Optimized scheduling method and device for wind and light storage pumping and storage combined system
Through the extreme learning machine model prediction and optimization scheduling model, the randomness and intermittent problems of wind power and photovoltaic new energy are solved, efficient consumption of new energy and system cost reduction are achieved, and the stable operation of the power system is ensured.
Patent Information
- Application Number
- CN202410949480.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-29
AI Technical Summary
The power generation power of new energy sources such as wind power and photovoltaics is random and intermittent, and it is difficult to accurately predict, resulting in serious wind and light abandonment, and the problem of new energy consumption is prominent, and the existing technology is difficult to effectively solve.
The pre-constructed extreme learning machine model is used to predict the wind power and photovoltaic output prediction values and load power of the wind and light storage joint system, and substitute them into the optimization scheduling model to solve the optimization results to realize the optimization scheduling scheme, including the day-to-day and intraday control cycles. The goal of scheduling is to reduce system operation costs and cut peaks and fill valleys.
By optimizing the scheduling method, the ability to absorb new energy is improved, the system operation costs are reduced, and the power system is helped to achieve safe, stable and economical operation.
Smart Images

Figure CN119051033A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power generation system scheduling, and in particular to an optimization scheduling method and device for a wind-solar-storage-pumped-storage combined system. Background Art
[0002] As the global climate warms, fossil fuels such as coal have caused serious environmental pollution, and clean energy has been vigorously developed. Hydropower is the main deterministic renewable energy. Compared with deterministic renewable energy, uncertain renewable energy such as wind power and solar power generation also has huge development potential. Renewable energy grids have been born and their number is increasing, which is an inevitable trend in the development of the grid.
[0003] At present, new energy is developing rapidly. However, there are a lot of wind and solar abandonment phenomena in new energy such as wind power and photovoltaic power, and the problem of new energy consumption is prominent. The power generation of renewable energy sources such as wind power and solar power has inherent uncertainty characterized by randomness and intermittency, which is difficult to accurately predict. The establishment of pumped storage power stations has well absorbed new energy sources such as photovoltaic and wind power, weakened their shortcomings of randomness, volatility and uncertainty to reduce the impact on the system, and combined with the advantages of electrochemical energy storage devices, explored the joint operation of pumped storage power stations combined with pumped storage, wind power, photovoltaic and electrochemical energy storage, which is of great significance to promote the consumption of new energy.
[0004] Batteries have the advantages of flexible regulation and low price, but their cycle life is short, large-scale application technology is immature, and they are easy to pollute the environment. Pumped storage power stations require special geographical conditions and sites, and their construction is relatively limited. Although the one-time investment cost is high, they have the characteristics of large scale, long cycle life and low operating costs. With the vigorous development of new energy, the consumption of new energy has also become an urgent problem to be solved. Pumped storage power stations complement the advantages of electrochemical energy storage, and thus work together with wind farms and photovoltaic power stations around hydropower stations to achieve peak shaving and valley filling, which will help to achieve safe, stable and economical operation of the power system.
[0005] Therefore, there is an urgent need for an optimal scheduling method for a wind-solar-storage-pumped-storage combined system. Summary of the invention
[0006] In order to overcome the above-mentioned defects, the present invention proposes an optimization scheduling method and device for a wind-solar-storage-pumped-storage combined system.
[0007] In a first aspect, a method for optimizing the dispatching of a wind-solar-storage-pumped-storage combined system is provided, wherein the method for optimizing the dispatching of a wind-solar-storage-pumped-storage combined system comprises:
[0008] The pre-built extreme learning machine model corresponding to different control cycles is used to predict the wind power output forecast value, photovoltaic output forecast value and load power forecast value of the wind-solar-storage-pumped-storage combined system in different control cycles;
[0009] Substituting the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles into the optimization scheduling model corresponding to different control cycles and solving them to obtain the optimization results corresponding to different control cycles;
[0010] The optimization results corresponding to the different control cycles are used as the optimization scheduling scheme of the wind-solar-storage-pumped-storage combined system;
[0011] The different control cycles include at least one of the following: a day-ahead control cycle and an intraday control cycle.
[0012] Preferably, the day-ahead control cycle is 24 hours with a resolution of 1 hour, and the day-ahead control cycle is 1 hour with a resolution of 15 minutes.
[0013] Preferably, the optimization result includes at least one of the following: the dispatching output of the photovoltaic power station, the dispatching output of the wind farm, the generating power of the pumped-storage unit, the pumping power of the pumped-storage unit, the discharging power of the electrochemical energy storage, the charging power of the electrochemical energy storage, the 0 / 1 variable of the operating state of the pumped-storage unit under pumping conditions, and the 0 / 1 variable of the operating state of the pumped-storage unit under generating conditions.
[0014] Furthermore, the optimization scheduling model corresponding to the day-ahead control period includes: a first objective function with the goal of minimizing the total cost of the joint operation system and its corresponding first constraint condition.
[0015] Furthermore, the first objective function is as follows:
[0016] minf1=C P +C PV +C W
[0017]
[0018] In the above formula, f1 is the first objective function value, C P is the total operating cost of the pumped storage unit, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T is the total number of time periods in the day-ahead control cycle, NG is the total number of pumped storage units, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under pumping conditions in period t, is the average pumping operation cost of the pumped storage unit, is the pumping power of the jth pumped storage unit in period t, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under power generation conditions in period t, is the average power generation and operation cost of the pumped storage unit, is the power generated by the j-th pumped storage unit in period t, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
[0019] Furthermore, the first constraint condition includes at least one of the following: system power balance constraint, pumped storage unit storage capacity constraint, pumped storage unit start and stop constraint, pumped storage unit output power constraint, pumped storage unit pumping power constraint, pumped storage unit climbing constraint, wind power output limit constraint, photovoltaic output limit constraint, electrochemical energy storage battery charge state constraint, energy storage battery power limit constraint under charging and discharging state, and rotating standby constraint.
[0020] Furthermore, the system power balance constraint is as follows:
[0021]
[0022] The storage capacity constraints of the pumped storage unit are as follows:
[0023]
[0024] The start and stop constraints of the pumped storage unit are as follows:
[0025]
[0026] The output power constraints of the pumped storage unit are as follows:
[0027]
[0028] The pumping power constraints of the pumped storage unit are as follows:
[0029]
[0030] The climbing constraints of the pumped storage unit are as follows:
[0031]
[0032] The wind power output limitation constraints are as follows:
[0033]
[0034]
[0035] The photovoltaic output limit constraints are as follows:
[0036]
[0037] The state of charge constraints of the electrochemical energy storage battery are as follows:
[0038] SOC min ≤SOC t ≤SOC max
[0039] The power limit constraints of the energy storage battery under the charging and discharging state are as follows:
[0040]
[0041] The spinning reserve constraints are as follows:
[0042]
[0043] In the above formula, is the dispatch output of the wind farm in period t during the day-ahead control cycle, is the dispatching output of the photovoltaic power station in the t period of the day-ahead control cycle, is the power generation power of the jth pumped storage unit in the t period of the day-ahead control cycle, is the pumping power of the jth pumped storage unit in the t period of the day-ahead control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit in the t period of the day-ahead control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period during the day-ahead control cycle, is the load forecasted one day in advance for period t, is the minimum storage capacity of the upper reservoir, V t u is the storage capacity of the upper reservoir during period t, is the maximum storage capacity of the upper reservoir, is the minimum storage capacity of the lower reservoir, V t d is the storage capacity of the reservoir in period t, is the maximum storage capacity of the lower reservoir, is the storage capacity of the reservoir in period t-1, is the flow rate of the j-th pumped storage unit under power generation conditions in period t, is the flow rate of the j-th pumped storage unit under pumping conditions during period t, is the storage capacity of the upper reservoir in period t-1, is the water level of the upper reservoir during period T, The water level control target of the upper reservoir is is the water level of the lower reservoir during period T, The water level control target of the lower reservoir is is the minimum power generation capacity of the jth pumped storage unit, is the maximum power generation capacity of the jth pumped storage unit, is the minimum pumping power of the jth pumped storage unit, is the maximum pumping power of the jth pumped storage unit, is the power generated by the j-th pumped storage unit in the period t+1, is the maximum downhill capacity of the jth pumped storage unit, is the maximum uphill capability of the jth pumped storage unit, P w,N is the installed capacity of the wind farm, P w,min,t is the lower limit of wind farm available power during period t, P w,max,t is the predicted output value of the wind farm during period t, P PV,N is the installed capacity of the photovoltaic power station, P PV,min,t is the lower limit of the available power of the photovoltaic power station during period t, P PV,max,t is the photovoltaic output forecast value during period t, SOC min The minimum state of charge of the battery, SOC t SOC is the battery state of charge during period t max is the maximum state of charge of the battery, P c,k,min The minimum power for charging the kth electrochemical energy storage, P c,k,max The maximum power for charging the kth electrochemical energy storage, P d,k,min is the minimum power of the kth electrochemical energy storage device, P d,k,max is the maximum power of the kth electrochemical energy storage device discharged, S PH is the installed capacity of pumped storage units, δ is the spinning reserve rate of the combined system, is the load power prediction value, is the load during period T.
[0044] Furthermore, the optimization scheduling model corresponding to the intraday control cycle includes: a second objective function with the goal of minimizing the total cost of the joint operation system and its corresponding second constraint condition.
[0045] Furthermore, the second objective function is as follows:
[0046] minf2=C ΔP +C PV +C W
[0047]
[0048] In the above formula, f2 is the second objective function value, C ΔPThe output adjustment cost of the pumped storage unit in each dispatch cycle, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T1 is the total number of time periods in the daily control cycle, NG is the total number of pumped storage units, ω ΔP is the unit output unit adjustment cost coefficient, ΔP j,t is the output adjustment of the jth pumped storage unit in period t compared with the day before, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
[0049] Furthermore, the second constraint condition includes at least one of the following: pumped storage unit extraction and discharge state switching reliability constraint, power balance constraint, wind power output limitation constraint, photovoltaic output limitation constraint, pumped storage power station operation constraint, electrochemical energy storage constraint, and pumped storage reliability constraint.
[0050] Furthermore, the pumping state switching reliability constraint of the pumped storage unit is as follows:
[0051] r=k / n
[0052] The power balance constraints are as follows:
[0053]
[0054] The operating constraints of the pumped storage power station are as follows:
[0055] X end =X0
[0056] The pumped storage reliability constraints are as follows:
[0057]
[0058] In the above formula, r is the pumping state switching reliability of the pumped storage unit, k is a constant, and n is the number of pumping state changes of the pumped storage unit within a day. is the dispatching output of the wind farm during the t period in the daily control cycle, is the dispatching output of the photovoltaic power station during the t period in the daily control cycle, is the power generation power of the jth pumped storage unit in the t period of the daily control cycle, is the pumping power of the jth pumped storage unit in the t period of the daily control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit during the t period of the daily control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period of the daily control cycle, is the load forecasted one day in advance for period t, X end is the water volume stored in the upper reservoir after rolling dispatch in the 24th cycle at the end of the day, X0 is the initial value of the water volume stored in the upper reservoir, P pump,t is the pumping power in period t, P pump,max is the upper limit of pumping power in period t, R pump,t is the pumping reliability in period t, e is a natural constant, λ pump is the pumping failure rate, P gen,t is the power generation during period t, P gen,max is the upper limit of power generation in period t, R gen,t is the power generation reliability in period t, λ gen is the power generation failure rate.
[0059] In a second aspect, an optimization dispatching device for a wind-solar-storage-pumped-storage combined system is provided, wherein the optimization dispatching device for the wind-solar-storage-pumped-storage combined system comprises:
[0060] A prediction module is used to predict the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles by using the pre-built extreme learning machine model corresponding to different control cycles;
[0061] An analysis module is used to substitute the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles into the optimization scheduling model corresponding to different control cycles and solve them to obtain the optimization results corresponding to different control cycles;
[0062] A scheduling module, used to use the optimization results corresponding to the different control cycles as the optimization scheduling scheme of the wind-solar-storage-pumped-storage combined system;
[0063] The different control cycles include at least one of the following: a day-ahead control cycle and an intraday control cycle.
[0064] Preferably, the day-ahead control cycle is 24 hours with a resolution of 1 hour, and the day-ahead control cycle is 1 hour with a resolution of 15 minutes.
[0065] Preferably, the optimization result includes at least one of the following: the dispatching output of the photovoltaic power station, the dispatching output of the wind farm, the generating power of the pumped-storage unit, the pumping power of the pumped-storage unit, the discharging power of the electrochemical energy storage, the charging power of the electrochemical energy storage, the 0 / 1 variable of the operating state of the pumped-storage unit under pumping conditions, and the 0 / 1 variable of the operating state of the pumped-storage unit under generating conditions.
[0066] Furthermore, the optimization scheduling model corresponding to the day-ahead control period includes: a first objective function with the goal of minimizing the total cost of the joint operation system and its corresponding first constraint condition.
[0067] Furthermore, the first objective function is as follows:
[0068] minf1=C P +C PV +C W
[0069]
[0070] In the above formula, f1 is the first objective function value, C P is the total operating cost of the pumped storage unit, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T is the total number of time periods in the day-ahead control cycle, NG is the total number of pumped storage units, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under pumping conditions in period t, is the average pumping operation cost of the pumped storage unit, is the pumping power of the jth pumped storage unit in period t, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under power generation conditions in period t, is the average power generation and operation cost of the pumped storage unit, is the power generated by the j-th pumped storage unit in period t, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
[0071] Furthermore, the first constraint condition includes at least one of the following: system power balance constraint, pumped storage unit storage capacity constraint, pumped storage unit start and stop constraint, pumped storage unit output power constraint, pumped storage unit pumping power constraint, pumped storage unit climbing constraint, wind power output limit constraint, photovoltaic output limit constraint, electrochemical energy storage battery charge state constraint, energy storage battery power limit constraint under charging and discharging state, and rotating standby constraint.
[0072] Furthermore, the system power balance constraint is as follows:
[0073]
[0074] The storage capacity constraints of the pumped storage unit are as follows:
[0075]
[0076] The start and stop constraints of the pumped storage unit are as follows:
[0077]
[0078] The output power constraints of the pumped storage unit are as follows:
[0079]
[0080] The pumping power constraints of the pumped storage unit are as follows:
[0081]
[0082] The climbing constraints of the pumped storage unit are as follows:
[0083]
[0084] The wind power output limitation constraints are as follows:
[0085]
[0086]
[0087] The photovoltaic output limit constraints are as follows:
[0088]
[0089] The state of charge constraints of the electrochemical energy storage battery are as follows:
[0090] SOC min ≤SOC t ≤SOC max
[0091] The power limit constraints of the energy storage battery under the charging and discharging state are as follows:
[0092]
[0093] The spinning reserve constraints are as follows:
[0094]
[0095] In the above formula, is the dispatch output of the wind farm in period t during the day-ahead control cycle, is the dispatching output of the photovoltaic power station in the t period of the day-ahead control cycle, is the power generation power of the jth pumped storage unit in the t period of the day-ahead control cycle, is the pumping power of the jth pumped storage unit in the t period of the day-ahead control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit in the t period of the day-ahead control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period during the day-ahead control cycle, is the load forecasted one day in advance for period t, is the minimum storage capacity of the upper reservoir, V t u is the storage capacity of the upper reservoir during period t, is the maximum storage capacity of the upper reservoir, is the minimum storage capacity of the lower reservoir, V t d is the storage capacity of the reservoir in period t, is the maximum storage capacity of the lower reservoir, is the storage capacity of the reservoir in period t-1, is the flow rate of the j-th pumped storage unit under power generation conditions in period t, is the flow rate of the j-th pumped storage unit under pumping conditions during period t, is the storage capacity of the upper reservoir in period t-1, is the water level of the upper reservoir during period T, The water level control target of the upper reservoir is is the water level of the lower reservoir during period T, The water level control target of the lower reservoir is is the minimum power generation capacity of the jth pumped storage unit, is the maximum power generation capacity of the jth pumped storage unit, is the minimum pumping power of the jth pumped storage unit, is the maximum pumping power of the jth pumped storage unit, is the power generated by the j-th pumped storage unit in the period t+1, is the maximum downhill capacity of the jth pumped storage unit, is the maximum uphill capability of the jth pumped storage unit, P w,N is the installed capacity of the wind farm, P w,min,t is the lower limit of wind farm available power during period t, P w,max,t is the predicted output value of the wind farm during period t, P PV,N is the installed capacity of the photovoltaic power station, P PV,min,t is the lower limit of the available power of the photovoltaic power station during period t, P PV,max,t is the photovoltaic output forecast value during period t, SOC min The minimum state of charge of the battery, SOC t SOC is the battery state of charge during period t max is the maximum state of charge of the battery, P c,k,min The minimum power for charging the kth electrochemical energy storage, P c,k,max The maximum power for charging the kth electrochemical energy storage, Pd,k,min is the minimum power of the kth electrochemical energy storage device, P d,k,max is the maximum power of the kth electrochemical energy storage device discharged, S PH is the installed capacity of pumped storage units, δ is the spinning reserve rate of the combined system, is the load power prediction value, is the load during period T.
[0096] Furthermore, the optimization scheduling model corresponding to the intraday control cycle includes: a second objective function with the goal of minimizing the total cost of the joint operation system and its corresponding second constraint condition.
[0097] Furthermore, the second objective function is as follows:
[0098] minf2=C ΔP +C PV +C W
[0099]
[0100] In the above formula, f2 is the second objective function value, C ΔP The output adjustment cost of the pumped storage unit in each dispatch cycle, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T1 is the total number of time periods in the daily control cycle, NG is the total number of pumped storage units, ω ΔP is the unit output unit adjustment cost coefficient, ΔP j,t is the output adjustment of the jth pumped storage unit in period t compared with the day before, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
[0101] Furthermore, the second constraint condition includes at least one of the following: pumped storage unit extraction and discharge state switching reliability constraint, power balance constraint, wind power output limitation constraint, photovoltaic output limitation constraint, pumped storage power station operation constraint, electrochemical energy storage constraint, and pumped storage reliability constraint.
[0102] Furthermore, the reliability constraints of the pumping state switching of the pumped storage unit are as follows:
[0103] r=k / n
[0104] The power balance constraints are as follows:
[0105]
[0106] The operating constraints of the pumped storage power station are as follows:
[0107] X end =X0
[0108] The pumped storage reliability constraints are as follows:
[0109]
[0110] In the above formula, r is the pumping state switching reliability of the pumped storage unit, k is a constant, n is the number of pumping state changes of the pumped storage unit within a day, is the dispatching output of the wind farm during the t period in the daily control cycle, is the dispatching output of the photovoltaic power station during the t period in the daily control cycle, is the power generation power of the jth pumped storage unit in the t period of the daily control cycle, is the pumping power of the jth pumped storage unit in the t period of the daily control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit during the t period of the daily control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period of the daily control cycle, is the load forecasted one day in advance for period t, X end is the water volume stored in the upper reservoir after rolling dispatch in the 24th cycle at the end of the day, X0 is the initial value of the water volume stored in the upper reservoir, P pump,t is the pumping power in period t, P pump,max is the upper limit of pumping power in period t, R pump,t is the pumping reliability in period t, e is a natural constant, λ pump is the pumping failure rate, P gen,t is the power generation during period t, P gen,max is the upper limit of power generation in period t, R gen,t is the power generation reliability in period t, λ gen is the power generation failure rate.
[0111] In a third aspect, a computer device is provided, comprising: one or more processors;
[0112] The processor is configured to execute one or more programs;
[0113] When the one or more programs are executed by the one or more processors, the optimization scheduling method of the wind-solar-storage-pumped-storage combined system is implemented.
[0114] In a fourth aspect, a computer-readable storage device is provided, on which a computer program is stored. When the computer program is executed, the optimization scheduling method of the wind-solar-storage-pumped-storage combined system is implemented.
[0115] The above one or more technical solutions of the present invention have at least one or more of the following beneficial effects:
[0116] The present invention provides an optimization scheduling method and device for a wind-solar-storage-pumped-storage combined system, including: using a pre-constructed extreme learning machine model corresponding to different control cycles to predict the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles; substituting the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles into the optimization scheduling model corresponding to different control cycles and solving them to obtain the optimization results corresponding to different control cycles; using the optimization results corresponding to the different control cycles as the optimization scheduling scheme of the wind-solar-storage-pumped-storage combined system; wherein the different control cycles include at least one of the following: a day-ahead control cycle and an intraday control cycle. The technical solution provided by the present invention can achieve peak shaving and valley filling, improve the new energy absorption capacity, reduce the system operation cost, and help to achieve safe, stable and economical operation of the power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0117] Figure 1 1 is a flow chart of the main steps of the optimization scheduling method of the wind-solar-storage-pumped-storage combined system according to an embodiment of the present invention;
[0118] Figure 2 This is a structural diagram of a wind-solar-storage-pumped-storage combined system joint operation system diagram of an embodiment of the present invention
[0119] Figure 3 1 is a flow chart of a hunter-orion algorithm according to an embodiment of the present invention;
[0120] Figure 4 is a load power prediction curve diagram in the day-ahead dispatching according to an embodiment of the present invention;
[0121] Figure 5 is a wind power and photovoltaic output prediction curve diagram in the day-ahead dispatching according to an embodiment of the present invention;
[0122] Figure 6 This is a diagram of the optimization scheduling strategy results of an embodiment of the present invention. DETAILED DESCRIPTION
[0123] The specific implementation modes of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0124] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0125] As disclosed in the background technology, with global warming, fossil energy such as coal has caused serious environmental pollution, and clean energy has been vigorously developed. Hydropower is the main deterministic renewable energy. Compared with deterministic renewable energy, uncertain renewable energy such as wind power and solar power generation also has huge development potential. Renewable energy grids have been born and the number is increasing, which is an inevitable trend in the development of the grid.
[0126] At present, new energy is developing rapidly. However, there are a lot of wind and solar abandonment phenomena in new energy such as wind power and photovoltaic power, and the problem of new energy consumption is prominent. The power generation of renewable energy sources such as wind power and solar power has inherent uncertainty characterized by randomness and intermittency, which is difficult to accurately predict. The establishment of pumped storage power stations has well absorbed new energy sources such as photovoltaic and wind power, weakened their shortcomings of randomness, volatility and uncertainty to reduce the impact on the system, and combined with the advantages of electrochemical energy storage devices, explored the joint operation of pumped storage power stations combined with pumped storage, wind power, photovoltaic and electrochemical energy storage, which is of great significance to promote the consumption of new energy.
[0127] Batteries have the advantages of flexible regulation and low price, but their cycle life is short, large-scale application technology is immature, and they are easy to pollute the environment. Pumped storage power stations require special geographical conditions and sites, and their construction is relatively limited. Although the one-time investment cost is high, they have the characteristics of large scale, long cycle life and low operating costs. With the vigorous development of new energy, the consumption of new energy has also become an urgent problem to be solved. Pumped storage power stations complement the advantages of electrochemical energy storage, and thus work together with wind farms and photovoltaic power stations around hydropower stations to achieve peak shaving and valley filling, which will help to achieve safe, stable and economical operation of the power system.
[0128] Therefore, there is an urgent need for an optimal scheduling method for a wind-solar-storage-pumped-storage combined system.
[0129] In order to improve the above-mentioned problems, the present invention provides an optimization scheduling method and device for a wind-solar-storage-pumped-storage combined system, including: using a pre-constructed extreme learning machine model corresponding to different control cycles to predict the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles; substituting the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles into the optimization scheduling model corresponding to different control cycles and solving them to obtain the optimization results corresponding to different control cycles; using the optimization results corresponding to the different control cycles as the optimization scheduling scheme for the wind-solar-storage-pumped-storage combined system; wherein the different control cycles include at least one of the following: a day-ahead control cycle and an intraday control cycle. The technical solution provided by the present invention can achieve peak shaving and valley filling, improve the new energy absorption capacity, reduce the system operation cost, and help to achieve safe, stable and economical operation of the power system.
[0130] The above scheme is described in detail below.
[0131] Example 1
[0132] See attached Figure 1 , Figure 1 1 is a flow chart of the main steps of the optimization dispatching method of the wind-solar-storage-pumped-storage combined system according to an embodiment of the present invention. Figure 1 As shown, the optimization scheduling method of the wind-solar-storage-pumped-storage combined system in the embodiment of the present invention mainly includes the following steps:
[0133] Step S101: using a pre-built extreme learning machine model corresponding to different control cycles to predict wind power output prediction values, photovoltaic output prediction values, and load power prediction values of a wind-solar-storage-pumped-storage combined system in different control cycles;
[0134] Step S102: Substituting the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles into the optimization scheduling model corresponding to the different control cycles and solving them to obtain the optimization results corresponding to the different control cycles;
[0135] Step S103: taking the optimization results corresponding to the different control cycles as the optimization scheduling scheme of the wind-solar-storage-pumped-storage combined system;
[0136] The different control cycles include at least one of the following: a day-ahead control cycle and an intraday control cycle. The day-ahead control cycle is 24 hours with a resolution of 1 hour, and the intraday control cycle is 1 hour with a resolution of 15 minutes.
[0137] In this embodiment, the optimization result includes at least one of the following: the dispatching output of the photovoltaic power station, the dispatching output of the wind farm, the generating power of the pumped storage unit, the pumping power of the pumped storage unit, the discharging power of the electrochemical energy storage, the charging power of the electrochemical energy storage, the 0 / 1 variable of the operating state of the pumped storage unit under the pumping condition, and the 0 / 1 variable of the operating state of the pumped storage unit under the generating condition.
[0138] In this embodiment, the extreme learning machine model can be trained through the historical values of wind power output, photovoltaic output and load power of the wind-solar-storage-pumped-storage combined system in different control cycles.
[0139] In one embodiment, the optimization scheduling model corresponding to the day-ahead control period includes: a first objective function with the goal of minimizing the total cost of the joint operation system and a corresponding first constraint condition.
[0140] In one embodiment, the first objective function is as follows:
[0141] minf1=C P +C PV +C W
[0142]
[0143] In the above formula, f1 is the first objective function value, C P is the total operating cost of the pumped storage unit, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T is the total number of time periods in the day-ahead control cycle, NG is the total number of pumped storage units, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under pumping conditions in period t, is the average pumping operation cost of the pumped storage unit, is the pumping power of the jth pumped storage unit in period t, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under power generation conditions in period t, is the average power generation and operation cost of the pumped storage unit, is the power generated by the j-th pumped storage unit in period t, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
[0144] In one embodiment, the first constraint condition includes at least one of the following: system power balance constraint, pumped storage unit storage capacity constraint, pumped storage unit start and stop constraint, pumped storage unit output power constraint, pumped storage unit pumping power constraint, pumped storage unit climbing constraint, wind power output limit constraint, photovoltaic output limit constraint, electrochemical energy storage battery charge state constraint, energy storage battery charge and discharge state power limit constraint, and rotating standby constraint.
[0145] In one embodiment, the system power balance constraint is as follows:
[0146]
[0147] The storage capacity constraints of the pumped storage unit are as follows:
[0148]
[0149] The start and stop constraints of the pumped storage unit are as follows:
[0150]
[0151] The output power constraints of the pumped storage unit are as follows:
[0152]
[0153] The pumping power constraints of the pumped storage unit are as follows:
[0154]
[0155] The climbing constraints of the pumped storage unit are as follows:
[0156]
[0157] The wind power output limitation constraints are as follows:
[0158]
[0159] The photovoltaic output limit constraints are as follows:
[0160]
[0161] The state of charge constraints of the electrochemical energy storage battery are as follows:
[0162] SOC min ≤SOC t ≤SOC max
[0163] The power limit constraints of the energy storage battery under the charging and discharging state are as follows:
[0164]
[0165] The spinning reserve constraints are as follows:
[0166]
[0167] In the above formula, is the dispatch output of the wind farm in period t during the day-ahead control cycle, is the dispatching output of the photovoltaic power station in the t period of the day-ahead control cycle, is the power generation power of the jth pumped storage unit in the t period of the day-ahead control cycle, is the pumping power of the jth pumped storage unit in the t period of the day-ahead control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit in the t period of the day-ahead control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period during the day-ahead control cycle, is the load forecasted one day in advance for period t, is the minimum storage capacity of the upper reservoir, V t u is the storage capacity of the upper reservoir during period t, is the maximum storage capacity of the upper reservoir, is the minimum storage capacity of the lower reservoir, V t d is the storage capacity of the reservoir in period t, is the maximum storage capacity of the lower reservoir, is the storage capacity of the reservoir in period t-1, is the flow rate of the j-th pumped storage unit under power generation conditions in period t, is the flow rate of the j-th pumped storage unit under pumping conditions during period t, is the storage capacity of the upper reservoir in period t-1, is the water level of the upper reservoir during period T, The water level control target of the upper reservoir is is the water level of the lower reservoir during period T, The water level control target of the lower reservoir is is the minimum power generation capacity of the jth pumped storage unit, is the maximum power generation capacity of the jth pumped storage unit, is the minimum pumping power of the jth pumped storage unit, is the maximum pumping power of the jth pumped storage unit, is the power generated by the j-th pumped storage unit in the period t+1, is the maximum downhill capacity of the jth pumped storage unit, is the maximum uphill capability of the jth pumped storage unit, P w,N is the installed capacity of the wind farm, P w,min,tis the lower limit of wind farm available power during period t, P w,max,t is the predicted output value of the wind farm during period t, P PV,N is the installed capacity of the photovoltaic power station, P PV,min,t is the lower limit of the available power of the photovoltaic power station during period t, P PV,max,t is the photovoltaic output forecast value during period t, SOC min The minimum state of charge of the battery, SOC t SOC is the battery state of charge during period t max is the maximum state of charge of the battery, P c,k,min The minimum power for charging the kth electrochemical energy storage, P c,k,max The maximum power for charging the kth electrochemical energy storage, P d,k,min is the minimum power of the kth electrochemical energy storage device, P d,k,max is the maximum power of the kth electrochemical energy storage device discharged, S PH is the installed capacity of pumped storage units, δ is the spinning reserve rate of the combined system, is the load power prediction value, is the load during period T.
[0168] In one embodiment, the optimization scheduling model corresponding to the intraday control period includes: a second objective function with the goal of minimizing the total cost of the joint operation system and its corresponding second constraint condition.
[0169] In one embodiment, the second objective function is as follows:
[0170] minf2=C ΔP +C PV +C W
[0171]
[0172] In the above formula, f2 is the second objective function value, C ΔP The output adjustment cost of the pumped storage unit in each dispatch cycle, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T1 is the total number of time periods in the daily control cycle, NG is the total number of pumped storage units, ω ΔP is the unit output unit adjustment cost coefficient, ΔP j,t is the output adjustment of the jth pumped storage unit in period t compared with the day before, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
[0173] In one embodiment, the second constraint condition includes at least one of the following: pumped storage unit extraction and discharge state switching reliability constraint, power balance constraint, wind power output limitation constraint, photovoltaic output limitation constraint, pumped storage power station operation constraint, electrochemical energy storage constraint, and pumped storage reliability constraint.
[0174] In one embodiment, the pumping state switching reliability constraint of the pumped storage unit is as follows:
[0175] r=k / n
[0176] The power balance constraints are as follows:
[0177]
[0178] The operating constraints of the pumped storage power station are as follows:
[0179] X end =X0
[0180] The pumped storage reliability constraints are as follows:
[0181]
[0182] In the above formula, r is the pumping state switching reliability of the pumped storage unit, k is a constant, and n is the number of pumping state changes of the pumped storage unit within a day. is the dispatching output of the wind farm during the t period in the daily control cycle, is the dispatching output of the photovoltaic power station during the t period in the daily control cycle, is the power generation power of the jth pumped storage unit in the t period of the daily control cycle, is the pumping power of the jth pumped storage unit in the t period of the daily control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit during the t period of the daily control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period of the daily control cycle, is the load forecasted one day in advance for period t, X end is the water volume stored in the upper reservoir after rolling dispatch in the 24th cycle at the end of the day, X0 is the initial value of the water volume stored in the upper reservoir, P pump,t is the pumping power in period t, P pump,max is the upper limit of pumping power in period t, R pump,t is the pumping reliability in period t, e is a natural constant, λ pump is the pumping failure rate, P gen,t is the power generation during period t, P gen,max is the upper limit of power generation in period t, R gen,t is the power generation reliability in period t, λgen is the power generation failure rate.
[0183] Among them, the forms of power balance constraints, wind power output limitation constraints, photovoltaic output limitation constraints, and electrochemical energy storage constraints are the same as the corresponding constraints in the optimization scheduling model corresponding to the day-ahead control period.
[0184] For ease of understanding, this application provides Figure 2 The application example of the wind, solar and energy storage combined system uses a 400MW photovoltaic power station, a 400MW wind farm, a 2×150MW variable speed pumped storage power station and a group of 50MW / 200MWh electrochemical energy storage devices;
[0185] The hunter-prey algorithm is used to solve the optimal scheduling model corresponding to different control cycles. The hunter-prey algorithm process is as follows: Figure 3 As shown;
[0186] The load power curve in the day-ahead dispatch predicted by the extreme learning machine model is as follows: Figure 4 As shown;
[0187] The power curve of photovoltaic and wind power output in day-ahead dispatch predicted by the extreme learning machine model is as follows Figure 5 As shown;
[0188] The maximum number of iterations in the hunter-prey optimization algorithm is set to 50, the initial population size is set to 50, and the SOC value range is set to 0.2-0.9, based on which the joint system model is solved;
[0189] The day-ahead and day-intraday scheduling results based on data drive are as follows: Figure 6 .
[0190] The comparison results of renewable energy consumption rate after only day-ahead scheduling and day-ahead and intraday scheduling are shown in Table 1.
[0191] Table 1
[0192] Renewable energy consumption rate / % Only day-ahead scheduling 91.13 Day-ahead-intraday scheduling 99.62
[0193] Compared with existing dispatching schemes, the present invention complements the advantages of pumped-storage power stations and electrochemical energy storage, and operates them in conjunction with wind farms and photovoltaic power stations around the hydropower station to achieve peak shaving and valley filling, which helps to achieve safe, stable and economical operation of the power system.
[0194] The present invention is based on the wind power output and photovoltaic output corresponding to each period in the optimization scheduling cycle and the load period prediction data, takes the maximum economic benefit of the joint operation system as the goal, comprehensively considers various constraints, and establishes a day-ahead optimization scheduling model.
[0195] The present invention adopts a hunter-prey optimization algorithm to solve the scheduling. The hunter-prey algorithm can quickly find the approximate area where the optimal solution is located during the optimization process, thereby accelerating the convergence of the algorithm and improving the accuracy of the algorithm. It is superior in solving the day-ahead optimization scheduling model of such a combined power generation system.
[0196] Pumped-storage power stations can alleviate the impact of the uncertainty of new energy on the power system, participate in the peak and valley regulation of the power system load curve, reduce the wind and solar power abandonment rates of new energy power generation, thereby effectively improving the energy utilization rate of photovoltaic and wind power generation and improving the economic benefits of the system.
[0197] Pumped storage and battery energy storage can complement each other's advantages: battery energy storage has the ability to quickly adjust. When the system needs to charge and discharge, the battery starts charging and discharging quickly, which can effectively complement the regulation capacity of the pumped storage power station. The energy storage unit can provide a larger storage space for the combined system and achieve reliable power supply at different stages.
[0198] Example 2
[0199] Based on the same inventive concept, the present invention also provides an optimization dispatching device for a wind-solar-storage-pumped-storage combined system, the optimization dispatching device for the wind-solar-storage-pumped-storage combined system comprising:
[0200] A prediction module is used to predict the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles by using the pre-built extreme learning machine model corresponding to different control cycles;
[0201] An analysis module is used to substitute the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles into the optimization scheduling model corresponding to different control cycles and solve them to obtain the optimization results corresponding to different control cycles;
[0202] A scheduling module, used to use the optimization results corresponding to the different control cycles as the optimization scheduling scheme of the wind-solar-storage-pumped-storage combined system;
[0203] The different control cycles include at least one of the following: a day-ahead control cycle and an intraday control cycle.
[0204] Preferably, the day-ahead control cycle is 24 hours with a resolution of 1 hour, and the day-ahead control cycle is 1 hour with a resolution of 15 minutes.
[0205] Preferably, the optimization result includes at least one of the following: the dispatching output of the photovoltaic power station, the dispatching output of the wind farm, the generating power of the pumped-storage unit, the pumping power of the pumped-storage unit, the discharging power of the electrochemical energy storage, the charging power of the electrochemical energy storage, the 0 / 1 variable of the operating state of the pumped-storage unit under pumping conditions, and the 0 / 1 variable of the operating state of the pumped-storage unit under generating conditions.
[0206] Furthermore, the optimization scheduling model corresponding to the day-ahead control period includes: a first objective function with the goal of minimizing the total cost of the joint operation system and its corresponding first constraint condition.
[0207] Furthermore, the first objective function is as follows:
[0208] minf1=C P +C PV +C W
[0209]
[0210] In the above formula, f1 is the first objective function value, C P is the total operating cost of the pumped storage unit, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T is the total number of time periods in the day-ahead control cycle, NG is the total number of pumped storage units, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under pumping conditions in period t, is the average pumping operation cost of the pumped storage unit, is the pumping power of the jth pumped storage unit in period t, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under power generation conditions in period t, is the average power generation and operation cost of the pumped storage unit, is the power generated by the j-th pumped storage unit in period t, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
[0211] Furthermore, the first constraint condition includes at least one of the following: system power balance constraint, pumped storage unit storage capacity constraint, pumped storage unit start and stop constraint, pumped storage unit output power constraint, pumped storage unit pumping power constraint, pumped storage unit climbing constraint, wind power output limit constraint, photovoltaic output limit constraint, electrochemical energy storage battery charge state constraint, energy storage battery power limit constraint under charging and discharging state, and rotating standby constraint.
[0212] Furthermore, the system power balance constraint is as follows:
[0213]
[0214] The storage capacity constraints of the pumped storage unit are as follows:
[0215]
[0216] The start and stop constraints of the pumped storage unit are as follows:
[0217]
[0218] The output power constraints of the pumped storage unit are as follows:
[0219]
[0220] The pumping power constraints of the pumped storage unit are as follows:
[0221]
[0222] The climbing constraints of the pumped storage unit are as follows:
[0223]
[0224] The wind power output limitation constraints are as follows:
[0225]
[0226]
[0227] The photovoltaic output limit constraints are as follows:
[0228]
[0229] The state of charge constraints of the electrochemical energy storage battery are as follows:
[0230] SOC min ≤SOC t ≤SOC max
[0231] The power limit constraints of the energy storage battery under the charging and discharging state are as follows:
[0232]
[0233] The spinning reserve constraints are as follows:
[0234]
[0235] In the above formula, is the dispatch output of the wind farm in period t during the day-ahead control cycle, is the dispatching output of the photovoltaic power station in the t period of the day-ahead control cycle, is the power generation power of the jth pumped storage unit in the t period of the day-ahead control cycle, is the pumping power of the jth pumped storage unit in the t period of the day-ahead control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit in the t period of the day-ahead control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period during the day-ahead control cycle, is the load forecasted one day in advance for period t, is the minimum storage capacity of the upper reservoir, V t u is the storage capacity of the upper reservoir during period t, is the maximum storage capacity of the upper reservoir, is the minimum storage capacity of the lower reservoir, V t d is the storage capacity of the reservoir in period t, is the maximum storage capacity of the lower reservoir, is the storage capacity of the reservoir in period t-1, is the flow rate of the j-th pumped storage unit under power generation conditions in period t, is the flow rate of the j-th pumped storage unit under pumping conditions during period t, is the storage capacity of the upper reservoir in period t-1, is the water level of the upper reservoir during period T, The water level control target of the upper reservoir is is the water level of the lower reservoir during period T, The water level control target of the lower reservoir is is the minimum power generation capacity of the jth pumped storage unit, is the maximum power generation capacity of the jth pumped storage unit, is the minimum pumping power of the jth pumped storage unit, is the maximum pumping power of the jth pumped storage unit, is the power generated by the j-th pumped storage unit in the period t+1, is the maximum downhill capacity of the jth pumped storage unit, is the maximum uphill capability of the jth pumped storage unit, P w,N is the installed capacity of the wind farm, P w,min,t is the lower limit of wind farm available power during period t, P w,max,t is the predicted output value of the wind farm during period t, P PV,N is the installed capacity of the photovoltaic power station, P PV,min,t is the lower limit of the available power of the photovoltaic power station during period t, P PV,max,tis the photovoltaic output forecast value during period t, SOC min The minimum state of charge of the battery, SOC t SOC is the battery state of charge during period t max is the maximum state of charge of the battery, P c,k,min The minimum power for charging the kth electrochemical energy storage, P c,k,max The maximum power for charging the kth electrochemical energy storage, P d,k,min is the minimum power of the kth electrochemical energy storage device, P d,k,max is the maximum power of the kth electrochemical energy storage device discharged, S PH is the installed capacity of pumped storage units, δ is the spinning reserve rate of the combined system, is the load power prediction value, is the load during period T.
[0236] Furthermore, the optimization scheduling model corresponding to the intraday control cycle includes: a second objective function with the goal of minimizing the total cost of the joint operation system and its corresponding second constraint condition.
[0237] Furthermore, the second objective function is as follows:
[0238] minf2=C ΔP +C PV +C W
[0239]
[0240] In the above formula, f2 is the second objective function value, C ΔP The output adjustment cost of the pumped storage unit in each dispatch cycle, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T1 is the total number of time periods in the daily control cycle, NG is the total number of pumped storage units, ω ΔP is the unit output unit adjustment cost coefficient, ΔP j,t is the output adjustment of the jth pumped storage unit in period t compared with the day before, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
[0241] Furthermore, the second constraint condition includes at least one of the following: pumped storage unit extraction and discharge state switching reliability constraint, power balance constraint, wind power output limitation constraint, photovoltaic output limitation constraint, pumped storage power station operation constraint, electrochemical energy storage constraint, and pumped storage reliability constraint.
[0242] Furthermore, the reliability constraints of the pumping state switching of the pumped storage unit are as follows:
[0243] r=k / n
[0244] The power balance constraints are as follows:
[0245]
[0246] The operating constraints of the pumped storage power station are as follows:
[0247] X end =X0
[0248] The pumped storage reliability constraints are as follows:
[0249]
[0250] In the above formula, r is the pumping state switching reliability of the pumped storage unit, k is a constant, n is the number of pumping state changes of the pumped storage unit within a day, is the dispatching output of the wind farm during the t period in the daily control cycle, is the dispatching output of the photovoltaic power station during the t period in the daily control cycle, is the power generation power of the jth pumped storage unit in the t period of the daily control cycle, is the pumping power of the jth pumped storage unit in the t period of the daily control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit during the t period of the daily control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period of the daily control cycle, is the load forecasted one day in advance for period t, X end is the water volume stored in the upper reservoir after rolling dispatch in the 24th cycle at the end of the day, X0 is the initial value of the water volume stored in the upper reservoir, P pump,t is the pumping power in period t, P pump,max is the upper limit of pumping power in period t, R pump,t is the pumping reliability in period t, e is a natural constant, λ pump is the pumping failure rate, P gen,t is the power generation during period t, P gen,max is the upper limit of power generation in period t, R gen,t is the power generation reliability in period t, λ gen is the power generation failure rate.
[0251] Example 3
[0252] Based on the same inventive concept, the present invention also provides a computer device, which includes a processor and a memory, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions in the computer storage medium to implement the corresponding method flow or corresponding function, so as to implement the steps of the optimization scheduling method of a wind-solar-storage-pumped storage combined system in the above embodiment.
[0253] Example 4
[0254] Based on the same inventive concept, the present invention also provides a storage medium, specifically a computer-readable storage device (Memory), which is a memory device in a computer device for storing programs and data. It can be understood that the computer-readable storage device here can include both the built-in storage medium in the computer device and the extended storage medium supported by the computer device. The computer-readable storage device provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage device here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage device to implement the steps of the optimization scheduling method of a wind-solar-storage-pumped storage combined system in the above embodiment.
[0255] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0256] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0257] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0258] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0259] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. An optimization dispatching method for a wind-solar-storage-pumped-storage combined system, characterized in that: The method comprises: The pre-built extreme learning machine model corresponding to different control cycles is used to predict the wind power output forecast value, photovoltaic output forecast value and load power forecast value of the wind-solar-storage-pumped-storage combined system in different control cycles; Substituting the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles into the optimization scheduling model corresponding to different control cycles and solving them to obtain the optimization results corresponding to different control cycles; The optimization results corresponding to the different control cycles are used as the optimization scheduling scheme of the wind-solar-storage-pumped-storage combined system; The different control cycles include at least one of the following: a day-ahead control cycle and an intraday control cycle.
2. The method according to claim 1, characterized in that The day-ahead control cycle is 24 hours with a resolution of 1 hour, and the intraday control cycle is 1 hour with a resolution of 15 minutes.
3. The method according to claim 1, characterized in that The optimization result includes at least one of the following: the dispatching output of the photovoltaic power station, the dispatching output of the wind farm, the generating power of the pumped-storage unit, the pumping power of the pumped-storage unit, the discharging power of the electrochemical energy storage, the charging power of the electrochemical energy storage, the 0 / 1 variable of the operating state of the pumped-storage unit under the pumping condition, and the 0 / 1 variable of the operating state of the pumped-storage unit under the generating condition.
4. The method according to claim 3, characterized in that The optimization scheduling model corresponding to the day-ahead control period includes: a first objective function with the goal of minimizing the total cost of the joint operation system and a corresponding first constraint condition.
5. The method according to claim 4, characterized in that The first objective function is as follows: minf1=C P +C PV +C W In the above formula, f1 is the first objective function value, C P is the total operating cost of the pumped storage unit, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T is the total number of time periods in the day-ahead control cycle, NG is the total number of pumped storage units, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under pumping conditions in period t, is the average pumping operation cost of the pumped storage unit, is the pumping power of the jth pumped storage unit in period t, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under power generation conditions in period t, is the average power generation and operation cost of the pumped storage unit, is the power generated by the j-th pumped storage unit in period t, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
6. The method according to claim 5, characterized in that The first constraint condition includes at least one of the following: system power balance constraint, pumped storage unit storage capacity constraint, pumped storage unit start and stop constraint, pumped storage unit output power constraint, pumped storage unit pumping power constraint, pumped storage unit climbing constraint, wind power output limit constraint, photovoltaic output limit constraint, electrochemical energy storage battery charge state constraint, energy storage battery power limit constraint under charging and discharging state, and rotating standby constraint.
7. The method according to claim 6, characterized in that The system power balance constraints are as follows: The storage capacity constraints of the pumped storage unit are as follows: The start and stop constraints of the pumped storage unit are as follows: The output power constraints of the pumped storage unit are as follows: The pumping power constraints of the pumped storage unit are as follows: The climbing constraints of the pumped storage unit are as follows: The wind power output limitation constraints are as follows: The photovoltaic output limit constraints are as follows: The state of charge constraints of the electrochemical energy storage battery are as follows: SOC min ≤SOC t ≤SOC max The power limit constraints of the energy storage battery under the charging and discharging state are as follows: The spinning reserve constraints are as follows: In the above formula, is the dispatch output of the wind farm in period t during the day-ahead control cycle, is the dispatching output of the photovoltaic power station in the t period of the day-ahead control cycle, is the power generation power of the jth pumped storage unit in the t period of the day-ahead control cycle, is the pumping power of the jth pumped storage unit in the t period of the day-ahead control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit in the t period of the day-ahead control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period during the day-ahead control cycle, is the load forecasted one day in advance for period t, is the minimum storage capacity of the upper reservoir, is the storage capacity of the upper reservoir during period t, is the maximum storage capacity of the upper reservoir, is the minimum storage capacity of the lower reservoir, is the storage capacity of the reservoir in period t, is the maximum storage capacity of the lower reservoir, is the storage capacity of the reservoir in period t-1, is the flow rate of the j-th pumped storage unit under power generation conditions in period t, is the flow rate of the j-th pumped storage unit under pumping conditions during period t, is the storage capacity of the upper reservoir in period t-1, is the water level of the upper reservoir during period T, The water level control target of the upper reservoir is is the water level of the lower reservoir during period T, The water level control target of the lower reservoir is is the minimum power generation capacity of the jth pumped storage unit, is the maximum power generation capacity of the jth pumped storage unit, is the minimum pumping power of the jth pumped storage unit, is the maximum pumping power of the jth pumped storage unit, is the power generated by the j-th pumped storage unit in the period t+1, is the maximum downhill capacity of the jth pumped storage unit, is the maximum uphill capability of the jth pumped storage unit, P w,N is the installed capacity of the wind farm, P w,min,t is the lower limit of wind farm available power during period t, P w,max,t is the predicted output value of the wind farm during period t, P PV,N is the installed capacity of the photovoltaic power station, P PV,min,t is the lower limit of the available power of the photovoltaic power station during period t, P PV,max,t is the photovoltaic output forecast value during period t, SOC min The minimum state of charge of the battery, SOC t SOC is the battery state of charge during period t max is the maximum state of charge of the battery, P c,k,min The minimum power for charging the kth electrochemical energy storage, P c,k,max The maximum power for charging the kth electrochemical energy storage, P d,k,min is the minimum power of the kth electrochemical energy storage device, P d,k,max is the maximum power of the kth electrochemical energy storage device discharged, S PH is the installed capacity of pumped storage units, δ is the spinning reserve rate of the combined system, is the load power forecast value, is the load during period T.
8. The method according to claim 3, characterized in that The optimization scheduling model corresponding to the intraday control cycle includes: a second objective function with the goal of minimizing the total cost of the joint operation system and its corresponding second constraint condition.
9. The method according to claim 8, characterized in that The second objective function is as follows: minf2=C ΔP +C PV +C W In the above formula, f2 is the second objective function value, C ΔP The output adjustment cost of the pumped storage unit in each dispatch cycle, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T1 is the total number of time periods in the daily control cycle, NG is the total number of pumped storage units, ω ΔP is the unit output unit adjustment cost coefficient, ΔP j,t is the output adjustment of the jth pumped storage unit in period t compared with the day before, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
10. The method according to claim 9, characterized in that The second constraint condition includes at least one of the following: pumped storage unit extraction and discharge state switching reliability constraint, power balance constraint, wind power output limitation constraint, photovoltaic output limitation constraint, pumped storage power station operation constraint, electrochemical energy storage constraint, and pumped storage reliability constraint.
11. The method according to claim 10, characterized in that The reliability constraints of the pumped storage unit pumping and discharging state switching are as follows: r=k / n The power balance constraints are as follows: The operating constraints of the pumped storage power station are as follows: X end =X0 The pumped storage reliability constraints are as follows: In the above formula, r is the pumping state switching reliability of the pumped storage unit, k is a constant, and n is the number of pumping state changes of the pumped storage unit within a day. is the dispatching output of the wind farm during the t period in the daily control cycle, is the dispatching output of the photovoltaic power station during the t period in the daily control cycle, is the power generation power of the jth pumped storage unit in the t period of the daily control cycle, is the pumping power of the jth pumped storage unit in the t period of the daily control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit during the t period of the daily control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period of the daily control cycle, is the load forecasted one day in advance for period t, X end is the water volume stored in the upper reservoir after rolling dispatch in the 24th cycle at the end of the day, X0 is the initial value of the water volume stored in the upper reservoir, P pump,t is the pumping power in period t, P pump,max is the upper limit of pumping power in period t, R pump,t is the pumping reliability in period t, e is a natural constant, λ pump is the pumping failure rate, P gen,t is the power generation during period t, P gen,max is the upper limit of power generation in period t, R gen,t is the power generation reliability in period t, λ gen is the power generation failure rate.
12. An optimization dispatching device for a wind-solar-storage-pumped-storage combined system, characterized in that: The device comprises: A prediction module is used to predict the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles by using the pre-built extreme learning machine model corresponding to different control cycles; An analysis module is used to substitute the wind power output prediction value, photovoltaic output prediction value and load power prediction value of the wind-solar-storage-pumped-storage combined system in different control cycles into the optimization scheduling model corresponding to different control cycles and solve them to obtain the optimization results corresponding to different control cycles; A scheduling module, used to use the optimization results corresponding to the different control cycles as the optimization scheduling scheme of the wind-solar-storage-pumped-storage combined system; The different control cycles include at least one of the following: a day-ahead control cycle and an intraday control cycle.
13. The device according to claim 12, characterized in that The day-ahead control cycle is 24 hours with a resolution of 1 hour, and the intraday control cycle is 1 hour with a resolution of 15 minutes.
14. The device according to claim 12, characterized in that The optimization result includes at least one of the following: the dispatching output of the photovoltaic power station, the dispatching output of the wind farm, the generating power of the pumped-storage unit, the pumping power of the pumped-storage unit, the discharging power of the electrochemical energy storage, the charging power of the electrochemical energy storage, the 0 / 1 variable of the operating state of the pumped-storage unit under the pumping condition, and the 0 / 1 variable of the operating state of the pumped-storage unit under the generating condition.
15. The device according to claim 14, characterized in that The optimization scheduling model corresponding to the day-ahead control period includes: a first objective function with the goal of minimizing the total cost of the joint operation system and a corresponding first constraint condition.
16. The device according to claim 15, characterized in that The first objective function is as follows: minf1=C P +C PV +C W In the above formula, f1 is the first objective function value, C P is the total operating cost of the pumped storage unit, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T is the total number of time periods in the day-ahead control cycle, NG is the total number of pumped storage units, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under pumping conditions in period t, is the average pumping operation cost of the pumped storage unit, is the pumping power of the jth pumped storage unit in period t, is a 0 / 1 variable of the operating state of the j-th pumped storage unit under power generation conditions in period t, is the average power generation and operation cost of the pumped storage unit, is the power generated by the j-th pumped storage unit in period t, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
17. The device according to claim 16, characterized in that The first constraint condition includes at least one of the following: system power balance constraint, pumped storage unit storage capacity constraint, pumped storage unit start and stop constraint, pumped storage unit output power constraint, pumped storage unit pumping power constraint, pumped storage unit climbing constraint, wind power output limit constraint, photovoltaic output limit constraint, electrochemical energy storage battery charge state constraint, energy storage battery power limit constraint under charging and discharging state, and rotating standby constraint.
18. The device according to claim 17, characterized in that The system power balance constraints are as follows: The storage capacity constraints of the pumped storage unit are as follows: The start and stop constraints of the pumped storage unit are as follows: The output power constraints of the pumped storage unit are as follows: The pumping power constraints of the pumped storage unit are as follows: The climbing constraints of the pumped storage unit are as follows: The wind power output limitation constraints are as follows: The photovoltaic output limit constraints are as follows: The state of charge constraints of the electrochemical energy storage battery are as follows: SOC min ≤SOC t ≤SOC max The power limit constraints of the energy storage battery under the charging and discharging state are as follows: The spinning reserve constraints are as follows: In the above formula, is the dispatch output of the wind farm in period t during the day-ahead control cycle, is the dispatching output of the photovoltaic power station in the t period of the day-ahead control cycle, is the power generation power of the jth pumped storage unit in the t period of the day-ahead control cycle, is the pumping power of the jth pumped storage unit in the t period of the day-ahead control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit in the t period of the day-ahead control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period during the day-ahead control cycle, is the load forecasted one day in advance for period t, is the minimum storage capacity of the upper reservoir, is the storage capacity of the upper reservoir during period t, is the maximum storage capacity of the upper reservoir, is the minimum storage capacity of the lower reservoir, is the storage capacity of the reservoir in period t, is the maximum storage capacity of the lower reservoir, is the storage capacity of the reservoir in period t-1, is the flow rate of the j-th pumped storage unit under power generation conditions in period t, is the flow rate of the j-th pumped storage unit under pumping conditions during period t, is the storage capacity of the upper reservoir in period t-1, is the water level of the upper reservoir during period T, The water level control target of the upper reservoir is is the water level of the lower reservoir during period T, The water level control target of the lower reservoir is is the minimum power generation capacity of the jth pumped storage unit, is the maximum power generation capacity of the jth pumped storage unit, is the minimum pumping power of the jth pumped storage unit, is the maximum pumping power of the jth pumped storage unit, is the power generated by the j-th pumped storage unit in the period t+1, is the maximum downhill capacity of the jth pumped storage unit, is the maximum uphill capability of the jth pumped storage unit, P w,N is the installed capacity of the wind farm, P w,min,t is the lower limit of wind farm available power during period t, P w,max,t is the predicted output value of the wind farm during period t, P PV,N is the installed capacity of the photovoltaic power station, P PV,min,t is the lower limit of the available power of the photovoltaic power station during period t, P PV,max,t is the photovoltaic output forecast value during period t, SOC min The minimum state of charge of the battery, SOC t SOC is the battery state of charge during period t max is the maximum state of charge of the battery, P c,k,min The minimum power for charging the kth electrochemical energy storage, P c,k,max The maximum power for charging the kth electrochemical energy storage, P d,k,min is the minimum power of the kth electrochemical energy storage device, P d,k,max is the maximum power of the kth electrochemical energy storage device discharged, S PH is the installed capacity of pumped storage units, δ is the spinning reserve rate of the combined system, is the load power forecast value, is the load during period T.
19. The device according to claim 14, characterized in that The optimization scheduling model corresponding to the intraday control cycle includes: a second objective function with the goal of minimizing the total cost of the joint operation system and its corresponding second constraint condition.
20. The device according to claim 19, characterized in that The second objective function is as follows: minf2=C ΔP +C PV +C W In the above formula, f2 is the second objective function value, C ΔP The output adjustment cost of the pumped storage unit in each dispatch cycle, C PV is the penalty cost for abandoning light, C W is the penalty cost for wind curtailment, T1 is the total number of time periods in the daily control cycle, NG is the total number of pumped storage units, ω ΔP is the unit output unit adjustment cost coefficient, ΔP j,t is the output adjustment of the jth pumped storage unit in period t compared with the day before, λ W A is the penalty cost coefficient for wind curtailment, W,t is the wind power abandoned by the wind farm during period t, λ PV A is the penalty cost coefficient for abandoned light, PV,t is the amount of abandoned photovoltaic power in the photovoltaic power station during period t.
21. The device according to claim 20, characterized in that The second constraint condition includes at least one of the following: pumped storage unit extraction and discharge state switching reliability constraint, power balance constraint, wind power output limitation constraint, photovoltaic output limitation constraint, pumped storage power station operation constraint, electrochemical energy storage constraint, and pumped storage reliability constraint.
22. The device according to claim 21, characterized in that The reliability constraints of the pumped storage unit pumping and discharging state switching are as follows: r=k / n The power balance constraints are as follows: The operating constraints of the pumped storage power station are as follows: X end =X0 The pumped storage reliability constraints are as follows: In the above formula, r is the pumping state switching reliability of the pumped storage unit, k is a constant, and n is the number of pumping state changes of the pumped storage unit within a day. is the dispatching output of the wind farm during the t period in the daily control cycle, is the dispatching output of the photovoltaic power station during the t period in the daily control cycle, is the power generation power of the jth pumped storage unit in the t period of the daily control cycle, is the pumping power of the jth pumped storage unit in the t period of the daily control cycle, MG is the total amount of electrochemical energy storage, is the charging power of the kth electrochemical energy storage unit during the t period of the daily control cycle, is the discharge power of the kth electrochemical energy storage unit in the t period of the daily control cycle, is the load forecasted one day in advance for period t, X end is the water volume stored in the upper reservoir after rolling dispatch in the 24th cycle at the end of the day, X0 is the initial value of the water volume stored in the upper reservoir, P pump,t is the pumping power in period t, P pump,max is the upper limit of pumping power in period t, R pump,t is the pumping reliability in period t, e is a natural constant, λ pump is the pumping failure rate, P gen,t is the power generation during period t, P gen,max is the upper limit of power generation in period t, R gen,t is the power generation reliability in period t, λ gen is the power generation failure rate.
23. A computer device, characterized in that: include: one or more processors; The processor is configured to execute one or more programs; When the one or more programs are executed by the one or more processors, the optimization scheduling method for the wind-solar-storage-pumped-storage combined system as described in any one of claims 1 to 11 is implemented.
24. A computer readable storage device, characterized in that: A computer program is stored thereon, and when the computer program is executed, the optimization scheduling method of the wind-solar-storage-pumped-storage combined system as described in any one of claims 1 to 11 is implemented.
Citation Information
Cited By
Optimized scheduling method and equipment for new energy power generation and energy storage system
CN119813387A
Extreme event response type electrochemical energy storage optimal configuration method based on MINLP
CN120675130A