High-temperature high-concentration hydrogen chloride corrosion test equipment and test method

By designing high-temperature and high-concentration hydrogen chloride corrosion test equipment, the problem of lack of high-temperature and high-concentration hydrogen chloride corrosion testing in the existing technology is solved, and the corrosion performance evaluation of metal materials in extreme environments is achieved, the equipment safety is ensured and the high-temperature alloy material is a high-temperature alloy material The research and development provides data support.

CN119044043APending Publication Date: 2024-11-29INST OF METAL RESEARCH - CHINESE ACAD OF SCI

Patent Information

Application Number
CN202411188590.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing technology lacks high-temperature and high-concentration hydrogen chloride corrosion testing equipment and related testing methods, making it difficult to evaluate the corrosion resistance of metal materials under extreme operating conditions, resulting in hidden dangers in equipment safety, especially in the corrosion behavior and mechanism of high-temperature alloy materials have not yet been effective. Research.

Method used

A high-temperature and high-concentration hydrogen chloride corrosion test equipment is designed, including quartz tubes, tube furnaces, test gas supply system, intake and exhaust system, sample placement system and exhaust treatment system, which can simulate the high-temperature and high-concentration hydrogen chloride environment and carry out the specific steps. Test, measure the before and after corrosion of the sample, collect the corrosion products, and repeat the test to obtain the corrosion kinetic curve.

Benefits of technology

Provide equipment and methods for high-temperature hydrogen chloride corrosion performance testing of metal materials, ensuring test safety, being able to simulate service conditions in high-temperature and high-concentration hydrogen chloride environment, supporting the research and development of high-temperature hydrogen chloride corrosion materials, and providing data support for related materials. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119044043A_ABST
    Figure CN119044043A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of high-temperature and high-concentration strong acid gas corrosion testing and corrosion evaluation, and particularly relates to high-temperature and high-concentration hydrogen chloride corrosion testing equipment and a high-temperature and high-concentration hydrogen chloride corrosion testing method.The high-temperature and high-concentration hydrogen chloride corrosion testing equipment comprises a tubular furnace, a testing gas supply system, a gas inlet and exhaust system, a sample containing system and a tail gas treatment system; the quartz tube is used for heating, placing the bracket and maintaining the sealing performance; the gas supply system comprises a carbon steel cylinder, a stainless steel valve and a pressure reducing valve and is used for continuously providing test gas; the air inlet and exhaust system comprises an air inlet pipe, a flow meter, a needle valve and an exhaust pipe and is used for detecting circulation, flow and safety of test gas; the sample placing system comprises a bracket and a nickel chrome wire and is used for placing an experimental sample; and the tail gas treatment system is used for purifying residual toxic tail gas and discharging the tail gas harmlessly. The device solves the problem of lack of a device for testing the high-temperature hydrogen chloride corrosion resistance of a metal material, and provides support for research and development of a high-temperature hydrogen chloride corrosion resistant material.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of high-temperature and high-concentration strong acid gas corrosion testing and corrosion evaluation, and in particular relates to a high-temperature and high-concentration hydrogen chloride corrosion testing device and a testing method. Background Art

[0002] In the extreme service environment of some new equipment (such as waste incineration equipment, etc.), there are high concentrations of hydrogen chloride, oxygen, water, etc. The metal materials that make up the equipment need to overcome the extreme working conditions of high temperature and high concentration of corrosive hydrogen chloride atmosphere. In order to ensure the efficient and stable operation of this type of equipment, it is necessary to develop metal materials that have sufficient high temperature strength and are resistant to high temperature hydrogen chloride corrosion.

[0003] However, a large number of studies have pointed out that when hydrogen chloride gas exists in the corrosive medium, the corrosion rate is much greater than that in the absence of hydrogen chloride due to the chlorination of alloy elements to form unprotected chlorides, and the corrosion rate tends to increase further when the temperature and hydrogen chloride concentration increase. Due to the differences in corrosion behavior and mechanism, it is still unclear whether metal materials that are feasible in oxidation and thermal corrosion environments can be directly applied to high-temperature hydrogen chloride corrosion environments, which poses a great hidden danger to the safe operation of equipment.

[0004] At present, the research on hydrogen chloride corrosion at home and abroad is mainly carried out under the conditions of relatively low temperature (below 900℃) and low hydrogen chloride concentration (ppm level), and the experimental materials are mainly steel with low high temperature strength, Ni-Cr alloy, etc. There is no public report on the corrosion behavior and mechanism of metal materials with high high temperature strength, especially high temperature alloys, in high temperature and high concentration hydrogen chloride atmosphere conditions; as for how to design alloys resistant to high temperature hydrogen chloride corrosion, there is no way to talk about it, and the research in this direction in China is basically blank. At present, there is a lack of equipment for high temperature and high concentration hydrogen chloride corrosion tests in China. It is urgent to develop relevant equipment, carry out hydrogen chloride corrosion tests simulating service conditions, establish a method for evaluating the corrosion resistance of metal materials to hydrogen chloride, provide data support for the research and development of high temperature hydrogen chloride corrosion resistant materials, and lay a theoretical foundation. Summary of the invention

[0005] The purpose of the present invention is to provide a high-temperature and high-concentration hydrogen chloride corrosion test device and a test method to provide support for the research and development of high-temperature hydrogen chloride corrosion resistant materials.

[0006] The objective of the present invention is achieved through the following technical solutions:

[0007] The test equipment of the present invention comprises a quartz tube, a tube furnace, a test gas supply system, an air intake and exhaust system, a sample placement system and an exhaust gas treatment system, wherein

[0008] The tube furnace comprises an outer metal shell and an inner furnace chamber, the quartz tube runs through the tube furnace, a sample placement system and plugs for heat insulation at both ends of the sample placement system are provided inside the quartz tube, and through holes for gas circulation are provided on the plugs; a heating wire and a thermocouple are provided in the furnace chamber below the quartz tube, and the heating wire and the thermocouple are connected to a temperature control system outside the tube furnace;

[0009] The test gas supply system comprises a carbon steel cylinder, in which hydrogen chloride gas of set pressure and concentration is contained, and a stainless steel valve is provided on the carbon steel cylinder, and the stainless steel valve is connected to the inlet of the pressure reducing valve;

[0010] The intake and exhaust system includes an intake pipe, a needle valve, a flow meter and an outlet pipe. The two ends of the intake pipe are respectively sealed and connected to the outlet of the pressure reducing valve and the intake end of the quartz tube. The two ends of the outlet pipe are respectively sealed and connected to the outlet end of the quartz tube and the exhaust gas treatment system. The intake pipe is provided with a needle valve and a flow meter.

[0011] The sample placement system comprises a bracket, a nickel-chromium wire and a test sample. The bracket is arranged in a constant temperature zone in a quartz tube, and the test sample is suspended on the bracket through the nickel-chromium wire.

[0012] Wherein: the tail gas treatment system comprises two conical bottles with rubber stoppers, the gas outlet pipe is inserted into the first conical bottle, and the first conical bottle is connected to the second conical bottle filled with sodium hydroxide solution of set concentration through a connecting hose.

[0013] The tube furnace is a vertical top-opening structure, that is, the metal shell and the furnace are divided into upper and lower parts that can be opened and closed, and the upper part of the metal shell and the upper part of the furnace can be flipped backward relative to their respective lower parts; the heating wire and the thermocouple are arranged between the quartz tube and the lower part of the furnace.

[0014] Both ends of the quartz tube are respectively sealed with metal connectors, and a pressure gauge is installed on the metal connector located at the air inlet end.

[0015] The quartz tube and the metal connector are locked with screws resistant to hydrogen chloride corrosion. The seal between the quartz tube and the metal connector is an end face seal, and the seal is a rubber gasket resistant to hydrogen chloride corrosion.

[0016] The air inlet pipe is connected to the air inlet end of the pressure reducing valve, needle valve, flow meter and quartz tube by conversion joints and fasteners. The conversion joint can be used to connect air inlet pipes of different diameters to meet the sealing connection requirements of the needle valve, flow meter and tubular furnace.

[0017] The air inlet pipe and the air outlet pipe are both corrosion-resistant and high-pressure resistant pipes. The air inlet pipe is a polytetrafluoroethylene pipe, and the air outlet pipe is a polyurethane pipe.

[0018] The high temperature and high concentration hydrogen chloride corrosion test method of the present invention comprises the following specific steps:

[0019] Step A, after measuring the original mass and size of the test sample, the test sample is suspended on the bracket by the nickel-chromium wire to form a sample placement system;

[0020] Step B, the quartz tube is initially placed in a tube furnace, the sample placement system is placed in a uniform temperature zone in the quartz tube, and the plug is placed;

[0021] Step C, confirming that the connections of the intake and exhaust systems are correct and the pressure reducing valve is in a completely closed state, opening the stainless steel valve on the carbon steel cylinder until the large indication number of the pressure reducing valve is stable and displays the gas pressure in the carbon steel cylinder, adjusting the small indication number on the pressure reducing valve to the set pressure and keeping it stable, opening the needle valve, adjusting the flow rate of the flow meter to the set value, at this time, hydrogen chloride gas is continuously introduced into the tubular furnace, and the tail gas is discharged through the tail gas treatment system;

[0022] Step D, after pre-washing, turn on the temperature control system switch, set the temperature rise program, keep the temperature after reaching the test temperature, and run the temperature rise program after confirming that it is correct;

[0023] Step E, keeping the temperature at the test temperature, and after reaching the predetermined test time, the heating program automatically stops, and the tube furnace cools down to room temperature;

[0024] Step F, taking the sample placement system and the plug out of the quartz tube, measuring the mass of the test sample after corrosion, retaining the interrupted sample, and continuing to hang the rest on the bracket for corrosion test;

[0025] Step G, collecting corrosion products formed on the inner wall of the quartz tube and the inner walls of metal connectors sealed at both ends of the quartz tube;

[0026] Step H, repeating steps B to G until the corrosion kinetic curve test of the test sample is completed.

[0027] Wherein: the metal shell and the furnace are divided into two parts, the upper and lower parts, which can be opened and closed, and the two ends of the quartz tube are sealed and connected to the metal connectors through rubber gaskets;

[0028] In the step B, the metal shell and the furnace chamber on the upper part of the tube furnace are turned backwards, the connecting screws between the metal connector and the quartz tube are unscrewed, the plug is taken out, and after the sample placement system is placed in the uniform temperature zone in the quartz tube, the metal shell and the furnace chamber on the upper part of the tube furnace are turned back to the initial position, the plug is replaced, the rubber gasket is covered, the connecting screws are tightened, and the air tightness of the equipment is checked;

[0029] In the step F, the metal shell and the furnace chamber on the upper part of the tube furnace are turned backwards, the connecting screws between the metal connector and the quartz tube are unscrewed, the plug and the sample placement system are taken out, and then the mass of the test sample after corrosion is measured.

[0030] The advantages and positive effects of the present invention are:

[0031] 1. The present invention provides a test device and test method for high-temperature hydrogen chloride corrosion of metal materials, which solves the problem of lack of testing equipment for the high-temperature hydrogen chloride corrosion resistance of metal materials in China, and provides support for the research and development of high-temperature hydrogen chloride corrosion resistant materials in my country.

[0032] 2. The key technology of the present invention is to ensure safety while achieving the simulation of the high-temperature and high-concentration hydrogen chloride environment near the service condition; the relevant test equipment, such as the air inlet pipe, quartz tube, plug, air outlet pipe, and bracket are all resistant to hydrogen chloride corrosion, thereby improving the safety of the test.

[0033] 3. The present invention is suitable for testing the corrosion resistance of metal materials in a high-temperature and high-concentration hydrogen chloride atmosphere. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a schematic diagram of the overall structure of the test equipment of the present invention;

[0035] Figure 2 This is a surface macroscopic morphology of the test sample of Example 1 of the present invention after being corroded at 960° C. in a 5 vol. % HCl-0.5 vol. % O2-Ar environment;

[0036] Figure 3A This is a diagram of volatile corrosion products formed at the condensation end of the device according to Example 1 of the present invention;

[0037] Figure 3B This is a diagram of volatile corrosion products formed at the condensation end of the device in Example 2 of the present invention;

[0038] Figure 4 This is a long-term result diagram of high-temperature hydrogen chloride corrosion resistance test of Example 1 of the present invention;

[0039] Figure 5 This is a short-time result diagram of the high-temperature hydrogen chloride corrosion resistance test of Example 1 of the present invention;

[0040] Among them: 1 is a carbon steel cylinder, 2 is hydrogen chloride gas, 3 is a stainless steel valve, 4 is a pressure reducing valve, 5 is an air inlet pipe, 6 is a needle valve, 7 is a flow meter, 8 is a pressure gauge, 9 is a metal connector, 10 is a rubber gasket, 11 is a quartz tube, 12 is a metal shell, 13 is a plug, 14 is a furnace, 15 is a bracket, 16 is a nickel-chromium wire, 17 is a test sample, 18 is a heating wire and a thermocouple, 19 is a temperature control system, 20 is an air outlet pipe, 21 is a conical flask, 22 is a sodium hydroxide solution, and 23 is a through hole. DETAILED DESCRIPTION

[0041] The present invention will be further described below in conjunction with the accompanying drawings.

[0042] Embodiment 1

[0043] like Figure 1 As shown, the test equipment of the present invention adopts a vertical open-top form, including a quartz tube 11, a tubular furnace, a test gas supply system, an intake and exhaust system, a sample placement system and an exhaust gas treatment system, wherein:

[0044] The tubular furnace includes an outer metal shell 12 and an inner furnace 14. The tubular furnace of this embodiment is a vertical upper open structure, that is, the metal shell 12 and the furnace 14 are divided into upper and lower parts that can be opened and closed. The upper part of the metal shell 12 and the upper part of the furnace 14 can be flipped backward 0 to 110 degrees relative to their respective lower parts. The material of the metal shell 12 of this embodiment can be carbon steel, and the furnace 14 can be a polycrystalline mullite fiber furnace. The quartz tube 11 runs through the tubular furnace. The quartz tube 11 is provided with a sample placement system and plugs 13 at both ends of the sample placement system for heat insulation. The plug 13 is provided with a through hole 23 for gas circulation. The size of the quartz tube 11 of this embodiment is Φ120 / 110×1400mm, the length of the heating zone is 600mm, and the length of the constant temperature zone is 300mm. A heating wire and a thermocouple 18 are provided between the quartz tube 11 and the lower part of the furnace 14, and the heating wire and the thermocouple 18 are connected to a temperature control system 19 located outside the tube furnace. In this embodiment, the two ends of the quartz tube 11 are sealed and connected with metal connectors 9 (the material of the metal connector 9 in this embodiment can be stainless steel), and a pressure gauge 8 is installed on the metal connector 9 located at the air inlet end; the quartz tube 11 and the metal connector 9 are locked with screws resistant to hydrogen chloride corrosion, and the seal between the quartz tube 11 and the metal connector 9 is an end face seal, and the seal is a rubber gasket 10 resistant to hydrogen chloride corrosion. The material of the plug 13 in this embodiment is alumina. The plugs 13 at both ends can reduce the temperature of other areas of the quartz tube 11 except the constant temperature zone, and reduce damage to the test equipment. If the temperature is too high, the rubber gasket 10 will be baked and white powder will be formed, affecting the experiment; on the other hand, the plug 13 with a through hole 23 does not hinder the normal circulation of the test gas. The temperature control system 19 of this embodiment is a prior art, and various temperature rising and falling programs can be compiled. The rated temperature is 1200° C. and the temperature control accuracy is ±1° C.

[0045] The test gas supply system includes a carbon steel cylinder 1, which is filled with hydrogen chloride gas 2 of set pressure and concentration (maximum pressure 9 MPa, 5 vol.% HCl-0.5 vol.% O2-Ar). The carbon steel cylinder 1 is provided with a stainless steel valve 3, which is connected to the inlet of a pressure reducing valve 4; the pressure reducing valve 4 in this embodiment has an outlet pressure range of 0 to 1.6 MPa.

[0046] The intake and exhaust system includes an intake pipe 5, a needle valve 6, a flowmeter 7 and an outlet pipe 20. One end of the intake pipe 5 is connected to the outlet of the pressure reducing valve 4, and the outlet pressure is controlled by the pressure reducing valve 4; the other end of the intake pipe 5 is sealed and connected to the intake end of the quartz tube 11. The intake pipe 5 is provided with a needle valve 6 and a flowmeter 7. The flowmeter 7 of this embodiment is a glass rotor flowmeter with a range of 0 to 100 mL / min. The two ends of the outlet pipe 20 are sealed and connected to the outlet end of the quartz tube 11 and the exhaust gas treatment system. The intake pipe 5 of this embodiment is connected to the pressure reducing valve 4, the needle valve 6, the flowmeter 7, and the intake end of the quartz tube 11 by conversion joints and fasteners. The conversion joint can be used to connect hoses of different diameters (i.e., the intake pipe 5), and meet the sealing connection requirements of the needle valve 6, the flowmeter 7, and the tubular furnace. The air inlet pipe 5 and the air outlet pipe 20 of the present embodiment are both corrosion-resistant and high-pressure-resistant pipes. The air inlet pipe 5 is a polytetrafluoroethylene pipe, and the air outlet pipe 20 is a polyurethane pipe.

[0047] The sample placement system includes a bracket 15, a nickel-chromium wire 16 and a test sample 17. The bracket 15 is arranged in the constant temperature zone in the quartz tube 11, and the test sample 17 is suspended on the bracket 15 through the nickel-chromium wire 16. In this embodiment, the material of the bracket 15 can be alumina.

[0048] The tail gas treatment system includes two conical flasks 21 with rubber stoppers, the outlet pipe 20 is inserted into the first conical flask 21, and the first conical flask 21 is connected to the second conical flask 21 filled with a set concentration of sodium hydroxide solution 22 through a connecting hose. The concentration of the sodium hydroxide solution 22 in this embodiment is 1 mol / L.

[0049] This embodiment is to test the long-term high-temperature hydrogen chloride corrosion resistance of the test alloy under high-temperature and high-concentration hydrogen chloride atmosphere conditions. The high-temperature and high-concentration hydrogen chloride corrosion test equipment is as follows: Figure 1 As shown, the specific steps of the test method include:

[0050] Step A, after measuring the original mass and size of the test sample 17, the test sample 17 is suspended on the bracket 15 through the nickel-chromium wire 16 to form a sample placement system;

[0051] Step B, the quartz tube 11 is initially placed in the tube furnace, the metal shell 12 and the furnace chamber 14 on the upper part of the tube furnace are turned backwards, the connecting screws between the metal connector 9 and the quartz tube 11 are unscrewed, the plug 13 is taken out, and after the sample placement system is placed in the constant temperature zone in the quartz tube 11, the metal shell 12 and the furnace chamber 14 on the upper part of the tube furnace are turned back to the initial position, the plug 13 is replaced, the rubber gasket 10 is covered, the connecting screws are tightened, and the air tightness of the equipment is checked;

[0052] Step C, after confirming that the connections of the intake and exhaust systems are correct and the pressure reducing valve 4 is in a completely closed state, open the stainless steel valve 3 on the carbon steel bottle 1 until the large indication number of the pressure reducing valve 4 is stable and displays the gas pressure in the carbon steel bottle 1, adjust the small indication number on the pressure reducing valve 4 to the set pressure (0.2MPa) and keep it stable, open the needle valve 6, and adjust the flow rate of the flow meter 7 to the set value (20ml / min). At this time, hydrogen chloride gas 2 is continuously introduced into the tubular furnace, and the tail gas first enters the first conical flask 21, and then enters the second conical flask 21 containing sodium hydroxide solution 22 through the connecting hose. After the remaining toxic tail gas is purified by the tail gas treatment system, it is harmlessly discharged;

[0053] Step D, after pre-washing for 30 minutes, turn on the temperature control system 19 switch, set the temperature rise program as follows: room temperature to 500°C, heating rate 5°C / min, 500°C to 800°C, heating rate 10°C / min, 800°C to 960°C, heating rate 5°C / min, the total heating time is 157 minutes, and keep warm for 25 hours after reaching the test temperature of 960°C. After confirming that everything is correct, run the heating program;

[0054] Step E, after the test temperature is kept at 960°C for 25 hours, the heating program is automatically stopped and the tube furnace is cooled to room temperature;

[0055] Step F, flip the metal shell 12 and the furnace 14 on the upper part of the tube furnace backward, unscrew the connecting screws between the metal connector 9 and the quartz tube 11, remove the plug 13 and the sample placement system, and then measure the quality of the test sample 17 after corrosion, and keep the interrupted sample. The typical macroscopic morphology is as follows Figure 2 As shown, the remaining samples continue to be suspended on the bracket 15 and then subjected to corrosion test;

[0056] Step G, collecting the corrosion products formed on the inner wall of the metal connector 9 and the quartz tube 11, such as Figure 3A As shown;

[0057] Step H, repeat steps B to G eight times until the corrosion kinetic curve test of test sample 17 is completed for 0 to 200 hours. Figure 4 As shown, the interruption time points are 25h, 50h, 75h and 100h respectively.

[0058] Embodiment 2

[0059] The test equipment used in Example 1 was used for testing.

[0060] This embodiment is to test the short-term high-temperature hydrogen chloride corrosion resistance of the test alloy under high-temperature and high-concentration hydrogen chloride atmosphere conditions. The high-temperature and high-concentration hydrogen chloride corrosion test equipment is as follows: Figure 1 As shown, the specific steps of the test method include:

[0061] Step A, after measuring the original mass and size of the test sample 17, the test sample 17 is suspended on the bracket 15 through the nickel-chromium wire 16 to form a sample placement system;

[0062] Step B, flip the metal shell 12 and the furnace 14 on the upper part of the tube furnace backward, unscrew the connecting screws between the metal connector 9 and the quartz tube 11, take out the plug 13, place the sample placement system in the constant temperature zone in the quartz tube 11, flip the metal shell 12 and the furnace 14 on the upper part of the tube furnace back to the initial position, replace the plug 13, cover the rubber gasket 10, tighten the connecting screws, and check the air tightness of the equipment;

[0063] Step C, after confirming that the connections of the intake and exhaust systems are correct and the pressure reducing valve 4 is in a completely closed state, open the stainless steel valve 3 on the carbon steel bottle 1 until the large indication number of the pressure reducing valve 4 is stable and displays the gas pressure in the carbon steel bottle 1, adjust the small indication number on the pressure reducing valve 4 to the set pressure (0.2MPa) and keep it stable, open the needle valve 6, and adjust the flow rate of the flow meter 7 to the set value (20ml / min). At this time, hydrogen chloride gas 2 is continuously introduced into the tubular furnace, and the tail gas first enters the first conical flask 21, and then enters the second conical flask 21 containing sodium hydroxide solution 22 through the connecting hose. After the remaining toxic tail gas is purified by the tail gas treatment system, it is harmlessly discharged;

[0064] Step D, after 30 minutes of pre-washing, turn on the temperature control system 19 switch, set the heating program as: room temperature to 500°C, heating rate 5°C / min, 500°C to 800°C, heating rate 10°C / min, 800°C to 960°C, heating rate 5°C / min, the total heating time is 157min, and keep warm for 15min after reaching the test temperature of 960°C (depending on the interruption time, some subsequent tests are kept warm for 30min), and after confirming that there is no error, run the heating program;

[0065] Step E, after the test temperature is kept at 960°C for 15 minutes (depending on the interruption time, some subsequent tests are kept for 30 minutes), the heating program is automatically stopped, and the tube furnace is cooled to room temperature;

[0066] Step F, flip the metal shell 12 and the furnace 14 on the upper part of the tube furnace backward, unscrew the connecting screws between the metal connector 9 and the quartz tube 11, take out the plug 13 and the sample placement system, and then measure the mass of the test sample 17 after corrosion, retain the interrupted sample, and continue to hang the remaining samples on the bracket 15 for corrosion test;

[0067] Step G, collecting the corrosion products formed on the inner wall of the metal connector 9 and the quartz tube 11, such as Figure 3B As shown;

[0068] Step H, repeat steps B to G six times until the corrosion kinetic curve test of test sample 17 is completed for 0 to 2.5 hours. Figure 5 As shown, the interruption time points are 15min, 30min, 1h, 1.5h, and 2h respectively.

[0069] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be included in the protection scope of the present invention.

Claims

1. A high temperature and high concentration hydrogen chloride corrosion test equipment, characterized in that: It comprises a quartz tube (11), a tube furnace, a test gas supply system, an air intake and exhaust system, a sample placement system and an exhaust gas treatment system, wherein The tube furnace comprises an outer metal shell (12) and an inner furnace chamber (14); the quartz tube (11) runs through the tube furnace; a sample placement system and heat-insulating plugs (13) are provided inside the quartz tube (11); through holes (23) for gas circulation are provided on the plugs (13); a heating wire and a thermocouple (18) are provided in the furnace chamber (14) below the quartz tube (11); the heating wire and the thermocouple (18) are connected to a temperature control system (19) outside the tube furnace; The test gas supply system comprises a carbon steel cylinder (1), wherein the carbon steel cylinder (1) contains hydrogen chloride gas (2) of set pressure and concentration, and the carbon steel cylinder (1) is provided with a stainless steel valve (3), wherein the stainless steel valve (3) is connected to the inlet of a pressure reducing valve (4); The intake and exhaust system comprises an intake pipe (5), a needle valve (6), a flow meter (7) and an outlet pipe (20); the two ends of the intake pipe (5) are respectively sealedly connected to the outlet of the pressure reducing valve (4) and the intake end of the quartz tube (11); the two ends of the outlet pipe (20) are respectively sealedly connected to the outlet end of the quartz tube (11) and the exhaust gas treatment system; the intake pipe (5) is respectively provided with a needle valve (6) and a flow meter (7); The sample placement system comprises a bracket (15), a nickel-chromium wire (16) and a test sample (17); the bracket (15) is arranged in a constant temperature zone in a quartz tube (11); and the test sample (17) is suspended on the bracket (15) through the nickel-chromium wire (16).

2. The high temperature and high concentration hydrogen chloride corrosion test equipment according to claim 1, characterized in that: The tail gas treatment system comprises two conical flasks (21) with rubber stoppers, the gas outlet pipe (20) is inserted into the first conical flask (21), and the first conical flask (21) is connected to the second conical flask (21) filled with sodium hydroxide solution (22) of a set concentration through a connecting hose.

3. The high temperature and high concentration hydrogen chloride corrosion test equipment according to claim 1, characterized in that: The tube furnace is a vertical top-opening structure, that is, the metal shell (12) and the furnace (14) are divided into two upper and lower parts that can be opened and closed, and the upper part of the metal shell (12) and the upper part of the furnace (14) can be turned backward relative to their respective lower parts; the heating wire and the thermocouple (18) are arranged between the quartz tube (11) and the lower part of the furnace (14).

4. The high temperature and high concentration hydrogen chloride corrosion test equipment according to claim 1, characterized in that: Both ends of the quartz tube (11) are respectively sealed with metal connectors (9), and a pressure gauge (8) is installed on the metal connector (9) located at the air inlet end.

5. The high temperature and high concentration hydrogen chloride corrosion test equipment according to claim 4, characterized in that: The quartz tube (11) and the metal connector (9) are locked with screws resistant to hydrogen chloride corrosion. The seal between the quartz tube (11) and the metal connector (9) is an end face seal, and the seal is a rubber gasket (10) resistant to hydrogen chloride corrosion.

6. The high temperature and high concentration hydrogen chloride corrosion test equipment according to claim 1, characterized in that: The air intake pipe (5) is connected to the air intake ends of the pressure reducing valve (4), the needle valve (6), the flow meter (7), and the quartz tube (11) by using conversion joints and fasteners. The conversion joints can be used to connect air intake pipes (5) of different diameters, thereby meeting the sealing connection requirements of the needle valve (6), the flow meter (7), and the tubular furnace.

7. The high temperature and high concentration hydrogen chloride corrosion test equipment according to claim 1, characterized in that: The air inlet pipe (5) and the air outlet pipe (20) are both corrosion-resistant and high-pressure-resistant pipes; the air inlet pipe (5) is a polytetrafluoroethylene pipe, and the air outlet pipe (20) is a polyurethane pipe.

8. A high temperature and high concentration hydrogen chloride corrosion test method, characterized in that: Using the high temperature and high concentration hydrogen chloride corrosion test equipment according to any one of claims 1 to 7, the specific steps include Step A, after measuring the original mass and size of the test sample (17), the test sample (17) is suspended on the bracket (15) through the nickel-chromium wire (16) to form a sample placement system; Step B, the quartz tube (11) is initially placed in a tube furnace, the sample placement system is placed in a uniform temperature zone in the quartz tube (11), and the plug (13) is placed; Step C, confirming that all connections of the intake and exhaust systems are correct and the pressure reducing valve (4) is in a completely closed state, opening the stainless steel valve (3) on the carbon steel bottle (1) until the large indication number of the pressure reducing valve (4) is stable and displays the gas pressure in the carbon steel bottle (1), adjusting the small indication number on the pressure reducing valve (4) to a set pressure and keeping it stable, opening the needle valve (6), adjusting the flow rate of the flow meter (7) to a set value, at which time the hydrogen chloride gas (2) is continuously introduced into the tubular furnace, and the tail gas is discharged through the tail gas treatment system; Step D, after pre-washing, turn on the temperature control system (19), set the temperature rise program, keep the temperature after reaching the test temperature, and run the temperature rise program after confirming that it is correct; Step E, keeping the temperature at the test temperature, and after reaching the predetermined test time, the heating program automatically stops, and the tube furnace cools down to room temperature; Step F, taking the sample placement system and the plug (13) out of the quartz tube (11), measuring the mass of the test sample (17) after corrosion, retaining the interrupted sample, and continuing to hang the rest on the bracket (15) for corrosion test; Step G, collecting corrosion products formed on the inner wall of the quartz tube (11) and the inner walls of the metal connectors (9) sealed and connected to both ends of the quartz tube (11); Step H, repeating steps B to G until the corrosion kinetic curve test of the test sample (17) is completed.

9. The high temperature and high concentration hydrogen chloride corrosion test method according to claim 8, characterized in that: The metal shell (12) and the furnace (14) are divided into two parts, an upper part and a lower part, which can be opened and closed. The two ends of the quartz tube (11) are respectively sealed and connected to the metal connector (9) through rubber gaskets (10); In the step B, the metal shell (12) and the furnace (14) on the upper part of the tube furnace are turned backwards, the connecting screws between the metal connector (9) and the quartz tube (11) are unscrewed, the plug (13) is taken out, and after the sample placement system is placed in the uniform temperature zone in the quartz tube (11), the metal shell (12) and the furnace (14) on the upper part of the tube furnace are turned back to the initial position, the plug (13) is replaced, the rubber gasket (10) is covered, the connecting screws are tightened, and the air tightness of the equipment is checked; In the step F, the metal shell (12) and the furnace (14) on the upper part of the tube furnace are turned backwards, the connecting screws between the metal connector (9) and the quartz tube (11) are unscrewed, the plug (13) and the sample placement system are taken out, and then the mass of the test sample (17) after corrosion is measured.

Citation Information

Patent Citations

  • Simulated boiler high-temperature smoke gas corrosion test device

    CN105572028A

  • High-temperature lasting test device and method for environment corrosion

    CN105842081A

  • Supercritical carbon dioxide corrosion testing device and use method

    CN108132211A

  • Solid fuel thermal conversion metal heating surface deposition corrosion characteristic simulation system and method

    CN116046654A

  • Gasification experiment system and method suitable for solid waste

    WO2021115355A1

Cited By

  • Gas corrosion aging experiment device and method

    CN122017389A