Protection device for excavation of foundation pit crossing current pipe gallery and construction method

By adopting a protective device that crosses the foundation pit of the current pipe corridor in the underground pipeline construction, and using the design of suspension structure and disassembly connection, the problems of long construction cycle, large safety hazards and high cost are solved, and the construction cycle is short and safe. Highly efficient and cost-effective protection.

CN119041489APending Publication Date: 2024-11-29CCCC FOURTH HIGHWAY ENG CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411138209.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In the prior art, the shallow buried underground pipe corridor has a long construction cycle, high safety hazards, low reuse rate, high construction cost, and large tunnels on both sides of the pipe corridor that need to be excavated openly have large widths, which increases the earthwork volume.

Method used

Provide a protective device for excavation of foundation pits across the current pipe corridor, including two support members, beret frames, beams and support members, connected by traction members to form a suspended structure, the support members can be detachably connected to reduce concrete pouring. The structural layout is more scientific and reasonable, and is suitable for the protection of the current pipeline corridor.

Benefits of technology

The protection effect of short construction cycle, high safety and good reuse is achieved. The suspension structure effectively prevents the settlement of the pipeline corridor, reduces construction costs, and reduces the volume of earthwork.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041489A_ABST
    Figure CN119041489A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of transverse pipe gallery foundation pit treatment, in particular to a protection device for transverse pipe gallery foundation pit excavation and a construction method. The structure layout is more scientific and reasonable, sedimentation of the current pipe gallery is effectively prevented, repeated utilization is achieved, and the construction period is short; comprising two supporting pieces, a bailey frame stretching across the two supporting pieces, a plurality of cross beams evenly distributed on the bailey frame and a plurality of bearing pieces located below the current pipe gallery, the bailey frame and the current pipe gallery are arranged in parallel, the cross beams and the corresponding bearing pieces are arranged in parallel and are perpendicular to the trend of the current pipe gallery, and traction pieces are symmetrically arranged on the two sides of each cross beam. The cross beam and the bearing piece are integrally connected through the traction piece; the supporting piece comprises two sets of base protection plates and at least two sets of inclined strut assemblies, each inclined strut assembly comprises a top beam and two supporting legs, the two supporting legs are located on the two sides of the top beam respectively, one end of each supporting leg is connected with the top beam, the other end of each supporting leg is connected with the corresponding base protection plate, and the base protection plates are installed at the positions, excavated on the two sides of an existing pipe gallery, of underground tunnel slopes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit treatment across a pipe gallery, and in particular to a protective device and a construction method for excavating a foundation pit across an existing pipe gallery. Background Art

[0002] With the rapid development of the country, the above-ground building space tends to be limited. It is necessary to release part of the above-ground space and transfer it underground to make room for the ground. Therefore, it is necessary to build underground pipelines. The construction of pipelines is divided into open excavation and trenchless methods. The trenchless method is suitable for crossing structures such as rivers, railways, and roads, and usually adopts construction techniques such as jacking and shallow buried excavation.

[0003] Another example is a Chinese invention patent that discloses an existing power corridor protection structure and construction method thereof that crosses the tunnel foundation pit during the open-cut section of a tunnel (Announcement No.: CN109137998B), which includes a foundation pit retaining structure, a top support plate, a crash wall and a cover plate. The top support plate is fixedly connected to the foundation pit retaining structure and supports the power corridor. The crash wall is arranged on the top support plate and is located on both sides of the power corridor and is higher than the power corridor. The cover plate is overlapped on the crash wall. The construction method comprises the following steps: (1) trench excavation; (2) construction of the foundation pit retaining structure; (3) construction of the top support plate; (4) formation of the power corridor protection structure; (5) when it is necessary to excavate the earth at the fracture during the above construction, the excavation should be carried out in layers. It ensures the safe operation of power cables during tunnel construction, saves manpower and material resources, and has a high reference significance for subsequent similar construction.

[0004] However, when the inventors implemented this device, they found the following defects: underground pipelines are constructed by shallow buried and dark excavation method, and there are usually structures above the foundation pit. The shallow buried and dark excavation method has a long construction period, great safety hazards, and extremely high requirements for construction technology and geology; the use of the above-mentioned pipeline protection structure has a long construction period and a low reuse rate; the tunnels on both sides of the pipeline corridor that need to be excavated are wide, which increases the earthwork volume and high construction costs. Summary of the invention

[0005] 1. Technical issues to be resolved In view of the deficiencies in the prior art, the present invention provides a protective device and construction method for excavating foundation pits across existing pipe corridors, which has a more scientific and reasonable structural layout, effectively prevents settlement of existing pipe corridors, is reusable, and has a short construction period.

[0006] (II) Technical solution To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a protective device for excavating a foundation pit across an existing pipeline corridor, comprising two support members, a Bailey frame spanning the two support members, a plurality of beams evenly distributed on the Bailey frame, and a plurality of supporting members located below the existing pipeline corridor, wherein the Bailey frame is arranged in parallel with the existing pipeline corridor, the beams are arranged in parallel with the corresponding supporting members and are perpendicular to the direction of the existing pipeline corridor, traction members are symmetrically arranged on both sides of the beams, and the beams and supporting members are integrally connected through the traction members; further, the spacing between adjacent beams is not greater than 1m; the supporting members can be square steel beams, channel steel beams or I-beams; the traction members can be adjusting screws, wire ropes, etc.

[0007] Preferably, the support member includes two groups of base guard plates and at least two groups of diagonal brace assemblies, the diagonal brace assemblies include a crown beam and two support legs, the two support legs are respectively located on both sides of the crown beam, one end of the support leg is connected to the crown beam, and the other end of the support leg is connected to the base guard plate, and the base guard plate is installed at the slope of the tunnel excavated on both sides of the current pipe gallery.

[0008] Preferably, one end of the support leg is hinged to the crown beam, and the other end of the support leg is hinged to the base guard plate; further, hinge shafts are rotatably installed at both ends of the support leg, and the support leg is hinged to the crown beam and the base guard plate through the hinge shafts, and the two support legs are arranged in an inverted "V" shape.

[0009] Preferably, the traction member includes a jack and a connecting member; the jack is fixedly installed on the top of the beam, one end of the connecting member is connected to the jack, and the other end of the connecting member is connected to the supporting member; further, the connecting member can be a rod or a wire rope.

[0010] Preferably, the jack is a mechanical screw jack, and the connecting piece is threaded steel; the top of the threaded steel is rotatably connected to the bottom of the lifting screw on the mechanical screw jack.

[0011] Preferably, the supporting member comprises a cylinder, a cylinder drill bit rotatably mounted on one end of the cylinder, and a driving rod rotatably mounted on the middle of the cylinder and fixedly connected to the cylinder drill bit; a horizontal supporting portion is provided on the cylinder.

[0012] Preferably, an outward expansion support member is installed in the middle of the cylinder, and the outward expansion support member includes a hollow tube body, two sliders slidably installed on the hollow tube body, a connecting rod group and two support seats, the connecting rod group includes two connecting rods, one end of the connecting rod is hinged to the slider, and the other end of the connecting rod is hinged to the support seat, and the hollow tube body is provided with mutually interlocking threaded portions at the contact point with the two sliders, the slider is threadedly connected to the hollow tube body, and the support seat is provided with a conical head on the side away from the hollow tube body, the top of the support seat is flush with the horizontal supporting portion at the top of the cylinder, and the driving rod passes through the hollow tube body; further, the cylinder body is provided with a accommodating groove allowing the outward expansion support member to be folded.

[0013] Preferably, a clamp is screwed onto the end of the connector, and the cylinder is provided with a ring hole and a groove for allowing the clamp to enter; further, the clamp comprises a nut and a ring plate integrally welded to the nut.

[0014] A construction method for excavating a foundation pit across an existing pipe gallery, using the above-mentioned protection device for excavating a foundation pit across an existing pipe gallery to protect the existing pipe gallery; comprising the following steps: S1. Use an excavator to excavate the earth above and on both sides of the existing existing pipeline corridor. After the earth is excavated, the existing pipeline corridor is exposed to the ground, and the tunnels on both sides of the existing pipeline corridor are sloped; further, the slope angles on both sides of the tunnel are adaptively adjusted according to the soil type and the excavation depth, which are not further limited here; S2. Hoist the two base guard plates to the slopes of the tunnels on both sides of the existing pipe gallery. The base guard plates are parallel to the corresponding tunnel slopes. Assemble the support legs and the crown beam. Hoist the Bailey frame to the crown beam and fix it in place. Dig a through channel from the lower part of the existing pipe gallery. The aperture of the through channel is 10cm-20cm. The distance between two adjacent through channels should be less than 1m. Pass the supporting parts through the through channel. Arrange the crossbeam on the top of the Bailey frame and fix the crossbeam on the Bailey frame. Arrange the crossbeam and the supporting parts accordingly. Install the jack. Connect the jack and the supporting parts together through the connector. S3. According to the design requirements, adjust the lifting height of the corresponding jack, and tension the existing pipe corridor in stages through the traction parts and supporting parts. After the tensioning is completed, the suspension protection work of the existing pipe corridor is completed; S4. Then, excavate the foundation pit below the middle of the existing pipe gallery. The excavation width of the foundation pit below the pipe gallery should be less than 1 / 3 of the length of the base guard plate.

[0015] (III) Beneficial effects Compared with the prior art, the present invention provides a protective device and a construction method for excavating a foundation pit across an existing pipeline corridor, which has the following beneficial effects: the protective device and the construction method for excavating a foundation pit across an existing pipeline corridor, the support members, Bailey frames, beams, traction members and supporting members are detachably connected, and the disassembly and assembly are convenient, and there is no need for excessive concrete pouring operations. The structural layout is more scientific and reasonable, can be reused, and the construction period is short; the protection of the existing pipeline corridor is achieved by suspension, and the Bailey frames between the two support members form a "bridge" structure, which effectively prevents the existing pipeline corridor from settling, improves the safety of excavation across the foundation pit under the existing pipeline corridor, and plays a better protective role for the existing pipeline corridor. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional structural schematic diagram of the present invention; Figure 2 It is a schematic diagram of the planar structure of the present invention; Figure 3 It is a schematic diagram of the three-dimensional structure of the supporting member of the present invention; Figure 4 It is a schematic diagram of the planar structure of the end portion of the supporting member of the present invention; Figure 5 The present invention Figure 2 Schematic diagram of the cross-section structure at AA in the middle; Figure 6 The present invention Figure 1 A schematic diagram of the partially enlarged structure at center A; Figure 7 It is a structural schematic diagram of the connection relationship between the Qianjinding and the connecting piece of the present invention; Markings in the attached drawings: 1. Bailey frame; 2. Crossbeam; 3. Supporting member; 4. Traction member; 5. Base guard plate; 6. Crown beam; 7. Support leg; 8. Jack; 9. Connecting member; 10. Cylinder body; 11. Cylinder drill bit; 12. Driving rod; 13. Horizontal supporting part; 14. Hollow tube body; 15. Slider; 16. Support seat; 17. Connecting rod; 18. Threaded part; 19. Conical head; 20. Clamp; 21. Ring hole; 22. Slot. DETAILED DESCRIPTION

[0017] In order to enable those skilled in the art to better understand the invention, the technical solutions in the embodiments of the invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the invention.

[0018] As described in the background technology, an existing power pipeline corridor protection structure and its construction method that crosses the tunnel foundation pit during the open-cut section construction of a tunnel: the underground pipeline corridor is constructed by shallow buried dark excavation method, and there are usually structures above the foundation pit. The shallow buried dark excavation method has a long construction period, great safety hazards, and extremely high requirements for construction technology and geology; the use of the above-mentioned pipeline corridor protection structure has a long construction period and a low reuse rate; the width of the tunnels on both sides of the pipeline corridor that needs to be open-cut is large, which increases the earthwork volume and high construction costs.

[0019] In order to solve this technical problem, the present invention provides a protective device and a construction method for excavating a foundation pit across an existing pipeline corridor, which is applied to excavation construction across a foundation pit under an existing pipeline corridor.

[0020] Specifically, please refer to Figure 1-2The protective device for excavating the foundation pit across the existing pipeline corridor specifically includes: two supporting members, a Bailey frame 1 spanning the two supporting members, a plurality of beams 2 evenly distributed on the Bailey frame 1, and a plurality of supporting members 3 located below the existing pipeline corridor. The Bailey frame 1 is arranged in parallel with the existing pipeline corridor, the beams 2 are arranged in parallel with the corresponding supporting members 3 and are perpendicular to the direction of the existing pipeline corridor, and traction members 4 are symmetrically arranged on both sides of the beams 2, and the beams 2 and the supporting members 3 are integrally connected through the traction members 4; further, the spacing between adjacent beams 2 is not more than 1m; the supporting members 3 can be square steel beams, channel steel beams or I-beams. Steel beam; the traction member 4 can adopt adjustment screws, wire ropes, etc.; the crossbeam 2 adopts double-jointed channel steel, and the welding spacing of the double-jointed channel steel is 5cm, so as to facilitate the subsequent installation of the traction member 4; the channel steel and the Bailey frame 1 are welded and fixed with 9V-type pressure plates or fixed by bolts to ensure the stability of the channel steel installation; it also includes connecting plates, and the connecting plates between the two channel steels are made of 220×200×18mm steel plates and 220×650×18mm steel plates. The first type is used on both sides of the traction member 4 and used to connect the two channel steels, and the second type is used inside the channel steel to enhance the structural strength of the crossbeam 2.

[0021] The protective device for excavating a foundation pit across an existing pipeline corridor provided by the present invention is easy to assemble and disassemble, does not require excessive concrete pouring operations, has a more scientific and reasonable structural layout, can be reused, and has a short construction period. The protection of the existing pipeline corridor is achieved by suspension, and the Bailey frame 1 between the two supporting members forms a "bridge" structure, which effectively prevents the existing pipeline corridor from sinking, improves the safety of excavation across the foundation pit below the existing pipeline corridor, and plays a better protective role for the existing pipeline corridor.

[0022] In order to enable those skilled in the art to better understand the invention, the technical solutions in the embodiments of the invention will be clearly and completely described below in conjunction with the accompanying drawings.

[0023] It should be noted that, in the absence of conflict, the embodiments of the invention and the features and technical solutions in the embodiments may be combined with each other.

[0024] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0025] Example 1 Please refer to Figure 1-2A protective device for excavating a foundation pit across an existing pipe gallery, comprising two support members, a Bailey frame 1 spanning the two support members, a plurality of crossbeams 2 evenly distributed on the Bailey frame 1, and a plurality of supporting members 3 located below the existing pipe gallery, wherein the Bailey frame 1 is arranged in parallel with the existing pipe gallery, the crossbeam 2 is arranged in parallel with the corresponding supporting member 3 and is perpendicular to the direction of the existing pipe gallery, traction members 4 are symmetrically arranged on both sides of the crossbeam 2, and the crossbeam 2 and the supporting member 3 are integrally connected through the traction member 4; the support member comprises two groups of base guard plates 5 and at least two groups of diagonal bracing assemblies, the diagonal bracing assemblies comprise a crown beam 6 and two supporting legs 7, the two supporting legs 7 are respectively located on both sides of the crown beam 6, one end of the supporting leg 7 is connected to the crown beam 6, and the other end of the supporting leg 7 is connected to the base guard plate 5, and the base guard plate 5 is installed at the slope of the tunnel excavated on both sides of the existing pipe gallery.

[0026] One end of the support leg 7 is hinged to the crown beam 6, and the other end of the support leg 7 is hinged to the base guard plate 5; further, hinge shafts are rotatably installed at both ends of the support leg 7, and the support leg 7 is hinged to the crown beam 6 and the base guard plate 5 through the hinge shafts, and the two support legs 7 are arranged in an inverted "V" shape.

[0027] The protective device for excavating a foundation pit across an existing pipe gallery provided in this embodiment installs a base guard plate 5 on the slopes of the tunnels excavated on both sides of the existing pipe gallery, and transmits the deadweight of the protective device and the weight of the suspended existing pipe gallery to the base guard plate 5 through the support legs 7. Since the base guard plate 5 is parallel to the slope, part of the pressure borne by the base guard plate 5 is transmitted to the ground below, while the other part of the pressure is transmitted outward in the horizontal direction. This can reduce the pressure transmitted to the bottom of the existing pipe gallery, avoid excessive squeezing of the soil layer under the pipe gallery, provide protection for the safe excavation of the tunnel across the existing pipe gallery, and at the base guard plate 5, it can play a good protective role on the slopes of the tunnels on both sides of the existing corridor, avoid landslides, and no additional protective treatment is required for the slopes. While the existing corridor is suspended for protection, effective protection of the slopes at the tunnels on both sides of the corridor is achieved; further reducing construction costs and shortening construction periods; and the support legs 7 are hinged with the base guard plate 5 and the crown beam 6, and the spacing and inclination angle between the two support legs 7 can be adjusted adaptively. The base guard plate 5 is consistent with the inclination of the slope, so that the suspension protection device can meet the use requirements of multiple tunnel widths and slope inclinations, thereby improving applicability.

[0028] Example 2 The protective device for excavating a foundation pit across an existing pipe gallery provided in Example 1 is specifically as follows: Figure 1 , 2 As shown in Figures 6 and 7, the traction member 4 includes a jack 8 and a connecting member 9; the jack 8 is fixedly installed on the top of the beam 2, one end of the connecting member 9 is connected to the jack 8, and the other end of the connecting member 9 is connected to the supporting member 3; further, the connecting member 9 can be a rod or a wire rope.

[0029] The jack 8 adopts a mechanical screw jack, and the connecting piece 9 adopts threaded steel; the top of the threaded steel is rotatably connected to the bottom of the lifting screw on the mechanical screw jack 8; the threaded steel has good flexibility and tensile strength, and is more convenient to install than steel wire ropes.

[0030] The protective device for excavating the foundation pit across the existing pipe gallery provided in this embodiment rotates the mechanical screw jack, and the jack 8 drives the connecting member 9 to move upward, so that the supporting member 3 is in close contact with the bottom of the existing pipe gallery, so as to achieve stable support of the existing pipe gallery by the supporting member 3; the tension of each connecting member 9 can be adaptively adjusted according to the stress condition of the existing pipe gallery, wherein the tension of the connecting member 9 located in the middle of the Bailey frame 1 is the largest, and the tension on the remaining connecting members 9 gradually decreases along the extension direction of both sides of the pipe gallery, so as to ensure that the stress of the pipe gallery is the same as the gravity distribution of the pipe gallery itself, to ensure the stress balance of the pipe gallery, and to avoid the pipe gallery from breaking due to uneven stress; in another embodiment, a tension sensor can be installed at the connection between the connecting member 9 and the jack 8 or the connecting member 9 and the supporting member 3, and the real-time tension at each connecting member 9 is monitored to ensure that the tension of the two connecting members 9 on the same beam 2 is equal, and the tension of the connecting member 9 at the middle of the Bailey frame 1 gradually decreases in the extension direction of both sides of the pipe gallery.

[0031] The protective device for excavating the foundation pit across the existing pipe gallery provided in Example 2 is further optimized, such as Figure 3-4 As shown, the supporting member 3 includes a cylinder 10, a cylinder drill bit 11 rotatably mounted on one end of the cylinder 10, and a driving rod 12 rotatably mounted in the middle of the cylinder 10 and fixedly connected to the cylinder drill bit 11; a horizontal supporting portion 13 is provided on the cylinder 10.

[0032] An outward expansion support is installed in the middle of the cylinder 10, and the outward expansion support includes a hollow tube 14, two sliders 15 slidably installed on the hollow tube 14, a connecting rod group and two support seats 16. The connecting rod group includes two connecting rods 17, one end of the connecting rod 17 is hinged to the slider 15, and the other end of the connecting rod 17 is hinged to the support seat 16. The hollow tube 14 is provided with a threaded portion 18 that is interlocked with each other at the contact point with the two sliders 15. The slider 15 is threadedly connected to the hollow tube 14. The support seat 16 is provided with a conical head 19 on the side away from the hollow tube 14. The top of the support seat 16 is flush with the horizontal supporting portion 13 at the top of the cylinder 10, and the driving rod 12 passes through the hollow tube 14; further, the cylinder 10 is provided with a receiving groove that allows the outward expansion support to be folded.

[0033] The protective device for excavating a foundation pit across an existing pipe gallery provided in this embodiment can rotate the driving rod 12 manually or with an external electric tool, so that the driving rod 12 drives the barrel drill bit 11 to rotate, and the barrel drill bit 11 can perform drilling operations under the existing pipe gallery, and the drilled loose soil enters the barrel body 10 and is discharged from the other end of the barrel body 10, so that the support member 3 can be quickly installed at the bottom of the existing pipe gallery; the barrel body 10 is pulled upward by the traction member 4, and the horizontal support portion 13 on the barrel body 10 is in close contact with the bottom of the existing pipe gallery to achieve stable support for the bottom of the existing pipe gallery; in another embodiment, the driving rod 12 and the barrel body 10 can be multi-section, and the multi-section barrel body 10 and the multi-section driving rod 12 can be detachably connected to each other at the head and tail, and the length of the barrel body 10 and the driving rod 12 is gradually increased according to the drilling depth of the barrel drill bit 11, so as to perform drilling operations on the bottom of the existing pipe gallery in a tunnel with width; After the cylinder 10 crosses the bottom of the existing pipeline corridor, the hollow tube body 14 is rotated manually or with an external electric tool. After threaded transmission, the two sliders 15 simultaneously approach the middle of the cylinder 10, and the connecting rod 17 pushes the support seat 16 to move away from the hollow tube body 14. The conical head 19 can break the soil layer more smoothly. After the support seat 16 is extended into place, the rotation of the hollow tube body 14 is stopped. At this time, the top of the support seat 16 is in close contact with the bottom of the existing pipeline corridor. Under the action of the outward expansion support, the contact area between the cylinder 10 and the bottom of the existing pipeline corridor is increased, which effectively prevents the cylinder 10 from rotating during the supporting process of the existing pipeline corridor, and improves the force balance at the bottom of the existing pipeline corridor.

[0034] Specifically, a clamping piece 20 is screwed on the end of the connecting piece 9, and a ring hole 21 and a groove 22 for allowing the clamping piece 20 to enter are provided on the cylinder 10; further, the clamping piece 20 includes a nut and a ring plate welded integrally with the nut; during the installation process of the connecting piece 9 and the cylinder 10, the clamping piece 20 is screwed on the bottom of the connecting piece 9, the clamping piece 20 is inserted into the ring hole 21, the clamping piece 20 is pushed into the groove 22, and the nut is rotated to achieve rapid installation of the connecting piece 9 and the cylinder 10. By setting the clamping piece 20 and the ring hole 21 and the groove 22, the convenience of disassembly between the connecting piece 9 and the cylinder 10 can be improved.

[0035] A construction method for excavating a foundation pit across an existing pipe gallery, using the above-mentioned protection device for excavating a foundation pit across an existing pipe gallery to protect the existing pipe gallery; comprising the following steps: S1. Design a suspension protection device according to the length, width and weight of the existing pipe corridor to be suspended and protected; determine the location of the existing pipe corridor, use an excavator to excavate the earth above and on both sides of the existing pipe corridor, and expose the existing pipe corridor to the ground after excavation, and slope the tunnels on both sides of the existing pipe corridor; further, the slope angles on both sides of the tunnels are adaptively adjusted according to the soil type and excavation depth, which are not further limited here; S2. Hoist the two base guard plates 5 to the slopes of the tunnels on both sides of the existing pipe gallery, with the base guard plates 5 being parallel to the corresponding tunnel slopes. Assemble the support legs 7 and the crown beam 6, hoist the Bailey frame 1 to the crown beam 6 and fix it in place. Dig a through channel from the lower part of the existing pipe gallery. The aperture of the through channel is 10cm-20cm, and the distance between two adjacent through channels should be less than 1m. Pass the supporting member 3 through the through channel, arrange the crossbeam 2 on the top of the Bailey frame 1 and fix the crossbeam 2 on the Bailey frame 1. The crossbeam 2 and the supporting member 3 are arranged correspondingly, install the jack 8, and connect the jack 8 and the supporting member 3 as a whole through the connector 9; S3. According to the design requirements, the lifting height of the corresponding jack 8 is adjusted, and the existing pipe corridor is tensioned in stages through the traction member 4 and the supporting member 3. After the tensioning is completed, the suspension protection work of the existing pipe corridor is completed; S4. Then, excavate the foundation pit below the middle of the existing pipe gallery. The excavation width of the foundation pit below the pipe gallery should be less than 1 / 3 of the length of the base guard plate 5.

[0036] In the invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be fixedly connected, detachably connected, or integrated; it can be mechanically connected, electrically connected, or able to communicate with each other; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.

Claims

1. A protective device for excavating a foundation pit across an existing pipe gallery, characterized in that: The invention comprises two supporting members, a Bailey frame (1) spanning the two supporting members, a plurality of crossbeams (2) evenly distributed on the Bailey frame (1), and a plurality of supporting members (3) located below the existing pipe gallery, wherein the Bailey frame (1) is arranged in parallel with the existing pipe gallery, the crossbeam (2) and the corresponding supporting member (3) are arranged in parallel and perpendicular to the direction of the existing pipe gallery, and traction members (4) are symmetrically arranged on both sides of the crossbeam (2), and the crossbeam (2) and the supporting member (3) are integrally connected via the traction member (4).

2. The protective device for excavating a foundation pit across an existing pipe gallery according to claim 1 is characterized in that: The support member comprises two groups of base guard plates (5) and at least two groups of diagonal brace assemblies, the diagonal brace assemblies comprise a crown beam (6) and two support legs (7), the two support legs (7) are respectively located on both sides of the crown beam (6), one end of the support leg (7) is connected to the crown beam (6), and the other end of the support leg (7) is connected to the base guard plate (5), and the base guard plate (5) is installed at the slope of the tunnel excavated on both sides of the existing pipe gallery.

3. The protective device for excavating a foundation pit across an existing pipe gallery according to claim 2 is characterized in that: One end of the support leg (7) is hinged to the crown beam (6), and the other end of the support leg (7) is hinged to the base guard plate (5).

4. The protective device for excavating a foundation pit across an existing pipe gallery according to claim 1 is characterized in that: The traction member (4) comprises a jack (8) and a connecting member (9); the jack (8) is fixedly mounted on the top of the crossbeam (2), one end of the connecting member (9) is connected to the jack (8), and the other end of the connecting member (9) is connected to the supporting member (3).

5. The protective device for excavating a foundation pit across an existing pipe gallery according to claim 4 is characterized in that: The jack (8) is a mechanical screw jack, and the connecting piece (9) is made of threaded steel; the top of the threaded steel is rotatably connected to the bottom of the lifting screw on the mechanical screw jack (8).

6. The protective device for excavating a foundation pit across an existing pipe gallery according to claim 5 is characterized in that: The supporting member (3) comprises a cylinder (10), a cylinder drill bit (11) rotatably mounted on one end of the cylinder (10), and a driving rod (12) rotatably mounted on the middle of the cylinder (10) and fixedly connected to the cylinder drill bit (11); a horizontal supporting portion (13) is provided on the cylinder (10).

7. The protective device for excavating a foundation pit across an existing pipe gallery according to claim 6 is characterized in that: An outward expansion support member is installed in the middle of the cylinder (10), and the outward expansion support member comprises a hollow tube (14), two sliders (15) slidably mounted on the hollow tube (14), a connecting rod group and two support seats (16), the connecting rod group comprises two connecting rods (17), one end of the connecting rod (17) is hinged to the slider (15), and the other end of the connecting rod (17) is hinged to the support seat (16), and the hollow tube (14) is provided with a mutually interlocking threaded portion (18) at a contact point with the two sliders (15), the slider (15) is connected to the hollow tube (14) by threaded transmission, and a conical head (19) is provided on the side of the support seat (16) away from the hollow tube (14), and the top of the support seat (16) is flush with the horizontal supporting portion (13) at the top of the cylinder (10); the driving rod (12) passes through the hollow tube (14).

8. The protective device for excavating a foundation pit across an existing pipe gallery according to claim 6 is characterized in that: A clamping piece (20) is screwed onto the end of the connecting piece (9), and the cylinder (10) is provided with a ring hole (21) and a clamping groove (22) for allowing the clamping piece (20) to enter.

9. A construction method for excavating a foundation pit across an existing pipe gallery, characterized in that: The present pipe gallery is protected by using the protection device for excavating the foundation pit across the present pipe gallery as described in claims 1 to 8 above; the protection comprises the following steps: S1. Use an excavator to excavate the earth above and on both sides of the existing pipeline corridor. After the earth is excavated, the existing pipeline corridor is exposed to the ground, and the tunnels on both sides of the existing pipeline corridor are sloped; S2. Hoist the two base guard plates (5) to the slopes of the tunnels on both sides of the existing pipe gallery, with the base guard plates (5) being parallel to the corresponding tunnel slopes. Assemble the support legs (7) and the crown beam (6). Hoist the Bailey frame (1) to the crown beam (6) and fix it in place. Excavate a through passage from the lower part of the existing pipe gallery. The aperture of the through passage is 10 cm-20 cm. The distance between two adjacent through passages should be less than 1 m. Pass the supporting member (3) through the through passage. Arrange the cross beam (2) on the top of the Bailey frame (1) and fix the cross beam (2) on the Bailey frame (1). Arrange the cross beam (2) and the supporting member (3) accordingly. Install the jack (8). Connect the jack (8) and the supporting member (3) as a whole through the connecting member (9). S3. According to the design requirements, the lifting height of the corresponding jack (8) is adjusted, and the existing pipe corridor is tensioned in stages through the traction member (4) and the supporting member (3). After the tensioning is completed, the suspension protection work of the existing pipe corridor is completed; S4. Then, excavate the foundation pit below the middle of the existing pipe gallery. The excavation width of the foundation pit below the pipe gallery should be less than 1 / 3 of the length of the base guard plate (5).