Network, province and region three-level power system collaborative optimization scheduling method, system and equipment

By building a coordinated optimization scheduling method for three-level power systems in the power system, the problem of insufficient coordination between grid and provinces in the power system is solved, and the overall resource optimization allocation of the power system and the improvement of renewable energy consumption capacity are achieved.

CN119030037AActive Publication Date: 2024-11-26CHINA SOUTHERN POWER GRID COMPANY +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411121685.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-26
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

In the scheduling mode, the existing power systems have limited synergy between networks and provinces, which leads to insufficient overall optimization of resource optimization and the difficulty in dealing with power system uncertainty and insufficient flexibility in large-scale distributed power access, especially in In the case of increasing renewable energy.

Method used

A method of collaborative optimization and scheduling for three-level power systems in the network, province and local power systems is proposed. By constructing a collaborative business system of the dispatching agency and a collaborative optimization and scheduling model, combining the optimization goals and constraints of the prefecture and provincial power levels, the global resources of the power system are realized. Optimize the collaborative optimization of configuration and scheduling planning.

Benefits of technology

It has improved the renewable energy consumption capacity of the large power grid and the system's risk resistance, and enhanced the coordinated operation ability of the power system and the resource allocation level.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119030037A_ABST
    Figure CN119030037A_ABST
Patent Text Reader

Abstract

The invention provides a network, province and region three-level power system collaborative optimization scheduling method, system and device. According to the optimization scheduling method, under the background that a large-scale distributed and centralized new energy power source is connected to a power grid, the network-province-regional three-level power system synergistic effect is considered, and on the basis that regional-level power grid flexibility resource collaboration is fully considered, the network-province-level power grid integrated optimization scheduling effect is enhanced; and meanwhile, the uncertainty of a source-load double-end prediction result is considered, so that the renewable energy consumption capability of a large power grid and the risk resistance capability of the system can be effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to a method, system and equipment for coordinated optimization and dispatching of power systems at the three levels of grid, province and city, and belongs to the technical field of optimized operation of power systems. Background Art

[0002] According to the Guiding Opinions on Accelerating the Construction of a National Unified Electricity Market System, various types of power resources in my country's power system will need to be optimized and allocated at the provincial, inter-provincial and larger regional levels in the future. However, the traditional planning and dispatching mode currently implemented adopts a two-level management of network-province decomposition, and the power grids at all levels are only responsible for the planning and safety verification within the scope of dispatching. Under the traditional dispatching mode, the network level first formulates the cross-regional interconnection line plan and the total power exchange plan between provinces, and then the provincial level formulates the regional power generation plan. There are often several iterations between the network and the province to determine the final dispatching plan, and the optimal allocation of resources within the province cannot achieve the global (whole network) optimal. At the same time, due to the independent planning of systems at all levels and limited coordination, the coordinated optimization of local resources is missing, and the flexibility is insufficient in dealing with the uncertainty of the power system and the challenges of large-scale distributed power access. Therefore, with the increasing number of various types of renewable energy, how to give full play to the role of coordinated optimization and dispatching of the three-level power system of network-province-locality to improve the renewable energy absorption capacity and the system's risk resistance has become a crucial issue in the field of power system optimization operation. Summary of the invention

[0003] In view of the above problems, the present invention proposes a method, system and equipment for collaborative optimization and dispatching of three-level power systems at the grid, province and local levels. By innovating the collaborative business system and system optimization operation model of power grid dispatching plans at different levels, the coordinated operation capability of the power system and the level of global resource optimization configuration are improved, thereby promoting the large power grid's ability to carry and absorb clean energy.

[0004] In order to achieve the above objectives, this application provides the following technical solutions:

[0005] In a first aspect, an embodiment of the present application provides a method for coordinated optimization and dispatching of a three-level power system of a grid, a province, and a city, which includes:

[0006] Constructing a coordinated business system for dispatching organizations at the three levels of the grid, province and locality, and establishing a coordinated optimization dispatching model for power systems at the three levels of the grid, province and locality; the coordinated optimization dispatching model for power systems is used to support the operation of the coordinated business system for dispatching organizations at the three levels of the grid, province and locality;

[0007] Acquire system related information, including basic physical information and model parameters of the three-level power system of the grid, province and local area, and system equipment operation constraint information;

[0008] Calculate and generate a source load prediction interval based on the system related information, and form a node net load based on the source load prediction interval, and generate conventional prediction scenarios and extreme scenarios as key conditions for collaborative optimization scheduling;

[0009] Solving the power system collaborative optimization dispatching model based on the key conditions to obtain a dispatching operation result;

[0010] The construction of the dispatching organization collaboration business system at the provincial and local levels includes:

[0011] The prefectural dispatching organization aggregates resources upwards, and optimizes the feasible domain of prefectural dispatching according to the local distributed renewable energy output level and output uncertainty, the control characteristics and adjustable capacity of prefectural controllable load resources, and the characteristics of prefectural power grid network; the provincial-level dispatching organization adopts an integrated optimization model based on the feasible domain of prefectural dispatching and the power exchange demand between grids and provinces, and optimizes the global resources uniformly according to the load forecast result adjustment to obtain the provincial-level dispatching plan; based on the characteristics of grid networks at all levels, the system operation and maintenance arrangements, and the cost of power generation resources, the provincial-level dispatching plan is decomposed downwards to form a coordinated optimization dispatching plan for the three-level power system of grid, province, and prefecture;

[0012] The establishment of a three-level power system coordinated optimization dispatch model includes:

[0013] A prefectural-level optimization dispatching model is established with the lowest dispatching cost of the prefectural-level power grid as the optimization target; on the basis of giving priority to the acceptance of new energy power, a provincial-level optimization dispatching model is established with the lowest power generation cost of the entire network as the optimization target; the prefectural-level optimization dispatching model is connected with the provincial-level optimization dispatching model to obtain a three-level power system collaborative optimization dispatching model of the network, province, and prefecture; wherein the connection processing includes: approximating the prefectural-level power grid as an equivalent node and connecting it to the upper provincial-level power grid.

[0014] Based on the above method, optionally, the objective function of the local level optimization scheduling model is:

[0015]

[0016] In the formula, F lower,i is the total day-ahead dispatch cost of distribution network i; is the total day-ahead dispatch cost of controllable micro-source k; is the output power of the controllable micro-source k at time t; is the total day-ahead dispatch cost of the uncontrollable micro-source j; is the output power of the uncontrollable micro-source j at time t; is the total day-ahead dispatch cost of the energy storage device; is the charging and discharging power of the energy storage device at time t; The interaction cost of the inter-provincial contact lines; is the power of the inter-regional interconnection line at time t; The day-ahead dispatch cost for load regulation; is the load regulation capacity that can be adjusted at time t.

[0017] Based on the above method, optionally, the constraint conditions of the local-level optimization scheduling model include power balance constraints and parameter constraints of each power equipment in the local-level power grid.

[0018] Based on the above method, optionally, the objective function of the network-level optimization scheduling model is:

[0019]

[0020] In the formula, c g,t is the power generation cost of conventional thermal power unit g in period t; c h,t is the power generation cost of hydropower unit h in period t; c m,t is the cost of reducing the flexible load m in period t; c n,t is the load transfer cost of the transferable flexible load n in period t; Δ w,t The power reduction penalty cost of the renewable energy unit w in period t; is the optimal dispatching cost of the local power grid k at time t.

[0021] Based on the above method, optionally, the constraints of the network-level provincial optimization scheduling model include network-wide power generation and consumption balance constraints, provincial load balance constraints, and AC and DC transmission line power and electricity exchange constraints.

[0022] Based on the above method, optionally, solving the power system collaborative optimization dispatching model based on the key conditions to obtain a dispatching operation result includes:

[0023] Based on the source-load probability and interval prediction results of cities, conventional prediction scenarios and extreme scenarios, as well as the probability of occurrence of different scenarios, are obtained. Based on the external input system operation boundary information and operation constraints, different scenarios and multiple optimization objectives are taken into account through uncertainty optimization methods. Under the premise of ensuring the safe operation of the distribution network, the distributed power generation plan is optimized to report the net load information of each node;

[0024] Based on the provincial source-load probability and interval prediction results, conventional prediction scenarios and extreme scenarios, as well as the probability of occurrence of different scenarios, are obtained. According to the external input system operation boundary information and operation constraints, the equivalent model of the local power system is taken into account. Based on robust optimization and taking into account different scenarios and multiple optimization objectives, the next day's multi-level dispatching plan and resource combination are output, including AC and DC interconnection line power exchange plan, pumped storage and energy storage control plan, power generation intervals in each province and region, cascade hydropower unit combination plan, water-wind-solar coordinated operation plan and orderly power consumption plan.

[0025] Based on the above method, optionally, the Ward equivalent method is used to perform equivalent calculation on the local power grid.

[0026] In a second aspect, the embodiment of the present application further provides a three-level power system coordinated optimization dispatching system of a network, province and region, which includes:

[0027] A construction module is used to construct a collaborative business system for dispatching agencies at the three levels of the network, province and locality, and to establish a collaborative optimization dispatching model for the power system at the three levels of the network, province and locality; the collaborative optimization dispatching model for the power system is used to support the operation of the collaborative business system for dispatching agencies at the three levels of the network, province and locality;

[0028] An acquisition module is used to acquire system related information, wherein the system related information includes basic physical information and model parameters of the three-level power system of the grid, province and local area, and operation constraint information of system equipment;

[0029] A calculation module, used to calculate and generate a source load prediction interval based on the system related information, and form a node net load based on the source load prediction interval, and generate conventional prediction scenarios and extreme scenarios as key conditions for collaborative optimization scheduling;

[0030] A dispatching module, used to solve the power system collaborative optimization dispatching model based on the key conditions to obtain a dispatching operation result;

[0031] The construction of the dispatching organization collaboration business system at the provincial and local levels includes:

[0032] The prefectural dispatching organization aggregates resources upwards, and optimizes the feasible domain of prefectural dispatching according to the local distributed renewable energy output level and output uncertainty, the control characteristics and adjustable capacity of prefectural controllable load resources, and the characteristics of prefectural power grid network; the provincial-level dispatching organization adopts an integrated optimization model based on the feasible domain of prefectural dispatching and the power exchange demand between grids and provinces, and optimizes the global resources uniformly according to the load forecast result adjustment to obtain the provincial-level dispatching plan; based on the characteristics of grid networks at all levels, the system operation and maintenance arrangements, and the cost of power generation resources, the provincial-level dispatching plan is decomposed downwards to form a coordinated optimization dispatching plan for the three-level power system of grid, province, and prefecture;

[0033] The establishment of a three-level power system coordinated optimization dispatch model includes:

[0034] A prefectural-level optimization dispatching model is established with the lowest dispatching cost of the prefectural-level power grid as the optimization target; on the basis of giving priority to the acceptance of new energy power, a provincial-level optimization dispatching model is established with the lowest power generation cost of the entire network as the optimization target; the prefectural-level optimization dispatching model is connected with the provincial-level optimization dispatching model to obtain a three-level power system collaborative optimization dispatching model of the network, province, and prefecture; wherein the connection processing includes: approximating the prefectural-level power grid as an equivalent node and connecting it to the upper provincial-level power grid.

[0035] In a third aspect, an embodiment of the present application further provides an electronic device comprising a memory and a processor, wherein the memory stores a computer program, and when the processor calls and executes the computer program, a method for collaborative optimization and scheduling of a three-level power system of a grid, province, and local area as described in any one of the first aspects is implemented.

[0036] The present application provides a method, system and equipment for coordinated optimization and dispatching of the three-level power system of the grid, province and local area, and proposes an optimization and dispatching method that considers the coordinated effect of the three-level power system of the grid, province and local area under the background of large-scale distributed and centralized new energy power sources being connected to the power grid. This method, on the basis of fully considering the coordination of the flexibility resources of the local power grid, strengthens the integrated optimization and dispatching effect of the grid and provincial power grids, and takes into account the uncertainty of the prediction results at both the source and load ends, which can effectively improve the renewable energy absorption capacity of the large power grid and the system's risk resistance ability. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The accompanying drawings herein are incorporated into and constitute a part of the specification, illustrate embodiments consistent with the present application, and together with the specification are used to explain the principles of the present application. In addition, these drawings and text descriptions are not intended to limit the scope of the concept of the present application in any way, but to illustrate the concept of the present application for those skilled in the art by referring to specific embodiments.

[0038] Figure 1 A schematic diagram of a flow chart of a method for coordinated optimization and dispatching of a three-level power system of a grid, province, and region provided in accordance with an embodiment of the present application;

[0039] Figure 2 A schematic diagram of a collaborative business system for dispatching organizations at the network, provincial and local levels provided for one embodiment of the present application;

[0040] Figure 3 A three-level grid equivalent model diagram for a network, province, and city provided in one embodiment of the present application;

[0041] Figure 4 A workflow diagram of a coordinated optimization dispatching operation model for a three-level power system of a grid, province, and city provided for an embodiment of the present application;

[0042] Figure 5 A schematic diagram of the structure of a coordinated optimization dispatching system for a three-level power system of a network, province, and city provided for an embodiment of the present application;

[0043] Figure 6 A schematic diagram of the structure of an electronic device provided for one embodiment of the present application. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in combination with the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0045] In order to give full play to the role of coordinated optimization and dispatching of the three-level power system of grid, province and locality, so as to improve the renewable energy absorption capacity and the system's ability to resist risks, the present invention provides a coordinated optimization and dispatching scheme for the three-level power system of grid, province and locality. On the basis of fully considering the coordination of the flexibility resources of the local power grid, the integrated optimization and dispatching role of the grid and provincial power grid is strengthened, while taking into account the uncertainty of the prediction results of the source and load ends, so as to effectively improve the renewable energy absorption capacity and the system's ability to resist risks of the large power grid. The specific implementation scheme is described non-restrictively by several examples or embodiments below.

[0046] Some embodiments of the present application provide a method for coordinated optimization and dispatching of a three-level power system of a network, province, and region, referring to Figure 1 , Figure 1 A flowchart of a method for coordinated optimization and dispatching of a three-level power system of a grid, province, and region provided for one embodiment of the present application. In a specific implementation, the solution of this embodiment may be a processing system configured in an electronic device such as a computer or server. That is, the solution of this embodiment may be implemented by a software system in an electronic device.

[0047] like Figure 1 As shown, the coordinated optimization dispatching method of the three-level power system of the grid, province and local area in this embodiment includes the following steps:

[0048] Step S101: construct a dispatching agency collaboration business system at the three levels of the grid, province and locality, and establish a coordinated optimization dispatching model for the power system at the three levels of the grid, province and locality. The coordinated optimization dispatching model for the power system is used to support the operation of the dispatching agency collaboration business system at the three levels of the grid, province and locality.

[0049] Among them, when constructing the collaborative business system of dispatching agencies at the three levels of network, province and city, the city-level dispatching agency aggregates resources upward, and optimizes the feasible domain of city-level dispatching according to the local distributed renewable energy output level and output uncertainty, the regulation characteristics and adjustable capacity of controllable load resources at the city level, and the network characteristics of the city-level power grid; the provincial-level dispatching agency adopts an integrated optimization model based on the feasible domain of city-level dispatching and the demand for power exchange between networks and provinces, and uniformly optimizes global resources according to the adjustment of load forecast results to obtain the provincial-level dispatching plan; then, based on the network characteristics of power grids at all levels, the system operation and maintenance arrangements, and the cost of power generation resources, the provincial-level dispatching plan is decomposed downward to form a coordinated optimization dispatching plan for the three-level power system of network, province and city.

[0050] Specifically, refer to Figure 2 , Figure 2 This is a schematic diagram of the collaborative business system of the three-level dispatching organizations at the network, provincial and local levels constructed in the example of the present invention. Figure 2 Among them, ① indicates that the grid dispatcher sends down the preliminary plan of inter-provincial interconnection lines for power transmission and reception and direct dispatch power plants; ② indicates that the provincial dispatcher reports to the power receiving and direct dispatch power plants for adjustment of power generation plans; ③ indicates that the power generation plans of inter-provincial power transmission and reception and direct dispatch power plants are adjusted and released; ④ indicates that the local dispatcher sends up the feasible domain of the local dispatch plan; ⑤ indicates that the local distributed power generation plan and the net load information of each node are adjusted and released. Figure 2 It can be seen that, vertically, the traditional dispatching planning business model in which dispatching instructions are issued layer by layer at the network and province level is used to achieve two-way "connection" between the dispatching agencies at all levels that were originally connected in one direction by constructing a hierarchical coordinated dispatching model that integrates the network, province and local areas; horizontally, the decentralized and independent dispatching centers will be able to make up for the lack of local information through information interaction that is integrated with cloud and edge, so that the dispatching agencies that originally made isolated decisions can "interact" with each other; by realizing effective interaction between dispatching agencies in different regions at all levels, the optimal allocation of global (whole network) resources of the system is guaranteed.

[0051] The coordinated business system of dispatching organizations at the network, provincial and local levels specifically includes:

[0052] (1) Optimization of provincial and local coordinated dispatch

[0053] Since the provincial dispatching agency generally cannot obtain the detailed grid model corresponding to the local dispatching agency, it is impossible to directly realize the unified optimization calculation and solution of the provincial and local global grid; and the local dispatching agency is generally a power resource with strong discreteness and weak controllability, such as distributed power sources and distributed loads, and there are few large-capacity directly controlled generators, which are not suitable for directly participating in the active power optimization dispatching of the provincial dispatching agency. Therefore, the local dispatching agency comprehensively considers the output level and output uncertainty of the local distributed power sources, the control characteristics and adjustable capacity of the local controllable load resources, and the network characteristics of the local power grid, and aggregates the distributed power resources to optimize the local dispatching feasible domain, so as to realize the participation of the local power grid in the optimization of power dispatching on the provincial side of the network in the form of virtual equivalent access.

[0054] (2) Optimization of network-province coordinated dispatching

[0055] Since the grid-level dispatching obtains all grid models above 220kV at the provincial level through the splicing of large models, the grid dispatching can optimize the calculation of the overall grid of the province by combining the power transmission and reception and the power generation plan adjustment suggestions of the directly dispatched power plants sent by the provincial dispatching. The coordinated optimization dispatching of the provincial grid realizes the "two-way interaction" of the provincial grid dispatching center, takes the power of the inter-provincial tie-line as a decision variable, and jointly optimizes it with the directly controlled generators and flexible loads at the grid level and provincial level, so that the tie-line can coordinate and interact with the resources within the province, and realize the unified optimization of the overall grid resources of the province.

[0056] In order to support the operation of the collaborative business system of dispatching agencies at the network, province and local levels, it is necessary to further establish a collaborative optimization dispatching model for the power system at the network, province and local levels. The process of establishing this model includes: taking the lowest dispatching cost of the local power grid as the optimization goal, establishing a local optimization dispatching model; on the basis of giving priority to accepting new energy power, taking the lowest power generation cost of the entire network as the optimization goal, establishing a network provincial optimization dispatching model; connecting the local optimization dispatching model with the network provincial optimization dispatching model to obtain a collaborative optimization dispatching model for the power system at the network, province and local levels; wherein, the connection processing includes: approximating the local power grid as an equivalent node and connecting it to the upper provincial power grid.

[0057] More specifically, the local level optimization scheduling model is as follows:

[0058] 1) Objective function of the local optimization scheduling model

[0059] Under the premise of satisfying the priority of local consumption of distributed energy, the local dispatching agency takes the lowest dispatching cost of the local power grid and the coordinated economy of the distribution network power as the optimization goal, and optimizes the power of distributed power sources, controllable micro-sources, energy storage devices, and interconnection lines with the upper power grid and adjustable loads to meet the dispatching needs. Its objective function is:

[0060]

[0061] In the formula, F lower,i is the total day-ahead dispatch cost of distribution network i; is the total day-ahead dispatch cost of controllable micro-source k; is the output power of the controllable micro-source k at time t; is the total day-ahead dispatch cost of the uncontrollable micro-source j; is the output power of the uncontrollable micro-source j at time t; is the total day-ahead dispatch cost of the energy storage device; is the charging and discharging power of the energy storage device at time t; The interaction cost of the inter-provincial contact lines; is the power of the inter-regional interconnection line at time t; The day-ahead dispatch cost for load regulation; is the load regulation capacity that can be adjusted at time t

[0062] 2) Constraints of the local optimization scheduling model

[0063] In this embodiment, the dispatching constraints of the prefectural-level low-voltage distribution network are mainly divided into power balance constraints and parameter constraints of each power equipment in the prefectural-level power grid, which are as follows:

[0064]

[0065] In the formula, is the power supply load value of the local power grid i at time t; are the upper and lower limits of the output of the corresponding power source k (min in the superscript indicates the lower limit, and max indicates the upper limit, the same below); is the charge of the energy storage device at time t; E min 、E max They are the upper and lower limits of the state of charge of the energy storage device respectively; They are the upper and lower limits of the charging and discharging power of the energy storage device (charge in the superscript means charging, and discharge means discharging); They are the upper and lower limits of transmission power of provincial and local interconnection lines, respectively; They are the upper and lower limits of the control capacity of the controllable load respectively.

[0066] In addition, the network-level optimization scheduling model is as follows:

[0067] 1) Objective function of the network-level optimization scheduling model

[0068] The objective function of the provincial optimization dispatching model is to minimize the power generation cost of the entire network on the basis of giving priority to the acceptance of new energy power. Its objective function is:

[0069]

[0070] In the formula, c g,t is the power generation cost of conventional thermal power unit g in period t; c h,t is the power generation cost of hydropower unit h in period t; c m,t is the cost of reducing the flexible load m in period t; c n,t is the load transfer cost of the transferable flexible load n in period t; Δ w,t The power reduction penalty cost of the renewable energy unit w in period t; is the optimal dispatching cost of the local power grid k at time t.

[0071] 2) Constraints of the provincial optimization scheduling model

[0072] The constraints of the provincial optimization dispatch model for the power grid include the power generation and consumption balance constraint of the whole grid, the load balance constraint of each province, and the power and electricity exchange constraint of AC and DC transmission lines. The details are as follows:

[0073] 1. Constraints on power generation and consumption balance across the entire network:

[0074]

[0075] Where: p i,t is the power value of generator equipment i in period t, where generator equipment i includes conventional thermal power units g, hydropower units h, and wind and solar power units w; L z,t is the system load forecast value of control area z in period t minus the flexible load; l m,t is the load value of the flexible load m that can be reduced in period t; l n,t is the load value of the transferable flexible load n in period t; Δp k,t is the power loss of AC / DC interconnection line k during period t.

[0076] 2. Provincial load balancing constraints:

[0077]

[0078] Where: and are the power values ​​of the equivalent units and equivalent loads of the AC / DC interconnection line k in time period t; i∈z means that the generator equipment i is in the control area z.

[0079] 3. Power and electricity exchange constraints of AC and DC transmission lines:

[0080] In practice, the power of DC interconnection lines is controllable and is a decision variable. However, for AC interconnection lines, the power at the sending end is related to the grid topology and node injection power, namely:

[0081]

[0082] Where: is the sending end power of AC tie line a in period t; S i,a,t and S l,a,t are the sensitivities of unit i and load node l to the AC tie line a in period t, calculated according to the network topology model of the entire network; l l,t is the load value of load node l at time t.

[0083] For the equivalent equipment on both sides of the AC / DC tie line, there are:

[0084]

[0085]

[0086] Where: α k,t is the loss coefficient of the AC / DC interconnection line k.

[0087] The upper and lower limits of AC and DC interconnection line power are:

[0088]

[0089] Where: P k,min With P k,max are the lower and upper limits of the transmission power of the AC and DC interconnection line k respectively.

[0090] The power adjustment limit constraint of AC / DC interconnection line is:

[0091]

[0092] Where: P k,up With P k,down They are the power rise and fall rate limits of the AC and DC interconnection line k respectively.

[0093] The power transmission constraint of AC / DC interconnection line is:

[0094]

[0095] Where: λ is the duration of a single period in minutes; Q k,min With Q k,max They are respectively the minimum and maximum power transmission of AC / DC interconnection line k during the scheduling period.

[0096]

[0097] Where: Q s-r,min With Q s-r,max are the minimum and maximum values ​​of the amount of electricity exchanged between the sending province s and the receiving province r, respectively; k∈(s,r) means that the tie line k is between provinces s and r.

[0098] In addition, the connection process principle and process of the prefecture-level optimization dispatching model and the network-level optimization dispatching model are as follows:

[0099] In the normal operation of the power grid, electric power flows equivalently from the upper provincial transmission network to the lower prefectural low-voltage distribution network through a 220k V main transformer. There is a coupling relationship between the transmission and distribution networks in terms of power flow: for the upper provincial transmission network, the prefectural distribution network with adjustable output can be regarded as a virtual load with a certain adjustment capability; and for the lower prefectural distribution network, the upper provincial transmission network can be equivalent to an injected power.

[0100] In addition to the direct coupling between power and power flow, by observing the prefectural-level optimization dispatch model and the integrated optimization dispatch model of the grid, province and city, it can be found that the objective function of the prefectural-level optimization dispatch model is part of the optimization objective of the integrated optimization dispatch model of the grid, province and city. The exploration of the day-ahead coordinated optimization dispatch problem of the three-level power system of the grid, province and city is to better play the characteristics of distributed energy at the prefectural-level grid level in centralized dispatching, reduce the power loss of the grid, and improve the operating status. However, at present, the grid, province and city dispatching agencies cannot directly control the controllable power sources in the prefectural-level grid, and must rely on the hierarchical structure of the provincial and city grids for adjustment by the local dispatch.

[0101] In order to establish a system collaborative optimization operation model to support the collaborative business system of the three-level dispatching organizations of the provincial and municipal levels, and at the same time avoid the dimensional explosion problem of the operation optimization process caused by too much power grid line information, in a certain section of the power grid, the municipal power grid is approximated and connected to the upper provincial power grid with equivalent nodes, thereby realizing the decoupling of the provincial and municipal power grids in terms of flow and power.

[0102] The prefecture-level power grid usually has a closed-loop structure and an open-loop operation state. More prefecture-level power grids are clustered and meshed, and radial structures are typical of this type of structure. By using "virtual nodes" to equalize the prefecture-level power grids and try to minimize the impact of power flow changes and power transfer within the prefecture-level power grid on the power flow of the connected upper provincial power grid, decoupling in power flow can be achieved.

[0103] In this embodiment, the Ward equivalent method is used to perform equivalent calculation, and the steps are as follows:

[0104]

[0105] Where: B represents the node set at the boundary of the prefecture-level power grid, E represents the node set in the prefecture-level power grid that needs to be virtually equalized, and P E , P B Corresponding to the injection power of each node, θ E ,θ B They correspond to the phase angle of each node respectively, and Y is the corresponding node admittance matrix.

[0106] Eliminate the equivalent nodes of the local grid internal demand, and the power injected into the boundary nodes becomes:

[0107]

[0108] The power transfer factor is defined to measure the degree of correlation between the equivalent node and the boundary node in terms of power, and is stored in the form of a matrix, as shown in the following formula:

[0109] R trans =-Y BE Y EE (15)

[0110]

[0111] The relationship between the injection power of the virtual boundary point k and the original injection power of each equivalent node inside it after the equalization is expressed by formula (17), P k is the equivalent power injected into point k, P node,j represents the power of node j in the equivalent area.

[0112] In the coordinated optimization dispatching of the three-level power system of the grid, province and local area, the change of power under the local dispatching should have a smaller impact on the upper power grid flow. Based on this, for a certain equivalent area, if it contains n power nodes, then according to formula (17), for the equivalent boundary node k, its transfer power is:

[0113]

[0114] When the power transfer factors of each power node in the equivalent area take similar values, the average value is used. When it is replaced, the injected power of the boundary node k can be further approximated as:

[0115]

[0116] When the power transfer factor is transferred, it can be seen that the power distribution of the power sources in the equivalent area has little effect on the injected power of the boundary node, because at this time the area can be equivalent to a virtual node connected to the upper power grid.

[0117] In the coordinated optimization dispatch model of the three-level power system of grid, province and local area, the equivalent values ​​of grid, province and local area power grid are as follows: Figure 3 shown.

[0118] Step S102: Obtaining system related information, the system related information including basic physical information and model parameters of the three-level power system of the grid, province and local area and system equipment operation constraint information.

[0119] Specifically, the data required by the prefectural dispatching agency include: unit type and parameters, unit operating costs, unit start-up and shutdown costs, short-term probability and interval forecast results of new energy, load probability and interval forecast results, flexible load adjustable capacity and regulation cost. The data required by the provincial dispatching agency include: unit type and parameters, unit operating costs, unit start-up and shutdown costs, transmission line related information and safety constraints, medium- and long-term power balance warning information, short-term probability and interval forecast results of new energy in various provinces and regions, load probability and interval forecast results, flexible load adjustable capacity and regulation cost.

[0120] Step S103: Calculate and generate a source-load prediction interval based on system-related information, and form a node net load based on the source-load prediction interval, and generate conventional prediction scenarios and extreme scenarios as key conditions for collaborative optimization scheduling.

[0121] Specifically, source and load refer to renewable energy (new energy) power generation and load respectively. In order to cope with the uncertainty of renewable energy output and load forecast results, this embodiment can first form a node net load interval forecast result based on the output interval forecast of photovoltaic, wind power and other power generation and load interval forecast results, and generate conventional forecast scenarios and extreme scenarios; subsequently, the uncertainty optimization modeling method can be used to expand the three-level power system collaborative optimization dispatch model established in the above steps into a two-level planning problem that takes into account the uncertainty of both ends of source and load, so as to solve it by methods such as particle swarm method, dynamic programming algorithm, genetic algorithm, etc., and obtain the day-ahead collaborative optimization dispatch result of the three-level power system of the network, province and land.

[0122] Step S104: Solve the power system collaborative optimization dispatch model based on key conditions to obtain the dispatch operation results.

[0123] Specifically, by solving the above steps and the constructed model through the acquired data, the dispatching operation results can be obtained to guide the efficient operation of the three-level power system of the grid, province and local area. Figure 4 shown.

[0124] In some embodiments, the step specifically includes:

[0125] Based on the source-load probability and interval prediction results of cities, conventional prediction scenarios and extreme scenarios, as well as the probability of occurrence of different scenarios, are obtained. Based on the external input system operation boundary information and operation constraints, different scenarios and multiple optimization objectives are taken into account through uncertainty optimization methods. Under the premise of ensuring the safe operation of the distribution network, the distributed power generation plan is optimized to report the net load information of each node;

[0126] Based on the provincial source-load probability and interval prediction results, conventional prediction scenarios and extreme scenarios, as well as the probability of occurrence of different scenarios, are obtained. According to the external input system operation boundary information and operation constraints, the equivalent model of the local power system is taken into account. Based on robust optimization and taking into account different scenarios and multiple optimization objectives, the next day's multi-level dispatching plan and resource combination are output, including AC and DC interconnection line power exchange plan, pumped storage and energy storage control plan, power generation intervals in each province and region, cascade hydropower unit combination plan, water-wind-solar coordinated operation plan and orderly power consumption plan.

[0127] Therefore, based on the above scheme, an optimization scheduling method considering the synergy of the three-level power systems of the network, province and local area is proposed under the background of large-scale distributed and centralized new energy power sources connected to the power grid. This method strengthens the integrated optimization scheduling role of the network and provincial power grids on the basis of fully considering the synergy of the flexibility resources of the local power grid, while taking into account the uncertainty of the prediction results at both the source and load ends, which can effectively improve the renewable energy absorption capacity of the large power grid and the system's risk resistance ability.

[0128] In addition, an embodiment of the present application provides a three-level power system collaborative optimization and dispatching system of the grid, province and local areas.

[0129] like Figure 5 As shown, the device comprises:

[0130] Construction module 51 is used to construct a dispatching agency collaboration business system at the three levels of the grid, province and locality, and to establish a coordinated optimization dispatching model for the power system at the three levels of the grid, province and locality; the coordinated optimization dispatching model for the power system is used to support the operation of the dispatching agency collaboration business system at the three levels of the grid, province and locality;

[0131] An acquisition module 52 is used to acquire system related information, which includes basic physical information and model parameters of the three-level power system of the grid, province and local area, and system equipment operation constraint information;

[0132] The calculation module 53 is used to calculate and generate the source load prediction interval based on the system related information, and form the node net load based on the source load prediction interval, and generate conventional prediction scenarios and extreme scenarios as key conditions for collaborative optimization scheduling;

[0133] The dispatch module 54 is used to solve the power system collaborative optimization dispatch model based on key conditions to obtain the dispatch operation results;

[0134] Among them, the construction of a coordinated business system for dispatching organizations at the network, provincial and local levels includes:

[0135] The prefectural dispatching organization aggregates resources upwards, and optimizes the feasible domain of prefectural dispatching according to the local distributed renewable energy output level and output uncertainty, the control characteristics and adjustable capacity of prefectural controllable load resources, and the characteristics of prefectural power grid network; the provincial-level dispatching organization adopts an integrated optimization model based on the feasible domain of prefectural dispatching and the power exchange demand between grids and provinces, and optimizes the global resources uniformly according to the load forecast result adjustment to obtain the provincial-level dispatching plan; based on the characteristics of grid networks at all levels, the system operation and maintenance arrangements, and the cost of power generation resources, the provincial-level dispatching plan is decomposed downwards to form a coordinated optimization dispatching plan for the three-level power system of grid, province, and prefecture;

[0136] Establish a three-level power system coordinated optimization dispatch model, including:

[0137] A prefectural-level optimization dispatching model is established with the lowest dispatching cost of prefectural-level power grid as the optimization target; on the basis of giving priority to accepting new energy power, a provincial-level optimization dispatching model is established with the lowest power generation cost of the entire network as the optimization target; the prefectural-level optimization dispatching model is connected with the provincial-level optimization dispatching model to obtain a coordinated optimization dispatching model of the power system at the three levels of network, province and prefecture; wherein, the connection processing includes: approximating the prefectural-level power grid as an equivalent node and connecting it to the upper provincial power grid.

[0138] Among them, regarding the specific implementation methods of each module of the above-mentioned three-level power system collaborative optimization and dispatching system of the grid, province and city, reference can be made to the corresponding contents in the aforementioned method embodiments, which will not be repeated here.

[0139] In addition, an embodiment of the present application provides an electronic device, such as Figure 6 As shown, the electronic device includes a memory 61 and a processor 62; wherein the memory 61 stores a computer program, and when the processor 62 calls and executes the computer program, the coordinated optimization and dispatching method of the three-level power system of the grid, province and local area in any of the above embodiments is implemented.

[0140] The electronic device may be a desktop computer, a notebook computer or a server.

[0141] It can be understood that the same or similar parts of the above embodiments can be referenced to each other, and the contents not described in detail in some embodiments can refer to the same or similar contents in other embodiments.

[0142] It should be noted that, in the description of the present invention, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present invention, unless otherwise specified, the meaning of "plurality" refers to at least two.

[0143] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present invention belong.

[0144] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0145] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium. When the program is executed, it includes one or a combination of the steps of the method embodiment.

[0146] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium. The above-mentioned storage medium may be a read-only memory, a disk or an optical disk, etc.

[0147] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0148] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for coordinated optimization and dispatching of a three-level power system of a grid, province and region, characterized in that: include: Build a collaborative business system for dispatching organizations at the grid, provincial and local levels, and establish a collaborative optimization dispatching model for power systems at the grid, provincial and local levels; The power system collaborative optimization dispatching model is used to support the operation of the collaborative business system of the three-level dispatching agencies of the network, province and locality; Acquire system related information, including basic physical information and model parameters of the three-level power system of the grid, province and local area, and system equipment operation constraint information; Calculate and generate a source load prediction interval based on the system related information, and form a node net load based on the source load prediction interval, and generate conventional prediction scenarios and extreme scenarios as key conditions for collaborative optimization scheduling; Solving the power system collaborative optimization dispatching model based on the key conditions to obtain a dispatching operation result; The construction of the dispatching organization collaboration business system at the provincial and local levels includes: The prefectural dispatching organization aggregates resources upwards, and optimizes the feasible domain of prefectural dispatching according to the local distributed renewable energy output level and output uncertainty, the control characteristics and adjustable capacity of prefectural controllable load resources, and the characteristics of prefectural power grid network; the provincial-level dispatching organization adopts an integrated optimization model based on the feasible domain of prefectural dispatching and the power exchange demand between grids and provinces, and optimizes the global resources uniformly according to the load forecast result adjustment to obtain the provincial-level dispatching plan; based on the characteristics of grid networks at all levels, the system operation and maintenance arrangements, and the cost of power generation resources, the provincial-level dispatching plan is decomposed downwards to form a coordinated optimization dispatching plan for the three-level power system of grid, province, and prefecture; The establishment of a three-level power system coordinated optimization dispatch model includes: A prefectural-level optimization dispatching model is established with the lowest dispatching cost of the prefectural-level power grid as the optimization target; on the basis of giving priority to the acceptance of new energy power, a provincial-level optimization dispatching model is established with the lowest power generation cost of the entire network as the optimization target; the prefectural-level optimization dispatching model is connected with the provincial-level optimization dispatching model to obtain a three-level power system collaborative optimization dispatching model of the network, province, and prefecture; wherein the connection processing includes: approximating the prefectural-level power grid as an equivalent node and connecting it to the upper provincial-level power grid.

2. The method according to claim 1, characterized in that: The objective function of the local level optimization scheduling model is: In the formula, F lower,i is the total dispatch cost of distribution network i on the day before; is the total day-ahead dispatch cost of controllable micro-source k; is the output power of the controllable micro-source k at time t; is the total day-ahead dispatch cost of the uncontrollable micro-source j; is the output power of the uncontrollable micro-source j at time t; is the total day-ahead dispatch cost of the energy storage device; is the charging and discharging power of the energy storage device at time t; The interaction cost of the inter-provincial contact lines; is the power of the inter-regional interconnection line at time t; The day-ahead dispatch cost for load regulation; is the load regulation capacity that can be adjusted at time t.

3. The method according to claim 2, characterized in that The constraints of the local-level optimization scheduling model include power balance constraints and parameter constraints of each power device in the local-level power grid.

4. The method according to claim 1, characterized in that: The objective function of the network-level optimization scheduling model is: In the formula, c g,t is the power generation cost of conventional thermal power unit g in period t; c h,t is the power generation cost of hydropower unit h in period t; c m,t is the cost of reducing the flexible load m in period t; c n,t is the load transfer cost of the transferable flexible load n in period t; Δ w,t The power reduction penalty cost of the renewable energy unit w in period t; is the optimal dispatching cost of the local power grid k at time t.

5. The method according to claim 4, characterized in that The constraints of the provincial optimization dispatching model include the power generation and consumption balance constraint of the whole network, the load balance constraint of each province, and the power and electricity exchange constraint of AC and DC transmission lines.

6. The method according to claim 1, characterized in that Solving the power system collaborative optimization dispatching model based on the key conditions to obtain a dispatching operation result includes: Based on the source-load probability and interval prediction results of cities, conventional prediction scenarios and extreme scenarios, as well as the probability of occurrence of different scenarios, are obtained. Based on the external input system operation boundary information and operation constraints, different scenarios and multiple optimization objectives are taken into account through uncertainty optimization methods. Under the premise of ensuring the safe operation of the distribution network, the distributed power generation plan is optimized to report the net load information of each node; Based on the provincial source-load probability and interval prediction results, conventional prediction scenarios and extreme scenarios, as well as the probability of occurrence of different scenarios, are obtained. According to the external input system operation boundary information and operation constraints, the equivalent model of the local power system is taken into account. Based on robust optimization and taking into account different scenarios and multiple optimization objectives, the next day's multi-level dispatching plan and resource combination are output, including AC and DC interconnection line power exchange plan, pumped storage and energy storage control plan, power generation intervals in each province and region, cascade hydropower unit combination plan, water-wind-solar coordinated operation plan and orderly power consumption plan.

7. The method according to claim 1, characterized in that The Ward equivalent method is used to perform equivalent calculations on local power grids.

8. A three-level power system coordinated optimization dispatching system for grid, province and region, characterized in that: include: Construction module, used to build a collaborative business system for dispatching organizations at the grid, provincial and local levels, and to establish a collaborative optimization dispatching model for power systems at the grid, provincial and local levels; The power system collaborative optimization dispatching model is used to support the operation of the collaborative business system of the three-level dispatching agencies of the network, province and locality; An acquisition module is used to acquire system related information, wherein the system related information includes basic physical information and model parameters of the three-level power system of the grid, province and local area, and operation constraint information of system equipment; A calculation module, used to calculate and generate a source load prediction interval based on the system related information, and form a node net load based on the source load prediction interval, and generate conventional prediction scenarios and extreme scenarios as key conditions for collaborative optimization scheduling; A dispatching module, used to solve the power system collaborative optimization dispatching model based on the key conditions to obtain a dispatching operation result; The construction of the dispatching organization collaboration business system at the provincial and local levels includes: The prefectural dispatching organization aggregates resources upwards, and optimizes the feasible domain of prefectural dispatching according to the local distributed renewable energy output level and output uncertainty, the control characteristics and adjustable capacity of prefectural controllable load resources, and the characteristics of prefectural power grid network; the provincial-level dispatching organization adopts an integrated optimization model based on the feasible domain of prefectural dispatching and the power exchange demand between grids and provinces, and optimizes the global resources uniformly according to the load forecast result adjustment to obtain the provincial-level dispatching plan; based on the characteristics of grid networks at all levels, the system operation and maintenance arrangements, and the cost of power generation resources, the provincial-level dispatching plan is decomposed downwards to form a coordinated optimization dispatching plan for the three-level power system of grid, province, and prefecture; The establishment of a three-level power system coordinated optimization dispatch model includes: A prefectural-level optimization dispatching model is established with the lowest dispatching cost of the prefectural-level power grid as the optimization target; on the basis of giving priority to the acceptance of new energy power, a provincial-level optimization dispatching model is established with the lowest power generation cost of the entire network as the optimization target; the prefectural-level optimization dispatching model is connected with the provincial-level optimization dispatching model to obtain a three-level power system collaborative optimization dispatching model of the network, province, and prefecture; wherein the connection processing includes: approximating the prefectural-level power grid as an equivalent node and connecting it to the upper provincial-level power grid.

9. An electronic device, characterized in that: It includes a memory and a processor, the memory stores a computer program, and when the processor calls and executes the computer program, it implements the network-province-local three-level power system collaborative optimization and dispatching method as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Power grid planning method applied to large-scale wind power base

    CN112968441A

  • Provincial and regional collaborative optimization regulation and control method considering optimal carbon emission and operating cost

    CN116599156A

  • Network, provincial and regional multi-level scheduling collaborative recovery method and device

    CN117134324A