Technical Problem

The prior art has low efficiency, high cost and large data volume in the calculation of mining volume in open-pit mining areas, making it difficult to automatically complete the calculation work quickly, accurately and at low cost.

Method used

Using a remote sensing image-based method, a digital elevation model is generated by obtaining the work area reference images and stereo pairs, a digital elevation model is generated, geographical registration and error correction are performed, and the amount of excavation is calculated is achieved to achieve rapid and accurate monitoring of the mining volume in the open-pit mining area.

Benefits of technology

It realizes fast, accurate and low-cost monitoring of the mining volume in open-pit mining areas, avoids the dangerous terrain restrictions of traditional methods and the difficulty of data processing, and has the advantages of large-scale, long-distance and strong economicality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119048919A_ABST
    Figure CN119048919A_ABST
Patent Text Reader

Abstract

The invention provides a strip mine area mining quantity monitoring method, system and equipment based on remote sensing images, and belongs to the technical field of mine area monitoring. According to the method, a working area digital elevation model can be generated based on a plurality of working area stereo image pairs and a preset DEM generation tool, and geographical registration image groups of different preset monitoring periods are determined according to a working area reference image and a specified remote sensing image. And determining horizontal registration error information of the geographical registration image group based on the selected homonymy points obtained by the user operation so as to carry out first registration processing on the digital elevation model of the working area. Based on each preset control point, determining vertical registration error information of the digital elevation model of the working area so as to perform second registration processing on each corresponding digital elevation model of the working area; and based on the digital elevation model of each working area after the second registration processing, determining the filling and excavation volume of the monitoring working area between the preset monitoring periods, and sending the filling and excavation volume of the monitoring working area to the user terminal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of mining area monitoring, and in particular to a method, system and equipment for monitoring the mining volume of an open-pit mine based on remote sensing images. Background Art

[0002] The mining volume of open-pit mines is the top priority of open-pit mine monitoring. Timely and accurate calculation of the mining volume of open-pit mines and grasping the mining status and mining trends of mines are of great significance for natural resources monitoring departments to grasp the mining status and changes of mineral resources in real time, and can provide an important basis for the scientific management of mine mining.

[0003] At present, there are several main ways to measure the mining volume in open-pit mines: First, the traditional open-pit mining volume measurement is mainly based on single-point measurement methods such as total stations and GNSS-RTK. This method requires a large number of densely deployed measurement and control points in the mining area. Not only is the operating efficiency very low, but it is also easily restricted by dangerous terrain, and the accuracy of the measurement results is difficult to guarantee; the second is the unmanned aerial vehicle oblique photogrammetry technology, which can perform high-precision and high-resolution three-dimensional reconstruction of open-pit mines, and can construct a more accurate three-dimensional model. It has high accuracy in mining land use information and mining volume measurement, but the price is high, and the data volume is large and time-consuming to process; the third is the scanning acquisition method of laser radar technology. This method is efficient and accurate, but the equipment is extremely expensive, the data volume is large and difficult to process.

[0004] Based on this, there is an urgent need for a fast, accurate, low-cost and low-difficulty data processing technical solution to automatically and accurately calculate the mining volume of open-pit mines. Summary of the invention

[0005] The embodiments of the present application provide an open-pit mine production monitoring method, system and equipment based on remote sensing images, which are used to solve the current problems of low efficiency and high cost in calculating the production volume of open-pit mines, large amount of measurement data, and difficulty in automatically completing the calculation of the production volume of open-pit mines quickly, accurately and at low cost.

[0006] On the one hand, an embodiment of the present application provides a method for monitoring the mining volume of an open-pit mine based on remote sensing images, the method comprising:

[0007] Acquire a work area reference image and a plurality of work area stereo image pairs corresponding to the monitored work area; wherein the plurality of work area stereo image pairs are collected in different preset monitoring periods and correspond to different monitoring period timestamps;

[0008] Based on the plurality of said working area stereo image pairs and the preset DEM generation tool, the working area digital elevation models corresponding to the monitoring working area in each of the preset monitoring periods are generated, and according to the working area reference image and the designated remote sensing image in each of the said working area stereo image pairs, the geo-referenced image groups of different said preset monitoring periods are determined; the said geo-referenced image groups at least include the designated remote sensing image and the said working area reference image;

[0009] Based on each selected same-name point obtained by the user operating each of the geo-referenced image groups, determining the horizontal registration error information corresponding to each of the geo-referenced image groups, so as to perform a first registration process on the digital elevation model of the work area according to each of the horizontal registration error information;

[0010] Based on each preset control point in the work area digital elevation model after the first registration process, determine the vertical registration error information corresponding to each of the work area digital elevation models, so as to perform a second registration process on each of the corresponding work area digital elevation models according to each of the vertical registration error information;

[0011] Based on the digital elevation models of each of the work areas after the second registration process, the filling and cutting volumes of the monitoring work areas between the preset monitoring periods are determined, and the filling and cutting volumes of each of the monitoring work areas are sent to the user terminal.

[0012] In one implementation of the present application, after obtaining a work area reference image and a plurality of work area stereo image pairs corresponding to the monitoring work area, the method further includes:

[0013] Input each of the preset control points and the reference image of the work area into ArcGIS software for overlay display to determine whether the corresponding position of each of the preset control points and the reference image of the work area coincides;

[0014] If not, the work area reference image is registered using the geographic registration tool in the ArcGIS software until each of the preset control points coincides with the corresponding position of the work area reference image, thereby obtaining the registered work area reference image.

[0015] In one implementation of the present application, based on a plurality of stereo image pairs of the work area and a preset DEM generation tool, a digital elevation model of the work area corresponding to each preset monitoring period of the monitoring work area is generated, specifically including:

[0016] Input each of the working area stereo image pairs into the preset DEM generation tool respectively, so that the preset DEM generation tool generates connection points between the front view image and the rear view image of the working area stereo image pair, so as to generate point cloud data corresponding to the connection points, and process each of the point cloud data through the DTM toolkit to generate the digital elevation model of the working area; the preset DEM generation tool is Inpho software; processing each of the point cloud data at least includes: classification and editing.

[0017] In one implementation of the present application, before determining the geo-referenced image groups of different preset monitoring periods according to the working area reference image and the designated remote sensing images in each of the working area stereo image pairs, the method further includes:

[0018] Through the rolling shutter tool in ArcGIS software, the digital elevation model of the work area is superimposed and overlapped with the front view image and the rear view image in the stereo image pair of the work area, and displayed on the user terminal; wherein the superposition and overlap is to use partial areas of the two superimposed images as foreground display images respectively;

[0019] Determining the designated remote sensing image based on the user's designated operation on the front view image and the rear view image; wherein the designated remote sensing image is the front view image or the rear view image;

[0020] Determining geo-referenced image groups of different preset monitoring periods according to the working area reference image and the designated remote sensing images in each working area stereo image pair specifically includes:

[0021] The working area reference image and the designated remote sensing image of the same preset monitoring period are taken as a group of geo-referenced images to determine the geo-referenced image group.

[0022] In one implementation of the present application, based on each selected same-name point obtained by a user operating each of the geo-referenced image groups, determining the horizontal registration error information corresponding to each of the geo-referenced image groups, specifically includes:

[0023] By using the geo-reference tool in the ArcGIS software, the geo-referenced image group is displayed on the user terminal so that the user can select a plurality of image points with the same name in the work area reference image and the designated remote sensing image as the selected same-name points;

[0024] Determine the root mean square value corresponding to the geo-referenced image group according to the first coordinate of each selected same-name point in the work area reference image, the second coordinate in the designated remote sensing image and the error calculation formula, and add the root mean square value, the first coordinate and the second coordinate to the horizontal registration error information;

[0025] The error calculation formula is as follows:

[0026]

[0027] Among them, TotalRMS error is the root mean square value; i represents the number of the selected same-name points; n represents the number of the selected same-name points; x i and i x respectively represent the horizontal coordinate value and the vertical coordinate value of the first coordinate corresponding to the selected same-name point; i ′ and y i ' respectively represent the abscissa value and ordinate value of the second coordinate corresponding to the selected same-name point;

[0028] According to each of the horizontal registration error information, a first registration process is performed on the work area digital elevation model, specifically comprising:

[0029] Comparing the root mean square value with a first preset threshold to determine whether the root mean square value is less than the first preset threshold;

[0030] If so, the work area digital elevation model is updated and geographically aligned to perform a first alignment process.

[0031] In an implementation of the present application, based on each preset control point in the digital elevation model of the work area after the first registration process, determining vertical registration error information corresponding to each digital elevation model of the work area specifically includes:

[0032] Determining the measured elevation value of each of the preset control points;

[0033] Determine the DEM elevation values ​​corresponding to the preset control points according to the digital elevation model of the work area after the first registration process;

[0034] Determine the elevation error value corresponding to each of the preset control points according to the difference between the measured elevation value of each of the preset control points and the corresponding DEM elevation value;

[0035] Taking the average value of each elevation error value of the same work area digital elevation model as the corresponding vertical registration error, and adding it to the vertical registration error information;

[0036] According to each of the vertical registration error information, a second registration process is performed on each of the corresponding work area digital elevation models, specifically including:

[0037] Through the raster calculator tool in ArcGIS software, the difference between each DEM elevation value of the work area digital elevation model and the corresponding vertical registration error is used as the corrected DEM elevation value to complete the second registration processing of the work area digital elevation model.

[0038] In one implementation of the present application, based on the digital elevation models of the work areas after the second registration process, determining the volume of fill and cut in the monitoring work areas between the preset monitoring periods specifically includes:

[0039] Generate corresponding segmentation polygons according to the image resolutions corresponding to the digital elevation models of the work areas after the second registration process, so as to segment the corresponding digital elevation models of the work areas into a plurality of sub-areas according to the segmentation polygons; the area of ​​the segmentation polygons is the square value of the image resolution;

[0040] Taking the DEM elevation value corresponding to each of the sub-regions as the height and the segmentation polygon as the bottom surface, a prism corresponding to each of the sub-regions is generated;

[0041] Based on each of the prisms in the digital elevation model of the work area corresponding to different preset monitoring periods, the corresponding filling and cutting volume of the monitoring work area is determined.

[0042] In one implementation of the present application, based on each of the prisms in the digital elevation model of the work area corresponding to different preset monitoring periods, determining the corresponding fill and cut volume of the monitoring work area specifically includes:

[0043] Determine the volume change of each prism in the digital elevation model of the work area in different preset monitoring periods through a fill and cut volume calculation formula to obtain the corresponding fill and cut volume of the monitoring work area;

[0044] The calculation formula for the filling and cutting volume is as follows:

[0045]

[0046] Wherein, V is the filling and cutting volume of the monitoring work area between the first work area digital elevation model H and the second work area digital elevation model h, V is a negative number for filling, V is a positive number for cutting, and V is 0 for no change; A j is the area of ​​the jth sub-region; H j is the DEM elevation value corresponding to the j-th sub-area in the digital elevation model of the first work area; j The DEM elevation value corresponding to the j-th sub-area in the digital elevation model of the second workspace; m is the number of divisions of the sub-area.

[0047] On the other hand, an embodiment of the present application provides an open-pit mine production monitoring system based on remote sensing images, the system comprising:

[0048] An acquisition module, used to acquire a work area reference image and a plurality of work area stereo image pairs corresponding to the monitoring work area; wherein the plurality of work area stereo image pairs are collected in different preset monitoring periods and correspond to different monitoring period timestamps;

[0049] A generating and determining module is used to generate a digital elevation model of the monitoring work area corresponding to each of the preset monitoring periods based on a plurality of the working area stereo image pairs and a preset DEM generating tool, and determine a geo-referenced image group of different preset monitoring periods according to the working area reference image and a designated remote sensing image in each of the working area stereo image pairs; the geo-referenced image group includes at least the designated remote sensing image and the working area reference image;

[0050] A first determination module is used to determine the horizontal registration error information corresponding to each of the geo-referenced image groups based on each selected same-name point obtained by the user operating each of the geo-referenced image groups, so as to perform a first registration process on the work area digital elevation model according to each of the horizontal registration error information;

[0051] A second determination module is used to determine vertical registration error information corresponding to each of the digital elevation models of the work area based on each preset control point in the digital elevation model of the work area after the first registration process, so as to perform a second registration process on each of the corresponding digital elevation models of the work area according to each of the vertical registration error information;

[0052] The third determination module is used to determine the filling and cutting volume of the monitoring work area between each preset monitoring period based on the digital elevation model of each work area after the second registration process, and send the filling and cutting volume of each monitoring work area to the user terminal.

[0053] On the other hand, the embodiment of the present application further provides an open-pit mine production monitoring device based on remote sensing images, the device comprising:

[0054] at least one processor; and a memory in communication with the at least one processor; wherein the memory stores instructions executable by the at least one processor, the instructions being executed by the at least one processor to enable the at least one processor to:

[0055] Acquire a work area reference image and a plurality of work area stereo image pairs corresponding to the monitored work area; wherein the plurality of work area stereo image pairs are collected in different preset monitoring periods and correspond to different monitoring period timestamps;

[0056] Based on the plurality of said working area stereo image pairs and the preset DEM generation tool, the working area digital elevation models corresponding to the monitoring working area in each of the preset monitoring periods are generated, and according to the working area reference image and the designated remote sensing image in each of the said working area stereo image pairs, the geo-referenced image groups of different said preset monitoring periods are determined; the said geo-referenced image groups at least include the designated remote sensing image and the said working area reference image;

[0057] Based on each selected same-name point obtained by the user operating each of the geo-referenced image groups, determining the horizontal registration error information corresponding to each of the geo-referenced image groups, so as to perform a first registration process on the digital elevation model of the work area according to each of the horizontal registration error information;

[0058] Based on each preset control point in the work area digital elevation model after the first registration process, determine the vertical registration error information corresponding to each of the work area digital elevation models, so as to perform a second registration process on each of the corresponding work area digital elevation models according to each of the vertical registration error information;

[0059] Based on the digital elevation models of each of the work areas after the second registration process, the filling and cutting volumes of the monitoring work areas between the preset monitoring periods are determined, and the filling and cutting volumes of each of the monitoring work areas are sent to the user terminal.

[0060] Compared with the prior art, the present invention has the following significant effects:

[0061] 1) This application uses the work area reference image and the work area stereo image pair of remote sensing image to perform system error correction and registration of DEM, so as to use the registered DEM to monitor the mining volume of the mining area quickly, accurately and at low cost. The use of remote sensing images to measure the mining volume of open-pit mines can take advantage of the many advantages of satellite remote sensing technology, such as large range, long distance, fast processing and low cost, avoiding the pain points of traditional monitoring methods, drone oblique photography and laser radar, which are susceptible to dangerous terrain and geographical restrictions, difficult data processing, expensive and difficult to use on a large scale. In the field of open-pit mining volume monitoring, it can quickly and accurately achieve large-scale, long-distance and economical monitoring.

[0062] 2) After obtaining the preset control points at one time, this application can perform system error correction on the digital elevation model of the working area. Compared with traditional monitoring methods, it avoids the difficulty of densely deploying ground control points throughout the mining area and minimizes the difficulty and workload of repeated deployment of control points in the mining area.

[0063] 3) Through the stereo image pairs of the working area, the three-dimensional surface information of the open-pit mine area at different periods is obtained, avoiding the repetitive and complicated work of multiple on-site surveys required by traditional monitoring methods. It can conduct periodic and time-series monitoring of the mining volume of the open-pit mine area without contact, which is of great significance for timely understanding the mining status of the open-pit mine area. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0065] Figure 1 A schematic diagram of a flow chart of a method for monitoring mining volume in an open-pit mine based on remote sensing images in an embodiment of the present application;

[0066] Figure 2 A schematic diagram of horizontal registration in a method for monitoring mining output in an open-pit mine based on remote sensing images in an embodiment of the present application;

[0067] Figure 3 A result schematic diagram of a digital elevation model of a working area before and after the second registration process in a method for monitoring mining output in an open-pit mine based on remote sensing images in an embodiment of the present application;

[0068] Figure 4 This is a schematic diagram of the structure of an open-pit mine production monitoring system based on remote sensing images in an embodiment of the present application;

[0069] Figure 5 It is a structural schematic diagram of an open-pit mine production monitoring device based on remote sensing images in an embodiment of the present application. DETAILED DESCRIPTION

[0070] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0071] The embodiments of the present application provide an open-pit mine production monitoring method, system and equipment based on remote sensing images, which are used to solve the current problems of low efficiency and high cost in calculating the production volume of open-pit mines, large amount of calculated data, and difficulty in automatically completing the calculation of the production volume of open-pit mines quickly, accurately and at low cost.

[0072] The following describes in detail various embodiments of the present application in conjunction with the accompanying drawings.

[0073] The present application embodiment provides a method for monitoring the mining volume of an open-pit mine based on remote sensing images, such as Figure 1 As shown, the method may include steps S101-S105:

[0074] S101, the server obtains a workspace reference image and a plurality of workspace stereo image pairs corresponding to a monitoring workspace.

[0075] The plurality of working area stereo image pairs are collected in different preset monitoring periods and correspond to different monitoring period timestamps.

[0076] The monitoring work area can be understood as an open-pit mine area where mining volume is monitored. The work area reference image and the work area stereo image pair are basic data collected by the server, which are used to realize accurate mining volume measurement. The work area reference image can be a high-precision drone image base map of the work area, or it can be a high-resolution sky map image of the work area obtained by the geographic information public service platform. The work area reference image is used to correct the horizontal error of the work area digital elevation model composed of the work area stereo image pair. The multiple work area stereo image pairs obtained in this application correspond to a preset monitoring period respectively. For example, if the period is 5 days, every 5 days is a preset monitoring period, and each preset monitoring period contains different monitoring period timestamps. There is a mapping relationship between the preset monitoring period and the monitoring period timestamp, and the corresponding preset monitoring period can be determined by the monitoring period timestamp.

[0077] By setting a preset monitoring cycle, the mining volume of the open-pit mine can be monitored periodically, and the mining status can be automatically and timely understood.

[0078] It should be noted that the server, as the executor of the open-pit mine production monitoring method based on remote sensing images, is only an example. The executor is not limited to the server, and this application does not make any specific limitations on this.

[0079] In the embodiment of the present application, after obtaining the work area reference image and multiple work area stereo image pairs corresponding to the monitoring work area, the method further includes:

[0080] The server inputs each preset control point and the work area reference image into ArcGIS software for overlay display to determine whether the corresponding positions of each preset control point and the work area reference image coincide. If not, the work area reference image is aligned through the georeferencing tool in ArcGIS software until the corresponding positions of each preset control point and the work area reference image coincide, and the aligned work area reference image is obtained.

[0081] In other words, the present application uses ArcGIS software to register the work area reference image. Specifically, the work area reference image and the preset control points pre-selected from the monitoring work area can be imported into the ArcGIS software for superimposed display. If the position vector of the preset control point does not coincide with its corresponding position in the work area reference image, it means that there is an offset between the work area reference image and the actual geographic location. Based on the position vector of the preset control point, use the geographic registration tool in ArcGIS to register the work area reference image so that the corresponding position collected by the preset control point in the work area reference image completely coincides with the position vector of the preset control point, thereby correcting the work area reference image to be consistent with the actual geographic location.

[0082] The preset control points can be control points of the mining area and the surrounding stable area collected by the user, or control points of the surrounding stable area of ​​the mining area collected on-site using equipment such as RTK (Real Time Kinematic, real-time dynamic measurement).

[0083] The above-mentioned horizontal position calibration of the working area reference image can make the subsequent correction of the working area digital elevation model more accurate and improve the accuracy of the open-pit mining area mining volume calculation results.

[0084] S102, the server generates a digital elevation model of the monitoring work area corresponding to each preset monitoring period based on multiple work area stereo image pairs and a preset DEM generation tool, and determines the geo-referenced image group of different preset monitoring periods according to the work area reference image and the specified remote sensing image in each work area stereo image pair.

[0085] The geo-referenced image group includes at least a designated remote sensing image and a work area reference image.

[0086] In the embodiment of the present application, the above-mentioned tool based on multiple stereo image pairs of work areas and preset DEM generation generates digital elevation models of the work areas corresponding to the monitoring work areas in each preset monitoring period, specifically including:

[0087] Input each work area stereo image pair into the preset DEM generation tool respectively, so that the preset DEM generation tool generates the connection points between the front view image and the rear view image of the work area stereo image pair, so as to generate point cloud data corresponding to the connection points, and process each point cloud data through the DTM toolkit to generate the work area digital elevation model. The preset DEM generation tool is Inpho software. Processing each point cloud data at least includes: classification and editing.

[0088] That is to say, the present application can use the Inpho software to generate a digital elevation model (DEM) of the work area. More specifically, the SATMaster tool under the ApplicationsMaster module of the Inpho software is used to create a project and set the project coordinate system to be consistent with the satellite image coordinate system; secondly, satellite images are added and a generated scene is created, and the workspace stereo image pair with RPC (Rational Polynomial Coefficients) information is imported; then, the ImageCommander tool is used to perform format conversion and pyramid creation on the workspace stereo image pair, thereby completing the preparation before the production of the three-dimensional model; then, the MATCH-AT SatelliteTriangulation module is used to match the same-name points of the front and rear images of the workspace stereo image pair and perform aerial triangulation encryption processing to automatically generate connection points; then, the Match-T DSM Commander module is used to automatically generate DSM (Digital Surface Model) and point cloud data based on the connection points generated by the aerial triangulation module; finally, the DTM (Digital Terrain Model) toolbox is used to classify, edit and convert the point cloud data to obtain the workspace digital elevation model. Different workspace stereo image pairs generate different workspace digital elevation models. When Inpho software generates DSM, it will also generate point cloud data. After classifying and editing the point cloud data, it can remove the height of surface buildings or vegetation to obtain DEM.

[0089] In the embodiment of the present application, before determining the geo-referenced image groups of different preset monitoring periods according to the working area reference image and the designated remote sensing images in the stereo image pairs of each working area, the method further includes:

[0090] The server uses the rolling shutter tool in ArcGIS software to overlay the digital elevation model of the work area with the front view image and the rear view image in the stereo image pair of the work area, and displays them on the user terminal. The overlay is to use the partial areas of the two overlaid images as the foreground display image. Based on the user's designated operation on the front view image and the rear view image, the designated remote sensing image is determined. The designated remote sensing image is the front view image or the rear view image.

[0091] Because DEM is black and white and does not have the characteristics of optical images, buildings, road corners and other objects cannot be seen clearly. Therefore, it is impossible to select control points on DEM for registration, and it is impossible to eliminate the horizontal error in the systematic error of DEM. The systematic error is due to the differences in satellite attitude, imaging time, shooting angle, etc. of the stereo image pair. The three-dimensional surface information extracted at different phases has different degrees of error. The systematic error is related to the image imaging parameters themselves. In order to accurately use remote sensing images to monitor the mining volume in open-pit mines, it is necessary to overcome horizontal errors. Therefore, this application selects an image from the stereo image pair of the working area for subsequent geo-registration operations.

[0092] Specifically, the rolling shutter tool is used in ArcGIS software to compare the overlap between the digital elevation model of the work area and the stereo image pair of the work area. The digital elevation model of the work area and the front view image and the rear view image in the stereo image pair of the work area can be superimposed and displayed respectively. When superimposing the two images, half of the upper image is displayed to show whether the two images are misaligned. The user can determine the front view image or the rear view image with a higher degree of overlap as the designated remote sensing image through the user terminal. In actual use, the rear view image is preferably used as the designated remote sensing image.

[0093] In the embodiment of the present application, according to the working area reference image and the designated remote sensing image in each working area stereo image pair, the geo-referenced image groups of different preset monitoring periods are determined, specifically including:

[0094] The server uses the work area reference image and the designated remote sensing image of the same preset monitoring period as a group of geo-referenced images to determine the geo-referenced image group.

[0095] That is to say, the server may use the reference image of the working area within a preset monitoring period and the designated remote sensing image corresponding to the preset monitoring period as a group of geo-referenced images to obtain a geo-referenced image group.

[0096] In another embodiment of the present application, the acquisition frequency of the work area reference image may be lower than the acquisition frequency of the work area stereo image pair, and one work area reference image may correspond to multiple preset monitoring periods. Then the server can add a work area reference image and its corresponding multiple (such as two) preset monitoring periods of designated remote sensing images to a geo-referenced image group to perform geo-referenced DEM.

[0097] Through the above scheme, a geo-referenced image group is obtained, so that the designated remote sensing image can be geo-referenced first, and then the DEM can be geo-referenced using the relevant information of the reference control points obtained by geo-reference, thereby solving the difficulty that DEM cannot be directly referenced due to data characteristics.

[0098] S103, the server determines the horizontal registration error information corresponding to each geo-referenced image group based on each selected same-name point obtained by the user's operation on each geo-referenced image group, so as to perform a first registration process on the digital elevation model of the work area according to each horizontal registration error information.

[0099] In the embodiment of the present application, based on each selected same-name point obtained by the user operating each geo-referenced image group, the horizontal registration error information corresponding to each geo-referenced image group is determined, specifically including:

[0100] The server displays the georeferenced image group on the user terminal through the georeference tool in ArcGIS software, so that the user can select multiple same-name image points in the workspace reference image and the specified remote sensing image as selected same-name points. According to the first coordinate of each selected same-name point in the workspace reference image, the second coordinate in the specified remote sensing image and the error calculation formula, the root mean square value corresponding to the georeferenced image group is determined, and the root mean square value, the first coordinate and the second coordinate are added to the horizontal registration error information.

[0101] The error calculation formula is as follows:

[0102]

[0103] Among them, TotalRMS error is the root mean square value. i represents the number of the selected points with the same name. n represents the number of the selected points with the same name. i and i Respectively represent the horizontal and vertical coordinate values ​​in the first coordinate corresponding to the selected point of the same name. i ′ and y i ′ respectively represent the horizontal coordinate value and the vertical coordinate value in the second coordinate corresponding to the selected point of the same name.

[0104] In other words, the server can first correct the horizontal error in the system error. Specifically, based on the reference image of the work area, the server uses the geo-registration tool in the ArcGIS software to register the specified remote sensing image to obtain the registered control point information, files, etc., and generate horizontal registration error information.

[0105] Specifically, using the geo-registration tool in ArcGIS software, with the corrected work area reference image as the base image and the designated remote sensing image as the image to be registered, the user can visually select several image points of the same name on the two images as selected same-name points. The principle of selecting the same-name points is: try to select stable positions such as road corners as selected same-name points, select the same-name points in a square or circular distribution, and arrange them layer by layer from the edge of the image to the center of the image. The number of selected same-name points is appropriately adjusted according to the image size and image quality. Subsequently, after the same-name points are selected, the residuals and RMS (Root Mean Square) total errors of the selected same-name points are viewed in the registration module window. The smaller the RMS, the higher the registration accuracy; the control points with excessive residuals are adjusted or deleted so that the RMS total error is within 1 pixel to ensure the accuracy of image registration.

[0106] In addition, if the total RMS error is always greater than the second preset threshold after adjusting the control points for a preset number of times, a prompt message can be sent to the user terminal to facilitate user intervention and assist in the registration. The preset number of times and the second preset threshold are set by the user according to the actual usage scenario, and this application does not make specific limitations on this.

[0107] In the embodiment of the present application, according to each level registration error information, the first registration processing is performed on the digital elevation model of the work area, specifically including:

[0108] The root mean square value is compared with a first preset threshold value to determine whether the root mean square value is less than the first preset threshold value. If so, the work area digital elevation model is updated and georeferenced to perform a first registration process.

[0109] That is, when the root mean square value does not meet the requirement of being less than the first preset threshold, the selected homonymous points will be continuously adjusted until the root mean square value is less than the first preset threshold, so that the registration module can save the control point file at this time, which may include the second coordinate, coordinate residual, selected homonymous point residual and root mean square value, etc., and add it to the horizontal registration error information. At this time, the updated geographic registration of the specified remote sensing image is performed through the horizontal registration error information, and the digital elevation model DEM of the working area is registered to complete the DEM horizontal error correction, thereby completing the first registration process. The first preset threshold is set by the user during actual use, and this application does not make specific restrictions on this. Horizontally align the working area reference image and the specified remote sensing image as follows: Figure 2 As shown, the left side is the reference image of the workspace, and the right side is the specified remote sensing image.

[0110] S104, the server determines vertical registration error information corresponding to each work area digital elevation model based on each preset control point in the work area digital elevation model after the first registration process, and performs a second registration process on each corresponding work area digital elevation model according to each vertical registration error information.

[0111] In the embodiment of the present application, based on each preset control point in the digital elevation model of the work area after the first registration process, the vertical registration error information corresponding to each digital elevation model of the work area is determined, specifically including:

[0112] The server determines the measured elevation value of each preset control point. According to the work area digital elevation model after the first registration process, the DEM elevation value corresponding to each preset control point is determined. According to the difference between the measured elevation value of each preset control point and the corresponding DEM elevation value, the elevation error value corresponding to each preset control point is determined. The average value of each elevation error value of the same work area digital elevation model is used as the corresponding vertical registration error and added to the vertical registration error information.

[0113] In other words, the server can correct the vertical error in the system error, and the vertical error correction uses the elevation value of the control point. Specifically, the server can extract the DEM elevation value of the preset control point from the digital elevation model of the work area that has undergone the above-mentioned first registration processing, and obtain the measured elevation value of the preset control point. The measured elevation value can be stored in the server or in a database connected to the server. This application does not make specific restrictions on this. The server can calculate the difference between the measured elevation value of each preset control point and its DEM elevation value, and use the difference as the elevation error value. Subsequently, the server counts the elevation error values ​​corresponding to each preset control point corresponding to the digital elevation model of the same work area, calculates the average value of the elevation error value, and obtains the vertical registration error.

[0114] In the embodiment of the present application, the second registration process is performed on the corresponding digital elevation models of each work area according to each vertical registration error information, specifically including:

[0115] The server uses the raster calculator tool in ArcGIS software to take the difference between each DEM elevation value of the work area digital elevation model and the corresponding vertical registration error as the corrected DEM elevation value to complete the second registration processing of the work area digital elevation model.

[0116] That is, using the raster calculator tool in ArcGIS software, the DEM elevation value of the work area digital elevation model is subtracted from its corresponding vertical registration error to correct each DEM elevation value, thereby realizing the vertical error correction of the work area digital elevation model and completing the second registration process. The result diagram of the work area digital elevation model before and after the second registration process is shown in Figure 2. Figure 3As shown, the left side is the result image of the digital elevation model of the working area without the second registration processing, and the right side is the result image of the digital elevation model of the working area after the second registration processing.

[0117] Through the above scheme, the present application realizes the correction of the system error of the digital elevation model of the working area, laying a data foundation for realizing the rapid, accurate and low-cost automatic completion of the open-pit mine mining volume calculation work.

[0118] S105, the server determines the filling and cutting volume of the monitoring work area between each preset monitoring period based on the digital elevation model of each work area after the second registration process, and sends the filling and cutting volume of each monitoring work area to the user terminal.

[0119] The user terminal can be a user's mobile phone, computer or other device, which can display the changes in the mining volume of the monitoring work area, that is, the filling and excavation volume of the monitoring work area.

[0120] In the embodiment of the present application, based on the digital elevation models of each work area after the second registration process, the amount of fill and cut in the monitoring work area between each preset monitoring period is determined, specifically including:

[0121] The server generates corresponding segmentation polygons according to the image resolution corresponding to the digital elevation model of each work area after the second registration process, so as to segment the corresponding digital elevation model of the work area into several sub-areas according to the segmentation polygons. The area of ​​the segmentation polygon is the square value of the image resolution. With the DEM elevation value corresponding to each sub-area as the height and the segmentation polygon as the bottom surface, a prism corresponding to each sub-area is generated. Based on each prism in the digital elevation model of the work area corresponding to different preset monitoring periods, the corresponding monitoring work area fill and cut volume is determined.

[0122] That is to say, the server divides the monitoring work area into several sub-areas according to the image resolution. Each sub-area is a segmentation polygon with equal area size, and the area is the square value of the image resolution. Secondly, according to the DEM elevation value corresponding to each sub-area in the working digital elevation model, a prism with the segmentation polygon as the bottom and the DEM elevation value as the height can be generated. The server can calculate the volume change of each prism in the digital elevation model of the working area for different preset monitoring cycles to obtain the filling and cutting volume of the monitoring work area.

[0123] Specifically, the above-mentioned determination of the corresponding monitoring work area filling and cutting volume based on each prism in the work area digital elevation model corresponding to different preset monitoring periods specifically includes:

[0124] The volume change of each prism in the digital elevation model of the working area in different preset monitoring periods is determined by the calculation formula of the filling and cutting volume to obtain the corresponding filling and cutting volume of the monitoring working area.

[0125] The calculation formula for filling and cutting volume is as follows:

[0126]

[0127] Where V is the volume of fill and cut in the monitoring work area between the first work area digital elevation model H and the second work area digital elevation model h. A negative number indicates fill, a positive number indicates cut, and 0 indicates no change. j is the area of ​​the jth sub-region. j is the DEM elevation value corresponding to the jth sub-area in the digital elevation model of the first work area. j The DEM elevation value corresponding to the jth sub-area in the digital elevation model of the second work area. m is the number of sub-area divisions.

[0128] Through the above-mentioned calculation method, the changes in the mining volume in the monitoring work area in different preset monitoring periods, that is, the filling and excavation volume in the monitoring work area, can be accurately obtained.

[0129] In one embodiment of the present application, taking an open-pit mine as an example, combined with the stereo image pair of the working area collected by GF7 and the reference image of the working area collected by the drone, the Inpho software is used to establish a project, generate a scene, import data, establish an image pyramid, and complete the relevant preparations; then the aerial triangulation module is used to automatically generate the surface three-dimensional model DSM and point cloud data, and then the DTM toolbox is used to classify, edit and convert the point cloud data to generate the digital elevation model DEM of the mining area. According to the above operation process, the three-dimensional model DEM of the mining area of ​​the first preset monitoring period and the second preset monitoring period are obtained respectively.

[0130] Secondly, in ArcGIS software, the geographic registration module was used to register the rear-view images of the two GF7 stereo pairs based on the drone image base map of the same period, and the RMS total error control point was controlled within 1 pixel, and the registration control point files of the first preset monitoring period and the second preset monitoring period were output respectively; further, using the control point files of the two-phase rear-view image registration, based on the drone image base map of the same period, the previous step was repeated to perform horizontal registration of the three-dimensional model DEM of the mining area of ​​the first preset monitoring period and the second preset monitoring period respectively.

[0131] Again, using the mining area control point vector, the elevation values ​​of the control points corresponding to the mining area DEM data of the first preset monitoring period and the second preset monitoring period are extracted, and the average error value of the two DEMs in the vertical direction is calculated; further using the raster calculator tool in the ArcGIS software, the DEM raster image value is subtracted from the average error value to correct the DEM data, thereby completing the error correction in the vertical direction of the DEM for the first preset monitoring period and the second preset monitoring period.

[0132] Finally, the DEM data of the first preset monitoring period and the second preset monitoring period with system error correction were input into ArcGIS software respectively. The excavation results of the mining area were obtained by using the calculation formula of filling and excavation volume. The excavation volume was statistically analyzed to obtain the mining volume of the first preset monitoring period and the second preset monitoring period of the open-pit mine area, such as 64474.65m 3 .

[0133] This application uses the working area reference image and the working area stereo image pair of the remote sensing image to perform the system error correction registration of the DEM, so as to use the registered DEM to monitor the mining volume of the mining area quickly, accurately and at low cost. On the one hand, the use of remote sensing images to measure the mining volume of the open-pit mining area can take advantage of the many advantages of satellite remote sensing technology, such as large range, long distance, fast processing, and low cost, avoiding the pain points of being susceptible to dangerous terrain and geographical restrictions, data processing difficulty, high price and difficulty in large-scale use in traditional monitoring methods, unmanned aerial vehicle tilt photography and laser radar, etc., in the field of open-pit mining volume monitoring, it can quickly and accurately achieve large-scale, long-distance, and economical monitoring. On the other hand, after the preset control points are obtained at one time, the digital elevation model of the working area can be corrected for system errors. Compared with traditional monitoring methods, it avoids the difficulty of densely arranging ground control points throughout the mining area, and minimizes the difficulty and workload of repeated arrangement of control points in the mining area. On the other hand, through the stereo image pairs of the working area, the three-dimensional surface information of the open-pit mine area at different periods can be obtained, avoiding the repetitive and complicated work of multiple on-site surveys required by traditional monitoring methods. It can conduct periodic and time-series monitoring of the open-pit mine mining volume without contact, which is of great significance for timely understanding the mining status of the open-pit mine area.

[0134] Figure 4 A schematic diagram of the structure of an open-pit mine production monitoring system 400 based on remote sensing images provided in an embodiment of the present application is shown in FIG. Figure 4 As shown, the system includes:

[0135] The acquisition module 401 is used to acquire a work area reference image and a plurality of work area stereo image pairs corresponding to the monitoring work area, wherein the plurality of work area stereo image pairs are collected in different preset monitoring periods and correspond to different monitoring period timestamps.

[0136] The generation and determination module 402 is used to generate the digital elevation models of the monitoring work area corresponding to each preset monitoring period based on multiple work area stereo image pairs and the preset DEM generation tool, and determine the geo-referenced image groups of different preset monitoring periods according to the work area reference image and the specified remote sensing image in each work area stereo image pair. The geo-referenced image group includes at least the specified remote sensing image and the work area reference image.

[0137] The first determination module 403 is used to determine the horizontal registration error information corresponding to each geo-referenced image group based on each selected same-name point obtained by the user's operation on each geo-referenced image group, so as to perform the first registration processing on the work area digital elevation model according to each horizontal registration error information.

[0138] The second determination module 404 is used to determine the vertical registration error information corresponding to each work area digital elevation model based on each preset control point in the work area digital elevation model after the first registration processing, so as to perform the second registration processing on each corresponding work area digital elevation model according to each vertical registration error information.

[0139] The third determination module 405 is used to determine the filling and cutting volume of the monitoring work area between each preset monitoring period based on the digital elevation model of each work area after the second registration process, and send the filling and cutting volume of each monitoring work area to the user terminal.

[0140] In the embodiment of the present application, the open-pit mine production monitoring system based on remote sensing images can also:

[0141] Input each preset control point and the work area reference image into ArcGIS software for overlay display to determine whether the corresponding position of each preset control point coincides with the corresponding position of the work area reference image. If not, use the georeferencing tool in ArcGIS software to align the work area reference image until each preset control point coincides with the corresponding position of the work area reference image, and obtain the aligned work area reference image.

[0142] In the embodiment of the present application, the generation and determination module 402 can specifically:

[0143] Input each work area stereo image pair into the preset DEM generation tool respectively, so that the preset DEM generation tool generates the connection points between the front view image and the rear view image of the work area stereo image pair, so as to generate point cloud data corresponding to the connection points, and process each point cloud data through the DTM toolkit to generate the work area digital elevation model. The preset DEM generation tool is Inpho software. Processing each point cloud data at least includes: classification and editing.

[0144] In the embodiment of the present application, the open-pit mine production monitoring system based on remote sensing images can also:

[0145] Through the rolling shutter tool in ArcGIS software, the digital elevation model of the work area is superimposed with the front view image and the rear view image in the stereo image pair of the work area, and displayed on the user terminal. The superposition is to use the partial areas of the two superimposed images as the foreground display image. Based on the user's specified operation on the front view image and the rear view image, the specified remote sensing image is determined. The specified remote sensing image is the front view image or the rear view image.

[0146] In the embodiment of the present application, the generation and determination module 402 can specifically:

[0147] The reference image of the working area and the designated remote sensing image of the same preset monitoring period are taken as a group of geo-referenced images to determine the geo-referenced image group.

[0148] In the embodiment of the present application, the first determining module 403 can specifically:

[0149] Through the georeferencing tool in ArcGIS software, the georeferenced image group is displayed on the user terminal so that the user can select multiple same-name image points in the workspace reference image and the specified remote sensing image as selected same-name points. According to the first coordinate of each selected same-name point in the workspace reference image, the second coordinate in the specified remote sensing image and the error calculation formula, the root mean square value corresponding to the georeferenced image group is determined, and the root mean square value, the first coordinate and the second coordinate are added to the horizontal registration error information.

[0150] The error calculation formula is as follows:

[0151]

[0152] Among them, TotalRMS error is the root mean square value. i represents the number of the selected points with the same name. n represents the number of the selected points with the same name. i and i Respectively represent the horizontal and vertical coordinate values ​​in the first coordinate corresponding to the selected point of the same name. i ′ and y i ′ respectively represent the horizontal coordinate value and the vertical coordinate value in the second coordinate corresponding to the selected point of the same name.

[0153] In the embodiment of the present application, the first determining module 403 may further specifically:

[0154] The root mean square value is compared with a first preset threshold value to determine whether the root mean square value is less than the first preset threshold value. If so, the work area digital elevation model is updated and georeferenced to perform a first registration process.

[0155] In the embodiment of the present application, the second determining module 404 can specifically:

[0156] Determine the measured elevation value of each preset control point. According to the work area digital elevation model after the first registration process, determine the DEM elevation value corresponding to each preset control point. According to the difference between the measured elevation value of each preset control point and the corresponding DEM elevation value, determine the elevation error value corresponding to each preset control point. The average value of each elevation error value of the same work area digital elevation model is used as the corresponding vertical registration error and added to the vertical registration error information. And, through the raster calculator tool in ArcGIS software, the difference between each DEM elevation value of the work area digital elevation model and the corresponding vertical registration error is used as the corrected DEM elevation value to complete the second registration process of the work area digital elevation model.

[0157] In the embodiment of the present application, the third determination module 405 can specifically:

[0158] According to the image resolution corresponding to the digital elevation model of each work area after the second registration process, the corresponding segmentation polygon is generated to segment the corresponding digital elevation model of the work area into several sub-areas according to the segmentation polygon. The area of ​​the segmentation polygon is the square value of the image resolution. With the DEM elevation value corresponding to each sub-area as the height and the segmentation polygon as the bottom surface, a prism corresponding to each sub-area is generated. Based on each prism in the digital elevation model of the work area corresponding to different preset monitoring periods, the corresponding monitoring work area fill and cut volume is determined.

[0159] In the embodiment of the present application, the third determining module 405 can specifically further:

[0160] The volume change of each prism in the digital elevation model of the working area in different preset monitoring periods is determined by the calculation formula of the filling and cutting volume to obtain the corresponding filling and cutting volume of the monitoring working area.

[0161] The calculation formula for filling and cutting volume is as follows:

[0162]

[0163] Where V is the volume of fill and cut in the monitoring work area between the first work area digital elevation model H and the second work area digital elevation model h. A negative number indicates fill, a positive number indicates cut, and 0 indicates no change. j is the area of ​​the jth sub-region. j is the DEM elevation value corresponding to the jth sub-area in the digital elevation model of the first work area. j The DEM elevation value corresponding to the jth sub-area in the digital elevation model of the second work area. m is the number of sub-area divisions.

[0164] Figure 5A schematic diagram of the structure of an open-pit mine production monitoring device based on remote sensing images provided in an embodiment of the present application is shown in FIG. Figure 5 As shown, the device includes:

[0165] At least one processor; and a memory in communication with the at least one processor. The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to:

[0166] Obtain a work area reference image and multiple work area stereo image pairs corresponding to the monitoring work area. Among them, multiple work area stereo image pairs are collected in different preset monitoring periods and correspond to different monitoring period timestamps. Based on multiple work area stereo image pairs and preset DEM generation tools, generate work area digital elevation models corresponding to the monitoring work area in each preset monitoring period, and determine the geo-referenced image groups of different preset monitoring periods according to the work area reference image and the specified remote sensing image in each work area stereo image pair. The geo-referenced image group includes at least the specified remote sensing image and the work area reference image. Based on the selected same-name points obtained by the user's operation on each geo-referenced image group, determine the horizontal registration error information corresponding to each geo-referenced image group, so as to perform a first registration process on the work area digital elevation model according to each horizontal registration error information. Based on each preset control point in the work area digital elevation model after the first registration process, determine the vertical registration error information corresponding to each work area digital elevation model, so as to perform a second registration process on the corresponding work area digital elevation model according to each vertical registration error information. Based on the digital elevation models of each work area after the second registration process, the filling and cutting volumes of the monitoring work areas between each preset monitoring period are determined, and the filling and cutting volumes of each monitoring work area are sent to the user terminal.

[0167] Each embodiment in this application is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system and device embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.

[0168] The system and equipment provided in the embodiments of the present application correspond one-to-one to the method. Therefore, the system and equipment also have similar beneficial technical effects as the corresponding methods. Since the beneficial technical effects of the methods have been described in detail above, the beneficial technical effects of the system and equipment will not be repeated here.

[0169] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0170] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A method for monitoring the mining volume of an open-pit mine based on remote sensing images, characterized in that: The method comprises: Acquire a work area reference image and a plurality of work area stereo image pairs corresponding to the monitored work area; wherein the plurality of work area stereo image pairs are collected in different preset monitoring periods and correspond to different monitoring period timestamps; Based on the plurality of said working area stereo image pairs and the preset DEM generation tool, the working area digital elevation models corresponding to the monitoring working area in each of the said preset monitoring periods are generated, and according to the said working area reference image and the specified remote sensing image in each of the said working area stereo image pairs, the geo-referenced image groups of different said preset monitoring periods are determined; the said geo-referenced image groups at least include the said specified remote sensing image and the said working area reference image; Based on each selected same-name point obtained by the user operating each of the geo-referenced image groups, determining the horizontal registration error information corresponding to each of the geo-referenced image groups, so as to perform a first registration process on the digital elevation model of the work area according to each of the horizontal registration error information; Based on each preset control point in the work area digital elevation model after the first registration process, determine the vertical registration error information corresponding to each of the work area digital elevation models, so as to perform a second registration process on each of the corresponding work area digital elevation models according to each of the vertical registration error information; Based on the digital elevation models of each of the work areas after the second registration process, the filling and cutting volumes of the monitoring work areas between the preset monitoring periods are determined, and the filling and cutting volumes of each of the monitoring work areas are sent to the user terminal.

2. The method for monitoring the mining volume of open-pit mines based on remote sensing images according to claim 1 is characterized in that: After obtaining a work area reference image and a plurality of work area stereo image pairs corresponding to the monitoring work area, the method further includes: Input each of the preset control points and the reference image of the work area into ArcGIS software for overlay display to determine whether the corresponding position of each of the preset control points and the reference image of the work area coincides; If not, the work area reference image is registered using the geographic registration tool in the ArcGIS software until each of the preset control points coincides with the corresponding position of the work area reference image, thereby obtaining the registered work area reference image.

3. The method for monitoring the mining volume of open-pit mines based on remote sensing images according to claim 1, characterized in that: Based on the plurality of stereo image pairs of the work area and the preset DEM generation tool, a digital elevation model of the work area corresponding to each preset monitoring period of the monitoring work area is generated, specifically including: Input each of the working area stereo image pairs into the preset DEM generation tool respectively, so that the preset DEM generation tool generates connection points between the front view image and the rear view image of the working area stereo image pair, so as to generate point cloud data corresponding to the connection points, and process each of the point cloud data through the DTM toolkit to generate the digital elevation model of the working area; the preset DEM generation tool is Inpho software; processing each of the point cloud data at least includes: classification and editing.

4. The method for monitoring mining output in open-pit mines based on remote sensing images according to claim 1, characterized in that: Before determining the geo-referenced image groups of different preset monitoring periods according to the working area reference image and the designated remote sensing images in each of the working area stereo image pairs, the method further includes: Through the rolling shutter tool in ArcGIS software, the digital elevation model of the work area is superimposed and overlapped with the front view image and the rear view image in the stereo image pair of the work area, and displayed on the user terminal; wherein the superposition and overlap is to use partial areas of the two superimposed images as foreground display images respectively; Based on the user's designated operation on the front view image and the rear view image, the designated remote sensing image is determined; wherein the designated remote sensing image is the front view image or the rear view image; Determining geo-referenced image groups of different preset monitoring periods according to the working area reference image and the designated remote sensing images in each working area stereo image pair specifically includes: The working area reference image and the designated remote sensing image of the same preset monitoring period are taken as a group of geo-referenced images to determine the geo-referenced image group.

5. The method for monitoring the mining volume of open-pit mines based on remote sensing images according to claim 4 is characterized in that: Based on each selected same-name point obtained by the user's operation on each of the geo-referenced image groups, determining horizontal registration error information corresponding to each of the geo-referenced image groups, specifically includes: By using the geo-reference tool in the ArcGIS software, the geo-referenced image group is displayed on the user terminal so that the user can select a plurality of image points with the same name in the work area reference image and the designated remote sensing image as the selected same-name points; Determine the root mean square value corresponding to the geo-referenced image group according to the first coordinate of each selected same-name point in the work area reference image, the second coordinate in the designated remote sensing image and the error calculation formula, and add the root mean square value, the first coordinate and the second coordinate to the horizontal registration error information; The error calculation formula is as follows: Among them, TotalRMS error is the root mean square value; i represents the number of the selected same-name points; n represents the number of the selected same-name points; x i and i x respectively represent the horizontal coordinate value and the vertical coordinate value of the first coordinate corresponding to the selected same-name point; i ′ and y i ' respectively represent the abscissa value and ordinate value of the second coordinate corresponding to the selected same-name point; According to each of the horizontal registration error information, a first registration process is performed on the work area digital elevation model, specifically comprising: Comparing the root mean square value with a first preset threshold to determine whether the root mean square value is less than the first preset threshold; If so, the work area digital elevation model is updated and geographically aligned to perform a first alignment process.

6. The method for monitoring mining output in open-pit mines based on remote sensing images according to claim 1, characterized in that: Determining vertical registration error information corresponding to each of the digital elevation models of the work area based on each preset control point in the digital elevation model of the work area after the first registration process specifically includes: Determining the measured elevation value of each of the preset control points; Determine the DEM elevation values ​​corresponding to the preset control points according to the digital elevation model of the work area after the first registration process; Determine the elevation error value corresponding to each of the preset control points according to the difference between the measured elevation value of each of the preset control points and the corresponding DEM elevation value; Taking the average value of each elevation error value of the same work area digital elevation model as the corresponding vertical registration error, and adding it to the vertical registration error information; According to each of the vertical registration error information, a second registration process is performed on each of the corresponding work area digital elevation models, specifically including: Through the raster calculator tool in ArcGIS software, the difference between each DEM elevation value of the work area digital elevation model and the corresponding vertical registration error is used as the corrected DEM elevation value to complete the second registration processing of the work area digital elevation model.

7. The method for monitoring mining output in open-pit mines based on remote sensing images according to claim 6, characterized in that: Determining the volume of fill and cut in the monitoring work area between each preset monitoring period based on the digital elevation model of each work area after the second registration process specifically includes: Generate corresponding segmentation polygons according to the image resolutions corresponding to the digital elevation models of the work areas after the second registration process, so as to segment the corresponding digital elevation models of the work areas into a plurality of sub-areas according to the segmentation polygons; the area of ​​the segmentation polygons is the square value of the image resolution; Taking the DEM elevation value corresponding to each of the sub-regions as the height and the segmentation polygon as the bottom surface, a prism corresponding to each of the sub-regions is generated; Based on each of the prisms in the digital elevation model of the work area corresponding to different preset monitoring periods, the corresponding filling and cutting volume of the monitoring work area is determined.

8. The method for monitoring the mining volume of open-pit mines based on remote sensing images according to claim 7 is characterized in that: Determining the corresponding fill and cut volume of the monitoring work area based on the prisms in the digital elevation model of the work area corresponding to different preset monitoring periods specifically includes: Determine the volume change of each prism in the digital elevation model of the work area in different preset monitoring periods through a fill and cut volume calculation formula to obtain the corresponding fill and cut volume of the monitoring work area; The calculation formula for the filling and cutting volume is as follows: Wherein, V is the filling and cutting volume of the monitoring work area between the first work area digital elevation model H and the second work area digital elevation model h, V is a negative number for filling, V is a positive number for cutting, and V is 0 for no change; A j is the area of ​​the jth sub-region; H j is the DEM elevation value corresponding to the j-th sub-area in the digital elevation model of the first work area; j The DEM elevation value corresponding to the j-th sub-area in the digital elevation model of the second workspace; m is the number of divisions of the sub-area.

9. An open-pit mining area mining output monitoring system based on remote sensing images, characterized in that: The system comprises: An acquisition module, used to acquire a work area reference image and a plurality of work area stereo image pairs corresponding to the monitoring work area; wherein the plurality of work area stereo image pairs are collected in different preset monitoring periods and correspond to different monitoring period timestamps; A generating and determining module is used to generate a digital elevation model of the monitoring work area corresponding to each of the preset monitoring periods based on a plurality of the working area stereo image pairs and a preset DEM generating tool, and determine a geographically referenced image group of different preset monitoring periods according to the working area reference image and a designated remote sensing image in each of the working area stereo image pairs; the geographically referenced image group includes at least the designated remote sensing image and the working area reference image; A first determination module is used to determine the horizontal registration error information corresponding to each of the geo-referenced image groups based on each selected same-name point obtained by the user operating each of the geo-referenced image groups, so as to perform a first registration process on the work area digital elevation model according to each of the horizontal registration error information; A second determination module is used to determine vertical registration error information corresponding to each of the digital elevation models of the work area based on each preset control point in the digital elevation model of the work area after the first registration process, so as to perform a second registration process on each of the corresponding digital elevation models of the work area according to each of the vertical registration error information; The third determination module is used to determine the filling and cutting volume of the monitoring work area between each preset monitoring period based on the digital elevation model of each work area after the second registration process, and send the filling and cutting volume of each monitoring work area to the user terminal.

10. An open-pit mining area mining output monitoring device based on remote sensing images, characterized in that: The device comprises: at least one processor; and, a memory communicatively connected to the at least one processor; wherein, The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute a method for monitoring open-pit mine production based on remote sensing images as described in any one of claims 1-8.

Citation Information

Patent Citations

  • Mine productivity monitoring method and device based on unmanned aerial vehicle

    CN114782847A

  • Open pit coal mine cross-border mining monitoring method and system

    CN118397533A

Cited By

  • Ploughing layer soil stripping engineering quantity estimation method based on image data processing

    CN121725374A

  • Method and system for dynamically monitoring surface mine use resource quantity

    CN122336173A