerical calculation method guided by probability statistics theory. The Monte Carlo method can be used to randomly sample or generate a large number of random numbers to simulate the complex material handling process of the crane. The Monte Carlo method can effectively handle the handling process with the uncertainty and randomness of the crane.

[0080] In this embodiment, the determination device can be constrained by random variable data, and the material handling flow of the crane can be simulated to a great extent through the Monte Carlo method and preset logistics simulation software, thereby improving the realism of the simulation and improving the accuracy of load determination.

[0081] In another possible implementation, if Figure 3As shown, in combination with the above-mentioned position and hoisting weight, the influence line of the steel crane beam needs to be determined to calculate the stress-strain history of the crane beam. The step of measuring the stress of the position and hoisting weight to obtain the stress history curve of the steel crane beam where the crane is located in this embodiment includes: determining the stress influence line of the steel crane beam where the crane is located; and measuring the stress of the lower flange at the mid-span of the steel crane beam according to the stress influence line and the position and hoisting weight to obtain the stress history curve of the steel crane beam.

[0082] It should be noted that the stress influence line is a curve that shows how the stress at a certain section of the beam changes with the load position when the crane moves on the steel crane beam. Among them, the lower flange at the mid-span is usually a more critical area of ​​the beam under stress and tension.

[0083] For example, the stress influence line of the lower flange in the mid-span of the steel crane beam or other verification points can be determined according to structural mechanics and material mechanics methods, so as to determine the stress at the verification point of the steel crane beam based on the crane wheel position, trolley position, and lifting weight.

[0084] In this implementation, considering that the lower flange in the mid-span of a steel crane beam is usually a more critical area of ​​the beam under stress and tension in structural mechanics, stress measurement can be performed through the stress influence line and the lower flange in the mid-span of the steel crane beam to further improve the representativeness of the stress history curve of the steel crane beam.

[0085] In another feasible implementation manner, the load distribution data includes a load spectrum; Figure 3 As shown, finally, according to the stress history curve of the steel crane beam obtained above, the load spectrum of the steel crane beam can be statistically calculated, and the load characteristic value of the steel crane beam and other data can be calculated. Step S40 of this embodiment may include the steps of: analyzing the stress history curve of the steel crane beam by the rain flow method to obtain the equivalent coefficient of the underload effect of the steel crane beam; and determining the load spectrum of each steel crane beam in the industrial plant according to the equivalent coefficient of the underload effect.

[0086] It should be noted that the rain flow method is a method for counting fatigue stress load cycles. By analyzing the random stress history curve, it is simplified into a series of stress cycles in order to calculate and evaluate the fatigue life of the steel crane beam.

[0087] It can be understood that the rain flow method can accurately count the number of cycles of different stress amplitudes and mean values ​​experienced by the steel crane beam in complex stress changes.

[0088] It should be noted that the equivalent coefficient of underload effect is a coefficient used to measure the impact caused by the actual load of the steel crane beam being less than the design load.

[0089] Since cranes may not always operate at full load in actual use, steel crane beams are often underloaded. This equivalent coefficient is used to quantify and reduce the impact of this underload condition on steel crane beams, so as to more accurately reflect the stress and performance of steel crane beams in actual situations.

[0090] It should be noted that the load spectrum is a data spectrum that describes the load size borne by the steel crane beam during operation and its change over time. The load spectrum records in detail the frequency, sequence, duration and other information of loads of different sizes on the steel crane beam. The load spectrum can better understand the stress condition of the steel crane beam in actual work, so as to improve the fatigue life of the steel crane beam.

[0091] In this embodiment, the determination equipment can analyze the stress history curve of the steel crane beam by the rain flow method to obtain the equivalent coefficient of the underload effect of the steel crane beam; through the equivalent coefficient of the underload effect, the stress and performance of the steel crane beam under actual conditions can be more accurately reflected, thereby obtaining an accurate load spectrum of the steel crane beam.

[0092] When modeling a random load model based on production process constraints, this embodiment can first conduct a survey of the production system layout, determine the main handling tasks of the crane, determine the operating time of each production equipment, etc. Then, the Monte-Carlo method is used in combination with the logistics design software to generate random material handling events. Finally, the stress history curve of the steel crane beam in the entire plant or production area is obtained by combining the influence line analysis and calculation, and the stress amplitude distribution (i.e., load spectrum) is obtained by applying the rain flow counting method. By taking the production system layout of the industrial plant as a constraint, the crane is numerically simulated to determine the load distribution data of the steel crane beam of the crane, avoiding the situation where the traditional on-site stress-strain test work is too cumbersome, thereby improving the spatiotemporal completeness of the load distribution data through simulation, which is suitable for both existing buildings and the design and planning of new buildings.

[0093] For example, in order to help understand the implementation process of the steel crane beam load determination method obtained by combining the above-mentioned embodiment 1 and embodiment 2, please refer to Figure 4 , Figure 4 The schematic diagram of the production process layout of the steelmaking and casting production plant provided in Example 2 of this application, the specific steps are as follows: 1. Determine the layout of the production system. The designed annual production capacity of a steel mill is 6.71 million tons. It adopts the casting process for steelmaking. The production process layout is shown in Figure 2. The AB span is the charging span (the distance is 25m), located in the scrap steel area and the molten iron filling area, equipped with three converters, two 440 / 80t cranes are responsible for transporting molten iron (such as crane No. 1 and crane No. 2), and a 110 / 100t crane is responsible for transporting scrap steel. The BC span is the converter span (the distance is 23m), and a maintenance crane is set. The CD span, DE span, EF span, and FG span are the first casting span, the second casting span, the third casting span, and the fourth casting span (each with a distance of 27m), respectively, located in the casting area, each equipped with a 440 / 80t crane responsible for transporting molten steel ladles and casting. The GH span is the ladle repair span (the distance is 27m), located in the ladle correction area, equipped with a 130 / 30 crane and a trolley, responsible for transporting empty ladle.

[0094] Reference Figure 5 , Figure 5 This is a distribution diagram of the wheel spacing of a crane provided in Example 2 of this application; the wheel spacing on one side of a 440 / 80t crane is as follows: Figure 5 As shown in (a), the crane width is 21.5m, the maximum wheel load is 530.0kN, the total weight is 288t, the trolley weight is 38t, the minimum wheel load is 80kN, and the number of wheels on each side is 16 (the distance between the wheels in the figure is 882, in millimeters). The wheel distance on one side of the 110+100t crane is as follows Figure 5 As shown in (b), the crane width is 12.0m, the maximum wheel load is 590kN, the total weight is 311t, the trolley weight is 100t, the minimum wheel load is 195kN, and the number of wheels on each side is 8 (the wheel spacing in the figure is 900, 1050, 900, in millimeters). The wheel spacing on one side of a 130 / 30t crane is as follows Figure 5 As shown in (c), the crane width is 14.0m, the maximum wheel load is 410kN, the total weight is 289t, the trolley weight is 65t, the minimum wheel load is 180kN, and the number of wheels on each side is 8 (the wheel spacing in the figure is 900, 1050, and 900, in millimeters).

[0095] like Figure 4As shown, 1, 5, 6, 7, 7-1, 8, 8-1, 9, 9-1, 10, 11, 12, 13, 13-1, 14, 15 are longitudinal axes, and the distances between them are not fixed, in meters. In the AB charging span, the No. 1 ladle is located at axis 14, the No. 2 ladle is located at axis 13, the desulfurization station is located between axes 10-11 (the distance is 28, in meters), the No. 1 converter is located in the middle of axes 9~9-1 (the distance is 21, in meters), the No. 2 converter is located in the middle of axes 8~8-1 (the distance is 21, in meters), the No. 3 converter is located in the middle of axes 7~7-1 (the distance is 21, in meters), and the scrap steel stacking area is located in axes 5~7 (the distances are 20 and 20, in meters respectively). In the BC converter span, only one maintenance crane is set up, and its operation is less heavy, so there is no need to consider the fatigue problem of the steel crane beam in this span. In the first pouring span CD, the second pouring span DE, the third pouring span EF, and the fourth pouring span FG, 12 pouring molds are placed between axes 1 to 7, and three ladle transport tracks are set up between axes 7 to 10. In the ladle correction span GH, three ladle transport tracks are set up between axes 7 to 10, and 6 ladle repair positions are set up between axes 10 to 12.

[0096] 2. Determine the handling task process. The No. 1 ladle of the charging span can only be randomly transported to the three converters by the No. 1 crane, and the No. 2 ladle is preferably randomly transported to the three converters by the No. 2 crane. When the No. 2 crane is under maintenance, the No. 2 ladle can be transported by the No. 1 crane. Before the ladle is transported to the converter, whether to desulfurize and slag treatment is selected according to the type of steel to be produced. Scrap steel can only be randomly transported to the three converters by the No. 3 crane, and it must be before the converter is filled with molten iron. After the No. 1 and No. 2 cranes fill the converter with molten iron, the empty ladle must be transported back to the original ladle placement point for the next use. After the No. 3 crane adds scrap steel to the converter, it needs to transport the scrap steel trough back to the scrap steel storage area for the next use. After the converter completes the molten iron refining, the molten steel needs to be introduced into the empty ladle transported by the trolley, and then the trolleys are randomly transported to the first casting span, the second casting span, the third casting span or the fourth casting span along their respective ladle transport tracks. When the ladle is transported to the casting area span, the ladle is transported to the casting area by the crane of the span for mold filling. After the mold filling is completed, the crane needs to transport the empty ladle to the original trolley, and the trolley transports the empty ladle to the ladle repair span. After the empty ladle is transported to the ladle repair span, the crane of the span takes the ladle that has just been used from the trolley, randomly puts it into an idle ladle repair position, and randomly takes out a repaired ladle from its ladle repair position, transports it to the idle trolley, and the trolley transports it to the converter span for standby use.

[0097] 3. Determine the operation time. The operation time of the equipment in the steelmaking workshop is divided into rigid time (time that is difficult to optimize or shorten) and flexible time (time affected by the type of steel and equipment). The operation time related to the crane is mostly rigid time, and the time related to other equipment is mostly flexible time. The statistical distribution parameters of the operation time of the charging cross-backflow station, desulfurization station, and converter are shown in Table 1. It is assumed that the operation time of each equipment obeys the truncated normal distribution, and the maximum (minimum) value is not higher (lower) than the maximum (minimum) value of the collected samples:

[0098] In order to further obtain the equipment operation time parameters required for modeling, a steel plant with similar production process was selected for actual measurement. The statistical parameters are shown in Table 2. Table 2 shows the statistical distribution of other related operation times:

[0099] The horizontal and vertical running speeds of the crane are both 2m / s. Under normal circumstances, the loading and unloading time of the crane is about 1min. The running speed of the trolley is about 2m / s. The converter operation time is about 34min.

[0100] 4. Other constraints. For example, the 8-hour work system constraint. The shift change time is 8:30, 17:30, and 1:30. When changing shifts, the left crane must be docked at the far left, and the right crane must be docked at the far right. When no scrap steel is needed, the mean weight of the molten iron is about 286t, the maximum value is 300t, the minimum value is 267t, and the standard deviation is 13t. It does not refuse to obey the truncated normal distribution; when scrap steel needs to be added, the mean weight of the molten steel is 177t, the maximum value is 200t, the minimum value is 150t, and the standard deviation is 18t. It does not refuse to obey the normal distribution. The mass of the ladle is about 120t, and the proportion of scrap steel added is about 43%. The average weight of the added scrap steel is 81t, the maximum weight is 100t, the minimum weight is 60t, and the standard deviation is 11.5t. It does not refuse to obey the truncated normal distribution. The mass of the scrap steel bucket is 60t. Each converter is overhauled once a month, and the three cranes are not overhauled at the same time. The overhaul time is 1 day. The crane is overhauled once a week, and each overhaul lasts 4 hours. The maximum converter capacity is 300t.

[0101] 5. Determine random variables. The time-related random variables and their distribution are described above. In addition to the random variables mentioned above, the modeling also needs to consider the random position variables generated by the three cranes making way for the loading span. During the simulation, it is assumed that the variable follows a uniform distribution within the feasible position domain.

[0102] 6. Simulate material handling flow based on Monte-Carlo. Under the above constraints, Flexsim software is used for modeling. The model layout is as follows: Figure 4As shown. Multiple generators are used to simulate the arrival of molten iron, ladle, and scrap steel respectively; a synthesizer is used to realize the backflow of molten iron into the ladle; a temporary storage area is used to simulate the ladle lifting position; a processor is used to simulate the desulfurization and slagging process; a synthesizer and a separator are used to realize the separation of molten iron and ladle in the molten iron ladle and the synthesis of molten iron and scrap steel before the converter; 3×4 temporary storage areas are used to simulate the scrap steel stacking area, and the No. 3 crane randomly takes out scrap steel from these temporary storage areas; a synthesizer is used at the converter outlet to simulate the pouring of molten steel into the ladle; a task executor is used to simulate the trolley, and network nodes are arranged between axes 7~8, 8~9, and 9~10, and the task executor motion trajectory is set to realize the movement of the trolley along the track; a separator and a task processor are used to simulate the casting process and the mold cooling and transportation time, etc.; 2×6 temporary storage areas are set on the GH / 1-7 axis to simulate the ladle trimming position.

[0103] Crane No. 2 in span AB starts collision detection. When crane No. 2 is idle or not working on production tasks, crane No. 2 gives way to crane No. 1. When crane No. 2 is performing production tasks, crane No. 1 needs to wait for crane No. 2 to complete the task before performing the task. Crane No. 3 starts collision detection. If crane No. 3 is loading or unloading, crane No. 2 needs to wait for crane No. 3 to complete the current task. In other cases, crane No. 3 gives way to crane No. 2.

[0104] Under the above production process constraints, each production cycle of 18,400 tons of steel was selected as a production cycle, and Monte Carlo random sampling was used to simulate 91,234 production cycles to meet the statistical requirements of 95% assurance rate, error less than 20%, and 95% confidence level.

[0105] 7. Determine the influence line of the steel crane beam and calculate the stress history. Determine the stress influence line of the lower flange or other verification points in the mid-span of the steel crane beam according to the methods of structural mechanics and material mechanics, so as to determine the stress at the verification point of the steel crane beam according to the position of the crane wheel, the position of the trolley, and the hoisting weight. Assume that all the steel crane beams in each span are steel crane beams with equal cross-sections (the equivalent coefficient of the underload effect is independent of the cross-sectional dimensions of the beam, so this assumption has no effect on the calculation results). The cross-sectional dimensions are shown in Table 3. Table 3 shows the cross-sectional dimensions of the steel crane beams in millimeters:

[0106] After the random load model was established using Flexsim software, the program was started to simulate the material transportation process of the entire factory, recording the position and lifting weight of the crane at every moment (essentially the same as the data recorded by the crane automatic driving system). Then, the stress time history curve of the lower flange of each beam was calculated using the influence line method. The calculation results of the stress time history curve of the steel crane beam in the typical area of ​​column A in span AB during a certain production cycle are shown in Figures 6 (a) to 6 (f). Figure 6 (a) is Figure 2Figure 6 (b) shows the stress history curve of the A column / 5-6 crane beam in the middle AB span during a production cycle; Figure 2 Figure 6 (c) shows the stress history curve of the crane beam in the middle AB span A column / 6-7 during a production cycle; Figure 2 Figure 6 (d) shows the stress history curve of the A column / 7-7-1 crane beam in the middle AB span during a production cycle; Figure 2 Figure 6 (e) shows the stress history curve of the A column / 8-8-1 crane beam in the middle AB span during a production cycle; Figure 2 Figure 6 (f) shows the stress history curve of the A column / 9-9-1 crane beam in the middle AB span during a production cycle; Figure 2 Stress history curve of A column / 10-11 crane beam in the middle AB span during a certain production cycle.

[0107] Referring to Figure 6 (a), the ordinate is stress in MPa, and the range is 0-75MPa; the abscissa is the data acquisition point number. For example, if data is collected at a frequency of 1 Hz, the data acquisition point number of the 10th second is 10. Figure 6 (a) shows the stress of data acquisition point numbers from 0 to 10,000. Referring to Figure 6 (b), the ordinate range is 0-65MPa, and Figure 6 (b) shows the stress of data acquisition point numbers from 0 to 10,000. Referring to Figure 6 (c), the ordinate range is 0-43MPa, and Figure 6 (c) shows the stress of data acquisition point numbers from 0 to 10,000. Referring to Figure 6 (d), the ordinate range is 0-32MPa, and Figure 6 (d) shows the stress of data acquisition point numbers from 0 to 10,000. Referring to Figure 6 (e), the ordinate range is 0-32MPa, and Figure 6 (e) shows the stress of data acquisition point numbers from 0 to 10,000. Referring to Figure 6(f), the vertical axis ranges from 0 to 48 MPa, and Figure 6(f) shows the stress of data acquisition point numbers from 0 to 10,000.

[0108] 8. Statistical load spectrum and underload effect coefficient, use rain flow method to process the stress time history curve of each steel crane beam, and calculate the equivalent coefficient of underload effect. The results are summarized in Table 4:

[0109] Among them, the 95% column in the table refers to the upper limit value that meets the 95% guarantee rate.

[0110] According to the actual measurement of the 11-12 steel crane beams of the plant's A column by the National Industrial Building Diagnosis and Reconstruction Engineering Technology Research Center in 2003, the equivalent coefficients of the underload effect at the mid-span and beam ends during actual production were 0.82 and 0.86, respectively, both within the range of 0.605-0.917 of this simulation result.

[0111] In summary, the random load simulation method of steel crane beams constrained by production process established in this embodiment is feasible. By setting appropriate random parameters, the load distribution characteristics of all steel crane beams in the entire plant can be fully obtained. If accurate crane scheduling data is obtained, the load spectrum of all steel crane beams in the plant can be obtained relatively easily based on this method. This method is of great significance for classifying steel crane beams based on the probabilistic damage tolerance method and effectively arranging inspections.

[0112] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the method for determining the load of the steel crane beam of the present application. More simple transformations based on this technical concept are all within the scope of protection of the present application.

[0113] This application also provides a steel crane beam load determination device, please refer to Figure 7 , Figure 7 This is a schematic diagram of the module structure of the steel crane beam load determination device of the embodiment of the present application; the steel crane beam load determination device comprises: The variable determination module 701 is used to perform variable determination on the crane according to the production system layout of the industrial plant to obtain random variable data corresponding to the crane; A random simulation module 702, configured to perform random material handling simulation on the crane according to the random variable data to obtain handling simulation data of the crane; A stress measurement module 703 is used to perform stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located; The load distribution module 704 is used to determine the load distribution data of the steel crane beam based on the stress history curve.

[0114] The steel crane beam load determination device provided by the present application adopts the steel crane beam load determination method in the above embodiment, which can solve the technical problems that the traditional on-site stress-strain test work is too cumbersome, the representativeness of historical loads and future loads will deteriorate, and it has time and space incompleteness. Compared with the prior art, the beneficial effects of the steel crane beam load determination device provided by the present application are the same as the beneficial effects of the steel crane beam load determination method provided by the above embodiment, and the other technical features of the steel crane beam load determination device are the same as the features disclosed in the above embodiment method, which will not be repeated here.

[0115] The present application provides a steel crane beam load determination device, which includes: at least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the steel crane beam load determination method in the above-mentioned embodiment one.

[0116] Reference below Figure 8 , Figure 8 The device structure diagram of the hardware operating environment involved in the method for determining the load of a steel crane beam in the embodiment of the present application shows a schematic diagram of the structure of a device for determining the load of a steel crane beam suitable for implementing the embodiment of the present application. The device for determining the load of a steel crane beam in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 8 The steel crane beam load determination device shown is only an example and should not bring any limitation to the function and scope of use of the embodiments of the present application.

[0117] like Figure 8 As shown, the steel crane beam load determination device may include a processing device 1001 (e.g., a central processing unit, a graphics processor, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM) 1004. Various programs and data required for the operation of the steel crane beam load determination device are also stored in the RAM 1004. The processing device 1001, the ROM 1002, and the RAM 1004 are connected to each other via a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems may be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touch pad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 may allow the steel crane beam load determination device to communicate wirelessly or wired with other devices to exchange data. Although the steel crane beam load determination device with various systems is shown in the figure, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have instead.

[0118] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0119] The steel crane beam load determination device provided by the present application adopts the steel crane beam load determination method in the above embodiment, which can solve the technical problems that the traditional on-site stress-strain test work is too cumbersome, the representativeness of historical loads and future loads will deteriorate, and it has time and space incompleteness. Compared with the prior art, the beneficial effects of the steel crane beam load determination device provided by the present application are the same as the beneficial effects of the steel crane beam load determination method provided by the above embodiment, and the other technical features in the steel crane beam load determination device are the same as the features disclosed in the previous embodiment method, which will not be repeated here.

[0120] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0121] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0122] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, the computer-readable program instructions being used to execute the steel crane beam load determination method in the above-mentioned embodiment.

[0123] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM: Random Access Memory), a read-only memory (ROM: Read Only Memory), an erasable programmable read-only memory (EPROM: Erasable Programmable Read Only Memory or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM: CD-Read Only Memory), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency: Radio Frequency), etc., or any suitable combination of the above.

[0124] The computer-readable storage medium may be included in the steel crane beam load determination device; or may exist independently without being assembled into the steel crane beam load determination device.

[0125] The above-mentioned computer-readable storage medium carries one or more programs. When the above-mentioned one or more programs are executed by the steel crane beam load determination device, the steel crane beam load determination device enables the following to: measure variables of the crane according to the production system layout of the industrial plant to obtain random variable data corresponding to the crane; perform random material handling simulation on the crane according to the random variable data to obtain handling simulation data of the crane; perform stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located; and determine the load distribution data of the steel crane beam based on the stress history curve.

[0126] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0127] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0128] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0129] The readable storage medium provided in this application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned method for determining the load of a steel crane beam, and can solve the technical problems that the traditional on-site stress-strain test is too cumbersome, the representativeness of historical loads and future loads will deteriorate, and it has time and space incompleteness. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in this application are the same as the beneficial effects of the method for determining the load of a steel crane beam provided in the above-mentioned embodiment, and will not be repeated here.

[0130] The present application also provides a computer program product, comprising a computer program, which implements the steps of the above-mentioned method for determining the load of a steel crane beam when executed by a processor.

[0131] The computer program product provided by the present application can solve the technical problems that the traditional on-site stress-strain test work is too cumbersome, the representativeness of historical loads and future loads will be poor, and there is temporal and spatial incompleteness. Compared with the prior art, the beneficial effects of the computer program product provided by the present application are the same as the beneficial effects of the steel crane beam load determination method provided in the above embodiment, and will not be repeated here.

[0132] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A method for determining the load of a steel crane beam, characterized in that: The method includes: Variable measurement is performed on the crane according to the production system layout of the industrial plant to obtain random variable data corresponding to the crane; Performing random material handling simulation on the crane according to the random variable data to obtain handling simulation data of the crane; Performing stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located; Based on the stress history curve, load distribution data of the steel crane beam is determined.

2. The method according to claim 1, characterized in that The step of measuring the variables of the crane according to the production system layout of the industrial plant to obtain the random variable data corresponding to the crane includes: Get the production system layout of industrial plants; Determine the handling task flow of each crane in the industrial plant according to the production system layout; Variables of the handling task process are measured to obtain random variable data of the crane.

3. The method according to claim 2, characterized in that The random variable data includes an operation time variable, a random position variable and a variable distribution. The step of measuring the variables of the handling task process to obtain the random variable data of the crane includes: Performing operation measurement on the crane according to the handling task process to obtain the operation time variable and random position variable of the crane; Count the variable distributions of the operation time variable and the random position variable.

4. The method according to claim 1, characterized in that The handling simulation data includes the position and lifting weight of the crane; the step of performing random material handling simulation on the crane according to the random variable data to obtain the handling simulation data of the crane includes: Taking the random variable data as constraints, a random load model is constructed through a preset logistics simulation software; Performing random material handling simulation by Monte Carlo method according to the random load model to obtain the position and lifting weight of the crane; Correspondingly, the step of performing stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located includes: Stress measurements are performed on the position and the hoisting weight to obtain a stress history curve of the steel crane beam where the crane is located.

5. The method according to claim 4, characterized in that The step of measuring the stress of the position and the hoisting weight to obtain the stress history curve of the steel crane beam where the crane is located includes: Determining the stress influence line of the steel crane beam on which the crane is located; The stress of the lower flange at the mid-span of the steel crane beam is measured according to the stress influence line, the position and the hoisting weight to obtain a stress history curve of the steel crane beam.

6. The method according to any one of claims 1 to 5, characterized in that The load distribution data includes a load spectrum; the step of determining the load distribution data of the steel crane beam based on the stress history curve includes: Analyzing the stress history curve of the steel crane beam by the rain flow method to obtain the equivalent coefficient of the underload effect of the steel crane beam; According to the equivalent coefficient of the underload effect, the load spectrum of each steel crane beam in the industrial plant is determined.

7. A device for determining the load of a steel crane beam, characterized in that: The device comprises: A variable determination module, used to perform variable determination on the crane according to the production system layout of the industrial plant, and obtain random variable data corresponding to the crane; A random simulation module, used for performing random material handling simulation on the crane according to the random variable data to obtain handling simulation data of the crane; A stress measurement module, used to perform stress measurement on the handling simulation data to obtain a stress history curve of the steel crane beam where the crane is located; A load distribution module is used to determine the load distribution data of the steel crane beam based on the stress history curve.

8. A steel crane beam load determination device, characterized in that: The device comprises: a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the method for determining the load of a steel crane beam according to any one of claims 1 to 6.

9. A storage medium, characterized in that: The storage medium is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the method for determining the load of a steel crane beam as described in any one of claims 1 to 6 are implemented.

10. A computer program product, characterized in that The computer program product comprises a computer program, which, when executed by a processor, implements the steps of the steel crane beam load determination method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Quantitative evaluation method for fatigue life of crane steel beam group

    CN110926770A

  • Flexible workshop scheduling optimization method and system considering crane transportation process

    CN112286149A

  • Method and device for detecting fatigue life of steel crane beam

    CN116858667A