Interconnection control method and device of bathroom air conditioner and intelligent equipment, and bathroom air conditioner

By interconnecting and controlling bathroom air conditioners with smart devices, anti-mold measures are implemented in a coordinated manner, overcoming the shortcomings of bathroom air conditioner anti-mold treatment and achieving intelligent and effective mold prevention.

CN119022412BActive Publication Date: 2025-12-19QINGDAO HAIER AIR CONDITIONER GENERAL CORP LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310600067.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-05-24
Publication Date
2025-12-19
Estimated Expiration
2043-05-24

AI Technical Summary

Technical Problem

Existing bathroom air conditioners lack effective anti-mold treatment solutions, especially in high humidity environments where mold growth is severe, affecting users' health.

Method used

By connecting and controlling the bathroom air conditioner with smart devices, it receives anti-mold instructions and performs anti-mold measures when no one is around, such as spraying cold water, ventilating, and opening windows, to work together to reduce humidity and temperature and prevent mold growth.

Benefits of technology

Without affecting user experience, it intelligently prevents mold growth, improving the hygiene of the bathroom space and the health of users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119022412B_ABST
    Figure CN119022412B_ABST
Patent Text Reader

Abstract

The present application relates to a bathroom air conditioner and intelligent device interconnection control method, device and bathroom air conditioner, and the intelligent device and the bathroom air conditioner are in the same bathroom space.The interconnection control method comprises the following steps: receiving a mildew-proof instruction for indicating that the bathroom space is subjected to a mildew-proof treatment; detecting whether a human body exists in the bathroom space; and when no human body exists in the bathroom space, controlling the bathroom air conditioner and / or the intelligent device to execute a mildew-proof measure.The interconnection control method first receives the mildew-proof instruction, and then controls the bathroom air conditioner and / or the intelligent device to execute the corresponding mildew-proof measure when no human body exists in the bathroom space, so as to subject the bathroom space to the mildew-proof treatment, effectively eliminate the possibility of breeding mold in the bathroom space before the mold breeds, improve the hygiene level in the bathroom space, and be beneficial to the health of the user.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of intelligent control, and in particular to a bathroom air conditioner and intelligent device interconnection control method and device and a bathroom air conditioner. BACKGROUND

[0002] In daily life, mold is an important factor leading to intestinal diseases, and one of the important reasons for causing mold breeding is environmental humidity. Mold is more likely to breed in a high-humidity environment.

[0003] With people's pursuit of higher and higher quality of life, the bathroom hygiene level has become an important aspect affecting people's daily life quality. However, due to the particularity of the bathroom use environment, it is easy to produce a high-temperature and high-humidity environment, which provides an ideal environment for mold breeding, so the bathroom mold-proof treatment is very important. Even with the increasing progress of science and technology, various devices used in the family are becoming more and more intelligent, and the newly emerging bathroom air conditioner has not designed a corresponding solution. SUMMARY

[0004] One object of the first aspect of the present application aims to overcome at least one defect of the prior art, and to provide a bathroom air conditioner and intelligent device interconnection control method to perform mold-proof treatment on a bathroom space.

[0005] One further object of the first aspect of the present application is to improve the intelligent degree of mold-proof treatment.

[0006] One further object of the first aspect of the present application is to improve the effectiveness of mold-proof measures.

[0007] The object of the second aspect of the present application is to provide a bathroom air conditioner and intelligent device interconnection control device to intelligently perform mold-proof treatment on a bathroom space.

[0008] The object of the third aspect of the present application is to provide an air conditioner with the above interconnection control device.

[0009] According to the first aspect of the present application, the present application provides a bathroom air conditioner and intelligent device interconnection control method, wherein the intelligent device and the bathroom air conditioner are in the same bathroom space; and

[0010] The interconnection control method comprises:

[0011] receiving a mold-proof instruction for indicating mold-proof treatment on the bathroom space;

[0012] detecting whether there is a human body in the bathroom space; and

[0013] controlling the bathroom air conditioner and / or the intelligent device to perform mold-proof measures when there is no human body in the bathroom space.

[0014] Optionally, the bathroom air conditioner is in communication connection with the smart shower; and

[0015] Before receiving the mildew-proof instruction, the interconnection control method further comprises:

[0016] receiving a closing signal indicating that the smart shower is closed;

[0017] determining whether an opening signal indicating that the smart shower is opened is received within a first preset time length;

[0018] If not, the mildew-proof instruction is generated.

[0019] Optionally, the bathroom air conditioner is in communication connection with the smart shower; and

[0020] Before receiving the mildew-proof instruction, the interconnection control method further comprises:

[0021] receiving a closing signal indicating that the smart shower is closed;

[0022] sending inquiry information to a terminal device interconnected with the bathroom air conditioner, the inquiry information being used to indicate whether the bathroom space needs to be treated for mildew-proof; and

[0023] generating the mildew-proof instruction when receiving an affirmative feedback signal sent by the terminal device, the affirmative feedback signal being used to indicate that the bathroom space needs to be treated for mildew-proof.

[0024] Optionally, the smart device at least comprises a smart shower in communication connection with the bathroom air conditioner; and

[0025] The step of controlling the bathroom air conditioner and / or the smart device to perform corresponding mildew-proof measures comprises:

[0026] opening the smart shower and controlling the smart shower to spray cold water towards the floor and walls of the bathroom space.

[0027] Optionally, the smart device further comprises a smart dry-wet sweeping robot in communication connection with the bathroom air conditioner; and

[0028] After opening the smart shower, the step of controlling the bathroom air conditioner and / or the smart device to perform corresponding mildew-proof measures further comprises:

[0029] determining whether the time length for which the smart shower is opened reaches a third preset time length;

[0030] If yes, the smart shower is closed;

[0031] start the intelligent dry-wet sweeping robot to remove the accumulated water on the floor in the bathroom space.

[0032] Optionally, the intelligent device further comprises an exhaust fan in communication connection with the bathroom air conditioner; and

[0033] After starting the intelligent dry-wet sweeping robot, the step of controlling the bathroom air conditioner and / or the intelligent device to perform the corresponding mold-proof measure further comprises:

[0034] starting the exhaust fan to exhaust air to the outside of the bathroom space.

[0035] Optionally, after starting the intelligent dry-wet sweeping robot, the step of controlling the bathroom air conditioner and / or the intelligent device to perform the corresponding mold-proof measure further comprises:

[0036] starting the bathroom air conditioner in a natural air supply mode to blow natural air that has not been heat-exchanged towards the bathroom space.

[0037] Optionally, the intelligent device further comprises an intelligent window in communication connection with the bathroom air conditioner; and

[0038] After starting the intelligent dry-wet sweeping robot, the step of controlling the bathroom air conditioner and / or the intelligent device to perform the corresponding mold-proof measure further comprises:

[0039] obtaining a first humidity in the bathroom space and a second humidity of an outdoor environment space;

[0040] when the first humidity is greater than the second humidity, opening the intelligent window.

[0041] According to a second aspect of the present application, the present application further provides an interconnected control device of a bathroom air conditioner and an intelligent device, the intelligent device being in the same bathroom space as the bathroom air conditioner; and

[0042] The interconnected control device comprises a processor and a memory, the memory storing a machine-executable program, and the machine-executable program is executed by the processor to implement the interconnected control method of any of the above-mentioned schemes.

[0043] According to a third aspect of the present application, the present application further provides a bathroom air conditioner comprising the interconnected control device of any of the above-mentioned schemes.

[0044] The bathroom air conditioner and the intelligent device are in the same bathroom space, so that the bathroom air conditioner and the intelligent device work cooperatively to jointly adjust the environmental parameters in the bathroom space. Specifically, the interconnection control method of the present application first receives a mold-proof instruction, and then controls the bathroom air conditioner and / or the intelligent device to perform corresponding mold-proof measures when there is no human body in the bathroom space, so as to perform mold-proof treatment on the bathroom space. In this way, the possibility of mold breeding in the bathroom space is effectively eliminated before the mold breeds, the hygiene level in the bathroom space is improved, and the health of the user is benefited.

[0045] Further, the bathroom air conditioner is in communication connection with the water flow detection device in the intelligent shower and / or the total water outlet pipeline. In this way, whether the user uses water in the bathroom space can be automatically judged according to the opening and closing state of the intelligent shower and / or the water flow size in the total water outlet pipeline, and then whether the bathroom space needs to be treated for mold-proof is judged. The user does not need to judge by himself, the intelligent degree is high, and the user experience is good.

[0046] Further, when the user takes a bath, hot water is usually used, which causes the temperature in the bathroom space to rise. When the temperature is high, the vitality of the mold is strong, and the humid environment creates good conditions for the breeding of mold. In the mold-proof measures of the present application, the intelligent shower is first opened to spray cold water towards the floor and the wall of the bathroom space, so as to reduce the floor temperature and the wall temperature of the bathroom space by using cold water. Since the specific heat capacity of water is large, the temperature of the entire bathroom space can be quickly and effectively reduced, the temperature condition for the growth of mold is destroyed, the breeding speed and possibility of mold are reduced, and the rate and effectiveness of the mold-proof treatment are improved.

[0047] The above and other objects, advantages and features of the present application will become more apparent from the following detailed description of some embodiments thereof, when taken in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF DRAWINGS

[0048] Some specific embodiments of the present application will be described in detail below with reference to the accompanying drawings, which are exemplary and not limiting. The same reference signs in the drawings denote the same or similar components or parts. Those skilled in the art should understand that these drawings are not necessarily drawn to scale. In the drawings:

[0049] Figure 1 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the intelligent device according to an embodiment of the present application;

[0050] Figure 2 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the intelligent device according to a second embodiment of the present application;

[0051] Figure 3 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the third embodiment of the present application;

[0052] Figure 4 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the fourth embodiment of the present application;

[0053] Figure 5 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the fifth embodiment of the present application;

[0054] Figure 6 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the sixth embodiment of the present application;

[0055] Figure 7 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the seventh embodiment of the present application;

[0056] Figure 8 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the eighth embodiment of the present application;

[0057] Figure 9 is a schematic structural block diagram of the interconnection control device according to an embodiment of the present application;

[0058] Figure 10 is a schematic structural block diagram of the bathroom air conditioner according to an embodiment of the present application. DETAILED DESCRIPTION

[0059] The present application first provides an interconnection control method of a bathroom air conditioner and a smart device, which can realize the intelligent interconnection of the bathroom air conditioner and the smart device, provide a smart home appliance interconnection scene, and effectively improve the intelligent degree.

[0060] Specifically, the smart device and the bathroom air conditioner are in the same bathroom space, so as to facilitate the cooperation of the bathroom air conditioner and the smart device, thereby jointly adjusting the environmental parameters in the bathroom space.

[0061] It should be noted that the methods of the following embodiments of the present application are described from the side of the interconnection control device of the bathroom air conditioner and the smart device, that is, the control device executes the related steps. And, the premise of realizing the following embodiment schemes of the present application is that the bathroom air conditioner and the smart device are interconnected. Specifically, the interconnection control device of the bathroom air conditioner and the smart device can be provided between the bathroom air conditioner and the smart device. The control device can receive the signals sent by the bathroom air conditioner and the smart device, and can send signals to the bathroom air conditioner and the smart device. The control device can be additionally and independently provided, or can be provided inside the bathroom air conditioner.

[0062] The intelligent device in the embodiment has the intelligent feature, which is due to the fact that it can send signals to the control device and receive signals issued by the control device. Specifically, this can be achieved by setting a controller on the intelligent device. Similarly, the bathroom air conditioner can also be provided with its own controller, so as to be able to send signals to the control device and receive signals issued by the control device.

[0063] Figure 1 is a schematic flowchart of the interconnection control method of the bathroom air conditioner and the intelligent device according to an embodiment of the present application. Referring to Figure 1 The interconnection control method of the intelligent device and the intelligent device of the present application comprises the following steps:

[0064] Step S40, receiving a mildew-proof instruction for indicating to perform a mildew-proof treatment on the bathroom space;

[0065] Step S50, detecting whether there is a human body in the bathroom space; if not, proceeding to step S60; if yes, returning to re-detecting; and

[0066] Step S60, controlling the bathroom air conditioner and / or the intelligent device to perform a mildew-proof measure.

[0067] The interconnection control method of the present application first receives the mildew-proof instruction, and then controls the bathroom air conditioner and / or the intelligent device to perform a corresponding mildew-proof measure when there is no human body in the bathroom space, so as to perform a mildew-proof treatment on the bathroom space. In this way, the possibility of breeding of mildew in the bathroom space is effectively eliminated before the breeding of mildew, the hygiene level in the bathroom space is improved, and the health of the user is benefited.

[0068] In some embodiments, the bathroom air conditioner is in communication connection with the intelligent shower, so as to facilitate the transmission of signals between the bathroom air conditioner and the intelligent shower. It can be understood that the bathroom air conditioner and the intelligent shower are both located in the bathroom space.

[0069] In these embodiments, before receiving the mildew-proof instruction, the interconnection control method of the present application further comprises:

[0070] receiving a closing signal for indicating that the intelligent shower is closed;

[0071] determining whether an opening signal for indicating that the intelligent shower is opened is received within a first preset time length;

[0072] if not, generating the mildew-proof instruction.

[0073] When receiving the closing signal, the smart shower is closed, and the user stops using water. If no water starting signal is received within the first preset time period after the smart shower is closed, it indicates that the user has not continued to use water for a long time, and thus the user has ended the activity in the bathroom space. Therefore, the present application automatically determines that the bathroom space needs to be treated for mildew when no water starting signal is received within the first preset time period after the smart shower is closed, because the user has used water before, which will cause the bathroom space to be humid, and no daily activity is performed thereafter, at which time the automatic mildew treatment instruction is generated to automatically perform the mildew treatment measure, without the need for the user to judge by himself, without affecting the normal activity of the user in the bathroom space, with high intelligence and good user experience.

[0074] Specifically, Figure 2 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the second embodiment of the present application. Referring to Figure 2 , the interconnection control method of the smart device and the smart device of the present application comprises:

[0075] Step S101, receiving a closing signal for indicating that the smart shower is closed;

[0076] Step S102, determining whether an opening signal is received within a first preset time period; if not, proceeding to step S103;

[0077] Step S103, generating a mildew treatment instruction for instructing to treat the bathroom space for mildew;

[0078] Step S40, receiving the mildew treatment instruction;

[0079] Step S50, detecting whether a human body exists in the bathroom space; if not, proceeding to step S60; if yes, returning to re-detecting; and

[0080] Step S60, controlling the bathroom air conditioner and / or the smart device to perform the mildew treatment measure.

[0081] In some embodiments, the bathroom air conditioner is in communication connection with the smart shower, so as to facilitate the transmission of signals between the bathroom air conditioner and the smart shower. It can be understood that the bathroom air conditioner and the smart shower are in the same bathroom space.

[0082] In these embodiments, before receiving the mildew treatment instruction, the interconnection control method of the present application further comprises:

[0083] receiving a closing signal for indicating that the smart shower is closed;

[0084] sending inquiry information to a terminal device interconnected with the bathroom air conditioner; the inquiry information is for indicating whether the bathroom space needs to be treated for mildew;

[0085] The anti-mildew instruction is generated when the positive feedback signal sent by the terminal device is received. The positive feedback signal is used to indicate that the bathroom space needs to be treated for mildew.

[0086] Unlike the embodiment shown in Figure 2 , in this embodiment, when the closing signal is received, the terminal device interconnected with the bathroom air conditioner is first sent inquiry information to inquire whether the user needs to treat the bathroom space for mildew. If the user thinks so, the positive feedback signal is sent through the terminal device, and only when the positive feedback signal is received, the anti-mildew instruction is generated. This embodiment combines the subjective consciousness of the user, and only when the user thinks that the bathroom space needs to be treated for mildew, the anti-mildew measure is executed, which improves the necessity of the execution of the anti-mildew measure and makes it more in line with the user's use demand, and to a certain extent, reduces the energy consumption. For example, in the humid season or humid weather, the execution of the anti-mildew measure needs to be more frequent; in the dry season or dry weather, even after bathing, the anti-mildew measure does not need to be executed. Therefore, this embodiment is suitable for the geographical conditions where the location of the bathroom air conditioner is distinct between dry and humid seasons.

[0087] Specifically, Figure 3 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the intelligent device according to the third embodiment of the present application. Referring to Figure 3 , the interconnection control method of the intelligent device and the intelligent device of the present application comprises:

[0088] Step S201, receiving a closing signal used to indicate that the intelligent shower is closed;

[0089] Step S202, sending inquiry information to the terminal device interconnected with the bathroom air conditioner;

[0090] Step S203, generating an anti-mildew instruction for indicating that the bathroom space is treated for mildew when the positive feedback signal sent by the terminal device is received;

[0091] Step S40, receiving the anti-mildew instruction;

[0092] Step S50, detecting whether there is a human body in the bathroom space; if not, go to step S60; if yes, return to re-detect; and

[0093] Step S60, controlling the bathroom air conditioner and / or the intelligent device to execute the anti-mildew measure.

[0094] In some alternative embodiments, the bathroom air conditioner is in communication connection with a water flow detection device arranged in the total water outlet pipeline of the bathroom space, so as to facilitate the transmission of signals between the bathroom air conditioner and the water flow detection device.

[0095] In these embodiments, before receiving the anti-mildew instruction, the interconnection control method of the present application further comprises:

[0096] receiving a water use stop signal sent by the water flow detection device; the water use stop signal is used to indicate that the water flow in the total water outlet pipeline is switched from greater than zero to zero;

[0097] determining whether a water use start signal is received within a second preset time length; the water use start signal is used to indicate that the water flow in the total water outlet pipeline is switched from zero to greater than zero;

[0098] if not, generating a mildew prevention instruction.

[0099] When the water use stop signal is received, it indicates that the water flow in the total water outlet pipeline stops and no water flows through, and thus it indicates that the user no longer uses water in the bathroom space. When no water use start signal is received within the second preset time length, it indicates that the user does not use water again within the second preset time length, and a long time without water use indicates that the user no longer uses the bathroom space and does not perform activities in the bathroom space. Therefore, the present application automatically determines that the bathroom space needs to be treated for mildew when no water use start signal is received within the second preset time length after water use stops, because the user used water before, which caused the bathroom space to be humid, and no daily activities are performed thereafter, and thus a mildew prevention instruction is automatically generated to automatically perform the mildew prevention measure, without the need for the user to judge by himself, without affecting the normal activities of the user in the bathroom space, with high intelligence and good user experience.

[0100] In some alternative embodiments, the bathroom air conditioner is in communication connection with a water flow detection device arranged in the total water outlet pipeline of the bathroom space, so as to facilitate the transmission of signals between the bathroom air conditioner and the water flow detection device.

[0101] In these embodiments, before receiving the mildew prevention instruction, the interconnection control method of the present application further comprises:

[0102] receiving a water use stop signal sent by the water flow detection device; the water use stop signal is used to indicate that the water flow in the total water outlet pipeline is switched from greater than zero to zero;

[0103] sending inquiry information to a terminal device interconnected with the bathroom air conditioner, the inquiry information being used to indicate whether the bathroom space needs to be treated for mildew;

[0104] generating a mildew prevention instruction when a positive feedback signal sent by the terminal device is received; the positive feedback signal is used to indicate that the bathroom space needs to be treated for mildew.

[0105] Unlike the previous embodiment, in this embodiment, after receiving the water stop signal, the terminal device interconnected with the bathroom air conditioner is first sent an inquiry message to inquire whether the user needs to carry out mold-proof treatment on the bathroom space. If the user no longer uses the bathroom and considers it necessary to carry out mold-proof treatment, a positive feedback signal is sent through the terminal device, and the mold-proof instruction is only produced after receiving the positive feedback signal. This embodiment combines the subjective consciousness of the user, can quickly determine whether the user still needs to use the bathroom, does not need to wait for the first preset time length, the response speed is faster, and the mold-proof measure is executed more timely. Moreover, the mold-proof measure is only executed when the user considers that the bathroom space needs to be treated, which improves the necessity of the mold-proof measure execution, makes it more in line with the user's use demand, and reduces the energy consumption to a certain extent. For example, in the humid season or humid weather, the execution of the mold-proof measure needs to be more frequent; in the dry season or dry weather, even after the dishwasher is stopped, the mold-proof measure does not need to be executed. Therefore, this embodiment is suitable for the geographical conditions where the position of the bathroom air conditioner is distinct between dry and humid seasons.

[0106] In some embodiments, the smart device at least includes a smart shower in communication connection with the bathroom air conditioner, so as to facilitate the transmission of signals between the bathroom air conditioner and the smart shower. In these embodiments, the step S60 of controlling the bathroom air conditioner and / or the smart device to execute the corresponding mold-proof measure can specifically include:

[0107] Turning on the smart shower and controlling the smart shower to spray cold water towards the floor and walls of the bathroom space.

[0108] When the user takes a bath, hot water is usually used, which causes the temperature in the bathroom space to rise. When the temperature is high, the activity of mold is strong, and the humid environment creates good conditions for the growth of mold. In the mold-proof measure of the present application, the smart shower is first turned on to spray cold water towards the floor and walls of the bathroom space, so as to reduce the floor temperature and wall temperature of the bathroom space by using cold water. Since the specific heat capacity of water is large, the temperature of the entire bathroom space can be quickly and effectively reduced, the temperature conditions for mold growth are destroyed, the speed and possibility of mold growth are reduced, and the rate and effectiveness of mold-proof treatment are improved.

[0109] Specifically, Figure 4 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the fourth embodiment of the present application. Referring to Figure 4 , the interconnection control method of the smart device and the smart device of the present application includes:

[0110] Step S40, receiving a mold-proof instruction for indicating mold-proof treatment on the bathroom space;

[0111] Step S50, detecting whether there is a human body in the bathroom space; if not, turning to step S61; if yes, returning to re-detecting; and

[0112] Step S61, opening the smart shower and controlling the smart shower to spray cold water towards the floor and walls of the bathroom space.

[0113] In some embodiments, the smart device further comprises a smart wet-dry sweeping robot in communication connection with the bathroom air conditioner, so as to facilitate the transmission of signals between the bathroom air conditioner and the smart wet-dry sweeping robot. In these embodiments, after the smart shower is opened, the step S60 of controlling the bathroom air conditioner and / or the smart device to perform the corresponding mold-proof measure further comprises:

[0114] determining whether the time length of opening the smart shower reaches a third preset time length;

[0115] if yes, closing the smart shower;

[0116] starting the smart wet-dry sweeping robot to remove the accumulated water on the floor in the bathroom space.

[0117] When the spraying time length of the smart shower reaches the third preset time length, the temperature in the bathroom space has basically been reduced, at this time, the smart shower is closed, and the smart wet-dry sweeping robot is started to remove the accumulated water on the floor in the bathroom space, so as to quickly eliminate the important factor of bringing high humidity to the bathroom space, avoid the upgrading of the mold-proof difficulty caused by the diffusion of water vapor to each area in the bathroom space after the evaporation of the accumulated water, and improve the efficiency of the mold-proof measure.

[0118] Specifically, Figure 5 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the fifth embodiment of the present application. Referring to Figure 5 , the interconnection control method of the smart device and the smart device of the present application comprises:

[0119] Step S40, receiving a mold-proof instruction for indicating to perform mold-proof treatment on the bathroom space;

[0120] Step S50, detecting whether there is a human body in the bathroom space; if not, turning to step S61; if yes, returning to re-detecting;

[0121] Step S61, opening the smart shower and controlling the smart shower to spray cold water towards the floor and walls of the bathroom space.

[0122] Step S62, determining whether the time length of opening the smart shower reaches a third preset time length; if yes, turning to step S63; if not, returning to continue determining;

[0123] Step S63, closing the smart shower; and

[0124] Step S64, starting the intelligent dry-wet sweeping robot to remove the accumulated water on the floor in the bathroom space.

[0125] In some embodiments, the intelligent device further comprises an exhaust fan in communication connection with the bathroom air conditioner, to transmit signals between the bathroom air conditioner and the exhaust fan. In these embodiments, after starting the intelligent dry-wet sweeping robot, the step S60 of controlling the bathroom air conditioner and / or the intelligent device to perform the corresponding mold-proof measure further comprises:

[0126] starting the exhaust fan to exhaust air outside the bathroom space.

[0127] The exhaust fan can quickly exhaust the humid air in the bathroom space, thereby replacing new air, further reducing the humidity in the bathroom space, effectively preventing mold from occurring in each area of the bathroom space, and improving the effectiveness of the mold-proof measure.

[0128] Specifically, Figure 6 is a schematic flowchart of the interconnection control method of the bathroom air conditioner and the intelligent device according to the sixth embodiment of the present application. Referring to Figure 6 , the interconnection control method of the intelligent device and the intelligent device of the present application comprises:

[0129] Step S40, receiving a mold-proof instruction for indicating to perform a mold-proof treatment on the bathroom space;

[0130] Step S50, detecting whether there is a human body present in the bathroom space; if not, proceeding to step S61; if yes, returning to re-detecting;

[0131] Step S61, opening the intelligent shower and controlling the intelligent shower to spray cold water towards the floor and the wall of the bathroom space;

[0132] Step S62, determining whether the opening time of the intelligent shower reaches a third preset time; if yes, proceeding to step S63; if not, returning to continue determining;

[0133] Step S63, closing the intelligent shower;

[0134] Step S64, starting the intelligent dry-wet sweeping robot to remove the accumulated water on the floor in the bathroom space;

[0135] Step S651, starting the exhaust fan to exhaust air outside the bathroom space.

[0136] In some embodiments, after starting the intelligent dry-wet sweeping robot, the step S60 of controlling the bathroom air conditioner and / or the intelligent device to perform the corresponding mold-proof measure further comprises:

[0137] starting the bathroom air conditioner in the natural air supply mode to blow the natural air without heat exchange towards the bathroom space.

[0138] In the natural air supply mode, the natural wind blown by the bathroom air conditioner is not subjected to heat exchange, that is, the compressor of the bathroom air conditioner does not need to be started, and no refrigerant flows through the heat exchange device, only the indoor fan of the bathroom air conditioner needs to be started, thereby saving energy consumption to the maximum extent and avoiding waste of cold or heat. In addition, the bathroom air conditioner is started in the natural air supply mode, which can promote the rapid flow of air in the bathroom space, thereby accelerating the dispersion of moisture in the bathroom space and further reducing the humidity in the bathroom space, effectively preventing mold from occurring in each area of the bathroom space and improving the effectiveness of the mold prevention measures.

[0139] Specifically, Figure 7 is a schematic flowchart of the interconnection control method of the bathroom air conditioner and the intelligent device according to the seventh embodiment of the present application. Referring to Figure 7 , the interconnection control method of the intelligent device and the intelligent device of the present application comprises:

[0140] Step S40, receiving a mold prevention instruction for indicating that the bathroom space is subjected to mold prevention treatment;

[0141] Step S50, detecting whether a human body exists in the bathroom space; if not, proceeding to step S61; if yes, returning to re-detecting;

[0142] Step S61, opening the intelligent shower and controlling the intelligent shower to spray cold water toward the floor and the wall of the bathroom space;

[0143] Step S62, determining whether the time length for which the intelligent shower is opened reaches a third preset time length; if yes, proceeding to step S63; if not, returning to continue determining;

[0144] Step S63, closing the intelligent shower;

[0145] Step S64, starting the intelligent dry-wet sweeping robot to remove the accumulated water on the floor of the bathroom space;

[0146] Step S652, starting the bathroom air conditioner in the natural air supply mode to blow the natural wind which is not subjected to heat exchange toward the bathroom space.

[0147] In some embodiments, the intelligent device further comprises an intelligent window in communication connection with the bathroom air conditioner, to transmit signals between the bathroom air conditioner and the intelligent window. In these embodiments, the step S60 of controlling the bathroom air conditioner and / or the intelligent device to perform the corresponding mold prevention measures after starting the intelligent dry-wet sweeping robot further comprises:

[0148] obtaining a first humidity in the bathroom space and a second humidity in an outdoor environment space; and

[0149] opening the intelligent window when the first humidity is greater than the second humidity.

[0150] When the first humidity in the bathroom space is higher than the second humidity in the outdoor environment space, the bathroom space and the outdoor environment space can be ventilated by opening the smart window, the air with lower humidity in the outdoor environment space is used to replace the air with higher humidity in the bathroom space, the humidity in the bathroom space is further reduced, and the mold in each area of the bathroom space is effectively prevented, thereby improving the effectiveness of the mold prevention measures.

[0151] Specifically, Figure 8 is a schematic flow chart of the interconnection control method of the bathroom air conditioner and the smart device according to the eighth embodiment of the present application. Referring to Figure 8 , the interconnection control method of the smart device and the smart device of the present application comprises:

[0152] Step S40, receiving a mold prevention instruction for indicating to perform mold prevention treatment on the bathroom space;

[0153] Step S50, detecting whether there is a human body in the bathroom space; if not, go to step S61; if yes, return to re-detect;

[0154] Step S61, opening the smart shower and controlling the smart shower to spray cold water towards the floor and the wall of the bathroom space;

[0155] Step S62, determining whether the time length of opening the smart shower reaches a third preset time length; if yes, go to step S63; if not, return to continue to determine;

[0156] Step S63, closing the smart shower;

[0157] Step S64, starting the smart dry-wet sweeping robot to remove the accumulated water on the floor in the bathroom space;

[0158] Step S653, acquiring the first humidity in the bathroom space and the second humidity in the outdoor environment space;

[0159] Step S654, determining whether the first humidity is greater than the second humidity; if yes, go to step S655; if not, go to step S656;

[0160] Step S655, opening the smart window;

[0161] Step S656, closing the smart window.

[0162] In some embodiments, the smart device can include a smart dry-wet sweeping robot, an exhaust fan, a smart door and window, a smart shower, etc. After starting the smart dry-wet sweeping robot, the control of the bathroom air conditioner and / or the smart device to perform the corresponding mold prevention measures can simultaneously include the above steps S651, S652, S653, S654, S655 and S656. The execution order of each smart device is not particularly limited.

[0163] The bathroom air conditioner can be communicatively connected with many smart devices in the bathroom space to facilitate the implementation of more comprehensive mold prevention measures. In a specific mold prevention measure, the bathroom space is first cooled by the smart shower to eliminate the temperature conditions for mold breeding; then the accumulated water on the floor in the bathroom space is removed by the smart dry-wet sweeping robot to quickly eliminate the important factor of high humidity in the bathroom space, and to avoid the water vapor spreading to all areas in the bathroom space after the accumulated water evaporates, resulting in an upgrade of mold prevention difficulty; finally, the humidity in the bathroom space is further reduced by means of air blowing of the bathroom air conditioner, starting of the exhaust fan, opening of the smart window, etc., effectively preventing mold from occurring in all areas of the bathroom space and improving the effectiveness of mold prevention measures.

[0164] The present application also provides an interconnection control device of a bathroom air conditioner and a smart device, and the smart device and the bathroom air conditioner are in the same bathroom space.

[0165] Figure 9 is a schematic structural block diagram of the interconnection control device according to an embodiment of the present application. The interconnection control device 20 of the present application includes a processor 21 and a memory 22, the memory 22 stores a machine executable program 23, and the machine executable program 23 is executed by the processor 21 to implement the interconnection control method described in any of the above embodiments.

[0166] Specifically, the processor 21 can be a central processing unit (CPU) or a digital processing unit, etc. The processor 21 transmits and receives data through a communication interface. The memory 22 is used to store the program executed by the processor 21. The memory 22 is any medium that can be used to carry or store desired program code in the form of instructions or data structures and can be accessed by a computer, and can also be a combination of multiple memories. The above machine executable program 23 can be downloaded from a computer readable storage medium to a corresponding computing / processing device or downloaded to a computer or an external storage device via a network (such as the Internet, a local area network, a wide area network and / or a wireless network).

[0167] As mentioned above, the interconnection control method of the bathroom air conditioner and the smart device of any of the above embodiments is described from the side of the interconnection control device 20, i.e. the relevant steps are performed by the interconnection control device 20. In a specific embodiment, the interconnection control device 20 is in data connection with the bathroom air conditioner and the smart device, which can be a network side device such as a server, cloud, etc., obtains various data of the set space through the network, and realizes the relevant adjustment by remotely sending instructions to the bathroom air conditioner and the smart device.

[0168] The interconnection control device 20 can also be a kind of centralized control device, arranged in the set space, and controls the bathroom air conditioner and the smart device. The data connection mode of the interconnection control device 20 with the bathroom air conditioner and the smart device includes but is not limited to wireless transmission, infrared transmission, ultrasonic transmission, etc.

[0169] In some embodiments, the interconnection control device 20 can also be part of the bathroom air conditioner, arranged inside the bathroom air conditioner, and in data connection with the self-controller of the bathroom air conditioner, for example, a dedicated interconnection control device is arranged inside the bathroom air conditioner, and works in cooperation with the controller dedicated to performing component control.

[0170] The present application also provides a bathroom air conditioner, Figure 10 is a schematic structural block diagram of the bathroom air conditioner according to an embodiment of the present application. The bathroom air conditioner 1 has the interconnection control device 20 described in the above embodiments. That is, the interconnection control device 20 can not be arranged outside the bathroom air conditioner 1, but can be arranged on the bathroom air conditioner 1. The interconnection control device 20 and the self-controller of the bathroom air conditioner 1 can be the same component, i.e. the interconnection control device 20 is used to control the work of the bathroom air conditioner 1 itself, and is also used to receive signals of the smart device and send signals to the smart device.

[0171] Alternatively, the interconnection control device 20 and the self-controller of the bathroom air conditioner can be different components, i.e. the controller is used to control the work of the bathroom air conditioner itself, and the interconnection control device 20 is used to receive signals of the smart device and send signals to the smart device. However, the interconnection control device 20 and the controller also realize communication to receive signals of the self-controller of the bathroom air conditioner and send signals to the controller.

[0172] In the description of the present embodiments, the description of the terms "one embodiment", "some embodiments", "an illustrative embodiment", "example", "a specific example", or "some examples" means that the specific features, structures, materials, or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present application. In the present specification, the illustrative description of the above terms does not necessarily mean the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0173] It should be noted that in the description of the present application, each functional module can be a physical module composed of multiple structures, components or electronic elements, or a virtual module composed of multiple programs; each functional module can be a module that exists independently of each other, or a module divided by a whole module according to function. Those skilled in the art should understand that, as long as the technical solutions described in the present application can be realized, the constituting manner, the implementation manner and the positional relationship of each functional module can be changed without departing from the technical principles of the present application, and therefore should fall within the protection scope of the present application.

[0174] At this point, those skilled in the art should recognize that although the present application has been shown and described in detail in this paper, many other variants or modifications conforming to the principles of the present application can be directly determined or deduced according to the content disclosed in the present application without departing from the spirit and scope of the present application. Therefore, the scope of the present application should be understood and recognized as covering all these other variants or modifications.

Claims

1. A method for interconnection control of a bathroom air conditioner and a smart device, the smart device and the bathroom air conditioner being in the same bathroom space. and The interconnection control method comprises: receiving a mildew-proof instruction for indicating that the bathroom space is subjected to a mildew-proof treatment; detecting whether there is a human body in the bathroom space; and controlling the bathroom air conditioner and / or the intelligent device to perform a mildew-proof measure when there is no human body in the bathroom space; the intelligent device at least comprises an intelligent showerhead in communication connection with the bathroom air conditioner; and the step of controlling the bathroom air conditioner and / or the intelligent device to perform a corresponding mildew-proof measure comprises: opening the intelligent showerhead and controlling the intelligent showerhead to spray cold water towards the ground and walls of the bathroom space. The intelligent device further comprises an intelligent dry-wet sweeping robot in communication connection with the bathroom air conditioner; and after the intelligent showerhead is opened, the step of controlling the bathroom air conditioner and / or the intelligent device to perform a corresponding mildew-proof measure further comprises: judging whether the intelligent showerhead is opened for a third preset time length; if yes, closing the intelligent showerhead; starting the intelligent dry-wet sweeping robot to remove water accumulated on the ground in the bathroom space.

2. The interconnection control method according to claim 1, wherein the bathroom air conditioner is in communication connection with the intelligent showerhead; and before the mildew-proof instruction is received, the interconnection control method further comprises: receiving a closing signal for indicating that the intelligent showerhead is closed; judging whether an opening signal for indicating that the intelligent showerhead is opened is received within a first preset time length; if no, generating the mildew-proof instruction.

3. The interconnection control method according to claim 1, wherein the bathroom air conditioner is in communication connection with the intelligent showerhead; and before the mildew-proof instruction is received, the interconnection control method further comprises: receiving a closing signal for indicating that the intelligent showerhead is closed; sending inquiry information to a terminal device interconnected with the bathroom air conditioner, the inquiry information being used to indicate whether the bathroom space needs to be subjected to a mildew-proof treatment; and when a positive feedback signal sent by the terminal device is received, generating the mildew-proof instruction, the positive feedback signal being used to indicate that the bathroom space needs to be subjected to a mildew-proof treatment.

4. The interconnection control method according to claim 1, wherein the intelligent device further comprises an exhaust fan in communication connection with the bathroom air conditioner; and after the intelligent dry-wet sweeping robot is started, the step of controlling the bathroom air conditioner and / or the intelligent device to perform a corresponding mildew-proof measure further comprises: starting the exhaust fan to exhaust air to the outside of the bathroom space.

5. The interconnection control method according to claim 1, wherein after the intelligent dry-wet sweeping robot is started, the step of controlling the bathroom air conditioner and / or the intelligent device to perform a corresponding mildew-proof measure further comprises: starting the bathroom air conditioner in a natural air supply mode to blow natural air without heat exchange towards the bathroom space.

6. The interconnection control method according to claim 1, wherein the intelligent device further comprises an intelligent window in communication connection with the bathroom air conditioner; and after the intelligent dry-wet sweeping robot is started, the step of controlling the bathroom air conditioner and / or the intelligent device to perform a corresponding mildew-proof measure further comprises: ​ acquiring a first humidity in the bathroom space and a second humidity of an outdoor environment space; when the first humidity is greater than the second humidity, opening the smart window. 7.An interconnected control device of a bathroom air conditioner and a smart device, wherein the smart device and the bathroom air conditioner are in a same bathroom space; and the interconnected control device comprises a processor and a memory, the memory stores a machine executable program, and the machine executable program is executed by the processor to implement the interconnected control method according to any one of claims 1-6. 8.A bathroom air conditioner comprising the interconnected control device according to claim 7.

Citation Information

Patent Citations

  • Bathroom air conditioner and control method thereof

    CN115076843A

  • Bathroom air conditioner and control method thereof

    CN115264682A