Mine intelligent scheduling method, device, equipment and medium
Through intelligent scheduling methods, automatic matching of production tasks and equipment requirements and optimize equipment scheduling, the problems of low efficiency and accuracy in traditional scheduling methods are solved, and the production efficiency and equipment utilization rate of open-pit mines are improved.
Patent Information
- Application Number
- CN202411166533.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-26
AI Technical Summary
The traditional manual scheduling and fixed vehicle distribution methods have blindness and lag in open-pit mine production, resulting in low production scheduling efficiency and accuracy, which seriously affects the mine production efficiency.
The intelligent mine scheduling method is adopted to obtain production task information and equipment information, determine equipment needs, and automatically schedule equipment based on this information, send scheduling instructions, optimize equipment matching and path planning, and reduce manual intervention and waiting time.
It improves the accuracy and efficiency of equipment scheduling, reduces idleness and waste of equipment, optimizes equipment utilization, and improves production efficiency and scheduling reliability.
Smart Images

Figure CN119026863A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of mine production, and in particular to a mine intelligent scheduling method, device, equipment and medium. Background Art
[0002] The open-pit mining production system is a large-scale production system centered on mining and transported as a link. With the continuous expansion of the scale of open-pit mine production and the continuous improvement of the large-scale, mechanized and automated degree of equipment, the proportion of mining and transportation costs in the production costs of mines is also increasing. The production plan of open-pit mining is mainly completed through the scheduling of mining and transportation equipment, especially mine cars. Whether the vehicle scheduling is reasonable will directly affect the production efficiency of open-pit mining.
[0003] The traditional manual scheduling, fixed vehicle allocation and other methods of production scheduling and command are blind and lagging, resulting in low efficiency and accuracy of production scheduling, which seriously affects the production efficiency of mines. Summary of the invention
[0004] In order to improve the efficiency and accuracy of scheduling, the present application provides a mine intelligent scheduling method, device, equipment and medium.
[0005] In the first aspect, the present application provides a mine intelligent scheduling method, which adopts the following technical solution: A mine intelligent scheduling method, comprising: Obtain production task information and equipment information; Determine equipment requirements based on the production task information, wherein the equipment requirements include equipment type and equipment quantity; Determine scheduling equipment information based on the equipment demand and the equipment information, wherein the scheduling equipment information includes the scheduling equipment corresponding to the production task information; Sending a scheduling instruction to the scheduling device.
[0006] By adopting the above technical solution, by accurately matching production tasks and equipment requirements, the accuracy of equipment requirements can be improved, the idleness and waste of equipment can be reduced, and the utilization rate of equipment can be improved. At the same time, equipment scheduling can be carried out according to the equipment requirements, which improves the accuracy of equipment scheduling. Automated equipment scheduling can reduce manual intervention and waiting time, and improve the efficiency of equipment scheduling.
[0007] Optionally, determining equipment requirements based on the production task information includes: Acquire historical production information, wherein the historical production information includes historical task information and historical equipment information; Analyze the historical production information to obtain the corresponding relationship between the historical task information and the historical equipment information; The equipment requirement is determined based on the production task information and the corresponding relationship, and the equipment requirement includes an excavation equipment requirement and a transportation equipment requirement.
[0008] By adopting the above technical solution, by analyzing the historical production information, the correspondence between the historical task information and the historical equipment information can be obtained, and the equipment requirements can be quickly obtained according to the production task information without manual equipment requirement analysis, thereby improving the accuracy of equipment requirements and thus improving the accuracy of equipment scheduling. Equipment scheduling can be carried out as soon as possible according to the equipment requirements, thereby improving the efficiency of scheduling.
[0009] Optionally, the determining the scheduling device information based on the device requirement and the device information includes: determining a task type based on the equipment requirements; If the task type is a production type, determining a first equipment group based on the equipment requirement and the equipment information, the first equipment group being an equipment group that meets the equipment requirement; Determine a task location based on the production task information; Determine a second device group based on the task location and the first device group, the second device group being the first device group closest to the task location; Scheduling device information is determined based on the second device group and the device requirements.
[0010] By adopting the above technical solution, if the task type is a production type, equipment scheduling is performed based on equipment groups, which is convenient for unified equipment management. The equipment group that meets the equipment requirements and is closest to the task location is selected for equipment scheduling, so that the scheduled equipment can reach the task location more quickly, thereby improving scheduling efficiency.
[0011] Optionally, the determining the scheduling device information based on the device requirement and the device information includes: If the task type is a scheduling type, determining the device location based on the device information; Calculate a first distance based on the device location and the task location, the first distance being the distance between the device location and the task location; Determine first device information based on the first distance, a preset distance, and the device information, wherein the first device information includes the device information of which the first distance is less than the preset distance; The scheduled device information is determined based on the device requirement, the first device information, and the device group.
[0012] By adopting the above technical solution, if the task type is a scheduling type, equipment scheduling is performed on a per-equipment basis, and equipment that is closer to the task location is selected as the scheduling equipment, so that the scheduling equipment can reach the task location more quickly, thereby improving scheduling efficiency.
[0013] Optionally, the determining the scheduling device information based on the device requirement, the first device information, and the device group includes: Determine the device group corresponding to the first device information as a third device group; Determining the number of idle devices in the third device group; Sorting the first device information based on the number of idle devices to obtain a sorting result; The scheduling device information is determined based on the sorting result, the first distance, the first device information, and the device requirement.
[0014] By adopting the above technical solution, the first device in the third device group with more idle devices is preferentially selected as the scheduling device, so that after the device scheduling, the number of devices in each device group is relatively small, and the distribution of idle devices is relatively uniform, which is convenient for subsequent device scheduling. At the same time, the possibility of a small number of idle devices in the device group is reduced, so that when the device scheduling is performed subsequently, the equipment can still be scheduled as a unit of device group, which is convenient for equipment scheduling and improves scheduling efficiency.
[0015] Optionally, the determining the scheduling device information based on the device requirement and the device information includes: Determining a total quantity required based on the equipment requirements; Determine the total number of idle devices based on the device information; If the total number of idle devices is less than the total number of required devices, determining a task level based on the production task information; The scheduling equipment information corresponding to the production task information is determined based on the task level.
[0016] By adopting the above technical solution, when idle equipment cannot meet multiple production task information at the same time, scheduling equipment is allocated to production task information with higher task levels first, so that production task information with higher task levels can be processed in time, thereby improving the reliability of scheduling.
[0017] Optionally, before sending the scheduling instruction to the scheduling device, the method further includes: Get a mine map; Determine the location of the dispatching device based on the dispatching device information; Determine a work location based on the production task information; Performing path planning based on a preset algorithm, the mine map, the location of the dispatching equipment, and the operation location to obtain a driving path; A scheduling instruction is determined based on the driving path and the production task information.
[0018] By adopting the above technical solution, the mine map is obtained in real time, the path is planned according to the preset algorithm, and the driving path is sent to the equipment operator, so that the equipment operator does not need to plan the path, which reduces the time to reach the working location and improves the scheduling efficiency.
[0019] In the second aspect, the present application provides a mine intelligent dispatching device, which adopts the following technical solution: A mine intelligent dispatching device, comprising: Information acquisition module, used to obtain production task information and equipment information; A demand determination module, used to determine equipment demand based on the production task information, wherein the equipment demand includes equipment type and equipment quantity; An equipment determination module, configured to determine scheduling equipment information based on the equipment demand and the equipment information, wherein the scheduling equipment information includes the scheduling equipment corresponding to the production information; An instruction sending module is used to send a scheduling instruction to the scheduling device.
[0020] By adopting the above technical solution, by accurately matching production tasks and equipment requirements, the accuracy of equipment requirements can be improved, the idleness and waste of equipment can be reduced, and the utilization rate of equipment can be improved. At the same time, equipment scheduling can be carried out according to the equipment requirements, which improves the accuracy of equipment scheduling. Automated equipment scheduling can reduce manual intervention and waiting time, and improve the efficiency of equipment scheduling.
[0021] In a third aspect, the present application provides an electronic device, which adopts the following technical solution: An electronic device comprises a processor, wherein the processor is coupled to a memory; The memory stores a computer program that can be loaded by the processor and execute the intelligent mine scheduling method described in any one of the first aspects.
[0022] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution: A computer-readable storage medium stores a computer program that can be loaded by a processor and execute the intelligent mine scheduling method described in any one of the first aspects. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a flow chart of a mine intelligent scheduling method provided in an embodiment of the present application.
[0024] Figure 2 It is a structural block diagram of a mine intelligent scheduling device provided in an embodiment of the present application.
[0025] Figure 3 It is a structural block diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0026] The present application is further described in detail below in conjunction with the accompanying drawings.
[0027] The embodiment of the present application provides a mine intelligent scheduling method, which can be executed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server providing cloud computing services. The terminal device can be a smart phone, a tablet computer, a desktop computer, etc., but is not limited thereto.
[0028] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0029] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0030] like Figure 1 As shown, a mine intelligent scheduling method, the main process of the method is described as follows (steps S101 to S104): Step S101, obtaining production task information and equipment information.
[0031] There are a large number of production plans in the mine, so there is a large amount of corresponding production task information, which is obtained from the mine manager; when conducting mine production, a large number of equipment are needed, such as excavation equipment and transportation equipment. The database stores relevant information of each equipment, that is, equipment information. The equipment information includes equipment number, equipment type and equipment status. The equipment status includes idle, standby and working. The equipment information is obtained from the database.
[0032] Step S102: Determine equipment requirements based on production task information.
[0033] Among them, equipment requirements include equipment type and equipment quantity.
[0034] Specifically, determining equipment requirements based on production task information includes: obtaining historical production information, which includes historical task information and historical equipment information; analyzing the historical production information to obtain the correspondence between the historical task information and the historical equipment information; and determining equipment requirements based on the production task information and the correspondence, which includes mining equipment requirements and transportation equipment requirements.
[0035] In this embodiment, historical production information is obtained from a database, and the historical production information is analyzed by a data analysis tool to obtain a correspondence between historical task information and historical equipment information, that is, a correspondence between production task information and equipment requirements. The correspondence is stored in a database, and a search is performed in the database based on the production task information to obtain equipment requirements corresponding to the production task information. The data analysis tool can be EXCEL, Python, or MATLAB.
[0036] Step S103: Determine scheduling device information based on device requirements and device information.
[0037] The scheduling equipment information includes the scheduling equipment corresponding to the production task information.
[0038] Specifically, the scheduling equipment information is determined based on the equipment requirements and the equipment information, including: determining the task type based on the equipment requirements; if the task type is a production type, determining the first equipment group based on the equipment requirements and the equipment information, the first equipment group being the equipment group that meets the equipment requirements; determining the task location based on the production task information; determining the second equipment group based on the task location and the first equipment group, the second equipment group being the first equipment group that is closest to the task location; and determining the scheduling equipment information based on the second equipment group and the equipment requirements.
[0039] Among them, the task type includes production type and scheduling type. The production type indicates that the task corresponding to the production task information is a production task, and the scheduling type indicates that the task corresponding to the production task information is a scheduling task; the equipment group is pre-set by the staff.
[0040] In this embodiment, the total number of equipment in the equipment demand is counted. If the total number of equipment is greater than the preset number, the task type is a production type. If the total number of equipment is less than or equal to the preset number, the task type is a scheduling type. The preset number is determined by the staff based on the specific circumstances of the equipment group and is not specifically limited here. The equipment group includes multiple equipment, and the multiple equipment includes at least one equipment type.
[0041] The devices with idle status are determined as idle devices. If the task type is production type, the device group whose device type and corresponding device quantity of the idle devices meet the equipment requirements is determined as the first equipment group. It should be noted that the idle devices in the same equipment group are located in the same position, that is, the position of the equipment group. The task location is found from the production task information, and the distance between the position corresponding to each first equipment group and the task location is calculated. The first equipment group corresponding to the smallest distance is determined as the second equipment group. Equipment is selected from the second equipment group in sequence according to the equipment number until the selected equipment meets the equipment requirements, and the selected equipment is determined as the scheduling equipment. The information of the scheduling equipment is the scheduling equipment information, and the equipment status of the scheduling equipment is modified to working.
[0042] The idle equipment other than the scheduled equipment in the second equipment group is determined as the alternative equipment of the production task information, and the equipment status of the alternative equipment is modified to standby. The alternative equipment is preferentially provided to the production task corresponding to the production task information. If the alternative equipment is still not used after the preset time since the start of the production task, the equipment status of the alternative equipment is modified to idle and can be used for scheduling other production task information. The preset time is pre-set by the staff and is not specifically limited here.
[0043] If the task type is production type, equipment scheduling is performed based on equipment groups. When a scheduled device fails or equipment demand increases temporarily, equipment in the same equipment group is given priority for unified equipment management.
[0044] Specifically, the scheduling equipment information is determined based on the equipment requirements and equipment information, including: if the task type is a scheduling type, the equipment location is determined based on the equipment information; a first distance is calculated based on the equipment location and the task location, the first distance being the distance between the equipment location and the task location; first equipment information is determined based on the first distance, a preset distance and equipment information, the first equipment information includes equipment information whose first distance is less than the preset distance; scheduling equipment information is determined based on the equipment requirements, the first equipment information and the equipment group.
[0045] In this embodiment, if the task type is a scheduling type, scheduling is performed on a single device basis, the device location of the idle device is found from the device information, and the distance between the device location corresponding to each idle device and the task location, i.e., the first distance, is calculated. The idle device whose first distance is less than the preset distance is determined as the first device, and the device information corresponding to the first device is the first device information. The first devices are sorted from small to large according to the first distance, and the first devices are selected as the scheduling devices in sequence according to the sorting until the scheduling device meets the equipment requirements, and the device information corresponding to the scheduling device is determined as the scheduling device information, wherein the preset distance is pre-set by the staff and is not specifically limited here.
[0046] Specifically, the scheduling equipment information is determined based on the equipment demand, the first equipment information and the equipment group, including: determining the equipment group corresponding to the first equipment information as the third equipment group; determining the number of idle equipment in the third equipment group; sorting the first equipment information based on the number of idle equipment to obtain a sorting result; and determining the scheduling equipment information based on the sorting result, the first distance, the first equipment information and the equipment demand.
[0047] In this embodiment, if the task type is a scheduling type, the device group where the first device is located is determined to be the third device group, the number of idle devices in the third device group, that is, the number of idle devices, is counted, and the first devices are sorted from large to small according to the number of idle devices in the corresponding third device group to obtain the sorting result of the corresponding first device information, and the sorting result is corrected according to the first distance. If the number of idle devices in the third device group corresponding to two or more first devices in the sorting result is the same, the first devices are sorted from small to large according to the first distance to obtain the corrected sorting result, and the first devices are selected as the scheduling device in turn according to the sorting result until the scheduling device meets the equipment requirements, and the device information corresponding to the scheduling device is determined as the scheduling device information.
[0048] Specifically, the scheduling equipment information is determined based on the equipment demand and the equipment information, including: determining the total demand quantity based on the equipment demand; determining the total number of idle devices based on the equipment information; if the total number of idle devices is less than the total demand quantity, determining the task level based on the production task information; determining the scheduling equipment information corresponding to the production task information based on the task level.
[0049] Among them, the production task information includes task scale and task deadline. The task scale includes a first task scale, a second task scale and a third task scale. The scales of the first task scale, the second task scale and the third task scale decrease in sequence. The task deadline is the length of time from the delivery date, including the first task deadline and the second task deadline. The first task deadline is less than the second task deadline. The task level includes a first level, a second level and a third level. The levels of the first level, the second level and the third level decrease in sequence. The task level is related to the task scale and the task deadline. If the task scale is the first task scale and the task deadline is the first task deadline, the task level is the first level; if the task scale is the second task scale and the task deadline is the first task deadline, the task level is the second level; if the task scale is the third task scale and the task deadline is the second task deadline, the task level is the third level.
[0050] In this embodiment, since there may be multiple production task information at the same time, each production task information has corresponding equipment requirements, the total number of requirements for all equipment requirements is calculated, and the number of idle devices in each equipment group is counted, and the total number of idle devices in all equipment groups is calculated. If the total number of idle devices is less than the total number of requirements, it means that equipment scheduling cannot be performed for all production task information at the same time. The task level of the production task information is determined by the task scale and task deadline in the production task information, and equipment scheduling is performed preferentially for production task information with a high task level. When performing equipment scheduling, the above steps are used to perform equipment scheduling in units of equipment groups or in units of individual equipment according to the task type until all idle equipment is scheduled.
[0051] Step S104: Send a scheduling instruction to the scheduling device.
[0052] Specifically, before sending a dispatch instruction to the dispatch device, the method also includes: obtaining a mine map; determining the location of the dispatch device based on the dispatch device information; determining the work location based on the production task information; performing path planning based on a preset algorithm, a mine map, the location of the dispatch device and the work location to obtain a driving path; and determining the dispatch instruction based on the driving path and the production task information.
[0053] In this embodiment, the geology within the mine often changes due to mining, which often leads to changes in the navigable roads. By acquiring the mine map in real time, the navigable paths can be updated in a timely manner. The location of the dispatching equipment also needs to be acquired in real time and stored in the database. The location of the dispatching equipment, that is, the dispatching equipment location, is obtained through the dispatching equipment information. The operating location is obtained through the production task information. The dispatching equipment location is used as the starting point, and the operating location is used as the end point. The starting point and the end point are used to obtain a driving path through a preset algorithm. The dispatching instruction includes the driving path and the production task information, so that the equipment operator can drive to the operating location according to the driving path after receiving the dispatching instruction.
[0054] Among them, the preset algorithm is a path planning algorithm, and the path planning algorithm can be a shortest path algorithm, a multi-objective optimization algorithm, a dynamic planning algorithm, and a heuristic algorithm, which is not specifically limited here.
[0055] Figure 2 This is a structural block diagram of a mine intelligent scheduling device 200 provided in an embodiment of the present application.
[0056] like Figure 2 As shown, the mine intelligent dispatching device 200 mainly includes: Information acquisition module 201, used to acquire production task information and equipment information; A demand determination module 202 is used to determine equipment demand based on production task information, where the equipment demand includes equipment type and equipment quantity; An equipment determination module 203 is used to determine the scheduling equipment information based on the equipment demand and the equipment information, where the scheduling equipment information includes the scheduling equipment corresponding to the production information; The instruction sending module 204 is used to send a scheduling instruction to the scheduling device.
[0057] As an optional implementation of this embodiment, the demand determination module 202 is also specifically used to determine equipment requirements based on production task information, including: obtaining historical production information, the historical production information includes historical task information and historical equipment information; analyzing the historical production information to obtain the correspondence between the historical task information and the historical equipment information; determining equipment requirements based on the production task information and the correspondence, the equipment requirements include mining equipment requirements and transportation equipment requirements.
[0058] As an optional implementation of this embodiment, the equipment determination module 203 is also specifically used to determine the scheduling equipment information based on the equipment requirements and equipment information, including: determining the task type based on the equipment requirements; if the task type is a production type, determining the first equipment group based on the equipment requirements and the equipment information, the first equipment group being the equipment group that meets the equipment requirements; determining the task location based on the production task information; determining the second equipment group based on the task location and the first equipment group, the second equipment group being the first equipment group closest to the task location; determining the scheduling equipment information based on the second equipment group and the equipment requirements.
[0059] As an optional implementation of this embodiment, the equipment determination module 203 is also specifically used to determine the scheduling equipment information based on the equipment requirements and equipment information, including: if the task type is a scheduling type, determining the equipment location based on the equipment information; calculating the first distance based on the equipment location and the task location, the first distance being the distance between the equipment location and the task location; determining the first equipment information based on the first distance, the preset distance and the equipment information, the first equipment information including equipment information whose first distance is less than the preset distance; determining the scheduling equipment information based on the equipment requirements, the first equipment information and the equipment group.
[0060] As an optional implementation of this embodiment, the device determination module 203 is also specifically used to determine the scheduling device information based on the device requirements, the first device information and the device group, including: determining the device group corresponding to the first device information as the third device group; determining the number of idle devices in the third device group; sorting the first device information based on the number of idle devices to obtain the sorting result; determining the scheduling device information based on the sorting result, the first distance, the first device information and the device requirements.
[0061] As an optional implementation of this embodiment, the equipment determination module 203 is also specifically used to determine the scheduling equipment information based on the equipment demand and the equipment information, including: determining the total number of demands based on the equipment demand; determining the total number of idle devices based on the equipment information; if the total number of idle devices is less than the total number of demands, determining the task level based on the production task information; determining the scheduling equipment information corresponding to the production task information based on the task level.
[0062] As an optional implementation of this embodiment, the instruction sending module 204 is also specifically used to, before sending the scheduling instruction to the scheduling device, also include: obtaining a mine map; determining the location of the scheduling device based on the scheduling device information; determining the work location based on the production task information; performing path planning based on a preset algorithm, a mine map, the location of the scheduling device and the work location to obtain a driving path; and determining the scheduling instruction based on the driving path and the production task information.
[0063] In one example, the module in any of the above devices can be one or more integrated circuits configured to implement the above methods, such as: one or more application specific integrated circuits (ASICs), or, one or more digital signal processors (DSPs), or, one or more field programmable gate arrays (FPGAs), or a combination of at least two of these integrated circuit forms.
[0064] For another example, when the modules in the device can be implemented in the form of a processing element scheduling program, the processing element can be a general-purpose processor, such as a central processing unit (CPU) or other processor that can call a program. For another example, these modules can be integrated together and implemented in the form of a system-on-a-chip (SOC).
[0065] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described devices and modules can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0066] Figure 3 A structural block diagram of an electronic device 300 provided in an embodiment of the present application.
[0067] like Figure 3 As shown, the electronic device 300 includes a processor 301 and a memory 302 , and may further include an information input / information output (I / O) interface 303 , one or more of a communication component 304 , and a communication bus 305 .
[0068] The processor 301 is used to control the overall operation of the electronic device 300 to complete all or part of the steps of the above-mentioned intelligent mine scheduling method; the memory 302 is used to store various types of data to support the operation of the electronic device 300, and these data may include, for example, instructions for any application or method operated on the electronic device 300, and data related to the application. The memory 302 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, EPROM), programmable read-only memory (Programmable Read-Only Memory, PROM), read-only memory (Read-Only Memory, ROM), magnetic memory, flash memory, magnetic disk or optical disk.
[0069] The I / O interface 303 provides an interface between the processor 301 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 304 is used for wired or wireless communication between the electronic device 300 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 304 can include: Wi-Fi components, Bluetooth components, NFC components.
[0070] The electronic device 300 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the intelligent mine scheduling method given in the above embodiment.
[0071] The communication bus 305 may include a path to transmit information between the above components. The communication bus 305 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The communication bus 305 may be divided into an address bus, a data bus, a control bus, etc.
[0072] The electronic device 300 may include, but is not limited to, mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc., and may also be servers, etc.
[0073] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned mine intelligent scheduling method are implemented.
[0074] The computer-readable storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0075] The terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.
[0076] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of application involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned application concept. For example, the above features are replaced with (but not limited to) technical features with similar functions applied in the present application.
Claims
1. A mine intelligent scheduling method, characterized in that: include: Obtain production task information and equipment information; Determine equipment requirements based on the production task information, wherein the equipment requirements include equipment type and equipment quantity; Determine scheduling equipment information based on the equipment demand and the equipment information, wherein the scheduling equipment information includes the scheduling equipment corresponding to the production task information; Sending a scheduling instruction to the scheduling device.
2. The method according to claim 1, characterized in that: The determining of equipment requirements based on the production task information includes: Acquire historical production information, wherein the historical production information includes historical task information and historical equipment information; Analyze the historical production information to obtain the corresponding relationship between the historical task information and the historical equipment information; The equipment requirement is determined based on the production task information and the corresponding relationship, and the equipment requirement includes an excavation equipment requirement and a transportation equipment requirement.
3. The method according to claim 1, characterized in that The determining the scheduling device information based on the device requirement and the device information includes: determining a task type based on the equipment requirements; If the task type is a production type, determining a first equipment group based on the equipment requirement and the equipment information, the first equipment group being an equipment group that meets the equipment requirement; Determine a task location based on the production task information; Determine a second device group based on the task location and the first device group, the second device group being the first device group closest to the task location; Scheduling device information is determined based on the second device group and the device requirements.
4. The method according to claim 3, characterized in that The determining the scheduling device information based on the device requirement and the device information includes: If the task type is a scheduling type, determining the device location based on the device information; Calculate a first distance based on the device location and the task location, the first distance being the distance between the device location and the task location; Determine first device information based on the first distance, the preset distance, and the device information, wherein the first device information includes the device information of the device whose first distance is less than the preset distance; The scheduled device information is determined based on the device requirement, the first device information, and the device group.
5. The method according to claim 4, characterized in that The determining the scheduling device information based on the device requirement, the first device information, and the device group includes: Determine the device group corresponding to the first device information as a third device group; Determining the number of idle devices in the third device group; Sorting the first device information based on the number of idle devices to obtain a sorting result; The scheduling device information is determined based on the sorting result, the first distance, the first device information, and the device requirement.
6. The method according to claim 1, characterized in that The determining the scheduling device information based on the device requirement and the device information includes: Determining a total quantity required based on the equipment requirements; Determine the total number of idle devices based on the device information; If the total number of idle devices is less than the total number of required devices, determining a task level based on the production task information; The scheduling equipment information corresponding to the production task information is determined based on the task level.
7. The method according to claim 1, characterized in that Before sending the scheduling instruction to the scheduling device, the method further includes: Get a mine map; Determine the location of the dispatching device based on the dispatching device information; Determine a work location based on the production task information; Performing path planning based on a preset algorithm, the mine map, the location of the dispatching equipment, and the operation location to obtain a driving path; A scheduling instruction is determined based on the driving path and the production task information.
8. A mine intelligent dispatching device, characterized in that: include: Information acquisition module, used to obtain production task information and equipment information; A demand determination module, used to determine equipment demand based on the production task information, wherein the equipment demand includes equipment type and equipment quantity; An equipment determination module, configured to determine scheduling equipment information based on the equipment demand and the equipment information, wherein the scheduling equipment information includes the scheduling equipment corresponding to the production information; An instruction sending module is used to send a scheduling instruction to the scheduling device.
9. An electronic device, characterized in that: comprising a processor coupled to a memory; The processor is configured to execute a computer program stored in the memory, so that the electronic device executes the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The method comprises a computer program or an instruction, which, when executed on a computer, causes the computer to execute the method according to any one of claims 1 to 7.
Citation Information