Photovoltaic energy storage integrated operation and maintenance management method

By building an operation and maintenance indicator management model and real-time data analysis, and generating and correcting operation and maintenance strategies, the problem of incomplete operation and maintenance management in the existing technology is solved, and the stability and efficiency of the integrated photovoltaic energy storage system are improved.

CN119005938AInactive Publication Date: 2024-11-22HUANENG SHANXI COMPREHENSIVE ENERGY CO LTD SHANXI PROVINCE +8
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410827891.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the operation and maintenance management methods of photovoltaic energy storage integrated systems rely on manual inspection and maintenance, and cannot comprehensively analyze operation data and system performance, resulting in low operation and maintenance efficiency and effectiveness, and cannot ensure the stable operation of the system.

Method used

By building an operation and maintenance indicator management model, generating operation and maintenance strategies based on historical and real-time data, calculating management coefficients, and conducting strategy evaluation and correction based on changing trends to improve system performance and security.

Benefits of technology

It improves the operation and maintenance management efficiency of the integrated photovoltaic energy storage system, ensures the safe and stable operation of the system, and enhances performance and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005938A_ABST
    Figure CN119005938A_ABST
Patent Text Reader

Abstract

The invention discloses a photovoltaic energy storage integrated operation and maintenance management method, which comprises the steps of obtaining historical operation and maintenance logs, performing classification processing on the historical operation and maintenance logs, and obtaining historical related data sets of a plurality of operation and maintenance indexes, the historical related data sets comprising historical related data and corresponding historical operation and maintenance strategies; generating a plurality of training data sets according to the historical related data sets of the plurality of operation and maintenance indexes, and constructing a plurality of operation and maintenance index management models according to the training data sets; real-time related data is analyzed, whether operation and maintenance are needed is judged, and if operation and maintenance are needed, an operation and maintenance strategy is generated based on a corresponding operation and maintenance index management model, so that the performance and safety of the photovoltaic energy storage integrated system are improved, the operation and maintenance management efficiency is improved, and safe and stable operation of photovoltaic energy storage integration is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of operation and maintenance management technology, and in particular to an operation and maintenance management method for photovoltaic energy storage integration. Background Art

[0002] Photovoltaic energy storage integration refers to a technical concept that combines photovoltaic power generation systems with energy storage systems. Photovoltaic power generation systems convert solar energy into electrical energy, but photovoltaic power stations are affected by weather and sunshine, and are intermittent, random, and volatile, which leads to fluctuations in the power generation of photovoltaic power generation systems. Therefore, configuring a certain capacity of energy storage system in a photovoltaic power station can improve energy utilization efficiency and system reliability.

[0003] In the existing technology, the operation and maintenance management methods mostly rely on manual inspection and maintenance, and the operation data and system performance analysis of the photovoltaic energy storage integration are not comprehensive, which limits the efficiency and effect of operation and maintenance management and cannot ensure the stable operation of the photovoltaic energy storage integration. Summary of the invention

[0004] In order to solve the above technical problems, the present application provides an operation and maintenance management method for photovoltaic energy storage integration, which constructs a corresponding operation and maintenance indicator management model based on historical related data groups of multiple operation and maintenance indicators, and obtains a corresponding operation and maintenance strategy based on real-time related data of photovoltaic energy storage integration. The application evaluation result of the operation and maintenance strategy is generated according to the change trend of the management coefficient after the operation and maintenance strategy, and the operation and maintenance strategy is corrected according to the application evaluation result to improve the performance and safety of the photovoltaic energy storage integration system, thereby improving the operation and maintenance management efficiency and ensuring the safe and stable operation of the photovoltaic energy storage integration.

[0005] In some embodiments of the present application, a photovoltaic energy storage integrated operation and maintenance management method is provided, comprising:

[0006] Obtain historical operation and maintenance logs, classify and process the historical operation and maintenance logs, and obtain historical related data groups of multiple operation and maintenance indicators, wherein the historical related data groups include historical related data and corresponding historical operation and maintenance strategies;

[0007] Generate multiple training data sets based on multiple historical data sets related to operation and maintenance indicators, and build multiple operation and maintenance indicator management models based on the training data sets;

[0008] Analyze relevant real-time data to determine whether operation and maintenance is required. If operation and maintenance is required, generate an operation and maintenance strategy based on the corresponding operation and maintenance indicator management model;

[0009] Perform operation and maintenance management according to the operation and maintenance strategy, calculate the management coefficient after operation and maintenance and determine the change trend of the management coefficient, evaluate the application of the operation and maintenance strategy based on the management coefficient and the change trend, and determine whether to generate correction instructions for the operation and maintenance strategy based on the application evaluation results.

[0010] In some embodiments of the present application, a plurality of historical related data groups of operation and maintenance management indicators are obtained, including:

[0011] Set multiple operation and maintenance indicators based on the operation and maintenance types in historical operation and maintenance logs;

[0012] Obtain historical data of historical operation and maintenance logs, calculate the correlation coefficient between the historical data and each operation and maintenance indicator, and set the historical data with a correlation coefficient greater than a preset correlation coefficient threshold as the historical relevant data of the corresponding operation and maintenance indicator;

[0013] Obtain the historical operation and maintenance strategy corresponding to the historical relevant data, and generate a historical relevant data group of corresponding operation and maintenance indicators from the historical relevant data and the corresponding historical operation and maintenance strategy.

[0014] In some embodiments of the present application, multiple training data sets are generated based on multiple historical related data groups of operation and maintenance management indicators, including:

[0015] Establish multiple time reference lines for the historical duration of each historical operation and maintenance strategy of the same operation and maintenance management indicator, set a preset time interval for the corresponding time reference line based on the preset detection accuracy, and set multiple collection time nodes according to the preset time interval;

[0016] For multiple collection time nodes in each time reference line, historical related data are collected, and the historical related data at the same collection time node in the same time reference line are compared with the preset standard data interval of the corresponding operation and maintenance management indicator, and abnormal related data are marked according to the comparison results and the corresponding abnormal coefficient is calculated;

[0017] According to the number of marked historical related data and the abnormal coefficient, the historical state coefficient at the corresponding collection time node is set, and the initial fault time node and the terminal fault time node corresponding to the current historical operation and maintenance strategy are set according to the historical state coefficient;

[0018] For the initial failure time node and the terminal failure time node in each time reference line, the historical related data between the initial failure time node and the terminal failure time node are intercepted, and the intercepted historical related data are identified as a set of training data corresponding to the operation and maintenance management indicators;

[0019] The multiple sets of training data corresponding to the multiple time reference lines are used to construct the training data sets of the corresponding operation and maintenance management indicators and perform neural network training to obtain the corresponding operation and maintenance indicator management model.

[0020] In some embodiments of the present application, the historical state coefficient at the corresponding acquisition time node is set according to the number of marked historical related data and the abnormal coefficient, including:

[0021] According to the comparison result, if the historical relevant data is not in the preset standard data interval and the historical relevant data difference is greater than the preset data difference threshold, the corresponding historical relevant data is set as abnormal data;

[0022] Generate an abnormal coefficient corresponding to the abnormal data according to the degree of deviation between the historical relevant data difference of the abnormal data and the preset data difference threshold;

[0023] Generate a historical state coefficient at a corresponding acquisition time node according to the number of marked abnormal data at the same acquisition time node and the corresponding abnormal coefficient;

[0024] The historical state coefficient is:

[0025]

[0026] Among them, K is the historical state coefficient, u is the number of abnormal data, |Zs-Z0| is the abnormal coefficient, Zs is the sth historical related data difference, Z0 is the preset data difference threshold, and L is the state transition coefficient.

[0027] In some embodiments of the present application, analyzing the real-time relevant data to determine whether operation and maintenance is required includes:

[0028] Obtain real-time relevant data within a preset period, classify and process the real-time relevant data, and obtain real-time relevant data of multiple operation and maintenance indicators;

[0029] Compare the real-time relevant data of each operation and maintenance indicator with the preset standard data interval, and calculate the state coefficient of each operation and maintenance indicator based on the comparison result;

[0030] If the status coefficients of all operation and maintenance indicators are greater than the preset status coefficient threshold, it is determined that no operation and maintenance is required;

[0031] If the status coefficients of all operation and maintenance indicators are not greater than the preset status coefficient threshold, the operation and maintenance indicators whose status coefficients are less than the preset status coefficient threshold are screened out and set as abnormal operation and maintenance indicators;

[0032] The operation and maintenance indicator management model corresponding to the abnormal operation and maintenance indicator is obtained, and the real-time relevant data involved in the current abnormal operation and maintenance indicator is input into the corresponding operation and maintenance indicator management model to obtain the operation and maintenance strategy.

[0033] In some embodiments of the present application, operation and maintenance management is performed according to the operation and maintenance strategy, the management coefficient after operation and maintenance is calculated, and the change trend of the management coefficient is determined, including:

[0034] Divide the operation and maintenance strategy into multiple operation and maintenance processes, and perform operation and maintenance management according to the operation and maintenance processes;

[0035] Obtain the real-time relevant data of the current abnormal operation and maintenance indicators after each operation and maintenance process, and compare the real-time relevant data with the preset standard data interval of the current abnormal operation and maintenance indicators;

[0036] If it is within the preset standard data interval, set the corresponding normal coefficient;

[0037] If it is not within the preset standard data interval, the data difference between the real-time relevant data and the preset standard data interval is calculated, and the corresponding abnormal coefficient is set according to the relationship between the data difference and the preset data difference interval;

[0038] The management coefficient after each operation and maintenance process is set according to the corresponding normal coefficient or abnormal coefficient, and the multiple management coefficients are generated into a management coefficient matrix F, F (F1, F2, ..., Fn) according to the operation and maintenance order of the operation and maintenance process, where fi is the management coefficient after the i-th operation and maintenance process, i = 1, 2..., n;

[0039] Calculate the coefficient differences between adjacent management coefficients in the management coefficient matrix F;

[0040] Determine whether all coefficient differences are greater than a preset coefficient difference threshold. If all coefficient differences are greater than the preset coefficient difference threshold, determine that the change trend of the management coefficient is an upward trend.

[0041] If they are not all greater than the preset coefficient difference threshold, a variation coefficient is generated according to the degree of deviation between the coefficient difference and the preset coefficient difference threshold and the corresponding weight coefficient;

[0042] When the variation coefficient is within the first preset variation coefficient interval, it is determined that the variation trend of the management coefficient is a general downward trend;

[0043] When the variation coefficient is within the second preset variation coefficient interval, it is determined that the variation trend of the management coefficient is a serious downward trend, and the first preset variation coefficient interval is smaller than the second preset variation coefficient interval;

[0044] Set corresponding compensation coefficients according to different change trends;

[0045] When the change trend of the management coefficient is an upward trend, the compensation coefficient is set to the third compensation coefficient d3;

[0046] When the change trend of the management coefficient is a general downward trend, the compensation coefficient is set to the second compensation coefficient d2;

[0047] When the change trend of the management coefficient is a serious downward trend, the compensation coefficient is set to the first compensation coefficient d1;

[0048] Among them, 0.5<d1<d2<1<d3<1.25;

[0049] The operation and maintenance strategy is evaluated based on the management coefficient and the compensation coefficient corresponding to the change trend of the management coefficient.

[0050] In some embodiments of the present application, a first preset standard data interval, a second preset standard data interval, and a third preset standard data interval are preset;

[0051] When the real-time related data is in the first preset standard data interval, the normal coefficient is set to the first preset normal coefficient a1;

[0052] When the real-time related data is in the second preset standard data interval, the normal coefficient is set to the second preset normal coefficient a2;

[0053] When the real-time related data is in the third preset standard data interval, the normal coefficient is set to the third preset normal coefficient a3;

[0054] Among them, 0<a1<a2<a3<1;

[0055] Presetting a first preset data difference interval, a second preset data difference interval and a third preset data difference interval;

[0056] When the data difference is within the first preset data difference interval, the abnormal coefficient is set to the third preset abnormal coefficient c3;

[0057] When the data difference is within the second preset data difference interval, the abnormal coefficient is set to the second preset abnormal coefficient c2;

[0058] When the data difference is within the first preset data difference interval, the abnormal coefficient is set to the first preset abnormal coefficient c1;

[0059] Among them, -1<c1<c2<c3<0.

[0060] In some embodiments of the present application, the operation and maintenance strategy is evaluated based on the management coefficient and its change trend, including:

[0061] The operation and maintenance strategy is evaluated based on the management coefficient matrix F of the corresponding operation and maintenance strategy and the compensation coefficient corresponding to the change trend;

[0062] The calculation formula for the application evaluation is:

[0063]

[0064] Wherein, W is the application evaluation result, dr is the rth compensation coefficient, r=1, 2, 3, Fi is the ith management coefficient, and ei is the weight coefficient corresponding to the ith management coefficient.

[0065] 9. The photovoltaic energy storage integrated operation and maintenance management method according to claim 8, characterized in that judging whether to generate a correction instruction for the operation and maintenance strategy according to the application evaluation result comprises:

[0066] Pre-set application evaluation thresholds;

[0067] When the application evaluation result is less than the application evaluation threshold, a correction instruction is generated for the operation and maintenance strategy, the operation and maintenance process that needs to be corrected is selected according to the coefficient difference, and a new operation and maintenance strategy is generated;

[0068] When the application evaluation result is greater than the application evaluation threshold, no correction instruction is generated for the operation and maintenance strategy.

[0069] Compared with the prior art, the photovoltaic energy storage integrated operation and maintenance management method of the embodiment of the present application has the following beneficial effects:

[0070] According to the historical relevant data groups of multiple operation and maintenance indicators, a corresponding operation and maintenance indicator management model is constructed, and the corresponding operation and maintenance strategy is obtained according to the real-time relevant data of the photovoltaic energy storage integration. The application evaluation result of the operation and maintenance strategy is generated according to the change trend of the management coefficient after the operation and maintenance strategy. The operation and maintenance strategy is revised according to the application evaluation result to improve the performance and safety of the photovoltaic energy storage integration system, thereby improving the operation and maintenance management efficiency and ensuring the safe and stable operation of the photovoltaic energy storage integration. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] Figure 1 It is a flow chart of an integrated photovoltaic energy storage operation and maintenance management method in the preferred embodiment of the present application. DETAILED DESCRIPTION

[0072] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0073] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0074] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0075] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0076] like Figure 1 As shown, a photovoltaic energy storage integrated operation and maintenance management method of a preferred embodiment of the present application includes:

[0077] Step S101: Obtain historical operation and maintenance logs, classify and process the historical operation and maintenance logs, and obtain historical related data groups of multiple operation and maintenance indicators, wherein the historical related data groups include historical related data and corresponding historical operation and maintenance strategies;

[0078] Step S102: generating multiple training data sets according to multiple historical related data groups of operation and maintenance indicators, and constructing multiple operation and maintenance indicator management models according to the training data sets;

[0079] Step S103: Analyze the real-time related data to determine whether operation and maintenance is required. If operation and maintenance is required, generate an operation and maintenance strategy based on the corresponding operation and maintenance indicator management model;

[0080] Step S104: Perform operation and maintenance management according to the operation and maintenance strategy, calculate the management coefficient after operation and maintenance and determine the change trend of the management coefficient, perform application evaluation on the operation and maintenance strategy according to the management coefficient and the change trend, and determine whether to generate correction instructions for the operation and maintenance strategy according to the application evaluation result.

[0081] In this embodiment, a corresponding operation and maintenance indicator management model is constructed based on the historical relevant data groups of multiple operation and maintenance indicators, and a corresponding operation and maintenance strategy is obtained based on the real-time relevant data of the photovoltaic energy storage integration. The application evaluation result of the operation and maintenance strategy is generated according to the change trend of the management coefficient after the operation and maintenance strategy, and the operation and maintenance strategy is corrected according to the application evaluation result, so as to ensure the safe and stable operation of the photovoltaic energy storage integration.

[0082] In some embodiments of the present application, a plurality of historical related data groups of operation and maintenance management indicators are obtained, including:

[0083] Set multiple operation and maintenance indicators based on the operation and maintenance types in historical operation and maintenance logs;

[0084] Obtain historical data of historical operation and maintenance logs, calculate the correlation coefficient between the historical data and each operation and maintenance indicator, and set the historical data with a correlation coefficient greater than a preset correlation coefficient threshold as the historical relevant data of the corresponding operation and maintenance indicator;

[0085] Obtain the historical operation and maintenance strategy corresponding to the historical relevant data, and generate a historical relevant data group of corresponding operation and maintenance indicators from the historical relevant data and the corresponding historical operation and maintenance strategy.

[0086] In this embodiment, the operation and maintenance types include types of operation and maintenance that require failures in the photovoltaic power generation system, failures in the energy storage system, failures in meeting the power demand or unstable power supply, and corresponding operation and maintenance indicators are set according to different operation and maintenance types. The correlation coefficient refers to the degree of correlation with the corresponding operation and maintenance indicators. The historical related data includes failure-related data of the photovoltaic power generation system, historical environmental data, historical power generation efficiency, failure-related data of the energy storage system, historical storage capacity, and historical power demand, etc.

[0087] In some embodiments of the present application, multiple training data sets are generated based on multiple historical related data groups of operation and maintenance management indicators, including:

[0088] Establish multiple time reference lines for the historical duration of each historical operation and maintenance strategy of the same operation and maintenance management indicator, set a preset time interval for the corresponding time reference line based on the preset detection accuracy, and set multiple collection time nodes according to the preset time interval;

[0089] For multiple collection time nodes in each time reference line, historical related data are collected, and the historical related data at the same collection time node in the same time reference line are compared with the preset standard data interval of the corresponding operation and maintenance management indicator, and abnormal related data are marked according to the comparison results and the corresponding abnormal coefficient is calculated;

[0090] According to the number of marked historical related data and the abnormal coefficient, the historical state coefficient at the corresponding collection time node is set, and the initial fault time node and the terminal fault time node corresponding to the current historical operation and maintenance strategy are set according to the historical state coefficient;

[0091] For the initial failure time node and the terminal failure time node in each time reference line, the historical related data between the initial failure time node and the terminal failure time node are intercepted, and the intercepted historical related data are identified as a set of training data corresponding to the operation and maintenance management indicators;

[0092] The multiple sets of training data corresponding to the multiple time reference lines are used to construct the training data sets of the corresponding operation and maintenance management indicators and perform neural network training to obtain the corresponding operation and maintenance indicator management model.

[0093] In this embodiment, the historical duration of each historical operation and maintenance strategy refers to the time point when the photovoltaic energy storage integrated system returned to normal after the last operation and maintenance to the time point when the photovoltaic energy storage integrated system returned to normal after the current historical operation and maintenance strategy operation and maintenance.

[0094] In this embodiment, the smaller the historical state coefficient is, the more likely it is that the photovoltaic energy storage integrated system will fail. The initial failure time node refers to the starting time node when the historical state coefficient is in a downward trend. When the historical state coefficient starts to become smaller, it means that the photovoltaic energy storage integrated system begins to fail. The terminal failure time node refers to the starting time node when the historical state coefficient changes from a downward trend to an upward trend.

[0095] In this embodiment, an operation and maintenance indicator management model is constructed by using multiple sets of training data corresponding to multiple historical operation and maintenance strategies of the corresponding operation and maintenance indicators. The operation and maintenance indicator management models of different operation and maintenance indicators are used to lay the foundation for formulating operation and maintenance strategies for different operation and maintenance indicators for subsequent real-time related data, thereby realizing multi-dimensional analysis of real-time related data, thereby improving the performance and safety of the photovoltaic energy storage integrated system.

[0096] In some embodiments of the present application, the historical state coefficient at the corresponding acquisition time node is set according to the number of marked historical related data and the abnormal coefficient, including:

[0097] According to the comparison result, if the historical relevant data is not in the preset standard data interval and the historical relevant data difference is greater than the preset data difference threshold, the corresponding historical relevant data is set as abnormal data;

[0098] Generate an abnormal coefficient corresponding to the abnormal data according to the degree of deviation between the historical relevant data difference of the abnormal data and the preset data difference threshold;

[0099] Generate a historical state coefficient at a corresponding acquisition time node according to the number of marked abnormal data at the same acquisition time node and the corresponding abnormal coefficient;

[0100] The historical state coefficient is:

[0101]

[0102] Among them, K is the historical state coefficient, u is the number of abnormal data, |Zs-Z0| is the abnormal coefficient, Zs is the sth historical related data difference, Z0 is the preset data difference threshold, and L is the state transition coefficient.

[0103] In this embodiment, the state conversion coefficient refers to the value obtained by converting the sum of the abnormality coefficients of a plurality of abnormal data into the same unit as the historical state coefficient.

[0104] In this embodiment, the historical state coefficient at the corresponding acquisition time node is determined according to the sum of the abnormal coefficients at the same acquisition time node, so as to judge the initial failure time node and the terminal failure time node of the corresponding operation and maintenance indicator, thereby shortening the data analysis time, obtaining the corresponding training data set, and constructing the corresponding operation and maintenance indicator management model, thereby improving the accuracy of the operation and maintenance indicator management model.

[0105] In some embodiments of the present application, analyzing the real-time relevant data to determine whether operation and maintenance is required includes:

[0106] Obtain real-time relevant data within a preset period, classify and process the real-time relevant data, and obtain real-time relevant data of multiple operation and maintenance indicators;

[0107] Compare the real-time relevant data of each operation and maintenance indicator with the preset standard data interval, and calculate the state coefficient of each operation and maintenance indicator based on the comparison result;

[0108] If the status coefficients of all operation and maintenance indicators are greater than the preset status coefficient threshold, it is determined that no operation and maintenance is required;

[0109] If the status coefficients of all operation and maintenance indicators are not greater than the preset status coefficient threshold, the operation and maintenance indicators whose status coefficients are less than the preset status coefficient threshold are screened out and set as abnormal operation and maintenance indicators;

[0110] The operation and maintenance indicator management model corresponding to the abnormal operation and maintenance indicator is obtained, and the real-time relevant data involved in the current abnormal operation and maintenance indicator is input into the corresponding operation and maintenance indicator management model to obtain the operation and maintenance strategy.

[0111] In this embodiment, abnormal related data and abnormal coefficients that are not in the preset standard data interval are obtained based on the comparison results, and multiple state coefficients within the preset time period are calculated based on the number of abnormal related data and the abnormal coefficients, and the multiple state coefficients are averaged to obtain the state coefficient of the operation and maintenance indicator.

[0112] In this embodiment, the preset state coefficient threshold refers to the minimum state coefficient when the corresponding operation and maintenance indicator is operating normally. When the state coefficient of each operation and maintenance indicator is greater than the preset state coefficient threshold, it means that each operation and maintenance indicator does not require operation and maintenance, and the system is in normal operation. The multi-dimensional operation state of the system is obtained according to the state coefficient of the operation and maintenance indicator, thereby improving the operation and maintenance efficiency of the photovoltaic energy storage integrated system and ensuring the safe and stable operation of the photovoltaic energy storage integrated system.

[0113] In some embodiments of the present application, operation and maintenance management is performed according to the operation and maintenance strategy, the management coefficient after operation and maintenance is calculated, and the change trend of the management coefficient is determined, including:

[0114] Divide the operation and maintenance strategy into multiple operation and maintenance processes, and perform operation and maintenance management according to the operation and maintenance processes;

[0115] Obtain the real-time relevant data of the current abnormal operation and maintenance indicators after each operation and maintenance process, and compare the real-time relevant data with the preset standard data interval of the current abnormal operation and maintenance indicators;

[0116] If it is within the preset standard data interval, set the corresponding normal coefficient;

[0117] If it is not within the preset standard data interval, the data difference between the real-time relevant data and the preset standard data interval is calculated, and the corresponding abnormal coefficient is set according to the relationship between the data difference and the preset data difference interval;

[0118] The management coefficient after each operation and maintenance process is set according to the corresponding normal coefficient or abnormal coefficient, and the multiple management coefficients are generated into a management coefficient matrix F, F (F1, F2, ..., Fn) according to the operation and maintenance order of the operation and maintenance process, where fi is the management coefficient after the i-th operation and maintenance process, i = 1, 2..., n;

[0119] Calculate the coefficient differences between adjacent management coefficients in the management coefficient matrix F;

[0120] Determine whether all coefficient differences are greater than a preset coefficient difference threshold. If all coefficient differences are greater than the preset coefficient difference threshold, determine that the change trend of the management coefficient is an upward trend.

[0121] If they are not all greater than the preset coefficient difference threshold, a variation coefficient is generated according to the degree of deviation between the coefficient difference and the preset coefficient difference threshold and the corresponding weight coefficient;

[0122] When the variation coefficient is within the first preset variation coefficient interval, it is determined that the variation trend of the management coefficient is a general downward trend;

[0123] When the variation coefficient is within the second preset variation coefficient interval, it is determined that the variation trend of the management coefficient is a serious downward trend, and the first preset variation coefficient interval is smaller than the second preset variation coefficient interval;

[0124] Set corresponding compensation coefficients according to different change trends;

[0125] When the change trend of the management coefficient is an upward trend, the compensation coefficient is set to the third compensation coefficient d3;

[0126] When the change trend of the management coefficient is a general downward trend, the compensation coefficient is set to the second compensation coefficient d2;

[0127] When the change trend of the management coefficient is a serious downward trend, the compensation coefficient is set to the first compensation coefficient d1;

[0128] Among them, 0.5<d1<d2<1<d3<1.25;

[0129] The operation and maintenance strategy is evaluated based on the management coefficient and the compensation coefficient corresponding to the change trend of the management coefficient.

[0130] In this embodiment, |Bv-B0| is the degree of deviation between the coefficient difference and the preset coefficient difference threshold, Bv is the vth coefficient difference, B0 is the preset coefficient difference threshold, O is the number of coefficient differences less than the preset coefficient difference threshold, jv is the weight coefficient corresponding to the vth coefficient difference, the weight coefficient is the weight coefficient of the corresponding management coefficient, and the weight coefficient of the management coefficient is set according to the importance of the operation and maintenance process. For example, if the coefficient difference of management coefficient 5 and management coefficient 4 is less than the preset coefficient difference threshold, then the weight coefficient of management coefficient 5 is set to the weight coefficient corresponding to the current coefficient difference.

[0131] In this embodiment, the operation and maintenance strategy is evaluated based on its multiple management coefficients and the change trend of the management coefficients. According to the application evaluation results, it is determined whether the current operation and maintenance strategy needs to be revised, thereby ensuring the stable operation of the photovoltaic energy storage integrated system.

[0132] In some embodiments of the present application, a first preset standard data interval, a second preset standard data interval, and a third preset standard data interval are preset;

[0133] When the real-time related data is in the first preset standard data interval, the normal coefficient is set to the first preset normal coefficient a1;

[0134] When the real-time related data is in the second preset standard data interval, the normal coefficient is set to the second preset normal coefficient a2;

[0135] When the real-time related data is in the third preset standard data interval, the normal coefficient is set to the third preset normal coefficient a3;

[0136] Among them, 0<a1<a2<a3<1;

[0137] Presetting a first preset data difference interval, a second preset data difference interval and a third preset data difference interval;

[0138] When the data difference is within the first preset data difference interval, the abnormal coefficient is set to the third preset abnormal coefficient c3;

[0139] When the data difference is within the second preset data difference interval, the abnormal coefficient is set to the second preset abnormal coefficient c2;

[0140] When the data difference is within the first preset data difference interval, the abnormal coefficient is set to the first preset abnormal coefficient c1;

[0141] Among them, -1<c1<c2<c3<0.

[0142] In this embodiment, the first preset standard data interval > the second preset standard data interval > the third preset standard data interval, but the first preset standard data interval does not include the second preset standard data interval and the third preset standard data interval, the second preset standard data interval does not include the third preset standard data interval, the first preset standard data interval refers to the general data interval of the corresponding operation and maintenance indicators in normal operation, the second preset standard data interval refers to the preferred data interval of the corresponding operation and maintenance indicators in normal operation, and the first preset standard data interval refers to the optimal data interval of the corresponding operation and maintenance indicators in normal operation.

[0143] In this embodiment, the first preset data difference interval is less than the second preset data difference interval and less than the third preset data difference interval. When the preset data difference interval in which the data difference is located is larger, the abnormality coefficient should be smaller, thereby making the management coefficient smaller, that is, the corresponding operation and maintenance process management evaluation value is smaller.

[0144] In some embodiments of the present application, the operation and maintenance strategy is evaluated based on the management coefficient and its change trend, including:

[0145] The operation and maintenance strategy is evaluated based on the management coefficient matrix F of the corresponding operation and maintenance strategy and the compensation coefficient corresponding to the change trend;

[0146] The calculation formula for the application evaluation is:

[0147]

[0148] Wherein, W is the application evaluation result, dr is the rth compensation coefficient, r=1, 2, 3, Fi is the ith management coefficient, and ei is the weight coefficient corresponding to the ith management coefficient.

[0149] 9. The photovoltaic energy storage integrated operation and maintenance management method according to claim 8, characterized in that judging whether to generate a correction instruction for the operation and maintenance strategy according to the application evaluation result comprises:

[0150] Pre-set application evaluation thresholds;

[0151] When the application evaluation result is less than the application evaluation threshold, a correction instruction is generated for the operation and maintenance strategy, the operation and maintenance process that needs to be corrected is selected according to the coefficient difference, and a new operation and maintenance strategy is generated;

[0152] When the application evaluation result is greater than the application evaluation threshold, no correction instruction is generated for the operation and maintenance strategy.

[0153] In this embodiment, an operation and maintenance process in which the coefficient difference between adjacent management coefficients is less than a preset coefficient difference threshold is selected, the selected operation and maintenance process is adjusted, and a new operation and maintenance strategy is generated, thereby improving the operation and maintenance management efficiency and improving the performance and safety of the photovoltaic energy storage integrated system.

[0154] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A photovoltaic energy storage integrated operation and maintenance management method, characterized in that: include: Obtain historical operation and maintenance logs, classify and process the historical operation and maintenance logs, and obtain historical related data groups of multiple operation and maintenance indicators, wherein the historical related data groups include historical related data and corresponding historical operation and maintenance strategies; Generate multiple training data sets based on multiple historical data sets related to operation and maintenance indicators, and build multiple operation and maintenance indicator management models based on the training data sets; Analyze relevant real-time data to determine whether operation and maintenance is required. If operation and maintenance is required, generate an operation and maintenance strategy based on the corresponding operation and maintenance indicator management model; Perform operation and maintenance management according to the operation and maintenance strategy, calculate the management coefficient after operation and maintenance and determine the change trend of the management coefficient, evaluate the application of the operation and maintenance strategy based on the management coefficient and the change trend, and determine whether to generate correction instructions for the operation and maintenance strategy based on the application evaluation results.

2. The photovoltaic energy storage integrated operation and maintenance management method according to claim 1, characterized in that: Get historical data sets related to multiple operation and maintenance management indicators, including: Set multiple operation and maintenance indicators based on the operation and maintenance types in historical operation and maintenance logs; Obtain historical data of historical operation and maintenance logs, calculate the correlation coefficient between the historical data and each operation and maintenance indicator, and set the historical data with a correlation coefficient greater than a preset correlation coefficient threshold as the historical relevant data of the corresponding operation and maintenance indicator; Obtain the historical operation and maintenance strategy corresponding to the historical relevant data, and generate a historical relevant data group of corresponding operation and maintenance indicators from the historical relevant data and the corresponding historical operation and maintenance strategy.

3. The photovoltaic energy storage integrated operation and maintenance management method according to claim 2, characterized in that: Generate multiple training data sets based on historical data sets of multiple operation and maintenance management indicators, including: Establish multiple time reference lines for the historical duration of each historical operation and maintenance strategy of the same operation and maintenance management indicator, set a preset time interval for the corresponding time reference line based on the preset detection accuracy, and set multiple collection time nodes according to the preset time interval; For multiple collection time nodes in each time reference line, historical related data are collected, and the historical related data at the same collection time node in the same time reference line are compared with the preset standard data interval of the corresponding operation and maintenance management indicator, and abnormal related data are marked according to the comparison results and the corresponding abnormal coefficient is calculated; According to the number of marked historical related data and the abnormal coefficient, the historical state coefficient at the corresponding collection time node is set, and the initial fault time node and the terminal fault time node corresponding to the current historical operation and maintenance strategy are set according to the historical state coefficient; For the initial failure time node and the terminal failure time node in each time reference line, the historical related data between the initial failure time node and the terminal failure time node are intercepted, and the intercepted historical related data are identified as a set of training data corresponding to the operation and maintenance management indicators; The multiple sets of training data corresponding to the multiple time reference lines are used to construct the training data sets of the corresponding operation and maintenance management indicators and perform neural network training to obtain the corresponding operation and maintenance indicator management model.

4. The photovoltaic energy storage integrated operation and maintenance management method according to claim 3, characterized in that: The historical state coefficient at the corresponding acquisition time node is set according to the number of marked historical related data and the abnormal coefficient, including: According to the comparison result, if the historical relevant data is not in the preset standard data interval and the historical relevant data difference is greater than the preset data difference threshold, the corresponding historical relevant data is set as abnormal data; Generate an abnormal coefficient corresponding to the abnormal data according to the degree of deviation between the historical relevant data difference of the abnormal data and the preset data difference threshold; Generate a historical state coefficient at a corresponding acquisition time node according to the number of marked abnormal data at the same acquisition time node and the corresponding abnormal coefficient; The historical state coefficient is: Among them, K is the historical state coefficient, u is the number of abnormal data, |Zs-Z0| is the abnormal coefficient, Zs is the sth historical related data difference, Z0 is the preset data difference threshold, and L is the state transition coefficient.

5. The photovoltaic energy storage integrated operation and maintenance management method according to claim 4, characterized in that: Analyze relevant real-time data to determine whether operation and maintenance is needed, including: Obtain real-time relevant data within a preset period, classify and process the real-time relevant data, and obtain real-time relevant data of multiple operation and maintenance indicators; Compare the real-time relevant data of each operation and maintenance indicator with the preset standard data interval, and calculate the state coefficient of each operation and maintenance indicator based on the comparison result; If the status coefficients of all operation and maintenance indicators are greater than the preset status coefficient threshold, it is determined that no operation and maintenance is required; If the status coefficients of all operation and maintenance indicators are not greater than the preset status coefficient threshold, the operation and maintenance indicators whose status coefficients are less than the preset status coefficient threshold are screened out and set as abnormal operation and maintenance indicators; The operation and maintenance indicator management model corresponding to the abnormal operation and maintenance indicator is obtained, and the real-time relevant data involved in the current abnormal operation and maintenance indicator is input into the corresponding operation and maintenance indicator management model to obtain the operation and maintenance strategy.

6. The photovoltaic energy storage integrated operation and maintenance management method according to claim 5, characterized in that: Perform operation and maintenance management according to the operation and maintenance strategy, calculate the management coefficient after operation and maintenance, and determine the change trend of the management coefficient, including: Divide the operation and maintenance strategy into multiple operation and maintenance processes, and perform operation and maintenance management according to the operation and maintenance processes; Obtain the real-time relevant data of the current abnormal operation and maintenance indicators after each operation and maintenance process, and compare the real-time relevant data with the preset standard data interval of the current abnormal operation and maintenance indicators; If it is within the preset standard data interval, set the corresponding normal coefficient; If it is not within the preset standard data interval, the data difference between the real-time relevant data and the preset standard data interval is calculated, and the corresponding abnormal coefficient is set according to the relationship between the data difference and the preset data difference interval; The management coefficient after each operation and maintenance process is set according to the corresponding normal coefficient or abnormal coefficient, and the multiple management coefficients are generated into a management coefficient matrix F, F (F1, F2, ..., Fn) according to the operation and maintenance order of the operation and maintenance process, where fi is the management coefficient after the i-th operation and maintenance process, i = 1, 2..., n; Calculate the coefficient differences between adjacent management coefficients in the management coefficient matrix F; Determine whether all coefficient differences are greater than a preset coefficient difference threshold. If all coefficient differences are greater than the preset coefficient difference threshold, determine that the change trend of the management coefficient is an upward trend. If they are not all greater than the preset coefficient difference threshold, a variation coefficient is generated according to the degree of deviation between the coefficient difference and the preset coefficient difference threshold and the corresponding weight coefficient; When the variation coefficient is within the first preset variation coefficient interval, it is determined that the variation trend of the management coefficient is a general downward trend; When the variation coefficient is within the second preset variation coefficient interval, it is determined that the variation trend of the management coefficient is a serious downward trend, and the first preset variation coefficient interval is smaller than the second preset variation coefficient interval; Set corresponding compensation coefficients according to different change trends; When the change trend of the management coefficient is an upward trend, the compensation coefficient is set to the third compensation coefficient d3; When the change trend of the management coefficient is a general downward trend, the compensation coefficient is set to the second compensation coefficient d2; When the change trend of the management coefficient is a serious downward trend, the compensation coefficient is set to the first compensation coefficient d1; Among them, 0.5<d1<d2<1<d3<1.25; The operation and maintenance strategy is evaluated based on the management coefficient and the compensation coefficient corresponding to the change trend of the management coefficient.

7. The photovoltaic energy storage integrated operation and maintenance management method according to claim 6, characterized in that: Presetting a first preset standard data interval, a second preset standard data interval and a third preset standard data interval; When the real-time related data is in the first preset standard data interval, the normal coefficient is set to the first preset normal coefficient a1; When the real-time related data is in the second preset standard data interval, the normal coefficient is set to the second preset normal coefficient a2; When the real-time related data is in the third preset standard data interval, the normal coefficient is set to the third preset normal coefficient a3; Among them, 0<a1<a2<a3<1; Presetting a first preset data difference interval, a second preset data difference interval and a third preset data difference interval; When the data difference is within the first preset data difference interval, the abnormal coefficient is set to the third preset abnormal coefficient c3; When the data difference is within the second preset data difference interval, the abnormal coefficient is set to the second preset abnormal coefficient c2; When the data difference is within the first preset data difference interval, the abnormal coefficient is set to the first preset abnormal coefficient c1; Among them, -1<c1<c2<c3<0.

8. The photovoltaic energy storage integrated operation and maintenance management method according to claim 6, characterized in that: The operation and maintenance strategy is evaluated based on the management coefficient and its changing trend, including: The operation and maintenance strategy is evaluated based on the management coefficient matrix F of the corresponding operation and maintenance strategy and the compensation coefficient corresponding to the change trend; The calculation formula for the application evaluation is: Wherein, W is the application evaluation result, dr is the rth compensation coefficient, r=1, 2, 3, Fi is the ith management coefficient, and ei is the weight coefficient corresponding to the ith management coefficient.

9. The photovoltaic energy storage integrated operation and maintenance management method according to claim 8, characterized in that: Determine whether to generate correction instructions for the operation and maintenance strategy based on the application evaluation results, including: Pre-set application evaluation thresholds; When the application evaluation result is less than the application evaluation threshold, a correction instruction is generated for the operation and maintenance strategy, the operation and maintenance process that needs to be corrected is selected according to the coefficient difference, and a new operation and maintenance strategy is generated; When the application evaluation result is greater than the application evaluation threshold, no correction instruction is generated for the operation and maintenance strategy.

Citation Information

Cited By

  • Data security management system and method based on multistage classification

    CN119538314A