Residential land evaluation method and device, electronic equipment and storage medium
By generating benefit values and sales profit margins through an automated evaluation model, the problem of cumbersome and subjective factors in the existing residential land evaluation process is solved, thus achieving efficient and reliable residential land evaluation.
Patent Information
- Application Number
- CN202410999643.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The assessment process for existing undeveloped residential land is cumbersome, inefficient, and easily influenced by subjective human factors.
By acquiring data files of undeveloped residential land, generating benefit values and sales profit margins using preset models, and automatically determining whether the assessment passes, manual intervention is reduced.
It improved assessment efficiency, reduced assessment time, and enhanced the reliability and accuracy of assessment information.
Smart Images

Figure CN119005735A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of Internet technology, and in particular to a residential land assessment method, device, electronic device and storage medium. Background Art
[0002] With the rapid expansion of urbanization, land resources are becoming increasingly tight, especially in first- and second-tier cities. As the main source of urban land income, it is urgent and critical to establish refined management of residential land before it is sold.
[0003] The evaluation process of the current scheme of the existing undeveloped residential land is cumbersome, which is not conducive to improving the evaluation efficiency of the current scheme of the residential land. The reason is that the existing technology mainly adopts the manual evaluation method to evaluate the current scheme of the undeveloped residential land, and the manual evaluation takes a long time and is easily affected by subjectivity. Therefore, the evaluation process of the current scheme of the existing undeveloped residential land is cumbersome, which is not conducive to improving the evaluation efficiency of the current scheme of the residential land. Summary of the invention
[0004] The embodiments of the present application provide a residential land assessment method, device, electronic device and storage medium to solve the technical problem that the assessment process of the current scheme for the above-mentioned existing undeveloped residential land is cumbersome and is not conducive to improving the assessment efficiency of the current scheme for residential land.
[0005] In a first aspect, an embodiment of the present application provides a residential land assessment method, which is applied to an electronic device. The residential land assessment method includes:
[0006] Obtaining a current plan for undeveloped residential land, and obtaining a first data file and a second data file corresponding to the current plan;
[0007] In the first data file, the land price, taxes, public service facility income, land acquisition and demolition costs, land development costs, and annual operating costs of public supporting facilities of the current plan are obtained, wherein the land acquisition and demolition costs are the costs of land acquisition and land demolition, the land development costs are the costs of the residential land meeting the development conditions, and the annual operating costs of public supporting facilities are the total amount of money required to maintain the normal operation of public supporting facilities each year;
[0008] In the second data file, the public supporting facilities cost, the proportion of self-owned funds, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, and the number of the saleable properties of the current plan are obtained, and the public supporting facilities cost is the construction cost of the public supporting facilities;
[0009] Generate the current benefit value of the current plan according to the land price, the taxes, the public service facility income, the land acquisition and demolition cost, the land development cost, the annual operating cost of the public supporting facilities and a preset benefit value generation model;
[0010] Generate the current sales profit rate of the current solution according to the land price, the taxes, the construction cost, the public supporting facilities fee, the self-owned funds ratio, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, the number of the saleable property and the preset sales profit rate generation model;
[0011] Determining whether the current benefit value is greater than a preset benefit value, and determining whether the current sales profit rate is greater than a preset sales profit rate;
[0012] When the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, evaluation pass information corresponding to the current plan is generated.
[0013] Exemplarily, the benefit value generation model is:
[0014] LSB=(LP+T+PR)-(DC+LM+PO×70);
[0015] Wherein, LSB is the current benefit value; LP is the land price;
[0016] T is the tax; PR is the revenue of the public service facilities;
[0017] DC is the land acquisition and demolition cost; LM is the land development cost;
[0018] PO is the annual operating cost of the public supporting facilities.
[0019] The benefit value generation model is a generation model of the current benefit value.
[0020] Among them, the higher the current benefit value is, the better the benefit of the current solution is; the lower the current benefit value is, the lower the benefit of the current solution is.
[0021] Exemplarily, the sales profit rate generation model is:
[0022]
[0023] SPM is the current sales profit margin;
[0024] LP is the land price, T is the tax, C is the construction cost, and EV is the cost of public supporting facilities;
[0025] p is the proportion of owned funds, δ is the annual financing loan interest rate, and n is the project development cycle;
[0026] UP i is the sales price of the i-th saleable property, A i is the sales area of the ith saleable property, and M is the number of saleable properties. The sales profit rate generation model is a generation model of the current profit rate.
[0027] Among them, the higher the current sales profit margin is, the stronger the profitability of the current solution is; the lower the current sales profit margin is, the weaker the profitability of the current solution is.
[0028] In a possible implementation manner of the first aspect, obtaining a current plan for undeveloped residential land and obtaining a first data file and a second data file corresponding to the current plan include:
[0029] Acquire a current plan for undeveloped residential land, and acquire a first file path and a second file path corresponding to the current plan, wherein the first file path and the second file path are different file paths;
[0030] The first data file corresponding to the current solution is obtained through the first file path, and the second data file corresponding to the current solution is obtained through the second file path.
[0031] In a possible implementation manner of the first aspect, when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, generating evaluation pass information corresponding to the current solution includes:
[0032] When the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, it is determined that the current solution passes the screening, and the number of the current solutions that pass the screening is obtained;
[0033] When the number of the current solutions that pass the screening is one, generating the evaluation pass information corresponding to the current solution;
[0034] When there are multiple current solutions that pass the screening, obtain the maximum sales profit rate among the multiple current solutions that pass the evaluation, take the current solution corresponding to the maximum sales profit rate as the preferred current solution, and generate the evaluation pass information corresponding to the preferred current solution.
[0035] In a possible implementation of the first aspect, when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes:
[0036] Creating a first display window and a second display window corresponding to the current solution, wherein the first display window and the second display window are different display windows;
[0037] The assessment passing information is displayed in the first display window, and the geographical location of the residential land is displayed in the second display window.
[0038] In a possible implementation of the first aspect, when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes:
[0039] A preset storage area is obtained, and the first data file, the second data file, and the evaluation pass information corresponding to the current solution are stored in the storage area.
[0040] In a possible implementation of the first aspect, when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes:
[0041] Read the preset upload time and determine whether the current time is the upload time;
[0042] If the current time is the upload time, a preset server is connected to upload the first data file, the second data file, and the evaluation pass information corresponding to the current solution to the server.
[0043] In a possible implementation of the first aspect, after determining whether the current benefit value is greater than a preset benefit value and determining whether the current sales profit rate is greater than a preset sales profit rate, the residential land evaluation method includes:
[0044] When the current benefit value is not greater than the preset benefit value or the current sales profit rate is not greater than the preset sales profit rate, evaluation failure information corresponding to the current plan is generated.
[0045] In a second aspect, an embodiment of the present application provides a residential land assessment device, which is applied to an electronic device, including:
[0046] A first acquisition module is used to acquire a current plan of undeveloped residential land, and acquire a first data file and a second data file corresponding to the current plan;
[0047] A second acquisition module is used to obtain the land price, taxes, public service facility income, land acquisition and demolition costs, land development costs, and annual operating costs of public supporting facilities of the current plan from the first data file, wherein the land acquisition and demolition costs are the costs of land acquisition and land demolition, the land development costs are the costs of the residential land meeting the development conditions, and the annual operating costs of public supporting facilities are the total amount of money required to maintain the normal operation of public supporting facilities each year;
[0048] a third acquisition module, configured to acquire, from the second data file, the public supporting facilities fee, the proportion of owned funds, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, and the number of the saleable properties of the current plan, wherein the public supporting facilities fee is the construction fee of the public supporting facilities;
[0049] A first generating module is used to generate the current benefit value of the current scheme according to the land price, the taxes, the public service facility income, the land acquisition and demolition cost, the land development cost, the annual operating cost of the public supporting facilities and a preset benefit value generating model;
[0050] A second generation module is used to generate the current sales profit rate of the current solution according to the land price, the taxes, the construction cost, the public supporting facilities fee, the self-owned funds ratio, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, the number of the saleable property and a preset sales profit rate generation model;
[0051] A judgment module, used to judge whether the current benefit value is greater than a preset benefit value, and to judge whether the current sales profit rate is greater than a preset sales profit rate;
[0052] The third generating module is used to generate evaluation passing information corresponding to the current plan when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate.
[0053] In a third aspect, an embodiment of the present application provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the residential land assessment method of the first aspect when executing the computer program.
[0054] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the residential land assessment method of the first aspect is implemented.
[0055] In a fifth aspect, an embodiment of the present application provides a computer program product. When the computer program product is run on an electronic device, the electronic device executes the residential land assessment method of the first aspect.
[0056] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, when the current benefit value is greater than the preset benefit value and the current sales profit margin is greater than the preset sales profit margin, the evaluation pass information corresponding to the current plan is generated. Since no manual evaluation is required, the evaluation time is reduced, which is beneficial to improving the evaluation efficiency of the current plan for residential land. On the other hand, it will not be affected by subjectivity, which is beneficial to improving the reliability of the evaluation pass information corresponding to the current plan. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0058] Figure 1 An application scenario diagram of the residential land assessment method provided in an embodiment of the present application;
[0059] Figure 2 It is a flowchart of a residential land assessment method provided in an embodiment of the present application;
[0060] Figure 3 A flowchart for obtaining the current solution provided in an embodiment of the present application;
[0061] Figure 4 A schematic block diagram of a residential land assessment device provided in an embodiment of the present application;
[0062] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0063] In order to make the purpose, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.
[0064] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0065] In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the fact that they can be implemented by ordinary technicians in this field. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0066] The flowcharts shown in the accompanying drawings are only examples and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps may also be decomposed, combined or partially merged, so the actual execution order may change according to actual conditions.
[0067] The residential land assessment method provided in the embodiment of the present application can be applied to electronic devices such as mobile phones, tablet computers, wearable devices, vehicle-mounted devices, augmented reality (AR) / virtual reality (VR) devices, laptops, ultra-mobile personal computers (UMPC), netbooks, personal digital assistants (PDA), etc. The embodiment of the present application does not impose any restrictions on the specific types of electronic devices.
[0068] See also Figure 1 , Figure 1 The application scenario diagram of the residential land assessment method provided in the embodiment of the present application is described in detail as follows:
[0069] Electronic devices connect internal systems.
[0070] The electronic device logs into the internal system using a designated user name and password, and searches for current plans for undeveloped residential land in a file manager or document library of the internal system.
[0071] In an embodiment of the present application, the electronic device can simultaneously connect to different files and obtain current plans for undeveloped residential land from different files.
[0072] See also Figure 2 , Figure 2 It is a flow chart of a residential land assessment method provided in an embodiment of the present application, which method can be applied to electronic devices.
[0073] like Figure 2 As shown, the residential land evaluation method provided in the embodiment of the present application includes the following steps, which are described in detail as follows:
[0074] S201, obtaining a current plan of undeveloped residential land, and obtaining a first data file and a second data file corresponding to the current plan;
[0075] Among them, undeveloped residential land refers to land resources that have not yet undergone construction activities and are specifically planned or designated for future residential purposes.
[0076] Among them, the current plan aims to optimize the resource allocation of undeveloped residential land, improve the utilization efficiency of undeveloped residential land, improve residents' living conditions, and promote urban economic and social development.
[0077] S202, obtaining the land price, taxes, public service facility income, land acquisition and demolition costs, land development costs, and annual operating costs of public supporting facilities of the current plan from the first data file, wherein the land acquisition and demolition costs are the costs of land acquisition and land demolition, the land development costs are the costs of the residential land meeting the development conditions, and the annual operating costs of public supporting facilities are the total amount of money required to maintain the normal operation of public supporting facilities each year;
[0078] For the sake of illustration, the cost of land demolition is as follows:
[0079] 1Residential and commercial buildings: RMB 15,000 / m2.
[0080] 2. Commercial buildings: RMB 15,000 / m2 + RMB 35 / m2 × 36 months.
[0081] 3. Industrial houses: RMB 6,000 / m2.
[0082] 4. Temporary buildings: 1,000 yuan / square meter.
[0083] The land development cost is set by the user or by the system by default and is not restricted here.
[0084] For the sake of illustration, the land development cost is given as follows:
[0085] The undeveloped residential land is Plot A. There are two roads to be built around Plot A. There is a height difference of 10 meters on the site, and there is soil pollution that needs to be treated. It is estimated that the land development cost of Plot A is 132.1 million yuan.
[0086] S203, obtaining the public supporting facilities cost, the proportion of self-owned funds, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, and the number of the saleable properties of the current plan from the second data file, wherein the public supporting facilities cost is the construction cost of the public supporting facilities;
[0087] S204, generating a current benefit value of the current solution according to the land price, the taxes, the public service facility income, the land acquisition and demolition cost, the land development cost, the annual operating cost of the public supporting facilities, and a preset benefit value generation model;
[0088] Exemplarily, the benefit value generation model is:
[0089] LSB=(LP+T+PR)-(DC+LM+PO×70);
[0090] Wherein, LSB is the current benefit value; LP is the land price;
[0091] T is the tax; PR is the revenue of the public service facilities;
[0092] DC is the land acquisition and demolition cost; LM is the land development cost;
[0093] PO is the annual operating cost of the public supporting facilities.
[0094] The benefit value generation model is a generation model of the current benefit value.
[0095] Among them, the higher the current benefit value is, the better the benefit of the current solution is; the lower the current benefit value is, the lower the benefit of the current solution is.
[0096] S205, generating a current sales profit rate of the current solution according to the land price, the taxes, the construction cost, the public supporting facilities fee, the self-owned capital ratio, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, the number of the saleable property and a preset sales profit rate generation model;
[0097] Exemplarily, the sales profit rate generation model is:
[0098]
[0099] SPM is the current sales profit margin;
[0100] LP is the land price, T is the tax, C is the construction cost, and EV is the cost of public supporting facilities;
[0101] p is the proportion of owned funds, δ is the annual financing loan interest rate, and n is the project development cycle;
[0102] UP i is the sales price of the i-th saleable property, A i is the sales area of the ith saleable property, and M is the number of saleable properties. The sales profit rate generation model is a generation model of the current profit rate.
[0103] Among them, the higher the current sales profit margin is, the stronger the profitability of the current solution is; the lower the current sales profit margin is, the weaker the profitability of the current solution is.
[0104] Among them, construction cost is the abbreviation of the cost of building a house and the cost of installing house facilities and equipment. Construction cost covers all the inputs of building a house and installing house facilities and equipment, including material cost and labor cost.
[0105] Among them, the project development cycle is set by the user or by system default, and is not restricted here.
[0106] S206, determining whether the current benefit value is greater than a preset benefit value, and determining whether the current sales profit rate is greater than a preset sales profit rate;
[0107] S207, when the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, generating evaluation pass information corresponding to the current plan.
[0108] Among them, when the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, it is determined that the current plan passes the screening, and the evaluation pass information corresponding to the current plan is generated.
[0109] Among them, the preset benefit value and sales profit margin are set by the user or by the system by default and are not restricted here.
[0110] For the sake of illustration, an example is given below:
[0111] For example, the preset benefit value is 0, and the preset sales profit rate is 10%;
[0112] The current benefit value is 1, and the current sales profit margin is 11%;
[0113] Therefore, the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, it is determined that the current plan passes the evaluation, and evaluation pass information corresponding to the current plan is generated.
[0114] For the sake of illustration, an example is given below:
[0115] For example, the preset benefit value is 0, and the preset sales profit margin is 11%;
[0116] The current benefit value is 2, and the current sales profit margin is 12%;
[0117] Therefore, the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, it is determined that the current plan passes the evaluation, and evaluation pass information corresponding to the current plan is generated.
[0118] Among them, the current benefit value is greater than the preset benefit value, and the current sales profit margin is greater than the preset sales profit margin, indicating that the feasibility of the current plan is higher than expected. Therefore, it is determined that the current plan passes the evaluation and the evaluation pass information corresponding to the current plan is generated.
[0119] Wherein, when the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, generating evaluation pass information corresponding to the current solution includes:
[0120] When the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, it is determined that the current solution passes the screening, and the number of the current solutions that pass the screening is obtained;
[0121] When the number of the current solutions that pass the screening is one, generating the evaluation pass information corresponding to the current solution;
[0122] When there are multiple current solutions that pass the screening, obtain the maximum sales profit rate among the multiple current solutions that pass the evaluation, take the current solution corresponding to the maximum sales profit rate as the preferred current solution, and generate the evaluation pass information corresponding to the preferred current solution.
[0123] Among them, taking the current solution corresponding to the maximum sales profit rate as the preferred current solution and generating the evaluation pass information corresponding to the preferred current solution is conducive to improving the evaluation effect.
[0124] For the sake of illustration, an example is given below:
[0125] For example, when the number of the current solutions that pass the screening is 5, the 5 current solutions that pass the screening are Solution 1, Solution 2, Solution 3, Solution 4, and Solution 5;
[0126] The current sales profit margin for Option 1 is 8.0%;
[0127] The current sales profit margin for Option 2 is 10.4%;
[0128] The current sales profit margin for Option 3 is 10.8%;
[0129] The current sales profit margin for Option 4 is 10.4%;
[0130] The current sales profit margin for Option 5 is 10.6%;
[0131] Among them, the maximum sales profit margin among the multiple current solutions that have passed the screening is 10.8%, and it is determined that Solution 3 corresponding to 10.8% has passed the screening. Therefore, Solution 3 corresponding to 10.8% is taken as the preferred current solution, and the evaluation pass information corresponding to the preferred current solution is generated.
[0132] For the sake of illustration, an example is given below:
[0133] For example, when the number of the current solutions that pass the screening is 5, the 5 current solutions that pass the screening are Solution 1, Solution 2, Solution 3, Solution 4, and Solution 5;
[0134] The current sales profit margin for Option 1 is 9.0%;
[0135] The current sales profit margin for Option 2 is 11.4%;
[0136] The current sales profit margin for Option 3 is 11.8%;
[0137] The current sales profit margin for Option 4 is 11.4%;
[0138] The current sales profit margin for Option 5 is 12.6%;
[0139] Among them, the maximum sales profit margin among the multiple current solutions that have passed the screening is 12.6%, and it is determined that solution 5 corresponding to 12.6% has passed the screening. Therefore, solution 5 corresponding to 12.6% is taken as the preferred current solution, and the evaluation pass information corresponding to the preferred current solution is generated.
[0140] Wherein, when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes:
[0141] Step A, creating a first display window and a second display window corresponding to the current solution, wherein the first display window and the second display window are different display windows;
[0142] The assessment passing information is displayed in the first display window, and the geographical location of the residential land is displayed in the second display window.
[0143] Wherein, when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes:
[0144] Step B, obtaining a preset storage area, and storing the first data file, the second data file, and the evaluation pass information corresponding to the current solution in the storage area.
[0145] Wherein, when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes:
[0146] Step C, reading the preset upload time, and determining whether the current time is the upload time;
[0147] If the current time is the upload time, a preset server is connected to upload the first data file, the second data file, and the evaluation pass information corresponding to the current solution to the server.
[0148] Among them, step A can be executed before or after step B and step C, step B can be executed before or after step A and step C, step C can be executed before or after step A and step B, and step A can be executed simultaneously with step B and step C. The specific execution order is not limited here.
[0149] Wherein, after determining whether the current benefit value is greater than a preset benefit value and determining whether the current sales profit rate is greater than a preset sales profit rate, the residential land evaluation method includes:
[0150] Step D: When the current benefit value is not greater than the preset benefit value or the current sales profit rate is not greater than the preset sales profit rate, generating evaluation failure information corresponding to the current solution.
[0151] When the current benefit value is not greater than the preset benefit value or the current sales profit rate is not greater than the preset sales profit rate, it is determined that the current solution has not passed the evaluation, and evaluation failure information corresponding to the current solution is generated.
[0152] Among them, when the current benefit value is not greater than the preset benefit value or the current sales profit margin is not greater than the preset sales profit margin, it means that the feasibility of the current plan is not as expected. Therefore, it is determined that the current plan has not passed the evaluation, and the evaluation failure information corresponding to the current plan is generated.
[0153] After determining whether the current benefit value is greater than the preset benefit value and determining whether the current sales profit rate is greater than the preset sales profit rate, S206 or step D is executed.
[0154] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, when the current benefit value is greater than the preset benefit value and the current sales profit margin is greater than the preset sales profit margin, the evaluation pass information corresponding to the current plan is generated. Since no manual evaluation is required, the evaluation time is reduced, which is beneficial to improving the evaluation efficiency of the current plan for residential land. On the other hand, it will not be affected by subjectivity, which is beneficial to improving the reliability of the evaluation pass information corresponding to the current plan.
[0155] See also Figure 3 , Figure 3 The flowchart for obtaining the current solution provided in the embodiment of the present application is described in detail as follows:
[0156] S301, obtaining a current plan of undeveloped residential land, and obtaining a first file path and a second file path corresponding to the current plan, wherein the first file path and the second file path are different file paths;
[0157] S302: Acquire the first data file corresponding to the current solution through the first file path, and acquire the second data file corresponding to the current solution through the second file path.
[0158] In an embodiment of the present application, the first data file corresponding to the current solution is obtained through the first file path, and the second data file corresponding to the current solution is obtained through the second file path, which can improve the efficiency of obtaining the first data file and the second data file.
[0159] For the residential land assessment method described in the above example, please refer to Figure 4 , Figure 4 A schematic block diagram of a residential land assessment device provided in an embodiment of the present application, Figure 4 The residential land evaluation device 400 shown can be applied to Figure 1 The electronic device in the application scenario diagram shown below takes the electronic device as an example. Figure 4The residential land assessment device 400 shown is described in detail. The residential land assessment device 400 may include a first acquisition module 401, a second acquisition module 402, a third acquisition module 403, a first generation module 404, a second generation module 405, a judgment module 406, and a third generation module 407.
[0160] The first acquisition module 401 is used to acquire a current plan of undeveloped residential land, and acquire a first data file and a second data file corresponding to the current plan;
[0161] The second acquisition module 402 is used to obtain the land price, taxes, public service facility income, land acquisition and demolition costs, land development costs, and annual operating costs of public supporting facilities of the current plan from the first data file, wherein the land acquisition and demolition costs are the costs of land acquisition and land demolition, the land development costs are the costs of the residential land meeting the development conditions, and the annual operating costs of public supporting facilities are the total amount of money required to maintain the normal operation of public supporting facilities each year;
[0162] The third acquisition module 403 is used to acquire the public supporting facilities cost, the proportion of self-owned funds, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, and the number of the saleable properties of the current plan from the second data file, wherein the public supporting facilities cost is the construction cost of the public supporting facilities;
[0163] A first generating module 404 is used to generate the current benefit value of the current scheme according to the land price, the tax, the public service facility income, the land acquisition and demolition cost, the land development cost, the annual operating cost of the public supporting facilities and a preset benefit value generation model;
[0164] The second generating module 405 is used to generate the current sales profit rate of the current solution according to the land price, the tax, the construction cost, the public supporting facilities fee, the self-owned funds ratio, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, the number of the saleable property and the preset sales profit rate generation model;
[0165] The judgment module 406 is used to judge whether the current benefit value is greater than a preset benefit value, and judge whether the current sales profit rate is greater than a preset sales profit rate;
[0166] The third generating module 407 is used to generate evaluation passing information corresponding to the current plan when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate.
[0167] It should be noted that the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0168] The beneficial effects of the embodiments of the present application lie in two aspects. On the one hand, when the current benefit value is greater than the preset benefit value and the current sales profit margin is greater than the preset sales profit margin, the evaluation pass information corresponding to the current plan is generated. Since no manual evaluation is required, the evaluation time is reduced, which is beneficial to improving the evaluation efficiency of the current plan for residential land. On the other hand, it will not be affected by subjectivity, which is beneficial to improving the reliability of the evaluation pass information corresponding to the current plan.
[0169] See also Figure 5 , Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.
[0170] like Figure 5 As shown, Figure 5 The electronic device 2 includes: at least one processor 20, a memory 21, and a computer program 22 stored in the memory 21 and executable on the at least one processor 20, and when the processor 20 executes the computer program 22, the steps in any of the above-mentioned method embodiments are implemented.
[0171] The electronic device 2 may include, but is not limited to, a processor 20 and a memory 21. Those skilled in the art will appreciate that Figure 5 It is only an example of the electronic device 2 and does not constitute a limitation on the electronic device 2. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.
[0172] The processor 20 is used to run the computer program 22 stored in the memory 21, and implement the following steps when executing the computer program 22:
[0173] Obtaining a current plan for undeveloped residential land, and obtaining a first data file and a second data file corresponding to the current plan;
[0174] In the first data file, the land price, taxes, public service facility income, land acquisition and demolition costs, land development costs, and annual operating costs of public supporting facilities of the current plan are obtained, wherein the land acquisition and demolition costs are the costs of land acquisition and land demolition, the land development costs are the costs of the residential land meeting the development conditions, and the annual operating costs of public supporting facilities are the total amount of money required to maintain the normal operation of public supporting facilities each year;
[0175] In the second data file, the public supporting facilities cost, the proportion of self-owned funds, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, and the number of the saleable properties of the current plan are obtained, and the public supporting facilities cost is the construction cost of the public supporting facilities;
[0176] Generate the current benefit value of the current plan according to the land price, the taxes, the public service facility income, the land acquisition and demolition cost, the land development cost, the annual operating cost of the public supporting facilities and a preset benefit value generation model;
[0177] Generate the current sales profit margin of the current plan based on the land price, the taxes, the construction cost, the public supporting facilities fee, the proportion of own funds, the annual financing loan interest rate, the project development cycle, the unit price of the saleable property, the sales area of the saleable property, the number of the saleable property and a preset sales profit margin generation model; determine whether the current benefit value is greater than the preset benefit value, and determine whether the current sales profit margin is greater than the preset sales profit margin; when the current benefit value is greater than the preset benefit value, and the current sales profit margin is greater than the preset sales profit margin, generate evaluation pass information corresponding to the current plan.
[0178] In some embodiments, the processor 20 is configured to implement:
[0179] Acquire a current plan for undeveloped residential land, and acquire a first file path and a second file path corresponding to the current plan, wherein the first file path and the second file path are different file paths;
[0180] The first data file corresponding to the current solution is obtained through the first file path, and the second data file corresponding to the current solution is obtained through the second file path.
[0181] In some embodiments, the processor 20 is configured to implement:
[0182] When the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, it is determined that the current solution passes the screening, and the number of the current solutions that pass the screening is obtained;
[0183] When the number of the current solutions that pass the screening is one, generating the evaluation pass information corresponding to the current solution;
[0184] When there are multiple current solutions that pass the screening, obtain the maximum sales profit rate among the multiple current solutions that pass the evaluation, take the current solution corresponding to the maximum sales profit rate as the preferred current solution, and generate the evaluation pass information corresponding to the preferred current solution.
[0185] In some embodiments, the processor 20 is configured to implement:
[0186] Creating a first display window and a second display window corresponding to the current solution, wherein the first display window and the second display window are different display windows;
[0187] The assessment passing information is displayed in the first display window, and the geographical location of the residential land is displayed in the second display window.
[0188] In some embodiments, the processor 20 is configured to implement:
[0189] A preset storage area is obtained, and the first data file, the second data file, and the evaluation pass information corresponding to the current solution are stored in the storage area.
[0190] In some embodiments, the processor 20 is configured to implement:
[0191] Read the preset upload time and determine whether the current time is the upload time;
[0192] If the current time is the upload time, a preset server is connected to upload the first data file, the second data file, and the evaluation pass information corresponding to the current solution to the server.
[0193] In some embodiments, the processor 20 is configured to implement:
[0194] When the current benefit value is not greater than the preset benefit value or the current sales profit rate is not greater than the preset sales profit rate, evaluation failure information corresponding to the current plan is generated.
[0195] The processor 20 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0196] In some embodiments, the memory 21 may be an internal storage unit of the electronic device 2, such as a hard disk or memory of the electronic device 2. In other embodiments, the memory 21 may also be an external storage device of the electronic device 2, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 2. Further, the memory 21 may also include both an internal storage unit of the electronic device 2 and an external storage device. The memory 21 is used to store an operating system, an application program, a boot loader (Boot Loader), data, and other programs, such as the program code of the computer program, etc. The memory 21 may also be used to temporarily store data that has been output or is to be output.
[0197] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.
[0198] An embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.
[0199] The computer-readable storage medium stores program codes, which can be called by a processor to execute the residential land assessment method described in the above method embodiment.
[0200] The computer-readable storage medium has a storage space for program codes.
[0201] The program code includes the code for any step in the residential land assessment method described in the above method embodiment.
[0202] The specific implementation of the above operations can be found in the previous embodiments, which will not be described in detail here.
[0203] The computer-readable storage medium may also be an external storage device of the residential land assessment device or electronic device, for example, a plug-in hard disk, a smart memory card (SmartMedia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), a non-transitory computer-readable storage medium (non-transitory computer-readable storage medium), etc., equipped on the residential land assessment device or electronic device.
[0204] Since the computer program stored in the computer-readable storage medium can execute any one of the residential land assessment methods provided in the embodiments of the present application, the computer-readable storage medium can achieve the beneficial effects that can be achieved by any one of the residential land assessment methods provided in the embodiments of the present application. Please see the previous embodiments for details and will not be repeated here.
[0205] An embodiment of the present application provides a computer program product. When the computer program product is run on an electronic device, the electronic device executes the above-mentioned residential land assessment method.
[0206] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium.
[0207] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0208] Based on such understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device capable of carrying the computer program code to an electronic device, a recording medium, a computer memory, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), an electrical carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.
[0209] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0210] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A method for evaluating residential land use, It is characterized in that Applied to electronic equipment, the residential land assessment method comprises: Obtaining a current plan for undeveloped residential land, and obtaining a first data file and a second data file corresponding to the current plan; In the first data file, the land price, taxes, public service facility income, land acquisition and demolition costs, land development costs, and annual operating costs of public supporting facilities of the current plan are obtained, wherein the land acquisition and demolition costs are the costs of land acquisition and land demolition, the land development costs are the costs of the residential land meeting the development conditions, and the annual operating costs of public supporting facilities are the total amount of money required to maintain the normal operation of public supporting facilities each year; In the second data file, the public supporting facilities cost, the proportion of self-owned funds, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, and the number of the saleable properties of the current plan are obtained, and the public supporting facilities cost is the construction cost of the public supporting facilities; Generate the current benefit value of the current plan according to the land price, the taxes, the public service facility income, the land acquisition and demolition cost, the land development cost, the annual operating cost of the public supporting facilities and a preset benefit value generation model; Generate the current sales profit rate of the current solution according to the land price, the taxes, the construction cost, the public supporting facilities fee, the self-owned funds ratio, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, the number of the saleable property and the preset sales profit rate generation model; Determining whether the current benefit value is greater than a preset benefit value, and determining whether the current sales profit rate is greater than a preset sales profit rate; When the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, evaluation pass information corresponding to the current plan is generated.
2. The residential land evaluation method according to claim 1, It is characterized in that The step of obtaining a current plan for undeveloped residential land and obtaining a first data file and a second data file corresponding to the current plan includes: Acquire a current plan for undeveloped residential land, and acquire a first file path and a second file path corresponding to the current plan, wherein the first file path and the second file path are different file paths; The first data file corresponding to the current solution is obtained through the first file path, and the second data file corresponding to the current solution is obtained through the second file path.
3. The residential land evaluation method according to claim 1, It is characterized in that When the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, generating evaluation pass information corresponding to the current solution, including: When the current benefit value is greater than the preset benefit value, and the current sales profit rate is greater than the preset sales profit rate, it is determined that the current solution passes the screening, and the number of the current solutions that pass the screening is obtained; When the number of the current solutions that pass the screening is one, generating the evaluation pass information corresponding to the current solution; When there are multiple current solutions that pass the screening, obtain the maximum sales profit rate among the multiple current solutions that pass the evaluation, take the current solution corresponding to the maximum sales profit rate as the preferred current solution, and generate the evaluation pass information corresponding to the preferred current solution.
4. The residential land evaluation method according to claim 1, It is characterized in that When the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes: Creating a first display window and a second display window corresponding to the current solution, wherein the first display window and the second display window are different display windows; The assessment passing information is displayed in the first display window, and the geographical location of the residential land is displayed in the second display window.
5. The residential land evaluation method according to claim 1, It is characterized in that When the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes: A preset storage area is obtained, and the first data file, the second data file, and the evaluation pass information corresponding to the current solution are stored in the storage area.
6. The residential land evaluation method according to claim 1, It is characterized in that When the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate, after generating the evaluation pass information corresponding to the current scheme, the residential land evaluation method includes: Read the preset upload time and determine whether the current time is the upload time; If the current time is the upload time, a preset server is connected to upload the first data file, the second data file, and the evaluation pass information corresponding to the current solution to the server.
7. The residential land evaluation method according to claim 1, It is characterized in that After determining whether the current benefit value is greater than a preset benefit value and determining whether the current sales profit rate is greater than a preset sales profit rate, the residential land evaluation method includes: When the current benefit value is not greater than the preset benefit value or the current sales profit rate is not greater than the preset sales profit rate, evaluation failure information corresponding to the current solution is generated.
8. A residential land assessment device, It is characterized in that Used in electronic equipment, including: A first acquisition module is used to acquire a current plan of undeveloped residential land, and acquire a first data file and a second data file corresponding to the current plan; A second acquisition module is used to obtain the land price, taxes, public service facility income, land acquisition and demolition costs, land development costs, and annual operating costs of public supporting facilities of the current plan from the first data file, wherein the land acquisition and demolition costs are the costs of land acquisition and land demolition, the land development costs are the costs of the residential land meeting the development conditions, and the annual operating costs of public supporting facilities are the total amount of money required to maintain the normal operation of public supporting facilities each year; a third acquisition module, configured to acquire, from the second data file, the public supporting facilities fee, the proportion of owned funds, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, and the number of the saleable properties of the current plan, wherein the public supporting facilities fee is the construction fee of the public supporting facilities; A first generating module is used to generate the current benefit value of the current scheme according to the land price, the taxes, the public service facility income, the land acquisition and demolition cost, the land development cost, the annual operating cost of the public supporting facilities and a preset benefit value generating model; A second generation module is used to generate the current sales profit rate of the current solution according to the land price, the taxes, the construction cost, the public supporting facilities fee, the self-owned funds ratio, the annual financing loan interest rate, the project development cycle, the sales unit price of the saleable property, the sales area of the saleable property, the number of the saleable property and a preset sales profit rate generation model; A judgment module, used to judge whether the current benefit value is greater than a preset benefit value, and to judge whether the current sales profit rate is greater than a preset sales profit rate; The third generating module is used to generate evaluation passing information corresponding to the current plan when the current benefit value is greater than the preset benefit value and the current sales profit rate is greater than the preset sales profit rate.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the residential land evaluation method according to any one of claims 1 to 7 is implemented.
10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the residential land evaluation method according to any one of claims 1 to 7 is implemented.