Gas production whole-process production management system
By designing a full-process production management system for gas production, real-time monitoring and precise control of the gas production process are achieved, the problems of real-time monitoring and data islands in the existing technology are solved, and the efficiency and quality of gas production are improved.
Patent Information
- Application Number
- CN202411097584.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-26
AI Technical Summary
The existing gas production management software cannot achieve real-time monitoring and precise control, resulting in the impact of production efficiency and quality, and there are problems of post-management, real-time monitoring and data silos.
A full-process production management system for gas production is designed, including order management subsystem, pre-process management subsystem and production management subsystem. The production process is standardized through online software programs to ensure the pre-pre- Page 1 of adsorption columns, cylinders and reactors. Processing and use to achieve real-time monitoring and precise control of the production process.
It improves the efficiency and quality of gas production, avoids the problem of equipment use not meeting the requirements due to operating errors, and ensures the standardization and standardization of the production process.
Smart Images

Figure CN119024781A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of software systems, and in particular to a gas production full-process production management system. Background Art
[0002] With the continuous deepening of industrialization, the gas production industry plays an increasingly important role in the national economy. However, the existing gas production management software generally has certain limitations, which are mainly reflected in the following aspects:
[0003] 1. Post-management: Most of the gas production management software on the market currently adopts post-management methods, such as enterprise resource planning (ERP) systems. In actual use, these systems cannot be customized according to the actual process conditions within the enterprise due to the functional module design of the software. Operators usually enter and process production information after the production process is completed. This management method cannot meet the needs of modern industrial production for real-time and dynamic management.
[0004] 2. Lack of real-time monitoring: Due to the lack of the function of real-time updating of production progress, the existing management system cannot provide enterprises with immediate feedback on production status, making it difficult for management to make timely adjustments and decisions, affecting production efficiency and product quality.
[0005] 3. Insufficient control over technology and procedures: Existing management software often cannot effectively integrate production technology and process requirements, and cannot achieve precise control of key parameters and operating steps in the production process, thereby failing to ensure the standardization and normalization of the production process.
[0006] 4. Data island problem: In the existing management system, production data is often scattered in different departments and systems, forming data islands, which not only increases the difficulty of data integration, but also affects the accuracy and availability of data.
[0007] In view of the above problems, the present invention aims to propose a gas production full-process production management system to address the deficiencies in the prior art and achieve real-time monitoring and precise control of the gas production process, thereby improving the efficiency and quality of gas production. Summary of the invention
[0008] The purpose of the present invention is to provide a gas production full-process production management system to solve the problems raised in the above-mentioned background technology.
[0009] To achieve the above object, the present invention provides the following technical solutions:
[0010] A gas production full-process production management system, including an order management subsystem, a pre-processing management subsystem, and a production management subsystem;
[0011] The order management subsystem includes a planning and scheduling module and a process planning module. The planning and scheduling module is used to clarify factory information, workshop information, production line information, production order information, total production volume of production orders, remaining planable quantity, current planned quantity, specific process route and planned completion time; the process planning module is used to split the current planned quantity into processes according to the specific process route to form multiple process planning units;
[0012] The pretreatment management subsystem includes an adsorption column processing module, a reactor processing module and a steel cylinder processing module; the adsorption column processing module is used to generate a pretreatment task for a designated adsorption column before production use, and the designated adsorption column can be selected for use in the production management subsystem only after the processing is completed; the reactor processing module is used to generate a pretreatment task for a designated reactor before production use, and the designated reactor can be selected for use in the production management subsystem only after the processing is completed; the steel cylinder processing module is used to generate a pretreatment task for a designated steel cylinder before production use, and the designated steel cylinder can be selected for use in the production management subsystem only after the processing is completed;
[0013] The production management subsystem is used to report work according to the specific information of the process planning unit to realize the control of the production process. The control process includes selecting at least one pretreated reactor to add chemical raw materials, selecting the reactor for heating reaction after the addition is completed, selecting at least one pretreated adsorption column for adsorption filtration, and selecting at least one pretreated cylinder for collection.
[0014] As a further improvement, the pretreatment management subsystem further includes an adsorption column archive module, which is used to record the number information, maximum inflow weight and number of adsorptions of the adsorption column, and the maximum flow weight is used to limit the maximum weight of the gas that can be adsorbed by the adsorption column; in the production process, the gas will flow into the cylinder after being filtered through the adsorption column. After selecting at least one adsorption column after pretreatment, only at least one cylinder whose sum of filling weights is less than the sum of the maximum inflow weights can be selected; when the number of times the adsorption column is selected reaches the number of adsorptions that can be adsorbed, the corresponding adsorption column becomes a pending state and cannot be selected in the production management subsystem.
[0015] As a further improvement, the adsorption column in the waiting state can be pre-treated in the adsorption column processing module and generate pre-treatment tasks, and the pre-treatment tasks include water washing, drying, filter element replacement, pressure maintenance and purification cleaning; after the pre-treatment tasks are completed, the maximum inflow weight and adsorption times of the corresponding adsorption column will be reset in the system and can be selected in the production management subsystem.
[0016] As a further improvement, the pretreatment tasks of the reactor include water washing, drying, filling with cleaning chemicals, pressure maintaining and drying and cleaning before use; when the reactor is used, a nitrogen purging processing task will be further generated. When the chemicals in the reactor cannot meet the reaction requirements, the system will regenerate the pretreatment task.
[0017] As a further improvement, the pre-processing task of the steel cylinder is purification. The steel cylinder can be selected in the production management subsystem only after completing the purification task, and the weight parameters and pressure parameters of the steel cylinder in the system are reset to zero.
[0018] As a further improvement, it further includes an organizational information management subsystem, which includes process route management, department files, personnel files, job files, multi-company information modules, multi-factory information modules, multi-workshop information modules, and multi-production line information modules; each production order includes production order information, total production volume of the production order, remaining plannable quantity, planned quantity for this issuance, specific process route and planned completion time, each production order can be further divided into multiple process plan numbers, each process plan number corresponds to a process plan unit, each process plan unit is used to clarify the total production volume of a specific factory or a specific workshop or a specific production line, each process plan number can be further divided into multiple work report numbers, each work report number corresponds to a specific work task.
[0019] As a further improvement, it further includes a post-production processing subsystem, which is used to generate inspection tasks, and the inspection tasks include sending the completed cylinders to the laboratory for inspection and outputting the test results. If the test results are qualified, warehousing operations are allowed to await shipment; if the test results are unqualified, concentration correction or purification or emptying or continued use is allowed.
[0020] As a further improvement, the post-production processing subsystem is further used to store the warehouse storage location, delivery information, delivery quantity and iron rack information of the cylinders at the time of delivery.
[0021] Compared with the prior art, the beneficial effects of the present invention are as follows: the entire production management system designs corresponding functional modules according to the actual gas production process, and further standardizes, controls and guides the actual offline production work through online software program control. On the one hand, the offline complex process flow is divided into multiple processes through the order management subsystem, and a task is generated for each process for multi-dimensional supervision to ensure that the entire production process is information-based and monitorable. On the other hand, through the control of the pretreatment management subsystem, the control and management of the preliminary pretreatment process of the adsorption column, cylinder and reactor are realized to ensure that in the online system of production management, only the adsorption column, cylinder and reactor after pretreatment can be selected to avoid the use of related hardware equipment that does not meet the production requirements due to the operator's work errors in the actual offline production process. The entire system can effectively realize real-time monitoring and precise control of the gas production process, thereby improving the efficiency and quality of gas production. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a system composition diagram of the gas production full-process production management system of the present invention. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] A gas production full-process production management system, including an order management subsystem, a pre-processing management subsystem, and a production management subsystem;
[0025] The order management subsystem includes a planning and scheduling module and a process planning module. The planning and scheduling module is used to clarify factory information, workshop information, production line information, production order information, total production of production orders, remaining planable quantity, planned quantity for this time, specific process routes (such as mixed gas filling production process, pure germane production process) and planned completion time; the process planning module is used to divide the planned quantity for this time into processes according to the specific process routes to form multiple process planning units. The information displayed in each process planning unit includes process status (such as completed, partially completed, not started, etc.), process name, process quantity, completed quantity, corresponding responsible team, inventory name and specifications;
[0026] The pretreatment management subsystem includes an adsorption column processing module, a reactor processing module and a steel cylinder processing module; the adsorption column processing module (such as the production of diborane and germane must use adsorption columns, etc., the gas needs to react through the reactor first, then pass through the adsorption column for adsorption and filtration, and finally flow into the steel cylinder) is used to generate a pretreatment task for the specified adsorption column before production and use. After the processing is completed, the specified adsorption column can be selected and used in the production management subsystem; the reactor processing module is used to generate a pretreatment task for the specified reactor before production and use. After the processing is completed, the specified reactor can be selected and used in the production management subsystem; the steel cylinder processing module is used to generate a pretreatment task for the specified steel cylinder before production and use. After the processing is completed, the specified steel cylinder can be selected and used in the production management subsystem;
[0027] The production management subsystem is used to report work according to the specific information of the process planning unit to realize the control of the production process. The control process includes selecting at least one pre-treated reactor to add chemical raw materials (tasks can be issued multiple times for production until the quantities in the production order are reported and then uniformly heated and reacted), selecting a reactor for heating reaction after the addition is completed (the gas to be produced is generated by heating reaction and transported to the cylinder through the adsorption column), selecting at least one pre-treated adsorption column for adsorption filtration, and selecting at least one pre-treated cylinder for collection.
[0028] The entire production management system is designed with corresponding functional modules according to the actual gas production process, and further standardizes, controls and guides the actual offline production work through online software program control. On the one hand, the order management subsystem is used to split the offline complex process into multiple processes, and a task is generated for each process for multi-dimensional supervision to ensure that the entire production process is information-based and monitorable. On the other hand, the pretreatment management subsystem is used to control and manage the pre-treatment process of adsorption columns, cylinders and reactors, ensuring that only pretreated adsorption columns, cylinders and reactors can be selected in the online production management system to avoid the use of related hardware equipment that does not meet production requirements due to operator errors in the actual offline production process. The entire system can effectively realize real-time monitoring and precise control of the gas production process, thereby improving the efficiency and quality of gas production.
[0029] Furthermore, the production management system further includes an organization information management subsystem, which is used to input information in the early stage, provide an information basis for subsequent specific production links and objects that can be selected during online operations, and the organization information management subsystem includes process route management (such as mixed gas filling production process, pure germane production process, etc., and record the specific process steps, working hours, required hardware requirements, etc. of each production process, so as to achieve when the order is a certain production process, through the information in the process route management, reverse constraints on selectable support items such as designated reactors, cylinders, adsorption columns, teams, etc.), department files (used to record the department to which the relevant personnel belong for easy management, and record the job content of different teams or different personnel in the department), and personnel files (used in specific Select the corresponding responsible person for each production process), multi-company information module (used to store company information, that is, the system can support at least one company to undertake related production orders, and make a selection during the specific order generation process), multi-factory information module (used to store factory information, that is, the system can support at least one factory in a single company to undertake related production orders, and make a selection during the specific order generation process), multi-workshop information module (used to store workshop information, that is, the system can support at least one workshop in a single factory to undertake related production orders, and make a selection during the specific order generation process), multi-production line information module (used to store production line information, that is, the system can support at least one production line in a single workshop to undertake related production orders, and make a selection during the specific order generation process).
[0030] With the support of the organizational information management subsystem, a production order can be split for the entire online operation. At the same time, when each production order is generated, the corresponding information includes production order information (such as specific customers, suppliers, raw materials), total production volume of the production order (such as the specific number of cylinders required and the gas required to be produced), remaining planable quantity (the total production volume of the production order minus the planned quantity issued this time is the remaining planable quantity, that is, a production order can be divided into multiple productions of multiple companies or multiple factories or multiple workshops or multiple production lines, and the planned quantity can be selected each time according to the actual situation), the planned quantity issued this time, the specific process route and the various options of the planned completion time. Each production order can be further split into multiple process plan numbers, each of which can correspond to the total production volume of a specific factory or a specific workshop or a specific production line. Each process plan number can be further split into multiple work order numbers, and the number of work order numbers is the largest. Each specific process can correspond to a work order number, such as the purification task of the cylinder, the drying task of the reactor, the pressure maintenance task of the reactor, the filter element replacement task of the adsorption column, etc. The production management system allows personnel from multiple companies to log in and operate at the same time. When a production order is split, different tasks corresponding to the work order number will be circulated in the systems of different personnel according to the different permissions of different personnel. Managers with higher permissions can query the full process tasks and status of the order on the system, and match the corresponding approval actions and permissions according to the process route.
[0031] Specifically, when each work order number is reported online for operation, the actual offline work tasks need to be completed, that is, each step requires the corresponding responsible personnel to perform online click operations or reviews, and most of the operations need to complete the corresponding offline execution actions before online operations. At the same time, the offline operations of related steps need to be scanned in conjunction with the hardware terminal. For example, when you need to select a certain adsorption column to filter and adsorb the gas produced by a certain reactor, you first need to select the adsorption column that has been pretreated in the system for use. After selection, before actually using the corresponding adsorption column offline to adsorb the designated reactor, you need to first scan the code with your mobile phone to identify the adsorption column file. Since the online system's click on a certain adsorption column will communicate data and match and update in real time with the offline work interface after scanning the code, if the operator scans the wrong adsorption column at this time, the system will confirm and identify the matching error based on information such as the adsorption column number, that is, the relevant confirmation page cannot be displayed after scanning the code, to avoid offline workers using the wrong adsorption column. In addition, after the adsorption column is used offline or pre-processed offline, the relevant operator will click in the online system to confirm the corresponding use action or complete the pre-processing action. After clicking, the adsorption column that has been pre-processed or the adsorption column that still has a number of uses can be selected online. Through a series of online and offline action coordination, the offline action is realized online, and the problem of possible misoperation is avoided through system operation and offline code scanning action. Similarly, in other processes of gas production, other parameters or states can be combined to achieve the same precise control action, so as to avoid production problems that may occur in the production process through online management, such as the number of adsorptions that the adsorption column can adsorb, the final weight of the cylinder, the status of related equipment (if the pre-treatment is not performed, it cannot be selected in the production management subsystem) and the attribution of different process routes (such as the relevant process route requires a reactor or adsorption column or cylinder with certain parameters. If the relevant hardware parameters do not meet the requirements, it cannot be selected in the specific operation task under the process route).
[0032] Furthermore, the pretreatment management subsystem further includes an adsorption column archive module, which is used to record the number information, maximum inflow weight, adsorption times, name, organization, process, status, filler weight, filler manufacturer, working hours, operator, etc. of the adsorption column. The adsorption column processing module is used to generate adsorption column processing tasks. After pretreatment according to the process, the state of the adsorption column becomes ready, and the corresponding state is synchronized on the system of the operator who needs to use the adsorption column; the maximum flow weight is used to limit the maximum weight of the gas that can be adsorbed by the adsorption column. During the production process, the gas will flow into the cylinder after being filtered by the adsorption column. After selecting at least one adsorption column after pretreatment, only at least one cylinder whose sum of filling weight is less than the sum of maximum inflow weight can be selected; when the number of times the adsorption column is selected reaches the adsorption times, the corresponding adsorption column becomes a pending state and cannot be selected in the production management subsystem. Through such system operation logic, production problems related to adsorption columns can be effectively avoided and the overall production defect rate can be reduced.
[0033] The adsorption column in the waiting state can be pre-treated in the adsorption column processing module and generate pre-treatment tasks. The pre-treatment tasks include water washing, drying, filter element replacement, pressure maintenance and purification cleaning. After the pre-treatment tasks are completed, the maximum inflow weight and adsorption times of the corresponding adsorption column will be reset in the system and can be selected in the production management subsystem, effectively avoiding the problem of the adsorption column being used in production without pre-treatment.
[0034] The pretreatment management subsystem further includes a reactor archive module for recording the reactor number information, fillable chemicals, manufacturers of fillable chemicals, reactive volume, name, organization, process, status (pending pretreatment, pending posttreatment, prepared, etc.), working hours, operators, etc. The pretreatment tasks of the reactor include water washing, drying, filling with clean chemicals (such as sodium borate chloride, using such clean chemicals to clean the environment in the reactor to meet the need for impurities in the gas production process), pressure maintenance (raising the pressure in the reactor and maintaining it for a specified time to ensure the reaction of the chemicals), and drying and cleaning; when the reactor is used, a nitrogen purging processing task will be further generated, and the status of the reactor will become pending posttreatment. When the chemicals in the reactor cannot meet the reaction requirements, the system will regenerate the pretreatment task, and the reactor cannot be selected in the production management subsystem at this time.
[0035] The pretreatment management subsystem further includes a cold trap processing module, which is used to temporarily store the related gases that have not been produced in the reactor. The cold trap processing module can generate a pretreatment task for cold trap purification. Only when the cold trap is purified and pretreated can it be selected in the production management subsystem for storing the gases in production. The cold trap processing module can effectively avoid the related misoperation problems caused by the cold trap being used in production without purification.
[0036] Furthermore, in the use of steel cylinders, the pretreatment task for the steel cylinders is purification. The steel cylinders here include, on the one hand, production cylinders for storing gases to be sold to customers after the reactor is produced, and on the other hand, source gas cylinders for providing raw materials for gas production; only after the source gas cylinders are completely extracted and the purification task is completed, or the production cylinders after the purification task is completed, can they be selected in the production management subsystem, and the weight parameters and pressure parameters of the cylinders in the system are reset to zero.
[0037] In addition, during the use of the system, the final weight of the cylinder calculated in the system can be used to determine whether the previous process tasks are correct. After the source gas cylinder arrives at the factory, the relevant model parameters and pressure-volume comparison table will be entered into the system in advance. For example, the source gas cylinder has a pressure value of 1, a volume of 29.5l, and a gas weight of 0.1 to 0.17kg. During the production process, at least one source gas cylinder is injected into the reactor for reaction and produces the corresponding finished gas, which is finally injected into the production cylinder. The final mass in the production cylinder will be calculated in advance based on the parameters of the source gas cylinder and the reaction of the reactor and displayed in the production order. When the system uses the reactor to produce the production order, the system will calculate the final actual weight of the system after the actual operation based on the actual number of operations and parameters of the reactor. If it is not equal to the final weight calculated in advance, the system will give a reminder, and the operator or administrator can use the reminder to discover problems in the actual production process. When a cylinder is worn out after being used for a period of time, resulting in a decrease in total weight or an error in the initial weight, the original parameter information of the cylinder needs to be modified. This modification requires a modification application to be initiated and approved by the leader to ensure the accuracy of the cylinder's weight.
[0038] Furthermore, the production management system further includes a post-production processing subsystem, which is used to generate inspection tasks (the cylinders to be inspected can be determined based on the work order number), and the inspection tasks include sending the completed cylinders to the laboratory for inspection and outputting the test results. If the test results are qualified, the warehousing operation is allowed to await shipment (the warehousing operation can be performed in batches for multiple times); if the test results are unqualified, concentration correction is allowed (concentration correction requires remedial correction based on actual concentration difference) or purification (the gas cannot be sold, but can be purified and recovered, and the recovered gas can be transferred to a cold trap or cylinder) or emptying (the gas does not meet the production requirements at all and is directly discharged) or continuing to use (if the upper and lower deviations are within the allowable error range, continue to use it for sale).
[0039] The post-production processing subsystem is further used to store the warehouse storage location of the cylinders, delivery information, delivery quantity and the iron rack information at the time of delivery (since the cylinders need to be fixed on iron racks for delivery together, and the cost of a single iron rack is relatively high, it may be an iron rack purchased by the customer or an iron rack from the manufacturer, so the ownership and location of the iron rack need to be recorded so that the position changes of the iron rack can be grasped through the system); in addition, the post-production processing subsystem can also record the position changes of the cylinders from the workshop to the warehouse, as well as the specific location in the warehouse.
[0040] The organizational information management subsystem further includes customer files, supplier files, inventory files, warehouse files, iron rack files, etc., to record all basic information related to the production order as information storage.
[0041] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A gas production full-process production management system, characterized by: Including order management subsystem, pre-processing management subsystem, and production management subsystem; The order management subsystem includes a planning and scheduling module and a process planning module. The planning and scheduling module is used to clarify factory information, workshop information, production line information, production order information, total production volume of production orders, remaining planable quantity, planned quantity for this time, specific process route and planned completion time; The process planning module is used to split the planned quantity issued this time into processes according to the specific process route to form multiple process planning units; The pretreatment management subsystem includes an adsorption column processing module, a reactor processing module and a steel cylinder processing module; the adsorption column processing module is used to generate a pretreatment task for a designated adsorption column before production use, and the designated adsorption column can be selected for use in the production management subsystem only after the processing is completed; the reactor processing module is used to generate a pretreatment task for a designated reactor before production use, and the designated reactor can be selected for use in the production management subsystem only after the processing is completed; the steel cylinder processing module is used to generate a pretreatment task for a designated steel cylinder before production use, and the designated steel cylinder can be selected for use in the production management subsystem only after the processing is completed; The production management subsystem is used to report work according to the specific information of the process planning unit to realize the control of the production process. The control process includes selecting at least one pretreated reactor to add chemical raw materials, selecting the reactor for heating reaction after the addition is completed, selecting at least one pretreated adsorption column for adsorption filtration, and selecting at least one pretreated cylinder for collection.
2. The gas production full-process production management system according to claim 1 is characterized in that: The pretreatment management subsystem further includes an adsorption column archive module, which is used to record the number information, maximum inflow weight and number of adsorptions of the adsorption column, and the maximum flow weight is used to limit the maximum weight of the gas that can be adsorbed by the adsorption column; in the production process, the gas will flow into the cylinder after being filtered by the adsorption column, and after selecting at least one adsorption column after pretreatment, only at least one cylinder whose sum of filling weights is less than the sum of maximum inflow weights can be selected; when the number of times the adsorption column is selected reaches the number of adsorptions that can be adsorbed, the corresponding adsorption column becomes a pending state and cannot be selected in the production management subsystem.
3. The gas production full-process production management system according to claim 2 is characterized in that: The adsorption column in the pending state can be pre-processed in the adsorption column processing module and generate pre-processing tasks. The pre-processing tasks include water washing, drying, filter element replacement, pressure maintenance and purification cleaning. After the pre-processing tasks are completed, the maximum inflow weight and adsorption times of the corresponding adsorption column will be reset in the system and can be selected in the production management subsystem.
4. The gas production full-process production management system according to claim 2 is characterized in that: The pretreatment tasks of the reactor include water washing, drying, filling with cleaning chemicals, pressure maintenance and drying and cleaning before use; when the reactor is used, a nitrogen purging treatment task will be further generated. When the chemicals in the reactor cannot meet the reaction requirements, the system will regenerate the pretreatment task.
5. The gas production full-process production management system according to claim 2 is characterized in that: The pre-processing task of the steel cylinder is purification. The steel cylinder can be selected in the production management subsystem only after completing the purification task, and the weight parameters and pressure parameters of the steel cylinder in the system are reset to zero.
6. The gas production full-process production management system according to claim 1 is characterized by: It further includes an organizational information management subsystem, which includes process route management, department files, personnel files, job files, multi-company information modules, multi-factory information modules, multi-workshop information modules, and multi-production line information modules; each production order includes production order information, total production volume of the production order, remaining plannable quantity, planned quantity for this issuance, specific process route and planned completion time, each production order can be further divided into multiple process plan numbers, each process plan number corresponds to a process plan unit, each process plan unit is used to clarify the total production volume of a specific factory or a specific workshop or a specific production line, each process plan number can be further divided into multiple work report numbers, each work report number corresponds to a specific work task.
7. The gas production full-process production management system according to claim 1 is characterized by: It further includes a post-production processing subsystem, which is used to generate inspection tasks, and the inspection tasks include sending the completed cylinders to the laboratory for inspection and outputting the inspection results. If the inspection results are qualified, warehousing operations are allowed to await shipment; if the inspection results are unqualified, concentration correction or purification or emptying or continued use is allowed.
8. The gas production full-process production management system according to claim 7 is characterized in that: The post-production processing subsystem is further used to store the warehouse storage location, delivery information, delivery quantity and iron rack information of the cylinders at the time of delivery.