Comprehensive energy system configuration optimization method based on multi-stage requirements

Through the multi-stage demand-based comprehensive energy system configuration optimization method and combined with the fruit fly algorithm, the empirical judgment problem of wind and light storage capacity configuration is solved, the reasonable configuration of wind and light storage capacity is achieved, the reliability and economics of the energy system are improved, and the reliability and economy of the energy system are reduced. Grid shock.

CN119027274APending Publication Date: 2024-11-26STATE GRID ZHEJIANG ELECTRIC POWER CO LTD QUZHOU POWER SUPPLY CO
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411078060.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, the configuration of wind and light storage capacity depends on the designer's experience judgment and cannot meet the reliability and economic needs of the energy system, resulting in unstable output of new energy power supplies and affecting the safe and stable operation of the power grid.

Method used

The comprehensive energy system configuration optimization method based on multi-stage demand is adopted, and the economics of wind power and photovoltaics are collected, and the capacity configuration is carried out based on phased demands. The fruit fly algorithm is used to solve the optimal capacity ratio.

Benefits of technology

The rational allocation of wind and light storage capacity is achieved, the output fluctuations of new energy power supply are reduced, the reliability and economics of the energy system are improved, and the optimization configuration model of the comprehensive energy system is provided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027274A_ABST
    Figure CN119027274A_ABST
Patent Text Reader

Abstract

The invention discloses an integrated energy system configuration optimization method based on multi-stage demands, and the method comprises the steps: S1, collecting sample data which is meteorological data of a typical year of a construction area, and the meteorological data comprises daily irradiation intensity, daily illumination duration, daily average temperature and daily average wind speed data; s2, performing data preprocessing on the sample data, and performing normalization processing on the meteorological data; s3, wind power and photovoltaic economy is judged, and a wind and light output curve and an enterprise power consumption curve are fitted; s4, carrying out capacity configuration based on wind power and photovoltaic power required by stages; and S5, configuring the energy storage capacity according to the wind-light capacity ratio and the power utilization curve of the construction site to obtain the optimal capacity configuration of the integrated energy system. The problem that an existing comprehensive energy system cannot reasonably configure the wind and light storage capacity is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of energy configuration optimization, and in particular, relates to a comprehensive energy system configuration optimization method based on multi-stage demand. Background Art

[0002] In the context of energy transformation and development and "dual carbon", integrated energy systems that adapt to new energy demands and new functional situations have emerged. An integrated energy system refers to an integrated energy production, supply and marketing system formed by organically coordinating and optimizing the generation, transmission and distribution (energy network), conversion, storage, consumption and other links of energy during planning, construction and operation. The most comprehensive integrated energy system is composed of energy supply networks (such as power supply, gas supply, cooling / heat supply, etc.), energy exchange links (such as CCHP units, generators, boilers, air conditioners, heat pumps, etc.), energy storage links (electricity storage, gas storage, heat storage, cooling storage, etc.), terminal integrated energy supply and use units (such as microgrids) and a large number of end users.

[0003] At present, many experts abroad have studied the optimization of wind, light and storage capacity configuration and developed relevant software. my country has also attached increasing importance to its research. In the process of realizing the present invention, the inventor found that there are at least the following problems in the prior art: with the increasing reduction of fossil fuels and the increasing severity of environmental pollution, people pay more and more attention to the use of clean energy, but due to the randomness and uncertainty of new energy itself, the grid connection of new energy power generation has an adverse impact on the safe and stable operation of the power grid. Photovoltaic resources have the intermittent characteristics of large output during the day and no output at night. Wind power generation has the characteristics of seasonal intermittent and unstable output. Energy storage can be used to smooth the peak and fill the valley and stabilize the wind and light processing. Therefore, a wind, light and storage complementary system is established to achieve stable output of new energy power sources and reduce the impact on the power grid. In the early stages of construction and research, the capacity ratio of wind, light and storage depends largely on the designer's experience and judgment, which cannot meet the requirements of operational reliability and economy. How to reasonably configure the wind, light and storage capacity to achieve reliability and economy is the main problem faced by the research. Summary of the invention

[0004] In view of the problem that the existing integrated energy system cannot reasonably configure wind, solar and storage capacity, the present invention provides an integrated energy system configuration optimization method based on multi-stage requirements.

[0005] In order to achieve the above technical objectives, the technical solution adopted by the present invention is as follows:

[0006] A method for optimizing the configuration of an integrated energy system based on multi-stage demand, comprising the steps of:

[0007] S1. Collect sample data. The sample data is the meteorological data of a typical year in the construction area. The meteorological data includes daily radiation intensity, sunshine duration, daily average temperature and daily average wind speed data;

[0008] S2, preprocessing the sample data and normalizing the meteorological data;

[0009] S3. Determine the economic feasibility of wind power and photovoltaic power, and fit the wind and photovoltaic power output curve with the enterprise power consumption curve;

[0010] S4. Capacity allocation of wind power and photovoltaic power based on phased demand;

[0011] S5. Configure the energy storage capacity according to the wind-solar capacity ratio and the electricity consumption curve of the construction site to obtain the optimal capacity configuration of the integrated energy system.

[0012] Furthermore, the detailed steps of step S3 include:

[0013] S301, using the wind power output model and the photovoltaic output model to determine the economic efficiency of wind power and photovoltaic power. If wind power is economical and photovoltaic power is not economical, proceed to step S302; if wind power is not economical and photovoltaic power is economical, proceed to step S303; if both wind power and photovoltaic power are economical, proceed to step S304;

[0014] S302, input the enterprise's annual electricity load EL, and fit it with the wind power annual output curve;

[0015] Wind power annual output curve = NPV wd *P wd (v).

[0016] S303, input the annual electricity load EL of the enterprise, and fit it with the annual photovoltaic output curve;

[0017] Photovoltaic annual output curve = NPV pv *P pv (t)

[0018] S304. Input the enterprise's annual electricity load EL, and perform fitting with the photovoltaic annual output curve and the wind power annual output curve.

[0019] Furthermore, the wind power output model:

[0020]

[0021] Where P r is the rated power; v is the actual wind speed; v ci is the cut-in wind speed; v co is the cut-out wind speed; v r is the rated wind speed;

[0022] Photovoltaic output model:

[0023] P PV (t) = A PV G(t)η PV η inv

[0024] In the formula, A pv —The area of ​​the photovoltaic panel receiving solar radiation, G(t)—light radiation value, W / m2, η pv — Photovoltaic module energy conversion efficiency, η inv —Inverter conversion efficiency.

[0025] Furthermore, the economic feasibility of wind power and photovoltaic power is determined as follows:

[0026] Assuming the number of years of wind power operation is x, the annual NPV of wind power per unit during operation is wd for:

[0027]

[0028] Among them, P refers to the time-of-use electricity price, P G is the electricity price for enterprises, P S is the government-subsidized electricity price; Q1 refers to the total annual wind power generation. is the annual operation and maintenance cost of unit wind power generation, k is the grid-connected rate of renewable energy power generation, T wd (v) is the wind power generation time.

[0029] Assuming that the number of years of photovoltaic operation is y years, the annual NPV of the photovoltaic power grid during operation is PV for:

[0030]

[0031] Where P refers to the time-of-use electricity price, P G is the electricity price for enterprises, P S is the government-subsidized electricity price; Q2 refers to the total annual photovoltaic power generation. is the annual operation and maintenance cost of photovoltaic power generation, k is the grid-connected rate of new energy power generation, I pv (t) is the annual sunshine time.

[0032] The total installed capacity of various equipment in the power generation unit should be limited within a certain range due to factors such as site restrictions:

[0033] 0<NPV wd <NPV wd-max ; 0<NPV pv <NPV pv-max

[0034] Furthermore, in step S4, the entire life cycle of the project is divided into three stages: construction stage, operation stage, and retirement stage, and economic capacity configuration models are established for each stage, and the fruit fly algorithm is used to solve them.

[0035] Furthermore, the detailed steps of step S4 include:

[0036] S401. Establish models for the construction period, operation period and decommissioning period;

[0037] S402, calculate and obtain the final capacity ratio and the fitted output curve ELr.

[0038] Furthermore, the construction period model:

[0039] (1) Cash outflow: C(m) = C1(m) + C2(m)

[0040] Initial investment cost:

[0041] They are the unit wind power / photovoltaic construction costs, which are directly input according to the conditions in different regions.

[0042] Power purchase cost: C2(m) = P G ·[Q-(1-k)·Q n ]

[0043] P G is the electricity price for the enterprise, Q is the annual electricity demand of the enterprise, Qn refers to the total annual power generation of renewable energy, which is 0 during the construction period;.

[0044] (2) Cash inflow: B(m) = 0

[0045] (3) Environmental pollution penalty fee: C E,m

[0046] Direct input.

[0047] Operational model:

[0048]

[0049] (1) Cash outflow: C(n) = C3(n) + C2(n)

[0050] Operation and maintenance costs:

[0051] They are the annual operation and maintenance costs of unit wind power generation / photovoltaic power generation, which are directly input according to the actual situation of the enterprise and region;

[0052] Electricity purchase cost: C2(n) = P G·[Q-(1-k)·Q n ]

[0053] (2) Cash inflow: B(n) = R S +C S

[0054] C S =P S Q n

[0055] P S is the government subsidized electricity price; Q n Refers to the total annual electricity generated by renewable energy;

[0056]

[0057] I pv (t) is the sunshine time, which is directly input into the matrix; T wd (v) is the wind power generation time, which is directly input into the matrix.

[0058] R S =Q s ·P

[0059] Q s =Q n ·k

[0060] P refers to the time-of-use electricity price, Q s is the annual electricity sales of the enterprise, k is the grid-connected rate of renewable energy power generation, and the grid-connected rate is different for different enterprises.

[0061] Retirement model:

[0062]

[0063] (1) Cash outflow: C(m+n+1) = P G ·[Q-(1-k)·Q n ]

[0064] (2) Cash inflow B(m+n+1) = R re

[0065]

[0066] R re Equipment residual value income after the system life ends, r wd 、r pv They are the residual value rates of wind turbines and photovoltaic panels respectively, which can be directly input according to actual conditions.

[0067] Furthermore, the energy storage capacity configuration model:

[0068] Pref =Δr·MAX[EL r-max -P ref ,P ref -EL r-min ]+N wd ·P wd (v)+N pv ·P pv (t)-N bat ·P c (t)

[0069] P ref =Δr·MAX[EL r-max -P ref ,P ref -EL r-min ]+N wd ·P wd (v)+N pv ·P pv (t)+N bat ·P d (t)

[0070] Where Pref is the critical value of the fitted output curve ELr, Δγ is the adjustment parameter, and P C (t) and P d (t) are the charging power and discharging power of the energy storage battery, respectively. The calculation formula is as follows:

[0071] System charging: SOC(t) = SOC(t-1)(1-σ) + P c (t)Δtη c / E max

[0072] System discharge:

[0073] Where, SOC(t) is the remaining capacity of the battery after the end of the tth time period; σ is the self-discharge rate of the battery per hour; Δt is the length of the tth time period; η c , η d —Battery charging efficiency and discharging efficiency; E max —Maximum battery capacity.

[0074] It can be inferred that P C (t) and P d (t)Calculation formula.

[0075]

[0076] Its constraint condition is that the remaining power of the energy storage battery must meet the upper and lower capacity requirements: SOC min ≤SOC(t)≤SOC max ;

[0077] The number of constructions has a maximum limit: 0<N bat ≤N bat-max .

[0078] Compared with the prior art, the present invention has the following beneficial effects:

[0079] The integrated energy system configuration optimization model based on multi-stage demand determines the premise of whether wind power generation and photovoltaic power generation need to be built by judging the economic feasibility of wind power generation and photovoltaic power generation in the construction area, and then constructs an optimization model with the goal of minimizing the total net present value cost of investment in stages, and uses FOA to solve the model to obtain the optimal ratio result. This model provides new directions and ideas for the actual construction of integrated energy systems. BRIEF DESCRIPTION OF THE DRAWINGS

[0080] Figure 1 It is an overall flow chart of a method for optimizing the configuration of an integrated energy system based on multi-stage demand in an embodiment of the present invention. DETAILED DESCRIPTION

[0081] In order to facilitate the understanding of those skilled in the art, the present invention is further described below in conjunction with embodiments and drawings. The contents mentioned in the implementation modes are not intended to limit the present invention.

[0082] like Figure 1 As shown, this embodiment provides a method for optimizing the configuration of an integrated energy system based on multi-stage requirements, comprising the steps of:

[0083] S1. Collect sample data. The sample data is the meteorological data of a typical year in the construction area. The meteorological data includes daily radiation intensity, sunshine duration, daily average temperature and daily average wind speed data;

[0084] S2, preprocessing the sample data and normalizing the meteorological data;

[0085] S3. Determine the economic feasibility of wind power and photovoltaic power, and fit the wind and photovoltaic power output curve with the enterprise power consumption curve;

[0086] S4. Capacity allocation of wind power and photovoltaic power based on phased demand;

[0087] S5. Configure the energy storage capacity according to the wind-solar capacity ratio and the electricity consumption curve of the construction site to obtain the optimal capacity configuration of the integrated energy system.

[0088] The application example of the present invention selects S Park as the research object, and collects data such as electricity consumption curve, daily radiation intensity, sunshine duration, average daily temperature and average daily wind speed from July 1, 2019 to June 30, 2020.

[0089] Table 1 Input parameters

[0090]

[0091]

[0092] The final optimization results are shown in Table 2 below:

[0093] Table 2 Optimal ratio of light-storage capacity

[0094] Number of PV panels (Npv / block) Number of energy storage devices (Nbat / unit) 25663 3500

[0095] The energy storage battery device is composed of a plurality of battery cells connected in series to form a string which is then connected in parallel with other strings to form an energy storage unit.

[0096] Table 3 Investment costs and related expenses

[0097] Investment cost (ten thousand yuan) Operating cost (ten thousand yuan) Equivalent annual cost (ten thousand yuan) 3713.02 683.29 906.07

[0098] From the calculation results in Table 2 and Table 3, it can be seen that under the optimal configuration, the total installed capacity of photovoltaic modules is 8468.79kW, the total capacity of battery devices is 2100kWh, and the minimum annual investment cost is 9.0607 million yuan. It is not economical to build wind power in this area, so in the subsequent calculation, the comprehensive energy system only considers wind and solar complementarity.

[0099] The installation area of ​​PV modules is close to the maximum installation limit of PV modules. This is mainly because the area where the park is located is rich in light energy resources, and the matching between PV output and dispatch requirements is stronger than in other areas. However, from the perspective of the whole day, light resources are only available during the day, which is poorly matched with dispatch requirements. At this time, it must be coordinated with energy storage and the power grid. Since photovoltaic power generation depends on meteorological conditions, it is highly random and volatile, and most of the time it cannot operate at rated power. Therefore, the capacity is relatively large relative to the dispatching requirements for grid access power standards.

[0100] In order to enable the integrated energy system capacity optimization configuration model to guide actual construction and put it into use, while reducing unnecessary calculations, this patent adopts a phased optimization model for capacity configuration. First, the economic feasibility of building wind power and photovoltaic power is determined based on the natural conditions of the construction area, and then the next step of capacity configuration is carried out. The fruit fly algorithm is applied to step S4 to select the optimal wind-solar ratio based on economic feasibility. The optimization flow chart is as follows: Figure 1 shown.

[0101] The detailed steps of step S3 include:

[0102] S301, using the wind power output model and the photovoltaic output model to determine the economic efficiency of wind power and photovoltaic power. If wind power is economical and photovoltaic power is not economical, proceed to step S302; if wind power is not economical and photovoltaic power is economical, proceed to step S303; if both wind power and photovoltaic power are economical, proceed to step S304;

[0103] S302, input the enterprise's annual electricity load EL, and fit it with the wind power annual output curve;

[0104] Wind power annual output curve = NPV wd *P wd (v).

[0105] S303, input the annual electricity load EL of the enterprise, and fit it with the annual photovoltaic output curve;

[0106] Photovoltaic annual output curve = NPV pv *P pv (t)

[0107] S304. Input the enterprise's annual electricity load EL, and perform fitting with the photovoltaic annual output curve and the wind power annual output curve.

[0108] Furthermore, the wind power output model:

[0109]

[0110] Where P r is the rated power; v is the actual wind speed; v ci is the cut-in wind speed; v co is the cut-out wind speed; v r is the rated wind speed;

[0111] Photovoltaic output model:

[0112] P PV (t) = A PV G(t)η PV η inv

[0113] In the formula, A pv —The area of ​​the photovoltaic panel receiving solar radiation, G(t)—light radiation value, W / m2, η pv — Photovoltaic module energy conversion efficiency, η inv —Inverter conversion efficiency.

[0114] Economic determination of wind power and photovoltaic power:

[0115] Assuming the number of years of wind power operation is x, the annual NPV of wind power per unit during operation is wd for:

[0116]

[0117] Among them, P refers to the time-of-use electricity price, P G is the electricity price for enterprises, P S is the government subsidy price; Q1 refers to the total annual power generation of wind power, Q sis the annual electricity sales of the enterprise, k is the rate of new energy power generation on the grid;

[0118] Assuming that the number of years of photovoltaic operation is y years, the annual NPV of the photovoltaic power grid during operation is PV for:

[0119]

[0120] Q2 refers to the total annual photovoltaic power generation.

[0121] The total installed capacity of various equipment in the power generation unit should be limited within a certain range due to factors such as site restrictions:

[0122] 0<NPV wd <NPV wd-max ; 0<NPV pv <NPV pv-max

[0123] In step S4, the entire life cycle of the project is divided into three stages: construction period, operation period, and decommissioning period. Economic capacity configuration models are established for each stage and solved using the fruit fly algorithm.

[0124] The detailed steps of step S4 include:

[0125] S401. Establish models for the construction period, operation period and decommissioning period;

[0126] S402, calculate and obtain the final capacity ratio and the fitted output curve ELr.

[0127] Furthermore, the construction period model:

[0128] (1) Cash outflow: C(m) = C1(m) + C2(m)

[0129] Initial investment cost:

[0130] They are the unit wind power / photovoltaic construction costs, which are directly input according to the conditions in different regions.

[0131] Power purchase cost: C2(m) = P G ·[Q-(1-k)·Q n ]

[0132] P G is the electricity price for the enterprise, Q is the annual electricity demand of the enterprise, and the remaining parameters are directly input as shown in (2).

[0133] (2) Cash inflow: B(m) = 0

[0134] (3) Environmental pollution penalty fee: C E,m

[0135] Direct input.

[0136] Operational model:

[0137]

[0138] (1) Cash outflow: C(n) = C3(n) + C2(n)

[0139] Operation and maintenance costs:

[0140] They are the annual operation and maintenance costs of unit wind power generation / photovoltaic power generation, which are directly input according to the actual situation of the enterprise and region;

[0141] Electricity purchase cost: C2(n) = P G ·[Q-(1-k)·Q n ]

[0142] (2) Cash inflow: B(n) = R S +C S

[0143] C S =P S Q n

[0144] P S is the government subsidized electricity price; Q n Refers to the total annual electricity generated by renewable energy;

[0145]

[0146] I pv (t) is the sunshine time, which is directly input into the matrix; T wd (v) is the wind power generation time, which is directly input into the matrix.

[0147] R S =Q s ·P

[0148] Q s =Q n ·k

[0149] P refers to the time-of-use electricity price, Qs is the annual electricity sales volume of the enterprise, and k is the grid-connected rate of renewable energy power generation, which varies from enterprise to enterprise.

[0150] Retirement model:

[0151] (1) Cash outflow: C(m+n+1) = P G ·[Q-(1-k)·Q n ]

[0152] (2) Cash inflow B(m+n+1) = R re

[0153]

[0154] R re Equipment residual value income after the system life ends, r wd 、r pv They are the residual value rates of wind turbines and photovoltaic panels respectively, which can be directly input according to actual conditions.

[0155] Furthermore, the energy storage capacity configuration model:

[0156] P ref =Δr·MAX[EL r-max -P ref ,P ref -EL r-min ]+N wd ·P wd (v)+N pv ·P pv (t)-N bat ·P c (t) (25)

[0157] P ref =Δr·MAX[EL r-max -P ref ,P ref -EL r-min ]+N wd ·P wd (v)+N pv ·P pv (t)+N bat ·P d (t) (26)

[0158] Where Pref is the critical value of the fitted output curve ELr, P C (t) and P d (t) are the charging power and discharging power of the energy storage battery, respectively. The calculation formula is as follows:

[0159] System charging: SOC(t) = SOC(t-1)(1-σ) + P c (t)Δtη c / E max

[0160] System discharge:

[0161] Where, SOC(t) is the remaining capacity of the battery after the end of the tth time period; σ is the self-discharge rate of the battery per hour; Δt is the length of the tth time period; ηc , η d —Battery charging efficiency and discharging efficiency; E max —Maximum battery capacity.

[0162] It can be inferred that P C (t) and P d (t)Calculation formula.

[0163]

[0164] Its constraint condition is that the remaining power of the energy storage battery must meet the upper and lower capacity requirements: SOC min ≤SOC(t)≤SOC max ;

[0165] The number of constructions has a maximum limit: 0<N bat ≤N bat-max .

[0166] Compared with the prior art, the present invention has the following beneficial effects:

[0167] The integrated energy system configuration optimization model based on multi-stage demand determines the premise of whether wind power generation and photovoltaic power generation need to be built by judging the economic feasibility of wind power generation and photovoltaic power generation in the construction area, and then constructs an optimization model with the goal of minimizing the total net present value cost of investment in stages, and uses FOA to solve the model to obtain the optimal ratio result. This model provides new directions and ideas for the actual construction of integrated energy systems.

[0168] The above is a detailed introduction to a method for optimizing the configuration of an integrated energy system based on multi-stage demand provided by the present application. The description of the specific embodiments is only used to help understand the method and its core idea of ​​the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of the present application.

Claims

1. A comprehensive energy system configuration optimization method based on multi-stage demand, It is characterized in that Includes steps: S1. Collect sample data. The sample data is the meteorological data of a typical year in the construction area. The meteorological data includes daily radiation intensity, sunshine duration, daily average temperature and daily average wind speed data; S2, preprocessing the sample data and normalizing the meteorological data; S3. Determine the economic feasibility of wind power and photovoltaic power, and fit the wind and photovoltaic power output curve with the enterprise power consumption curve; S4. Capacity allocation of wind power and photovoltaic power based on phased demand; S5. Configure the energy storage capacity according to the wind-solar capacity ratio and the electricity consumption curve of the construction site to obtain the optimal capacity configuration of the integrated energy system.

2. According to claim 1, a method for optimizing the configuration of an integrated energy system based on multi-stage demand, It is characterized in that The detailed steps of step S3 include: S301, using the wind power output model and the photovoltaic output model to determine the economic efficiency of wind power and photovoltaic power. If wind power is economical and photovoltaic power is not economical, proceed to step S302; if wind power is not economical and photovoltaic power is economical, proceed to step S303; if both wind power and photovoltaic power are economical, proceed to step S304; S302, input the enterprise's annual electricity load EL, and fit it with the wind power annual output curve; S303, input the annual electricity load EL of the enterprise, and fit it with the annual photovoltaic output curve; S304. Input the enterprise's annual electricity load EL, and perform fitting with the photovoltaic annual output curve and the wind power annual output curve.

3. According to claim 2, a method for optimizing the configuration of an integrated energy system based on multi-stage demand, It is characterized in that Wind power output model: Where P r is the rated power; v is the actual wind speed; v ci is the cut-in wind speed; v co is the cut-out wind speed; v r is the rated wind speed; Photovoltaic output model: P PV (t)=A PV G(t)h PV or inv In the formula, A pv —The area of ​​the photovoltaic panel receiving solar radiation, G(t)—light radiation value, W / m2, η pv — Photovoltaic module energy conversion efficiency, η inv —Inverter conversion efficiency.

4. According to claim 3, a method for optimizing the configuration of an integrated energy system based on multi-stage demand, It is characterized in that Economic determination of wind power and photovoltaic power: Assuming the number of years of wind power operation is x, the annual NPV of wind power per unit during operation is wd for: Among them, P refers to the time-of-use electricity price, P G is the electricity price for enterprises, P S is the government subsidized electricity price; Q 1 Refers to the total annual wind power generation. is the annual operation and maintenance cost of unit wind power generation, k is the grid-connected rate of renewable energy power generation, T wd (v) is the wind power generation time. Assuming that the number of years of photovoltaic operation is y years, the annual NPV of the photovoltaic power grid during operation is PV for: Where P refers to the time-of-use electricity price, P G is the electricity price for enterprises, P S is the government subsidized electricity price; Q 2 Refers to the total annual photovoltaic power generation. is the annual operation and maintenance cost of photovoltaic power generation, k is the grid-connected rate of new energy power generation, I pv (t) is the annual sunshine time. are the unit wind power / photovoltaic construction costs respectively.

5. According to claim 4, a method for optimizing the configuration of an integrated energy system based on multi-stage demand, It is characterized in that In step S4, the entire life cycle of the project is divided into three stages: construction period, operation period, and decommissioning period. Economic capacity configuration models are established for each stage and solved using the fruit fly algorithm.

6. A method according to claim 5, It is characterized in that The detailed steps of step S4 include: S401. Establish models for the construction period, operation period and decommissioning period; S402, calculate and obtain the final capacity ratio and the fitted output curve ELr.

7. A method for optimizing the configuration of an integrated energy system based on multi-stage demand according to claim 6, It is characterized in that Construction period model: Cash outflow: C(m) = C 1 (m)+C 2 (m) Initial investment cost: Electricity purchase cost: C 2 (m) = P G ·[Q-(1-k)·Q n ] P G is the electricity price for the enterprise, Q is the annual electricity demand of the enterprise, Q n Refers to the total annual electricity generation from renewable energy, which is 0 during the construction period; They are the unit wind power / photovoltaic construction costs, which are directly input according to the conditions of different regions; N wd is the number of wind power installations, N pv is the number of PV panels. Cash inflow: B(m) = 0, Environmental pollution penalty fee: C E,m .

8. According to claim 7, a method for optimizing the configuration of an integrated energy system based on multi-stage demand, It is characterized in that Operational model: Cash outflow: C(n) = C 3 (n)+C 2 (n) Operation and maintenance costs: They are the annual operation and maintenance costs of unit wind power generation / photovoltaic power generation, which are directly input according to the actual situation of the enterprise and region; Electricity purchase cost: C 2 (n) = P G ·[Q-(1-k)·Q n ] Cash inflow: B(n) = R S +C S C S =P S ·Q n P S is the government subsidized electricity price; Q n Refers to the total annual electricity generated by renewable energy; I pv (t) is the sunshine time, which is directly input into the matrix; T wd (v) is the wind power generation time, which is directly input into the matrix; R S =Q s ·P Q s =Q n ·k P refers to the time-of-use electricity price, Q s is the annual electricity sales of the enterprise, k is the grid-connected rate of renewable energy power generation, and the grid-connected rate is different for different enterprises.

9. A method for optimizing the configuration of an integrated energy system based on multi-stage demand according to claim 8, It is characterized in that Retirement model: Cash outflow: C(m+n+1)=P G ·[Q-(1-k)·Q n ] Cash inflow: B(m+n+1)=R re R re Equipment residual value income after the system life ends, r wd 、r pv They are the residual value rates of wind turbines and photovoltaic panels respectively, which can be directly input according to actual conditions.

10. A method for optimizing the configuration of an integrated energy system based on multi-stage demand according to claim 9, It is characterized in that Energy storage capacity configuration model: P ref =Δr·MAX[EL r-max -P ref ,P ref -EL r-min ]+N wd ·P wd (v)+N pv ·P pv (t)-N bat ·P c (t) P ref =Δr·MAX[EL r-max -P ref ,P ref -EL r-min ]+N wd ·P wd (v)+N pv ·P pv (t)+N bat ·P d (t) Among them, P ref is the critical value of the fitting output curve ELr, Δγ is the adjustment parameter, P C (t) and P d (t) are the charging power and discharging power of the energy storage battery, respectively. The calculation formula is as follows: System charging: SOC(t) = SOC(t-1)(1-σ) + P c (t)Δtη c / E max System discharge: Where, SOC(t) is the remaining capacity of the battery after the end of the tth time period; σ is the self-discharge rate of the battery per hour; Δt is the length of the tth time period; η c , η d —Battery charging efficiency and discharging efficiency; E max — Maximum capacity of the battery; Inversely deduce P C (t) and P d (t) Calculation formula, Its constraint condition is that the remaining power of the energy storage battery must meet the upper and lower capacity requirements: SOC min ≤SOC(t)≤SOC max ; The number of constructions has a maximum limit: 0<N bat ≤N bat-max .

Citation Information