Power failure observable multi-objective optimization configuration method and system for measuring redundancy

By applying a multi-objective optimization configuration method for measuring redundancy in the power system, the improved bat algorithm optimizes the configuration of the power quality measurement device, and solving the problems of high cost and unreasonable configuration in the existing technology, realizing the realization of the realization of high cost and unreasonable configuration. More efficient resource utilization and lower installation costs.

CN119024093APending Publication Date: 2024-11-26HAINAN POWER GRID CO LTD ELECTRIC POWER RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410819476.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing multi-objective optimization configuration method for power failures has high costs and unreasonable configuration problems, resulting in waste of resources and increased equipment installation costs.

Method used

Using the multi-objective optimization configuration method for measuring redundancy of power failures, by obtaining the power system parameter information, determining the multi-objective optimization rules for measuring redundancy of power, designing the multi-objective optimization objective function and constraints of the power quality measurement device and solve the optimal power quality measurement device configuration scheme using improved bat algorithm.

Benefits of technology

It effectively improves the search accuracy of measurement redundancy and optimal solution, optimizes the installation position of the power quality measurement device in the power system, reduces the number of equipment and installation costs, and improves the installation efficiency and resource utilization of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119024093A_ABST
    Figure CN119024093A_ABST
Patent Text Reader

Abstract

The invention discloses a power failure observable multi-objective optimization configuration method and system for measuring redundancy. The method comprises the following steps: acquiring parameter information of a power system; determining a multi-objective optimization rule of fault observability and measurement redundancy; designing a multi-objective optimization objective function of the electric energy quality measuring device; determining configuration constraint conditions of the electric energy quality measuring device; and designing an improved bat algorithm, and solving the target function to obtain an optimal multi-target optimization configuration scheme of the electric energy quality measurement device. Aiming at the photovoltaic and energy storage influence and the economical efficiency and fault observability of the electric energy quality measuring device in a power system, and considering measurement redundancy maximization, a system objective function is constructed, constraint conditions are considered, and a multi-objective optimal configuration scheme of the electric energy quality measuring device is solved by utilizing an improved bat algorithm. After configuration optimization, the measurement redundancy and the search precision of the optimal solution are effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power measurement, and in particular to an observable multi-objective optimization configuration method and system for measuring redundancy of electric power failures. Background Art

[0002] In recent years, with the continuous advancement of high-proportion new energy grid connection, the energy sector is undergoing profound changes. This change has brought new hope for environmental sustainability, but also faces a series of challenges. New energy, especially photovoltaic and wind power generation, as representatives of renewable energy, has gradually been integrated into the power grid and has become a key force in promoting the upgrading of energy structure. However, large-scale grid connection of new energy may lead to challenges in energy balance and stability.

[0003] Renewable energy power generation equipment, such as photovoltaic inverters and wind turbines, has nonlinear load characteristics, which may cause harmonics to be injected into the power grid. Harmonics can affect the normal operation of other users and equipment, causing the risk of power quality degradation and equipment damage. In order to obtain system node status information more accurately and solve harmonic problems, the distribution system requires a smarter and more flexible management method, which includes real-time monitoring and control technology, that is, including the optimization configuration of power quality measurement devices, so as to obtain the system state variables more timely and accurately. By using high-precision data acquisition and analysis tools and more reasonably installing power quality measurement devices, the status information of system nodes can be quickly obtained, and corresponding measures can be taken to achieve safer and more stable operation of the power system. However, due to the scale of the power system and the high cost of measurement devices, it is difficult to cover the entire network with device installation.

[0004] Therefore, intelligent strategies are needed to install limited devices in suitable locations to achieve the minimum economic cost and obtain more node status information. Through the application of intelligent strategies, the installation location of the device can be optimized to ensure coverage of the most representative area while minimizing the number of devices. However, traditional optimization algorithms are limited to ensuring the optimal configuration under the constraint of fully observable system status, and are prone to falling into local optimal solutions, which to a certain extent increases the installation cost of the system and causes waste of resources. Summary of the invention

[0005] In view of the above-mentioned problems, the present invention is proposed.

[0006] Therefore, the technical problem solved by the present invention is that the existing method has the problems of high cost and unreasonable configuration.

[0007] In order to solve the above technical problems, the present invention provides the following technical solution: a multi-objective optimization configuration method for power failures with redundancy measurement, comprising:

[0008] Obtain parameter information of the power system;

[0009] Determine the multi-objective optimization rules for fault observability and measurement redundancy;

[0010] Design multi-objective optimization objective function for power quality measurement devices;

[0011] Determine the configuration constraints of power quality measurement devices;

[0012] An improved bat algorithm is designed and the objective function is solved to obtain the optimal multi-objective optimization configuration scheme for the power quality measurement device.

[0013] As a preferred solution of the power failure observable multi-objective optimization configuration method for measuring redundancy of the present invention, wherein: the parameter information includes power system network topology data: number and location of nodes, branch connection relationship, branch parameters;

[0014] Power quality measurement device data: installation node locations and measurement parameters of existing power quality measurement devices;

[0015] Fault data: fault type, fault location, fault frequency and impact;

[0016] Redundancy and observability data: node status measurement data, redundancy calculation data.

[0017] As a preferred solution of the multi-objective optimization configuration method for measuring redundancy of the present invention, the multi-objective optimization rule includes: if the configuration of the power quality measurement device can monitor and accurately locate any fault position of the power system, it means that the power system is observable; considering the network elements of the power system, the observable fault is defined as: if the voltage phasors at both ends of a branch and the branch current phasors are known, the branch can still be observed in the fault state; if all branches of the entire power system are observable, the system is called observable fault;

[0018] The ratio of the number of independent measurement quantities to the number of state measurements in the system is taken as redundancy; for an n-node power system, its measured state quantity is an n-dimensional voltage phasor; the independent measurement quantity is the voltage phasor configured with the power quality measurement device and the current phasor associated with it;

[0019] Therefore, the redundancy R is defined as:

[0020]

[0021] Where p represents the node set equipped with power quality measurement devices, d i Indicates the number of branches associated with node i configured with the power quality measurement device.

[0022] As a preferred solution of the multi-objective optimization configuration method for measuring redundancy of power fault observability described in the present invention, the multi-objective optimization objective function includes the objective function according to the observability of faults and the minimum number of power quality measurement devices configured as follows:

[0023]

[0024] Where ε represents the cost coefficient of each HMD, which is set to 1; x i Indicates whether the i-th node in the system is configured with HMD. If the node needs to be configured with HMD, let x i is 1, otherwise it is 0; i Represents the weight of the i-th node in the system; the weight satisfies the rules:

[0025] Assume that the initial weight of all nodes in the system is 0;

[0026] If a node is connected to m nodes, the weight of the node is increased by 0.5m;

[0027] If a node is connected to new energy sources such as photovoltaics and wind power, the weight of the node will be increased by 2;

[0028] On this basis, the measurement redundancy of the power system should be as large as possible, and nodes with more branches should be selected as much as possible under the same conditions. The objective function is as follows:

[0029]

[0030] Among them, 1 / d i ≤1,

[0031] As a preferred solution of the observable multi-objective optimization configuration method for power faults of measurement redundancy described in the present invention, wherein: the constraint conditions include that any node installed with a power quality measurement device is observable, and each adjacent node of the node is also observable; if any node with n adjacent nodes is observable, and n-1 adjacent nodes are observable, then the remaining adjacent nodes are also observable; if n adjacent nodes of any node with unknown observability are observable, then the node is observable; if its adjacent nodes contain nodes with unknown observability, its observability should be solved by Kirchhoff's voltage and current law;

[0032] Based on the observability of power node system faults, the constraints for achieving global observability of the power quality measurement device are as follows:

[0033] AX T ≥ b

[0034]

[0035] Among them, matrix A represents the connection status of nodes in the system; A ij Represents the elements in matrix A. If nodes i and j are the same node or connected nodes, let A ij is 1, otherwise it is 0; X=(x1,x2,...,x n ) represents the layout of the power quality measurement devices at each node in the system; b is an n-dimensional column vector of the form [1,1,…,1].

[0036] As a preferred scheme of the observable multi-objective optimization configuration method for measuring redundancy of power faults described in the present invention, the improved bat algorithm includes: the location of the bat population represents the installation status of the power quality measurement device of the power system; the loudness of the bat sound waves corresponds to the current flowing through the branch of the power system, and the higher the branch current, the louder the loudness; the frequency corresponds to the power grid operating frequency, which is 50Hz or 60Hz.

[0037] As a preferred solution of the multi-objective optimization configuration method for power failure measurement redundancy described in the present invention, the specific process of the improved bat algorithm is:

[0038] Step 1: The bat population position and velocity expressions are:

[0039] f i =f min +β(f max -f min )

[0040]

[0041] in, represents the speed of the i-th bat in the t-th generation; represents the position of the i-th bat in the t-th generation; X best represents the best position in the bat population; f max and f min Represents the maximum and minimum values ​​of frequency; β∈[0,1];

[0042] Step 2: Generate a random number rand1∈[0,1], if rand1>r i , then update If rand1>r is not satisfied i , go directly to step 3;

[0043]

[0044] In the formula, A t represents the average loudness of all bats in the tth generation;

[0045] Step 3: Randomly generate rand2∈[0,1], if Then accept the new bat position and update A i and r i ;

[0046]

[0047] r i t =r i t-1 [1-exp(-γt)]

[0048] Where α is a random number between (0,1); γ is a constant and satisfies 0<γ<1;

[0049] Step 4: Confirm the new bat position indicates that the bat emits pulse loudness Gradually decrease, the pulse emission rate r i t gradually increase;

[0050] Step 5: When t reaches the preset value, the loudness A t When the preset range gradually approaches 0, it means the prey is captured and the sound stops. best It is the best location for installing power quality measurement devices.

[0051] A power failure observable multi-objective optimization configuration system for measuring redundancy using the method of the present invention, wherein:

[0052] The acquisition unit obtains the parameter information of the power system; determines the multi-objective optimization rules for fault observability and measurement redundancy;

[0053] The optimization unit designs the multi-objective optimization objective function of the power quality measurement device; determines the configuration constraints of the power quality measurement device;

[0054] The computing unit designs and improves the bat algorithm, solves the objective function, and obtains the optimal multi-objective optimization configuration scheme of the power quality measurement device.

[0055] A computer device comprises: a memory and a processor; the memory stores a computer program, wherein: the processor implements the steps of any one of the methods of the present invention when executing the computer program.

[0056] A computer-readable storage medium stores a computer program, wherein: when the computer program is executed by a processor, the steps of any one of the methods of the present invention are implemented.

[0057] Beneficial effects of the present invention: The multi-objective optimization configuration method for power fault observability of measurement redundancy provided by the present invention aims at the influence of photovoltaic and energy storage in the power system, the economy and fault observability of the power quality measurement device, and the maximization of measurement redundancy, constructs the system objective function, considers the constraints, and uses the improved bat algorithm to solve and obtain the multi-objective optimization configuration scheme of the power quality measurement device. After configuration optimization, the measurement redundancy and the search accuracy of the optimal solution are effectively improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0059] Figure 1 The overall flow chart of the power failure observable multi-objective optimization configuration method for measuring redundancy provided by the first embodiment of the present invention;

[0060] Figure 2 An improved IEEE-30 node system topology diagram in the power failure observable multi-objective optimization configuration method for measuring redundancy provided by the second embodiment of the present invention;

[0061] Figure 3 The second embodiment of the present invention provides an improved IEEE-39 node system topology diagram in the power failure observable multi-objective optimization configuration method for measuring redundancy. DETAILED DESCRIPTION

[0062] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0063] Example 1

[0064] Reference Figure 1 , as an embodiment of the present invention, provides a multi-objective optimization configuration method for power failures with measurement redundancy, comprising:

[0065] S1: Obtain parameter information of the power system.

[0066] Specifically, the power system network topology data includes but is not limited to:

[0067] Number and location of nodes: Detailed location of each node in the system.

[0068] Branch connection relationship: the power line connection relationship between nodes.

[0069] Branch parameters: line resistance, reactance and susceptance and other parameters.

[0070] Power quality measurement device data:

[0071] Installation location: The installation node location of the existing power quality measurement device.

[0072] Measurement parameters: Parameters that can be measured by each measuring device (such as voltage phasor, current phasor).

[0073] Fault data:

[0074] Fault type: various types of faults that may occur in the system (such as short circuit, open circuit, etc.).

[0075] Fault location: The location where different faults may occur in the system.

[0076] Fault frequency and impact: The frequency of occurrence of different faults and their impact on the system.

[0077] Redundancy and observability data:

[0078] Node status measurement data: voltage phasor and current phasor of each node.

[0079] Redundancy calculation data: the ratio of independent measurement quantity to state measurement quantity.

[0080] Economic data.

[0081] Equipment cost: The cost factor of each power quality measurement device.

[0082] Installation and maintenance costs: The cost of installing and maintaining measurement devices at different nodes.

[0083] S2: Determine the multi-objective optimization rules for fault observability and measurement redundancy.

[0084] If a method for configuring a power quality measurement device can monitor and accurately locate any fault location in a power system, it means that the power system is fault observable. Considering the network elements of the power system, the definition of fault observability is: if the voltage phasors at both ends of a branch and the branch current phasors are known, the branch can still be observed in the fault state; if all branches of the entire power system are observable, the system is called fault observable.

[0085] The ratio of the number of independent measurements to the number of state measurements in the system is taken as redundancy; for an n-node power system, its measured state quantity is an n-dimensional voltage phasor; the independent measurement quantity is the voltage phasor configured with the power quality measurement device and the current phasor associated with it. Therefore, the redundancy R is defined as:

[0086]

[0087] Where p represents the node set equipped with power quality measurement devices, d i Indicates the number of branches associated with node i configured with the power quality measurement device.

[0088] S3: Design the multi-objective optimization objective function of the power quality measurement device.

[0089] The objective function based on the observability of faults and the minimum number of power quality measurement devices is as follows:

[0090]

[0091] Where ε represents the cost coefficient of each HMD, which is set to 1; x i Indicates whether the i-th node in the system is configured with HMD. If the node needs to be configured with HMD, let x i is 1, otherwise it is 0; i Represents the weight of the i-th node in the system; the weight satisfies the rules:

[0092] Assume that the initial weight of all nodes in the system is 0.

[0093] If a node is connected to m nodes, the weight of the node is increased by 0.5m.

[0094] If a node is connected to new energy sources such as photovoltaics and wind power, the weight of the node will be increased by 2.

[0095] On this basis, the measurement redundancy of the power system should be as large as possible, and nodes with more branches should be selected as much as possible under the same conditions. The objective function is as follows:

[0096]

[0097] Among them, 1 / d i ≤1,

[0098] S4: Determine the configuration constraints of the power quality measurement device.

[0099] Any node with a power quality measurement device installed is observable, and all adjacent nodes of the node are also observable; if any node with n adjacent nodes is observable, and n-1 adjacent nodes are observable, then the remaining adjacent nodes are also observable; if the n adjacent nodes of any node with unknown observability are observable, then the node is observable; if its adjacent nodes contain nodes with unknown observability, its observability must be solved using Kirchhoff's voltage and current law.

[0100] Based on the observability of power node system faults, the constraints for achieving global observability of the power quality measurement device are as follows:

[0101] AX T ≥ b

[0102]

[0103] Among them, matrix A represents the connection status of nodes in the system; A ij Represents the elements in matrix A. If nodes i and j are the same node or connected nodes, let A ij is 1, otherwise it is 0; X=(x1,x2,...,x n ) represents the layout of the power quality measurement devices at each node in the system; b is an n-dimensional column vector of the form [1,1,…,1].

[0104] S5: Design and improve the bat algorithm, solve the objective function, and obtain the optimal multi-objective optimization configuration scheme for the power quality measurement device.

[0105] The specific process of improving the bat algorithm is as follows:

[0106] Step 1: The bat population position and velocity expressions are:

[0107] f i =f min +β(f max -f min )

[0108]

[0109] in, represents the speed of the i-th bat in the t-th generation; represents the position of the i-th bat in the t-th generation; X best represents the best position in the bat population; f max and f min Represents the maximum and minimum values ​​of frequency; β∈[0,1].

[0110] Step 2: Generate a random number rand1∈[0,1], if rand1>r i , then update If rand1>r is not satisfied i , go directly to step 3.

[0111]

[0112] In the formula, A t represents the average loudness of all bats in the tth generation.

[0113] Step 3: Randomly generate rand2∈[0,1], if Then accept the new bat position and update A i and r i .

[0114]

[0115] r i t =r i t-1 [1-exp(-γt)]

[0116] Where α is a random number between (0,1); γ is a constant that satisfies 0<γ<1.

[0117] Step 4: Confirm the new bat position indicates that the bat emits pulse loudness Gradually decrease, the pulse emission rate r i t Increase gradually.

[0118] Step 5: When t reaches the preset value, the loudness A t When the preset range gradually approaches 0, it means the prey is captured and the sound stops. best It is the best location for installing power quality measurement devices.

[0119] On the other hand, this embodiment also provides a power failure observable multi-objective optimization configuration system for measuring redundancy, which includes:

[0120] The acquisition unit obtains parameter information of the power system; determines the multi-objective optimization rules of fault observability and measurement redundancy.

[0121] The optimization unit designs the multi-objective optimization objective function of the power quality measurement device and determines the configuration constraints of the power quality measurement device.

[0122] The computing unit designs and improves the bat algorithm, solves the objective function, and obtains the optimal multi-objective optimization configuration scheme of the power quality measurement device.

[0123] If the above functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for enabling a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.

[0124] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0125] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0126] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0127] Example 2

[0128] Reference Figure 2-3 , which is an embodiment of the present invention, provides an observable multi-objective optimization configuration method for power failures with measurement redundancy. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments.

[0129] The program based on the improved bat algorithm was written using MATLAB R2018b as the development tool, and the IEEE-30 node and IEEE-39 system were used as the test system. Figure 2 As shown, distributed power sources are set at nodes 1, 2, 5, 8, 11, and 13, photovoltaic power is set at node 5, and wind power is set at node 11. The node system parameters are shown in Table 1; the IEEE-39 node system is as follows Figure 3 As shown, distributed power sources are set at nodes 1-10, photovoltaic power is set at nodes 16 and 26, and wind power is set at nodes 13 and 21. The node system parameters are shown in Table 2.

[0130] Table 1 Connection structure parameters of IEEE-30 node system

[0131]

[0132]

[0133]

[0134] Table 2 Connection structure parameters of IEEE-39 node system

[0135]

[0136]

[0137] The present invention uses an improved bat algorithm, takes the group size X=20, and the number of iterations t=200, and can converge to the optimal solution. The algorithm used in the present invention is compared with the genetic algorithm and the simulated annealing algorithm. The optimization scheme of the IEEE-30 node system is shown in Table 3. It can be clearly concluded that the number of nodes configured by the algorithm used in the present invention is reduced by 1 compared with the 12 nodes of the genetic algorithm and the simulated annealing algorithm. Only 11 power quality measurement devices need to be configured to achieve global failure observability, and the measurement redundancy of the present invention is greater than the measurement redundancy of the other two algorithms; the optimization scheme of the IEEE-39 node system is shown in Table 4. It can be clearly concluded that the number of nodes configured by the algorithm used in the present invention is reduced by 3 compared with the 20 nodes of the genetic algorithm and the simulated annealing algorithm. Only 17 power quality measurement devices need to be configured to achieve global failure observability, and the measurement redundancy of the present invention is greater than the measurement redundancy of the other two algorithms; the superiority of the algorithm is proved.

[0138] Table 3 Optimization scheme of IEEE-30 node system

[0139] algorithm Power quality measurement device configuration node Redundancy Genetic Algorithms 3 4 5 6 11 12 15 17 20 22 25 27 1.6667 Simulated annealing algorithm 1 2 6 9 10 11 12 19 24 26 28 30 1.7000 Algorithm of the present invention 2 3 6 10 11 12 15 18 20 25 27 1.7333

[0140] Table 4 Optimization scheme of IEEE-39 node system

[0141]

[0142] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A multi-objective optimization method for power failure observable configuration with redundancy measurement, characterized in that: include: Obtain parameter information of the power system; Determine the multi-objective optimization rules for fault observability and measurement redundancy; Design multi-objective optimization objective function for power quality measurement devices; Determine the configuration constraints of power quality measurement devices; An improved bat algorithm is designed and the objective function is solved to obtain the optimal multi-objective optimization configuration scheme for the power quality measurement device.

2. The power failure observable multi-objective optimization configuration method for measuring redundancy according to claim 1, characterized in that: The parameter information includes: power system network topology data: number and location of nodes, branch connection relationship, branch parameters; Power quality measurement device data: installation node locations and measurement parameters of existing power quality measurement devices; Fault data: fault type, fault location, fault frequency and impact; Redundancy and observability data: node status measurement data, redundancy calculation data.

3. The power failure observable multi-objective optimization configuration method for measuring redundancy according to claim 2, characterized in that: The multi-objective optimization rules include: if the power quality measurement device configuration can monitor and accurately locate any fault location of the power system, then the power system is fault observable; considering the network elements of the power system, the fault observable is defined as: if the voltage phasors at both ends of a branch and the branch current phasors are known, then the branch can still be observed in the fault state; if all branches of the entire power system are observable, then the system is said to be fault observable; The ratio of the number of independent measurement quantities to the number of state measurements in the system is taken as redundancy; for an n-node power system, its measured state quantity is an n-dimensional voltage phasor; the independent measurement quantity is the voltage phasor configured with the power quality measurement device and the current phasor associated with it; Therefore, the redundancy R is defined as: Where p represents the node set equipped with power quality measurement devices, d i Indicates the number of branches associated with node i configured with the power quality measurement device.

4. The power failure observable multi-objective optimization configuration method for measuring redundancy according to claim 3, characterized in that: The multi-objective optimization objective function includes the following objective functions based on the observability of faults and the minimum number of power quality measurement devices configured: Where ε represents the cost coefficient of each HMD, which is set to 1; x i Indicates whether the i-th node in the system is configured with HMD. If the node needs to be configured with HMD, let x i is 1, otherwise it is 0; i Represents the weight of the i-th node in the system; the weight satisfies the rules: Assume that the initial weight of all nodes in the system is 0; If a node is connected to m nodes, the weight of the node is increased by 0.5m; If a node is connected to new energy sources such as photovoltaics and wind power, the weight of the node will be increased by 2; On this basis, the measurement redundancy of the power system should be as large as possible, and nodes with more branches should be selected as much as possible under the same conditions. The objective function is as follows: in, 5. The power failure observable multi-objective optimization configuration method for measuring redundancy according to claim 4, characterized in that: The constraint conditions include that any node with a power quality measurement device installed is observable, and all adjacent nodes of the node are also observable; if any node with n adjacent nodes is observable, and n-1 adjacent nodes are observable, then the remaining adjacent nodes are also observable; if n adjacent nodes of any node with unknown observability are observable, then the node is observable; if its adjacent nodes contain nodes with unknown observability, its observability must be solved using Kirchhoff's voltage and current law; Based on the observability of power node system faults, the constraints for achieving global observability of the power quality measurement device are as follows: AX T ≥b Among them, matrix A represents the connection status of nodes in the system; A ij Represents the elements in matrix A. If nodes i and j are the same node or connected nodes, let A ij is 1, otherwise it is 0; X=(x1,x2,...,x n ) represents the layout of the power quality measurement devices at each node in the system; b is an n-dimensional column vector of the form [1,1,…,1].

6. The power failure observable multi-objective optimization configuration method for measuring redundancy according to claim 5, characterized in that: The improved bat algorithm includes: the location of the bat population represents the installation status of the power quality measurement device of the power system; the loudness of the bat sound wave corresponds to the current flowing through the power system branch, and the higher the branch current, the louder the sound; the frequency corresponds to the power grid power frequency, which is 50Hz or 60Hz.

7. The power failure observable multi-objective optimization configuration method for measuring redundancy according to claim 6, characterized in that: The specific process of improving the bat algorithm is as follows: Step 1: The bat population position and velocity expressions are: f i =f min +β(f max -f min ) in, represents the speed of the i-th bat in the t-th generation; represents the position of the i-th bat in the t-th generation; X best represents the best position in the bat population; f max and f min Represents the maximum and minimum values ​​of frequency; β∈[0,1]; Step 2: Generate a random number rand1∈[0,1], if rand1>r i , then update If rand1>r is not satisfied i , go directly to step 3; In the formula, A t represents the average loudness of all bats in the tth generation; Step 3: Randomly generate rand2∈[0,1], if Then accept the new bat position and update A i and r i ; Where α is a random number between (0,1); γ is a constant and satisfies 0<γ<1; Step 4: Confirm the new bat position indicates that the bat emits pulse loudness Gradually decrease, the pulse emission rate r i t gradually increase; Step 5: When t reaches the preset value, the loudness A t When the preset range gradually approaches 0, it means the prey is captured and the sound stops. best It is the best location for installing power quality measurement devices.

8. A power failure observable multi-objective optimization configuration system using the measurement redundancy method according to any one of claims 1 to 7, characterized in that: A collection unit, which obtains parameter information of the power system; Determine the multi-objective optimization rules for fault observability and measurement redundancy; Optimization unit, designs multi-objective optimization objective function of power quality measurement device; Determine the configuration constraints of power quality measurement devices; The computing unit designs and improves the bat algorithm, solves the objective function, and obtains the optimal multi-objective optimization configuration scheme of the power quality measurement device.

9. A computer device comprising: Memory and processor; The memory stores a computer program, characterized in that: when the processor executes the computer program, the steps of the power failure observable multi-objective optimization configuration method for measuring redundancy are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method for multi-objective optimization configuration of power failure observable for measuring redundancy are implemented.