Gas supply system, ship, and gas supply method
By using the first and second compressors in the gas supply system in the liquefied hydrogen tank, efficient replacement of hydrogen and inert gas is achieved, and the problem of low gas replacement efficiency in the prior art is solved, and it is suitable for liquefied hydrogen transport ships promotion and maintenance requirements.
Patent Information
- Application Number
- CN202280094983.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-10
- Publication Date
- 2024-11-29
AI Technical Summary
The prior art is difficult to efficiently perform gas replacement in the liquefied hydrogen tank, especially in the process of replacing hydrogen in the tank with inert gas or air before and after maintenance, which is inefficient and time-consuming.
A gas supply system is designed, including the first and second supply lines and corresponding compressors, and hydrogen is compressed by the first compressor to above the required pressure of the boiler, and then mixed with the inert gas and hydrogen is through the second compressor. The mixed gas is compressed to the boiler's required pressure above, achieving efficient gas replacement.
It realizes efficient gas replacement in the tank, ensures the maintenance efficiency and safety of the liquefied hydrogen tank, avoids excessive load on the performance of the first compressor, and is suitable for the propulsion and maintenance needs of liquefied hydrogen transport ships.
Smart Images

Figure CN119053778A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to a gas supply system for supplying gas from a tank to a gas consumer, a ship having the gas supply system, and a gas supply method for supplying gas from a tank to a gas consumer. Background Art
[0002] In recent years, systems for storing or transporting liquefied hydrogen have been developed (eg, Patent Document 1).
[0003] Prior art literature
[0004] Patent Literature
[0005] Patent Document 1: Japanese Patent Application Publication No. 2021-177088 Summary of the invention
[0006] Problems to be solved by the invention
[0007] In order to perform maintenance on a liquefied hydrogen storage tank, the following operations need to be performed first: after the tank is filled with hydrogen by taking out liquefied hydrogen from the tank, the hydrogen in the tank is replaced with an inert gas, and then the inert gas filled in the tank is replaced with air. In addition, conversely, in order to store liquefied hydrogen in the tank after maintenance, the following operations need to be performed: before supplying liquefied hydrogen to the tank, the air in the tank is replaced with an inert gas, and then the inert gas in the tank is further replaced with hydrogen. It is desirable to efficiently perform the replacement operation of the gas in the tank.
[0008] An object of the present disclosure is to provide a gas supply system, a ship, and a gas supply method that can efficiently perform a work of replacing gas in a tank.
[0009] Means for solving problems
[0010] In order to solve the above-mentioned problems, a gas supply system of one embodiment of the present invention includes: a gas consumer that can consume hydrogen; a tank that stores hydrogen; a first supply line that connects the tank and the gas consumer; a first compressor that is arranged on the first supply line and is configured to compress the hydrogen gas discharged from the tank and guided by the first supply line to a pressure greater than the required pressure of the gas consumer; an inert gas line that guides the inert gas to the tank; a second supply line that is connected to a portion of the first supply line that is upstream of the first compressor and is connected to a portion of the first supply line that is downstream of the first compressor; and a second compressor that is arranged on the second supply line and is configured to compress a mixed gas formed by the inert gas and the hydrogen gas that is discharged from the tank due to the introduction of the inert gas into the tank using the inert gas line to a pressure greater than the required pressure of the gas consumer.
[0011] Another aspect of the gas supply system disclosed herein comprises: a first gas consumer capable of consuming hydrogen; a tank storing hydrogen; a first supply line connecting the tank and the first gas consumer; a first compressor disposed on the first supply line and configured to compress the hydrogen gas discharged from the tank and guided by the first supply line to a pressure greater than a required pressure of the first gas consumer; an inert gas line guiding the inert gas to the tank; a second gas consumer capable of consuming a mixed gas formed by mixing the inert gas and the hydrogen; a second supply line connected to a portion of the first supply line that is upstream of the first compressor and is connected to the second gas consumer; and a second compressor disposed on the second supply line and configured to compress the mixed gas to a pressure greater than a required pressure of the second gas consumer.
[0012] A ship according to one aspect of the present disclosure includes any of the above-described gas supply systems.
[0013] A gas supply method according to one embodiment of the present invention is a gas supply method for supplying gas discharged from a tank, wherein, when hydrogen is discharged from the tank containing hydrogen, the hydrogen discharged from the tank is guided to a first compressor and compressed, and the compressed hydrogen is consumed by a first gas consumer, and when a mixed gas of an inert gas and hydrogen is discharged from the tank, the mixed gas discharged from the tank is guided to a second compressor of a type different from the first compressor and compressed, and the compressed mixed gas is consumed by the first gas consumer or a second gas consumer of a type different from the first gas consumer.
[0014] Effects of the Invention
[0015] According to the present disclosure, it is possible to provide a gas supply system, a ship, and a gas supply method that can efficiently perform a work of replacing the gas in a tank. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic configuration diagram of the gas supply system according to the first embodiment.
[0017] Figure 2 It is a schematic configuration diagram of a gas supply system according to a second embodiment.
[0018] Figure 3 It is a schematic configuration diagram of a gas supply system according to a third embodiment.
[0019] Figure 4 It is a schematic configuration diagram of a gas supply system according to a fourth embodiment.
[0020] Figure 5 This is a schematic configuration diagram of a gas supply system according to Modification 1.
[0021] Figure 6 This is a schematic configuration diagram of a gas supply system according to Modification 2. DETAILED DESCRIPTION
[0022] Hereinafter, the gas supply system of the embodiment will be described with reference to the drawings. In addition, in the following, the same reference numerals are attached to the same or corresponding elements in all the drawings, and the repeated description is omitted.
[0023] <First embodiment>
[0024] exist Figure 1 , a schematic diagram of a gas supply system 1A according to the first embodiment is shown. The gas supply system 1A described in this embodiment is mounted on a ship. The ship is a hydrogen transport ship that transports liquefied hydrogen and has a tank 2 for storing liquefied hydrogen as a cargo. Figure 1 One tank 2 is shown, but the vessel may also have a plurality of tanks 2 .
[0025] In addition, a main engine 3 is mounted on the hull of the ship. In the present embodiment, the main engine 3 is a combination of two boilers 4 and one steam turbine 5 .
[0026] The boiler 4 uses hydrogen as fuel. In the present embodiment, the boiler 4 uses one or both of hydrogen and fuel oil as fuel gas as fuel. Therefore, even when hydrogen is not supplied to the boiler 4 or the hydrogen supplied to the boiler 4 does not reach the required amount of the boiler 4, the operation of the boiler 4 can be performed by supplying fuel oil to the boiler 4. The boiler 4 may also be referred to as a gas consumer or a first gas consumer. The steam turbine 5 uses the steam generated in the two boilers 4 to drive the propulsion shaft of the propeller 6. The propeller 6 is, for example, a propeller. In addition, the number of boilers 4 and the number of steam turbines 5 mounted on the hull as the main engine 3 are not limited thereto. For example, the number of turbines 5 may also be multiple.
[0027] The main engine 3 uses the boil-off gas generated by the evaporation of the liquefied hydrogen in the tank 2 as a fuel for propulsion. In the present embodiment, the gas supply system 1A supplies the hydrogen in the tank 2 to the main engine 3 for propulsion. The tank 2 and the boiler 4 are connected via a first supply line 10. The first supply line 10 guides the gas discharged from the tank 2 to the boiler 4. The first compressor 7 is arranged on the first supply line 10. In addition, including the first supply line 10, the pipelines described below are flow paths for guiding fluids, and are composed of pipes and the like.
[0028] In the present embodiment, the tank 2 is a tank for storing liquefied hydrogen. When the tank 2 stores liquefied hydrogen, the space above the liquid surface of the liquefied hydrogen in the tank 2, i.e., the gas layer, is filled with hydrogen. The gas layer contains boil-off gas formed by gasification of liquefied hydrogen in the tank 2. The upstream end of the first supply line 10 is arranged at the upper part of the tank 2.
[0029] In addition, the tank 2 is provided with a pressure gauge 8. The pressure gauge 8 detects the pressure of the gas layer in the tank 2. That is, the pressure increase caused by the generation of the boil-off gas can be detected based on the pressure measured by the pressure gauge 8.
[0030] In addition, the tank 2 is connected to the inert gas generating device 31 via an inert gas line 32. More specifically, the upstream end of the inert gas line 32 is connected to the inert gas generating device 31, and the downstream end of the inert gas line 32 is arranged at the lower part (e.g., the bottom) in the tank 2. However, the downstream end of the inert gas line 32 may not necessarily be arranged at the lower part in the tank 2. An on-off valve 33 capable of opening and closing the flow path is arranged on the inert gas line 32.
[0031] The inert gas generator 31 generates an inert gas. Examples of the inert gas include nitrogen, argon, and carbon dioxide. The inert gas generator 31 is used to replace the hydrogen gas in the tank 2 with the inert gas. Before the gas replacement is performed, the inert gas generator 31 is operated, for example, by manual operation of an operator. By opening the on-off valve 33 and operating the inert gas generator 31, the inert gas generated by the inert gas generator 31 is guided into the tank 2 through the inert gas pipeline 32. As a result, a mixed gas of the inert gas and hydrogen is discharged from the tank 2 through the upstream end of the first supply pipeline 10.
[0032] In the present embodiment, a gas concentration meter 18 is disposed in a portion of the first supply line 10 that is upstream of the first compressor 7 (more specifically, the first common flow path 11 described later). The gas concentration meter 18 measures the hydrogen concentration. For example, during gas replacement, the proportion of hydrogen in the mixed gas discharged from the tank 2 is measured. That is, the progress of the gas replacement can be grasped based on the hydrogen concentration measured by the gas concentration meter 18. The gas concentration meter 18 may not be disposed in the first supply line 10, but may be disposed in the tank 2, for example.
[0033] The first compressor 7 is a compressor for compressing hydrogen. The first compressor 7 is configured to be able to compress the hydrogen guided by the first supply pipeline 10 to a pressure greater than the required pressure of the boiler 4 as the first gas consumer. In addition, for example, the maximum discharge volume of the first compressor 7 is greater than the required flow rate of the boiler 4 as the first gas consumer. The first compressor 7 is used, for example, when a ship having a gas supply system 1A transports hydrogen from a hydrogen supply site (hereinafter also referred to as a loading site) such as a hydrogen manufacturing base to a hydrogen demand site (hereinafter also referred to as an unloading site). For example, during the voyage of the ship from the loading site to the unloading site, in the tank 2, the pressure in the tank 2 rises due to the generation of boil-off gas. In order to suppress the pressure rise in the tank 2, boil-off gas is discharged from the tank 2. The discharged boil-off gas, i.e., hydrogen, is compressed by the first compressor 7 to a pressure greater than the required pressure of the boiler 4, thereby being able to be used in the boiler 4 as a propulsion fuel.
[0034] The first supply line 10 includes a first common flow path 11, two first branch flow paths 12, a second common flow path 13, and two second branch flow paths 14. The first common flow path 11, two first branch flow paths 12, second common flow path 13, and two second branch flow paths 14 are connected in sequence from the upstream side to the downstream side.
[0035] The first common flow path 11 extends from the tank 2. An on-off valve 17 capable of opening and closing the flow path is arranged on the first common flow path 11. The two first branch flow paths 12 are branched into two branches at a branching portion 10a which is the downstream end of the first common flow path 11. In the present embodiment, in order to ensure redundancy, the gas supply system 1A has two first compressors 7 arranged in parallel with each other. The two first compressors 7 are respectively arranged in the two first branch flow paths 12. In addition, the number of the first compressors 7 possessed by the gas supply system 1A may be one or more than three. The number of the first branch flow paths 12 may also vary according to the number of the first compressors 7.
[0036] In the present embodiment, the first compressor 7 is, for example, a turbo type or a reciprocating type. The two first compressors 7 may be of the same type or different types. The first compressor 7 may be a compressor of a type other than a turbo type or a reciprocating type.
[0037] An on-off valve 15 capable of opening and closing the flow path is provided in a portion of each first branch flow path 12 on the upstream side of the first compressor 7 .
[0038] The second common flow path 13 extends from the confluence portion 10b of the two first branch flow paths 12. The two second branch flow paths 14 are branched into two branches at the branch portion 10c which is the downstream end of the second common flow path 13. The downstream ends of the two second branch flow paths 14 are respectively connected to the two boilers 4. An on-off valve 16 capable of opening and closing the second branch flow path 14 is provided on each second branch flow path 14.
[0039] The gas supply system 1A also includes a second supply line 20 , a second compressor 9 disposed in the second supply line 20 , and a gas engine 41 for power generation.
[0040] The second supply line 20 branches off from a portion of the first supply line 10 on the upstream side of the first compressor 7 and extends. More specifically, an upstream end 20a of the second supply line 20 is connected to the first common flow path 11.
[0041] The second supply line 20 includes a common flow path 21, a first branch flow path 22, and a second branch flow path 23. The upstream end 20a of the common flow path 21 extends from a portion of the first supply line 10 that is upstream of the first compressor 7. The first branch flow path 22 and the second branch flow path 23 are branched into two branches at a branching portion 20b that is the downstream end of the common flow path 21. That is, the second supply line 20 has two downstream ends, specifically, a downstream end 20c of the first branch flow path 22 and a downstream end 20d of the second branch flow path 23.
[0042] The downstream end 20c of the first branch flow path 22 is connected to the first supply line 10 (more specifically, the second common flow path 13). That is, the line extending from the upstream end 20a to the downstream end 20c of the second supply line 20 constitutes a bypass line that bypasses the first compressor 7. The downstream end 20d of the second branch flow path 23 is connected to the gas engine 41.
[0043] The second compressor 9 is disposed in the common flow path 21 in the second supply line 20. The second compressor 9 is basically a compressor used when replacing the gas in the tank 2.
[0044] For example, when the tank 2 is to be maintained, first, liquefied hydrogen is taken out from the tank 2 so that the tank 2 is filled with hydrogen (i.e., a hydrogen atmosphere). Thereafter, in order to remove hydrogen from the tank 2, an inert gas is supplied to the tank 2 through the inert gas pipeline 32. Thus, a mixed gas of the inert gas and hydrogen is discharged from the tank 2 through the upstream end of the first supply pipeline 10. The second compressor 9 is used to compress the mixed gas discharged at this time. The second compressor 9 is configured to be able to compress the mixed gas to a pressure higher than the required pressure of the boiler 4. During the gas replacement, the mixed gas discharged from the tank 2 is compressed by the second compressor 9 to a pressure higher than the required pressure of the boiler 4, and then consumed by the boiler 4.
[0045] In addition, for example, after the maintenance of the tank 2, the air in the tank 2 is replaced with an inert gas. Then, in order to remove the inert gas from the tank 2 at a base (e.g., a loading site) for supplying hydrogen, hydrogen is supplied to the tank 2 through a hydrogen pipeline 60 described later. Thus, a mixed gas of the inert gas and hydrogen is discharged from the tank 2 through the upstream end of the first supply pipeline 10. The second compressor 9 may also be used to compress the discharged mixed gas at this time.
[0046] The difference in use of the first compressor 7 and the second compressor 9 described above will be described in more detail. The first compressor 7 is suitable for pressurizing hydrogen gas having an extremely low specific gravity. The first compressor 7 can compress the hydrogen gas to a pressure higher than the required pressure of the boiler 4, which is the first gas consumer. Therefore, for example, the evaporated gas discharged from the tank 2, i.e., the hydrogen gas, is compressed by the first compressor 7 and used as a propulsion fuel in the boiler 4. However, since the first compressor 7 is used for pressurizing the hydrogen gas, even if an attempt is made to pressurize the mixed gas using the first compressor 7, the hydrogen gas in the mixed gas discharged from the tank 2 may not be consumed in the boiler 4, which is the first gas consumer, or even if the first compressor 7 can be used for compressing the mixed gas, it may take too much time to pressurize the mixed gas compared to the case where the second compressor 9 is used.
[0047] Therefore, in this embodiment, in order to pressurize the mixed gas discharged from the tank 2 to the gas consumer during gas replacement, a second compressor 9 is provided. The second compressor 9 can compress the mixed gas to a pressure higher than the required pressure of the boiler 4, which is the first gas consumer. In addition, the second compressor 9 can compress the mixed gas to a pressure higher than the required pressure of the gas engine 41, which is the second gas consumer.
[0048] For example, the maximum discharge amount of hydrogen gas from the second compressor 9 is smaller than the maximum discharge amount of hydrogen gas from the first compressor 7. Therefore, for example, when the amount of boil-off gas generated per unit time is large, hydrogen gas cannot be fully compressed and delivered in the second compressor 9, and the pressure rise in the tank 2 may not be suppressed.
[0049] Thus, in the present embodiment, the gas supply system 1A includes the first compressor 7 suitable for pressurizing and sending gas with a relatively low specific gravity and the second compressor 9 suitable for pressurizing and sending gas with a relatively high specific gravity. Therefore, the compressors can be used separately according to the purpose, the pressure rise in the tank 2 can be reliably suppressed, and the hydrogen gas in the tank 2 can be efficiently replaced during gas replacement.
[0050] In the present embodiment, the second compressor 9 is a compressor of a different type from the two first compressors 7. The second compressor 9 is, for example, a rotary compressor. The second compressor 9 may also be a compressor of a type other than the rotary compressor. In addition, the second compressor 9 may also be able to compress the mixed gas to a pressure higher than the required pressure of the boiler 4 as the first gas consumer or the required pressure of the gas engine 41 as the second gas consumer.
[0051] An on-off valve 24 capable of opening and closing the flow path is disposed in the second supply line 20 at a portion upstream of the second compressor 9. An on-off valve 25 capable of opening and closing the flow path is disposed in the first branch flow path 22. An on-off valve 26 capable of opening and closing the flow path is disposed in the second branch flow path 23.
[0052] The gas engine 41 uses hydrogen as fuel to drive the generator 42. In the present embodiment, the gas engine 41 is a dual-fuel engine that burns one or both of hydrogen and fuel oil as fuel gas. The gas engine 41 may also be referred to as a second gas consumer.
[0053] The hydrogen gas used as fuel is guided to the gas engine 41 through the second branch flow path 23. The required pressure of the gas engine 41 may be the same as or different from the required pressure of the boiler 4. For example, depending on the situation, the hydrogen gas compressed by the first compressor 7 or the mixed gas compressed by the second compressor 9 is guided to the gas engine 41.
[0054] In addition, when the hydrogen gas compressed by the first compressor 7 is guided to the gas engine 41, the hydrogen gas compressed by the first compressor 7 flows from the downstream end 20c in the second supply line 20 toward the branching portion 20b. That is, the portion between the downstream end 20c and the branching portion 20b in the second supply line 20 can change the direction of the gas flow according to the situation.
[0055] The discharge volume of each compressor of the first compressor 7 and the second compressor 9 is variable. The discharge volume of each compressor is controlled by the control device 50. The control device 50 is a so-called computer, and has a calculation processing unit such as a CPU, and a storage unit such as a ROM and a RAM (none of which are shown in the figure). The storage unit stores programs executed by the calculation processing unit, various fixed data, etc.
[0056] For example, the control device 50 controls the first compressor 7 to change the gas supply amount to the boiler 4. For example, when the gas consumption in the main engine 3 changes, such as when the state of operating two boilers 4 is switched to the state of operating only one boiler 4, the control device 50 controls the first compressor 7 to reduce the discharge amount of the first compressor 7. In addition, the above-mentioned on-off valves 15, 16, 17, 24, 25, 26, 33, 64, 65, 66, and 72 are all manually operated valves, but part or all of the above-mentioned on-off valves 15, 16, 17, 24, 25, 26, 64, 65, 66, and 72 may be automatic control valves controlled by the control device 50.
[0057] The gas supply system 1A further includes a hydrogen line 60. The hydrogen line 60 is a flow path for supplying hydrogen gas or liquefied hydrogen to the tank 2 or discharging hydrogen gas or liquefied hydrogen from the tank 2. In the present embodiment, the hydrogen line 60 is connected to the first supply line 10 and the inert gas line 32. That is, a part of the first supply line 10 and a part of the inert gas line 32 are also used as a flow path for supplying hydrogen gas or liquefied hydrogen to the tank 2 or discharging hydrogen gas or liquefied hydrogen from the tank 2.
[0058] Specifically, the hydrogen pipeline 60 includes a common flow path 61, a first branch flow path 62, and a second branch flow path 63. One end of the common flow path 61 is configured to be connected to a supply source of hydrogen gas or liquefied hydrogen, or a supply destination of hydrogen gas or liquefied hydrogen. For example, a connector that can be connected to a loading arm provided at a loading site or an unloading site is provided at one end of the common flow path 61. At the other end of the common flow path 61, i.e., a branching portion 60a, the first branch flow path 62 and the second branch flow path 63 are branched into two branches.
[0059] One end of the first branch flow path 62 is connected to the common flow path 61 at the branching portion 60a, and the other end of the first branch flow path 62 is connected to the portion between the tank 2 and the on-off valve 17 in the common flow path 11 of the first supply line 10. One end of the second branch flow path 63 is connected to the common flow path 61 at the branching portion 60a, and the other end of the second branch flow path 63 is connected to the portion between the tank 2 and the on-off valve 33 in the inert gas line 32.
[0060] An on-off valve 64 capable of opening and closing the common flow path 61 is disposed. An on-off valve 65 capable of opening and closing the first branch flow path 62 is disposed. An on-off valve 66 capable of opening and closing the second branch flow path 63 is disposed.
[0061] The gas supply system 1A further includes a connection line 71 that connects the first common flow path 11 and the inert gas line 32. For example, as described later, the connection line 71 is used when replacing the inert gas in the tank 2 with hydrogen. An on-off valve 72 that can open and close the flow path is disposed on the connection line 71.
[0062] One end of the connection line 71 is connected to a portion between the connection portion connected to the upstream end 20a of the second supply line 20 and the on-off valve 17 in the first common flow path 11. The other end of the connection line 71 is connected to a portion between the tank 2 and the on-off valve 33 in the inert gas line 32. In addition, one end of the connection line 71 may be connected to the second supply line 20 instead of being connected to the first common flow path 11. For example, one end of the connection line 71 may be connected to a portion between the upstream end 20a of the second supply line 20 and the on-off valve 24. In addition, the other end of the connection line 71 may be connected to a portion of the second branch flow path 63 that is closer to the inert gas line 32 than the on-off valve 66.
[0063] Next, a gas supply method implemented by the gas supply system 1A of this embodiment is described. In the following description, a method of supplying boil-off gas from the tank 2 storing liquefied hydrogen to the boiler 4 and a gas supply method performed when replacing the gas in the tank 2 with another gas are described.
[0064] (Supply of evaporated gas)
[0065] When the ship is sailing from the loading point to the unloading point, the ship is fully loaded with liquefied hydrogen occupying most of the space in the tank 2. During the voyage, hydrogen gas is generated by evaporation of liquefied hydrogen in the tank 2. The ship uses the hydrogen gas as fuel gas for propulsion.
[0066] Specifically, the on-off valves 15, 16, and 17 are opened, the on-off valves 24, 25, 26, 33, 64, 65, 66, and 72 are closed, and the first compressor 7 is operated. The first compressor 7 pressure-feeds the hydrogen gas from the tank 2 to the boiler 4.
[0067] If the hull's rolling changes due to a sudden storm or the like during navigation, the amount of boil-off gas generated in the tank 2 may increase. In this case, the increase in the tank pressure accompanying the increase in the amount of boil-off gas can be suppressed by increasing the amount of gas supplied from the first compressor 7 to the boiler 4. However, since it is difficult for the steam turbine 5 to change the load immediately, the amount of gas supplied to the boiler 4 may exceed the amount of gas consumed by the boiler 4.
[0068] In the present embodiment, since the gas supply amount to the boiler 4 exceeds the gas consumption amount of the boiler 4, the boil-off gas remaining between the first compressor 7 and the boiler 4 in the first supply line 10 is effectively utilized in the gas engine 41 as the second gas consumer. Specifically, the on-off valve 25 and the on-off valve 26 are opened, and the hydrogen gas is guided to the gas engine 41 through the first branch flow path 22 and the second branch flow path 23, and is consumed by the gas engine 41.
[0069] The timing of introducing hydrogen gas to the gas engine 41, that is, the timing of opening the on-off valves 25 and 26, can be determined using an index that can directly or indirectly determine that the gas supply amount to the boiler 4 exceeds the gas consumption amount of the boiler 4. For example, the on-off valves 25 and 26 may be opened when the measured value of the pressure gauge 8 becomes greater than a predetermined value, or the on-off valves 25 and 26 may be opened when the discharge amount of the first compressor 7 becomes greater than a predetermined value.
[0070] The electric power generated by the generator 42 driven by the gas engine 41 is distributed to the electrical equipment in the ship. The electric power generated by the generator 42 may be stored in a battery or the like.
[0071] (Gas supply during gas replacement before maintenance)
[0072] Next, the gas supply performed during the gas replacement before maintenance of the tank 2 will be described. Maintenance is performed at a predetermined dock, for example, but in this embodiment, the gas replacement is started before arriving at the dock, not after arriving at the dock.
[0073] For example, when the ship arrives at the unloading site with liquefied hydrogen stored in the tank 2, the liquefied hydrogen in the tank 2 is unloaded. As a result, the tank 2 changes from a fully loaded state to an empty state in which there is no liquefied hydrogen or there is little liquefied hydrogen in the space inside the tank 2. In the empty state of the tank 2, the tank 2 becomes full of hydrogen. Ships generally require regular maintenance, such as a 2.5-year cycle or a 5-year cycle. In the case where maintenance is required, if unloading is completed, the ship is not sailed toward the next loading site, but sailed toward the dock for maintenance.
[0074] In this embodiment, gas replacement is performed when the ship is sailing toward the dock. Specifically, the on-off valves 15, 26, 64, 65, 66, and 72 are closed, and the on-off valves 16, 17, 24, 25, and 33 are opened, and then the inert gas generator 31 and the second compressor 9 are operated. Thus, the inert gas is supplied from the inert gas generator 31 to the tank 2 in a state where hydrogen is stored. As a result, a mixed gas of the inert gas and hydrogen is discharged from the tank 2 through the upstream end of the first supply line 10.
[0075] The mixed gas discharged from the tank 2 is guided to the second compressor 9 through the common flow path 21 of the second supply line 20, and the hydrogen gas is pressure-sent from the tank 2 to the boiler 4 through the first branch flow path 22. The hydrogen gas in the mixed gas introduced into the boiler 4 is used as the fuel gas of the boiler 4, and the mixed gas is burned.
[0076] In addition, when the amount of hydrogen gas in the mixed gas supplied to the boiler 4 is not sufficient as the fuel gas of the boiler 4, fuel oil is supplied to the boiler 4. When the inert gas is transported to the bottom of the tank 2, the inert gas having a larger specific gravity than hydrogen gas is basically accumulated at the bottom of the tank 2. Therefore, the concentration of hydrogen gas discharged from the tank 2 is high immediately after the inert gas is supplied to the tank 2. During the continuous supply of the inert gas, the concentration of hydrogen gas discharged from the tank 2 decreases. In this case, the treatment can also be carried out without stagnation by supplying fuel oil to the boiler 4.
[0077] In addition, the maximum discharge amount of hydrogen from the second compressor 9 is smaller than the maximum discharge amount of hydrogen from each first compressor 7. However, when sailing from the unloading site toward the dock, since the tank 2 is in an unloaded state, there is no concern about the increase in tank pressure caused by evaporation gas. Therefore, when the tank 2 is in an unloaded state, the flow rate of hydrogen discharged from the tank 2 can be smaller than when the tank 2 is fully loaded, and even the second compressor 9 can fully meet the requirements. In addition, even if the amount of hydrogen supplied to the boiler 4 is insufficient, it is possible to sail without stagnation by supplying fuel oil to the boiler 4.
[0078] In this way, the hydrogen gas in the tank 2 can be replaced with the inert gas on the way to the dock. Thereafter, in order to perform maintenance on the tank 2, the inert gas in the tank 2 is replaced with air.
[0079] (Gas supply during gas replacement after maintenance)
[0080] Next, the gas supply performed during the gas replacement after maintenance of the tank 2 will be described. The gas replacement after maintenance is performed in order to store liquefied hydrogen in the tank 2.
[0081] That is, after the maintenance is completed in the dock, the air in the tank 2 is replaced with the inert gas. In the present embodiment, the work of replacing the air in the tank 2 with the inert gas is performed while the ship is sailing from the dock to the loading site.
[0082] After arriving at the loading site, the inert gas filled in the tank 2 is replaced with hydrogen. Specifically, the tank 2 is connected to a hydrogen supply source (e.g., a hydrogen generator) by connecting a loading arm provided at the loading site to one end of the common flow path 61. Then, the on-off valves 15, 17, 33, 66, etc. are closed, and the on-off valves 24, 64, 65, 72 are opened, and hydrogen is supplied from the hydrogen supply source to the tank 2 through the common flow path 61, the first branch flow path 62, and the first common flow path 11.
[0083] Hydrogen gas having a smaller specific gravity than the inert gas is accumulated in the upper part of the tank 2, and the mixed gas of the inert gas and hydrogen is discharged from the tank 2 through the end of the inert gas line 32. In addition, the concentration of the hydrogen gas discharged from the tank 2 is low immediately after the supply of hydrogen gas to the tank 2 is started. As the supply of hydrogen gas continues, the concentration of the hydrogen gas discharged from the tank 2 increases.
[0084] The mixed gas discharged from the tank 2 is guided to the second compressor 9 through the inert gas line 32, the connecting line 71, the first common flow path 11, and the common flow path 21. The mixed gas compressed by the second compressor 9 may be guided to the gas engine 41 by, for example, opening the on-off valve 26 and consumed by the gas engine 41. Alternatively, the mixed gas compressed by the second compressor 9 may be guided to the gas engine 41. Figure 1 The gas combustion unit (GCU; Gas Combustion Unit; see Figure 4 For example, when the hydrogen concentration measured by the gas concentration meter 18 is higher than the required concentration of the gas engine 41, the on-off valve 26 is opened to consume the mixed gas in the gas engine 41, and when the hydrogen concentration is lower than the required concentration of the gas engine 41, the on-off valve 26 is closed to process using the GCU.
[0085] After the gas replacement from the inert gas to the hydrogen gas is completed, the on-off valves 24, 33, 65, 72, etc. are closed, and the on-off valves 15, 17, 32, 64, 72, etc. are opened to introduce liquefied hydrogen into the tank 2. Whether the gas replacement from the inert gas to the hydrogen gas is completed can be determined, for example, by whether the hydrogen concentration measured by the gas concentration meter 18 exceeds the reference value. Liquefied hydrogen is supplied to the tank 2 from the liquefied hydrogen supply source through the common flow path 61, the second branch flow path 63, and the inert gas line 32.
[0086] By supplying liquefied hydrogen into the tank 2, hydrogen gas is discharged from the tank 2 through the upstream end of the first supply line 10. The discharged hydrogen gas is guided to the first compressor 7 through the first supply line 10. The hydrogen gas compressed by the first compressor 7 may be guided to the gas engine 41 by opening the on-off valves 25 and 26, for example, and consumed by the gas engine 41. Alternatively, the hydrogen gas compressed by the first compressor 7 may be guided to the gas engine 41. Figure 1The GCU (not shown) is used for guidance.
[0087] As described above, in the gas supply system 1A of the present embodiment, in addition to the first compressor 7 for pressurizing the boil-off gas, there is also a second compressor 9 capable of compressing the mixed gas formed by mixing the inert gas and the hydrogen gas to a pressure higher than the pressure required by the boiler 4. Therefore, the compressors can be used separately according to the purpose, the pressure increase in the tank 2 can be reliably suppressed, and the hydrogen gas in the tank 2 can be efficiently replaced during the gas replacement.
[0088] Since the ship is equipped with a second compressor 9 for compressed gas delivery in addition to the first compressor 7 for compressed gas delivery, when the ship is heading for a dock for maintenance, for example, it is possible to perform gas replacement by replacing the hydrogen gas in the tank 2 with an inert gas. In addition, the mixed gas formed by mixing the inert gas and the hydrogen gas can be effectively used in the boiler 4 for propulsion.
[0089] In a ship that cannot perform gas replacement operations on board, it is necessary to return the mixed gas to land after docking, and it is impossible to smoothly transfer to maintenance operations. In contrast, in this embodiment, the hydrogen in the tank 2 replaced with inert gas can be effectively utilized, and the gas in the tank 2 can be replaced during navigation, so that the maintenance operations can be smoothly transferred.
[0090] In addition, the specific gravity of inert gas is extremely large compared to hydrogen. Therefore, even if the first compressor 7 for hydrogen pressure delivery is tried to pressure-deliver the mixed gas, it is possible that the hydrogen in the mixed gas discharged from the tank 2 cannot be consumed in the boiler 4 as the first gas consumer, or even if the first compressor 7 can be used in the compression of the mixed gas, it is possible that too much time is spent in the pressure delivery of the mixed gas compared to the case of using the second compressor 9. However, in the present embodiment, in addition to the first compressor 7 for hydrogen that compresses hydrogen, there is also a second compressor 9 that can compress the mixed gas to a pressure above the required pressure of the boiler 4, so that the compressors used can be used separately in the case of compressing hydrogen during normal navigation and in the case of compressing the mixed gas discharged from the tank 2 when gas replacement is performed midway toward the dock. Therefore, it is possible to avoid the performance required of the first compressor 7 becoming higher or the first compressor 7 being overloaded due to the compression of the mixed gas.
[0091] In addition, depending on the type of gas consumer, if the proportion of hydrogen in the mixed gas is not above a certain level, the mixed gas may not be consumed. However, in this embodiment, since the gas consumer of the main engine 3 is the boiler 4, the mixed gas can be consumed regardless of the mixing ratio of hydrogen and inert gas.
[0092] <Second embodiment>
[0093] Figure 2 1 is a schematic diagram of a gas supply system 1B according to a second embodiment. In the gas supply system 1B according to the second embodiment, unlike the gas supply system 1A according to the first embodiment, the second supply line 20 does not include a second branch flow path 23. That is, both the gas compressed by the first compressor 7 and the gas compressed by the second compressor 9 are guided to the boiler 4. The second compressor 9 can compress the mixed gas to a pressure higher than the required pressure of the boiler 4 as the first gas consumer. The second compressor 9 may not be able to compress the mixed gas to a pressure higher than the required pressure of the gas engine 41 as the second gas consumer.
[0094] In this embodiment as well, the same effects as those of the first embodiment can be obtained.
[0095] <Third embodiment>
[0096] Figure 3 1 is a schematic diagram of a gas supply system 1C according to a third embodiment. In the gas supply system 1C according to the third embodiment, unlike the gas supply system 1A according to the first embodiment, the second supply line 20 does not include the first branch flow path 22. That is, the gas compressed by the first compressor 7 is guided to the boiler 4, and the gas compressed by the second compressor 9 is guided to the gas engine 41. The second compressor 9 can compress the mixed gas to a pressure higher than the required pressure of the gas engine 41 as the second gas consumer. The second compressor 9 may not be able to compress the mixed gas to a pressure higher than the required pressure of the boiler 4 as the first gas consumer.
[0097] In this embodiment as well, the same effects as those of the first embodiment can be obtained.
[0098] <Fourth embodiment>
[0099] Figure 4 1 is a schematic diagram of a gas supply system 1D according to a fourth embodiment. Unlike the gas supply system 1A according to the first embodiment, the gas supply system 1D according to the fourth embodiment has a GCU 81 capable of consuming the supplied gas regardless of whether the gas is compressed, in addition to the gas engine 41 as the second gas consumer.
[0100] The second supply line 20 includes a third branch flow path 82 in addition to the common flow path 21, the first branch flow path 22, and the second branch flow path 23. The first branch flow path 22, the second branch flow path 23, and the third branch flow path 82 branch at a branching portion 20b that is the downstream end of the common flow path 21. The downstream end 20e of the third branch flow path 82 is connected to the gas combustion device 81. In addition, an on-off valve 83 that can open and close the flow path is arranged on the third branch flow path 82.
[0101] In addition, the gas supply system 1D has a bypass line 84 that guides the gas discharged from the tank 2 to the GCU 81, bypassing the first compressor 7 and the second compressor 9. The upstream end of the bypass line 84 is connected to a portion of the common flow path 21 that is upstream of the on-off valve 24, and the downstream end of the bypass line 84 is connected to a portion of the third branch flow path 82 between the on-off valve 83 and the GCU 81.
[0102] In this embodiment, the same effect as that of the first embodiment can be obtained. In addition, in this embodiment, when the total amount of hydrogen supplied to both the boiler 4 and the gas engine 41 exceeds the total amount of hydrogen consumed by both the boiler 4 and the gas engine 41, the remaining hydrogen can be supplied to the GCU 81 through the third branch flow path 82. In addition, in this embodiment, the gas discharged from the tank 2 can be guided to the GCU 81 through the bypass line 84 without passing through the first compressor 7 or the second compressor 9.
[0103] <Other embodiments>
[0104] The present disclosure is not limited to the above-described embodiments, and various modifications can be made without departing from the gist of the present disclosure.
[0105] For example, in the above embodiment, as an example of a ship, a hydrogen transport ship that transports liquefied hydrogen as cargo is illustrated, but the ship is not limited to this. For example, the ship may also be a hydrogen fuel ship that uses hydrogen as a propulsion fuel. In this case, the hydrogen fuel ship may be a cargo ship that transports cargo other than liquefied hydrogen, or it may be a passenger ship. In addition, the ship may also be an offshore floating body equipment.
[0106] In addition, the gas supply system of the above embodiment is mounted on a ship, but the gas supply system may also be installed in land facilities. For example, the gas supply system may also be installed in liquefied hydrogen production facilities, liquefied hydrogen storage facilities, liquefied hydrogen transportation facilities, liquefied hydrogen cargo bases, etc. installed on land.
[0107] The shape of the tank is not particularly limited either, and can be spherical, horizontally cylindrical, or square. In addition, the type of the tank is not particularly limited either, and can be, for example, a membrane system, a self-supporting ball system, etc.
[0108] In the above embodiment, the first gas consumer and the second gas consumer may each be used for propulsion or power generation, or may have other purposes. In the above embodiment, the boiler 4 is described as the gas consumer or the first gas consumer, but the gas consumer or the first gas consumer may not be a boiler, but may be a gas engine that can use hydrogen as a fuel gas. The gas engine may not be a dual-fuel engine, but may be a gas-only engine that uses only fuel gas as fuel. The gas consumer or the first gas consumer may not be a main engine, but may be an auxiliary engine. The gas consumer or the first gas consumer may also be a device for power generation.
[0109] In the above embodiment, the gas engine 41 for power generation is described as the second gas consumer, but the second gas consumer may not be a gas engine for power generation. For example, the second gas consumer may be a boiler that can use hydrogen as fuel gas.
[0110] The gas supply system may include a plurality of second gas consumers. In this case, the types of the plurality of second gas consumers may be different from each other.
[0111] In addition, the opening and closing timing of the valves 15, 16, 17, 24, 25, 26, 33, 64, 65, 66, and 72 during the gas replacement is not limited to the timing described in the above embodiment. For example, in the above embodiment, the opening and closing valves 24 and 26 are closed during the voyage from the loading place to the unloading place, but the state of the opening and closing valve 25 may be maintained and the opening and closing valves 24 and 26 may be opened. In this case, the hydrogen gas may be guided to the second compressor 9, the hydrogen gas may be pressurized to a pressure higher than the required pressure of the second gas consumer 41, and the hydrogen gas may be consumed by the second gas consumer 41.
[0112] The valves 15, 16, 17, 24, 25, 26, 33, 64, 65, 66, 72 described in the above-mentioned embodiment are described as on-off valves, but the valves provided in each flow path are not limited to on-off valves. In the flow paths provided with the valves 15, 16, 17, 24, 25, 26, 33, 64, 65, 66, 72 provided in each flow path, a pressure regulating valve or a flow control valve may be provided instead of the on-off valve or on the basis of the on-off valve. For example, when the required pressure of the second gas consumer is different from the required pressure of the first gas consumer, the valve provided in the portion (the first branch flow path 22) between the downstream end 20c and the branching portion 20b in the second supply line 20 may also be a valve capable of adjusting the pressure of the hydrogen gas supplied to the second gas consumer to the required pressure of the second gas consumer reduced from the required pressure of the first gas consumer.
[0113] The connection method of the second supply line relative to the first supply line is not limited to the method described in the above embodiment. The second supply line only needs to bypass the first compressor to guide the gas from the tank to the second compressor, and bypass the first compressor to guide the gas compressed by the second compressor to the gas consumer (the first gas consumer or the second gas consumer).
[0114] For example, the second supply pipeline may also be composed of a plurality of flow paths separated from each other. For example, the second supply pipeline may also include a pipeline branching from a portion of the first supply pipeline upstream of the first compressor and merging with a portion of the first supply pipeline downstream of the first compressor, that is, a bypass line bypassing the first compressor, and a pipeline branching from the first supply pipeline at a location different from the connection location of the bypass line and provided with the second compressor. In other words, the second compressor may not be arranged on the bypass line bypassing the first compressor. Figure 5 and Figure 6 In the drawings, examples of a gas supply system composed of a plurality of flow paths separated from each other in the second supply line are shown as Modifications 1 and 2, respectively.
[0115] Figure 5 The gas supply system 1E shown has: a gas consumer 101 that can consume hydrogen; a tank 102 that stores hydrogen; a first supply line 103 that connects the tank 102 and the gas consumer 101; a first compressor 104 that is arranged on the first supply line 103 and is configured to compress the hydrogen gas discharged from the tank 102 to a pressure greater than the required pressure of the gas consumer 103; an inert gas line 105 that guides the inert gas to the tank 102; a second supply line 106; and a second compressor 107 that is configured to compress a mixed gas formed by a mixture of inert gas and hydrogen discharged from the tank 102 due to the introduction of inert gas into the tank 102 using the inert gas line 105 to a pressure greater than the required pressure of the gas consumer 101. Figure 5 As shown, the second supply line 106 includes a first sub-line 106a and a second sub-line 106b. The first sub-line 106a branches from a portion of the first supply line 103 that is upstream of the first compressor 104, and is connected to a portion of the first supply line 103 that is downstream of the first compressor 104. That is, the first sub-line 106a is a pipeline that bypasses the first compressor 104. The second sub-line 106b branches from a portion of the first supply line 103 that is downstream of a connection portion with the first sub-line 106a, and merges with the first supply line 103 further downstream. The second sub-line 106b may also be connected to the first supply line 103 at a portion that is upstream of the two connection portions with the first sub-line 106a (branching and merging). The second compressor 107 is disposed on the second sub-line 106b. In this example, the compressors can also be used separately according to the purpose.
[0116] Figure 6 The gas supply system 1F shown has: a first gas consumer 201 that can consume hydrogen; a tank 202 that stores hydrogen; a first supply line 203 that connects the tank 202 and the first gas consumer 201; a first compressor 204 that is arranged on the first supply line 203 and is configured to compress the hydrogen discharged from the tank 202 to a pressure greater than the required pressure of the first gas consumer 203; an inert gas line 205 that guides the inert gas to the tank 202; a second gas consumer 208 that can consume a mixed gas formed by a mixture of inert gas and hydrogen; a second supply line 206; and a second compressor 207 that is configured to compress a mixed gas formed by a mixture of inert gas and hydrogen discharged from the tank 202 due to the introduction of inert gas into the tank 202 using the inert gas line 205 to a pressure greater than the required pressure of the first gas consumer 201. Figure 6 As shown, the second supply line 206 includes a first sub-line 206a and a second sub-line 206b. The first sub-line 206a is branched from a portion of the first supply line 203 on the upstream side of the first compressor 204, and merges with a portion of the first supply line 203 on the downstream side of the first compressor 204. The second sub-line 206b is branched from a confluence portion of the first sub-line 206a in the first supply line 203 and is connected to the second gas consumer 208. The first sub-line 206a is a line that bypasses the first compressor 204. The second compressor 207 is arranged in the second sub-line 206b. In this example, the compressors can also be used separately according to the purpose.
[0117] In the above-mentioned embodiment, the hydrogen pipeline 60 is connected to the first supply pipeline 10 and the inert gas pipeline 32, but the hydrogen pipeline 60 is not limited to such a structure. For example, the first branch flow path 62 of the hydrogen pipeline 60 may be directly connected to the tank 2 without passing through the first supply pipeline 10. That is, one end of the first branch flow path 62 may also be arranged at the upper part of the tank 2. In addition, for example, the second branch flow path 63 of the hydrogen pipeline 60 may also be directly connected to the tank 2 without passing through the inert gas pipeline 32. That is, one end of the second branch flow path 63 may also be arranged at the lower part of the tank 2. In addition, the hydrogen pipeline 60 is a pipeline used in any case of supplying hydrogen to the tank 2 and supplying liquefied hydrogen to the tank 2, but the hydrogen pipeline 60 may also have a gas pipeline for supplying hydrogen to the tank 2 and a liquid pipeline for supplying liquefied hydrogen to the tank 2, respectively.
[0118] The first to fourth embodiments, other embodiments, and modifications 1 and 2 described above can be combined as appropriate. For example, the second supply line shown in modifications 1 and 2 can be applied to each of the first to fourth embodiments described above.
[0119] The functions of the elements disclosed in this specification can be performed using circuits or processing circuits including general-purpose processors, special-purpose processors, integrated circuits, ASICs (Application Specific Integrated Circuits), existing circuits and / or combinations thereof that are constructed or programmed to perform the disclosed functions. The processor includes transistors and other circuits and is therefore considered a processing circuit or circuit. In the present disclosure, a circuit, unit or component is hardware that performs the listed functions, or hardware that is programmed to perform the listed functions. The hardware may be the hardware disclosed in this specification, or it may be other known hardware that is programmed or constructed to perform the listed functions. In the case where the hardware is a processor that is considered to be a type of circuit, the circuit, component or unit is a combination of hardware and software, and the software is used for the structure of the hardware and / or processor.
[0120] [Public Project]
[0121] The following items disclose preferred embodiments.
[0122] [Project 1]
[0123] A gas supply system, comprising: a gas consumer capable of consuming hydrogen; a tank storing hydrogen; a first supply line connecting the tank and the gas consumer; a first compressor disposed on the first supply line and configured to compress the hydrogen gas discharged from the tank and guided by the first supply line to a pressure higher than a required pressure of the gas consumer; an inert gas line guiding the inert gas to the tank; a second supply line connected to a portion of the first supply line on the upstream side of the first compressor and to a portion of the first supply line on the downstream side of the first compressor; and a second compressor disposed on the second supply line and configured to compress a mixed gas formed by a mixture of the inert gas and the hydrogen gas discharged from the tank as a result of introducing the inert gas into the tank using the inert gas line to a pressure higher than a required pressure of the gas consumer.
[0124] According to item 1, in addition to the first compressor for pressurizing the boil-off gas, there is also a second compressor capable of compressing the mixed gas formed by mixing the inert gas and the hydrogen gas to a pressure higher than the required pressure of the boiler. Therefore, the compressors can be used according to the purpose, the pressure rise in the tank can be reliably suppressed, and the hydrogen gas in the tank can be replaced efficiently during the gas replacement.
[0125] [Project 2]
[0126] The gas supply system according to item 1, wherein the gas consumer is a boiler.
[0127] Depending on the type of gas consumer, the mixed gas may not be consumed unless the ratio of hydrogen in the mixed gas is above a certain level. However, according to item 2, since the gas consumer is a boiler, the mixed gas can be consumed regardless of the mixing ratio of hydrogen and inert gas.
[0128] [Item 3]
[0129] A gas supply system according to item 1 or 2, wherein the gas supply system further comprises: a second gas consumer of a different type from the first gas consumer serving as the gas consumer, which is capable of consuming the mixed gas; and a branch flow path which branches from a portion of the second supply pipeline downstream of the second compressor, or branches from a portion of the first supply pipeline downstream of the first compressor and is connected to the second gas consumer.
[0130] According to Item 3, even when the amount of hydrogen compressed by the first compressor and supplied to the first gas consumer exceeds the amount of hydrogen consumed in the first gas consumer, the remaining hydrogen between the first compressor and the first gas consumer in the first supply pipeline can be guided to the second gas consumer through a branch flow path, thereby enabling the hydrogen to be effectively utilized by the second gas consumer.
[0131] [Item 4]
[0132] A gas supply system, comprising: a first gas consumer capable of consuming hydrogen; a tank storing hydrogen; a first supply line connecting the tank and the first gas consumer; a first compressor disposed on the first supply line and configured to compress the hydrogen gas discharged from the tank and guided by the first supply line to a pressure greater than a required pressure of the first gas consumer; an inert gas line guiding the inert gas to the tank; a second gas consumer capable of consuming a mixed gas formed by mixing the inert gas and the hydrogen; a second supply line connected to a portion of the first supply line on an upstream side of the first compressor and connected to the second gas consumer; and a second compressor disposed on the second supply line and configured to compress the mixed gas discharged from the tank due to the introduction of the inert gas into the tank by the inert gas line to a pressure greater than a required pressure of the second gas consumer.
[0133] According to Item 4, in addition to the first compressor for pressurizing the boil-off gas, there is also a second compressor capable of compressing the mixed gas formed by mixing the inert gas and the hydrogen gas to a pressure higher than the required pressure of the boiler. Therefore, the compressors can be used separately according to the purpose, the pressure increase in the tank can be reliably suppressed, and the hydrogen gas in the tank can be replaced efficiently during the gas replacement.
[0134] [Item 5]
[0135] A ship comprising the gas supply system according to any one of items 1 to 4.
[0136] Since the ship is equipped with a second compressor for compressed gas delivery in addition to the first compressor for compressed gas delivery, it is possible to perform gas replacement by replacing the hydrogen in the tank with an inert gas when the ship is heading for a dock for maintenance work, for example. In addition, the mixed gas formed by mixing the inert gas and hydrogen can be effectively used in a propulsion boiler.
[0137] [Item 6]
[0138] A gas supply method for supplying gas discharged from a tank, wherein, when hydrogen is discharged from the tank in a state of storing hydrogen, the hydrogen discharged from the tank is guided to a first compressor and compressed, and the compressed hydrogen is consumed by a first gas consumer; and when a mixed gas formed by a mixture of an inert gas and hydrogen is discharged from the tank, the mixed gas discharged from the tank is guided to a second compressor of a type different from the first compressor and compressed, and the compressed mixed gas is consumed by the first gas consumer or a second gas consumer of a type different from the first gas consumer.
[0139] Compared with hydrogen, the specific gravity of inert gas is extremely large. When the compressor for hydrogen is also used for compressing the mixed gas during gas replacement, it is possible that the performance required of the hydrogen compressor becomes too high, or the hydrogen compressor is overloaded due to compressing the mixed gas. However, according to the method of item 6, the compressor used is used separately in the case of compressing the hydrogen discharged from the tank and the case of compressing the mixed gas discharged from the tank when gas replacement is performed. Therefore, it is possible to avoid the performance required of the hydrogen compressor becoming high or the hydrogen compressor being overloaded due to compressing the mixed gas.
[0140] [Item 7]
[0141] According to the gas supply method described in Item 6, the step of discharging hydrogen from the tank containing hydrogen includes the following steps: discharging hydrogen from the tank without supplying an inert gas to the tank containing hydrogen, and the step of discharging the mixed gas from the tank includes the following steps: discharging the mixed gas from the tank by supplying an inert gas to the tank containing hydrogen.
[0142] The compressor used can be used separately for compressing the gas discharged from the tank when gas replacement is performed to replace the hydrogen gas in the tank with an inert gas and for compressing the gas discharged from the tank when gas replacement is not performed.
[0143] [Item 8]
[0144] According to the gas supply method described in Item 7, the tank, the first compressor, the first gas consumer, the second compressor and the second gas consumer are mounted on a ship, and the step of discharging hydrogen from the tank in a state of storing hydrogen includes the following steps: while the ship is sailing toward a loading point for unloading liquefied hydrogen stored in the tank, evaporated gas, i.e., hydrogen, generated due to evaporation of liquefied hydrogen in the tank is discharged from the tank, and after the liquefied hydrogen in the tank is unloaded at the unloading point, the step of discharging the mixed gas from the tank for the gas replacement is performed while the ship is anchored at the unloading point or while the ship is sailing from the unloading point.
[0145] In a ship that cannot perform gas replacement operations on board, it is necessary to return the mixed gas to land after docking, and it is not possible to smoothly transfer to maintenance operations. In contrast, according to item 8, the hydrogen in the tank replaced with inert gas can be effectively utilized, and gas replacement can be promoted during navigation to smoothly transfer to maintenance operations.
[0146] [Item 9]
[0147] A gas supply method according to any one of items 6 to 8, wherein the step of discharging hydrogen from the tank containing hydrogen includes the following steps: discharging hydrogen from the tank without supplying an inert gas to the tank containing hydrogen, and the step of discharging the mixed gas from the tank includes the following steps: discharging the mixed gas from the tank by supplying hydrogen to the tank containing an inert gas.
[0148] The compressor used can be used separately for compressing the gas discharged from the tank when gas replacement is performed to replace the inert gas in the tank with hydrogen gas and for compressing the gas discharged from the tank when gas replacement is not performed.
Claims
1. A gas supply system comprising: a gas consumer capable of consuming hydrogen; a tank containing hydrogen gas; a first supply line connecting the tank and the gas consumer; a first compressor disposed on the first supply line and configured to compress the hydrogen gas discharged from the tank and guided through the first supply line to a pressure higher than a required pressure of the gas consumer; an inert gas line directing inert gas toward the tank; a second supply line connected to a portion of the first supply line upstream of the first compressor and connected to a portion of the first supply line downstream of the first compressor; and The second compressor is arranged on the second supply line and is configured to compress the mixed gas of the inert gas and the hydrogen gas discharged from the tank as a result of introducing the inert gas into the tank through the inert gas line to a pressure higher than the required pressure of the gas consumer.
2. The gas supply system according to claim 1, wherein: The gas consumer is a boiler.
3. The gas supply system according to claim 1 or 2, wherein: The gas supply system also has: a second gas consumer of a different type from the first gas consumer serving as the gas consumer, and capable of consuming the mixed gas; and A branch flow path is branched from a portion of the second supply line on the downstream side of the second compressor, or is branched from a portion of the first supply line on the downstream side of the first compressor, and is connected to the second gas consumer.
4. A gas supply system comprising: a first gas consumer capable of consuming hydrogen; a tank containing hydrogen gas; a first supply line connecting the tank and the first gas consumer; a first compressor disposed on the first supply line and configured to compress the hydrogen gas discharged from the tank and guided through the first supply line to a pressure higher than a pressure required by the first gas consumer; an inert gas line directing inert gas toward the tank; a second gas consumer capable of consuming a mixed gas formed by mixing the inert gas and the hydrogen gas; a second supply line connected to a portion of the first supply line on an upstream side of the first compressor and connected to the second gas consumer; and The second compressor is disposed in the second supply line and is configured to compress the mixed gas discharged from the tank as a result of introducing the inert gas into the tank through the inert gas line to a pressure higher than a required pressure of the second gas consumer.
5. A ship comprising the gas supply system according to claim 1 or 4.
6. A gas supply method for supplying gas discharged from a tank, wherein: When the hydrogen gas is discharged from the tank containing the hydrogen gas, the hydrogen gas discharged from the tank is guided to the first compressor and compressed, and the compressed hydrogen gas is consumed by the first gas consumer. When a mixed gas formed by a mixture of inert gas and hydrogen is discharged from the tank, the mixed gas discharged from the tank is guided to a second compressor of a different type from the first compressor and compressed, and the compressed mixed gas is consumed by the first gas consumer or a second gas consumer of a different type from the first gas consumer.
7. The gas supply method according to claim 6, wherein: The step of discharging hydrogen gas from the tank storing hydrogen gas includes the steps of: discharging hydrogen gas from the tank without supplying an inert gas to the tank storing hydrogen gas; The step of discharging the mixed gas from the tank includes the step of discharging the mixed gas from the tank by supplying an inert gas to the tank in a state where the hydrogen gas is stored.
8. The gas supply method according to claim 7, wherein: The tank, the first compressor, the first gas consumer, the second compressor, and the second gas consumer are mounted on a ship. The step of discharging hydrogen from the tank containing hydrogen includes the steps of discharging hydrogen gas, which is boil-off gas generated by evaporation of liquefied hydrogen in the tank, from the tank while the ship is navigating toward a loading point for unloading liquefied hydrogen stored in the tank, After the liquefied hydrogen in the tank is unloaded at the unloading site, the step of discharging the mixed gas from the tank for the gas replacement is performed while the ship is anchored at the unloading site or while the ship is sailing from the unloading site.
9. The gas supply method according to claim 6 or 7, wherein: The step of discharging hydrogen gas from the tank storing hydrogen gas includes the steps of: discharging hydrogen gas from the tank without supplying an inert gas to the tank storing hydrogen gas; The step of discharging the mixed gas from the tank includes the step of discharging the mixed gas from the tank by supplying hydrogen gas to the tank in a state where an inert gas is stored.