Main road multi-path green wave control method for multiple travel modes
By building a multi-path green wave control model for main roads for multiple travel modes, the green wave belts of cars, buses and electric bicycles are optimized, and the problem of green wave coordinated control between motor vehicles and electric bicycles in the existing technology is solved, and the main road is realized The green wave synchronous optimization of various travel methods has improved the traffic efficiency.
Patent Information
- Application Number
- CN202411284530.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-22
AI Technical Summary
The existing green wave control method for the main road is mainly aimed at motor vehicles and buses, which ignores the demand for electric bicycles and cannot effectively coordinate the green waves of motor vehicles and electric bicycles, resulting in inefficient passage efficiency of the main road.
A multi-path green wave control method for the main road for multi-travel mode is proposed. A model is constructed to optimize the green wave band position, width and cyclic integer constraints of cars, buses and electric bicycles, and phase sequence and coordination are established through the 0/1 variable. The connection of paths determines the common signal period and intersection phase sequence, and realizes the synchronous optimization of multi-path green waves.
Multi-path green waves are generated for cars, buses and electric bicycles at the same time on the main road, solving the problem of green wave synchronous control between multiple travel methods and improving the traffic efficiency and coordination of the main road.
Smart Images

Figure CN119007470A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of traffic signal control, and in particular to a trunk road multi-path green wave control method for multiple travel modes. Background Art
[0002] Signal-controlled intersections are the bottleneck of the overall traffic capacity of trunk roads. How to design an efficient traffic signal control scheme to reduce the delay time and number of stops of travelers on trunk roads is one of the problems faced by traffic engineers and traffic managers. The green wave signal control of trunk roads can coordinate the traffic flow to pass through the signal-controlled intersection without stopping as much as possible by optimizing the phase difference, intersection phase sequence, common signal cycle, etc., which can significantly improve the traffic efficiency of trunk roads. However, the existing trunk road green wave control methods are mostly based on motor vehicles, namely cars and buses, and provide green wave belts for them, ignoring the widespread existence of electric bicycles on the road. In fact, electric bicycles have the advantages of convenience, low cost, energy saving and environmental protection, and have become an important tool for short-distance travel for urban residents. Therefore, it is necessary to fully consider the demand for green wave control of electric bicycles. Due to the significant difference in the running speed of electric bicycles and motor vehicles, the existing trunk road green wave control method with motor vehicles as the main research object cannot solve the problem of green wave coordinated control of motor vehicles and electric bicycles. In this regard, the present invention simultaneously considers the green wave control needs of cars, buses and electric bicycles on trunk roads, and provides a trunk road multi-path green wave control method for multiple travel modes. Summary of the invention
[0003] In order to solve the above problems, the present invention provides a trunk road multi-path green wave control method for multiple travel modes, which can achieve synchronous optimization of multi-path green wave control of multiple travel modes on the trunk road, namely cars, buses and electric bicycles.
[0004] In order to achieve the above object, the technical solution provided by the present invention is as follows:
[0005] A multi-path green wave control method for a trunk road for multiple travel modes, wherein there are N intersections on the trunk road for implementing green wave control, which are named intersection 1, intersection 2, ..., intersection i, intersection i+1, ..., intersection N in sequence, from intersection 1 to intersection N is an upward direction, and vice versa is a downward direction, the multiple travel modes refer to three travel modes of cars, buses and electric bicycles traveling on the trunk road, and the control method comprises the following steps:
[0006] Step 1: Construct a multi-path green wave control model for trunk roads with multiple travel modes;
[0007] Step 2: Determine a multi-path green wave control scheme for multiple travel modes on the main road;
[0008] In step 1, the construction of the multi-path green wave control model for multiple travel modes on the main road includes the following steps:
[0009] Step 1.1: Construct the target optimization function;
[0010] Step 1.2: For each coordinated path of each travel mode, construct the corresponding green wave belt location constraints;
[0011] Step 1.3: For each coordinated path of each travel mode, construct the corresponding green wave bandwidth constraint to be forced to zero;
[0012] Step 1.4: For each coordinated path of each travel mode, construct the corresponding green wave bandwidth minimum constraint;
[0013] Step 1.5: For each coordinated path of each travel mode, construct the corresponding green wave band cyclic integer constraint;
[0014] Step 1.6: Construct constraints to optimize the period of the common signal.
[0015] In step 1.1, the optimization objective is to maximize the sum of weighted green wave bandwidths of all coordinated paths of various travel modes on all road sections. The objective optimization function of the multi-path green wave control model for multiple travel modes is:
[0016]
[0017] Where N is the number of intersections on the trunk road; b i,m,p is the green wave bandwidth of the upbound coordinated path p of travel mode m between intersections i and i+1; is the downlink coordination path of travel mode m between intersections i and i+1 The green wave bandwidth; when m is 1, 2, and 3, it represents a car, a bus, and an electric bicycle respectively; a i,m,p and They are green wave bandwidth b i,m,p and The weight coefficient of .
[0018] In step 1.2, the green wave position constraints that need to be satisfied by each coordinated path under each travel mode are:
[0019]
[0020] In the formula, is the starting time of the up-going green light at the starting intersection i (ending intersection i+1) and the green wave bandwidth b i,m,p The spacing between the left edges of ; The end time of the downlink green light and the green wave bandwidth of the ending intersection i (starting intersection i+1) The spacing between the right edges of ; The uplink green light duration obtained by the coordinated path p at the starting intersection i (ending intersection i+1); To coordinate the path The downlink green light duration obtained at the ending intersection i (starting intersection i+1); x i,m,p and All are 0 / 1 variables; M is a sufficiently large positive number; Represents the path of travel mode m between intersections i and i+1 Be coordinated, Represents the path of travel mode m between intersections i and i+1 Not coordinated.
[0021] When a path of travel mode m between intersections i and i+1 is not coordinated, the green wave bandwidth of the corresponding path needs to be forced to zero to ensure that the expression of the objective optimization function is correct. In step 1.3, the constraint that the green wave bandwidth is forced to be zero for each coordinated path under each travel mode is:
[0022]
[0023] In step 1.4, the minimum green wave bandwidth constraint that needs to be satisfied by each coordinated path under each travel mode is:
[0024]
[0025] Where z is the inverse of the common signal period; b min It is the minimum limit of green wave bandwidth.
[0026] In step 1.5, the green wave band cyclic integer constraint that needs to be satisfied by each coordinated path under each travel mode is:
[0027]
[0028] In the formula, θ i (θ i+1 ) is the time difference between the initial time at intersection i(i+1) and the start time of the green light for the east-west through phase; is the total red light time on the left side of the green wave band of the coordinated path p at the starting intersection i (ending intersection i+1); t i,m,p k is the travel time of travel mode m on the uplink path p between intersections i and i+1. If the bus stops on the uplink path p, its travel time includes the stop time; i+1,m,p is an integer variable; To coordinate the path at the end intersection i (starting intersection i+1) The total red light time on the right side of the green wave band; The travel mode m between intersections i and i+1 is on the down path If the bus is on the down path If there is a stop on the train, the travel time includes the stop time. is an integer variable.
[0029] In formula (5), The calculation formula is:
[0030]
[0031] In the formula, g i,u is the green light time of phase u at intersection i; y i,u,v is the order of phase v and phase u of the coordinated path p at intersection i. If phase u is before phase v, then y i,u,v The value of y is 1, otherwise i,u,v The value of is 0.
[0032] In formula (6), the variable y i,u,v The following constraints also need to be met:
[0033]
[0034] In the formula, y i,v,u is the order of phase u and phase v of the coordinated path p at intersection i. If phase v is before phase u, then y i,v,u The value of y is 1, otherwise i,v,u The value of y is 0; i,u,r is the order of phase r and phase u of the coordinated path p at intersection i. If phase u is before phase r, then y i,u,r The value of y is 1, otherwise i,u,r The value of y is 0; i,r,v is the order of phase v and phase r of the coordinated path p at intersection i. If phase r is before phase v, then y i,r,v The value of y is 1, otherwise i,r,v The value of is 0.
[0035] In formula (5), The calculation formula is:
[0036]
[0037] In the formula, g i+1,u is the green light time of phase u at intersection i+1; y i+1,u,vis the order of phase v and phase u of the coordinated path p at intersection i+1. If phase u is before phase v, then y i+1,u,v The value of y is 1, otherwise, i+1,u,v The value of is 0.
[0038] In formula (8), the variable y i+1,u,v The following constraints are also required:
[0039]
[0040] In the formula, y i+1,v,u is the order of phase u and phase v of the coordinated path p at intersection i+1. If phase v is before phase u, then y i+1,v,u The value of y is 1, otherwise i+1,v,u The value of y is 0; i+1,u,r is the order of phase r and phase u of the coordinated path p at intersection i+1. If phase u is before phase r, then y i+1,u,r The value of y is 1, otherwise i+1,u,r The value of y is 0; i+1,r,v is the order of phase v and phase r of the coordinated path p at intersection i+1. If phase r is before phase v, then y i+1,r,v The value of y is 1, otherwise i+1,r,v The value of is 0.
[0041] In formula (5), The calculation formula is:
[0042]
[0043] In the formula, To coordinate the path at the terminal intersection i The total red light time on the left side of the green wave band; Coordinated path for intersection i The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0.
[0044] In formula (10), the variable The following constraints also need to be met:
[0045]
[0046] In the formula, Coordinated path for intersection i The phase u and phase The order of the two is, if the phase Before phase u, The value of is 1, otherwise The value of is 0; Coordinated path for intersection i The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0; Coordinated path for intersection i The phase With phase The order of the two is, if the phase In phase Before, The value of is 1, otherwise The value of is 0.
[0047] In formula (5), The calculation formula is:
[0048]
[0049] In the formula, To coordinate the path at the starting intersection i+1 The total red light time on the left side of the green wave band; Coordinate the path for intersection i+1 The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0.
[0050] In formula (12), the variable The following constraints also need to be met:
[0051]
[0052] In the formula, Coordinate the path for intersection i+1 The phase u and phase The order of the two is, if the phase Before phase u, The value of is 1, otherwise The value of is 0; Coordinate the path for intersection i+1 The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0; Coordinate the path for intersection i+1 The phase With phase The order of the two is, if the phase In phase Before, The value of is 1, otherwise The value of is 0.
[0053] In step 1.6, the constraint for optimizing the common signal period is:
[0054]
[0055] In the formula, C min and C max are the minimum and maximum values of the common signal period respectively.
[0056] In step 2, determining the multi-path green wave control scheme for multiple travel modes on the main road means solving the multi-path green wave control model for multiple travel modes on the main road, and then determining the common signal cycle, intersection phase difference and intersection phase sequence according to the solution results. In the solution results, z represents the inverse of the common signal cycle, and the common signal cycle is The solution θ i It represents the time difference between the initial time at intersection i and the start time of the green light for the east-west straight phase. The phase difference of intersection i is converted into seconds. The phase difference of intersection i is The method for determining the phase sequence of intersection i is as follows: i,3,2 =0,y i,2,4 =1 and y i,3,4 =1, the corresponding phase sequence is phase sequence 1; in the solution, when y i,3,2 =0,y i,2,4 =1 and y i,3,4 = 0, the corresponding phase sequence is phase sequence 2; in the solution, when y i,3,2 =1,y i,2,4 =0 and y i,3,4 =1, the corresponding phase sequence is phase sequence 3; in the solution, when y i,3,2 =1,y i,2,4 =0 and y i,3,4 = 0, the corresponding phase sequence is phase sequence 4; in the solution, when y i,3,2 =1,y i,2,4 =1 and y i,3,4 =1, the corresponding phase sequence is phase sequence 5; in the solution, when y i,3,2 =0,y i,2,4 =0 and yi,3,4 =0, the corresponding phase sequence is phase sequence 6. The phase sequence 1 refers to the phase release sequence of the intersection as west-east straight, west-east left turn, north-south straight and north-south left turn; the phase sequence 2 refers to the phase release sequence of the intersection as west-east straight, west-east left turn, north-south left turn, and north-south straight; the phase sequence 3 refers to the phase release sequence of the intersection as west-east straight, north-south straight, north-south left turn, and west-east left turn; the phase sequence 4 refers to the phase release sequence of the intersection as west-east straight, north-south left turn, north-south straight, and west-east left turn; the phase sequence 5 refers to the phase release sequence of the intersection as west-east straight, north-south straight, west-east left turn, and north-south left turn; the phase sequence 6 refers to the phase release sequence of the intersection as west-east straight, north-south left turn, west-east left turn, and north-south straight.
[0057] Compared with the prior art, the present invention has the following beneficial effects:
[0058] 1. The present invention provides a trunk road multi-path green wave control method for multiple travel modes, which can generate multi-path green waves for cars, buses and electric bicycles on the trunk road at the same time, solving the problem of synchronous control of trunk road green waves between multiple travel modes on the trunk road.
[0059] 2. A multi-path green wave control method for main roads with multiple travel modes provided by the present invention establishes a connection between the phase sequence and the coordinated path in a symmetrical phase scheme by introducing 0 / 1 variables, thereby enabling synchronous optimization of the phase sequence and the coordinated path at the intersection. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 It is a flow chart of a multi-path green wave control method for trunk roads with multiple travel modes;
[0061] Figure 2 It is a schematic diagram of a trunk road consisting of N intersections;
[0062] Figure 3 It is a schematic diagram of the multi-stream coordinated paths in the upward direction between adjacent intersections;
[0063] Figure 4 It is a schematic diagram of the multi-stream coordinated paths in the downstream direction between adjacent intersections;
[0064] Figure 5 It is the multi-path green wave time-distance diagram of the main road with multiple travel modes between adjacent intersections;
[0065] Figure 6 Schematic diagram of a trunk road corresponding to the embodiment. DETAILED DESCRIPTION
[0066] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and a specific operation process, but the protection scope of the present invention is not limited to the following embodiments.
[0067] like Figure 1 As shown, the present invention provides a trunk road multi-path green wave control method for multiple travel modes, wherein the multiple travel modes refer to three travel modes of cars, buses and electric bicycles traveling on the trunk road, and the control method comprises the following steps:
[0068] Step 1: Construct a multi-path green wave control model for trunk roads with multiple travel modes;
[0069] Step 2: Determine a multi-path green wave control scheme for multiple travel modes on the main road.
[0070] In step 1, the multi-path green wave control model for multiple travel modes is established as follows: Figure 2 On the main road shown. There are N intersections on the main road, named intersection 1, intersection 2, ..., intersection i, intersection i+1, ..., intersection N in sequence. From intersection 1 to intersection N is the upward direction, and vice versa is the downward direction. Step 1 includes the following steps:
[0071] Step 1.1: Construct the target optimization function;
[0072] Step 1.2: For each coordinated path of each travel mode, construct the corresponding green wave belt location constraints;
[0073] Step 1.3: For each coordinated path of each travel mode, construct the corresponding green wave bandwidth constraint to be forced to zero;
[0074] Step 1.4: For each coordinated path of each travel mode, construct the corresponding green wave bandwidth minimum constraint;
[0075] Step 1.5: For each coordinated path of each travel mode, construct the corresponding green wave band cyclic integer constraint;
[0076] Step 1.6: Construct constraints to optimize the period of the common signal.
[0077] Figure 3 and Figure 4 It shows the existence of multiple coordinated paths between two adjacent intersections. Figure 3 and Figure 4 It can be seen that, no matter in the upward or downward direction, each travel mode (car, bus and electric bicycle) between adjacent intersections has 4 coordinated paths. Indicates the number of the coordination path in the upstream (downstream) direction. When the values are 1, 2, 3, and 4, they represent the coordinated paths 1, 2, 3, and 4 in the uplink (downlink) direction respectively.
[0078] Figure 5 The spatial and temporal relationship between the green wave bandwidth, coordination path, phase difference, phase sequence, traffic light time, etc. between adjacent intersections is shown. Figure 5 The objective optimization function of the model, the green wave position constraint of each coordinated path under each travel mode, the green wave bandwidth of each coordinated path under each travel mode is forced to be zero, the green wave bandwidth minimum constraint of each coordinated path under each travel mode, and the green wave bandwidth cyclic integer constraint of each coordinated path under each travel mode can be constructed. The constraints for optimizing the common signal period can be directly established.
[0079] In step 1.1, the optimization objective is to maximize the sum of weighted green wave bandwidths of all coordinated paths of various travel modes on all road sections. The objective optimization function of the multi-path green wave control model for multiple travel modes is:
[0080]
[0081] Where N is the number of intersections on the trunk road; b i,m,p is the green wave bandwidth of the upbound coordinated path p of travel mode m between intersections i and i+1; is the downlink coordination path of travel mode m between intersections i and i+1 The green wave bandwidth; when m is 1, 2, and 3, it represents a car, a bus, and an electric bicycle respectively; a i,m,p and They are green wave bandwidth b i,m,p and The weight coefficient of .
[0082] In step 1.2, the green wave position constraints that need to be satisfied by each coordinated path under each travel mode are:
[0083]
[0084] In the formula, is the starting time of the up-going green light at the starting intersection i (ending intersection i+1) and the green wave bandwidth b i,m,p The spacing between the left edges of ; The end time of the downlink green light and the green wave bandwidth of the ending intersection i (starting intersection i+1) The spacing between the right edges of ; The uplink green light duration obtained by the coordinated path p at the starting intersection i (ending intersection i+1); To coordinate the path The downlink green light duration obtained at the ending intersection i (starting intersection i+1); x i,m,p and All are 0 / 1 variables; M is a sufficiently large positive number; Represents the path of travel mode m between intersections i and i+1 Be coordinated, Represents the path of travel mode m between intersections i and i+1 Not coordinated.
[0085] When a path of travel mode m between intersections i and i+1 is not coordinated, the green wave bandwidth of the corresponding path needs to be forced to zero to ensure that the expression of the objective optimization function is correct. In step 1.3, the constraint that the green wave bandwidth is forced to be zero for each coordinated path under each travel mode is:
[0086]
[0087] In step 1.4, the minimum green wave bandwidth constraint that needs to be satisfied by each coordinated path under each travel mode is:
[0088]
[0089] Where z is the inverse of the common signal period; b min It is the minimum limit of green wave bandwidth.
[0090] In step 1.5, the green wave band cyclic integer constraint that needs to be satisfied by each coordinated path under each travel mode is:
[0091]
[0092] In the formula, θ i (θ i+1 ) is the time difference between the initial time at intersection i(i+1) and the start time of the green light for the east-west through phase; is the total red light time on the left side of the green wave band of the coordinated path p at the starting intersection i (ending intersection i+1); t i,m,p k is the travel time of travel mode m on the uplink path p between intersections i and i+1. If the bus stops on the uplink path p, its travel time includes the stop time; i+1,m,p is an integer variable; To coordinate the path at the end intersection i (starting intersection i+1) The total red light time on the right side of the green wave band; The travel mode m between intersections i and i+1 is on the down path If the bus is on the down path If there is a stop on the train, the travel time includes the stop time. is an integer variable.
[0093] In formula (5), The calculation formula is:
[0094]
[0095] In the formula, g i,u is the green light time of phase u at intersection i; y i,u,v is the order of phase v and phase u of the coordinated path p at intersection i. If phase u is before phase v, then y i,u,v The value of y is 1, otherwise i,u,v The value of is 0.
[0096] In formula (6), the variable y i,u,v The following constraints also need to be met:
[0097]
[0098] In the formula, y i,v,u is the order of phase u and phase v of the coordinated path p at intersection i. If phase v is before phase u, then y i,v,u The value of y is 1, otherwise i,v,u The value of y is 0; i,u,r is the order of phase r and phase u of the coordinated path p at intersection i. If phase u is before phase r, then y i,u,r The value of y is 1, otherwise i,u,r The value of y is 0; i,r,v is the order of phase v and phase r of the coordinated path p at intersection i. If phase r is before phase v, then y i,r,v The value of y is 1, otherwise i,r,v The value of is 0.
[0099] In formula (5), The calculation formula is:
[0100]
[0101] In the formula, g i+1,u is the green light time of phase u at intersection i+1; y i+1,u,v is the order of phase v and phase u of the coordinated path p at intersection i+1. If phase u is before phase v, then y i+1,u,v The value of y is 1, otherwise, i+1,u,v The value of is 0.
[0102] In formula (8), the variable y i+1,u,vThe following constraints are also required:
[0103]
[0104] In the formula, y i+1,v,u is the order of phase u and phase v of the coordinated path p at intersection i+1. If phase v is before phase u, then y i+1,v,u The value of y is 1, otherwise i+1,v,u The value of y is 0; i+1,u,r is the order of phase r and phase u of the coordinated path p at intersection i+1. If phase u is before phase r, then y i+1,u,r The value of y is 1, otherwise i+1,u,r The value of y is 0; i+1,r,v is the order of phase v and phase r of the coordinated path p at intersection i+1. If phase r is before phase v, then y i+1,r,v The value of y is 1, otherwise i+1,r,v The value of is 0.
[0105] In formula (5), The calculation formula is:
[0106]
[0107] In the formula, To coordinate the path at the terminal intersection i The total red light time on the left side of the green wave band; Coordinated path for intersection i The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0.
[0108] In formula (10), the variable The following constraints also need to be met:
[0109]
[0110] In the formula, Coordinated path for intersection i The phase u and phase The order of the two is, if the phase Before phase u, The value of is 1, otherwise The value of is 0; Coordinated path for intersection i The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0; Coordinated path for intersection i The phase With phase The order of the two is, if the phase In phase Before, The value of is 1, otherwise The value of is 0.
[0111] In formula (5), The calculation formula is:
[0112]
[0113] In the formula, To coordinate the path at the starting intersection i+1 The total red light time on the left side of the green wave band; Coordinate the path for intersection i+1 The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0.
[0114] In formula (12), the variable The following constraints also need to be met:
[0115]
[0116] In the formula, Coordinate the path for intersection i+1 The phase u and phase The order of the two is, if the phase Before phase u, The value of is 1, otherwise The value of is 0; Coordinate the path for intersection i+1 The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0; Coordinate the path for intersection i+1 The phase With phase The order of the two is, if the phase In phase Before, The value of is 1, otherwise The value of is 0.
[0117] In step 1.6, the constraint for optimizing the common signal period is:
[0118]
[0119] In the formula, C min and C max are the minimum and maximum values of the common signal period respectively.
[0120] In step 2, determining the multi-path green wave control scheme for multiple travel modes on the main road means solving the multi-path green wave control model for multiple travel modes on the main road, and then determining the common signal cycle, intersection phase difference and intersection phase sequence according to the solution results. In the solution results, z represents the inverse of the common signal cycle, and the common signal cycle is The solution θ i It represents the time difference between the initial time at intersection i and the start time of the green light for the east-west straight phase. The phase difference of intersection i is converted into seconds. The phase difference of intersection i is The method for determining the phase sequence of intersection i is as follows: i,3,2 =0,y i,2,4 =1 and y i,3,4 =1, the corresponding phase sequence is phase sequence 1; in the solution, when y i,3,2 =0,y i,2,4 =1 and y i,3,4 = 0, the corresponding phase sequence is phase sequence 2; in the solution, when y i,3,2 =1,y i,2,4 =0 and y i,3,4 =1, the corresponding phase sequence is phase sequence 3; in the solution, when y i,3,2 =1,y i,2,4 =0 and y i,3,4 = 0, the corresponding phase sequence is phase sequence 4; in the solution, when y i,3,2 =1,y i,2,4 =1 and y i,3,4 =1, the corresponding phase sequence is phase sequence 5; in the solution, when y i,3,2 =0,y i,2,4 =0 and y i,3,4=0, the corresponding phase sequence is phase sequence 6. The phase sequence 1 refers to the phase release sequence of the intersection as west-east straight, west-east left turn, north-south straight and north-south left turn; the phase sequence 2 refers to the phase release sequence of the intersection as west-east straight, west-east left turn, north-south left turn, and north-south straight; the phase sequence 3 refers to the phase release sequence of the intersection as west-east straight, north-south straight, north-south left turn, and west-east left turn; the phase sequence 4 refers to the phase release sequence of the intersection as west-east straight, north-south left turn, north-south straight, and west-east left turn; the phase sequence 5 refers to the phase release sequence of the intersection as west-east straight, north-south straight, west-east left turn, and north-south left turn; the phase sequence 6 refers to the phase release sequence of the intersection as west-east straight, north-south left turn, west-east left turn, and north-south straight.
[0121] Example
[0122] A known east-west road such as Figure 6 As shown. It is assumed that vehicles travel from west to east in the upward direction, and vice versa in the downward direction. The distance between intersection 1 and intersection 2 is 524m, and the distance between intersection 2 and intersection 3 is 436m. The green light time of each phase at each intersection is shown in Table 1, and the unit of the green light time is the common signal cycle. The travel time of each travel mode on each coordinated path on each section is shown in Table 2. The weight coefficient of each coordinated path under each travel mode on each section is set to 1. The value range of the common signal cycle is [80,100]s. The minimum value b of the green wave bandwidth of each coordinated path under each travel mode min 4s.
[0123] Table 1 Green light time of each phase at each intersection (unit: common signal cycle)
[0124] Intersection Number Phase 1: Going straight from west to east Phase 2: Turn left from west to east Phase 3: North-South Direction Phase 4: North-South Left Turn Intersection 1 0.286 0.215 0.278 0.221 Intersection 2 0.238 0.278 0.262 0.222 Intersection 3 0.254 0.215 0.279 0.252
[0125] Table 2 Travel time of each travel mode on each coordinated path on each road section (unit: s)
[0126]
[0127] Step 1: Construct a multi-path green wave control model for multiple travel modes on main roads
[0128] When constructing the trunk road multi-path green wave control model for multiple travel modes corresponding to the embodiment, the green light duration data obtained by each coordinated path at the starting intersection or the ending intersection can be obtained in Table 1, and the green light time data of each phase of each intersection can also be obtained in Table 1. The travel time data of each travel mode on each coordinated path on each road section can be obtained in Table 2. The weight coefficient of each coordinated path under each travel mode on each road section is set to 1, and the value range of the inverse of the required common signal period z is The minimum value b of the green wave bandwidth of each coordinated path under each travel modemin is 4s, and the sufficiently large positive number M can be set to 20.
[0129] Substituting the required data into the corresponding formula, a trunk road multi-path green wave control model for multiple travel modes suitable for the embodiment can be obtained.
[0130] Step 2: Determine the multi-path green wave control scheme for multiple travel modes on the main road
[0131] Solve the multi-path green wave control model for multiple travel modes corresponding to the embodiment, and then determine the common signal cycle, intersection phase difference and intersection phase sequence according to the solution results. In the solution result, z = 0.0112219, that is, the common signal cycle is In the solution, θ1=0.481578, θ2=0, θ3=0.7936128, that is, the phase difference at intersection 1 is The phase difference at intersection 2 is Phase difference at intersection 3 The solution result y 1,3,2 =0,y 1,2,4 =1 and y 1,3,4 = 0, the phase sequence of intersection 1 is phase sequence 2, that is, go straight from west to east, turn left from west to east, turn left from north to south, and go straight from north to south; the solution result y 2,3,2 =0,y 2,2,4 =1 and y 2,3,4 =1, the phase sequence of intersection 2 is phase sequence 1, that is, going straight from west to east, turning left from west to east, going straight from north to south, and turning left from north to south; the solution result y 3,3,2 =1,y 3,2,4 =1 and y 3,3,4 =1, the phase sequence of intersection 3 is phase sequence 5, that is, go straight from west to east, go straight from north to south, turn left from west to east, and turn left from north to south.
[0132] The technical contents and technical features of the present invention have been disclosed as above. However, those skilled in the art may still make various substitutions and modifications based on the disclosure of the present invention without departing from the spirit of the present invention. Therefore, the protection scope of the present invention should not be limited to the contents disclosed in the embodiments, but should include various substitutions and modifications without departing from the present invention and be covered by the claims of this patent application.
Claims
1. A multi-path green wave control method for trunk roads with multiple travel modes, characterized by: There are N intersections on the main road where green wave control is implemented, which are named intersection 1, intersection 2, ..., intersection i, intersection i+1, ..., intersection N in sequence. From intersection 1 to intersection N is the upward direction, and the opposite direction is the downward direction. The multiple travel modes refer to three travel modes of cars, buses and electric bicycles traveling on the main road. The control method includes the following steps: Step 1: Construct a multi-path green wave control model for trunk roads with multiple travel modes; Step 2: Determine a multi-path green wave control scheme for multiple travel modes on the main road; In step 1, the construction of the multi-path green wave control model for multiple travel modes on the main road includes the following steps: Step 1.1: Construct the target optimization function; Step 1.2: For each coordinated path of each travel mode, construct the corresponding green wave belt location constraints; Step 1.3: For each coordinated path of each travel mode, construct the corresponding green wave bandwidth constraint to be forced to zero; Step 1.4: For each coordinated path of each travel mode, construct the corresponding green wave bandwidth minimum constraint; Step 1.5: For each coordinated path of each travel mode, construct the corresponding green wave band cyclic integer constraint; Step 1.6: Construct constraints to optimize the common signal period; In step 1.1, the optimization objective is to maximize the sum of weighted green wave bandwidths of all coordinated paths of various travel modes on all road sections. The objective optimization function of the multi-path green wave control model for multiple travel modes is: Where N is the number of intersections on the trunk road; b i,m,p is the green wave bandwidth of the upbound coordinated path p of travel mode m between intersections i and i+1; is the downlink coordination path of travel mode m between intersections i and i+1 The green wave bandwidth; when m is 1, 2, and 3, it represents a car, a bus, and an electric bicycle respectively; a i,m,p and They are green wave bandwidth b i,m,p and The weight coefficient of In step 1.2, the green wave position constraints that need to be satisfied by each coordinated path under each travel mode are: In the formula, is the starting time of the up-going green light at the starting intersection i (ending intersection i+1) and the green wave bandwidth b i,m,p The spacing between the left edges of ; The end time of the downlink green light and the green wave bandwidth of the ending intersection i (starting intersection i+1) The spacing between the right edges of ; The uplink green light duration obtained by the coordinated path p at the starting intersection i (ending intersection i+1); To coordinate the path The downlink green light duration obtained at the ending intersection i (starting intersection i+1); x i,m,p and All are 0 / 1 variables; M is a sufficiently large positive number; Represents the path of travel mode m between intersections i and i+1 Be coordinated, Represents the path of travel mode m between intersections i and i+1 Not coordinated; When a path of travel mode m between intersections i and i+1 is not coordinated, the green wave bandwidth of the corresponding path needs to be forced to zero to ensure that the expression of the objective optimization function is correct; in step 1.3, the constraint that the green wave bandwidth is forced to be zero for each coordinated path under each travel mode is: In step 1.4, the minimum green wave bandwidth constraint that needs to be satisfied by each coordinated path under each travel mode is: Where z is the inverse of the common signal period; b min is the minimum limit of green wave bandwidth; In step 1.5, the green wave band cyclic integer constraints that need to be satisfied by each coordinated path under each travel mode are: In the formula, θ i (θ i+1 ) is the time difference between the initial time at intersection i(i+1) and the start time of the green light for the east-west through phase; is the total red light time on the left side of the green wave band of the coordinated path p at the starting intersection i (ending intersection i+1); t i,m,p k is the travel time of travel mode m on the uplink path p between intersections i and i+1. If the bus stops on the uplink path p, its travel time includes the stop time; i+1,m,p is an integer variable; To coordinate the path at the end intersection i (starting intersection i+1) The total red light time on the right side of the green wave band; The travel mode m between intersections i and i+1 is on the down path If the bus is on the down path If there is a stop on the train, the travel time includes the stop time. is an integer variable; In formula (5), The calculation formula is: In the formula, g i,u is the green light time of phase u at intersection i; y i,u,v is the order of phase v and phase u of the coordinated path p at intersection i. If phase u is before phase v, then y i,u,v The value of y is 1, otherwise i,u,v The value of is 0; In formula (6), the variable y i,u,v The following constraints also need to be met: In the formula, y i,v,u is the order of phase u and phase v of the coordinated path p at intersection i. If phase v is before phase u, then y i,v,u The value of y is 1, otherwise i,v,u The value of y is 0; i,u,r is the order of phase r and phase u of the coordinated path p at intersection i. If phase u is before phase r, then y i,u,r The value of y is 1, otherwise i,u,r The value of y is 0; i,r,v is the order of phase v and phase r of the coordinated path p at intersection i. If phase r is before phase v, then y i,r,v The value of y is 1, otherwise i,r,v The value of is 0; In formula (5), The calculation formula is: In the formula, g i+1,u is the green light time of phase u at intersection i+1; y i+1,u,v is the order of phase v and phase u of the coordinated path p at intersection i+1. If phase u is before phase v, then y i+1,u,v The value of y is 1, otherwise, i+1,u,v The value of is 0; In formula (8), the variable y i+1,u,v The following constraints are also required: In the formula, y i+1,v,u is the order of phase u and phase v of the coordinated path p at intersection i+1. If phase v is before phase u, then y i+1,v,u The value of y is 1, otherwise i+1,v,u The value of y is 0; i+1,u,r is the order of phase r and phase u of the coordinated path p at intersection i+1. If phase u is before phase r, then y i+1,u,r The value of y is 1, otherwise i+1,u,r The value of y is 0; i+1,r,v is the order of phase v and phase r of the coordinated path p at intersection i+1. If phase r is before phase v, then y i+1,r,v The value of y is 1, otherwise i+1,r,v The value of is 0; In formula (5), The calculation formula is: In the formula, To coordinate the path at the terminal intersection i The total red light time on the left side of the green wave band; Coordinated path for intersection i The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0; In formula (10), the variable The following constraints also need to be met: In the formula, Coordinated path for intersection i The phase u and phase The order of the two is, if the phase Before phase u, The value of is 1, otherwise The value of is 0; Coordinated path for intersection i The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0; Coordinated path for intersection i The phase With phase The order of the two is, if the phase In phase Before, The value of is 1, otherwise The value of is 0; In formula (5), The calculation formula is: In the formula, To coordinate the path at the starting intersection i+1 The total red light time on the left side of the green wave band; Coordinate the path for intersection i+1 The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0; In formula (12), the variable The following constraints also need to be met: In the formula, Coordinate the path for intersection i+1 The phase u and phase The order of the two is, if the phase Before phase u, The value of is 1, otherwise The value of is 0; Coordinate the path for intersection i+1 The phase The relationship between phase u and phase u is that if phase u is in phase Before, The value of is 1, otherwise The value of is 0; Coordinate the path for intersection i+1 The phase With phase The order of the two is, if the phase In phase Before, The value of is 1, otherwise The value of is 0; In step 1.6, the constraint for optimizing the common signal period is: In the formula, C min and C max are the minimum and maximum values of the common signal period respectively.
2. The method for controlling multi-path green waves on trunk roads for multiple travel modes according to claim 1, characterized in that: In step 2, determining the multi-path green wave control scheme for multiple travel modes on the main road means solving the multi-path green wave control model for multiple travel modes on the main road, and then determining the common signal cycle, intersection phase difference and intersection phase sequence according to the solution results; in the solution results, z represents the inverse of the common signal cycle, and the common signal cycle is The solution θ i It represents the time difference between the initial time at intersection i and the start time of the green light for the east-west straight phase. The phase difference of intersection i is converted into seconds. The phase difference of intersection i is The method for determining the phase sequence of intersection i is as follows: i,3,2 =0,y i,2,4 =1 and y i,3,4 =1, the corresponding phase sequence is phase sequence 1; in the solution, when y i,3,2 =0,y i,2,4 =1 and y i,3,4 = 0, the corresponding phase sequence is phase sequence 2; in the solution, when y i,3,2 =1,y i,2,4 =0 and y i,3,4 =1, the corresponding phase sequence is phase sequence 3; in the solution, when y i,3,2 =1,y i,2,4 =0 and y i,3,4 = 0, the corresponding phase sequence is phase sequence 4; in the solution, when y i,3,2 =1,y i,2,4 =1 and y i,3,4 =1, the corresponding phase sequence is phase sequence 5; in the solution, when y i,3,2 =0,y i,2,4 =0 and y i,3,4 =0, the corresponding phase sequence is phase sequence 6; the phase sequence 1 refers to the phase release sequence of the intersection as west-east straight, west-east left turn, north-south straight and north-south left turn; the phase sequence 2 refers to the phase release sequence of the intersection as west-east straight, west-east left turn, north-south left turn, and north-south straight; the phase sequence 3 refers to the phase release sequence of the intersection as west-east straight, north-south straight, north-south left turn, and west-east left turn; the phase sequence 4 refers to the phase release sequence of the intersection as west-east straight, north-south left turn, north-south straight, and west-east left turn; the phase sequence 5 refers to the phase release sequence of the intersection as west-east straight, north-south straight, west-east left turn, and north-south left turn; the phase sequence 6 refers to the phase release sequence of the intersection as west-east straight, north-south left turn, west-east left turn, and north-south straight.
Citation Information
Cited By
Road network multi-path green wave control method of multi-trip mode under early start and late break phase
CN119741843A
Multi-critical-path-oriented variable-bandwidth green wave coordination method and system for trunk road
CN119811111A