Steel structural member hoisting process

By simultaneously lifting inclined columns and steel beams, and using shoulder pole beams and automatic winder to achieve balance and precise lifting of inclined columns, the problems of high construction difficulty and low installation accuracy of steel structure components are solved, and construction efficiency and building stability are improved .

CN119062120APending Publication Date: 2024-12-03CHONGQING SHIXIN CONSTR GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411384136.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

During construction, there are problems such as high construction difficulty, long construction cycle and low installation accuracy during the lifting process of large-scale special-shaped components of steel structure components, which affects the stability of the overall building.

Method used

Using synchronously lifting inclined columns and steel beams tied with them, the length of the rope at both ends of the inclined columns is adjusted before lifting to ensure that the angle adjustment is completed simultaneously during lifting, and balance and through the shoulder pole beam and automatic winder Accurate lifting, simplify temporary fixing steps, and improve the stability and installation accuracy of the overall structure.

Benefits of technology

It significantly improves the stability of inclined column hoisting and installation accuracy, reduces construction difficulty and cycle, reduces dependence on manpower, and improves construction efficiency and overall building stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062120A_ABST
    Figure CN119062120A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction, in particular to a steel structural member hoisting process which comprises a stand column, a special-shaped column, an inclined column and a steel beam. Wherein the batter post and the steel beam tied with the batter post are synchronously hoisted, and the hoisting method comprises the following steps that S1, before hoisting, the segmented batter post is assembled and then integrally hoisted, the difference value of the included angle alpha between the batter post and the ground and the installation angle of the batter post is within + / -10 degrees when the batter post is hoisted, and after the batter post is hoisted to the installation position, the foot of the batter post is fixed to a connector of a special-shaped post; s2, the steel beams comprise the first steel beam and the second steel beam; s3, after the first steel beam is hoisted in place, one end of the first steel beam is fixedly connected with the stand column, and the other end of the first steel beam is fixedly connected with the lower end of the inclined column; after the first steel beam is fixed, the second steel beam is hoisted; after the second steel beam is hoisted in place, one end of the second steel beam is fixedly connected with the stand column, and the other end is fixedly connected with the upper end of the inclined column.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to a steel structure component hoisting process. Background Art

[0002] With the booming economy and the accelerated urbanization process, the demand for cultural facilities such as large sports stadiums, exhibition centers, and science and technology service centers is growing. These facilities not only bear important social functions, but also tend to be more diversified and personalized in architectural design, which puts higher requirements on building structure and construction technology. In construction, steel structure components include conventional components (such as conventional steel columns, steel beams, etc.) and special-shaped components (such as special-shaped beams such as curved beams and broken line beams, and special-shaped columns such as inclined columns). Among them, large special-shaped components are difficult to construct, the construction operation process is cumbersome, and the construction period is long. When the existing technology hoists large special-shaped components (for example, inclined columns spanning multiple floors), it is usually necessary to divide them into sections, and then hoist and install them in sections.

[0003] The patent with authorization announcement number CN114961286B discloses a method for hoisting and constructing ultra-high outward-inclined large-section K-shaped rigid steel column, which includes the following steps: S1, erecting foundation pedestal; S2, segment optimization; S3, hoisting of the first rigid steel column; S4, hoisting of the second rigid steel column; S5, hoisting of the third rigid steel column; S6, hoisting of the fourth rigid steel column; S7, hoisting of the fifth rigid steel column; S8, hoisting and welding of annular connecting beams.

[0004] Although this technical solution reduces the use of temporary support materials and construction time, the inventors found in the actual construction process that the use of this solution for the installation of large-span inclined columns (for example, inclined columns spanning multiple floors) requires a large amount of manpower to assist in adjusting the installation position and angle of each section of steel structure components and connecting adjacent components. The manpower demand is large, the construction difficulty is high, and the construction period is long; the installation accuracy of the overall steel structure components is low, which affects the stability of the overall building. Summary of the invention

[0005] The present invention provides a steel structure component hoisting process, which can solve the problems of high construction difficulty, long construction period, low installation accuracy of the overall steel structure components, and influence on the stability of the overall building.

[0006] This application provides the following technical solutions:

[0007] A steel structure component hoisting process, wherein the steel structure component includes a column, a special-shaped column, an inclined column, and a steel beam; wherein the inclined column and the steel beam connected to the inclined column are hoisted synchronously, comprising the following steps:

[0008] S1. Hoisting the inclined column: The inclined column is transported to the construction site in sections. Before hoisting, the sections of the inclined column are assembled and hoisted as a whole. The difference between the angle α between the inclined column and the ground and the installation angle of the inclined column during hoisting is within ±10°. After the inclined column is hoisted to the installation position, the column foot is installed on the fixed special-shaped column;

[0009] S2. Hoisting steel beams: The steel beams include a first steel beam and a second steel beam. The first steel beam located at the lower installation position is hoisted first;

[0010] S3. Install the inclined columns and steel beams: After the first steel beam is hoisted into place, one end of the first steel beam is fixedly connected to the column, and the other end of the first steel beam is fixedly connected to the lower end of the inclined column; after the first steel beam is fixed, the second steel beam is hoisted; after the second steel beam is hoisted into place, one end of the second steel beam is fixedly connected to the column, and the other end of the second steel beam is fixedly connected to the upper end of the inclined column.

[0011] Beneficial effects:

[0012] 1. This technology has a great leading and breakthrough effect on this field. At present, this field has always maintained the traditional segmented hoisting installation when installing inclined columns; especially when installing inclined columns between multiple floors, because the multiple floors themselves are layered, the installation has always been carried out in sections and layers. However, the inventor broke the traditional thinking and realized the integral hoisting installation of inclined columns, especially for large-span inclined columns across multiple floors, which can simultaneously ensure the hoisting strength, installation accuracy and efficiency, reduce the steps of alignment adjustment and testing of inclined columns after hoisting, save time and labor, and have great promotion value.

[0013] 2. When the prior art hoists the inclined column, two cranes are usually used to work together, that is, the hooks of the two cranes are connected to the two ends of the inclined column respectively. During the hoisting, the two cranes synchronously apply an upward pulling force to the inclined column square to the ground, lift the inclined column off the ground and lift it to a predetermined height, and adjust the angle of the inclined column, that is, one of the cranes suspends the lifting operation, and the other crane continues to lift upward, so as to change the angle of the inclined column to reach the installation angle. However, this technical solution is prone to swaying in actual operation, which increases the complexity of operation and potential safety hazards. Moreover, it is difficult to control the inclined column to reach the required installation angle. The position and angle need to be adjusted many times during installation, which is cumbersome to operate and has low construction efficiency. This technical solution adjusts the length of the lifting ropes at both ends of the inclined column in advance before hoisting, so that the inclined column can complete the angle adjustment synchronously during the hoisting stage, and the adjustment angle can be as consistent as possible with the installation angle, thereby significantly improving the stability of the inclined column hoisting and the accuracy of installation, reducing the dependence on manpower during the hoisting process, reducing the difficulty of construction, achieving rapid positioning and fixing, and greatly shortening the construction period.

[0014] 3. Compared with the prior art, the inclined columns are hoisted first, and then the inclined columns are temporarily fixed after they are installed in place, and then the steel beams connected to the inclined columns are hoisted. This technical solution adopts the synchronous hoisting of the inclined columns and the steel beams connected to them, which can support each other, simplifying the steps of temporarily fixing the inclined columns. The upper and lower steel beams can achieve stable support for the inclined columns, thereby improving the stability of the overall structure. The inclined columns and steel beams can be aligned, tested, adjusted, and installed simultaneously to ensure the installation accuracy of the inclined columns and steel beams, significantly improve the overall stability and construction quality of the building, simplify the construction process, improve construction efficiency, shorten the construction period, and reduce construction costs.

[0015] Furthermore, the inclined column is lifted at two points, and the two lifting points are respectively arranged at both ends of the inclined column. The distance from the lifting point to the end of the inclined column is less than or equal to 1 / 5 of the total length of the inclined column, and lifting ears are welded at the lifting points.

[0016] Beneficial effects: It can significantly improve the stability and safety of the inclined column during the hoisting process, ensure that the inclined column is evenly stressed during the hoisting process, avoid structural deformation and damage caused by single-point hoisting or improper hoisting point position, effectively disperse the stress generated during the hoisting process, and reduce the possibility of bending or twisting of the inclined column during the hoisting process, thereby improving the accuracy and reliability of the inclined column hoisting. At the same time, it can fully expose the assembly position of the inclined column to avoid the overlap of the hoisting point and the assembly position of the inclined column, thereby ensuring the accurate connection and stable fixation between the inclined column and the steel beam.

[0017] Furthermore, the inclined column is lifted by a shoulder pole beam, and automatic reels are provided at both ends of the shoulder pole beam. The automatic reels include a retractable lifting rope, and the lifting rope is fixedly connected to the lifting ear of the inclined column through a shackle.

[0018] Beneficial effects: It can significantly improve the balance and accuracy of the inclined column during the lifting process, ensuring that the inclined column remains stable during the lifting process. The use of the automatic reel can automatically adjust the length of the lifting rope according to the weight and shape of the inclined column, making it easy to adjust the angle between the inclined column and the ground so that it is close to the installation angle of the inclined column. In addition, the use of the shoulder beam can effectively disperse the lifting force, reduce the stress concentration on the inclined column during the lifting process, and improve the safety and reliability of the lifting operation; this design not only simplifies the lifting operation, reduces the demand for auxiliary equipment and manpower, but also shortens the lifting time and the adjustment time of the inclined column, and improves the construction efficiency.

[0019] Furthermore, the minimum extension length of the suspension rope connected to the inclined column is greater than or equal to 1 / 4 of the total length of the inclined column.

[0020] Beneficial effect: Ensure that the inclined column remains stable during lifting and avoid collision between the inclined column and the shoulder pole beam.

[0021] Furthermore, the method for hoisting the inclined column comprises the following steps: determining the initial extension lengths of the lifting ropes at both ends of the shoulder pole beam before hoisting, and connecting the lifting ropes at both ends of the shoulder pole beam to both ends of the inclined column respectively; the lifting equipment drops a hook, and the shoulder pole beam is hung on the drop hook, and the lifting equipment slowly lifts the hook, and a short lifting rope with a shorter length at one end of the inclined column is first stressed to make the inclined column rotate around the column foot, and after a long lifting rope with a longer length at the other end of the inclined column is fully stressed, the lifting equipment stops lifting the hook; detecting the angle α between the inclined column and the ground, and when the error between the angle α and the installation angle of the inclined column exceeds ±10°, adjusting the extension lengths of the short lifting rope and the long lifting rope to make the error between the angle α and the installation angle of the inclined column within ±10°. °; and check and confirm the lifting equipment, shoulder beam, inclined column and slings; after confirmation, the lifting equipment continues to slowly lift the hook, and after lifting the inclined column 200-500mm from the ground, the lifting equipment stops lifting the hook, and after the inclined column is stable, check the angle α between the inclined column and the ground. The error between the angle α and the installation angle of the inclined column is within ±10°; check and confirm the lifting equipment, inclined column, slings and foundation again; after confirmation, the lifting equipment continues to slowly lift the hook, and slowly lift the hoisted object to 300-500mm above the installation position, stop lifting, and the lifting equipment rotates the boom to lower the hook and lift the inclined column to the installation position.

[0022] Beneficial effect: By controlling the initial extension length of the lifting ropes at both ends of the inclined column, the angle of the inclined column can be adjusted while lifting, ensuring that the angle α between the inclined column and the ground can be as consistent as possible with the installation angle of the inclined column. The short lifting rope at one end of the inclined column is first subjected to force, driving the inclined column to rotate around the column foot, and then gradually subjected to force as the long lifting rope is gradually subjected to force, ensuring that the inclined column transitions smoothly during the lifting process, avoiding sudden tilting or swinging, and reducing the impact and damage to the structure. In the actual operation process, due to the inclination of the inclined column, the shoulder beam will also tilt to a certain extent, which will cause the angle α between the inclined column and the ground to shift. By stopping the lifting twice for detection and adjusting the extension length of the short and long lifting ropes, the angle α between the inclined column and the ground can be gradually adjusted to make it closer to the installation angle of the inclined column, ensuring the angle accuracy of the inclined column during the lifting process, improving the accuracy of the installation, and avoiding the shaking of the inclined column caused by excessive single adjustment, which reduces the stability and safety of the inclined column. At the same time, it ensures that all components are in normal working condition, avoids safety hazards caused by equipment failure or operating errors, and ensures that the inclined column remains stable during the lifting process to avoid accidents. This improves the safety and reliability of the lifting process, reduces the demand for manpower, simplifies the operation process, and shortens the construction period. The lifting method that combines the shoulder beam and the long and short lifting ropes ensures the stability and accuracy of the inclined column during the lifting process, which can significantly improve the controllability and safety of the inclined column lifting.

[0023] Furthermore, the fixing method of the inclined column base includes the following: pre-arranging a first connecting plate at the butt ends of the inclined column base and the special-shaped column connecting head; fixing the second connecting plate to the first connecting plate of the inclined column base by bolts; after the inclined column is hoisted to the installation position, the bolts are inserted into the second connecting plate and the first connecting plate on the special-shaped column connecting head, and when the center lines of all four sides are aligned or the deviation is controlled within the range required by the specification, the bolts are tightened to fix the inclined column base.

[0024] Beneficial effects: It ensures the rapid positioning and fixing of the inclined column after it is hoisted to the installation position, improving the installation accuracy and efficiency. It ensures the precise docking between the inclined column and the special-shaped column. The connection plate simplifies the fixing process, improves the stability and reliability of the connection, reduces the error caused by manual adjustment, and ensures the stability of the overall structure and the construction quality.

[0025] Furthermore, the special-shaped column includes a column section at the lower end and a connecting head at the upper end, the connecting head is bent and extended to one side, and the special-shaped column is lifted at one point, the lifting point is set at the top of the column section of the special-shaped column, and a lifting ear is provided at the lifting point, and the lifting ear is fixedly connected to the lifting rope by a shackle.

[0026] Beneficial effects: To ensure the stability of the special-shaped column during the lifting process, the lifting point is set at the top of the column section to fully utilize the structural strength of the column, reduce stress concentration during the lifting process, and avoid structural deformation or damage caused by improper lifting point position. At the same time, it simplifies the lifting operation process, reduces the demand for auxiliary equipment and manpower, shortens the lifting time, and improves construction efficiency.

[0027] Furthermore, a lifting lug is provided at the top of the column, and the lifting lug is fixedly connected to the lifting rope via a shackle, so that after the column is lifted, the column body is vertical.

[0028] Beneficial effects: Ensure the stability and precise control of the column during lifting, and avoid structural deformation or damage caused by improper lifting point position.

[0029] Furthermore, the hoisting method of the column or special-shaped column includes the following: the hoisting equipment drops a hook, the lifting rope is hung on the drop hook, the hoisting equipment slowly lifts the hook, and after the lifting rope of the hoisting equipment is fully stressed and tightened, the hoisting equipment stops lifting the hook, and the hoisting equipment, the hoisted object, the sling and the foundation and other factors are checked and confirmed; after confirmation, the hoisting equipment continues to slowly lift the hook, and after the hoisted object is lifted 200-500mm from the ground, the hoisting equipment stops lifting the hook, and after the column is stable, the hoisting equipment, the column, and the sling are checked and confirmed again. After confirmation, the hoisting equipment continues to slowly lift the hook, and slowly lifts the hoisted object to 300-500mm above the installation position, and stops lifting; the hoisting equipment rotates the boom to lower the hook and hoist the column to the installation position.

[0030] Beneficial effects: Ensure the stability and safety of columns and special-shaped columns during the hoisting process. Through multiple inspections and confirmations, the potential risks in the hoisting process are reduced, and the safety and reliability of the hoisting are improved.

[0031] Furthermore, the steel beam is lifted at two points, and the two lifting points are respectively set at both ends of the inclined column. The distance from the lifting point to the end of the steel beam is less than or equal to 1 / 4 of the total length of the steel beam. During lifting, the angle β between the steel beam and the lifting rope is greater than or equal to 45°.

[0032] Beneficial effects: It can significantly improve the stability and safety of steel beam hoisting. The selection of the lifting point position can ensure that the steel beam is evenly stressed during the lifting process, reducing structural deformation or damage caused by single-point lifting or improper lifting point position. It ensures the balance and stability of the steel beam during the lifting process, reduces the demand for auxiliary equipment and manpower, simplifies the operation process, and shortens the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is an overall schematic diagram of the steel structure component of the steel structure component hoisting process of the present invention.

[0034] Figure 2 It is a schematic diagram of the inclined column hoisting of the steel structure component hoisting process of the present invention.

[0035] Figure 3 The figure is a schematic diagram of steel beam hoisting in the steel structure component hoisting process of the present invention.

[0036] Figure 4 for Figure 1 Enlarged view of part A.

[0037] Figure 5 for Figure 1 Enlarged view of part B. DETAILED DESCRIPTION

[0038] The following is further described in detail through specific implementation methods:

[0039] The marks in the drawings of the specification include: column 1, special-shaped column 2, inclined column 3, steel beam 4, first steel beam 41, second steel beam 42, first connecting plate 5, second connecting plate 6, shoulder beam 7, automatic reel 8, lifting rope 9, annular plate 10, extension plate 11, connecting piece 12, top plate 13.

[0040] Embodiment 1

[0041] like Figures 1 to 4 As shown, the steel structure component hoisting process includes a column 1, a special-shaped column 2, an inclined column 3, and a steel beam 4. After the column 1 and the special-shaped column 2 are hoisted and fixed first, the inclined column 3 and the steel beam 4 connected to the inclined column are hoisted synchronously, including the following steps:

[0042] S1. Preliminary preparation: Move the steel structure components and lifting equipment to the construction site. The steel structure components include columns 1, special-shaped columns 2, inclined columns 3, and steel beams 4. Lifting equipment includes cranes and tower cranes. Select one or more lifting equipment according to the lifting requirements of the steel structure components. The lifting equipment is set at the lifting position. The boom angle of the lifting equipment is rotated according to the lifting position to observe whether there are any obstacles. Specifically, the crane moves to the lifting position, and the boom is extended after the legs are in place. According to the rotation angle of the lifting position, observe whether there are any obstacles. According to the lifting requirements of the steel structure components, select the corresponding lifting rope and shackle. The lifting rope can be a wire rope or a guy rope according to the lifting requirements.

[0043] Before lifting, verify the size of the steel structure components, determine the center of gravity of the steel structure components, select the location of the hanging rope to install the lifting lug, and fix the lifting lug of the steel structure components and the lifting rope through the shackle. Hang the ropes in order to avoid mutual squeezing, crossing, twisting, and twisting of the ropes. Before lifting, check whether there is dirt and other debris at the bolting position, and if there is any, it should be cleaned up.

[0044] S2. Lifting columns:

[0045] S2.1. Selection of column lifting points: The position and number of lifting points of column 1 are determined according to the shape, section, length, weight, lifting performance of the crane and other specific conditions of the steel column. Generally, the steel column has good elasticity, and the lifting point adopts one-point lifting. The lifting lug is placed at the top of column 1, and the lifting lug is fixedly connected to the lifting rope through a shackle. For long and thin steel columns, two-point or three-point lifting can be used to prevent deformation of the steel column. After the column 1 is lifted, the column body is vertical, which is easy to align and correct.

[0046] S2.2. Lifting method of columns: It is determined according to the lifting equipment and site conditions. Single-machine, two-machine, three-machine lifting, etc. can be used.

[0047] The hoisting methods of the column 1 include the following, which can be selected according to the construction requirements:

[0048] S2.2.1, Rotation method: Column 1 is transported to the site, and the crane is used to lift column 1 while lifting the hook and rotating it around the column foot. When lifting, wooden blocks should be placed under the column foot to prevent friction with the ground, and at the same time, ensure that the lifting point and the column foot foundation are on the same arc of the crane's boom rotation.

[0049] S2.2.2, Sliding method: A single or double crane is used to lift column 1. The crane only lifts the hook, and the column foot of column 1 slides to lift column 1. A taxiway is laid between column 1 and the ground.

[0050] S2.2.3, Delivery method: Two or three machines are used for lifting. To reduce the friction between the foot of column 1 and the ground, one of them is the auxiliary machine. The lifting point is selected at the lower end of column 1. When lifting the column, it cooperates with the main machine to lift the hook. As the main machine is lifted, the auxiliary machine needs to move or rotate. During the delivery process, the auxiliary machine bears part of the load and delivers the foot of column 1 to the top of the installation position of column 1. The auxiliary machine removes the hook and unloads the load. At this time, the main machine is fully loaded and the steel column is in place.

[0051] S2.3. Lifting method of the column: Lift the hook of the lifting equipment and hang the lifting rope on the hook. The hoisting equipment slowly hooks up, and stops hooking after the hoisting rope of the hoisting equipment is fully stressed and tightened. Check and confirm the hoisting equipment, column 1, slings and foundation and other factors, confirm whether there is any abnormality in the hoisting equipment (including checking the readings of the hoisting equipment, whether the hoisting equipment is tilted, etc.), confirm the total weight of the hoisted object and the load condition of the hoisting equipment, and visually check whether the hoisted object, lifting lugs, wire ropes and shackles are intact; after confirmation, the hoisting equipment continues to slowly hook up, and after lifting column 1 500mm from the ground, the hoisting equipment stops hooking and stays still for 2-5 minutes. After column 1 is stable, check and confirm the hoisting equipment, column 1 and slings again. After confirmation, the hoisting equipment continues to slowly hook up, and slowly lifts column 1 to 300mm above the installation position, and stops lifting; the hoisting equipment rotates the boom to lower the hook and lift column 1 to the installation position.

[0052] After column 1 is hoisted to the installation position, align the center lines of the four sides of column 1 with the cross axis of the foundation, that is, use a ruler to extend the center lines of the four sides of column 1 to the edge, taking all four sides into consideration. When the alignment or control is within the specification, the alignment of column 1 is completed. Then use nuts to preliminarily fix column 1, and then use the method of pulling cables and wind ropes in four directions to temporarily fix column 1. If the cable wind rope cannot be pulled due to height and environmental influences, a hard support method should be used for temporary fixation. After temporary fixation, under the measurement and monitoring of the surveyor, use the cable wind rope, fall chain, jack, etc. for temporary fixation to correct the verticality of column 1, adjust the elevation of column 1, and process the horizontal position and spacing of column 1. After the correction of column 1 is completed, it is reinforced, and after confirming that it is tightened correctly, the hook is released.

[0053] S3. Hoisting special-shaped columns:

[0054] S3.1. Preparation for hoisting of special-shaped columns: The special-shaped column 2 includes a column section at the lower end and a connector at the upper end. The connector is bent and extended to one side, and the connector is used to fix and connect the oblique column 3. The column section and connector of the special-shaped column 2 can be an integral structure or a segmented structure; when the column section and connector of the special-shaped column 2 are segmented structures, they are welded and fixed before hoisting, and then hoisted as a whole, so as to ensure the installation accuracy of the connector and the column section, and then ensure the installation accuracy of the column section and the oblique column. At the same time, the installation process of the oblique column 3 is simplified, making on-site installation easier and faster, and reducing the construction difficulty. Verify the size of the special-shaped column 2, and use the rotation method to lift it at one point. The lifting point is set at the top of the column 1 section of the special-shaped column 2. Since the length of the connector is much smaller than the length of the column section, it has little effect on the verticality of the special-shaped column 2. The special-shaped column can be fixed and adjusted after the hoisting is completed. Weld the lifting lug at the lifting point, and the lifting lug is fixedly connected to the lifting rope 9 by a shackle.

[0055] S3.2, Hoisting method of special-shaped column 2:

[0056] The hoisting equipment drops the hook, and the hoisting rope is hung on the hook; the hoisting equipment slowly lifts the hook, and after the hoisting rope of the hoisting equipment is fully stressed, the hoisting equipment stops lifting the hook, and the hoisting equipment, special-shaped column 2, slings and foundation and other elements are checked and confirmed, that is, whether there is any abnormality in the hoisting equipment (including reading inspection of the hoisting equipment, whether the hoisting equipment is tilted, etc.), confirm the total weight of the hoisted object and the load of the hoisting equipment, and visually check whether the special-shaped column 2, lifting lugs, wire ropes, and shackles are intact. After confirmation, the hoisting equipment continues to slowly lift the hook, and after lifting the special-shaped column 2 500mm off the ground, the hoisting equipment stops lifting the hook and stays still for 2-5 minutes. After the special-shaped column 2 is stable, the hoisting equipment, special-shaped column 2, slings and foundation and other elements are checked and confirmed again. After confirmation, the hoisting equipment continues to slowly lift the hook, slowly lift the special-shaped column 2 to 300mm above the installation position, and stop lifting; the hoisting equipment rotates the lower hook of the boom to lift the special-shaped column 2 to the installation position.

[0057] After the special-shaped column 2 is hoisted to the installation position, align the four center lines of the special-shaped column 2 with the cross axis of the foundation, that is, use a ruler to extend the four center lines of the column 1 to the edge, taking all four sides into consideration. When the alignment or control is within the specification, the alignment of the special-shaped column 2 is completed. Then use nuts to preliminarily fix the special-shaped column 2, and then use the method of pulling cables and wind ropes in four directions, and then temporarily fix the steel column. If the cable wind rope cannot be pulled due to height and environmental influences, a hard support method should be used for temporary fixation. After temporary fixation, under the measurement and monitoring of the surveyor, use the cable wind rope, fall chain, jack, etc. for temporary fixation to correct the verticality of the special-shaped column 2, adjust the elevation of the special-shaped column 2, and process the horizontal position and spacing of the special-shaped column 2. After the correction of the special-shaped column 2 is completed, it is reinforced, and after confirming that it is tightened correctly, the hook is released.

[0058] S4. Hoisting of inclined columns and steel beams

[0059] Two lifting devices are used to synchronously lift the inclined column 3 and the steel beam 4 connected to the inclined column 3 respectively, to ensure that the inclined column 3 and the steel beam 4 are installed synchronously, so as to ensure that the inclined column 3 is fixed after being installed in place.

[0060] S4.1. Hoisting inclined columns:

[0061] S4.1.1. Preparation for hoisting of the inclined column: The inclined column 3 is transported to the construction site in sections. Before hoisting, the sections of the inclined column 3 are assembled by welding and hoisted as a whole. The welding points are then reinforced by connecting plates. The inclined column 3 is hoisted at two points. The two hoisting points are respectively set at the two ends of the inclined column 3. The distance from each hoisting point to the adjacent end of the inclined column 3 is less than or equal to 1 / 5 of the total length of the inclined column 3. Lifting ears are welded at each hoisting point. The inclined column 3 is hoisted by a shoulder pole beam 7. Both ends of the shoulder pole beam 7 are provided with automatic retractors 8. Each automatic retractor 8 includes a retractable lifting rope 9. One end of the lifting rope 9 is fixedly connected to the reel. The reel is connected to the motor drive through a speed change gear. The motor drives the reel to rotate and reel in the lifting rope 9. The other end of the lifting rope 9 extends out of the automatic retractor 8 and is fixedly connected to the lifting ear of the inclined column 3 through a shackle. The motor is connected to the controller, and the motor is controlled by the controller to adjust the extension length of the lifting rope 9. The minimum extension length of the suspension rope 9 connected to the inclined column 3 is greater than or equal to 1 / 4 of the total length of the inclined column 3.

[0062] The difference between the angle α between the inclined column 3 and the ground when it is hoisted and the installation angle of the inclined column 3 is within ±10°, that is, the angle α between the inclined column 3 and the ground when it is hoisted is as close as possible to the installation angle of the inclined column 3 (that is, the angle formed by the inclined column 3 and the horizontal plane when the inclined column 3 is installed in place). Before hoisting, the length difference of the suspension ropes 9 at both ends of the inclined column 3 when the angle α is consistent with the installation angle of the inclined column 3 is calculated through the installation angle of the inclined column 3, the length of the inclined column 3, the position of the lifting lug and other data; combined with the minimum extension length of the suspension rope 9 being greater than or equal to 1 / 4 of the total length of the inclined column 3, the initial extension length of the suspension rope 9 at both ends of the adjustable shoulder beam 7 can be obtained. By adjusting the initial extension length of the suspension rope 9 at both ends of the shoulder beam 7, the angle α between the inclined column 3 and the ground when it is hoisted can be made as consistent as possible with the installation angle of the inclined column 3. Specifically, the total length of the inclined column 3 is 13m, and the length of the shorter suspension rope on the inclined column 3 is 4m, which can effectively avoid the collision between the inclined column 3 and the shoulder beam 7.

[0063] S4.1.2, the method of lifting the inclined column: the lifting equipment drops the hook, the shoulder pole beam 7 is hung on the drop hook, the lifting equipment slowly lifts the hook, the short lifting rope with a shorter length at one end of the inclined column 3 is stressed first, so that the inclined column 3 rotates around the column foot, and the long lifting rope with a longer length at the other end of the inclined column 3 is fully stressed, and the lifting equipment stops lifting the hook; the angle α between the inclined column 3 and the ground is detected by a laser level or a digital level ruler. When the error between the angle α and the installation angle of the inclined column 3 exceeds ±10°, the extension length of the short lifting rope and the long lifting rope is adjusted by the driving motor to make the error between the angle α and the installation angle of the inclined column 3 within ±10°; and the lifting equipment, shoulder pole beam 7, inclined column 3, and lifting rope are adjusted. The lifting equipment is checked and confirmed; after confirmation, the lifting equipment continues to slowly lift the hook, and after lifting the inclined column 3 200 from the ground, the lifting equipment stops lifting the hook and remains still for 2-5 minutes. After the inclined column 3 is stable, the angle α between the inclined column 3 and the ground is detected, and the inspection lengths of the short lifting rope 9 and the long lifting rope 9 are adjusted by the drive motor to make the error between the angle α and the installation angle of the inclined column 3 within ±10°; the lifting equipment, inclined column 3, slings and foundation and other elements are checked and confirmed again; after confirmation, the lifting equipment continues to slowly lift the hook, slowly lift the hoisted object to 300mm above the installation position, stop lifting, and the lifting equipment rotates the lower hook of the boom to lift the inclined column 3 to the installation position.

[0064] S4.2. Hoisting of steel beams

[0065] The steel beam 4 includes a first steel beam 41 and a second steel beam 42. The first steel beam 41 located at the lower installation position is hoisted first. After the first steel beam 41 is installed in place, the second steel beam 42 located at the upper installation position is hoisted.

[0066] S4.2.1. Preparation for lifting of steel beams: Steel beam 4 is lifted at two points. The two lifting points are respectively set at the two ends of steel beam 4. The distance from each lifting point to the adjacent end of steel beam 4 is less than or equal to 1 / 4 of the total length of the steel beam. During lifting, the angle β between steel beam 4 and lifting rope 9 is greater than or equal to 45°. The selection of lifting points of steel beam 4 can be determined according to the specific situation, so that steel beam 4 does not deform and is balanced and stable after lifting. Steel beam 4 can be directly tied with lifting rope 9, or lifted by special clamps, or by welding lifting ears. To prevent the wire rope from damaging the paint, the lifting points are protected with rubber. Before lifting steel beam 4, clean the dirt on the surface of steel beam 4, and remove the rust before lifting.

[0067] S4.2.2. Steel beam hoisting method: The hoisting equipment drops the hook and hangs the lifting rope 9 on the hook; the hoisting equipment slowly lifts the hook, and when the lifting rope 9 is fully stressed and taut, the hoisting equipment stops lifting the hook and checks and confirms the hoisting equipment, steel beam 4, slings and other factors; after confirmation, the hoisting equipment continues to slowly lift the hook, and after lifting the steel beam 4 200mm from the ground, the hoisting equipment stops lifting the hook and stays still for 2-5 minutes. After the steel beam 4 is stable, the hoisting equipment, steel beam 4, slings and foundation and other factors are checked and confirmed again; after confirmation, the hoisting equipment continues to slowly lift the hook, and slowly lifts the steel beam 4 to 300mm above the installation position, stops lifting, and the hoisting equipment rotates the boom to lower the hook and lift the steel beam 4 to the installation position.

[0068] S4.3. Install inclined columns and steel beams

[0069] Before installation, multiple positioning lines are pre-popped out at the base of the inclined column 3 and the docking port of the special-shaped column 2 as the installation reference line, and the first connecting plate 5 is set at each positioning line. The first connecting plate 5 is fixedly connected to the inclined column 3 and the special-shaped column 2 by welding; the two second connecting plates 6 are respectively fixed on both sides of the first connecting plate 5 of the inclined column 3 by bolts. After the inclined column 3 is hoisted to the installation position, the inclined column 3 is aligned with the special-shaped column 2 connection head, the first connecting plate 5 on the special-shaped column 2 connection head is inserted between the corresponding two second connecting plates 6, the remaining bolts are inserted into the second connecting plate 6 and the first connecting plate 5 on the special-shaped column 2 connection head, and the center lines of the four sides of the inclined column 3 are aligned with the center lines of the four sides of the special-shaped column 2 connection head. When the center lines of the four sides are aligned or the deviation has been controlled within the range required by the specification, the bolts are tightened to temporarily fix it, and then the butt joint is reinforced by welding. At this time, the inclined column 3 is still in the hoisting state.

[0070] The first steel beam 41 located at the bottom of the installation position is hoisted first. After the first steel beam 41 is hoisted into place, it is aligned according to the construction drawing. After alignment, both ends of the first steel beam 41 are fixed at the same time. One end of the first steel beam 41 is fixedly connected to the column 1 through a connecting plate, and the other end of the first steel beam 41 is fixedly connected to the lower end of the inclined column 3 through a connecting assembly. After confirming that it is properly tightened, release the hook. Then hoist the second steel beam 42. After the second steel beam 42 is hoisted into place, align the second steel beam 42. After alignment, both ends of the second steel beam 42 are fixed at the same time. One end of the second steel beam 42 is fixedly connected to the column 1 through a connecting plate, and the other end of the second steel beam 42 is fixedly connected to the upper end of the inclined column 3 through a connecting assembly. After confirming that it is properly tightened, release the hooks on the second steel beam 42 and the inclined column 3. When hoisting and fixing the inclined column 3 and the steel beam 4, measurement and monitoring should be carried out to ensure the installation accuracy of the inclined column 3 and the steel beam 4. The connection assembly includes two upper and lower annular plates 10, which are welded to the inclined column 3, and an extension plate 11 extending outward is arranged between the upper and lower annular plates 10, and the extension plate 11 is integrally formed with the annular plate 10, and the extension plate 11 is fixedly connected to the first steel beam 41 or the second steel beam 42 through a connecting piece 12. The connection assembly at the top of the inclined column 3 also includes a top plate 13, which is sealed on the top of the inclined column 3 and integrally formed with the annular plate 12. The connection assembly realizes a stable connection between the inclined column 3 and the steel beam 4, enhances the rigidity and stability of the overall structure, improves the overall coordination and adaptability of the structure, reduces the workload on site, and improves the installation efficiency.

[0071] After the installation is completed, a temporary support frame can be made from No. 16 I-beam under the inclined column 3 to reinforce the inclined column 3 and ensure construction safety.

[0072] The above are only embodiments of the present invention. The invention is not limited to the field involved in this implementation case. The common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. The steel structure component hoisting process is characterized by: The steel structure components include upright columns, special-shaped columns, inclined columns, and steel beams; wherein the inclined columns and the steel beams connected to the inclined columns are synchronously hoisted, including the following steps: S1. Hoisting the inclined column: The inclined column is transported to the construction site in sections. Before hoisting, the sections of the inclined column are assembled and hoisted as a whole. The difference between the angle α between the inclined column and the ground and the installation angle of the inclined column during hoisting is within ±10°. After the inclined column is hoisted to the installation position, the column foot is installed on the fixed special-shaped column; S2. Hoisting steel beams: The steel beams include a first steel beam and a second steel beam. The first steel beam located at the lower installation position is hoisted first; S3. Install the inclined columns and steel beams: After the first steel beam is hoisted into place, one end of the first steel beam is fixedly connected to the column, and the other end of the first steel beam is fixedly connected to the lower end of the inclined column; after the first steel beam is fixed, the second steel beam is hoisted; after the second steel beam is hoisted into place, one end of the second steel beam is fixedly connected to the column, and the other end of the second steel beam is fixedly connected to the upper end of the inclined column.

2. The steel structure member hoisting process according to claim 1 is characterized in that: The inclined column is lifted by two points, the two lifting points are respectively arranged at both ends of the inclined column, the distance from the lifting point to the end of the inclined column is less than or equal to 1 / 5 of the total length of the inclined column, and the lifting ears are welded at the lifting points.

3. The steel structure member hoisting process according to claim 2 is characterized in that: The inclined column is lifted by a shoulder pole beam, and automatic reels are arranged at both ends of the shoulder pole beam. The automatic reels include a retractable lifting rope, and the lifting rope is fixedly connected to the lifting ear of the inclined column through a shackle.

4. The steel structure member hoisting process according to claim 3 is characterized in that: The minimum extension length of the suspension rope connected to the inclined column is greater than or equal to 1 / 4 of the total length of the inclined column.

5. The steel structure member hoisting process according to claim 4 is characterized in that: The method for hoisting the inclined column comprises the following steps: determining the initial extension lengths of the lifting ropes at both ends of the shoulder pole beam before hoisting, and connecting the lifting ropes at both ends of the shoulder pole beam to both ends of the inclined column respectively; the lifting equipment drops a hook, and the shoulder pole beam is hung on the drop hook, and the lifting equipment slowly lifts the hook, and a short lifting rope with a shorter length at one end of the inclined column is first stressed to make the inclined column rotate around the column foot, and after a long lifting rope with a longer length at the other end of the inclined column is fully stressed, the lifting equipment stops lifting the hook; detecting the angle α between the inclined column and the ground, and when the error between the angle α and the installation angle of the inclined column exceeds ±10°, adjusting the extension lengths of the short lifting rope and the long lifting rope to make the error between the angle α and the installation angle of the inclined column within ±10°. The lifting equipment, shoulder beam, inclined column and slings are checked and confirmed. After confirmation, the lifting equipment continues to slowly hook up, and after lifting the inclined column 200-500mm from the ground, the lifting equipment stops hooking, and after the inclined column is stable, the angle α between the inclined column and the ground is detected. The error between the angle α and the installation angle of the inclined column is within ±10°. The lifting equipment, inclined column, slings and foundation are checked and confirmed again. After confirmation, the lifting equipment continues to slowly hook up, and slowly lifts the hoisted object to 300-500mm above the installation position, stops lifting, and the lifting equipment rotates the boom to lower the hook to lift the inclined column to the installation position.

6. The steel structure member hoisting process according to claim 5, characterized in that: The fixing method of the inclined column base includes the following steps: pre-arranging a first connecting plate at the butt ends of the inclined column base and the special-shaped column connecting head; fixing the second connecting plate to the first connecting plate of the inclined column base by bolts; after the inclined column is hoisted to the installation position, inserting the bolts into the second connecting plate and the first connecting plate on the special-shaped column connecting head, and when the center lines of all four sides are aligned or the deviation is controlled within the range required by the specification, tightening the bolts to fix the inclined column base.

7. The steel structure member hoisting process according to claim 6 is characterized in that: The special-shaped column includes a column section at the lower end and a connecting head at the upper end. The connecting head is bent and extended to one side. The special-shaped column is lifted at one point. The lifting point is set at the top of the column section of the special-shaped column. A lifting ear is provided at the lifting point. The lifting ear is fixedly connected to the lifting rope by a shackle.

8. The steel structure member hoisting process according to claim 7, characterized in that: A lifting lug is provided on the top of the column, and the lifting lug is fixedly connected to the lifting rope through a shackle. After the column is lifted, the column body is vertical.

9. The steel structure member hoisting process according to claim 8, characterized in that: The hoisting method of the column or special-shaped column includes the following steps: the hoisting equipment drops a hook, a lifting rope is hung on the drop hook, the hoisting equipment slowly lifts the hook, and after the lifting rope of the hoisting equipment is fully stressed and tightened, the hoisting equipment stops lifting the hook, and the hoisting equipment, the hoisted object, the lifting sling and the foundation and other factors are checked and confirmed; after confirmation, the hoisting equipment continues to slowly lift the hook, and after the hoisted object is lifted 200-500mm from the ground, the hoisting equipment stops lifting the hook, and after the column is stable, the hoisting equipment, the column and the lifting sling are checked and confirmed again, and after confirmation, the hoisting equipment continues to slowly lift the hook, and slowly lifts the hoisted object to 300-500mm above the installation position, and stops lifting; the hoisting equipment rotates the boom to lower the hook and hoist the column to the installation position.

10. The steel structure member hoisting process according to claim 9, characterized in that: The steel beam is lifted at two points, and the two lifting points are respectively set at both ends of the inclined column. The distance from the lifting point to the end of the steel beam is less than or equal to 1 / 4 of the total length of the steel beam. During lifting, the angle β between the steel beam and the lifting rope is greater than or equal to 45°.

Citation Information

Patent Citations

  • A method for hoisting and constructing ultra-high outward-inclined large-section K-shaped rigid steel column

    CN114961286B