Automatic monitoring auxiliary device, automatic monitoring method and monitoring system for top of fender post
Through the design of the automatic monitoring auxiliary device for the roof of the enclosed piles, simultaneous monitoring of the vertical and horizontal displacement of the roof of the enclosed piles is realized, and the problems of large monitoring workload, safety risks and inaccurate data in the existing technology are solved. Improve monitoring efficiency and accuracy, and realize informatization guidance on construction.
Patent Information
- Application Number
- CN202411039285.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-26
AI Technical Summary
The existing vertical and horizontal displacement monitoring methods for the top of the enclosed piles require carrying a variety of instruments, resulting in large monitoring workload, low efficiency, safety risks, and the data may be discontinuous and inaccurate, which cannot truly reflect the enclosed piles. deformation.
An automatic monitoring auxiliary device for the roof of the enclosing pile is designed, including frameless prism assembly, monitoring support device, monitoring mobile device, L-shaped displacement marking nail, embedded protection box, motor control device and processing device, through integrated The automatic monitoring method realizes simultaneous monitoring of vertical and horizontal displacements on the pile top, and the data is processed through remote terminals and fed back in real time.
It improves the efficiency and accuracy of monitoring work, reduces the risk of external damage, realizes information-oriented construction guidance, reduces information transmission errors, and ensures the smooth progress of construction.
Smart Images

Figure CN119021285A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction engineering monitoring, and in particular to an automatic monitoring auxiliary device for the top of a retaining pile, an automatic monitoring method and a monitoring system. Background Art
[0002] Retaining piles are key construction measures to prevent soil collapse and water and sand gushing in construction projects, and play an important role in construction safety. The monitoring of vertical and horizontal displacements of the top of retaining piles are two necessary monitoring items in the monitoring work. They can accurately judge the overall stability of the retaining structure and are indispensable in construction projects.
[0003] In the existing monitoring methods, the vertical and horizontal displacements of the top of the retaining piles are monitored by laying displacement marker nails. Specifically, the vertical displacement monitoring uses a level and a level rod. The monitoring personnel need to erect the level rod on the displacement marker nail and use the level to complete the monitoring work. The horizontal displacement uses a total station, a forced centering rod and a prism. The monitoring personnel place the prism on the forced centering rod and then erect it on the displacement marker nail and use the total station to complete the monitoring work.
[0004] The above monitoring method has the following problems: it is necessary to carry multiple instruments for monitoring, resulting in a large monitoring workload and low monitoring efficiency; the level rod and the forced centering rod are erected close to the edge of the foundation pit, which poses a safety risk; during the construction process, the displacement marker nails are very easy to be damaged, and the secondary layout leads to discontinuity of monitoring data, and cannot guide construction by information technology; long-distance manual measurement errors may lead to inaccurate data and cannot truly reflect the deformation of the retaining piles. Summary of the invention
[0005] Based on this, it is necessary to provide an automatic monitoring auxiliary device, automatic monitoring method and monitoring system for the top of retaining piles, which can reduce the risk of external damage and the cost of personnel, instruments and equipment and improve work efficiency in response to the above technical problems.
[0006] An automatic monitoring auxiliary device for the top of a retaining pile, the device comprising: a frameless prism assembly, a monitoring support device, a monitoring mobile device, an L-shaped displacement marker nail, a pre-buried protection box, a motor control device and a processing device;
[0007] The inner wall of the embedded protection box is provided with a gear guide rail, and the monitoring support device is installed on the gear guide rail. The monitoring support device slides on the gear guide rail to be received into the embedded protection box or extends out of the embedded protection box. The monitoring mobile device is fixedly installed on the monitoring support device. The monitoring mobile device includes a pulley guide rail, an upper limiter and a lower limiter. The upper limiter and the lower limiter are arranged on the pulley guide rail. One end of the displacement mark nail is slidably connected to the pulley guide rail and is located between the upper limiter and the lower limiter. The other end of the displacement mark nail is detachably connected to the frameless prism assembly. The motor control device is connected to the pulley guide rail and the gear guide in a transmission manner, and the motor control device is connected to the processing device.
[0008] In one of the embodiments, the device further includes a protective cover; the protective cover is installed on the top of the embedded protection box, and the motor control device is connected to the protective cover in a transmission manner.
[0009] In one of the embodiments, the monitoring mobile device is provided with a scale for recording the vertical movement distance of the displacement marker pin and the frameless prism assembly.
[0010] In one embodiment, the embedded protection box is welded to the steel bars of the monitored retaining pile structure.
[0011] In one of the embodiments, the protective cover is engraved with information and protection marks of the monitored vertical displacement and horizontal displacement monitoring points of the guardrail pile top.
[0012] In one of the embodiments, the motor control device includes a main power supply, a main switch, a pulley guide switch, a pulley guide micromotor, a gear guide switch and a gear guide micromotor;
[0013] The main power supply is connected in series with the main switch as a main circuit, and two branch circuits are connected in parallel on the main circuit, one branch circuit includes the pulley guide switch and the pulley guide micromotor connected in series, and the other branch circuit includes the gear guide switch and the gear guide micromotor connected in series;
[0014] The pulley guide micromotor is connected to the pulley guide in a transmission manner, and the gear guide micromotor is connected to the gear guide in a transmission manner.
[0015] In one of the embodiments, the motor control device further includes a protective cover switch and a protective cover micromotor;
[0016] The protective cover switch and the protective cover micromotor are connected in series and then connected in parallel with the main circuit, and the protective cover micromotor is connected to the protective cover in a transmission manner.
[0017] A method for automatically monitoring the top of a retaining pile, the method comprising:
[0018] The upper computer sends monitoring instructions to the processing device and the automatic monitoring instrument of the automatic monitoring auxiliary device for the top of the retaining pile;
[0019] The processing device controls the displacement marking nail and the monitoring support device of the automatic monitoring auxiliary device for the top of the retaining pile to rise to the target position according to the monitoring content carried in the monitoring instruction;
[0020] The automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device for the retaining pile top according to the monitoring instruction, obtains corresponding coordinate data, and transmits it back to the host computer;
[0021] The host computer analyzes the corresponding current point change rate and the cumulative point change rate according to the corresponding coordinate data, draws a time-course cumulative change curve according to the corresponding point change rate and generates a report.
[0022] In one embodiment, the processing device controls the displacement marking nail and the monitoring support device of the automatic monitoring auxiliary device for the top of the retaining pile to rise to the target position according to the monitoring content carried in the monitoring instruction, including:
[0023] When the monitoring content is the vertical displacement of the pile top, the processing device controls the main switch and the pulley guide switch of the motor control device of the auxiliary device for automatically monitoring the pile top of the retaining pile to be turned on in sequence, so that the displacement mark nail rises to the highest position;
[0024] When the monitoring content is the horizontal displacement of the pile top, the processing device controls the main switch, the pulley guide switch and the gear guide switch of the motor control device of the auxiliary device for automatically monitoring the pile top of the retaining pile to be turned on in sequence, so that the displacement marking nail and the monitoring support device rise to the highest position;
[0025] When the monitoring content is the vertical displacement and horizontal displacement of the pile top, the processing device controls the main switch, pulley guide switch and gear guide switch of the motor control device of the automatic monitoring auxiliary device for the retaining pile top to be turned on in sequence, so that the displacement marking nail and the monitoring support device rise to the highest position.
[0026] In one embodiment, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the auxiliary device for automatic monitoring of the top of the retaining pile according to the monitoring instruction to obtain corresponding coordinate data, including:
[0027] When the monitoring content is the vertical displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the auxiliary device for automatic monitoring of the retaining pile top and obtains the coordinate data of the elevation coordinates;
[0028] When the monitoring content is the horizontal displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the auxiliary device for automatic monitoring of the retaining pile top and obtains the coordinate data of the plane coordinates;
[0029] When the monitoring content is the vertical displacement and horizontal displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the auxiliary device for automatic monitoring of the retaining pile top and obtains the coordinate data of the three-dimensional coordinates.
[0030] In one embodiment, the analysis method of the current point change rate and the cumulative point change rate is:
[0031] When the coordinate data is the coordinate data of the elevation coordinate, the analysis formula of the point change rate is:
[0032]
[0033] Δ 竖向本次 =(H i -h i )-(H i-1 -h i-1 )
[0034] The analytical formula for the cumulative point change rate is:
[0035]
[0036] Δ 竖向累计 =(H i -h i )-(H0-h0)
[0037] Among them, v 竖向本次 is the vertical displacement change rate of the pile top at this point, Δ 竖向本次 is the displacement change value of the current pile top vertical displacement relative to the previous pile top vertical displacement, n1 is the interval between the current pile top vertical displacement collection and the previous pile top vertical displacement collection, H i is the elevation coordinate collected this time, h i H is the vertical distance of the displacement marker pin. i-1 is the elevation coordinate collected from the last pile top vertical displacement monitoring, h i-1 is the vertical displacement distance of the displacement marker nail obtained from the last pile top vertical displacement monitoring, v 竖向累计 is the cumulative point change rate of the pile top vertical displacement, Δ 竖向累计is the cumulative change value of the vertical displacement of the pile top, i1 is the interval between the current vertical displacement collection of the pile top and the first vertical displacement collection of the pile top, H0 is the elevation coordinate obtained by the first monitoring and collection of the vertical displacement of the pile top, and h0 is the vertical movement distance of the displacement marker nail obtained by the first monitoring and collection of the vertical displacement of the pile top;
[0038] When the coordinate data is the coordinate data of the plane coordinates, the analysis formula of the point position change rate is:
[0039]
[0040]
[0041] The analytical formula for the cumulative point change rate is:
[0042]
[0043]
[0044] Among them, v 水平本次 is the rate of change of horizontal displacement of the pile top at this point, Δ 水平本次 is the displacement change value of the current pile top horizontal displacement relative to the previous pile top horizontal displacement, n2 is the interval time between the current pile top horizontal displacement collection and the previous pile top horizontal displacement collection, (x i ,y i ) is the plane coordinates collected by the pile top horizontal displacement monitoring, (x i-1 ,y i-1 ) is the plane coordinate collected from the last pile top vertical displacement monitoring, v 水平累计 is the cumulative point change rate of pile top horizontal displacement, Δ 水平累计 is the displacement change value of the current pile top horizontal displacement relative to the first pile top horizontal displacement, i2 is the interval time between the current pile top horizontal displacement collection and the first pile top horizontal displacement collection, (x0, y0) is the plane coordinates obtained by the first pile top vertical displacement monitoring collection.
[0045] A system for automatically monitoring the top of a retaining pile, the system comprising: an auxiliary device for automatically monitoring the top of a retaining pile, a host computer and an automatic monitoring instrument, wherein the host computer is connected to the auxiliary device for automatically monitoring the top of a retaining pile and the automatic monitoring instrument through a network;
[0046] The processing device controls the displacement marking nail and the monitoring support device of the automatic monitoring auxiliary device for the top of the retaining pile to rise to the target position according to the monitoring content carried in the monitoring instruction;
[0047] The automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device for the retaining pile top according to the monitoring instruction, obtains corresponding coordinate data, and transmits it back to the host computer;
[0048] The host computer analyzes the corresponding current point change rate and the cumulative point change rate according to the corresponding coordinate data, draws a time-course cumulative change curve according to the corresponding point change rate and generates a report.
[0049] Beneficial effects:
[0050] 1. It has two functions of automatic monitoring of pile top vertical displacement and horizontal displacement. Through functional integration, one monitoring operation can obtain two monitoring data of pile top vertical displacement and horizontal displacement at the same time, making the monitoring work efficient and safe, and greatly improving work efficiency.
[0051] 2. Data can be processed through remote terminals to reduce the workload of internal data processing personnel, and the deformation of the retaining piles and the time-course cumulative change curve can be displayed in real time to visualize the results and realize information-based guidance of construction.
[0052] 3. Through timely feedback of data, monitoring and early warning situations can be discovered at the first time, and data information can be notified to all construction parties, reducing information transmission errors, enabling construction units to discover construction problems in a timely manner and ensure the smooth progress of project construction.
[0053] 4. The overall structure of the automatic monitoring auxiliary device for the top of the retaining pile can be stored in a pre-buried protection box with a protective cover, which greatly reduces the risk of external damage.
[0054] 5. The overall structure of the automatic monitoring auxiliary device on the top of the retaining pile is welded with the structural steel bars of the retaining pile, which can more accurately reflect the deformation of the retaining pile, avoid manual measurement errors, and improve measurement accuracy.
[0055] 6. The automatic monitoring auxiliary device for the top of the retaining pile can be remotely controlled. It has a simple structure and is easy to operate, which greatly improves work efficiency.
[0056] 7. Reduce the safety risks caused by personnel, instruments, etc. being close to the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] Figure 1 A front view of an automatic monitoring auxiliary device for the top of a retaining pile in one embodiment;
[0058] Figure 2 A side view of an automatic monitoring auxiliary device for the top of a retaining pile in one embodiment;
[0059] Figure 3A schematic diagram of the structure of a motor control device of an automatic monitoring auxiliary device for a retaining pile top in one embodiment;
[0060] Figure 4 A schematic diagram of a flow chart of a method for automatically monitoring the top of a retaining pile in one embodiment;
[0061] Figure 5 FIG. 1 is a schematic diagram of the structure of an automatic monitoring instrument in an embodiment. DETAILED DESCRIPTION
[0062] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0063] In one embodiment, Figure 1 and Figure 2 As shown, an automatic monitoring auxiliary device for the top of a retaining pile comprises: a frameless prism assembly 1, a monitoring support device 2, a monitoring mobile device 3, an L-shaped displacement marker nail 4, a pre-buried protection box 5, a motor control device and a processing device 6;
[0064] A gear guide rail 7 is provided on the inner wall of the embedded protection box 5, and the monitoring support device 2 is installed on the gear guide rail 7. The monitoring support device 2 slides on the gear guide rail 7 to be received in the embedded protection box 5 or extends out of the embedded protection box 5. The monitoring mobile device 3 is fixedly installed on the monitoring support device 2. The monitoring mobile device 3 includes a pulley guide rail 31, an upper limiter 32 and a lower limiter 33. The upper limiter 32 and the lower limiter 33 are arranged on the pulley guide rail 31. One end of the displacement marking nail 4 is slidably connected to the pulley guide rail 31 and is located between the upper limiter 32 and the lower limiter 33. The other end of the displacement marking nail 4 is detachably connected to the frameless prism assembly 1. The motor control device is connected to the pulley guide rail 31 and the gear guide rail 7 in a transmission manner, and the motor control device is connected to the processing device 6.
[0065] The motor control device is electrically connected to the processing device 6; the processing device 6 sends a control instruction to the control device to control the pulley guide rail 31 and / or the gear guide rail 7, so that the displacement marking nail 4 and / or the monitoring support device 2 rises or falls.
[0066] The monitoring mobile device 3 is used to ensure the vertical stable movement of the monitoring components (i.e., the displacement marking nail 4 and the frameless prism component 1). The monitoring mobile device 3 is provided with a scale, and the monitoring mobile device 3 can record the vertical movement distance of the displacement marking nail 4 and the frameless prism component 1, and transmit the movement distance back to the computer.
[0067] Among them, the displacement marking nail 4 and the frameless prism assembly 1 can be used in combination to simultaneously monitor the vertical displacement and horizontal displacement of the top of the retaining pile; the displacement marking nail 4 and the frameless prism assembly 1 can also be separated, and the displacement marking nail 4 is used alone for monitoring the vertical displacement of the top of the retaining pile.
[0068] The upper limiter 32 is used to limit the highest rising position of the displacement marking pin 4, and the lower limiter 33 is used to limit the lowest descending position of the displacement marking pin 4.
[0069] The upper limiter 32 and the lower limiter 33 may be provided with buffer pads to increase their service life.
[0070] The processing device 6 includes a wireless communication module and an auxiliary device power supply module. The wireless communication module is used to exchange information with the host computer to control the pulley guide rail 31, the gear guide rail 7 and the protective cover. The auxiliary device power supply module is used to power the auxiliary device for automatic monitoring of the pile top of the retaining pile.
[0071] Among them, the monitoring support device 2 can be a rectangular frame steel structure, the long side of the monitoring support device 2 can be 400mm~500mm, the short side can be 200mm~300mm, the outer side length of the structural square tube can be 25mm~40mm, and the wall thickness can be 1.5mm~2.5mm.
[0072] In one example, the monitoring support device 2 has a long side of 400 mm and a short side of 200 mm, and the outer side of the structural square tube is 30 mm long and has a wall thickness of 2 mm.
[0073] Among them, the monitoring support device 2 and the monitoring moving device 3 are welded up and down to ensure the stability of the structure and the smooth vertical movement of the displacement marker nail.
[0074] The embedded protection box 5 is used to protect and store the monitoring support device 2. The embedded protection box 5 may be a box-shaped frame steel structure, the length and width of the embedded protection box 5 may be 300 mm to 400 mm, the height may be 550 mm to 650 mm, the outer side length of the structural square tube may be 25 mm to 40 mm, and the wall thickness may be 1.5 mm to 2.5 mm.
[0075] In one example, the embedded protection box 5 is 300 mm long, 300 mm wide, 550 mm high, the outer side length of the structural square tube is 30 mm, and the wall thickness is 2 mm.
[0076] The welding of the embedded protection box 5 and the structural reinforcement of the retaining pile can directly reflect the deformation of the retaining pile structure and ensure the stability of the entire box body.
[0077] It should be understood that the above-mentioned automatic monitoring auxiliary device for the top of the retaining pile has a simple structure and is easy to operate. It also has two functions of monitoring the vertical displacement and horizontal displacement of the pile top, which effectively reduces manual monitoring errors and the risk of external damage, reduces the intensity of field monitoring work, and improves work efficiency.
[0078] In one embodiment, the auxiliary device for automatically monitoring the top of the retaining pile further includes a protective cover 8; the protective cover 8 is installed on the top of the embedded protection box 5, and the motor control device is connected to the protective cover 8 in a transmission manner.
[0079] Among them, when the protective cover 8 is closed, it is flush with the top of the retaining pile, which plays a role in protecting the entire device. The information and protection marks of the vertical and horizontal displacement monitoring points of the pile top are engraved on it, which can play a protective and warning role.
[0080] In one embodiment, the monitoring moving device 3 is provided with a scale for recording the vertical movement distance of the displacement marking pin 4 and the frameless prism assembly 1 .
[0081] In one embodiment, the embedded protection box 5 is welded to the steel bars of the monitored retaining pile structure.
[0082] In one embodiment, the protective cover 8 is engraved with information and protection marks of the monitoring points of the vertical displacement and horizontal displacement of the top of the guard pile being monitored.
[0083] In one embodiment, Figure 3 As shown, the motor control device includes a main power supply 61, a main switch 62, a pulley rail switch 63, a pulley rail micromotor 65, a gear rail switch 64 and a gear rail micromotor 66;
[0084] The main power supply 61 and the main switch 62 are connected in series as the main line, and two branch lines are connected in parallel on the main line. One branch line includes a pulley guide switch 63 and a pulley guide micromotor 65 connected in series, and the other branch line includes a gear guide switch 64 and a gear guide micromotor 66 connected in series; the pulley guide micromotor 65 is connected to the pulley guide 31 in a transmission manner, and the gear guide micromotor 66 is connected to the gear guide 7 in a transmission manner.
[0085] In one embodiment, Figure 3 As shown, the motor control device also includes a protective cover switch 67 and a protective cover micromotor 68; the protective cover switch 67 and the protective cover micromotor 68 are connected in series and in parallel with the main circuit, and the protective cover micromotor 68 is connected to the protective cover 8 in a transmission manner.
[0086] Beneficial effects:
[0087] 1. The switch for adjusting the moving height of the monitoring support device 2 and the displacement marking nail 4 by the processing device 6 has a simple structure and convenient operation, which greatly improves the work efficiency.
[0088] 2. The overall structure of the displacement marking nail 4 and the frameless prism assembly 1 can be stored in a pre-buried protection box 5, and is provided with a protection cover 8, which greatly reduces the risk of external damage.
[0089] 3. It has two functions: monitoring the vertical displacement and horizontal displacement of the pile top, which reduces the cost of personnel, instruments and equipment, effectively reduces manual monitoring errors and the risk of external damage, reduces the intensity of field monitoring work, and improves work efficiency.
[0090] 4. The welding of structural steel bars between the overall structure and the retaining piles can more accurately reflect the deformation of the retaining piles, avoid manual measurement errors, and improve measurement accuracy.
[0091] 5. The switch of the protective cover 8 can also be adjusted through the processing device 6. It has a simple structure and convenient operation, which greatly improves the work efficiency.
[0092] In one embodiment, the working process of the above-mentioned auxiliary device for automatically monitoring the top of the retaining pile is as follows:
[0093] The embedded protection box 5 is welded to the steel bars of the monitored retaining pile structure, and the frameless prism assembly 1 and the displacement marker nail 4 are used in combination. When the measurement work is carried out, the processing device 6 controls the protection cover 8 to open, and controls the pulley guide rail 31 and the gear guide rail 7. Through the transmission of the gear guide rail 7 and the pulley guide rail 31, the monitoring support device 2 and the displacement marker nail 4 are sequentially raised; the protection cover 8 and the gear guide rail 7 can also be controlled to make the monitoring support device 2 rise. Then, the displacement marker nail 4 and the frameless prism assembly 1 are scanned by the measuring equipment to monitor the coordinate positions of the displacement marker nail 4 and the frameless prism assembly 1 to determine whether the monitored retaining pile has the risk of soil collapse and water and sand gushing.
[0094] In one embodiment, Figure 4 As shown, a method for automatically monitoring the top of a retaining pile is provided, comprising the following steps:
[0095] Step S220: the host computer sends a monitoring instruction to the processing device and the automatic monitoring instrument of the auxiliary device for automatic monitoring of the top of the retaining pile.
[0096] Among them, Figure 5 As shown, the automatic monitoring instrument includes a total station 91 and an instrument control system 92. The instrument control system 92 includes an instrument wireless communication module 921 and an instrument power supply module 922. The use of the total station 51 and data transmission are controlled by the instrument wireless communication module 921 and the instrument power supply module 922.
[0097] During monitoring, the operator issues monitoring instructions through the host computer, and the processing device and the instrument control system respectively control the corresponding devices to perform monitoring work. After the monitoring is completed, the data is automatically transmitted back to the host computer through wireless communication, and saved after processing.
[0098] Step S240, the processing device controls the displacement marking pins of the automatic monitoring auxiliary device for the top of the retaining pile and the monitoring support device to rise to the target position according to the monitoring content carried in the monitoring instruction.
[0099] Step S260, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device for the top of the retaining pile according to the monitoring instruction, obtains the corresponding coordinate data, and transmits it back to the host computer.
[0100] Step S280: The host computer analyzes the corresponding current point change rate and the cumulative point change rate according to the corresponding coordinate data, draws a time-course cumulative change curve according to the corresponding point change rate, and generates a report.
[0101] Among them, when the horizontal displacement of the pile top is automatically monitored, the plane coordinates obtained by monitoring are entered, the required data are obtained by calculation and a curve graph is drawn; when the vertical displacement of the pile top is automatically monitored, the elevation coordinates obtained by monitoring are entered, the required data are obtained by calculation and a curve graph is drawn; when the vertical and horizontal displacements of the pile top are automatically monitored, the elevation coordinates and plane coordinates obtained by monitoring are entered, the required data are obtained by calculation and a curve graph is drawn.
[0102] In one embodiment, the processing device controls the displacement marking nail and the monitoring support device of the automatic monitoring auxiliary device for the top of the retaining pile to rise to the target position according to the monitoring content carried in the monitoring instruction, including:
[0103] When the monitoring content is the vertical displacement of the pile top, the processing device controls the main switch and the pulley guide switch of the motor control device of the auxiliary device for automatically monitoring the pile top of the retaining pile to be turned on in sequence, so that the displacement mark nail rises to the highest position;
[0104] When the monitoring content is the horizontal displacement of the pile top, the processing device controls the main switch, pulley guide switch and gear guide switch of the motor control device of the automatic monitoring auxiliary device of the retaining pile top to be turned on in sequence, so that the displacement mark nail and the monitoring support device rise to the highest position;
[0105] When the monitoring content is the vertical displacement and horizontal displacement of the pile top, the processing device controls the main switch, pulley guide switch and gear guide switch of the motor control device of the automatic monitoring auxiliary device of the retaining pile top to be turned on in sequence, so that the displacement marking nail and the monitoring support device rise to the highest position.
[0106] In one embodiment, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device for the top of the retaining pile according to the monitoring instruction, and obtains corresponding coordinate data, including:
[0107] When the monitoring content is the vertical displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device of the retaining pile top and obtains the coordinate data of the elevation coordinate;
[0108] When the monitoring content is the horizontal displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device of the retaining pile top and obtains the coordinate data of the plane coordinates;
[0109] When the monitoring content is the vertical displacement and horizontal displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device of the retaining pile top and obtains the coordinate data of the three-dimensional coordinates.
[0110] In one embodiment, the analysis method of the current point change rate and the cumulative point change rate is:
[0111] When the coordinate data is the coordinate data of the elevation coordinate, the analysis formula for the change rate of this point position is:
[0112]
[0113] Δ 竖向本次 =(H i -h i )-(H i-1 -h i-1 )
[0114] The analytical formula for the cumulative point change rate is:
[0115]
[0116] Δ 竖向累计 =(H i -h i )-(H0-h0)
[0117] Among them, v 竖向本次 is the vertical displacement change rate of the pile top at this point, Δ 竖向本次 is the displacement change value of the current pile top vertical displacement relative to the previous pile top vertical displacement, n1 is the interval between the current pile top vertical displacement collection and the previous pile top vertical displacement collection, H i is the elevation coordinate collected this time, h i H is the vertical distance of the displacement marker pin. i-1 is the elevation coordinate collected from the last pile top vertical displacement monitoring, h i-1is the vertical displacement distance of the displacement marker nail obtained from the last pile top vertical displacement monitoring, v 竖向累计 is the cumulative point change rate of the pile top vertical displacement, Δ 竖向累计 is the cumulative change value of the vertical displacement of the pile top, i1 is the interval between the current vertical displacement collection of the pile top and the first vertical displacement collection of the pile top, H0 is the elevation coordinate obtained by the first monitoring and collection of the vertical displacement of the pile top, and h0 is the vertical movement distance of the displacement marker nail obtained by the first monitoring and collection of the vertical displacement of the pile top;
[0118] When the coordinate data is the coordinate data of the plane coordinates, the analysis formula for the change rate of this point position is:
[0119]
[0120]
[0121] The analytical formula for the cumulative point change rate is:
[0122]
[0123]
[0124] Among them, v 水平本次 is the rate of change of horizontal displacement of the pile top at this point, Δ 水平本次 is the displacement change value of the current pile top horizontal displacement relative to the previous pile top horizontal displacement, n2 is the interval time between the current pile top horizontal displacement collection and the previous pile top horizontal displacement collection, (x i ,y i ) is the plane coordinates collected by the pile top horizontal displacement monitoring, (x i-1 ,y i-1 ) is the plane coordinate collected from the last pile top vertical displacement monitoring, v 水平累计 is the cumulative point change rate of pile top horizontal displacement, Δ 水平累计 is the displacement change value of the current pile top horizontal displacement relative to the first pile top horizontal displacement, i2 is the interval time between the current pile top horizontal displacement collection and the first pile top horizontal displacement collection, (x0, y0) is the plane coordinates obtained by the first pile top vertical displacement monitoring collection.
[0125] In one example, when only the vertical displacement of the pile top is required, the method for monitoring the vertical displacement of the pile top includes the following steps:
[0126] Step a1: The main switch, the protective cover switch, and the pulley rail switch are controlled to be turned on in sequence by the processing device;
[0127] Step a2: Control the total station through the wireless communication module of the instrument, automatically aim at the center of the frameless prism assembly, obtain the elevation coordinates, and complete the measurement;
[0128] Step a3: If the acquisition is successful, end this step; if the aiming fails and the data cannot be acquired, repeat step a1 while controlling the gear guide switch to turn on, record the vertical movement distance of the monitoring support device, obtain the elevation coordinates, and complete the measurement.
[0129] When only the horizontal displacement of the pile top is required, the monitoring method of the horizontal displacement of the pile top includes the following steps:
[0130] Step b1: The main switch, the protective cover switch, the pulley guide switch and the gear guide switch are controlled by the processing device to be turned on in sequence;
[0131] Step b2: Control the total station through the wireless communication module of the instrument, automatically aim at the center of the frameless prism assembly, obtain the plane coordinates, and complete the measurement.
[0132] When the vertical displacement and horizontal displacement of the pile top are required, the monitoring method includes the following steps:
[0133] Step c1: The main switch, the protective cover switch, the pulley guide switch and the gear guide switch are controlled by the processing device to be turned on in sequence;
[0134] Step c2: Control the total station through the wireless communication module of the instrument, automatically aim at the center of the frameless prism assembly, record the vertical movement distance of the displacement marker pin, obtain the three-dimensional coordinates, and complete the measurement.
[0135] After the entire monitoring is completed, the monitoring data is transmitted back to the computer, the data is calculated and a chart is generated.
[0136] Specifically, the steps from monitoring to calculating and obtaining data and generating charts are as follows:
[0137] 1) Generate database
[0138] Before issuing a monitoring instruction, the operator enters project-related information on the host computer. The input information includes but is not limited to the project name, project number, project work site, monitoring point number, monitoring time, and monitoring personnel. The database is set up according to the target information classification.
[0139] If it is the first monitoring, you need to enter the project-related information in detail and save the initial monitoring data; if it is not the first monitoring, you only need to mobilize the corresponding project in the database.
[0140] 2) Collection and calculation of displacement data
[0141] In order to realize the visualization of the results, it is necessary to process the data collected at the time of acquisition, and at the same time retrieve the data in the database to calculate the monitored displacement change and generate a time-course cumulative change curve.
[0142] According to the monitoring requirements, the processing of collected data can be divided into three cases. First, when only the vertical displacement of the pile top needs to be monitored, the elevation coordinates H i The vertical distance h of the monitoring component 2 i .
[0143] Δ 竖向本次 =(H i -h i )-(H i-1 -h i-1 )
[0144] Among them, H i-1 is the elevation coordinate collected from the last pile top vertical displacement monitoring, h i-1 is the vertical displacement distance of the displacement marker nail obtained from the last pile top vertical displacement monitoring, Δ 竖向本次 It is the displacement change of the current pile top vertical displacement relative to the previous pile top vertical displacement.
[0145]
[0146] Among them, n1 is the interval between the current collection of pile top vertical displacement and the previous collection of pile top vertical displacement, usually in days.
[0147] It should be noted that when the vertical displacement monitoring interval is less than 1 day, n1 is converted to hours.
[0148] Δ 竖向累计 =(H i -h i )-(H0-h0)
[0149] Among them, H0 is the elevation coordinate obtained by the first pile top vertical displacement monitoring, h0 is the vertical movement distance of the displacement marker nail obtained by the first pile top vertical displacement monitoring, Δ 竖向累计 is the cumulative change of the vertical displacement of the pile top.
[0150]
[0151] Among them, i1 is the interval between the current collection of pile top vertical displacement and the first collection of pile top vertical displacement, usually in days.
[0152] Secondly, when only the horizontal displacement of the pile top needs to be monitored, the plane coordinates (x i ,y i ).
[0153]
[0154] Among them, (x i-1 ,yi-1 ) is the plane coordinate obtained from the last pile top vertical displacement monitoring, Δ 水平本次 It is the displacement change of the current pile top horizontal displacement relative to the previous pile top horizontal displacement.
[0155]
[0156] Among them, n2 is the interval between the current pile top horizontal displacement collection and the previous pile top horizontal displacement collection, usually in days.
[0157] It should be noted that when the horizontal displacement monitoring interval is less than 1 day, n2 is converted to hours.
[0158]
[0159] Among them, (x0, y0) is the plane coordinate obtained by the first pile top vertical displacement monitoring, Δ 水平累计 It is the displacement change of the current pile top horizontal displacement relative to the first pile top horizontal displacement.
[0160]
[0161] Among them, i2 is the interval between the current pile top horizontal displacement collection and the first pile top horizontal displacement collection, usually in days.
[0162] Finally, when it is necessary to monitor the vertical displacement and horizontal displacement of the pile top, the plane coordinates (x i ,y i , H i ) and the vertical movement distance h of the displacement marker i . The vertical displacement and horizontal displacement data can be calculated according to the above method.
[0163] According to the above calculation method, the required monitoring data can be obtained and a time-course cumulative change curve can be drawn on the computer.
[0164] The above monitoring data and results need to be saved in the database for later retrieval and viewing.
[0165] Chart management: Save the drawn charts to the corresponding data files for reference by subsequent operators.
[0166] Report generation: According to the built-in report template, the system automatically fills the data and charts into the corresponding positions. The system can provide multiple import formats, including Word, Excel, PDF, etc.
[0167] Beneficial effects:
[0168] 1. It has two functions of automatic monitoring of pile top vertical displacement and horizontal displacement. Through functional integration, one monitoring operation can obtain two monitoring data of pile top vertical displacement and horizontal displacement at the same time, making the monitoring work efficient and safe, and greatly improving work efficiency.
[0169] 2. Data can be processed through remote terminals to reduce the workload of internal data processing personnel, and the deformation of the retaining piles and the time-course cumulative change curve can be displayed in real time to visualize the results and realize information-based guidance of construction.
[0170] 3. Through timely feedback of data, monitoring and early warning situations can be discovered at the first time, and data information can be notified to all construction parties, reducing information transmission errors, enabling construction units to discover construction problems in a timely manner and ensure the smooth progress of project construction.
[0171] 4. The overall structure of the automatic monitoring auxiliary device for the top of the retaining pile can be stored in a pre-buried protection box with a protective cover, which greatly reduces the risk of external damage.
[0172] 5. The overall structure of the automatic monitoring auxiliary device on the top of the retaining pile is welded with the structural steel bars of the retaining pile, which can more accurately reflect the deformation of the retaining pile, avoid manual measurement errors, and improve measurement accuracy.
[0173] 6. The automatic monitoring auxiliary device for the top of the retaining pile can be remotely controlled. It has a simple structure and is easy to operate, which greatly improves work efficiency.
[0174] 7. Reduce the safety risks caused by personnel, instruments, etc. being close to the foundation pit.
[0175] It should be understood that although Figure 4 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 4 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.
[0176] In one embodiment, a system for automatically monitoring the top of a retaining pile is provided, the system comprising: an auxiliary device for automatically monitoring the top of a retaining pile, a host computer and an automatic monitoring instrument, wherein the host computer is connected to the auxiliary device for automatically monitoring the top of a retaining pile and the automatic monitoring instrument through a network;
[0177] The processing device controls the displacement marking nails of the automatic monitoring auxiliary device on the top of the retaining pile and the monitoring support device to rise to the target position according to the monitoring content carried in the monitoring instruction;
[0178] The automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device on the top of the retaining pile according to the monitoring instruction, obtains the corresponding coordinate data, and transmits it back to the host computer;
[0179] The host computer analyzes the corresponding current point change rate and the cumulative point change rate based on the corresponding coordinate data, draws a time-course cumulative change curve based on the corresponding point change rate and generates a report.
[0180] For the specific definition of the automatic monitoring system for the top of the guard pile, please refer to the definition of the automatic monitoring method for the top of the guard pile above, which will not be repeated here. Each module in the above-mentioned automatic monitoring system for the top of the guard pile can be implemented in whole or in part through software, hardware and their combination. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0181] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0182] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. An automatic monitoring auxiliary device for the top of a retaining pile, characterized in that: The device comprises: a frameless prism assembly, a monitoring support device, a monitoring moving device, an L-shaped displacement marking nail, a pre-embedded protection box, a motor control device and a processing device; The inner wall of the embedded protection box is provided with a gear guide rail, and the monitoring support device is installed on the gear guide rail. The monitoring support device slides on the gear guide rail to be received into the embedded protection box or extends out of the embedded protection box. The monitoring mobile device is fixedly installed on the monitoring support device. The monitoring mobile device includes a pulley guide rail, an upper limiter and a lower limiter. The upper limiter and the lower limiter are arranged on the pulley guide rail. One end of the displacement mark nail is slidably connected to the pulley guide rail and is located between the upper limiter and the lower limiter. The other end of the displacement mark nail is detachably connected to the frameless prism assembly. The motor control device is connected to the pulley guide rail and the gear guide in a transmission manner, and the motor control device is connected to the processing device.
2. The device according to claim 1, characterized in that The device also includes a protective cover; the protective cover is installed on the top of the embedded protection box, and the motor control device is connected to the protective cover in a transmission manner.
3. The device according to claim 1, characterized in that The monitoring moving device is provided with a scale for recording the vertical moving distance of the displacement marking nail and the frameless prism assembly.
4. The device according to claim 1, characterized in that The motor control device includes a main power supply, a main switch, a pulley guide switch, a pulley guide micromotor, a gear guide switch and a gear guide micromotor; The main power supply is connected in series with the main switch as a main circuit, and two branch circuits are connected in parallel on the main circuit, one branch circuit includes the pulley guide switch and the pulley guide micromotor connected in series, and the other branch circuit includes the gear guide switch and the gear guide micromotor connected in series; The pulley guide micromotor is connected to the pulley guide in a transmission manner, and the gear guide micromotor is connected to the gear guide in a transmission manner.
5. The device according to claim 1, characterized in that The motor control device also includes a protective cover switch and a protective cover micromotor; The protective cover switch and the protective cover micromotor are connected in series and then connected in parallel with the main circuit, and the protective cover micromotor is connected to the protective cover in a transmission manner.
6. A method for automatically monitoring the top of a retaining pile, characterized in that: The method comprises: The upper computer sends monitoring instructions to the processing device and the automatic monitoring instrument of the automatic monitoring auxiliary device for the top of the retaining pile; The processing device controls the displacement marking nail and the monitoring support device of the automatic monitoring auxiliary device for the top of the retaining pile to rise to the target position according to the monitoring content carried in the monitoring instruction; The automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device for the retaining pile top according to the monitoring instruction, obtains corresponding coordinate data, and transmits it back to the host computer; The host computer analyzes the corresponding current point change rate and the cumulative point change rate according to the corresponding coordinate data, draws a time-course cumulative change curve according to the corresponding point change rate and generates a report.
7. The method according to claim 6, characterized in that The processing device controls the displacement marking nail and the monitoring support device of the automatic monitoring auxiliary device for the top of the retaining pile to rise to the target position according to the monitoring content carried in the monitoring instruction, including: When the monitoring content is the vertical displacement of the pile top, the processing device controls the main switch and the pulley guide switch of the motor control device of the auxiliary device for automatically monitoring the pile top of the retaining pile to be turned on in sequence, so that the displacement mark nail rises to the highest position; When the monitoring content is the horizontal displacement of the pile top, the processing device controls the main switch, the pulley guide switch and the gear guide switch of the motor control device of the auxiliary device for automatically monitoring the pile top of the retaining pile to be turned on in sequence, so that the displacement marking nail and the monitoring support device rise to the highest position; When the monitoring content is the vertical displacement and horizontal displacement of the pile top, the processing device controls the main switch, pulley guide switch and gear guide switch of the motor control device of the automatic monitoring auxiliary device for the retaining pile top to be turned on in sequence, so that the displacement marking nail and the monitoring support device rise to the highest position.
8. The method according to claim 7, characterized in that The automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the auxiliary device for automatic monitoring of the pile top of the retaining pile according to the monitoring instruction to obtain corresponding coordinate data, including: When the monitoring content is the vertical displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the auxiliary device for automatic monitoring of the retaining pile top and obtains the coordinate data of the elevation coordinates; When the monitoring content is the horizontal displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the auxiliary device for automatic monitoring of the retaining pile top and obtains the coordinate data of the plane coordinates; When the monitoring content is the vertical displacement and horizontal displacement of the pile top, the automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the auxiliary device for automatic monitoring of the retaining pile top and obtains the coordinate data of the three-dimensional coordinates.
9. The method according to claim 8, characterized in that The analysis method of the current point change rate and the cumulative point change rate is as follows: When the coordinate data is the coordinate data of the elevation coordinate, the analysis formula of the point position change rate is: Δ 竖向本次 =(H i -h i )-(H i-1 -h i-1 ) The analytical formula for the cumulative point change rate is: Δ 竖向累计 =(H i -h i )-(H0-h0) Among them, v 竖向本次 is the vertical displacement change rate of the pile top at this point, Δ 竖向本次 is the displacement change value of the current pile top vertical displacement relative to the previous pile top vertical displacement, n1 is the interval between the current pile top vertical displacement collection and the previous pile top vertical displacement collection, H i is the elevation coordinate collected this time, h i H is the vertical distance of the displacement marker pin. i-1 is the elevation coordinate collected from the last pile top vertical displacement monitoring, h i-1 is the vertical displacement distance of the displacement marker nail obtained from the last pile top vertical displacement monitoring, v 竖向累计 is the cumulative point change rate of the pile top vertical displacement, Δ 竖向累计 is the cumulative change value of the vertical displacement of the pile top, i1 is the interval between the current vertical displacement collection of the pile top and the first vertical displacement collection of the pile top, H0 is the elevation coordinate obtained by the first monitoring and collection of the vertical displacement of the pile top, and h0 is the vertical movement distance of the displacement marker nail obtained by the first monitoring and collection of the vertical displacement of the pile top; When the coordinate data is the coordinate data of the plane coordinates, the analysis formula of the point position change rate is: The analytical formula for the cumulative point change rate is: Among them, v 水平本次 is the rate of change of horizontal displacement of the pile top at this point, Δ 水平本次 is the displacement change value of the current pile top horizontal displacement relative to the previous pile top horizontal displacement, n2 is the interval time between the current pile top horizontal displacement collection and the previous pile top horizontal displacement collection, (x i ,y i ) is the plane coordinates collected by the pile top horizontal displacement monitoring, (x i-1 ,y i-1 ) is the plane coordinate collected from the last pile top vertical displacement monitoring, v 水平累计 is the cumulative point change rate of pile top horizontal displacement, Δ 水平累计 is the displacement change value of the current pile top horizontal displacement relative to the first pile top horizontal displacement, i2 is the interval time between the current pile top horizontal displacement collection and the first pile top horizontal displacement collection, (x0, y0) is the plane coordinates obtained by the first pile top vertical displacement monitoring collection.
10. An automatic monitoring system for the top of a retaining pile, characterized in that: The system comprises: the auxiliary device for automatically monitoring the top of a retaining pile according to any one of claims 1 to 5, a host computer and an automatic monitoring instrument, wherein the host computer is connected to the auxiliary device for automatically monitoring the top of a retaining pile and the automatic monitoring instrument through a network; The processing device controls the displacement marking nail and the monitoring support device of the automatic monitoring auxiliary device for the top of the retaining pile to rise to the target position according to the monitoring content carried in the monitoring instruction; The automatic monitoring instrument automatically aims at the center of the frameless prism assembly of the automatic monitoring auxiliary device for the retaining pile top according to the monitoring instruction, obtains corresponding coordinate data, and transmits it back to the host computer; The host computer analyzes the corresponding current point change rate and the cumulative point change rate according to the corresponding coordinate data, draws a time-course cumulative change curve according to the corresponding point change rate and generates a report.