Project cost index generation and use method, device and equipment

By constructing a multi-level index classification structure tree and determining index elements, the problem of lack of a unified framework in engineering cost is solved, and the cost comparison and analysis of different projects is realized, ensuring the comparability and consistency of data.

CN119026809AInactive Publication Date: 2024-11-26CIVIL AVIATION AIRPORT PLANNING & DESIGN RES INST CO LTD +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411430181.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The lack of a unified engineering cost index framework system in the existing technology has led to the inability to effectively compare and analyze the cost data of different projects and units.

Method used

By building a multi-level indicator classification structure tree, determine the indicator elements and calculation formulas of each indicator node, establish the corresponding rules between the bill of quantities and the indicator nodes, determine the matching relationship between the target cost indicators and indicator elements, and calculate the target project The index element values ​​of each index node are determined, and the target cost indicators are determined.

Benefits of technology

The engineering cost comparison and analysis between different projects was realized, and a unified cost index framework system was established to ensure the comparability and consistency of cost data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026809A_ABST
    Figure CN119026809A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of project cost, in particular to a project cost index generation and use method, device and equipment, and the method comprises the steps: building a multi-level index classification structure tree based on the data information of each industry; determining an index element of each index node and a calculation formula of the index element; constructing a corresponding rule between the engineering quantity list and each index node; determining a matching relationship between the target cost index and the index element; and calculating values of the index elements of the index nodes corresponding to the target project based on the data in the project quantity list corresponding to the target project and the index nodes and a calculation formula of the index elements, and determining a target cost index corresponding to the target project according to the calculated values of the index elements and the matching relationship. Therefore, a unified project cost index framework system can be constructed based on the multi-level index classification structure tree, and price comparison and analysis of project cost among different projects can be realized through the target cost index.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering cost, and in particular to a method, device and equipment for generating and using engineering cost indicators. Background Art

[0002] In my country, many industries such as housing construction, municipal administration, civil aviation, railways, electricity, coal, water transport, petroleum, petrochemicals, and metallurgy are managed by different industry authorities. These industries have significant differences and complexities in engineering cost methods and cost structures. For a long time, due to the lack of a unified classification principle and a complete list specification system, the engineering cost data of various industries have shown diversity, and there is a lack of unified standards and structured frameworks in terms of form, content, profession, naming, stage, and level. However, with the rapid development of building information modeling (BIM) and big data technology, as well as the continuous upgrading of engineering cost investment control needs and the in-depth promotion of engineering cost market-oriented reforms, the demand for engineering cost benchmarking in various industries is becoming increasingly strong. The traditional engineering cost management method, which relies too much on individual expert experience and personal data accumulation, can no longer meet the accuracy and systematic requirements of current engineering cost work.

[0003] The Chinese patent "A method and system for analyzing engineering cost indicators" provides a method for analyzing cost indicators, determines the cost influencing indicators and indicator influencing factors of the target project, and constructs an engineering cost estimation model to obtain the engineering cost of the target project. The Chinese patent "A method for establishing dynamic cost indicators and a dynamic indicator system" forms a final list of benchmark materials based on the main material price list of the construction company's engineering cases in the past 3-5 years. However, the solutions in the prior art lack a systematic method for setting up a cost indicator framework system. Most of the analysis is single-point analysis, and a method for setting up a cost indicator framework system has not been systematically provided as a whole. The cost indicators of different projects and units cannot be effectively compared and analyzed. Summary of the invention

[0004] In view of this, the purpose of the present invention is to provide a method, device and equipment for generating and using engineering cost indicators, so as to overcome the lack of a unified cost indicator framework system in the current engineering cost field, which makes it impossible to conduct comparative analysis on cost data of different projects and different units.

[0005] To achieve the above objectives, the present invention adopts the following technical solutions: In a first aspect, an embodiment of the present application provides a method for generating and using a construction cost indicator, including: Based on the data information of each industry, a multi-level indicator classification structure tree is constructed, wherein each level of the indicator classification structure tree includes at least one indicator node, and each indicator node of the previous level corresponds to at least one indicator node of the next level; Determine the indicator element of each indicator node and the calculation formula of the indicator element; Constructing a correspondence rule between the bill of quantities and the indicator nodes; Determine the matching relationship between the target cost index and the index element, wherein the target cost index is used to analyze and compare the engineering costs of different target projects; Based on the data in the bill of quantities corresponding to the target project and the indicator nodes, and the calculation formula of the indicator elements, the values ​​of the indicator elements of each indicator node corresponding to the target project are calculated, and the target cost indicator corresponding to the target project is determined according to the calculated values ​​of the indicator elements and the matching relationship.

[0006] Further, in some embodiments of the present application, the indicator classification structure tree includes nine levels; Among them, the first level is the industry, the second level is the engineering area, the third level is the professional functional area, the fourth level is the nature of the project, the fifth level is the single project, the sixth level is the unit project, the seventh level is the divisional project, the eighth level is the sub-project, and the ninth level is the functional material process.

[0007] Furthermore, in some embodiments of the present application, it further includes: setting technical description parameters for the indicator nodes of the single project corresponding to the target project; The technical description parameters include basic parameters, characteristic parameters and quantitative parameters; The basic parameters are parameters that can reflect the basis and overall status of the cost composition of a single project, and the basis and overall status include the date of preparation of the project cost, the basis for pricing, and the cost composition; The characteristic parameters are selected to reflect the characteristics and essential requirements of the representative construction methods, process requirements and materials and equipment of a single project; The quantitative parameters are physical measurement data that can represent the price level of a single project.

[0008] Further, in some embodiments of the present application, determining the indicator element of each indicator node includes: The indicator elements of each indicator node are determined based on the key factors affecting the construction cost level determined through statistical analysis of historical project data, and the information of benchmark companies and projects in the corresponding industry.

[0009] Furthermore, in some embodiments of the present application, the target cost index includes a total project investment index, a single project index, a main project quantity index, a unit project material price index, a functional index, and a comprehensive unit price index of the list.

[0010] Furthermore, in some embodiments of the present application, it also includes: Determine the base unit of the data in the target cost indicator; Convert the non-benchmark unit data in the calculated target cost index into benchmark unit data.

[0011] Furthermore, in some embodiments of the present application, it also includes: converting the data of the comprehensive unit price mode in the target cost index after unit conversion into data of the full-cost comprehensive unit price mode.

[0012] In a second aspect, an embodiment of the present application provides a device for generating and using a construction cost indicator, including: A structure tree generation module is used to construct a multi-level indicator classification structure tree based on the data information of each industry, wherein each level of the indicator classification structure tree includes at least one indicator node, and each indicator node of the previous level corresponds to at least one indicator node of the next level; An indicator element determination module, used to determine the indicator element of each indicator node and the calculation formula of the indicator element; In a third aspect, an embodiment of the present application provides a device for generating and using a construction cost indicator, including a processor and a memory, wherein the processor is connected to the memory: Wherein, the processor is used to call and execute the program stored in the memory; The memory is used to store the program, and the program is at least used to execute the above-mentioned method for generating and using the engineering cost index.

[0013] The present invention relates to the technical field of engineering cost, and specifically to a method, device and equipment for generating and using engineering cost indicators, the method comprising: constructing a multi-level index classification structure tree based on data information of various industries; determining the index element of each index node and the calculation formula of the index element; constructing the corresponding rules between the bill of quantities and each index node; determining the matching relationship between the target cost indicator and the index element; calculating the value of the index element of each index node corresponding to the target project based on the data in the bill of quantities corresponding to the target project and the index node, and the calculation formula of the index element, and determining the target cost indicator corresponding to the target project according to the calculated value of the index element and the matching relationship. In this way, a unified engineering cost indicator framework system can be constructed based on the multi-level index classification structure tree, and the comparison and analysis of engineering costs between different projects can be realized through the target cost indicator. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is a flowchart of a method for generating and using a construction cost index provided by an embodiment of the present invention; Figure 2 It is a schematic diagram of an indicator classification structure tree in a method for generating and using engineering cost indicators provided in an embodiment of the present invention; Figure 3 It is a structural schematic diagram of a device for generating and using a project cost index provided by an embodiment of the present invention; Figure 4 It is a structural schematic diagram of a device for generating and using a project cost indicator provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0016] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.

[0017] First of all, it should be noted that this application description mainly uses civil airports as an example to introduce the generation and use methods, devices and equipment for the engineering cost indicators provided in this application. In actual applications, the principles for generating and using indicators for other industries such as housing construction, municipal administration, etc. are the same as those for civil airports, and will not be repeated here.

[0018] Figure 1 is a flow chart of a method for generating and using a construction cost indicator provided by an embodiment of the present invention, Figure 2 This is a schematic diagram of the index classification structure tree in the method for generating and using the engineering cost index provided by the embodiment of the present invention. Figure 1 and Figure 2 The method for generating and using the engineering cost index provided in this embodiment may include the following steps: S101. Construct a multi-level indicator classification structure tree based on data information from various industries.

[0019] Among them, each level in the indicator classification structure tree includes at least one indicator node, and each indicator node of the previous level corresponds to at least one indicator node of the next level.

[0020] In this step, by analyzing the data information of various industries, the data types and characteristics of industries including housing construction, municipal administration, civil aviation, etc. are identified, so as to determine the classification structure of data indicators, generate a structured hierarchy based on industry characteristics and project types, and obtain an indicator classification structure tree.

[0021] First, determine the first level. In practical applications, in view of the differences in pricing methods and cost structures of various industries, this application constructs a first-level indicator structure system according to the industry, that is, the industry is taken as the first level to ensure the continuity of cost data and comparability between industries.

[0022] Furthermore, the second and third levels are determined. In practical applications, referring to national standards, industry standards and related design specifications, the region (i.e., engineering area) is taken as the second level, and the specialty (i.e., functional area) is taken as the third level. In this way, it is ensured that the classification structure tree can fully reflect the overall situation of the project construction, and at the same time integrate with the current design specifications to promote the integration of cost design.

[0023] Furthermore, the fourth level is determined. In practical applications, the nature of the project is determined as the fourth level by combining the information of the nature of civil aviation projects, housing construction projects, municipal projects, etc., such as Figure 2 As shown, for Minghang Engineering, this level can include foundation treatment engineering, earthwork engineering, pavement engineering, drainage engineering, bridge engineering, culvert engineering, pipeline corridor engineering, rainwater pipe network, sewage pipe network and ancillary engineering (all of which are indicator nodes in the indicator classification structure tree). It should be noted that in this application, the engineering cost data of the target project can also be displayed based on the indicator classification structure tree. During the display process, the four-level indicator node can be used as the minimum level of display (that is, levels 1-3 are not displayed, and levels 4-9 are displayed), and the corresponding data (such as the indicator elements mentioned later) are displayed to facilitate detailed display and analysis of the data.

[0024] Furthermore, the fifth level and above are determined. In practical applications, combined with the single project and unit project of the engineering structure division in the existing technology and the divisional project and sub-project classification of the bill of quantities specification, the indicator nodes of the structure tree above the fifth level are determined, specifically including the fifth level as single project, the sixth level as unit project, the seventh level as divisional project, the eighth level as sub-project, and the ninth level as functional material process, so as to provide a basis for more detailed data analysis and display.

[0025] It should be noted that Figure 2 This is an indicator classification structure tree generated for civil airports, namely the civil aviation engineering industry (the classification principle of indicator classification structure trees for other industries is the same), such as Figure 2As shown in the figure, for civil aviation projects, for any initial level project (i.e., the project that actually needs to be evaluated and analyzed for construction cost), you can Figure 2 The data is divided into 1-9 levels to obtain a structured cost data system, based on which subsequent indicator elements are calculated, target cost indicators are determined, and related displays are performed. Figure 2 As shown, each indicator node of the previous level corresponds to at least one indicator node of the next level, such as the bridge engineering indicator node in the fourth level corresponds to the service lane bridge, taxiway bridge and light trestle indicator nodes in the fifth level (it can be understood that other indicator nodes in the fourth level correspond to other indicator nodes in the fifth level, but Figure 2 (not marked one by one).

[0026] In some embodiments of the present application, it is also possible to set technical description parameters for the single project indicator node in each structure tree based on the above-mentioned indicator classification structure tree, and the technical description parameters can be used to determine each expression item in the collection table (collected from the drawings and technical documents of the target project, etc.), and the collection table is used to summarize and express the technical description parameters of each single project. It should be noted that in practical applications, when conducting comparative analysis between different engineering projects, only the comparative analysis of economic indicators is often incomplete. Therefore, the present application also introduces technical description parameters to represent the technical description parameters of a single project by generating a collection table. For example, when expressing the indicator of a single project, an economic indicator and a technical description parameter are required, for example, the terminal building has a unit cost of 16,000 yuan / square meter (the unit cost of the terminal building is an economic indicator), and the terminal building structure is a steel-concrete structure, a building area of ​​700,000 square meters and a seismic level of three (steel-concrete structure, a building area of ​​700,000 square meters and a seismic level of three are technical description parameters).

[0027] Specifically, in this application, technical description parameters include basic parameters, characteristic parameters and quantitative parameters. In this application, for the selection of the above technical description parameters, unified selection principles and methods are specified, as follows: For the selection of basic parameters, select parameters that can reflect the basic and overall characteristics of the cost composition, such as the date of preparation of the project cost, the basis for pricing, and the cost composition of each individual project. These parameters are the basis for data analysis and comparison, and are crucial for understanding the background and overall trend of cost data.

[0028] For the selection of characteristic parameters, select parameters that can reflect the characteristics and essential requirements of the representative construction practices, process requirements, materials and equipment of each single project. Characteristic parameters help to deeply understand the characteristics and differences of different single projects and provide a basis for benchmarking.

[0029] For quantitative parameter selection, select physical measurement data that can represent the price level of a single project and have a statistical basis, analytical basis, and quantitative basis (this part of the data can be obtained from the bill of quantities mentioned later). These parameters are the key to quantifying cost data and provide data support for data analysis, comparison, and prediction.

[0030] S102: Determine the indicator element of each indicator node and the calculation formula of the indicator element.

[0031] It should be noted that in this application, the selection of indicator elements for each indicator node should follow the principles of quantification, representativeness and universality. The selected indicator elements should be able to quantitatively express the level of construction cost, avoiding subjectivity and ambiguity; and should be able to reflect the main characteristics and key factors of the project cost and have broad representativeness.

[0032] In practical applications, the indicator elements of each indicator node can be determined in the following ways: refer to benchmark companies and projects in the industry to understand the key indicator elements they use; conduct statistical analysis on past project data, i.e. historical project data, to find out the key factors affecting the cost level, and thus comprehensively organize and determine the indicator elements corresponding to each indicator node.

[0033] It should be noted that each indicator element should have a clear calculation formula or method to quantify its value; the calculation formula should be simple and clear, easy to understand and operate. For complex calculation formulas, the calculation principle behind it should be explained to ensure that users can accurately understand it, and the calculation principle should be consistent with industry standards and specifications.

[0034] Furthermore, in some embodiments of the present application, remark information can be set for indicator elements, and the remark information is used to reflect relevant concepts, definitions and scopes. Professional terms or concepts involved in indicator elements and calculation formulas can be explained and defined through the remark information; in addition, for various indicator elements, the applicable project type, stage or scope, etc. can also be set, and for indicator elements with special circumstances, special instructions can be given in the remark to flexibly use various indicator elements.

[0035] On the basis of the above, in some embodiments of the present application, a unified indicator element calculation table can also be constructed based on the above indicator elements, with a unified design classified by category, with the single project in the structure tree as the smallest unit, and the indicator elements are classified and sorted according to different categories, so as to facilitate users to find and use; wherein, the indicator element calculation table can contain the name of the indicator element, calculation formula, remarks and other necessary information. And for the indicator element calculation table, an update and maintenance mechanism can be determined, and the indicator calculation table can be reviewed and revised regularly to ensure its accuracy and applicability to adapt to industry development and technological progress.

[0036] S103, constructing the correspondence rules between the bill of quantities and each indicator node.

[0037] In the present application, corresponding rules between the bill of quantities and each indicator node are constructed to generate a corresponding rule base for classifying the data in the actual bill of quantities, such as the bill of quantities instance, according to the indicator nodes of the indicator classification structure tree based on the corresponding rules in the corresponding rule base.

[0038] Specifically, we can determine the project type and stage to which each target project to be analyzed belongs, conduct a detailed analysis of the bill of quantities, and understand the project name, project characteristics, work content, and measurement unit of each sub-project in the bill of quantities. According to the analysis results of the indicator classification structure tree and the bill of quantities, we can formulate detailed corresponding rules to indicate which bill of quantities or which data in which bill of quantities belongs to which indicator node, so that the value of the indicator element of the corresponding project under the indicator node can be generated based on the data in the bill of quantities corresponding to the indicator node.

[0039] S104. Determine the matching relationship between the target cost index and the index element.

[0040] Among them, the target cost index is used to analyze and compare the engineering costs of different target projects.

[0041] S105. Based on the data in the bill of quantities corresponding to the target project and the indicator nodes and the calculation formula of the indicator elements, calculate the values ​​of the indicator elements of each indicator node corresponding to the target project, and determine the target cost indicator corresponding to the target project according to the calculated values ​​of the indicator elements and the matching relationship.

[0042] Specifically, after the target project's construction bill of quantities is matched with the indicator nodes in the indicator classification structure tree based on the above-mentioned corresponding rule base, the indicator elements of each indicator node are divided and matched according to the actual project composition, the composition of the total investment and the usage requirements, so as to correspond to the target cost indicator, that is, to determine the matching relationship between the target cost indicator and the indicator elements, and to specify which indicator elements are used to constitute which target cost indicator, such as generating the project's total investment indicator, single project indicator, main engineering quantity indicator, unit engineering material price indicator, functional indicator and comprehensive unit price indicator of the bill of quantities.

[0043] It should be noted that, in this application, the data information of the target project to be analyzed, such as the bill of quantities, is based on the corresponding indicator classification structure tree (for example, when the target project to be analyzed is a civil aviation project, the corresponding indicator classification structure tree is as follows Figure 2After the indicator classification result tree of the civil aviation engineering industry is matched, the target cost indicator of a certain indicator node, such as the taxiway bridge in a one-way project, can be calculated and determined by the indicator elements of the indicator node, or by summarizing the indicator nodes in the corresponding next level (such as Figure 2 The indicator elements of the foundation engineering, substructure, superstructure, auxiliary structure and protective shed shown in the figure are obtained. Among them, for the second method, the indicator nodes in the next level, such as the ninth level, can be matched with the bill of quantities of the target project. After calculating the indicator elements in the indicator nodes in the next level, such as the ninth level, the indicator elements of the indicator nodes in the next level, such as the ninth level, are used to calculate the indicator elements of the corresponding indicator nodes in the previous level, such as the eighth level. By analogy, the calculation amount of the indicator elements in the previous level can be effectively reduced.

[0044] For example, the total project investment index is the highest-level target cost index, which indicates the total investment amount of the entire project. It can be summarized by the index elements of all single project levels and is a comprehensive reflection of the total project investment. The single project index is the second highest level, which is used to indicate the investment amount of an independent engineering unit with specific functions in the target project, namely, a single project. It can be determined by its own index elements, or summarized by the index elements of the unit project at the next level (in some embodiments, it can also be obtained by the index elements of the sub-projects at the next level). The main engineering quantity index is a more detailed level, which is used to reflect the quantity, scale or proportional relationship of the main engineering quantities in the project (which can also be obtained from the bill of quantities). At the same time, it can also be used to calculate the unit engineering material price index. When setting the index elements for each index node, the index elements related to the main engineering quantities can be set for each unit engineering index node. Thereby, the main engineering quantity indicators of each unit project of the target project are calculated; the unit engineering material price indicator is a detailed level, which is used to express the prices of materials, labor, machinery and other resources required for each unit project. Among them, when setting indicator elements for each indicator node, indicator elements related to the unit engineering material price indicator can be set for each unit engineering indicator node. The unit engineering material price indicator is determined by calculating the main engineering quantity indicators of each unit project, which is an important part of the investment of a single project; the functional indicator is an auxiliary level, which is used to evaluate the functionality, performance or benefits of the project and other non-direct economic indicators. Among them, when setting indicator elements for each indicator node, indicator elements related to the functional indicators can be set for each indicator node. It should be noted that although the functional indicators do not directly participate in economic calculations, they have an important impact on the investment decision-making and design optimization of the project, and indirectly affect the total investment of the project.

[0045] Furthermore, in some embodiments of the present application, the method for generating and using the engineering cost index provided above, with respect to the comprehensive unit price index of the list, may also include determining a base unit of data in the target cost index; and converting non-base unit data in the calculated target cost index into base unit data.

[0046] Specifically, it should be noted that in this application, the comprehensive unit price index of the list is also expressed in the form of a list composed of multiple indicator elements, and its indicator elements are calculated or matched based on the bill of quantities, and the data in the bill of quantities may not be unified, which will lead to the units of the data in the final comprehensive unit price index of the list being inconsistent. Therefore, in the subsequent calculations and comparisons based on the bill of quantities, it is crucial to ensure the uniformity of the measurement units of the data. For example, when there are multiple measurement units for the same list item, such as mud wall bored piles have three units of m³, m and roots, it is necessary to formulate a set of conversion rules to unify these units in order to conduct horizontal comparisons and generate accurate indicator elements or target cost indicators.

[0047] In this application, first, all the list items with multiple measurement units in the bill of quantities or the comprehensive unit price index of the bill of quantities and their respective measurement units can be listed; then the base unit is selected. For each list item, a base unit that is widely accepted, easy to understand and calculate in the industry is selected. For example, for mud wall bored piles, m³ can be selected as the base unit; again, for each non-base unit, a rule is formulated for conversion to the base unit based on engineering practice, industry standards and / or physical relationships, and the units of the list instances are unified using the conversion rules. It should be noted that similar operations can also be performed on other target cost indicators based on the same principle to unify their units.

[0048] Furthermore, in some embodiments of the present application, the method for generating and using the engineering cost index provided above, after obtaining the list comprehensive unit price index, may also include converting the data of the comprehensive unit price mode in the list comprehensive unit price index after unit conversion into data of the full-cost comprehensive unit price mode, including determining the conversion logic and formula of the list comprehensive unit price, converting the comprehensive unit price into the full-cost comprehensive unit price, and ensuring that the content of the index price data is unified and complete.

[0049] Specifically, in the current domestic engineering pricing, there are two modes: comprehensive unit price and full-cost comprehensive unit price. The price composition of the two modes is not completely consistent. The comprehensive unit price includes labor costs, material costs, machinery costs, management fees, profits, and risk fees within a certain range. The full-cost comprehensive unit price includes all the costs of the above-mentioned comprehensive unit price, including measures project fees, fees, taxes, other project fees, etc. All costs that constitute the project content. In this application, when converting the two modes, the conversion can be carried out according to the situation, including if the full-cost comprehensive unit price has several more items than the comprehensive unit price, that is, the additional cost items are based on a certain proportion or fixed amount of the comprehensive unit price, then they can be calculated directly; if the additional cost items are based on labor costs or the sum of labor costs and machinery costs, it is necessary to first determine the labor costs and machinery costs, and then calculate the additional cost items. According to the specific circumstances of the project and the contract requirements, determine the calculation method and proportion / amount of the additional cost items, and then convert the comprehensive unit price into the full-cost comprehensive unit price. Of course, the specific conversion logic and formula may vary from project to project, contract to region. Therefore, in actual application, it is necessary to adjust according to the specific circumstances.

[0050] The method for generating and using engineering cost indicators provided in this application systematically establishes a cost indicator framework system and a unified grading and classification method, so that the cost indicators of different projects and different units can be effectively compared and analyzed; and determines the selection principles and methods for the selection, calculation and naming of basic parameters, characteristic parameters, quantitative parameters and indicator elements of engineering indicators, so as to ensure the consistency and comparability of various indicators during the compilation process.

[0051] Based on the same inventive concept, the present application also provides a device for generating and using a construction cost indicator, which is used to implement the above method embodiment. Figure 3 is a schematic diagram of the structure of a device for generating and using a project cost index provided by an embodiment of the present invention, such as Figure 3 As shown, the device comprises: The structure tree generation module 11 is used to construct a multi-level indicator classification structure tree based on the data information of each industry, each level of the indicator classification structure tree includes at least one indicator node, and each indicator node of the previous level corresponds to at least one indicator node of the next level; An indicator element determination module 12, used to determine the indicator element of each indicator node and the calculation formula of the indicator element; A rule construction module 13 is used to construct corresponding rules between the bill of quantities and each indicator node; A matching module 14 is used to determine the matching relationship between the target cost index and the index element, and the target cost index is used to analyze and compare the construction costs of different engineering projects; The calculation module 15 is used to calculate the value of the indicator element of the indicator node based on the data in the bill of quantities corresponding to the indicator node and the calculation formula of the indicator element, and determine the target cost indicator according to the calculated value of the indicator element and the matching relationship.

[0052] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.

[0053] The present invention also provides a device for generating and using an engineering cost indicator, which is used to implement the above method embodiment. Figure 4 Schematic diagram of the structure of the device for generating and using the engineering cost index provided by the embodiment of the present invention. Figure 4 As shown, the device for generating and using the engineering cost index of this embodiment includes a processor 21 and a memory 22, and the processor 21 is connected to the memory 22. The processor 21 is used to call and execute the program stored in the memory 22; the memory 22 is used to store the program, which is at least used to execute the method for generating and using the engineering cost index in the above embodiment.

[0054] The specific implementation scheme of the device for generating and using the engineering cost index provided in the embodiment of the present application can refer to the implementation scheme of the method for generating and using the engineering cost index in any of the above embodiments, which will not be repeated here.

[0055] It can be understood that the same or similar parts of the above embodiments can be referenced to each other, and the contents not described in detail in some embodiments can refer to the same or similar contents in other embodiments.

[0056] It should be noted that, in the description of the present invention, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present invention, unless otherwise specified, the meaning of "plurality" refers to at least two.

[0057] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present invention belong.

[0058] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0059] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0060] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0061] The storage medium mentioned above can be a read-only memory, a magnetic disk or an optical disk, etc.

[0062] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0063] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for generating and using a construction cost indicator, It is characterized in that include: Based on the data information of each industry, a multi-level indicator classification structure tree is constructed, wherein each level of the indicator classification structure tree includes at least one indicator node, and each indicator node of the previous level corresponds to at least one indicator node of the next level; Determine the indicator element of each indicator node and the calculation formula of the indicator element; Constructing a correspondence rule between the bill of quantities and the indicator nodes; Determine the matching relationship between the target cost index and the index element, wherein the target cost index is used to analyze and compare the engineering costs of different target projects; Based on the data in the bill of quantities corresponding to the target project and the indicator nodes, and the calculation formula of the indicator elements, the values ​​of the indicator elements of each indicator node corresponding to the target project are calculated, and the target cost indicator corresponding to the target project is determined according to the calculated values ​​of the indicator elements and the matching relationship.

2. The method for generating and using the engineering cost index according to claim 1, It is characterized in that The indicator classification structure tree includes nine levels; Among them, the first level is the industry, the second level is the engineering area, the third level is the professional functional area, the fourth level is the nature of the project, the fifth level is the single project, the sixth level is the unit project, the seventh level is the divisional project, the eighth level is the sub-project, and the ninth level is the functional material process.

3. The method for generating and using the engineering cost index according to claim 2, It is characterized in that Also includes: Setting technical description parameters for the indicator nodes of the individual projects corresponding to the target projects; The technical description parameters include basic parameters, characteristic parameters and quantitative parameters; The basic parameters are parameters that can reflect the basis and overall status of the cost composition of a single project, and the basis and overall status include the date of preparation of the project cost, the basis for pricing, and the cost composition; The characteristic parameters are selected to reflect the characteristics and essential requirements of the representative construction methods, process requirements and materials and equipment of a single project; The quantitative parameters are physical measurement data that can represent the price level of a single project.

4. The method for generating and using the engineering cost index according to claim 1, It is characterized in that The indicator element of each indicator node is determined as follows: The indicator elements of each indicator node are determined based on the key factors affecting the construction cost level determined through statistical analysis of historical project data, and the information of benchmark companies and projects in the corresponding industry.

5. The method for generating and using the engineering cost index according to claim 1, It is characterized in that The target cost indicators include the total project investment indicators, single project indicators, main project quantity indicators, unit project labor and material price indicators, functional indicators and comprehensive unit price indicators of the list.

6. The method for generating and using the engineering cost index according to claim 1, It is characterized in that Also includes: Determine the base unit of the data in the target cost indicator; Convert the non-benchmark unit data in the calculated target cost index into benchmark unit data.

7. The method for generating and using the engineering cost index according to claim 6, It is characterized in that Also includes: Convert the data of the comprehensive unit price model in the target cost index after unit conversion into the data of the comprehensive unit price model of all costs.

8. A device for generating and using a construction cost index, It is characterized in that include: A structure tree generation module is used to construct a multi-level indicator classification structure tree based on the data information of each industry, wherein each level of the indicator classification structure tree includes at least one indicator node, and each indicator node of the previous level corresponds to at least one indicator node of the next level; An indicator element determination module, used to determine the indicator element of each indicator node and the calculation formula of the indicator element; A rule building module, used to build corresponding rules between the bill of quantities and the indicator nodes; A matching module, used to determine the matching relationship between the target cost index and the index element, wherein the target cost index is used to analyze and compare the engineering costs of different target projects; A calculation module is used to calculate the value of the indicator element of each indicator node corresponding to the target project based on the data in the bill of quantities corresponding to the target project and the indicator node, and the calculation formula of the indicator element, and determine the target cost indicator corresponding to the target project according to the calculated value of the indicator element and the matching relationship.

9. A device for generating and using engineering cost indicators, It is characterized in that The invention comprises a processor and a memory, wherein the processor is connected to the memory: Wherein, the processor is used to call and execute the program stored in the memory; The memory is used to store the program, and the program is at least used to execute the method for generating and using the engineering cost index described in any one of claims 1-7.

Citation Information

Cited By

  • Engineering project metering method and device, electronic equipment and storage medium

    CN119919076A

  • Semantic understanding-based sub-item project cost matching mapping method and system

    CN120386871A

  • Construction cost index library construction and updating method and system based on version mapping

    CN122111989A