Simulation scheduling system for iron transportation locomotives in iron and steel plant
Through multi-agent modeling method, the iron and water bag transportation process of steel plants is decomposed, and the resource scheduling of locomotives and water bags is optimized, which solves the problems of low pressure and transportation efficiency of steel mills, and realizes efficient and safe transportation of iron and water bags.
Patent Information
- Application Number
- CN202410923509.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-11-12
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-29
AI Technical Summary
During the steel production process, the transportation scheduling of molten iron bags depends on the experience of operators, which leads to frequent occurrence of packing in steel mills. The existing research mainly focuses on path optimization and ignores locomotive collisions during actual transportation. Situation, lack of scientific decision-making.
Using multi-agent modeling method, the transportation process of molten iron bags is broken down into empty bags, heavy bag transportation, converter iron, and empty bag return. Through the railway transportation task management intelligent body, locomotive management intelligent body and molten iron bag management intelligent body The collaborative simulation of the body optimizes the scheduling of locomotives and molten iron package resources, matches appropriate locomotives and paths, avoids conflicts, and improves transportation efficiency.
The solution to the pressure packing of steel mills has been achieved, the turnover rate of molten iron bags and the efficiency of locomotive transportation has been improved, and the efficient and safe operation of molten iron transportation has been ensured.
Smart Images

Figure CN119045420A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of railway locomotive simulation scheduling, and in particular provides a railway locomotive simulation scheduling system for a steel plant, which manages the operation of the railway locomotive in the steel plant by simulating a molten iron transportation process. Background Art
[0002] In the steel production process, the ladle is an important carrier for molten iron and an important part connecting the blast furnace and the converter. Therefore, the transportation of the ladle is a key link between the blast furnace and the converter. Continuous and efficient transportation plays an important role in ensuring the iron-making of the blast furnace and the smelting of the converter. However, due to the mismatch between the blast furnace iron-making time and the amount of molten iron and the converter smelting time and the demand for molten iron in the actual production process, and because the ladle transportation process involves the scheduling and allocation of multiple resources over a long period of time, the coordination is difficult. At present, there is little research on the transportation of molten iron ladles in steel plants. The transportation scheduling of locomotives and ladles mainly relies on the experience of operators and lacks scientific decision-making, resulting in the phenomenon of ladle compression in steel plants. At the same time, the optimization research on the iron transportation process mainly focuses on the optimization of the path through the optimization algorithm, but ignores the actual situation of the use of commonly used transportation paths in the actual production process, the actual transportation time and the possible locomotive collision conflicts. In order to improve the turnover rate of molten iron ladles and locomotive transportation efficiency, it is necessary to simulate and analyze the iron transportation process from ironmaking to steelmaking, decompose the transportation path, simulate different locomotive matching, path selection and other rules, and select the appropriate locomotive to perform the transportation task through dynamic optimization decision-making while ensuring safe production. Summary of the invention
[0003] The purpose of the present invention is to provide a simulation dispatching system for railway locomotives in a steel plant, which solves the problems of ladle pressing in steel plants. It is used to simulate the production and transportation process from the molten iron from the blast furnace to the ladle to the steel plant in the steel production process, and provide a simulation tool for the research and analysis of molten iron transportation. The present invention adopts a multi-agent modeling method, and by optimizing and coordinating locomotive and ladle resources, it can achieve the effect of improving the turnover rate of the ladle and the locomotive transportation efficiency, which is of great significance for the efficient and safe operation of the molten iron transportation process.
[0004] The present invention adopts a multi-agent modeling approach to decompose the transportation process of the molten iron ladle from the iron mouth of the blast furnace to the steel plant into empty ladle iron reception, heavy ladle transportation, converter iron exchange, and empty ladle return. The main resources involved include locomotives, molten iron ladles, and railways. The agents include railway transportation task management agents, locomotive management agents, and molten iron ladle management agents. The agents are mainly responsible for the matching of railway transportation tasks, changes in resource attribute states, etc.
[0005] The present invention mainly includes hardware equipment, simulation intelligent body and resources
[0006] The hardware equipment includes: desktop computers, servers, monitors, data simulators, power supply equipment, and routers.
[0007] The intelligent agents include: a railway transportation task management intelligent agent, a locomotive management intelligent agent, and a molten iron ladle management intelligent agent; the resources include: a locomotive, a molten iron ladle, and a railway.
[0008] Connect the hardware devices as required. The power supply device is to supply power to other devices, so connect it to the desktop computer, server, monitor, data simulator and router. The desktop computer is connected to the server, monitor, router and data simulator. At the same time, the server is also connected to the monitor, router and data simulator. After setting up the hardware environment, the railway task management agent, locomotive management agent and ladle management agent are all installed and run on the desktop computer to ensure the normal operation of each agent. The simulation effect is analyzed by observing the running results on the monitor. The specific technical process of each agent is described as follows:
[0009] The railway transport task management agent is responsible for the allocation of empty, heavy and tail railway transport tasks; the locomotive management agent is mainly responsible for managing the location and status information of all locomotives in the locomotive list, including judging the locomotive operating status according to the locomotive's previous position and the selected path number, updating the locomotive's estimated idle time according to the actual end time of the last task to be completed in the locomotive task list, judging the locomotive status by judging whether the task start time is ahead of the locomotive's estimated idle time, and matching feasible paths for idle locomotives to execute railway transport tasks. After completing the matching of locomotives, the locomotive resources and feasible path resources are stored in the locomotive number and path number attributes of the railway transport task.
[0010] When the locomotive position is updated, the travel time of the selected railway path is compared with the standard time of each section. The locomotive automatically records the time of entering each section, and uses the simulation time and the time when the locomotive enters the section to calculate the travel time of the locomotive in the section. By comparing it with the standard travel time of the section, when the travel time of the locomotive in the section is greater than the standard time of the section, the locomotive position attribute is changed to the next section of the path, otherwise the locomotive will remain in the original position unchanged.
[0011] There are four types of locomotive status attributes, namely, unused, in use, offline, and heading to the starting station. Among them, unused means that the locomotive is not offline, has completed the scheduled molten iron ladle transportation task, and is waiting for a new rail transportation task to start; in use means that the locomotive has received a molten iron ladle and is carrying a heavy, empty, or tail ladle; offline means that the locomotive has been offline and cannot be used; heading to the starting station means that the locomotive has received a rail transportation task and is heading to the starting position of the task to receive the ladle.
[0012] When matching locomotives for rail transport tasks, the rail transport task management agent selects available locomotives based on the estimated idle time of each locomotive in the locomotive list, and selects the locomotive with the earliest time to arrive at the starting position of the rail transport task from the set of available locomotives to perform this transport task. In addition to matching locomotives, it also includes matching feasible paths based on the starting and ending positions of the rail transport task. The feasible paths cover all paths from the starting position to the end position, and selects the path with the shorter transportation time from the feasible paths. At the same time, by judging the time that each section has been occupied, possible locomotive conflicts and collisions may be considered.
[0013] The ladle management agent is mainly responsible for managing the status information of all ladles in the ladle list. When the empty ladle is connected to the iron mouth and the heavy ladle is smelted, the locomotive is responsible for transporting the ladle to the steel mill or returning to the blast furnace iron mouth to continue to connect iron. During the process of transporting the ladle by the locomotive, the update of the ladle position is mainly related to the operating status of the locomotive; when the empty ladle is connected to the iron mouth of the blast furnace or the heavy ladle is connected to the iron at the steel mill, the ladle is transported to the destination by the locomotive. During this process, the status of the ladle is in transportation, and the position of the ladle is consistent with the position of the locomotive.
[0014] The railway transportation task refers to the planned transportation task of the hot metal ladle, which is divided into three categories: heavy ladle transportation, empty ladle transportation, and tail ladle transportation. The railway transportation task indicates the starting and ending position of the railway transportation and the required arrival time. The railway transportation task management agent then matches the appropriate locomotive and railway path for the heavy ladle transportation task according to the matching rules. In summary, the entire railway transportation process covers the locomotive waiting time after the blast furnace taps iron, the railway transportation time, and the locomotive avoidance waiting time when the path conflicts.
[0015] The attributes of locomotive resources include: simulation task type number, simulation actual task number, locomotive number, railway transport task number list, ongoing task number, ladle number, locomotive position, locomotive arrival start time of current section, status, expected idle time, and expected idle position.
[0016] Among them, the simulation task type number is used to distinguish the simulation task type; the simulation actual task number is used to indicate the actual planned task represented by the executed simulation task; the locomotive number refers to the unique identifiable number of each locomotive, which is used to distinguish different locomotives; the locomotive task number list is a task set composed of the railway transportation tasks assigned to each locomotive, which are arranged in chronological order; the task number being executed is used to indicate the task number executed by the locomotive at the simulation moment; the ladle number refers to the number of the ladle transported by the locomotive at the simulation moment, and the ladle number of the ladle is unique; the locomotive position attribute refers to the path position number of the locomotive at the simulation moment. By recording the locomotive position at different simulation moments, the locomotive transportation turnover process can be tracked. The locomotive status includes unused, picking up the package, offline, and transporting the ladle; the locomotive's expected idle time and position refer to the end time and position of the last transportation task in the locomotive's completed task list. At this time, the locomotive status changes from transportation to unused.
[0017] The attributes of the ladle resource include: simulation task type number, simulation actual task number, ladle number, ladle age, nominal capacity, current molten iron volume, weight status, target molten iron volume, location, current iron batch, current heat batch, next iron batch, next heat batch, and status.
[0018] The attributes of railway resources include: route number, route time, and section number.
[0019] The transportation route is decomposed from the actual transportation route of the steel enterprise, and the locations of each key section of the transportation route are marked in a digital way.
[0020] Among them, the route number represents an entire railway transport route, and a transport route is composed of multiple sections; the route time represents the time required for the locomotive to travel from the starting point of the route to the end point of the route; the section number refers to the number of each section in a transport route. Among them, the section represents the smallest unit of the railway transport route, and the distribution and connection of each section are derived from the actual railway distribution of the factory area.
[0021] The routes are divided into three categories, including: heavy bag transport route, empty bag return transport route, and tail bag transfer route. Among them, the heavy bag transport route refers to the railway route from the blast furnace iron mouth to the ironmaking throat and then to the steelmaking throat. On the contrary, the empty bag return transport route refers to the railway route from the steel mill to the ironmaking throat and then to the steelmaking throat. The tail bag transfer route refers to the transport route from the blast furnace iron mouth to the ironmaking throat and then to the iron mouth of another blast furnace. Therefore, the list of all routes contains the path from the iron mouth to the iron mouth, the path from the steel mill to the steel mill, the path from the iron mouth to the steel mill, the path from the steel mill to another steel mill and then to the iron mouth, and the path from the iron mouth to another iron mouth and then to the steel mill.
[0022] The advantages of the present invention are:
[0023] 1. The simulation process of the present invention takes into account the entire process of locomotive rail transportation from waiting for the empty ladle to receive iron to the empty ladle returning to the iron mouth of the blast furnace after the heavy ladle is replaced with iron. In this process, the tail ladle transfer, locomotive collision and other possible practical situations that may occur in the actual process are also taken into account. Through dynamic decision-making and setting of redundant time and waiting time, various situations that may occur in the actual production process are fully considered.
[0024] 2. The present invention adopts a multi-agent, multi-resource collaborative simulation method. By dividing the railway transportation process into a railway transportation task management agent, a locomotive management agent, a ladle management agent and locomotives, ladles and railway resources, the reasonable allocation of locomotives, ladles and railway resources is achieved through optimized matching. At the same time, the actual conditions of locomotive matching, avoidance, path conflict, locomotive waiting, etc. are comprehensively considered, and the simulation is made more realistic by setting redundant time in the simulation.
[0025] 3. The present invention adopts a dynamic simulation method: it always relies on the simulation calculation results of the previous moment to make dynamic optimization decisions to determine the current steps to be executed, wherein the locomotive and ladle management intelligent body determines whether the position of the locomotive and the ladle has changed and whether the status needs to be changed at the current simulation moment by reading the position, status and matched path information of all locomotives and ladles at the previous simulation moment. At the same time, based on the position information after the change at the current moment, it predicts possible path conflicts, locomotive collisions, etc., and chooses to re-match the path for the locomotive or re-match the locomotive for the railway transportation task through pre-set optimization decisions to avoid the occurrence of conflicts. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0027] Figure 1 It is the logic diagram of the simulation module.
[0028] Figure 2 Hardware device connection layout diagram.
[0029] Figure 3 It is the agent and resource attribute graph.
[0030] Figure 4 This is an abstract diagram of the actual path.
[0031] Figure 5 Match the logic diagram for the locomotive.
[0032] Figure 6 This is the logic diagram for locomotive conflict judgment.
[0033] Figure 7 Updated logic diagram for ladle status.
[0034] Figure 8 Ladle tracking Gantt chart. DETAILED DESCRIPTION
[0035] The present invention mainly includes hardware equipment, simulation intelligent body and resources
[0036] The hardware equipment includes: desktop computers, servers, monitors, data simulators, power supply equipment, and routers.
[0037] The intelligent agents include: a railway transportation task management intelligent agent, a locomotive management intelligent agent, and a molten iron ladle management intelligent agent; the resources include: a locomotive, a molten iron ladle, and a railway.
[0038] Connect the hardware devices as required. The power supply device is used to supply power to other devices, so it is connected to the desktop computer, server, monitor, data simulator and router. The desktop computer is connected to the server, monitor, router and data simulator. At the same time, the server is also connected to the monitor, router and data simulator. After the hardware environment is built, the railway task management agent, locomotive management agent and ladle management agent are all installed and run on the desktop computer to ensure the normal operation of each agent. The simulation effect is analyzed by observing the running results on the monitor.
[0039] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] To realize the simulation dispatching system of locomotives in steel plants, the following hardware environment is required:
[0041] 1. A desktop computer: Acer model, Windows 10 operating system, CPU i7-1165, memory capacity 16GB, hard disk capacity 500G.
[0042] 2. A server: The server model is a general brand HP, the server is 4 cores 64G, and the operating system is CentOS.
[0043] 3. A monitor: Xiaomi model monitor, 24 inches in size.
[0044] 4. Data simulator: A device specially used to simulate the operating status data of steel plant locomotives.
[0045] 5. Power supply equipment: A power supply equipment provides power to ensure that each device can be used normally.
[0046] 6. Router: A network device router is required to ensure normal Internet access and data transmission.
[0047] like Figure 2 As shown, the hardware is used as follows:
[0048] 1. First, connect the power supply to each device to ensure that each hardware device can maintain normal operation.
[0049] 2. Package each agent program on the desktop computer, generate an image, and then push it to the server for deployment.
[0050] 3. Deploy in a microservices manner, deploying each agent as an independent microservice. At the same time, provide a dedicated database server to store the generated data.
[0051] 4. Connect the data simulator to the server so that it can generate the required rail transportation process data. In actual steel plant applications, this device will be replaced with the actual data acquisition equipment of the steel plant, such as sensors, cameras, etc.
[0052] 5. Connect the server to the monitor to display the simulation effect.
[0053] After the hardware is deployed and implemented as described above, the operation of the steel plant locomotive can be simulated. The specific technical implementation steps of the operation management system of the steel plant locomotive of the present invention are as follows:
[0054] Step 1: Generate a rail transport task and initialize the path, locomotive, and ladle. In principle, a rail transport task must include the task starting location, end location, planned start time, and required arrival time.
[0055] According to the actual distribution of the railway routes in the factory area and the transportation time statistics, the transportation routes are decomposed into various sections, and the detailed section table and section time consumption table of the route are initialized. The detailed section table of the route clarifies all the sections included in each route and sets the sequence connection relationship for all sections. The section time consumption table stores the standard transportation time of each section, which is convenient for the subsequent calculation of the task completion time and the judgment of locomotive collision conflicts; locomotive initialization refers to setting the position of each locomotive at the beginning of the simulation, whether it is online, the task number list, the task being executed, the package number and other status information;
[0056] Step 2: Match locomotives according to railway transport tasks. At the beginning of the simulation, the railway transport task management agent receives the railway transport tasks, and searches for railway transport tasks with a task status of to-be-assigned from all railway transport tasks, matches them according to the task objects to be assigned by calling the matching locomotive, and returns the matched locomotive object.
[0057] The matching locomotive mode in step 2 specifically includes two processes: the locomotive moves from the current position to the location of the package and the locomotive moves to the destination of the railway transportation task after receiving the package. The specific steps are:
[0058] 1. Calculate the estimated idle position and idle time of the locomotive. First, determine the last rail transport task performed by the locomotive. After the rail transport task is assigned to the appropriate locomotive, the task number will be automatically associated with the task list of the corresponding locomotive. When the task begins to be executed, the task will be transferred from the locomotive task list to the task being executed by the locomotive. Therefore, when determining the last task to be performed by the locomotive, first determine whether the locomotive task list is empty. If the locomotive task list is empty, the task being performed by the locomotive is taken as the last task to be performed by the locomotive; if the locomotive task list is not empty, the last task in the locomotive task list is taken as the last task to be performed by the locomotive. Calculate the completion time and end position of this task based on the determined last rail transport task performed by the locomotive.
[0059] 2. Select available locomotives and match the path according to the starting and ending positions of the railway transportation task, the required time and the locomotive position. An available locomotive is defined as the sum of the completion time of the last railway transportation task to be performed by the locomotive and the time required for the locomotive to travel from the end position of this railway transportation task to the starting position of the next railway transportation task. The time from the starting position of the next railway transportation task to the end position of the next railway transportation task should be earlier than the planned completion time of the railway transportation task. Locomotives that meet the above three conditions are available locomotives. The railway transportation task management agent traverses all locomotives, queries the locomotive status, selects all online locomotives, and calculates the estimated idle time of all online locomotives, and the time taken from the estimated idle position to the starting position of the next railway transportation task to select all alternative locomotives. Match paths for alternative locomotives and determine possible collisions. When the starting point of the railway transportation task and the estimated idle position of each available locomotive are known, the path to pick up the molten iron ladle is matched for all candidate locomotives with the estimated idle position of the locomotive as the starting point and the starting position of the railway transportation task as the end point. After determining the path, the path time can be determined. If the time when the locomotive arrives at the starting position of the railway transportation task is earlier than the required start time of the task plan, it means that the locomotive can rush to the starting point of the task to pick up the molten iron ladle before the required time. At the same time, the path is re-matched with the starting position of the railway transportation task as the starting point and the end position as the end point, and the path time is recorded. If the time when the locomotive arrives at the end position is earlier than the planned completion time of the task, the locomotive is an available locomotive.
[0060] Step 3: Determine whether the locomotive has collided, conflicted, or waited. When matching a path for a locomotive, determine whether the time each path has been occupied overlaps with the time this locomotive has occupied the path. If so, this locomotive sets a waiting time on this section of road, and the completion time of the rail transport task is delayed accordingly. At the same time, since the task has a certain advance, when the locomotive arrives at the starting position of the task but the task has not actually started, the locomotive will be in a waiting state. For example, when the ladle receiving molten iron under the iron mouth of a blast furnace is transported by a locomotive, when the locomotive arrives under the iron mouth of the blast furnace, the ladle is in a state of receiving iron. The locomotive will wait until the ladle is full of molten iron before starting the rail transport task.
[0061] Step 4: Update the task information according to the determined locomotive and path. After completing the locomotive matching and path matching, the railway transportation task management agent updates the locomotive number, the package receiving path number, the actual locomotive arrival time, the actual task start time, the path number of the transport package, the task status, the transport task type, and the simulation time to the task attributes.
[0062] Step 5, dynamically calculate the position and status information of the locomotive and the ladle. The locomotive management agent reads the position of all locomotives at the last simulation moment and the starting time when the locomotive entered the section at the last simulation moment, and calculates the driving time of the locomotive on the section by subtracting the starting time when the locomotive entered the section at the last simulation moment from the simulation moment. The driving time is compared with the standard driving time of the section, where the standard driving time of the section represents the total time required for the locomotive to pass through the section. If the driving time is less than the standard driving time of the section, the position at the current simulation moment remains unchanged, otherwise the locomotive position is changed to the next section, indicating that the locomotive is traveling to the next section, and the time when the locomotive starts to enter the section is recorded, so as to later determine the time the locomotive has traveled on the section. In addition, when different locomotives choose the same section at the same time, locomotive collisions may occur. In order to avoid conflicts, the locomotive management agent automatically determines whether there are multiple locomotives occupying the same railway section in the same period of time based on the updated locomotive position information at each simulation moment. If so, the locomotive management agent sets a waiting time for each locomotive by dividing the priorities: delayed locomotives are given priority and locomotives that are close to the arrival time of the task are given priority, and determines whether to continue waiting before the locomotive updates its position information next time.
[0063] Example 1
[0064] The implementation logic of the dynamic optimization management system for railway locomotives in a steel plant described in the present invention is as shown in the attached figure. Figure 1 As shown, the specific implementation method includes the following steps:
[0065] Step 1: Initialize the path, locomotive, and ladle to generate rail transport tasks. Decompose the path based on the actual distribution of the railway on site of the steel enterprise, initialize the path list based on the actual distribution of the railway on site and the statistical results of the railway transport time, and set the standard transportation time and connection relationship of each section, as shown in the attached figure. Figure 4 As shown in the figure, virtual road segments are used to replace actual spatial locations. Figure 3 As shown, the actual positions of all locomotives and ladles and whether they are online at the start of the simulation are initialized as simulation input; the ladles transportation task is generated according to the blast furnace iron-making plan and the converter production plan, and the starting position, end position, planned start time and required arrival time of the railway transportation task are determined.
[0066] Step 2: Real-time dynamic adjustment of all tasks. The railway task management agent receives the railway tasks, takes the current simulation time as the entry point, refreshes the status of all tasks, and selects the railway tasks to be assigned and the assigned but unexecuted railway tasks from all railway tasks.
[0067] Step 3: Match the locomotive according to the requirements of the task object to be assigned, return the matched locomotive and path objects, and store them in the task attributes. Figure 5 As shown, firstly, the tasks are sorted in order of the required start time, and all locomotives are traversed to match each locomotive with the shortest path from the current location to the starting location of the railway transportation task and the shortest path from the starting location of the railway transportation task to the ending location of the railway transportation task, and the locomotive with the shortest total transportation time from the current location to the ending location of the railway transportation task is selected from all locomotives, and the locomotive number, the numbers of the two paths, the time when the locomotive actually arrives at the starting location of the railway transportation task, and the time when the locomotive actually arrives at the ending location of the railway transportation task are recorded in the task attributes;
[0068] Step 4: Dynamically track the locomotive and ladle positions, and update the locomotive and ladle positions and status information at each simulation moment to achieve optimal matching of locomotives and path selection. Figure 6 As shown in the figure, the locomotive management agent calculates the time the locomotive has been waiting and transporting at the location according to the locomotive's position at the last simulation moment, based on the time the locomotive enters a certain section of road, and determines whether a collision occurs and whether the location needs to be changed to the next location. Figure 7 As shown, the ladle management agent updates the position and status of the ladle by judging whether the ladle is bound to the locomotive and whether it has reached the task end position.
[0069] Step 5: Analysis of simulation results: By summarizing and analyzing the data at each simulation moment, the dynamic tracking of locomotives and molten iron ladles, the calculation of molten iron ladles turnover rate, average operating time, etc. can be realized, as shown in the attached figure. Figure 8The figure shows the dynamic tracking Gantt chart of the molten iron ladle H001, indicating the time when the molten iron ladle receives iron under the iron mouth of the blast furnace, the time when the molten iron ladle receives iron at the iron mouth of another blast furnace, the time when it is transported by the locomotive, the time when it passes through the steelmaking throat, the waiting time in the hot rolling mill, the KR transportation time, and the transportation time to the converter, thus realizing the tracking of the entire process of the molten iron ladle circulation.
Claims
1. A steel plant locomotive simulation dispatching system, characterized in that: Including desktop computers, servers, monitors, data simulators, power supply equipment, routers; railway task management agents, locomotive management agents, and ladle management agents; The power supply equipment is connected to the desktop computer, server, display, data simulator and router respectively; the desktop computer is connected to the server, display, router and data simulator, and the server is connected to the display, router and data simulator; after the hardware environment is built, the railway task management agent, locomotive management agent and ladle management agent are all loaded and run on the desktop computer, and the simulation effect is analyzed by observing the running results on the display; The railway transport task management agent is responsible for the allocation of empty, heavy and tail railway transport tasks; the locomotive management agent is responsible for managing the location and status information of all locomotives in the locomotive list, including judging the locomotive operation status according to the locomotive's last location and the selected path number, updating the locomotive's estimated idle time according to the actual end time of the last task to be completed in the locomotive task list, judging the locomotive status by judging whether the task start time is ahead of the locomotive's estimated idle time, and matching the idle locomotive with a feasible path to execute the railway transport task. After completing the matching of the locomotive, the locomotive resources and feasible path resources are stored in the locomotive number and path number attributes of the railway transport task; When the locomotive position is updated, the travel time of the selected railway path is compared with the standard time of each section. The locomotive automatically records the time of entering each section, and uses the simulation time and the time when the locomotive enters the section to calculate the travel time of the locomotive in the section. By comparing it with the standard travel time of the section, when the travel time of the locomotive in the section is greater than the standard time of the section, the locomotive position attribute is changed to the next section of the path, otherwise the locomotive will remain in the original position unchanged. There are four types of locomotive status attributes, namely, unused, in use, offline, and heading to the starting station. Among them, unused means that the locomotive is not offline, has completed the scheduled molten iron ladle transportation task, and is waiting for a new rail transportation task to start. In use means that the locomotive has received a molten iron ladle and is carrying a heavy, empty, or tail ladle. Offline means that the locomotive has been offline and cannot be used. Heading to the starting station means that the locomotive has received a rail transportation task and is heading to the task starting position to receive the ladle. When matching locomotives for rail transport tasks, the rail transport task management agent selects available locomotives based on the estimated idle time of each locomotive in the locomotive list, and selects the locomotive with the earliest time to arrive at the starting position of the rail transport task from the set of available locomotives to perform this transport task; in addition to matching locomotives, it also includes matching feasible paths based on the starting and ending positions of the rail transport task. The feasible paths cover all paths from the starting position to the end position, and selects the path with the shorter transportation time from the feasible paths. At the same time, by judging the time that each section has been occupied, possible locomotive conflicts and collisions may be considered; The ladle management agent is responsible for managing the status information of all ladles in the ladle list. When the empty ladle is connected to the iron and the heavy ladle is smelted, the locomotive is responsible for transporting the ladle to the steel mill or returning to the blast furnace iron mouth to continue to connect iron. During the process of transporting the ladle by the locomotive, the update of the ladle position is related to the operation status of the locomotive; when the empty ladle is connected to the blast furnace iron mouth or the heavy ladle is connected to the steel mill, the ladle is transported to the destination by the locomotive. During this process, the status of the ladle is in transportation, and the position of the ladle is consistent with the position of the locomotive. The railway transportation task refers to the planned transportation task of hot metal ladles, which is divided into three categories: heavy ladle transportation, empty ladle transportation, and tail ladle transportation. The railway transportation task indicates the starting and ending position of the railway transportation and the required arrival time. The railway transportation task management agent then matches the appropriate locomotive and railway route for the heavy ladle transportation task according to the matching rules. The entire railway transportation process covers the locomotive waiting time after the blast furnace taps iron, the railway transportation time, and the locomotive avoidance waiting time when the route conflicts. The attributes of locomotive resources include: simulation task type number, simulation actual task number, locomotive number, railway transport task number list, ongoing task number, ladle number, locomotive position, locomotive arrival start time of current section, status, expected idle time, and expected idle position.
2. The steel plant locomotive simulation dispatching system according to claim 1, characterized in that: The simulation task type number is used to distinguish the simulation task type; the simulation actual task number is used to indicate the actual planned task represented by the executed simulation task; the locomotive number refers to the unique identifiable number of each locomotive, which is used to distinguish different locomotives; the locomotive task number list is a task set consisting of the railway transportation tasks assigned to each locomotive, which are arranged in chronological order; the task number being executed is used to indicate the task number executed by the locomotive at that simulation moment; the ladle number refers to the number of the ladle transported by the locomotive at that simulation moment, and the ladle number of the ladle is unique; the locomotive position attribute refers to the path position number of the locomotive at that simulation moment, and the locomotive transportation turnover process can be tracked by recording the locomotive position at different simulation moments; the locomotive status includes unused, picking up the package, offline, and transporting the ladle; the locomotive's estimated idle time and position refers to the end time and position of the last transportation task in the locomotive's completed task list, at which time the locomotive status changes from transportation to unused; 3. The steel plant locomotive simulation dispatching system according to claim 1, characterized in that: The attributes of the ladle resource include: simulation task type number, simulation actual task number, ladle number, ladle age, nominal capacity, current molten iron volume, weight status, target molten iron volume, location, current iron batch, current heat batch, next iron batch, next heat batch, and status; The transportation route is decomposed from the actual transportation route of the steel enterprise, and the locations of each key section of the transportation route are marked in a digital way. Among them, the route number represents an entire railway transport route, and a transport route is composed of multiple sections; the route time represents the time required for the locomotive to travel from the starting point of the route to the end point of the route; the section number refers to the number of each section in a transport route; among them, the section represents the smallest unit of the railway transport route, and the distribution and connection of each section are derived from the actual railway distribution of the factory area; The paths are divided into three categories, including: heavy bag transportation path, empty bag return transportation path, and last bag transfer path; among them, the heavy bag transportation path refers to the railway path from the blast furnace iron mouth to the ironmaking throat and then to the steelmaking throat, on the contrary, the empty bag return transportation path refers to the railway path from the steel mill to the ironmaking throat and then to the steelmaking throat, and the last bag transfer path refers to the transportation path from the blast furnace iron mouth to the ironmaking throat and then to another blast furnace iron mouth; the list of all paths contains the path from iron mouth to iron mouth, the path from steel mill to steel mill, the path from iron mouth to steel mill, the path from steel mill to another steel mill and then to the iron mouth, and the path from iron mouth to another iron mouth and then to the steel mill.
Citation Information
Cited By
Metallurgy enterprise railway operation automatic shunting plan generation method
CN120942396A