Construction method of permeable breakwater structure with wave dissipation function

By using a combination of structures distributed in an annular array and permeable hole wave-removing chambers in the breakwater structure, the problems of low construction efficiency and poor resistance to wind and waves are solved, and more efficient wave energy consumption and construction efficiency are achieved.

CN119021141APending Publication Date: 2024-11-26SOUTHERN BRANCH OF CHINA COMM CONSTR CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411267417.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, the construction efficiency of breakwater structures is low and have poor resistance to wind and waves, and cannot meet the strict requirements of deep sea projects.

Method used

The construction method of the water permeable and wave-removing function is adopted. Through the distribution of multiple structures annular arrays, a narrow space and wave-removing cavity are formed. The permeable holes are used to communicate with the cavity, changing the wave travel speed and flow field, and consuming wave energy. And improve construction efficiency through prefabricated processes.

Benefits of technology

The breakwater's resistance to wind and waves has been improved, the construction period has been shortened, land use has been saved and construction costs have been reduced, and more efficient wave energy consumption and structural stability have been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021141A_ABST
    Figure CN119021141A_ABST
Patent Text Reader

Abstract

The invention provides a construction method of a permeable breakwater structure with a wave dissipation function, the breakwater structure comprises a plurality of structures, the structures are distributed in an annular array, and a narrow space is formed between every two adjacent structures; the structure comprises a foundation structure and a dike body structure which are sequentially arranged from bottom to top, water permeable holes are formed in the dike body structure, a cavity in the dike body structure forms a wave dissipation cavity, and the wave dissipation cavity is communicated with the water permeable holes. The construction method comprises the steps that the structure is prefabricated in a prefabrication factory in a fragmented or segmented mode, a shoreside platform is assembled and outfitted, the module vehicle is installed on a ship in a rolling mode and shipped, field diving is conducted, a cavity in the structure is inflated for floating transportation, a crane ship assists floating in place, and the structure is installed in a negative-pressure sinking mode. According to the structure, the wave dissipating cavities of the structures and the narrow spaces between the adjacent structures change the wave advancing speed and the flow field, reflected waves, incident waves, vortexes and cavitation bubbles are formed, and wave energy is consumed. Structures are prefabricated in a prefabrication factory in a fragmented or segmented mode, the efficiency and quality are improved, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of hydraulic engineering and coastal defense technology, and more specifically, to a construction method of a water-permeable breakwater structure with its own wave-breaking function. Background Art

[0002] With the strengthening of national strength, national defense construction, fishery breeding, ports and docks, and artificial island construction have begun to develop in the deep sea; the sea is deep, the waves are high, and the natural conditions are extremely harsh. In order to form effective protection, it is necessary to build sea defense structures to resist wind and wave conditions, and it is necessary to build super-large structures that can withstand the harsh external sea conditions. Vertical dikes are a common structural type in ports and coastal defense projects. The construction of such structures at sea will change the wave form in the sea area in front of it, thereby affecting the effect of waves on buildings and forming a cover for the waters behind the structures. For example: the first super-large deep-sea marine ranch pilot project in China has a water depth of about -30m, a wave height of 15m, and a wavelength period of more than 10s. It is a long-period wave with extremely strong destructive power. In order to effectively ensure the safety of the cages themselves and the breeding ranches, hydraulic structures must be used to form a ring to form a relatively enclosed breeding base to resist the harsh sea conditions around.

[0003] For offshore operations, the sea conditions are poor, so it is necessary to choose a site with good sea conditions and preferably avoid the typhoon season. The construction period is tight and the project volume is large. The traditional structure and prefabrication process have low construction efficiency and cannot meet the construction period requirements. Traditional coastal defense structures generally adopt straight wall structures, which have poor resistance to wind and waves, and reduce the ability to protect the waters behind the structure. Summary of the invention

[0004] The purpose of the embodiments of the present application is to provide a construction method for a permeable breakwater structure with its own wave-breaking function, so as to solve the technical problems existing in the prior art of low construction efficiency and poor wind and wave resistance.

[0005] To achieve the above-mentioned purpose, the technical solution adopted in the present application is: to provide a construction method of a permeable breakwater structure with self-contained wave-breaking function, wherein the breakwater structure includes a plurality of structures, and the plurality of structures are distributed in a circular array, and there is a narrow space between two adjacent structures; the structure includes a foundation structure and a levee structure arranged in sequence from bottom to top, and the levee structure is provided with permeable holes, and the cavity inside the levee structure forms a wave-breaking cavity, and the wave-breaking cavity is connected to the permeable holes; the construction method includes: the structure is prefabricated in pieces or sections in a prefabrication factory, the shore platform is assembled and outfitted, the module car is rolled onto the ship for shipment, the structure is dived on site, the cavity in the structure is inflated and floated, the crane ship assists in floating into place, and the structure is installed by sinking under negative pressure.

[0006] Optionally, the basic structure includes a base and a top plate, the bottom of the base is buried in the seabed mud, and the top of the base is connected to the top plate; the base includes an annular outer wall, an annular inner wall and a plurality of partitions; the annular outer wall is sleeved on the annular inner wall, the partition is connected to the annular outer wall and the annular inner wall, and a plurality of partitions are arranged at intervals to divide the cavity between the annular outer wall and the annulus into a plurality of compartments.

[0007] Optionally, the prefabrication of the infrastructure includes:

[0008] Prefabrication of partitions: partitions are produced in the workshop on a flat plate assembly line. They are prefabricated and steamed in horizontal double-layer panels divided vertically according to their lengths, erected outside the workshop, and stored vertically.

[0009] The wall is prefabricated in pieces, and the pieces are reasonably divided according to the approximate straight lines of the curved surface. The double-stacked plate mode is constructed on a special mold production line, steam-cured, transported to the outside of the workshop, turned over, and stored vertically; the wall pieces are used to make the annular outer wall and the annular inner wall;

[0010] The top slab is prefabricated in the form of a single composite slab, which is divided into sections according to the structure, prefabricated and stored horizontally, and the concrete on the top of the composite slab is poured on site.

[0011] Optionally, after the prefabrication of the basic structure is completed, it is transported or hoisted to the platform assembly area, quickly and accurately positioned according to the floor markings and the tooling structure, and assembled in the order of inside first and outside later; after the annular outer wall, the annular inner wall and the partition are assembled, the joint steel bars are tied and the joint formwork is erected; after all the joint formworks are erected, the top single-sided composite slab is hoisted, and the connecting bars between the wall segments and the connecting steel bars with the top plate are tied; after all the steel bars are tied, the concrete of the joint and the top plate is poured at one time; after the pouring is completed, it is maintained and stored according to the specified time.

[0012] Optionally, the embankment structure includes a plurality of columns and a plurality of arch rings, one end of the column is installed on the basic structure, and the plurality of columns are distributed in an array along the circumferential direction of the arch ring; the plurality of arch rings are stacked in sequence from bottom to top along the length direction of the column, and the outer wall of the arch ring is provided with a water-permeable hole, and the cavity inside the arch ring forms a wave-breaking cavity, and the wave-breaking cavity is connected to the water-permeable hole.

[0013] Optionally, the columns are horizontally bound with steel cages as a whole, and are horizontally prefabricated, and are steam cured in a workshop, turned over outside the workshop, and stored on site.

[0014] Optionally, the column passes through the top plate and is connected to the base as a whole; the bottom of the column is provided with vertical steel bars and horizontal steel bars connected to the top plate.

[0015] Optionally, the embankment structure further includes a tie rod, which is horizontally arranged, and both ends of the tie rod are respectively connected to the two columns; a tie rod connection hole is reserved in the middle of the column wall.

[0016] Optionally, the arch ring includes a plurality of arc pieces, which are connected in sequence to form an annular structure; the arc pieces are prefabricated, and the vertical and circumferential dimensions of the plurality of arc pieces are equal, and a part of the arc pieces are provided with the water-permeable holes; the arc pieces are cast and cured on a special mold table, and are turned over after reaching a predetermined strength, and transported to outside the workshop for storage.

[0017] Optionally, when assembling the embankment structure, the outer shape assembly is completed in the order of columns first and then arch rings, and the overall verticality and ovality are verified. If the requirements are met, the tie rods are installed and verified again for compliance; cast-in-place concrete is completed at each joint on the general assembly platform, and finally prestress is applied to the columns, the tie rod connection holes are closed, and the general assembly of the embankment structure is completed.

[0018] The construction method of the permeable breakwater structure with self-wave dissipation function provided by the present application has the following beneficial effects:

[0019] (1) Compared with the prior art, in the present application, multiple structures are distributed in a circular array, and there is a narrow space between two adjacent structures. The wave-breaking cavity of the structure and the narrow space between adjacent structures change the wave travel speed and flow field, forming reflected waves, incident waves, vortices and cavitations, and consuming wave energy. The water flow and wave speed between the structures increase, the waves arrive early, the liquid level rises (or decreases), and the flow field of the outer wall of the adjacent structure changes, causing water collision and partial reflection, which consumes part of the wave energy; the water entering the internal cavity in the early stage fluctuates with the water entering the internal cavity later, consuming another part of the wave energy; due to the irregularity of the reflected wave and the phase difference with the incident wave, the incident wave and the reflected wave interfere with each other to reduce the water surface oscillation and the effect of wave impact pressure; the outer wall of the embankment structure is provided with water-permeable holes, and after the incident wave enters the wave-breaking chamber through the water-permeable holes, the wave energy is consumed, thereby achieving the effect of wave breaking.

[0020] (2) Compared with the prior art, the structure of the present application is prefabricated in pieces or sections in a prefabrication factory, which solves the problem of shortage of land supply for the construction of super-large structure prefabrication factories. Factory prefabrication can save a lot of land; small pieces are prefabricated in the factory and assembled into a whole, which solves the problem of insufficient large lifting equipment in the workshop; the workshop-based and standardized production of concrete components improves efficiency and quality, and solves the problem of tight construction period; it solves the problem of difficult steel bar binding for large components and difficult quality control and inspection; small pieces are prefabricated, small templates are simple to make, and the turnover times are high, which is green, energy-saving and environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0022] Figure 1 A schematic diagram of the structure of a water-permeable breakwater structure with self-contained wave-breaking function provided in an embodiment of the present application;

[0023] Figure 2 for Figure 1 Middle A is a partial enlarged schematic diagram;

[0024] Figure 3 A side elevation view of a structure in a water-permeable breakwater structure with self-contained wave-breaking function provided in an embodiment of the present application;

[0025] Figure 4 A front elevation view of a structure in a water-permeable breakwater structure with self-contained wave-breaking function provided in an embodiment of the present application;

[0026] Figure 5 A rear elevation view of a structure in a water-permeable breakwater structure with self-contained wave-breaking function provided in an embodiment of the present application;

[0027] Figure 6 A cross-sectional view of the foundation structure of a water-permeable breakwater structure with self-contained wave-breaking function provided in an embodiment of the present application;

[0028] Figure 7 A cross-sectional view of the embankment structure of a water-permeable breakwater structure with self-contained wave-breaking function provided in an embodiment of the present application;

[0029] Figure 8 A cross-sectional view of the embankment structure (including tie rods) of a water-permeable breakwater structure with self-contained wave-breaking function provided in an embodiment of the present application.

[0030] Among them, the reference numerals in the figure are:

[0031] 1-Structure; 2-Narrow space;

[0032] 10-base structure; 101-base; 111-annular outer wall; 112-annular inner wall; 113-partition; 102-top plate;

[0033] 20-embankment structure; 201-column; 202-arch ring; 221-water permeable hole; 222-wave-breaking cavity; 203-pull rod; 204-support column. DETAILED DESCRIPTION

[0034] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0035] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.

[0036] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0037] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0038] The construction method of the permeable breakwater structure with self-wave dissipation function provided in the embodiment of the present application is now described. Figure 1 and Figure 2 The breakwater structure includes a plurality of structures 1, which are distributed in a circular array, and a narrow space 2 is provided between two adjacent structures 1; Figure 3 As shown, the structure 1 includes a foundation structure 10 and a dike structure 20 arranged in sequence from bottom to top, a water-permeable hole 221 is provided on the dike structure 20, and the cavity inside the dike structure 20 forms a wave-breaking cavity 222, which is connected to the water-permeable hole 221; the construction method of the water-permeable breakwater structure with self-contained wave-breaking function includes: the structure 1 is prefabricated in pieces or sections in a prefabrication factory, the shore platform is assembled and outfitted, the module car is rolled on board and shipped, the site is submerged, the cavity in the structure 1 is inflated and floated, the crane ship assists in floating in place, and the structure 1 is installed by negative pressure sinking. Among them, the module car can be a large SPMT car (self-propelled module transporter).

[0039] The present embodiment provides a permeable breakwater structure with self-contained wave-breaking function. Compared with the prior art, in the embodiment of the present application, a plurality of structures 1 are distributed in a circular array, and a narrow space 2 is provided between two adjacent structures 1. The wave-breaking cavity 222 of the structure 1 and the narrow space 2 between the adjacent structures 1 both change the wave travel speed and flow field, forming reflected waves, incident waves, vortices and cavitations, and consuming wave energy. The water flow and wave speed between structures 1 increase, the wave arrives early, the liquid level rises (or falls), and the flow field of the outer wall of the adjacent structure 1 changes, resulting in water collision, partial reflection, and consumption of part of the wave energy; the water entering the internal cavity in the early stage fluctuates with the water entering the internal cavity in the later stage, consuming another part of the wave energy; due to the irregularity of the reflected wave and the phase difference with the incident wave, the incident wave and the reflected wave interfere with each other to reduce the oscillation of the water surface and the effect of the wave impact pressure; the outer wall of the embankment structure 20 is provided with a water-permeable hole 221, and after the incident wave enters the wave-breaking chamber through the water-permeable hole 221, the wave energy is consumed, thereby achieving the effect of wave breaking.

[0040] The present embodiment provides a construction method for a permeable breakwater structure with a self-contained wave-breaking function. Compared with the prior art, the structure 1 of the present application is prefabricated in pieces or sections in a prefabrication factory, which solves the problem of shortage of land supply for the construction of prefabrication factories for super-large structures, and factory-based prefabrication can save a lot of land; small pieces are prefabricated in factories and assembled into groups, which solves the problem of insufficient large lifting equipment in workshops; concrete components are produced in workshops and in a standardized manner, which improves efficiency and quality and solves the problem of tight construction period; the problems of difficulty in steel bar binding, quality control and inspection of large components are solved; small pieces are prefabricated, small templates are simple to make, and the turnover times are high, which is green, energy-saving and environmentally friendly.

[0041] In one embodiment of the present application, see Figure 3 The foundation structure 10 includes a base 101 and a top plate 102. The bottom of the base 101 is buried in the seabed mud, and the top of the base 101 is connected to the top plate 102. Figure 6 As shown, the base 101 includes an annular outer wall 111, an annular inner wall 112 and a plurality of partitions 113; the annular outer wall 111 is sleeved on the annular inner wall 112, the partitions 113 are connected to the annular outer wall 111 and the annular inner wall 112, and the plurality of partitions 113 are arranged at intervals to divide the cavity between the annular outer wall 111 and the annular cavity into a plurality of compartments.

[0042] In this embodiment, the cross-sectional dimension of the foundation structure 10 is larger than the cross-sectional dimension of the embankment structure 20 , so that the overall center of gravity moves downward, thereby improving the stability of the structure 1 .

[0043] In this embodiment, a plurality of partitions 113 are arranged at intervals to separate the annular outer wall 111 and the cavity between the annuli into a plurality of compartments, which can be used to adjust the negative pressure value of each compartment and control the sinking speed and verticality of the basic structure 10.

[0044] Specifically, the shape of the annular outer wall 111 is similar to a sports track, and the outermost ends of the annular outer wall 111 are semicircular, with vertical edges on both sides; the annular inner wall 112 is a circular ring.

[0045] In one embodiment of the present application, the prefabrication of the base structure 10 includes:

[0046] The partition 113 is prefabricated. The partition 113 is factory-produced on a flat plate assembly line in a workshop. The partition 113 is prefabricated and steamed in horizontal double-layered panels in vertical sections according to the length dimensions, and then erected outside the workshop and stored vertically.

[0047] The wall is prefabricated in pieces, and the pieces are reasonably divided according to the approximate straight lines of the curved surface. The double-stacked plate mode is constructed on a special mold production line, steam-cured, transported to the outside of the workshop, turned over, and stored vertically. The wall pieces are used to make an annular outer wall 111 and an annular inner wall 112;

[0048] The top plate 102 is prefabricated in the form of a single composite plate, which is divided into pieces according to the structure, prefabricated and stored horizontally, and the concrete on the top of the composite plate is poured on site.

[0049] In one embodiment of the present application, after the prefabrication of the basic structure 10 is completed, it is transported or hoisted to the platform assembly area, and is quickly and accurately positioned according to the floor markings and the tooling structure, and assembled in the order of inside first and outside later; after the annular outer wall 111, the annular inner wall 112 and the partition 113 are assembled, the joint steel bars are tied and the joint formwork is erected; after all the joint formworks are erected, the top single-sided composite slab is hoisted, and the connecting bars between the wall segments and the connecting steel bars with the top plate 102 are tied; after all the steel bars are tied, the concrete of the joints and the top plate 102 is poured at one time; after the pouring is completed, it is cured and stored according to the prescribed time.

[0050] In this embodiment, the basic structure 10 is divided into different prefabricated units according to the structural form and size, and prefabricated and maintained in the factory workshop, with a high level of intelligence, high prefabrication accuracy, reliable quality, controllable progress, less use of professional workers, and green and environmentally friendly.

[0051] In one embodiment of the present application, see Figure 3 The embankment structure 20 includes a plurality of columns 201 and a plurality of arch rings 202. One end of the column 201 is mounted on the foundation structure 10. The plurality of columns 201 are arranged in an array along the circumference of the arch ring 202. The plurality of arch rings 202 are stacked from bottom to top along the length direction of the column 201. The outer wall of the arch ring 202 is provided with a water-permeable hole 221. Figure 8As shown, the cavity inside the arch ring 202 forms a wave-breaking cavity 222 , and the wave-breaking cavity 222 is communicated with the water-permeable hole 221 .

[0052] In one embodiment of the present application, the foundation of the column 201 (including the annular and radial wall parts) is prefabricated in the lower structure, and is lifted and turned over by two gantry cranes, one high and one low; stored in the yard, and installed on the assembly platform. The column 201 is the main load-bearing component, bearing various horizontal forces and bending moments. The vertical steel bars must be continuous or the joints must transmit force continuously and reliably. The column 201 is tied horizontally with a steel cage as a whole, and the horizontal prefabrication process is adopted. It adopts steam curing in the workshop, turning over outside the workshop, and field storage process.

[0053] In one embodiment of the present application, the column 201 passes through the top plate 102 and is connected to the base 101 as a whole; the bottom of the column 201 is provided with vertical and horizontal steel bars connected to the top plate 102. A connecting hole for the tie rod 203 is reserved in the middle of the wall of the column 201.

[0054] In this embodiment, the column 201 passes through the top plate 102 and extends into the base 101, which can improve the connection stability between the embankment structure 20 and the foundation structure 10; further, the arch ring 202 can also penetrate into the base 101 and be connected to the partition 113 as a whole, which can not only improve the stability of the connection, but also move the overall center of gravity downward, thereby improving the stability of the structure 1.

[0055] In one embodiment of the present application, Figure 7 As shown, the embankment structure 20 also includes a tie rod 203, which is horizontally arranged, and the two ends of the tie rod 203 are respectively connected to the two columns 201; a connection hole for the tie rod 203 is reserved in the middle of the wall of the column 201.

[0056] In this embodiment, by providing the pull rod 203, a plurality of columns 201 can be connected into a whole, thereby improving the stability of the overall structure.

[0057] In one embodiment of the present application, see Figure 7 The embankment structure 20 further includes a support column 204, which is arranged along the axis of the arch ring 202. A plurality of tie rods 203 are provided, one end of each of the tie rods 203 is connected to the support column 204, and the other end of each of the tie rods 203 is connected to a column 201 in a one-to-one correspondence.

[0058] In this embodiment, a structure 1 can be provided with six columns 201, and the six columns 201 are distributed in a regular hexagon; the columns 201 serve as supports for the arch ring 202, and transmit the water flow force, wave force, wind load, etc. of the arch ring 202 to the columns 201. The columns 201 adopt a prestressed structure vertically, which generates a great resistance to external forces and moments. Correspondingly, six tie rods 203 are also provided, and the columns 201, tie rods 203, and support columns 204 form a whole, which improves the overall rigidity of the embankment structure 20 and ensures safe and reliable force.

[0059] It is understandable that, in response to different water depths and wave conditions, the number of columns 201, the dimensions of the foundation structure 10, and the embankment structure 20 can all be changed, which is universal.

[0060] In one embodiment of the present application, the arch ring 202 includes a plurality of arc pieces, which are connected in sequence to form a ring structure; the arc pieces are prefabricated, and the vertical and circumferential dimensions of the plurality of arc pieces are equal, and a portion of the arc pieces are provided with water-permeable holes 221; the arc pieces are cast and cured on a special mold platform, and after reaching a predetermined strength, they are turned over and transported to the outside of the workshop for storage. The workshop has assembly line operation, 24-hour operation, high degree of intelligence, less industrial workers, guaranteed construction period, high and stable product quality, green environmental protection, and energy saving.

[0061] The tie rod 203 is prefabricated, and is also prefabricated as a whole in the workshop, leaving a cast-in-place steel bar head at the connection with the column 201.

[0062] In this embodiment, the arch ring 202 uses a plurality of arc pieces, and the thickness and reinforcement of the arc pieces meet the external resistance requirements; specifically, the arch ring 202 is cylindrical, and the cylindrical structure has a good water flow field and scientific force transmission. The column 201 adopts a prestressed reinforced concrete hollow structure, similar to a continuous plate lattice column. Under the same weight and area, the cross-sectional area is expanded, the self-rigidity is large, the cross-sectional force transmission is scientific, the force is clear, the structure is light, and the engineering cost is low.

[0063] In one embodiment of the present application, when assembling the embankment structure 20, the outer shape assembly is completed in the order of columns 201 first and then arch rings 202, and the overall verticality and ovality are checked. If the requirements are met, the tie rods 203 are installed and checked again for compliance; cast-in-place concrete is completed at each joint on the assembly platform, and finally prestress is applied to the columns 201, and the connecting holes of the tie rods 203 are closed to complete the assembly of the embankment structure 20.

[0064] In this embodiment, the embankment structure 20 is relatively simple in composition, including columns 201, arch rings 202 and tie rods 203, and each part has a single size specification, which greatly simplifies the prefabrication process and the types of formwork.

[0065] Outfitting is the process of pre-outfitting prefabricated components, including the installation of opening sealing plates and the transportation and installation of required ancillary facilities.

[0066] For shipment, choose a place with good seawater window, use SPMT heavy module vehicle to roll on semi-submersible barge or semi-submersible ship, carry out hatch sealing operation, fix it, exit the module vehicle, and tow it to the site. Dive at the designated location, move structure 1 out of the semi-submersible barge, and complete the transportation task.

[0067] Installation: According to the construction sequence on site, install one by one from the direction of strong waves. During the installation process, control the position, verticality and elevation.

[0068] In one embodiment of the present application, the foundation structure 10 further includes a bottom plate (not shown), which is connected to the bottom of the base 101 and is installed on a base bed on the seabed.

[0069] In this embodiment, whether the foundation structure 10 includes a bottom plate can be determined according to the specific geological structure. The foundation structure 10 is used to bear its own weight and various external forces transmitted from the embankment structure 20. In the case of good geological conditions and a shallow silt layer, the foundation structure 10 can be provided with a bottom plate, and the ground is simply riprap-leveled, and the bottom plate is located on the base bed, similar to a gravity-type dock structure.

[0070] In the case of poor geological conditions and thick silt layers, such as the planned construction of a large deep-sea ranch, the silt layer is thick and the bearing capacity is low. The amount of work required to dig out and replace all the silt is huge, the construction period is long, the foundation cost is high, and the mud dumping and replacement are limited by resources and green environmental protection policies, and it is difficult to meet the engineering needs. In this case, the foundation structure 10 is designed to be bottomless (i.e., no bottom plate is required), and the foundation is sunk by using vacuum negative pressure and high-pressure water pipes installed in the wall to flush the foundation, so that the base 101 is completely buried in the mud or reaches the height required by the bearing capacity.

[0071] In this embodiment, a unique sinking method is adopted, which does not require excavation of foundation trenches, filling of base beds and compaction treatment, simplifies the process and greatly shortens the construction period. No excavation or filling is required, which saves a lot of resources, reduces pollution to the sea area, and reduces or eliminates mountain excavation.

[0072] In one embodiment of the present application, please refer to Figure 3 and Figure 4 The side of the arch ring 202 facing the open sea and the two side surfaces adjacent to the side surface are both provided with water permeable holes 221.

[0073] In this embodiment, water-permeable holes 221 are arranged on the side of the arch ring 202 facing the open sea and on the two side surfaces adjacent to the side. The incident wave enters the wave-breaking cavity 222 through the water-permeable holes 221, so that the incident wave and the reflected wave interfere with each other and the water surface oscillation is reduced. There is a phase difference between the inner and outer wave peaks and the waves oscillate irregularly in the cavity, which reduces the effect of wave pressure and has a good energy dissipation effect. At the same time, the height difference of the liquid level inside and outside the arch ring 202 is reduced, which reduces the pressure difference of the arch ring 202, reduces the impact of waves on the embankment structure 20, and improves the force-bearing performance of the arch ring 202.

[0074] In one embodiment of the present application, see Figure 5 Among the multiple arch rings 202, two arch rings 202 close to the foundation structure 10 are provided with water permeable holes 221 on the side facing the inland sea.

[0075] In this embodiment, water-permeable holes 221 are only provided on the side of the two arch rings 202 close to the foundation structure 10 facing the inland sea, which are far away from the wave surface height, so that water can be permeable to exchange water inside and outside the arch ring 202, and can also prevent seawater with large wave surface vibration from entering the internal cavity surrounded by multiple structures 1, causing large fluctuations and affecting mooring stability. At the same time, seawater enters the inner cavity of the embankment structure 20, increasing its own weight and improving overall stability.

[0076] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A construction method for a water-permeable breakwater structure with self-contained wave-breaking function, characterized in that: The breakwater structure includes a plurality of structures, which are arranged in a circular array, and a narrow space is provided between two adjacent structures; the structure includes a foundation structure and a levee structure which are arranged in sequence from bottom to top, and a water-permeable hole is provided on the levee structure, and the cavity inside the levee structure forms a wave-breaking cavity, and the wave-breaking cavity is connected with the water-permeable hole; The construction method includes: the structure is prefabricated in pieces or sections at a prefabrication factory, the shore platform is assembled and outfitted, the module vehicles are rolled onto the ship for shipment, the structure is dived on site, the cavity in the structure is inflated and floated, a crane ship assists in floating it into place, and the structure is installed by sinking it under negative pressure.

2. The construction method of the water-permeable breakwater structure with self-wave-breaking function as claimed in claim 1, characterized in that: The basic structure includes a base and a top plate, the bottom of the base is buried in the seabed mud, and the top of the base is connected to the top plate; the base includes an annular outer wall, an annular inner wall and a plurality of partitions; the annular outer wall is sleeved on the annular inner wall, the partition is connected to the annular outer wall and the annular inner wall, and a plurality of partitions are arranged at intervals to divide the cavity between the annular outer wall and the annulus into a plurality of compartments.

3. The construction method of the water-permeable breakwater structure with self-wave-breaking function as claimed in claim 2, characterized in that: The prefabrication of the infrastructure includes: Prefabrication of partitions: partitions are produced in the workshop on a flat plate assembly line. They are prefabricated and steamed in horizontal double-layer panels divided vertically according to their lengths, erected outside the workshop, and stored vertically. The wall is prefabricated in pieces, and the pieces are reasonably divided according to the approximate straight lines of the curved surface. The double-stacked plate mode is constructed on a special mold production line, steam-cured, transported to the outside of the workshop, turned over, and stored vertically; the wall pieces are used to make the annular outer wall and the annular inner wall; The top slab is prefabricated in the form of a single composite slab, which is divided into sections according to the structure, prefabricated and stored horizontally, and the concrete on the top of the composite slab is poured on site.

4. The construction method of the water-permeable breakwater structure with self-wave-breaking function as claimed in claim 3, characterized in that: After the prefabrication of the foundation structure is completed, it is transported or hoisted to the platform assembly area, quickly and accurately positioned according to the floor markings and tooling structures, and assembled in the order of inside first and outside later; after the annular outer wall, the annular inner wall and the partition are assembled, the joint steel bars are tied and the joint formwork is erected; after all the joint formworks are erected, the top single-sided composite slab is hoisted, and the connecting bars between the wall segments and the connecting steel bars with the top plate are tied; after all the steel bars are tied, the concrete of the joint and the top plate is poured at one time; after the pouring is completed, it is maintained and stored according to the specified time.

5. The construction method of the water-permeable breakwater structure with self-wave-breaking function as claimed in claim 2, characterized in that: The embankment structure includes multiple columns and multiple arch rings, one end of the column is installed on the basic structure, and the multiple columns are distributed in an array along the circumferential direction of the arch ring; the multiple arch rings are stacked in sequence from bottom to top along the length direction of the column, and the outer wall of the arch ring is provided with a water-permeable hole, and the cavity inside the arch ring forms a wave-breaking cavity, and the wave-breaking cavity is connected to the water-permeable hole.

6. The construction method of the water-permeable breakwater structure with self-wave-breaking function as claimed in claim 5, characterized in that: The columns are horizontally bound with steel cages as a whole, and are horizontally prefabricated. They are steam cured in a workshop, turned over outside the workshop, and stored on site.

7. The construction method of the water-permeable breakwater structure with self-wave-breaking function as claimed in claim 5, characterized in that: The column passes through the top plate and is connected to the base as a whole; the bottom of the column is provided with vertical steel bars and horizontal steel bars connected to the top plate.

8. The construction method of the water-permeable breakwater structure with self-wave-breaking function as claimed in claim 5, characterized in that: The embankment structure also includes a tie rod, which is horizontally arranged, and the two ends of the tie rod are respectively connected to the two columns; the middle of the column wall is reserved for the tie rod connection hole.

9. The construction method of the water-permeable breakwater structure with self-wave-breaking function as claimed in claim 5, characterized in that: The arch ring includes a plurality of arc pieces, and the plurality of arc pieces are connected in sequence to form a ring structure; The arc pieces are prefabricated, and the vertical and circumferential dimensions of the plurality of arc pieces are equal, and some of the arc pieces are provided with the water-permeable holes; the arc pieces are cast and cured on a special mold platform, and are turned over after reaching a predetermined strength, and transported to outside the workshop for storage.

10. The construction method of the permeable breakwater structure with self-wave-breaking function according to any one of claims 5 to 9, characterized in that: When assembling the embankment structure, the shape assembly is completed in the order of columns first and then arch rings, and the overall verticality and ovality are checked. Once the requirements are met, the tie rods are installed and checked again for compliance. Cast-in-place concrete is completed at each joint on the assembly platform, and finally prestress is applied to the columns, and the tie rod connection holes are closed to complete the assembly of the embankment structure.